CN113235513A CN202110615827.3A CN202110615827A CN113235513A CN 113235513 A CN113235513 A CN 113235513A CN 202110615827 A CN202110615827 A CN 202110615827A CN 113235513 A CN113235513 A CN 113235513A
Authority
CN
China
Prior art keywords
dam body
damaged
landscape
dam
travertine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110615827.3A
Other languages
Chinese (zh)
Other versions
CN113235513B (en
Inventor
裴向军
周立宏
宋会兴
杜杰
肖维阳
李怡
雷泞菲
张晓超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIUZHAI VALLEY SCENIC SPOT ADMINISTRATION
Chengdu Univeristy of Technology
Original Assignee
Chengdu Univeristy of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Univeristy of Technology filed Critical Chengdu Univeristy of Technology
Priority to CN202110615827.3A priority Critical patent/CN113235513B/en
Publication of CN113235513A publication Critical patent/CN113235513A/en
Application granted granted Critical
Publication of CN113235513B publication Critical patent/CN113235513B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/28Polysaccharides or derivatives thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Soil Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Botany (AREA)
  • Environmental Sciences (AREA)
  • Revetment (AREA)

Abstract

本发明提供了一种受损钙华坝体及景观生态修复方法,涉及受损钙华地质修复技术领域。该方法,至少包括以下步骤:对待修复的受损钙华坝体及景观按先后顺序进行振冲碎石固基、糯米灰浆筑坝、竹锚加筋护坡、生态材料堵缝、分形景观设计以及本土植物绿化。该方法能够有效修复受损钙华坝体,恢复相应的景观,并且,该方法人工干预小、环境影响小。

Figure 202110615827

The invention provides a damaged travertine dam body and a landscape ecological restoration method, and relates to the technical field of damaged travertine geological restoration. The method includes at least the following steps: vibrating the damaged travertine dam body and landscape to be repaired in order to fix the foundation, build the dam with glutinous rice mortar, reinforced slope protection with bamboo anchors, caulking with ecological materials, fractal landscape design and Native plant greenery. The method can effectively repair the damaged travertine dam and restore the corresponding landscape, and the method has less manual intervention and less environmental impact.

