CN113187515B - Tunnel secondary lining with assembled UHPC structure as bottom die and construction method thereof - Google Patents
Tunnel secondary lining with assembled UHPC structure as bottom die and construction method thereof Download PDFInfo
- Publication number
- CN113187515B CN113187515B CN202110592274.4A CN202110592274A CN113187515B CN 113187515 B CN113187515 B CN 113187515B CN 202110592274 A CN202110592274 A CN 202110592274A CN 113187515 B CN113187515 B CN 113187515B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- uhpc
- secondary lining
- section
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/385—Sealing means positioned between adjacent lining members
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及一种以装配式UHPC结构为底模的隧道二次衬砌,包括分别拼装在隧道坑道左侧墙节段、右侧墙节段和拱顶节段的UHPC肋板梁节段,整体形成装配式UHPC结构,作为隧道二次衬砌的底模,该底模与二次衬砌外侧钢筋网浇筑为一体。充分发挥UHPC的超高抗压强度、高抗裂性、抗渗性和抗冻融,以及高耐久性的性能,预制节段构件的尺寸精度和质量可以得到保证;洞内采用机械化拼装可缩短工期和改善劳动条件;拼装成环后可作为浇筑混凝土的免拆除模板,并承受灌浆和现浇混凝土的自重,减少内腔钢筋骨架绑扎工作量,节省大量的支撑材料和劳力。同时本发明结构简单,设计合理,施工方便,可广泛应用于隧道结构中,提高施工效率和使用寿命。
The invention relates to a tunnel secondary lining with a prefabricated UHPC structure as the bottom form, including UHPC rib beam sections assembled on the left wall section, right side wall section and vault section of the tunnel tunnel respectively. A prefabricated UHPC structure is formed, which is used as the base form of the secondary lining of the tunnel, and the base form is integrated with the external reinforcement mesh of the secondary lining. By giving full play to UHPC's ultra-high compressive strength, high crack resistance, impermeability, freeze-thaw resistance, and high durability, the dimensional accuracy and quality of prefabricated segmental components can be guaranteed; mechanized assembly in the hole can shorten the Construction period and improved working conditions; assembled into a ring, it can be used as a demolition-free formwork for pouring concrete, and bear the self-weight of grouting and cast-in-place concrete, reducing the workload of tying the steel skeleton in the inner cavity, and saving a lot of supporting materials and labor. At the same time, the invention has simple structure, reasonable design and convenient construction, can be widely used in tunnel structures, and improves construction efficiency and service life.
Description
技术领域technical field
本发明涉及一种以装配式UHPC结构为底模的隧道二次衬砌及其施工方法。The invention relates to a secondary lining of a tunnel using an assembled UHPC structure as a base form and a construction method thereof.
背景技术Background technique
隧道是我国交通基础设施非常重要的组成部分,现有隧道存在施工作业条件恶劣、施工工序繁多、施工质量难以保证,尤其是隧道二次衬砌内侧存在冻害、渗漏水、衬砌裂损、钢筋外露等病害,提高了运行维护成本,降低了使用寿命。Tunnels are a very important part of my country's transportation infrastructure. Existing tunnels have harsh construction conditions, numerous construction procedures, and difficult construction quality assurance, especially frost damage, water leakage, lining cracks, and exposed steel bars on the inner side of the secondary lining of the tunnel. and other diseases, which increase the operation and maintenance cost and reduce the service life.
发明内容Contents of the invention
鉴于现有技术的不足,本发明所要解决的技术问题是提供一种以装配式UHPC结构为底模的隧道二次衬砌及其施工方法。In view of the deficiencies in the prior art, the technical problem to be solved by the present invention is to provide a secondary lining of a tunnel with a prefabricated UHPC structure as the bottom form and a construction method thereof.
