CN113175196A - Cable net construction platform - Google Patents
Cable net construction platform Download PDFInfo
- Publication number
- CN113175196A CN113175196A CN202110325664.5A CN202110325664A CN113175196A CN 113175196 A CN113175196 A CN 113175196A CN 202110325664 A CN202110325664 A CN 202110325664A CN 113175196 A CN113175196 A CN 113175196A
- Authority
- CN
- China
- Prior art keywords
- cable
- building
- construction platform
- springboard
- horizontal cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 92
- 240000006409 Acacia auriculiformis Species 0.000 claims 3
- 210000005069 ears Anatomy 0.000 claims 3
- 238000010030 laminating Methods 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 abstract description 47
- 239000010959 steel Substances 0.000 abstract description 47
- 238000000034 method Methods 0.000 abstract description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 18
- 229910052742 iron Inorganic materials 0.000 description 9
- 238000005034 decoration Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 3
- 230000001174 ascending effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000004677 Nylon Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/18—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
The utility model relates to a cable net construction platform relates to the field of construction platform technique, and it includes horizontal cable, is used for the H shaped steel frame of being connected with the building and lays springboard on the horizontal cable, H shaped steel frame is located the building and keeps away from one side of horizontal cable sets up, the one end of horizontal cable run through the building with H shaped steel frame connects, and the other end is used for connecting on the building of opposite side, just parallel arrangement between the horizontal cable. By arranging the H-shaped steel frame, the connection of the transverse inhaul cables can be supported, so that the supporting strength of the transverse inhaul cables on the springboard is improved, and construction operation of constructors on the springboard is facilitated; meanwhile, the construction platform does not occupy the space at the bottom of the building, so that construction personnel can perform construction operation at the bottom of the building, and further the construction efficiency can be improved.
Description
Technical Field
The application relates to the field of building construction platform technology, in particular to a cable net construction platform.
Background
When the decoration is carried out in rooms with large areas, such as reception halls of large museums, halls of high-end hotels and the like. In order to embody the sense of space, the indoor space is often a tall space of tens of meters or even tens of meters. And in order to highlight the theme decoration effect, the decoration materials and the process are particularly complex. Therefore, when indoor decoration is carried out, a construction platform needs to be built, and construction personnel can construct indoors conveniently.
In general, when constructing indoors, a construction platform in a full hall scaffold manner is used, and the scaffold refers to various supports that are erected on a construction site for workers to operate and solve vertical and horizontal transportation. When the scaffold is built indoors, the field of the scaffold must be tamped and leveled, and certain requirements are also placed on the strength of the concrete of the surface of the foundation structure. Full hall formula scaffold frame is high density scaffold frame, when carrying out construction platform's the buildding, needs a large amount of pole settings, horizon bar and wall connecting rod, and the distance of adjacent member is fixed.
To the correlation technique among the above-mentioned, the inventor thinks that when using full hall formula scaffold frame as construction platform, construction platform's bottom occupation space is big, and the constructor of being inconvenient for is under construction the top and the bottom of construction platform simultaneously, influences the efficiency of construction.
Disclosure of Invention
In order to improve the efficiency of construction, this application provides a cable net construction platform.
The application provides a cable net construction platform adopts following technical scheme:
the utility model provides a cable net construction platform, includes a plurality of horizontal cables, is used for the H shaped steel frame be connected with the building and lays springboard on the horizontal cable, H shaped steel frame is located the building and keeps away from one side setting of horizontal cable, the one end of horizontal cable run through the building with H shaped steel frame is connected, the other end is used for connecting on the building of opposite side, just parallel arrangement between the horizontal cable.