Figure 202110615827

Description

Damaged calcium bloom dam body and landscape ecological restoration method
Technical Field
The invention relates to the technical field of ecological restoration of a damaged calcium bloom geological landscape, in particular to a damaged calcium bloom dam body and a landscape ecological restoration method.
Background
Calcium bloom (Travertine or Tufa), also known as Travertine or Tufa, is a chemical precipitate of calcium carbonate formed by the release of a large amount of carbon dioxide when geothermal water containing calcium bicarbonate is brought close to and exposed to the surface in an open system.
The California landscape zone not only has unique karst landform scientific research value, but also has rich aesthetic value, is an important component of China and even underground landscape areas of the world, and has profound influence on local geography, economy and national culture.
In recent years, the integrity and aesthetic value of the artificial ecological building are partially or totally lost due to the large-area damage of natural operation such as earthquake, wind erosion and water erosion and human activities such as engineering construction and tourism development.
Taking Turkey cotton castle as an example, after a calcium bloom embankment collapses, mineral substances in the calcium bloom embankment become fragile under the dilution of rainstorm, the Turkey government recovers the original shape by using cement when the Turkey desert collapses for the first time, and the calcium bloom embankment is directly flushed to the downstream of a river by the rainstorm when the Turkey government collapses for the second time, and the calcium bloom embankment is not available when the Turkey cotton castle is repaired.
For damaged caltrop geology, no effective and high-applicability repairing method exists at present.
In view of this, the present application is specifically made.
Disclosure of Invention
The invention aims to provide a damaged calcium bloom dam body and a landscape ecological restoration method, which can effectively restore damaged calcium bloom geology and restore corresponding landscape, and have small manual intervention and small environmental influence.
The application can be realized as follows:
the application provides a damaged calcium-bearing dam body and a landscape ecological restoration method, which at least comprises the following steps: and (3) carrying out vibroflotation gravel fixation, sticky rice mortar dam construction, bamboo anchor reinforced slope protection, ecological material seam plugging, fractal landscape design and native plant greening on the damaged calcium dam body and the landscape to be repaired in sequence.
In an optional embodiment, the method further comprises designing a repair model to simulate and obtain a preset repair state of the damaged geological structure of the calcium dam body and data parameters in the preset repair state before repair.
In an alternative embodiment, the vibro-replacement stone matrix comprises: adopt vibroflotation gravel pile to consolidate the ground in order to reach predetermined ground bearing capacity.
In an optional embodiment, in the process of vibroflotation gravel foundation stabilization, the vibroflotation gravel piles are arranged in a plum blossom shape.
In an alternative embodiment, the distance between two adjacent vibro-crushed stone piles is 1.5-2m, preferably 1.8 m.
In an alternative embodiment, the glutinous rice mortar damming comprises: and building a dam body by using a dam building material, wherein the dam building material comprises sticky rice mortar.
In an alternative embodiment, the glutinous rice mortar is a modified glutinous rice mortar, and the modified glutinous rice mortar is prepared from glutinous rice glue, lime, gypsum, a water repellent, and plant fibers.
In an alternative embodiment, the modified glutinous rice mortar is prepared from 0.4-0.5 part of glutinous rice glue, 0.1-0.2 part of lime, 0.10-0.22 part of gypsum, 0.015-0.02 part of water repellent and 0.075-0.225 part of plant fiber by weight.
In an alternative embodiment, the modified waxy rice slurry has a flowability of 120-250mm and a setting time of 90-360 min.
In an alternative embodiment, the bamboo anchor reinforced revetment comprises: bamboo anchor reinforcement is adopted for slope protection; the bamboo anchor reinforcement is composed of a bamboo anchor rod with a hollow structure and glutinous rice mortar poured into the hollow structure;
in an alternative embodiment, a hole is formed in the slope to be protected, a bamboo anchor rod is inserted into the hole, and glutinous rice mortar is poured into the hollow area of the bamboo anchor rod.
In an optional embodiment, after the bamboo anchor reinforced slope protection is finished, the strain fluctuation of the bamboo anchor rod is not more than 800 mu epsilon.
In an alternative embodiment, the ecological material caulking comprises: and (4) grouting, reinforcing and plugging cracks on the surface of the dam body and in the dam body.
Wherein, grouting reinforcement and gap plugging are carried out by adopting ecological materials, and the ecological materials comprise glutinous rice mortar or other environment-friendly materials.
In an alternative embodiment, the ecological material is a modified glutinous rice mortar.
In an alternative embodiment, the fractal landscape design includes: and (3) designing the morphological parameters of the damaged calcium-blooming dam body and the repaired landscape on the surface of the dam body so that the repaired calcium-blooming dam body is basically consistent with the original dam body and the peripheral landscape before damage.
In an alternative embodiment, the characteristics related to the morphological parameters include the upstream face of the dam, the downstream face of the dam, and the crown line.
In an alternative embodiment, the native plant is greened by a local plant that does not affect the diversity of the native species.
The beneficial effect of this application includes:
the damaged calcium bloom dam body can be effectively repaired and the corresponding landscape can be recovered by performing vibroflotation gravel fixation, sticky rice mortar dam construction, bamboo anchor reinforced slope protection, ecological material seam plugging, fractal landscape design and native plant greening on the damaged calcium bloom dam body and the landscape to be repaired at least in sequence.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
FIG. 1 is a graph comparing the damage of an earthquake to a spark sea in example 1;
FIG. 2 is a schematic view showing pile arrangement of vibro-replacement stone piles in the repairing method provided in example 1;
fig. 3 is a schematic view of a dam repair structure in the repair method provided in embodiment 1;
FIG. 4 is a real-time photograph of the upstream curve of the spark dam body before water storage in example 1 after repair;
FIG. 5 is a photograph of a real scene of the upstream curve of the repaired spark dam in example 1 after water storage;
FIG. 6 is a photograph showing a real view of the water-exiting surface of the spark sea dam in the course of repair construction in example 1;
FIG. 7 is a photograph of a real scene of the withdrawal surface of the spark dam at the later stage of the repair construction in example 1;
FIG. 8 is a photograph of a real scene of the restored pre-impoundment spark dam exit surface of example 1;
fig. 9 is a photograph of a real scene of the restored water-stored spark dam body waterfall in example 1.
Icon: 1-a gravel cushion layer; 2-a dam body; 3-restoring the surface layer; 4-vibrating the gravel pile; 5-glutinous rice mortar block stone; 6-glutinous rice mortar and calhua mixture.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below. The examples, in which specific conditions are not specified, were conducted under conventional conditions or conditions recommended by the manufacturer. The reagents or instruments used are not indicated by the manufacturer, and are all conventional products available commercially.
The method for restoring the ecology of the damaged calcium bloom geological landscape provided by the application is specifically explained below.
The application provides a damaged calcium bloom geological landscape ecological restoration method, which at least comprises the following steps: and (3) performing vibroflotation, stone crushing and foundation fixing, sticky rice mortar dam building, reinforcing rib slope protection, dam body reinforcement, fractal landscape design and plant greening on the damaged calcium bloom geological landscape to be repaired in sequence.
Preferably, the method further comprises designing a repair model to simulate and obtain the preset repair state of the damaged calcium dam and the landscape and the data parameters in the preset repair state before repair.
By the green ecological restoration technology, the groundwater seepage, surface water overflow, ecological water supply and atmospheric precipitation regulation of the relevant damaged calcium bloom dam body can be restored, and the ecological balance of microorganisms and calcium bloom can be maintained.
In an alternative embodiment, the vibro-replacement stone matrix comprises: adopt vibroflotation gravel pile to consolidate the ground in order to reach predetermined ground bearing capacity.
Taking the damaged calcium bloom geological landscape to be repaired as a dam body form as an example, the stability and the bearing capacity of the dam foundation can be improved and the groundwater seepage can be reduced by reinforcing the dam foundation by using the vibroflotation gravel pile. The vibroflotation gravel pile can be used for the stratum such as sandy soil, mucky soil, silt soil, underwater conditions and the like, and has the characteristics of great improvement on the bearing capacity of the foundation, high construction speed, environment-friendly materials, excellent economy and the like.
In the process of vibroflotation gravel consolidation, the vibroflotation gravel piles are arranged in a plum blossom shape (the front row and the rear row are arranged in a crossed way). In some specific embodiments, the distance between two adjacent vibro-replacement stone piles may be 1.5-2m, preferably 1.8m, and in addition, other distances may be set according to actual conditions.
When the bottom layer of the dam foundation is a soft layer (such as a sludge layer), before the vibroflotation gravel pile is arranged, a gravel cushion layer is laid firstly, and then the vibroflotation gravel pile is inserted into and penetrates through the gravel cushion layer to a deeper position, so that the gravel cushion layer plays a certain role in fixing the vibroflotation gravel pile.
It should be noted that the pile diameter, the insertion depth, the pile spacing, the mud content of the broken stones contained in the vibroflotation gravel pile, the particle size of the broken stones, and the like of the vibroflotation gravel pile depend on different specific situations of the damaged calcium bloom geological landscape to be repaired (including the specific position of the damaged calcium bloom geological landscape to be repaired, the area to be repaired, and the like).
In some preferred embodiments, the broken stones used for vibro-replacement stone column directly adopt the broken stones existing in damaged calcium bloom geological landscape to be repaired and the surrounding mountain collapse, the materials are obtained from local sources, the broken stone transportation cost can be reduced, and the materials are environment-friendly and excellent in economical efficiency.
In an alternative embodiment, the glutinous rice mortar damming comprises: and building a dam body by using a dam building material, wherein the dam building material comprises sticky rice mortar. The sticky rice mortar is obtained by mixing sticky rice soup and mortar, wherein the amylopectin contained in the sticky rice soup can control the growth of calcium carbonate crystals on one hand and can generate a compact microstructure on the other hand, so that the dam body has higher strength.
Preferably, the above-mentioned glutinous rice mortar may be a modified glutinous rice mortar prepared from materials including glutinous rice glue, lime, gypsum, a water repellent and plant fibers.