为了解决上述技术问题,本发明的技术方案是:一种以装配式UHPC结构为底模的隧道二次衬砌,包括分别拼装在隧道坑道左侧墙节段、右侧墙节段和拱顶节段的UHPC肋板梁节段,整体形成装配式UHPC结构,作为隧道二次衬砌的底模,该底模内部与二次衬砌外侧钢筋网浇筑为一体。In order to solve the above-mentioned technical problems, the technical solution of the present invention is: a secondary lining of the tunnel with the assembled UHPC structure as the bottom formwork, including the left wall section, the right wall section and the vault section respectively assembled in the tunnel tunnel. The UHPC ribbed beam segment of the section forms a prefabricated UHPC structure as a whole, which is used as the bottom formwork for the secondary lining of the tunnel. The inside of the bottom formwork is integrated with the outer reinforcement mesh of the secondary lining.
优选的,左侧墙节段与右侧墙节段的UHPC肋板梁节段分别拼装至仰拱左右两端,仰拱为预制或现浇的钢筋混凝土结构。Preferably, the UHPC rib beam segments of the left wall segment and the right wall segment are respectively assembled to the left and right ends of the invert, and the invert is a prefabricated or cast-in-place reinforced concrete structure.
优选的,拱顶节段的UHPC肋板梁节段悬挂拼装至左侧墙节段和右侧墙节段的UHPC肋板梁节段牛腿上,形成沿隧道纵向方向一环接一环的装配式UHPC结构。Preferably, the UHPC rib beam segment of the vault segment is suspended and assembled to the UHPC rib beam segment corbels of the left wall segment and the right wall segment, forming a ring-to-ring loop along the longitudinal direction of the tunnel. Fabricated UHPC structure.
优选的,左侧墙节段、右侧墙节段的UHPC肋板梁节段和仰拱的拼接处需用锚杆进行连接,相邻UHPC肋板梁节段的拼接处需用锚杆进行连接,所有拼接处设防水密封垫。Preferably, the joints between the UHPC rib beam segments and the inverted arches of the left wall segment and the right wall segment need to be connected with anchor rods, and the joints of adjacent UHPC rib beam segments need to be connected with anchor rods. All joints are provided with waterproof gaskets.
优选的,UHPC肋板梁节段均包括纵向弧线与隧道的内轮廓一致的底板,底板沿其弧线轨迹固设有若干道肋板与若干道横隔板,底板、肋板和横隔板内部均配置钢筋骨架,且肋板和横隔板均位于底模的内部。Preferably, the UHPC ribbed girder segments all include a bottom plate whose longitudinal arc is consistent with the inner contour of the tunnel, and the bottom plate is fixed with several ribs and several transverse diaphragms along the arc trajectory, and the bottom plate, ribs and transverse diaphragm The interior of the slab is equipped with a reinforced skeleton, and the ribs and diaphragms are located inside the bottom formwork.
优选的,肋板底部均设置有若干个圆孔,用于对穿钢筋条;二次衬砌外侧钢筋网与底模内部浇筑有普通混凝土层。Preferably, several round holes are provided at the bottom of the ribs for piercing through the steel bars; the outer steel mesh of the secondary lining and the inside of the bottom form are poured with ordinary concrete layers.
优选的,底模的侧部设有灌浆工作孔洞。Preferably, grouting holes are provided on the side of the bottom form.