Through adopting above-mentioned technical scheme, when fitment is carried out to the inside of building, at first carry out construction platform's construction, punch at the appointed point of building one side to keep away from indoor one side at the building and connect H type steelframe. And adjusting the transverse stay cables, penetrating the transverse stay cables through holes in the building, connecting one end of each transverse stay cable with the H-shaped steel frame, connecting the other end of each transverse stay cable with the building on the other side, and sequentially completing the connection of the transverse stay cables to form a stay cable platform. And then, paving the springboard on the adjacent transverse guy cable, thereby completing the installation of the construction platform. The H type steelframe that sets up can support the connection of horizontal cable, and then improves construction platform's support intensity, can supply more horizontal cables to connect, can improve the intensive degree between the horizontal cable, and the springboard of the less size of being convenient for is laid on horizontal cable. By arranging the H-shaped steel frame, the connection of a plurality of transverse inhaul cables can be supported, so that the supporting strength of the transverse inhaul cables on the springboard is improved, and construction operation of constructors on the springboard is facilitated; meanwhile, the construction platform does not occupy the space at the bottom of the building, so that construction personnel can perform construction operation at the bottom of the building, and further the construction efficiency can be improved.
Optionally, the pull rope further comprises a vertical pull rod and a connecting device, the connecting device is arranged on the transverse pull rope, the top of the vertical pull rod is used for being connected with the top of a building, and the bottom of the vertical pull rod is connected with the connecting device.
Through adopting above-mentioned technical scheme, connect connecting device evenly in the assigned position department on horizontal cable, then, adjust vertical pull rod, make the top and the building top of vertical pull rod be connected, make the bottom and the connecting device of vertical pull rod be connected, accomplish the connection of vertical pull rod, and then accomplish being connected between vertical pull rod and the horizontal cable. The vertical pull rod that sets up can have an ascending power to horizontal cable, further to the support intensity of horizontal cable, and then strengthens horizontal cable to the support intensity of springboard, can reduce the effort of springboard to horizontal cable, and then can improve construction platform's support intensity, improves the support intensity to constructor, and the constructor of being convenient for carries out safe construction on construction platform.
Optionally, the connecting device comprises an upper lug plate, a lower lug plate, a connecting single lug piece and at least two clamping screws, wherein the connecting single lug piece and the at least two clamping screws are positioned on the upper lug plate, the two sides of the upper lug plate, which are close to the lower lug plate, are provided with arc grooves used for being attached with the transverse inhaul cable, the transverse inhaul cable is arranged in the arc grooves, the connecting single lug piece is positioned on the upper lug plate and is far away from one side of the lower lug plate, the connecting single lug piece is far away from one end of the upper lug plate and connected with the vertical pull rod, and the clamping screws penetrate through the upper lug plate and the lower lug plate.
Through adopting above-mentioned technical scheme, at the assigned position department of horizontal cable, adjust upper ear plate and lower otic placode, place horizontal cable between upper ear plate and lower otic placode, make horizontal cable be located the arc wall. Then, adjust vertical pull rod, be connected vertical pull rod's top and building, be connected vertical pull rod's bottom and be connected the monaural piece, then tighten clamping screw in proper order, realize that upper ear plate and lower otic placode press from both sides tightly fixedly on horizontal cable, accomplished vertical pull rod and connected, and then realize horizontal cable and vertical pull rod and be connected. The arc wall that sets up can play certain limiting displacement to horizontal cable, reduces rocking between horizontal cable and last otic placode and the lower otic placode, and then improves the connection performance between horizontal cable and last otic placode and the lower otic placode, is convenient for improve the stability of being connected of vertical pull rod to horizontal cable. The connecting device who sets up can realize dismantling of horizontal cable and vertical pull rod and be connected, is convenient for adjust the strong point of horizontal cable according to the support intensity needs of horizontal cable, and then improves the support intensity of horizontal cable to the jump board.
Optionally, the bottom of H type steelframe is provided with the bracing section, the one end of bracing section with the H type steelframe is kept away from the one end of horizontal cable is connected, and the other end is used for being connected with the building, the bracing section by the one end that is close to ground to keep away from ground one end with the distance of horizontal cable increases gradually.
Through adopting above-mentioned technical scheme, constitute the triangle-shaped structure between bracing section and the H shaped steel frame and the building that set up, can strengthen the joint strength of H shaped steel frame and building, improve the support intensity of H shaped steel frame to horizontal cable, and then improve the support intensity to construction platform.
Optionally, one end of the springboard along the length direction is overlapped on another springboard.
Through adopting above-mentioned technical scheme, when laying the springboard, set up the springboard on another springboard along length direction, then fix the springboard on horizontal cable through the iron wire, can improve the joint strength between the springboard, and then improve the stability of springboard at horizontal cable, the constructor of being convenient for carries out the construction operation on construction platform, and then reduces the unexpected emergence of construction.
Optionally, the transverse cable is a hydraulic pull rod.
Through adopting above-mentioned technical scheme, the hydraulic pressure pull rod of setting can carry out the tensioning to horizontal cable and adjust, improves horizontal cable support strength, and then improves construction platform's stability.
Optionally, the bottom of the springboard is provided with a dense net, and the dense net is fixed on the transverse inhaul cable through an iron wire.
By adopting the technical scheme, the arranged dense net can reduce the size of a gap between the gangboards and can play a certain protection role for constructors; the dense net arranged at the bottom of the springboard can increase the friction force between the springboard and the transverse guy cable and improve the stability of the springboard in installation on the transverse guy cable; in addition, the construction material can be reduced from falling off the construction platform, and construction hidden troubles are caused.
Optionally, a pedestrian board is laid on the springboard.
By adopting the technical scheme, the arranged pedestrian boards can increase the contact area between the constructors and the gangplank, so that the plurality of gangplanks can stably support the constructors, and the stability of supporting the constructors is improved; meanwhile, the arranged human-shaped plate can support larger construction equipment, and construction personnel can conveniently perform construction operation on the construction platform.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by arranging the H-shaped steel frame, the connection of a plurality of transverse inhaul cables can be supported, so that the supporting strength of the transverse inhaul cables on the springboard is improved, and construction operation of constructors on the springboard is facilitated; meanwhile, the construction platform does not occupy the space at the bottom of the building, so that construction personnel can carry out construction operation at the bottom of the building, and further the construction efficiency can be improved;
2. the vertical pull rod that sets up can have an ascending power to horizontal cable, further to the support intensity of horizontal cable, and then strengthens horizontal cable to the support intensity of springboard, can reduce the effort of springboard to horizontal cable, and then can improve construction platform's support intensity, improves the support intensity to constructor, and the constructor of being convenient for carries out safe construction on construction platform.
3. The connecting device who sets up can realize dismantling of horizontal cable and vertical pull rod and be connected, is convenient for adjust the strong point of horizontal cable according to the support intensity needs of horizontal cable, and then improves the support intensity of horizontal cable to the jump board.
Drawings
Fig. 1 is a schematic overall structure diagram of a cable net construction platform according to embodiment 1 of the present application.
Fig. 2 is a partial schematic view of a cable net construction platform according to embodiment 1 of the present application.
Fig. 3 is an enlarged schematic view of a portion a of fig. 2.
Fig. 4 is an enlarged schematic view of a portion B in fig. 2.
Fig. 5 is a schematic overall structure diagram of a cable net construction platform according to embodiment 2 of the present application.
Reference numerals: 1. a transverse stay cable; 11. carrying out dense networking; 12. iron wires; 13. a protective net; 2. an H-shaped steel frame; 21. a diagonal bracing section; 22. connecting a steel frame; 3. a gangboard; 31. a pedestrian board; 4. a vertical pull rod; 5. a connecting device; 51. an upper ear plate; 52. a lower ear plate; 53. connecting the single lug plates; 54. clamping the screw rod; 55. an arc-shaped slot; 6. connecting the ear plates; 7. a thick steel plate.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
Example 1
The embodiment of the application discloses cable net construction platform. Referring to fig. 1, nine square columns are arranged on one side of a building, and the square columns are arranged in a row. The another side of building is provided with nine circular stand columns, and circular stand column is just to square stand column setting, and the wall of building one side is located between circular stand column and the square stand column, and the wall is close to square stand column one side and sets up. The circular upright posts are arranged into an arc shape, and a supporting frame convenient to erect is connected between the adjacent circular upright posts. The cable net construction platform comprises transverse cables 1, an H-shaped steel frame 2 used for being connected with a building and a springboard 3 paved on the transverse cables 1, wherein the transverse cables 1 are arranged in parallel. Wherein, the connected mode of horizontal cable 1 has two kinds of situations: the first method comprises the following steps: the transverse inhaul cable 1 which is right opposite to the support frame and the H-shaped steel frame 2 is connected in the following mode: one end of a transverse inhaul cable 1 is connected to the supporting frame, and the other end of the transverse inhaul cable penetrates through the building and is connected with an H-shaped steel frame 2; and the second method comprises the following steps: the transverse inhaul cable 1 facing the round upright post and the square upright post is connected in the following mode: one end of a transverse inhaul cable 1 is connected with the round upright post, and the other end of the transverse inhaul cable is connected with the square upright post through the building. The distance between the adjacent transverse cables 1 is set to 1500mm, the transverse cables 1 are set to hydraulic pull rods, and the hydraulic pull rods can tension and adjust the transverse cables 1 to 100mm in length. The construction platform that sets up, the constructor of being convenient for carries out the construction operation with construction platform's bottom on construction platform simultaneously, improves the efficiency of construction.
Referring to fig. 1, in order to facilitate the construction of a constructor on a gangboard 3, dense nets 11 are laid on a transverse guy cable 1, the dense nets 11 are fixed on the transverse guy cable 1 through iron wires 12, and the dense nets 11 are nylon nets in this embodiment. Then, the springboard 3 is laid on two adjacent transverse cables 1, one end of the springboard 3 in the length direction is lapped on the other springboard 3, and the springboard 3 and the transverse cables 1 are fixed by iron wires 12. Optionally, a layer of dense net 11 is laid on the springboard 3, and the dense net 11 and the transverse inhaul cable 1 are fixed by using iron wires 12. And then, paving a pedestrian board 31 on the springboard 3 according to the construction requirements of constructors.
Referring to fig. 2 and 3, one end of the square column, which is far away from the circular column, is connected with a thick steel plate 7, in this embodiment, the size of the thick steel plate 7 is 1200 × 400 × 20mm, and an H-shaped steel frame 2 is welded on the thick steel plate 7, and the size of the H-shaped steel frame 23 is 300 × 305 × 15 mm. A connecting steel frame 22 is arranged on the H-shaped steel frame 2, the bottom of the connecting steel frame 22 is integrally connected with the H-shaped steel frame 2, and the top of the connecting steel frame 22 is welded to the top of a building. The bottom of H shaped steel frame 2 still is provided with the bracing section 21 that can support H shaped steel frame 2, and the one end of bracing section 21 and the one end welding of keeping away from horizontal cable 1 of H shaped steel frame 2, the other end welding is on thick steel plate 7, and bracing section 21 is crescent to the one end of keeping away from ground and the distance of horizontal cable 1 by the one end that is close to ground. One side of the round upright column, which is far away from the square upright column, is provided with a support frame, one end of a part of transverse guy cables 1 is connected with an H-shaped steel frame 2, and the other end of the transverse guy cables is connected to the support frame; one end of the transverse inhaul cable 1 at the other part is connected with the round upright post, and the other end of the transverse inhaul cable is connected with the square upright post. And the thick steel plate 7 is fully welded on the side, close to each other, of the H-shaped steel frame 2 and the supporting frame, and the size of the thick steel plate 7 is set to be 30 × 300 × 20mm in the embodiment. All welded on the thick steel plate 7 has connecting lug plate 6, and the one end of horizontal cable 1 is passed through the bolt and is connected with connecting lug plate 6, and the other end passes the wall of building and is connected with connecting lug plate 6 through the bolt. Be provided with a plurality of horizontal cable 1 between the adjacent circular stand, be connected with two horizontal cable 1 between the circular stand of this embodiment, and be connected with the protection network 13 that can protect constructor through iron wire 12 on the horizontal cable 1 that gathers the farthest mutually, reduce the probability that constructor dropped from the construction platform.
Referring to fig. 4, in order to enhance the supporting strength of the transverse stay cables 1 to constructors, the cable net construction platform further comprises vertical pull rods 4 and connecting devices 5, the distance between the vertical pull rods 4 is set to be 3750mm, the connecting devices 5 are arranged on the transverse stay cables 1, the tops of the vertical pull rods 4 are connected with connecting lug plates 6 through bolts, the connecting lug plates 6 are welded on specified thick steel plates 7, and the thick steel plates 7 are welded on the tops of buildings; the bottom of the vertical pull rod 4 is connected with the connecting device 5, the connecting device 5 comprises an upper ear plate 51, a lower ear plate 52, a connecting single ear plate 53 and four clamping screws 54, the connecting single ear plate 53 and the four clamping screws 54 are positioned on the upper ear plate 51, the two sides of the upper ear plate 51, which are close to the lower ear plate 52, are provided with arc-shaped grooves 55 for being attached to the horizontal pull cable 1, the horizontal pull cable 1 is positioned in the arc-shaped grooves 55, the connecting single ear plate 53 is positioned on one side of the upper ear plate 51, which is far away from the lower ear plate 52, the connecting single ear plate 53 is integrally connected with the upper ear plate 51, one end of the connecting single ear plate 53, which is far away from the upper ear plate 51, is connected with the vertical pull rod 4 through bolts, the clamping screws 54 sequentially penetrate through the lower ear plate 52 and the upper ear plate 51, so as to realize the connection between the upper ear plate 51 and the lower ear plate 52, and then realize being connected between vertical pull rod 4 and the horizontal cable 1, can strengthen the support intensity of horizontal cable 1, improve constructor's construction safety nature.
The implementation principle of the embodiment 1 of the application is as follows: when the interior of a building is decorated, a construction platform is firstly built, holes are punched in the wall surface of the building close to the square upright posts, and the H-shaped steel frame 2 is welded on one side, far away from the circular upright posts, of the square upright posts. Weld the one side that is close to each other at circular stand and square stand with connection otic placode 6 in proper order, the one side that is close to each other on support frame and the H type steelframe 2, and make these connection otic placodes 6 be in same height, adjust horizontal cable 1, pass horizontal cable 1 building wall, make the one end and the circular stand of horizontal cable 1 and be close to the connection otic placode 6 of circular stand and be connected, make the other end and the H type steelframe 2 of horizontal cable 1 and square connection otic placode 6 on standing connect gradually. Then, a dense net 11 is laid on the transverse cable 1, the dense net 11 is fixed on the transverse cable 1 by using iron wires 12, and then the springboard 3 is laid on the adjacent transverse cable 1, so that the springboard 3 is erected on the other springboard 3 along the length direction. Then, dense nets 11 are fully paved on the gangway 3 and fixed by iron wires 12, and a pedestrian board 31 which is convenient for the constructors to walk is paved on the gangway 3 according to the construction requirements of the constructors.
And adjusting the vertical pull rod 4, and welding the top of the vertical pull rod 4 with a connecting lug plate 6 on a building. And applying force to the transverse guy cable 1 to lift the transverse guy cable 1 upwards. Then, the vertical pull rod 4 is adjusted, the bottom of the vertical pull rod 4 is connected with the connecting single lug plate 53 through a bolt, then the clamping screw 54 is sequentially adjusted, the upper lug plate 51 and the lower lug plate 52 are fixed on the transverse inhaul cable 1, and the installation of the vertical pull rod 4 and the transverse inhaul cable 1 platform is completed. The construction platform is quick in installation time, and certain construction time can be saved. The built construction platform has the advantages that constructors can construct on the construction platform and also can construct at the bottom of the construction platform, construction is simultaneously carried out on two sides, and construction efficiency can be improved.
Example 2
The embodiment of the application discloses cable net construction platform. Referring to fig. 5, the difference from embodiment 1 is: the two sides of the building are respectively the wall body of the building. The cable net construction platform comprises transverse cables 1, an H-shaped steel frame 2 used for being connected with a building and a springboard 3 laid on the transverse cables 1, the transverse cables 1 are arranged in parallel, the H-shaped steel frame 2 is welded on a wall body outside the building, one end of each transverse cable 1 is connected with the wall body on one side of the building, and the other end of each transverse cable penetrates through the wall body on the other side of the building and is connected with the H-shaped steel frame 2.
The implementation principle of embodiment 2 of the present application is as follows: when fitment is carried out in the building, at first, the construction platform is built, the H-shaped steel frame 2 is welded on the outer side of the wall body on one side of the building, one end of the transverse stay rope 1 is connected with the wall body on one side of the building, the other end of the transverse stay rope 1 penetrates through the wall surface on one side, close to the H-shaped steel frame 2, of the building, and then the transverse stay rope 1 is connected to the H-shaped steel frame 2. Then, the subsequent construction platform construction steps in embodiment 1 are sequentially performed.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. A cable net construction platform is characterized in that: including a plurality of horizontal cables (1), be used for H type steelframe (2) be connected with the building and lay springboard (3) on horizontal cable (1), H type steelframe (2) are located the building and keep away from one side setting of horizontal cable (1), the one end of horizontal cable (1) run through the building with H type steelframe (2) are connected, and the other end is used for connecting on the building of opposite side, just parallel arrangement between horizontal cable (1).
2. The cable net construction platform of claim 1, wherein: still include vertical pull rod (4) and connecting device (5), connecting device (5) set up on horizontal cable (1), the top of vertical pull rod (4) is used for being connected with the top of building, the bottom of vertical pull rod (4) with connecting device (5) are connected.
3. A cable net construction platform according to claim 2, wherein: connecting device (5) include otic placode (51), lower otic placode (52), be located go up the connection list auris piece (53) and two at least clamping screw (54) on otic placode (51), go up otic placode (51) and lower otic placode (52) both sides that are close to each other offer be used for with arc wall (55) of horizontal cable (1) laminating, horizontal cable (1) sets up in arc wall (55), it is located to connect list auris piece (53) go up otic placode (51) and keep away from one side setting of lower otic placode (52), it keeps away from to connect list auris piece (53) go up the one end of otic placode (51) with vertical pull rod (4) are connected, clamping screw (54) run through go up otic placode (51) and lower otic placode (52) setting.
4. The cable net construction platform of claim 1, wherein: the bottom of H type steelframe (2) is provided with bracing section (21), the one end of bracing section (21) with H type steelframe (2) are kept away from the one end of horizontal cable (1) is connected, and the other end is used for being connected with the building, bracing section (21) by the one end that is close to ground to the one end of keeping away from ground with the distance of horizontal cable (1) increases gradually.
5. The cable net construction platform of claim 1, wherein: one end of the springboard (3) along the length direction is overlapped on the other springboard (3).
6. The cable net construction platform of claim 1, wherein: the transverse inhaul cable (1) is set to be a hydraulic pull rod.
7. The cable net construction platform of claim 1, wherein: the bottom of the springboard (3) is provided with a dense net (11), and the dense net (11) is fixed on the transverse inhaul cable (1).
8. The cable net construction platform of claim 1, wherein: and a pedestrian board (31) is paved on the springboard (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110325664.5A CN113175196A (en) | 2021-03-26 | 2021-03-26 | Cable net construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110325664.5A CN113175196A (en) | 2021-03-26 | 2021-03-26 | Cable net construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113175196A true CN113175196A (en) | 2021-07-27 |
Family
ID=76922409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110325664.5A Pending CN113175196A (en) | 2021-03-26 | 2021-03-26 | Cable net construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113175196A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114991450A (en) * | 2022-05-17 | 2022-09-02 | 中建二局第三建筑工程有限公司 | Prestress reverse-pulling soft platform and construction method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11200616A (en) * | 1998-01-14 | 1999-07-27 | Juko:Kk | Working net at elevation |
US6264002B1 (en) * | 1995-07-25 | 2001-07-24 | Paul Kristen, Inc. | Scaffolding for bridges and other structures |
CN103821336A (en) * | 2014-03-17 | 2014-05-28 | 江苏邗建集团有限公司 | Cable fixed type high-altitude large-span construction operation platform and construction method thereof |
CN206562694U (en) * | 2017-02-21 | 2017-10-17 | 广东坚宜佳五金制品有限公司 | Bracing cable clamp |
CN206942111U (en) * | 2017-07-26 | 2018-01-30 | 北京城建科技促进会 | Build high spatial large span lighting roof, ceiling construction rope net scaffold |
CN207360534U (en) * | 2017-07-19 | 2018-05-15 | 尹俊 | Locking device for load-bearing construction platform on water |
CN108222481A (en) * | 2018-03-16 | 2018-06-29 | 中国建筑第八工程局有限公司 | For the job platform and its construction method of the Zhongting of high-rise building |
CN112196247A (en) * | 2020-09-30 | 2021-01-08 | 北京港源建筑装饰工程有限公司 | Manufacturing method of steel wire rope net platform and steel wire rope net platform |
-
2021
- 2021-03-26 CN CN202110325664.5A patent/CN113175196A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6264002B1 (en) * | 1995-07-25 | 2001-07-24 | Paul Kristen, Inc. | Scaffolding for bridges and other structures |
JPH11200616A (en) * | 1998-01-14 | 1999-07-27 | Juko:Kk | Working net at elevation |
CN103821336A (en) * | 2014-03-17 | 2014-05-28 | 江苏邗建集团有限公司 | Cable fixed type high-altitude large-span construction operation platform and construction method thereof |
CN206562694U (en) * | 2017-02-21 | 2017-10-17 | 广东坚宜佳五金制品有限公司 | Bracing cable clamp |
CN207360534U (en) * | 2017-07-19 | 2018-05-15 | 尹俊 | Locking device for load-bearing construction platform on water |
CN206942111U (en) * | 2017-07-26 | 2018-01-30 | 北京城建科技促进会 | Build high spatial large span lighting roof, ceiling construction rope net scaffold |
CN108222481A (en) * | 2018-03-16 | 2018-06-29 | 中国建筑第八工程局有限公司 | For the job platform and its construction method of the Zhongting of high-rise building |
CN112196247A (en) * | 2020-09-30 | 2021-01-08 | 北京港源建筑装饰工程有限公司 | Manufacturing method of steel wire rope net platform and steel wire rope net platform |
Non-Patent Citations (1)
Title |
---|
张国灿;孙学水: "高空大跨度拉索平台施工技术", 中国标准化, no. 12, pages 166 - 167 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114991450A (en) * | 2022-05-17 | 2022-09-02 | 中建二局第三建筑工程有限公司 | Prestress reverse-pulling soft platform and construction method |
CN114991450B (en) * | 2022-05-17 | 2023-04-18 | 中建二局第三建筑工程有限公司 | Prestressed reverse-pulling soft platform and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2001046531A3 (en) | Modular building frame | |
CN111155756B (en) | Arc-shaped elevation large-angle variable slope hydraulic protection structure and construction method thereof | |
CN113175196A (en) | Cable net construction platform | |
CN216713950U (en) | Steel construction assembled supports bed-jig | |
CN202925957U (en) | Instrumentalized extension-type safety protection shed | |
CN110778094A (en) | High-altitude large-span dragline net operating platform and construction method | |
CN211815605U (en) | Construction device for pile column type pier tie beam and capping beam | |
CN212897667U (en) | Temporary supporting device for swing column | |
CN213268816U (en) | Assembled shaped steel horizontal protection platform of encorbelmenting | |
CN107227839B (en) | Integrated support construction safety platform and installation method | |
CN216042482U (en) | Concatenation formula operation platform | |
US6795985B2 (en) | Narrow buttress system structure for swimming pools | |
CN219974049U (en) | Combined type pole tower suitable for double-slope inclined roof construction scene | |
CN220150379U (en) | Operation and maintenance overhauling cable steel trestle | |
CN219100805U (en) | Protective shed | |
CN216341031U (en) | Truss assembling device convenient to adjust | |
CN114517449B (en) | Cross-connection cross brace construction platform for arch bridge | |
CN219117025U (en) | Structure of assembled pedestrian passageway convenient to install | |
CN115559413B (en) | A special-shaped cantilever steel structure and construction method thereof | |
CN212688719U (en) | Bridge vase-shaped pier body protective bracket | |
CN222478099U (en) | A steel wire rope flexible operating platform for high-altitude operations in hollow areas of buildings | |
CN214246078U (en) | Stainless steel structure and organic glass canopy supporting system | |
CN212535128U (en) | Construction system for building large flagpole on truss ceiling | |
CN221778954U (en) | A high pile foundation photovoltaic module installation work platform | |
CN211851074U (en) | Building site uses many functional safety protection canopy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210727 |