The modified glutinous rice mortar may be prepared from 0.4-0.5 parts by weight of glutinous rice glue, 0.1-0.2 parts by weight of lime, 0.10-0.22 parts by weight of gypsum, 0.015-0.02 parts by weight of water repellent, and 0.075-0.225 parts by weight of plant fiber.
Wherein the content of glutinous rice glue can be 0.4 part, 0.45 part or 0.5 part, and can also be any other value within the range of 0.4-0.5. The lime content may be 0.1, 0.15 or 0.2 parts, or any other value within the range of 0.1-0.2. The content of gypsum may be 0.1 part, 0.15 part, 0.2 part, and 0.22 part, and may be any other value within the range of 0.10 to 0.22. The water repellent can be 0.015 part, 0.018 part or 0.02 part, and can also be any value within the range of 0.015-0.02. The vegetable fiber can be 0.075 part, 0.1 part, 0.15 part, 0.2 part, or 0.225 part, or any other value within the range of 0.075 to 0.225. The water repellent and the plant fiber may be those commonly used in the art, and are not limited herein.
Preferably, the fluidity of the modified glutinous rice mortar is 120-250mm, the setting time is 90-360min, and the technical problems of difficult water flowing and condensation and durability of the lime-based material are solved.
In an alternative embodiment, the bamboo anchor reinforced revetment comprises: bamboo anchor reinforcement is adopted for slope protection; the bamboo anchor reinforcement is composed of a bamboo anchor rod with a hollow structure and glutinous rice mortar poured into the hollow structure.
Also in this application, use the bamboo stock to replace ordinary reinforcing bar stock, also replace the reinforcing bar in the ordinary stock with the bamboo timber. Meanwhile, glutinous rice mortar is used as a grouting material instead of cement mortar. The reinforcing rib at least has the advantages of environmental protection and low energy consumption. The sticky rice mortar and the bamboo anchor rod are matched to form a reinforcing rib structure and effectively improve the stability of the whole slope surface of the dam body.
In operation, the hole is opened on the slope to be protected, the bamboo anchor rod is inserted into the hole, and then the glutinous rice mortar is poured into the hollow area of the bamboo anchor rod. The inserting depth of the bamboo anchor rod is at least inserted into a fastening area inside the slope-dam body, so that the bamboo anchor rod forms an anchoring section, a free section and an expenditure section from bottom to top, wherein the anchoring section is located in the fastening area inside the slope and the dam body, the free section is located in a loose area relative to the fastening area, and the expenditure section is located outside the slope.
The bamboo anchor rod reinforcement working process is as follows: the plastic deformation zone of the bamboo anchor rod mainly appears at the bamboo joint part of the bamboo anchor rod, and the bamboo joint and the slurry cementing surface are continuously damaged in the friction extrusion process and other processes due to factors such as stress and the like to form a separation friction deformation zone, so that the efficacy is finally lost.
Preferably, after the bamboo anchor reinforced slope protection is finished, the strain fluctuation of the bamboo anchor is not more than 800 mu epsilon (1 mu epsilon-10)-6)。
In an alternative embodiment, the ecological material caulking comprises: and (4) grouting, reinforcing and plugging cracks on the surface of the dam body and in the dam body.
Wherein, grouting reinforcement and caulking are carried out by adopting ecological materials, and the ecological materials comprise glutinous rice mortar or other environment-friendly materials, preferably the modified glutinous rice mortar.
According to the thickness and the unstable degree of the residual dam body after grouting, the arrangement of grouting holes can be selectively and correspondingly increased at the position of the dam abutment.
Furthermore, a restoring surface layer is arranged on the surface of the dam body by using a mixture of the sticky rice mortar and the calcium bloom, and the designed shape can be displayed in a form of weaving a wire mesh (which can contain carbon fibers), using reinforcing steel bars as an outer support and pouring the sticky rice mortar and the calcium bloom mixture by adopting a mesh-weaving mode.
In an alternative embodiment, the fractal landscape design includes: and (3) designing the morphological parameters of the damaged calcium-blooming dam body and the repaired landscape on the surface of the dam body so that the repaired calcium-blooming dam body is basically consistent with the original dam body and the peripheral landscape before damage.
The above morphological parameters may be referred to as features including the upstream face of the dam, the downstream face of the dam, and the crown line.
Specifically, morphological parameters of the repaired dam body are constructed by quantizing characteristics of the remained dam body such as the upstream surface, the outlet surface and the crown line by adopting fractal dimension parameters, so that the repaired dam body is consistent with the original dam body and the surrounding landscape in the aspects of symmetry, rhythm and the like, harmony of the repaired dam body and the surrounding landscape is realized, and the visual unity is formed.
In an alternative embodiment, the native plant is greened by a local plant that does not affect the diversity of the native species. Specifically, a soil seed bank method can be adopted to collect residual dam body surface soil and cover soil to restore the ground cover plants of the dam body for planting, so that the species for repairing the dam body are all native species. The native plants are used as the main unit of the green restoration of the dam body and are ecologically compatible with the original environment, so that the original plant ecological environment of the dam body is restored.
On the basis, the damaged calcium dam body can be effectively repaired by the method, and the originality and the integrity of the damaged calcium dam body are recovered.
The features and properties of the present invention are described in further detail below with reference to examples.
Examples
The spark ocean is known as the blue lake, the Pond; the periphery of the lake is dense forest, and the lake water is hidden in heavy emerald, such as a crystal and clear emerald.The aesthetic value of the sparkling sea mainly comprises a calcium bloom lake, a calcium bloom waterfall and dam, vegetation growing on the calcium bloom dam and the lake bank, aquatic animals and plants and the like. The elevation of the spark sea lake is about 2178m, the area is about 3.5ha, the depth is 9-16.5m, and the storage capacity is about 4.5 multiplied by 105m3
7.0-level earthquake in 8.8.8 days of Kyuhai village in 2017 causes the damage of the core landscape spark sea calhua heritage point in the Kyuhai village scenic region to be serious. The downstream dam breaking dike of the sparkling sea (the middle part breaks to form a trapezoidal gap with the length of about 40m, the thickness of about 12m in the south and north and the depth of about 15 m) is almost completely dried up. Meanwhile, in the period more than one year after the earthquake, the calcium bloom continuously degrades, including continuous collapse of calcium bloom dams at the upstream and downstream of the spark sea and lakes and calcium bloom dunes in the lakes, desertification, weathering, blackening, erosion and corrosion of the calcium bloom, pollution type microorganisms appear at the bottom of the lake due to drying of the spark sea, the biomass of algae is obviously increased, and some woody plants of the salicaceae and rosaceous families appear at the bottom of the lake.
The evaluation results show that earthquakes greatly reduce the aesthetic value of the spark sea. The landscape characteristic element affected most is the disappearance of lake water, namely the sparkling sea lake; secondly, the instability of the calcium bloom and the reduction of the aesthetic value of the degraded calcium bloom are caused; in addition, vegetation landscape destruction, waterfall disappearance, and fish species number reduction due to habitat loss are also manifestations of reduced aesthetic value of earthquakes on sparkling seas.
Meanwhile, the sparkling sea, the downstream double-dragon sea, the upstream horizontal dragon sea and the tree positive group sea form a long-term stable lake-calcium bloom dam system. The spark sea dykes and dams are dug up to cause the spark sea to be dried up to form a water head difference, so that the balance is broken, and the risk that the system is broken down in a further lake is increased. A comparative graph of the damage of an earthquake to a spark sea is shown in fig. 1.
The embodiment provides an ecological restoration method for a Kyuai ditch sparkling sea landscape, which refers to the following steps:
(1) model set-up
Before repair, a repair model (a corresponding spark sea dam model can be constructed by adopting sketch up) is designed to simulate and obtain a preset repair state of the damaged calcium dam body and data parameters in the preset repair state. Meanwhile, the plane, the vertical face and the section of the waterfall are combined to guide the site construction.
(2) Vibroflotation gravel solid foundation
The vibroflotation gravel pile is adopted to reinforce the foundation so as to achieve the preset foundation bearing capacity, improve the stability and the bearing capacity of the dam foundation and reduce the groundwater seepage.
The used broken stone is broken stone left after the earthquake in the spark sea area and is introduced into the materials related to the stratum such as sandy soil, mucky soil, silt soil, underwater conditions and the like, and the method has the characteristics of great improvement on the bearing capacity of the foundation, high construction speed, environment-friendly materials, excellent economy and the like.
In the process of vibro-replacement and foundation stabilization, the arrangement of vibro-replacement stone piles is shown in fig. 2. That is, the pile arrangement form is plum blossom-shaped arrangement, and can also be understood as arrangement in multiple rows and multiple columns, each row and each column are staggered, the distance between two adjacent rows is 1.8m, and the distance between two adjacent columns is 1.8 m.
The composite foundation stability analysis calculation result is as follows: 305.3 Kpa; total settling of downstream (zone i): 29.72 mm; total settling on upstream (partition ii): 59.91 mm.
(3) Glutinous rice mortar damming
Mixing 0.4-0.5 part of glutinous rice glue, 0.1 part of lime, 0.16 part of gypsum, 0.015-0.02 part of water repellent and 0.075-0.225 part of plant fiber to obtain the modified glutinous rice mortar.
And (3) building a dam body by using the modified sticky rice mortar as a dam building material.
(4) Reinforced slope protection
The bamboo anchor rod with the diameter of 80mm is used for replacing a common steel bar anchor rod (bamboo is used for replacing steel bars in the common anchor rod), and meanwhile, glutinous rice mortar is used for replacing cement mortar to serve as a grouting material. The reinforcing rib structure is formed by the bamboo anchor rod with the hollow structure and the glutinous rice mortar poured into the hollow structure.
And (3) drilling a hole on the slope to be protected, inserting the bamboo anchor rod into the hole, and pouring glutinous rice mortar into the hollow area of the bamboo anchor rod. The inserting depth of the bamboo anchor rod is at least inserted into a fastening area inside the slope-dam body, so that the bamboo anchor rod forms an anchoring section, a free section and an expenditure section from bottom to top, wherein the anchoring section is located in the fastening area inside the slope and the dam body, the free section is located in a loose area relative to the fastening area, and the expenditure section is located outside the slope.
After the bamboo anchor reinforcement slope protection is finished, the strain fluctuation of the bamboo anchor rod is not more than 800 mu epsilon.
(5) Ecological material caulking
The modified glutinous rice mortar is used for grouting, caulking and reinforcing cracks on the surface of the dam body and in the dam body.
According to the thickness and the instability degree of the residual dam body of the slurry, arranging grouting holes at the position of the dam abutment correspondingly; and the grouting holes are arranged on the left bank and the right bank of the upstream residual dam body and the downstream residual dam body.
The grouting holes are also arranged in a quincunx shape, the pitch of the holes is 2m, the aperture is 90mm, the depth of the holes is 13m, and the row pitch is 1.5 m.
Further, the step is narrower in the dam body construction of spark sea conservation dam upstream face, can't clear up through the view of piling up the mode of stone, so, restore the top layer with sticky rice mortar and calcium hua mixture setting on dam body surface, specific: the designed model is shown in the form of woven wire mesh, steel bar for external support and glutinous rice mortar pouring, and the designed model is shown in the form of woven wire mesh, steel bar for external support and glutinous rice mortar and calcium mixture pouring.
Referring to fig. 3, the arrow indicates the water flow direction, the lower layer of the dam body 2 is provided with at least 4m of gravel cushion layer 1, the vibrating gravel pile 4 is inserted into and penetrates through the gravel cushion layer 1 to enter the lower part of the gravel cushion layer 1, the upper part of the gravel cushion layer 1 is used for building the dam body 2 by using sticky rice mortar stones 5, the width of the top platform of the dam body 2 is 13m, the height of the dam body 2 is 8.7m, and the slopes of two sides of the dam body 2 are respectively 1:0.5 and 1: 0.7. A recovery surface layer 3 is arranged above the dam body 2 by using a mixture 6 of glutinous rice mortar and calcium bloom, the height of the recovery surface layer 3 is 2.8m, protective blankets are further arranged on two sides of the bottom of the dam body 2, the height of the protective blanket on the upstream side is 1m, and the height of the protective blanket on the downstream side is 2 m. The length of the blanket located on the downstream side was 8 m. The glutinous rice mortar stone 5 used in the blanket had a diameter of 1.5 m.
(6) Fractal landscape design
On the basis of fractal characteristic analysis of the sea bank of the positive group of the core heritage point tree of the Jiuzhaigou, the obvious fractal characteristic of the sea bank of the core heritage point tree of the Jiuzhaigou is determined; and quantizing the characteristics of the upstream surface, the downstream surface, the forest crown line and the like of the residual dam body by adopting the fractal dimension parameters, constructing morphological parameters of the repaired dam body, ensuring that the repaired dam body is consistent with the original dam body and the surrounding landscape in the aspects of symmetry, rhythm and the like, realizing harmony of the repaired dam body and the surrounding landscape, and forming visual unity.
(7) Greening of native plant
The investigation result of the residual dam plant community of the sparkling sea shows that the top dominant species of the dam plant community is Chinese pine, the top-sub-layer arbor species comprise juniper, yew, white birch, aspen and the like, the shrub species comprise salix delavayi, rose, mountain ash, rhododendron, berberis chuanensis and the like, the herbaceous plants are distributed sporadically, and the diversity of the whole community is high. In order to not introduce foreign species, plants such as Chinese pine, juniper, salix sinomontana, barberry, rhododendron and the like flushed out from the upstream and downstream of the spark dam body due to dam body collapse, debris flow and the like are collected in the project implementation process, shrub species such as almond, spruce, oriental paperbush and the like which are plant materials in the trenches of the nine villages are replanted, soil on the surface layer of the residual dam body is collected by a soil seed bank method, the ground cover plant of the dam body is recovered by covering soil, and the species for repairing the dam body are all native species.
The plant species and number for dam recovery applications are shown in table 1:
TABLE 1 details of indigenous plants used for greening
Figure BDA0003097969210000111
The dam crest landscape is based on fractal art as a theoretical basis, corresponding drawings are designed by combining the original form, landform and plant configuration condition of the residual dam body, micro-topography is built, the water flow direction is controlled by the topography, the water quantity is controlled by controlling the height and the form of a water inlet, and finally the waterfall stacking landscape is formed.
In addition, when the spark sea conservation dam is built, the residual dam body still needs to be reinforced, and the stability and the safety of the residual dam body are improved. The construction adopts the step dam face plate to reinforce the residual dam body, but the step face plate is too artificial and cannot enter the surrounding natural environment, thus destroying the landscape effect of the peripheral embankment. Through adopting the mode that stone is piled up, the netting is pour, the withered wood is decorated to carry out the view to the step panel and clear up, reach the integration with the surrounding environment.
The effect before and after the spark-sea repair is shown in fig. 4 to 9. The result shows that the repairing method provided by the embodiment effectively repairs the spark sea dam body and maintains the authenticity and integrity of the spark sea spot before the earthquake.
In summary, the damaged calcium bloom dam body and the landscape to be repaired are subjected to vibroflotation gravel fixation, sticky rice mortar dam construction, bamboo anchor reinforced slope protection, ecological material seam plugging, fractal landscape design and native plant greening at least in sequence, so that the damaged calcium bloom geology can be effectively repaired, the corresponding landscape is recovered, and the method is small in manual intervention and small in environmental influence.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1.一种受损钙华坝体及景观生态修复方法,其特征在于,至少包括以下步骤:对待修复的受损钙华坝体及景观按先后顺序进行振冲碎石固基、糯米灰浆筑坝、竹锚加筋护坡、生态材料堵缝、分形景观设计以及本土植物绿化。1. a damaged travertine dam body and a landscape ecological restoration method are characterized in that, at least the following steps are included: the damaged travertine dam body and the landscape that are to be repaired are vibrated and crushed to solidify the foundation, and the glutinous rice mortar is constructed in sequence. Dam, bamboo anchor reinforced slope protection, ecological material caulking, fractal landscape design and native plant greening. 2.根据权利要求1所述的受损钙华坝体及景观生态修复方法,其特征在于,还包括在修复前,设计修复模型以模拟获得受损的钙华坝体地质的预设修复状态以及预设修复状态下的数据参数。2. The damaged travertine dam body and landscape ecological restoration method according to claim 1, characterized in that, further comprising, before restoration, designing a restoration model to simulate a preset restoration state of the damaged travertine dam body geology And the data parameters in the preset repair state. 3.根据权利要求2所述的受损钙华坝体及景观生态修复方法,其特征在于,所述振冲碎石固基包括:采用振冲碎石桩对地基进行加固以达到预设的地基承载力;3. The damaged travertine dam body and landscape ecological restoration method according to claim 2, characterized in that, the vibrating crushed stone solid foundation comprises: adopting vibro-flushing crushed stone piles to reinforce the foundation to achieve a preset value. Bearing capacity of foundation; 优选地,所述振冲碎石固基过程中,振冲碎石桩呈梅花状排布;Preferably, in the process of vibrating and crushing stone to solidify the foundation, the vibrating and crushing stone piles are arranged in a plum blossom shape; 优选地,相邻两个所述振冲碎石桩之间的距离为1.5-2m,优选为1.8m。Preferably, the distance between two adjacent vibro-flushed stone piles is 1.5-2m, preferably 1.8m. 4.根据权利要求1所述的受损钙华坝体及景观生态修复方法,其特征在于,糯米灰浆筑坝包括:以筑坝材料进行坝体筑造,所述筑坝材料包括糯米灰浆。4 . The damaged travertine dam body and landscape ecological restoration method according to claim 1 , wherein building a dam with sticky rice mortar comprises: building a dam body with a dam building material, and the dam building material includes sticky rice mortar. 5 . 5.根据权利要求4所述的受损钙华坝体及景观生态修复方法,其特征在于,所述糯米灰浆为改性糯米灰浆,所述改性糯米灰浆的制备原料包括糯米胶、石灰、石膏、憎水剂以及植物纤维。5. damaged travertine dam body and landscape ecological restoration method according to claim 4, is characterized in that, described glutinous rice mortar is modified glutinous rice mortar, and the preparation raw material of described modified glutinous rice mortar comprises glutinous rice glue, lime, Gypsum, water repellent and vegetable fibers. 6.根据权利要求5所述的受损钙华坝体及景观生态修复方法,其特征在于,按重量份数计,所述改性糯米灰浆的制备原料包括0.4-0.5份所述糯米胶、0.1-0.2份所述石灰、0.10-0.22份所述石膏、0.015-0.02份所述憎水剂以及0.075-0.225份所述植物纤维;6. The damaged travertine dam body and landscape ecological restoration method according to claim 5, wherein, in parts by weight, the preparation raw materials of the modified glutinous rice mortar comprise 0.4-0.5 parts of the glutinous rice glue, 0.1-0.2 part of the lime, 0.10-0.22 part of the gypsum, 0.015-0.02 part of the water repellent, and 0.075-0.225 part of the plant fiber; 优选地,所述改性糯米灰浆的流动性为120-250mm,凝结时间为90-360min。Preferably, the fluidity of the modified glutinous rice mortar is 120-250mm, and the setting time is 90-360min. 7.根据权利要求6所述的受损钙华坝体及景观生态修复方法,其特征在于,竹锚加筋护坡包括:采用竹锚加筋进行护坡;所述竹锚加筋由具有空心结构的竹锚杆以及灌注于所述空心结构的糯米灰浆构成;7. damaged travertine dam body and landscape ecological restoration method according to claim 6, is characterized in that, bamboo anchor reinforcement reinforcement comprises: adopt bamboo anchor reinforcement to carry out slope protection; the bamboo anchor rod and the glutinous rice mortar poured into the hollow structure; 优选地,在待保护的边坡开孔,将所述竹锚杆插入所述开孔中,于所述竹锚杆的空心区域灌注所述糯米灰浆;Preferably, opening a hole in the slope to be protected, inserting the bamboo anchor rod into the opening, and pouring the glutinous rice mortar into the hollow area of the bamboo anchor rod; 优选地,竹锚加筋护坡完成后,所述竹锚杆的应变波动不超过800με。Preferably, after the bamboo anchor reinforced slope protection is completed, the strain fluctuation of the bamboo anchor rod does not exceed 800με. 8.根据权利要求6所述的受损钙华坝体及景观生态修复方法,其特征在于,生态材料堵缝包括:对坝体表面和坝体内部的裂缝进行灌浆加固和堵缝;8. The damaged travertine dam body and landscape ecological restoration method according to claim 6, wherein the ecological material caulking comprises: grouting reinforcement and caulking the cracks on the surface of the dam body and the interior of the dam body; 其中,灌浆加固和堵缝采用生态材料进行,所述生态材料包括糯米灰浆或其它环境友好材料;Wherein, grouting reinforcement and caulking are performed with ecological materials, and the ecological materials include glutinous rice mortar or other environmentally friendly materials; 优选地,所述生态材料为所述改性糯米灰浆。Preferably, the ecological material is the modified glutinous rice mortar. 9.根据权利要求2所述的受损钙华坝体及景观生态修复方法,其特征在于,分形景观设计包括:对受损钙华坝体的形态参数以及坝体表面的修复景观进行设计以使修复后的钙华坝体与未受损前原有坝体及周边景观基本保持一致;9. The damaged travertine dam body and landscape ecological restoration method according to claim 2, wherein the fractal landscape design comprises: designing the morphological parameters of the damaged travertine dam body and the restoration landscape on the surface of the dam body to Make the restored travertine dam basically the same as the original dam and surrounding landscape before it was damaged; 优选地,所述形态参数所涉及的特征包括坝体迎水面、坝体退水面以及林冠线。Preferably, the features involved in the morphological parameters include the upstream surface of the dam body, the receding surface of the dam body, and the canopy line. 10.根据权利要求1所述的受损钙华坝体及景观生态修复方法,其特征在于,本土植物绿化所种植的植物为不影响本土物种多样性的当地植物。10 . The damaged travertine dam body and landscape ecological restoration method according to claim 1 , wherein the plants grown by native plants are native plants that do not affect the diversity of native species. 11 .
CN202110615827.3A 2021-06-02 2021-06-02 Damaged calcium bloom dam body and landscape ecological restoration method Active CN113235513B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110615827.3A CN113235513B (en) 2021-06-02 2021-06-02 Damaged calcium bloom dam body and landscape ecological restoration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110615827.3A CN113235513B (en) 2021-06-02 2021-06-02 Damaged calcium bloom dam body and landscape ecological restoration method

Publications (2)

Publication Number Publication Date
CN113235513A true CN113235513A (en) 2021-08-10
CN113235513B CN113235513B (en) 2022-03-25

Family

ID=77136407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110615827.3A Active CN113235513B (en) 2021-06-02 2021-06-02 Damaged calcium bloom dam body and landscape ecological restoration method

Country Status (1)

Country Link
CN (1) CN113235513B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960538A (en) * 2022-05-25 2022-08-30 浙江省钱塘江管理局勘测设计院 Glutinous rice mortar paving construction method
CN116349575A (en) * 2023-05-10 2023-06-30 成都理工大学 A kind of glutinous rice mortar planting soil and its construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208650068U (en) * 2018-03-27 2019-03-26 西南科技大学 A travertine landscape restoration and conservation bamboo and wood geogrid
CN112195910A (en) * 2020-07-10 2021-01-08 中国电建集团华东勘测设计研究院有限公司 A soft foundation treatment structure and construction method of an earth-rock dam reinforced with vibro-flushed gravel piles and rockfill body

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208650068U (en) * 2018-03-27 2019-03-26 西南科技大学 A travertine landscape restoration and conservation bamboo and wood geogrid
CN112195910A (en) * 2020-07-10 2021-01-08 中国电建集团华东勘测设计研究院有限公司 A soft foundation treatment structure and construction method of an earth-rock dam reinforced with vibro-flushed gravel piles and rockfill body

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范明明等: "改性糯米灰浆的室内研究及在九寨沟钙华地质裂缝修复中的应用", 《水文地质工程地质》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960538A (en) * 2022-05-25 2022-08-30 浙江省钱塘江管理局勘测设计院 Glutinous rice mortar paving construction method
CN116349575A (en) * 2023-05-10 2023-06-30 成都理工大学 A kind of glutinous rice mortar planting soil and its construction method

Also Published As

Publication number Publication date
CN113235513B (en) 2022-03-25

Similar Documents

Publication Publication Date Title
CN105862887B (en) A kind of ion type rareearth mine ecological slope protection structure
CN105178245A (en) Large filling bag ecological embankment and revetment building method for river lake channel
US20210324258A1 (en) Protection of Structures with Subterranean Injection of Lignocellulosic Solids
CN106759104B (en) Ecological slope protection structure and construction method
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN114182686B (en) Ecological slope protection of log frame and resource-resourced concrete combined structure and its construction method
CN113235513B (en) Damaged calcium bloom dam body and landscape ecological restoration method
CN212956378U (en) Intertidal zone ecological revetment structure
CN104234061A (en) Reinforced ecological concrete revetment and construction method thereof
CN103603316A (en) Ecological cement and geocell combination slope protection technology
CN108640409A (en) A kind of combined biological shore protection and its construction method
CN102953353B (en) A method for ecological slope protection of river embankments reinforced by microorganisms
CN110725277A (en) A scour-resistant ecological management method for the riparian zone
CN105839590A (en) Contour planting ecological management method and structural body thereof in medium-steep soil slope drawdown area
CN108547254A (en) A kind of river channel ecology shore protection and its construction method
CN207392130U (en) A kind of ecology block stone revetment structure
CN204738325U (en) Repairing and reinforcing scarp
EP4267802B1 (en) Subterranean placement of lignocellulosic materials
CN108930253B (en) Ecological flexible slope protection structure for river channel and construction method
CN215715388U (en) Combined type high and steep slope mine ecological restoration treatment system
CN104480951B (en) A kind of method of flinty slope ecology softening
CN104005370A (en) Reinforced soil light revetment retaining wall for hollow brick ecological surface cover and construction method thereof
CN205530299U (en) Ecological slope protection structure in ion type rare earth mine mountain
CN206245321U (en) Cut slope composite supporting construction
CN102369834B (en) Aggregate bio-substrate concrete (BSC) and preparation and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240808

Address after: Three road 610000 Sichuan city of Chengdu province Chenghua District Erxian Qiaodong No. 1

Patentee after: Chengdu University of Technology

Country or region after: China

Patentee after: JIUZHAI VALLEY SCENIC SPOT ADMINISTRATION

Address before: Three road 610000 Sichuan city of Chengdu province Chenghua District Erxian Qiaodong No. 1

Patentee before: Chengdu University of Technology

Country or region before: China