一种以装配式UHPC结构为底模的隧道二次衬砌的施工方法,按以下步骤进行:(1)根据实际现场情况以及工艺要求,将隧道支护结构横断面分成四部分,包括左侧墙节段、右侧墙节段、拱顶节段和仰拱;(2)全断面开挖后,现浇施工或者预制吊装仰拱;(3)绑扎UHPC肋板梁节段的底板、肋板和横隔板的钢筋骨架,浇筑UHPC肋板梁节段的混凝土;(4)绑扎隧道二次衬砌外侧钢筋网;(5)待UHPC肋板梁节段养护达到强度后,运进隧道坑道内,用机械进行拼装;(6)左侧墙节段和右侧墙节段分别拼装至仰拱左右两端;(7)拱顶节段悬挂拼装至左侧墙节段和右侧墙节段的牛腿上形成沿隧道纵向方向一环接一环的装配式UHPC结构;(8)左侧墙节段、右侧墙节段、拱顶节段和仰拱的拼接处需用锚杆进行连接,拼接处需设防水密封垫;(9)以装配式UHPC结构作为底模,现浇普通混凝土形成隧道二次衬砌,完成施工制作。A construction method for the secondary lining of the tunnel using the prefabricated UHPC structure as the bottom form, which is carried out according to the following steps: (1) According to the actual site conditions and process requirements, the cross section of the tunnel support structure is divided into four parts, including the left wall segment, right side wall segment, vault segment and invert; (2) after full section excavation, cast-in-place construction or prefabricated hoisting invert; For the reinforced skeleton of the clapboard, pour the concrete of the UHPC rib beam segment; (4) Bind the outer reinforcement mesh of the secondary lining of the tunnel; Mechanical assembly; (6) The left and right wall segments are assembled to the left and right ends of the inverted arch; (7) The vault segment is hung and assembled to the left and right wall segments. A prefabricated UHPC structure is formed on the legs one after another along the longitudinal direction of the tunnel; (8) The joints of the left wall segment, right wall segment, vault segment and inverted arch need to be connected with anchor rods, and the joints A waterproof gasket is required; (9) The prefabricated UHPC structure is used as the bottom form, and the ordinary concrete is poured in place to form the secondary lining of the tunnel, and the construction is completed.
与现有技术相比,本发明具有以下有益效果:充分发挥UHPC的超高抗压强度、高抗裂性、抗渗性和抗冻融,以及高耐久性的性能,预制节段构件的尺寸精度和质量可以得到保证;洞内采用机械化拼装可缩短工期和改善劳动条件;拼装成环后可作为浇筑混凝土的免拆除模板,并承受灌浆和现浇混凝土的自重,减少内腔钢筋骨架绑扎工作量,节省大量的支撑材料和劳力。同时本发明结构简单,设计合理,施工方便,可广泛应用于隧道结构中,提高施工效率和使用寿命。Compared with the prior art, the present invention has the following beneficial effects: give full play to the ultra-high compressive strength, high crack resistance, impermeability and freeze-thaw resistance of UHPC, and the performance of high durability, the size of the prefabricated segmental components The accuracy and quality can be guaranteed; the mechanized assembly in the hole can shorten the construction period and improve the working conditions; after the assembly into a ring, it can be used as a non-removable formwork for pouring concrete, and bear the weight of grouting and cast-in-place concrete, reducing the binding work of the inner cavity steel skeleton The amount, saving a lot of support material and labor. At the same time, the invention has simple structure, reasonable design and convenient construction, can be widely used in tunnel structures, and improves construction efficiency and service life.
下面结合附图和具体实施方式对本发明做进一步详细的说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
附图说明Description of drawings
图1为本发明实施例的装配式UHPC结构立面示意图。Fig. 1 is a schematic elevational view of a fabricated UHPC structure according to an embodiment of the present invention.
图2为本发明实施例的隧道二次衬砌横断面示意图。Fig. 2 is a schematic cross-sectional view of the secondary lining of the tunnel according to the embodiment of the present invention.
具体实施方式Detailed ways
下面结合附图及实施例对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
应该指出,以下详细说明都是示例性的,旨在对本申请提供进一步的说明。除非另有指明,本文使用的所有技术和科学术语具有与本申请所属技术领域的普通技术人员通常理解的相同含义。It should be pointed out that the following detailed description is exemplary and is intended to provide further explanation to the present application. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
需要注意的是,这里所使用的术语仅是为了描述具体实施方式,而非意图限制根据本申请的示例性实施方式。如在这里所使用的,除非上下文另外明确指出,否则单数形式也意图包括复数形式,此外,还应当理解的是,当在本说明书中使用术语“包含”和/或“包括”时,其指明存在特征、步骤、操作、器件、组件和/或它们的组合。It should be noted that the terminology used here is only for describing specific implementations, and is not intended to limit the exemplary implementations according to the present application. As used herein, unless the context clearly dictates otherwise, the singular is intended to include the plural, and it should also be understood that when the terms "comprising" and/or "comprising" are used in this specification, they mean There are features, steps, operations, means, components and/or combinations thereof.
如图1~2所示,本实施例提供了一种以装配式UHPC结构为底模的隧道二次衬砌,包括分别拼装在隧道坑道左侧墙节段1、右侧墙节段2和拱顶节段3的UHPC肋板梁节段100,整体形成装配式UHPC结构200,作为隧道二次衬砌的底模,该底模内部与二次衬砌外侧钢筋网21浇筑为一体。装配式UHPC结构既作为隧道二次衬砌现浇混凝土的免拆除底模,又参与二次衬砌的受力。结构简单,设计合理,施工方便,可缩短工期、节省施工支撑材料、改善劳动条件,可广泛应用于隧道结构中,提高施工效率和使用寿命。As shown in Figures 1 and 2, this embodiment provides a tunnel secondary lining with a prefabricated UHPC structure as the bottom form, including the
在本发明实施例中,左侧墙节段与右侧墙节段的UHPC肋板梁节段分别拼装至仰拱4左右两端,仰拱为预制或现浇的钢筋混凝土结构。In the embodiment of the present invention, the UHPC rib beam segments of the left wall segment and the right wall segment are respectively assembled to the left and right ends of the
在本发明实施例中,拱顶节段的UHPC肋板梁节段悬挂拼装至左侧墙节段和右侧墙节段的UHPC肋板梁节段牛腿上,形成沿隧道纵向方向一环接一环的装配式UHPC结构。In the embodiment of the present invention, the UHPC rib beam segment of the vault segment is suspended and assembled to the UHPC rib beam segment corbels of the left wall segment and the right wall segment to form a ring along the longitudinal direction of the tunnel. A prefabricated UHPC structure connected to a ring.
在本发明实施例中,左侧墙节段、右侧墙节段的UHPC肋板梁节段和仰拱的拼接处需用锚杆5进行连接,相邻UHPC肋板梁节段的拼接处需用锚杆进行连接,所有拼接处设防水密封垫18。In the embodiment of the present invention, the joints of the UHPC rib beam segments and the inverted arches of the left wall segment and the right wall segment need to be connected with
在本发明实施例中,UHPC肋板梁节段均包括纵向弧线与隧道的内轮廓一致的底板11,底板沿其弧线轨迹固设有若干道肋板12与若干道横隔板13,底板、肋板和横隔板内部均配置钢筋骨架14,且肋板和横隔板均位于底模的内部。In the embodiment of the present invention, the UHPC ribbed girder sections all include a
在本发明实施例中,肋板底部均设置有若干个圆孔15,用于对穿钢筋条16;二次衬砌外侧钢筋网与底模内部浇筑有普通混凝土层22。In the embodiment of the present invention, several
在本发明实施例中,底模的侧部设有灌浆工作孔洞17。In the embodiment of the present invention, a
一种以装配式UHPC结构为底模的隧道二次衬砌的施工方法,按以下步骤进行:(1)根据实际现场情况以及工艺要求,将隧道支护结构横断面分成四部分,包括左侧墙节段、右侧墙节段、拱顶节段和仰拱;(2)全断面开挖后,现浇施工或者预制吊装仰拱;(3)绑扎UHPC肋板梁节段的底板、肋板和横隔板的钢筋骨架,浇筑UHPC肋板梁节段的混凝土;(4)绑扎隧道二次衬砌外侧钢筋网;(5)待UHPC肋板梁节段养护达到强度后,运进隧道坑道内,用机械进行拼装;(6)左侧墙节段和右侧墙节段分别拼装至仰拱左右两端;(7)拱顶节段悬挂拼装至左侧墙节段和右侧墙节段的牛腿上形成沿隧道纵向方向一环接一环的装配式UHPC结构;(8)左侧墙节段、右侧墙节段、拱顶节段和仰拱的拼接处需用锚杆进行连接,拼接处需设防水密封垫;(9)以装配式UHPC结构作为底模,现浇普通混凝土形成隧道二次衬砌,完成施工制作。A construction method for the secondary lining of the tunnel using the prefabricated UHPC structure as the bottom form, which is carried out according to the following steps: (1) According to the actual site conditions and process requirements, the cross section of the tunnel support structure is divided into four parts, including the left wall segment, right side wall segment, vault segment and invert; (2) after full section excavation, cast-in-place construction or prefabricated hoisting invert; For the reinforced skeleton of the clapboard, pour the concrete of the UHPC rib beam segment; (4) Bind the outer reinforcement mesh of the secondary lining of the tunnel; Mechanical assembly; (6) The left and right wall segments are assembled to the left and right ends of the inverted arch; (7) The vault segment is hung and assembled to the left and right wall segments. A prefabricated UHPC structure is formed on the legs one after another along the longitudinal direction of the tunnel; (8) The joints of the left wall segment, right wall segment, vault segment and inverted arch need to be connected with anchor rods, and the joints A waterproof gasket is required; (9) The prefabricated UHPC structure is used as the bottom form, and the ordinary concrete is poured in place to form the secondary lining of the tunnel, and the construction is completed.
以上所述,仅是本发明的较佳实施例而已,并非是对本发明作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例。但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本发明技术方案的保护范围。The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention to other forms. Any skilled person who is familiar with this profession may use the technical content disclosed above to change or modify the equivalent of equivalent changes. Example. However, any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still belong to the protection scope of the technical solution of the present invention.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110592274.4A CN113187515B (en) | 2021-05-28 | 2021-05-28 | Tunnel secondary lining with assembled UHPC structure as bottom die and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110592274.4A CN113187515B (en) | 2021-05-28 | 2021-05-28 | Tunnel secondary lining with assembled UHPC structure as bottom die and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113187515A CN113187515A (en) | 2021-07-30 |
CN113187515B true CN113187515B (en) | 2023-03-17 |
Family
ID=76985920
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110592274.4A Active CN113187515B (en) | 2021-05-28 | 2021-05-28 | Tunnel secondary lining with assembled UHPC structure as bottom die and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113187515B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113790065B (en) * | 2021-09-29 | 2023-03-17 | 中铁隧道局集团有限公司 | Auxiliary kit for in-situ repair of large-volume defects of tunnel lining by UHPC material and construction method |
CN114086985A (en) * | 2021-11-19 | 2022-02-25 | 浙江数智交院科技股份有限公司 | A prefabricated tunnel structure and its construction method |
CN117803420B (en) * | 2024-02-29 | 2024-06-07 | 广东水电二局股份有限公司 | Circular tunnel concrete construction template and construction method |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3480338B2 (en) * | 1998-11-02 | 2003-12-15 | 鹿島建設株式会社 | Segment and tunnel lining method |
JP3306865B2 (en) * | 1999-05-26 | 2002-07-24 | 日本サミコン株式会社 | Method of manufacturing precast concrete arched unit plate |
CN104818996A (en) * | 2015-04-28 | 2015-08-05 | 中铁工程设计咨询集团有限公司 | Inverted arch prefabricated monomer, inverted arch and preparation method of inverted arch prefabricated monomer |
CN207740009U (en) * | 2018-01-25 | 2018-08-17 | 张群 | The lining segment structure of section overlapping shield tunnel above and below city underground |
EP3543459A1 (en) * | 2018-03-20 | 2019-09-25 | Kern Tunneltechnik SA | Method and device for removing the sheathing from a tunnel tube |
CN208473888U (en) * | 2018-04-03 | 2019-02-05 | 中交一公局第二工程有限公司 | Tunnel-liner inverted arch longitudinal direction embedded bar installs end mold device |
CN210127857U (en) * | 2019-07-01 | 2020-03-06 | 四川省交通勘察设计研究院有限公司 | Steel beam-concrete combined assembly type tunnel component suitable for highway tunnel |
CN110318776B (en) * | 2019-07-05 | 2021-02-05 | 甘肃省交通规划勘察设计院股份有限公司 | Tunnel construction method based on inverted arch and inverted arch filling layer replacing steel-concrete composite structure |
CN110924434B (en) * | 2019-12-12 | 2021-06-01 | 岳阳市公路桥梁基建总公司 | UHPC (ultra high performance polycarbonate) fabricated tunnel open cut tunnel lining structure and construction method |
CN111188632A (en) * | 2020-03-16 | 2020-05-22 | 中铁第六勘察设计院集团有限公司 | Sea area corrosive environment high performance durability shield constructs section of jurisdiction lining structure |
CN111927491B (en) * | 2020-08-21 | 2022-08-02 | 上海市隧道工程轨道交通设计研究院 | A shield lining structure for rail transit station |
CN214944311U (en) * | 2021-05-28 | 2021-11-30 | 福州大学 | Tunnel secondary lining using assembled UHPC structure as bottom die |
-
2021
- 2021-05-28 CN CN202110592274.4A patent/CN113187515B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN113187515A (en) | 2021-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113187515B (en) | Tunnel secondary lining with assembled UHPC structure as bottom die and construction method thereof | |
CN109183607B (en) | Prefabricated spliced UHPC pipe-concrete ultra-high bridge pier and construction method | |
CN205503146U (en) | Novel supporting construction of shallow tunnel suitable for city sensitizing range | |
CN107675610A (en) | A kind of construction and the practice of the connection of precast assembly bridge pier section | |
CN111456759A (en) | A prefabricated tunnel lining structure | |
CN105298020A (en) | Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof | |
CN108560544A (en) | A kind of sleeve connection assembled pile foundation and its construction method | |
CN103628404A (en) | Hinge joint structure with expansion reinforcing steel bars and construction method of hinge joint structure | |
CN204826429U (en) | Cast member reinforcing bar grout connecting piece | |
CN105064625A (en) | Grout sleeve for reinforcement connection and reinforcement connecting method | |
CN113107528A (en) | Assembled UHPC tunnel lining structure and construction method thereof | |
CN105019606A (en) | Precast concrete unit steel bar grouting connecting piece and connecting method | |
CN211646353U (en) | Integral bridge pile foundation structure adopting ECC concrete | |
CN210152316U (en) | A prefabricated reinforcement device for reinforced concrete beams | |
CN209384388U (en) | Assembled composite beam wall connecting joint structure | |
CN214944311U (en) | Tunnel secondary lining using assembled UHPC structure as bottom die | |
CN211777459U (en) | Partition wall basement reinforced structure in multi-arch tunnel | |
CN207161094U (en) | A kind of new construction for reinforcing Existing Railway Line tunnel rhegma lining cutting | |
CN108035457A (en) | A kind of high ductility concrete shear force wall connection structure of assembled and connection method | |
CN107938499A (en) | A kind of prefabricated assembled bridge pier | |
CN113294171B (en) | Prefabricated tunnel lining structure combined with corrugated steel plate and UHPC and its construction method | |
CN217105824U (en) | Prefabricated UHPC-steel-UHPC pipe concrete composite column | |
CN216893135U (en) | Assembled concrete connection structure through segmentation rebar connection | |
CN114622685B (en) | Prefabricated UHPC-steel-UHPC pipe concrete composite column and construction method thereof | |
CN207582275U (en) | A kind of PBL puts more energy into type flat steel case concrete plate arch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |