CN113007692B - A full-process automatic start-up control method for coal-fired units based on a steam-driven feed pump - Google Patents

A full-process automatic start-up control method for coal-fired units based on a steam-driven feed pump Download PDF

Info

Publication number
CN113007692B
CN113007692B CN202110197700.4A CN202110197700A CN113007692B CN 113007692 B CN113007692 B CN 113007692B CN 202110197700 A CN202110197700 A CN 202110197700A CN 113007692 B CN113007692 B CN 113007692B
Authority
CN
China
Prior art keywords
started
steam
load
coal
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110197700.4A
Other languages
Chinese (zh)
Other versions
CN113007692A (en
Inventor
谭祥帅
宋沛
刘帅
辛志波
李长海
郭云飞
李昭
牛利涛
陈余土
吴青云
杨翰林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN202110197700.4A priority Critical patent/CN113007692B/en
Publication of CN113007692A publication Critical patent/CN113007692A/en
Application granted granted Critical
Publication of CN113007692B publication Critical patent/CN113007692B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B35/00Control systems for steam boilers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D19/00Starting of machines or engines; Regulating, controlling, or safety means in connection therewith
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/18Lubricating arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C18/00Rotary-piston pumps specially adapted for elastic fluids
    • F04C18/08Rotary-piston pumps specially adapted for elastic fluids of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing
    • F04C18/12Rotary-piston pumps specially adapted for elastic fluids of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing of other than internal-axis type
    • F04C18/126Rotary-piston pumps specially adapted for elastic fluids of intermeshing-engagement type, i.e. with engagement of co-operating members similar to that of toothed gearing of other than internal-axis type with radially from the rotor body extending elements, not necessarily co-operating with corresponding recesses in the other rotor, e.g. lobes, Roots type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C25/00Adaptations of pumps for special use of pumps for elastic fluids
    • F04C25/02Adaptations of pumps for special use of pumps for elastic fluids for producing high vacuum

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)
  • Control Of Turbines (AREA)

Abstract

The invention discloses a full-process automatic starting control method of a coal-fired unit based on a steam feed pump, which comprises automatic starting control in a unit starting stage and automatic starting control in a unit grid-connected load increasing stage; in the automatic starting process of the unit, the starting of the auxiliary system of the unit and the starting of the main system of the unit are in mutual correlation seamless connection in a mode of longitudinal extension and transverse expansion, so that the automatic starting without a breakpoint in the whole process of the starting stage of the unit is realized, the technical problem that the automatic starting in the whole process of the coal-fired generator set is difficult to realize is fundamentally solved, and the method can realize the automatic starting in the whole process of the coal-fired generator set.

Description

一种基于汽动给水泵的燃煤机组全过程自动启动控制方法A full-process automatic start-up control method for coal-fired units based on a steam-driven feed pump

技术领域technical field

本发明属于火力发电领域,涉及一种基于汽动给水泵的燃煤机组全过程自动启动控制方法。The invention belongs to the field of thermal power generation, and relates to a whole-process automatic start-up control method for a coal-fired unit based on a steam-driven feed pump.

背景技术Background technique

根据国家的政策方针,我国电力工业将由规模扩张型发展向质量效益型发展转变。随着电力市场的不断发展,两化的加速推进,智能发电厂具有更安全、更人性化、更高效等特点将成为我国未来电厂的发展方向。传统发电厂作为最复杂的社会基础建设项目,推进经济增长有着难以替代的地位。因此,传统电厂智能化改造将是必经之路。According to the national policies and guidelines, my country's electric power industry will transform from a scale-expansion development to a quality-benefit development. With the continuous development of the power market and the acceleration of the two industrializations, smart power plants are safer, more user-friendly, and more efficient, and will become the development direction of my country's future power plants. As the most complex social infrastructure project, traditional power plants play an irreplaceable role in promoting economic growth. Therefore, the intelligent transformation of traditional power plants will be the only way.

燃煤机组全过程自动启动控制技术作为智能发电的技术之一,对该技术的研究无论从机组快速安全启动的角度,还是从节能增效的角度都具有极其重要的意义,也为智能发电厂全过程自动启动技术的应用提供参考。The whole-process automatic start-up control technology of coal-fired units is one of the technologies of intelligent power generation. The research on this technology is of great significance from the perspective of rapid and safe start-up of units, as well as from the perspective of energy saving and efficiency enhancement. Provide reference for the application of automatic start technology in the whole process.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于克服上述现有技术的缺点,提供了一种基于汽动给水泵的燃煤机组全过程自动启动控制方法,该方法能够实现燃煤发电机组全过程自动启动。The purpose of the present invention is to overcome the above-mentioned shortcomings of the prior art, and to provide a whole-process automatic start-up control method for a coal-fired generating set based on a steam-driven feed pump, which can realize the automatic start-up of the coal-fired generating set throughout the process.

为达到上述目的,本发明所述的基于汽动给水泵的燃煤机组全过程自动启动控制方法包括机组启动阶段的自动启动控制以及机组并网升负荷阶段的自动启动控制;In order to achieve the above object, the whole process automatic start-up control method of the coal-fired unit based on the steam-driven feed pump of the present invention includes the automatic start-up control of the unit start-up stage and the automatic start-up control of the unit grid-connected and load-raising stage;

机组启动阶段的自动启动控制的具体过程为:The specific process of automatic start-up control in the unit start-up phase is as follows:

依次启动循环水系统、闭式冷却水系统及凝结水系统和润滑油系统,待润滑油系统启动完成后启动密封油系统并投入盘车,待凝结水系统启动完成后启动除氧器上水冲洗系统,同时启动低加水侧系统以及辅助蒸汽系统,待辅助蒸汽系统启动完成后继续启动轴封系统,待轴封系统启动完成后启动真空系统,待真空系统启动完成后,启动高压缸暖缸以及中压缸正暖,同时启动汽缸夹层顺控,启动汽机EH油系统,待汽机EH油系统启动完成后,启动汽动给水泵,待除氧器上水冲洗完成后启动给水管道静态注水,待给水管道静态注水完成后启动除氧器加热系统;Start the circulating water system, closed cooling water system, condensate water system and lubricating oil system in sequence. After the lubricating oil system is started, start the sealing oil system and put it into cranking. After the condensing water system is started, start the deaerator and flush it with water. system, start the low water side system and the auxiliary steam system at the same time, continue to start the shaft seal system after the auxiliary steam system is started, start the vacuum system after the shaft seal system is started, and start the high-pressure cylinder warmer and cylinder after the vacuum system is started. The medium-pressure cylinder is being warmed up. At the same time, the sequence control of the cylinder interlayer is started, and the EH oil system of the turbine is started. After the start of the EH oil system of the turbine is completed, the steam-driven feed pump is started. After the static water injection of the water supply pipeline is completed, start the deaerator heating system;

待除氧器加热系统启动完成后,启动锅炉上水功能组,同时投入锅炉疏水排气联锁以及汽机疏水排气联锁,待锅炉完成上水后依次启动锅炉冷态清洗系统、火检冷却风机、风烟系统及风烟系统投自动,待风烟系统自动投入后,启动等离子准备系统,然后投给水自动及旁路自动,待给水自动投入后启动炉膛吹扫,然后启动空预器连续吹灰,同时启动制粉系统准备及投二次风门自动,待制粉系统准备完成后投一次风机自动及启动第一层等离子点火系统,待第一层等离子点火系统启动完成后,启动第一台磨煤机,再启动锅炉自动升温升压系统及投入凝汽器减温控制进行锅炉热态清洗,同时启动定子冷却水系统,待锅炉热态清洗完成后,启动汽轮机冲转同时投入汽机润滑油油温投自动,在汽轮机冲转过程中,启动罗茨水环真空泵系统,并在汽轮机中速暖机过程中投入低加及汽轮机中压缸启动方式投入3#高加,在汽轮机高速暖机过程中启动锅炉自动升压,待锅炉升压完成后依次启动第二层等离子点火系统及第二台磨煤机,待第二台磨煤机启动完成后,即完成第二套制粉系统的启动,然后启动第二台送风机系统及第二台引风机系统,待送风机及引风机并入后,投入过热器及再热器减温水自动,等待汽轮机定速至预设速度;After the deaerator heating system is started, start the boiler water supply function group, and put into the boiler drain and exhaust interlock and steam turbine drain and exhaust interlock at the same time. The fan, wind and smoke system and wind and smoke system are automatically put into operation. After the wind and smoke system is automatically put into operation, the plasma preparation system is started, and then the feed water is automatically and the bypass is automatic. Soot blowing, start the preparation of the pulverizing system at the same time and throw the secondary air door automatically. After the preparation of the pulverizing system is completed, the first fan is automatically activated and the first layer of the plasma ignition system is activated. After the first layer of the plasma ignition system is started, the first A coal mill, then start the automatic heating and boosting system of the boiler and put into the condenser temperature reduction control to clean the boiler in a hot state, and start the stator cooling water system at the same time. The oil and oil temperature is automatically put into operation. During the running process of the steam turbine, the Roots water ring vacuum pump system is started, and the low pressure is put in during the steam turbine medium-speed warm-up process, and the 3# high pressure is put into the steam turbine medium-pressure cylinder startup mode. When the steam turbine warms up at high speed Start the boiler to automatically boost the pressure during the process of the boiler. After the boiler boost is completed, the second layer of plasma ignition system and the second coal mill will be started in sequence. After the second coal mill is started, the second set of pulverizing system will be completed. After the blower and the induced draft fan are merged, the superheater and reheater desuperheating water is automatically put in, and the steam turbine is waiting for the speed to reach the preset speed;

机组并网升负荷阶段的自动启动控制的具体过程为:The specific process of automatic start-up control in the stage of grid-connection and load-raising is as follows:

先启动发电机并网,待发电机并网完成后进行初负荷暖机启动DEH切缸,DEH切缸完成后投入高加系统,同时投汽机主控自动及除氧器汽源切至四抽,待汽机主控自动投入完成后投入燃料主控自动,待燃料主控自动投入完成后升负荷至第一预设负荷,同时辅汽汽源切至冷再暖管,待机组负荷升至第二预设负荷后启动给水管路切至主路运行,待给水管路切至主路运行完成后升负荷至第三预设负荷转干态运行,待转干态运行后启动第三台磨煤机,同时投入脱硝系统,待第三台磨煤机启动完成后,然后启动升负荷至第四预设负荷,待负荷升至第四预设负荷后投协调控制系统同时退等离子助燃系统,待协调控制系统投入后启动第四台磨煤机,待第四台磨煤机启动完成后,投入AGC,根据AGC指令带负荷情况启动第五台磨煤机。First start the generator and connect to the grid. After the generator is connected to the grid, the initial load is warmed up to start the DEH cutting cylinder. After the DEH cutting cylinder is completed, it will be put into the high-feed system, and the main control of the steam generator will be automatically switched to the deaerator. The steam source is switched to four extractions After the main control of the steam turbine is automatically put into operation, the main control of the fuel is put into operation. After the automatic operation of the main control of the fuel is completed, the load is increased to the first preset load. At the same time, the auxiliary steam source is switched to the cooling and reheating pipe, and the load of the standby group rises to the first preset load. After the second preset load, start the water supply pipeline to switch to the main road for operation. After the water supply pipeline is switched to the main road, the load is increased to the third preset load, and the third mill is started to run in a dry state. At the same time, the coal mill is put into the denitration system. After the third coal mill is started, it will start to increase the load to the fourth preset load. After the load has risen to the fourth preset load, the coordinated control system will be put into the system and the plasma combustion support system will be withdrawn. After the coordinated control system is put into operation, the fourth coal mill is started. After the fourth coal mill is started, the AGC is put into operation, and the fifth coal mill is started according to the load condition of the AGC command.

预设速度为3005rpm。The preset speed is 3005rpm.

第一预设负荷为70MW。The first preset load is 70MW.

第二预设负荷为70MW。The second preset load is 70MW.

第三预设负荷为110MW。The third preset load is 110MW.

第四预设负荷为145MW。The fourth preset load is 145MW.

本发明具有以下有益效果:The present invention has the following beneficial effects:

本发明所述的基于汽动给水泵的燃煤机组全过程自动启动控制方法在具体操作时,在机组自动启动过程中,通过纵向延伸、横向拓展的方式将机组辅助系统启动与机组主系统启动相互关联的无缝衔接,实现机组启动阶段全过程无断点自动启动,从根本上解决燃煤发电机组全过程自动启动难以实现的技术难题,机组全过程自动启动比其它自动启动更为经济,避免了机组在自动启动过程中需要人为干预,同时降低机组在启动过程中的水耗及煤耗指标,从根本上杜绝机组在启动过程中由于人为原因引起的误操作,使机组在启动过程中更简单、安全、快速、节能。During the specific operation of the whole-process automatic start-up control method of the coal-fired unit based on the steam-driven feed pump of the present invention, during the automatic start-up process of the unit, the auxiliary system of the unit and the main system of the unit are started by longitudinal extension and horizontal expansion. The interrelated seamless connection realizes the automatic start of the whole process of the unit start-up phase without breakpoints, and fundamentally solves the technical problem that the whole process of automatic start of coal-fired generating units is difficult to achieve. The whole process of automatic start of the unit is more economical than other automatic starts. It avoids the need for human intervention during the automatic start-up process of the unit, and reduces the water consumption and coal consumption indicators during the start-up process of the unit. Simple, safe, fast and energy efficient.

附图说明Description of drawings

图1为本发明的结构示意图。FIG. 1 is a schematic structural diagram of the present invention.

具体实施方式Detailed ways

下面结合附图对本发明做进一步详细描述:Below in conjunction with accompanying drawing, the present invention is described in further detail:

参考图1,本发明所述的基于汽动给水泵的燃煤机组全过程自动启动控制方法包括以下步骤:Referring to Fig. 1, the whole process automatic start-up control method of a coal-fired unit based on a steam-driven feed pump according to the present invention includes the following steps:

在机组启动阶段During the start-up phase of the unit

依次启动循环水系统、闭式冷却水系统及凝结水系统和润滑油系统,待润滑油系统启动完成后启动密封油系统并投入盘车,待凝结水系统启动完成后启动除氧器上水冲洗系统,同时启动低加水侧系统以及辅助蒸汽系统,待辅助蒸汽系统启动完成后继续启动轴封系统,待轴封系统启动完成后启动真空系统,待真空系统启动完成后,启动高压缸暖缸以及中压缸正暖,同时启动汽缸夹层顺控,启动汽机EH油系统,待汽机EH油系统启动完成后,启动汽动给水泵,待除氧器上水冲洗完成后启动给水管道静态注水,待给水管道静态注水完成后启动除氧器加热系统;Start the circulating water system, closed cooling water system, condensate water system and lubricating oil system in sequence. After the lubricating oil system is started, start the sealing oil system and put it into cranking. After the condensing water system is started, start the deaerator and flush it with water. system, start the low water side system and the auxiliary steam system at the same time, continue to start the shaft seal system after the auxiliary steam system is started, start the vacuum system after the shaft seal system is started, and start the high-pressure cylinder warmer and cylinder after the vacuum system is started. The medium-pressure cylinder is being warmed up. At the same time, the sequence control of the cylinder interlayer is started, and the EH oil system of the turbine is started. After the start of the EH oil system of the turbine is completed, the steam-driven feed pump is started. After the static water injection of the water supply pipeline is completed, start the deaerator heating system;

待除氧器加热系统投入完成后,启动锅炉上水功能组,同时投入锅炉疏水排气联锁以及汽机疏水排气联锁,待锅炉完成上水后依次启动锅炉冷态清洗系统、火检冷却风机、风烟系统及风烟系统投自动,待风烟系统自动投入后,启动等离子准备系统,然后投给水自动及旁路自动,待给水自动投入后启动炉膛吹扫,然后启动空预器连续吹灰,同时启动制粉系统准备及投二次风门自动,待制粉系统准备完成后投一次风机自动及启动第一层等离子点火系统,待第一层等离子点火系统启动完成后,启动第一台磨煤机,再启动锅炉自动升温升压系统及投入凝汽器减温控制进行锅炉热态清洗,同时启动定子冷却水系统,待锅炉热态清洗完成后,启动汽轮机冲转同时投入汽机润滑油油温投自动,在汽轮机冲转过程中,启动罗茨水环真空泵系统,并在汽轮机中速暖机过程中投入低加及汽轮机中压缸启动方式投入3#高加,在汽轮机高速暖机过程中启动锅炉自动升压,待锅炉升压完成后依次启动第二层等离子点火系统及第二台磨煤机,待第二台磨煤机启动完成后,即完成第二套制粉系统的启动,然后启动第二台送风机系统及第二台引风机系统,待送风机及引风机并入后,投入过热器及再热器减温水自动,等待汽轮机定速至3005rpm。After the deaerator heating system is put into operation, start the boiler water supply function group, and put the boiler drain and exhaust interlock and steam turbine drain and exhaust interlock at the same time. After the boiler is supplied with water, start the boiler cold cleaning system, fire detection cooling The fan, wind and smoke system and wind and smoke system are automatically put into operation. After the wind and smoke system is automatically put into operation, the plasma preparation system is started, and then the feed water is automatically and the bypass is automatic. Soot blowing, start the preparation of the pulverizing system at the same time and throw the secondary air door automatically. After the preparation of the pulverizing system is completed, the first fan is automatically activated and the first layer of the plasma ignition system is activated. After the first layer of the plasma ignition system is started, the first A coal mill, then start the automatic heating and boosting system of the boiler and put into the condenser temperature reduction control to clean the boiler in a hot state, and start the stator cooling water system at the same time. The oil and oil temperature is automatically put into operation. During the running process of the steam turbine, the Roots water ring vacuum pump system is started, and the low pressure is put in during the steam turbine medium-speed warm-up process, and the 3# high pressure is put into the steam turbine medium-pressure cylinder startup mode. When the steam turbine warms up at high speed Start the boiler to automatically boost the pressure during the process of the boiler. After the boiler boost is completed, the second layer of plasma ignition system and the second coal mill will be started in sequence. After the second coal mill is started, the second set of pulverizing system will be completed. Then start the second blower system and the second induced draft fan system. After the blower and the induced draft fan are combined, put in the superheater and reheater desuperheating water automatically, and wait for the steam turbine to stabilize at 3005rpm.

在机组并网升负荷阶段,首先启动发电机并网,待发电机并网完成后进行初负荷暖机启动DEH切缸,DEH切缸完成后投入高加系统,同时投汽机主控自动及除氧器汽源切至四抽,待汽机主控自动投入完成后投入燃料主控自动,待燃料主控自动投入完成后升负荷至70MW,同时辅汽汽源切至冷再暖管,待机组负荷升至70MW后启动给水管路切至主路运行,待给水管路切至主路运行完成后升负荷至110MW转干态运行,待转干态运行后启动第三台磨煤机,同时投入脱硝系统,待第三台磨煤机启动完成后,然后启动升负荷至145MW,负荷升至145MW后投协调控制系统同时退等离子助燃系统,待协调控制系统投入后启动第四台磨煤机,待第四台磨煤机启动完成后,投入AGC,根据AGC指令带负荷情况启动第五台磨煤机。When the unit is connected to the grid and the load is increased, the generator is first started to connect to the grid. After the generator is connected to the grid, the initial load is warmed up to start the DEH cutting cylinder. The steam source of the oxygen generator is switched to four extractions. After the main control of the steam turbine is automatically put into operation, the main control of the fuel is put into operation. After the main control of the fuel is automatically put into operation, the load is increased to 70MW. After the load rises to 70MW, the water supply pipeline will be switched to the main road for operation. After the water supply pipeline has been switched to the main road, the load will be increased to 110MW, and then the third coal mill will be started. Put into the denitration system, after the start of the third coal mill is completed, then start to increase the load to 145MW, after the load rises to 145MW, the coordinated control system is put into operation and the plasma combustion support system is turned off, and the fourth coal mill is started after the coordinated control system is put into operation , after the fourth coal mill is started, put into AGC, and start the fifth coal mill according to the load condition of the AGC command.

Claims (6)

1.一种基于汽动给水泵的燃煤机组全过程自动启动控制方法,其特征在于,包括机组启动阶段的自动启动控制以及机组并网升负荷阶段的自动启动控制;1. a coal-fired unit full-process automatic start-up control method based on a steam-driven feed pump, is characterized in that, comprises the automatic start-up control of the unit start-up stage and the automatic start-up control of the unit grid-connected load-lifting stage; 机组启动阶段的自动启动控制的具体过程为:The specific process of automatic start-up control in the unit start-up phase is as follows: 依次启动循环水系统、闭式冷却水系统及凝结水系统和润滑油系统,待润滑油系统启动完成后启动密封油系统并投入盘车,待凝结水系统启动完成后启动除氧器上水冲洗系统,同时启动低加水侧系统以及辅助蒸汽系统,待辅助蒸汽系统启动完成后继续启动轴封系统,待轴封系统启动完成后启动真空系统,待真空系统启动完成后,启动高压缸暖缸以及中压缸正暖,同时启动汽缸夹层顺控,启动汽机EH油系统,待汽机EH油系统启动完成后,启动汽动给水泵,待除氧器上水冲洗完成后启动给水管道静态注水,待给水管道静态注水完成后启动除氧器加热系统;Start the circulating water system, closed cooling water system, condensate water system and lubricating oil system in sequence. After the lubricating oil system is started, start the sealing oil system and put it into cranking. After the condensing water system is started, start the deaerator and flush it with water. system, start the low water side system and the auxiliary steam system at the same time, continue to start the shaft seal system after the auxiliary steam system is started, start the vacuum system after the shaft seal system is started, and start the high-pressure cylinder warmer and cylinder after the vacuum system is started. The medium-pressure cylinder is being warmed up. At the same time, the sequence control of the cylinder interlayer is started, and the EH oil system of the turbine is started. After the start of the EH oil system of the turbine is completed, the steam-driven feed pump is started. After the static water injection of the water supply pipeline is completed, start the deaerator heating system; 待除氧器加热系统启动完成后,启动锅炉上水功能组,同时投入锅炉疏水排气联锁以及汽机疏水排气联锁,待锅炉完成上水后依次启动锅炉冷态清洗系统、火检冷却风机、风烟系统及风烟系统投自动,待风烟系统自动投入后,启动等离子准备系统,然后投给水自动及旁路自动,待给水自动投入后启动炉膛吹扫,然后启动空预器连续吹灰,同时启动制粉系统准备及投二次风门自动,待制粉系统准备完成后投一次风机自动及启动第一层等离子点火系统,待第一层等离子点火系统启动完成后,启动第一台磨煤机,再启动锅炉自动升温升压系统及投入凝汽器减温控制进行锅炉热态清洗,同时启动定子冷却水系统,待锅炉热态清洗完成后,启动汽轮机冲转同时投入汽机润滑油油温投自动,在汽轮机冲转过程中,启动罗茨水环真空泵系统,并在汽轮机中速暖机过程中投入低加及汽轮机中压缸启动方式投入3#高加,在汽轮机高速暖机过程中启动锅炉自动升压,待锅炉升压完成后依次启动第二层等离子点火系统及第二台磨煤机,待第二台磨煤机启动完成后,即完成第二套制粉系统的启动,然后启动第二台送风机系统及第二台引风机系统,待送风机及引风机并入后,投入过热器及再热器减温水自动,等待汽轮机定速至预设速度;After the deaerator heating system is started, start the boiler water supply function group, and put into the boiler drain and exhaust interlock and steam turbine drain and exhaust interlock at the same time. The fan, wind and smoke system and wind and smoke system are automatically put into operation. After the wind and smoke system is automatically put into operation, the plasma preparation system is started, and then the feed water is automatically and the bypass is automatic. Soot blowing, start the preparation of the pulverizing system at the same time and throw the secondary air door automatically. After the preparation of the pulverizing system is completed, the first fan is automatically activated and the first layer of the plasma ignition system is activated. After the first layer of the plasma ignition system is started, the first A coal mill, then start the boiler's automatic heating and boosting system and put into the condenser temperature reduction control to clean the boiler in a hot state, and start the stator cooling water system at the same time. The oil and oil temperature is automatically put into operation. During the running process of the steam turbine, the Roots water ring vacuum pump system is started, and the low pressure is put in during the steam turbine medium-speed warm-up process, and the 3# high pressure is put into the steam turbine medium-pressure cylinder startup mode. When the steam turbine warms up at high speed Start the boiler to automatically boost the pressure during the process, and start the second-layer plasma ignition system and the second coal mill in sequence after the boiler boost is completed. After the second coal mill is started, the second set of pulverizing system is completed. After the blower and the induced draft fan are merged, the superheater and the reheater desuperheating water are automatically put in, and the steam turbine is waiting for the fixed speed to reach the preset speed; 机组并网升负荷阶段的自动启动控制的具体过程为:The specific process of automatic start-up control in the stage of grid-connection and load-raising is as follows: 先启动发电机并网,待发电机并网完成后进行初负荷暖机启动DEH切缸,DEH切缸完成后投入高加系统,同时投汽机主控自动及除氧器汽源切至四抽,待汽机主控自动投入完成后投入燃料主控自动,待燃料主控自动投入完成后升负荷至第一预设负荷,同时辅汽汽源切至冷再暖管,待机组负荷升至第二预设负荷后启动给水管路切至主路运行,待给水管路切至主路运行完成后升负荷至第三预设负荷转干态运行,待转干态运行后启动第三台磨煤机,同时投入脱硝系统,待第三台磨煤机启动完成后,然后启动升负荷至第四预设负荷,待负荷升至第四预设负荷后投协调控制系统同时退等离子助燃系统,待协调控制系统投入后启动第四台磨煤机,待第四台磨煤机启动完成后,投入AGC,根据AGC指令带负荷情况启动第五台磨煤机。First start the generator and connect to the grid. After the generator is connected to the grid, the initial load is warmed up to start the DEH cutting cylinder. After the DEH cutting cylinder is completed, it will be put into the high-feed system, and the main control of the steam generator will be automatically switched to the deaerator. The steam source is switched to four extractions After the main control of the steam turbine is automatically put into operation, the main control of the fuel is put into operation. After the automatic operation of the main control of the fuel is completed, the load is increased to the first preset load. At the same time, the auxiliary steam source is switched to the cooling and reheating pipe, and the load of the standby group rises to the first preset load. After the second preset load, start the water supply pipeline to switch to the main road for operation. After the water supply pipeline is switched to the main road, the load is increased to the third preset load, and the third mill is started to run in a dry state. At the same time, the coal mill is put into the denitration system. After the third coal mill is started, it will start to increase the load to the fourth preset load. After the load has risen to the fourth preset load, the coordinated control system will be put into the system and the plasma combustion support system will be withdrawn. After the coordinated control system is put into operation, the fourth coal mill is started. After the fourth coal mill is started, the AGC is put into operation, and the fifth coal mill is started according to the load condition of the AGC command. 2.根据权利要求1所述的基于汽动给水泵的燃煤机组全过程自动启动控制方法,其特征在于,预设速度为3005rpm。2 . The whole-process automatic start-up control method for a coal-fired unit based on a steam-driven feed pump according to claim 1 , wherein the preset speed is 3005 rpm. 3 . 3.根据权利要求1所述的基于汽动给水泵的燃煤机组全过程自动启动控制方法,其特征在于,第一预设负荷为70MW。3 . The full-process automatic start-up control method for a coal-fired unit based on a steam-driven feed pump according to claim 1 , wherein the first preset load is 70MW. 4 . 4.根据权利要求1所述的基于汽动给水泵的燃煤机组全过程自动启动控制方法,其特征在于,第二预设负荷为70MW。4 . The full-process automatic start-up control method for a coal-fired unit based on a steam-driven feed pump according to claim 1 , wherein the second preset load is 70MW. 5 . 5.根据权利要求1所述的基于汽动给水泵的燃煤机组全过程自动启动控制方法,其特征在于,第三预设负荷为110MW。5 . The full-process automatic start-up control method for a coal-fired unit based on a steam-driven feed pump according to claim 1 , wherein the third preset load is 110 MW. 6 . 6.根据权利要求1所述的基于汽动给水泵的燃煤机组全过程自动启动控制方法,其特征在于,第四预设负荷为145MW。6 . The full-process automatic start-up control method for a coal-fired unit based on a steam-driven feed pump according to claim 1 , wherein the fourth preset load is 145MW. 7 .
CN202110197700.4A 2021-02-22 2021-02-22 A full-process automatic start-up control method for coal-fired units based on a steam-driven feed pump Active CN113007692B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110197700.4A CN113007692B (en) 2021-02-22 2021-02-22 A full-process automatic start-up control method for coal-fired units based on a steam-driven feed pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110197700.4A CN113007692B (en) 2021-02-22 2021-02-22 A full-process automatic start-up control method for coal-fired units based on a steam-driven feed pump

Publications (2)

Publication Number Publication Date
CN113007692A CN113007692A (en) 2021-06-22
CN113007692B true CN113007692B (en) 2022-07-19

Family

ID=76406036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110197700.4A Active CN113007692B (en) 2021-02-22 2021-02-22 A full-process automatic start-up control method for coal-fired units based on a steam-driven feed pump

Country Status (1)

Country Link
CN (1) CN113007692B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113708407B (en) * 2021-08-26 2024-06-11 华能南京燃机发电有限公司 Black start method for fuel cell power plant
CN115437329B (en) * 2022-09-26 2024-06-18 黑龙江建龙钢铁有限公司 Automatic start-stop method for gas power station

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6055945A (en) * 1998-12-14 2000-05-02 Combustion Engineering, Inc. Full range feedwater control system for pressurized water reactor steam generators
CN102506407A (en) * 2011-07-20 2012-06-20 皖能合肥发电有限公司 Cold start oil auxiliary heating system of boiler and heat source-less independent starting method of generating set
CN105782948A (en) * 2016-04-14 2016-07-20 长安益阳发电有限公司 Method for starting thermal power generating unit under recycling fault of turbine driven feed water pumps
CN111042882A (en) * 2019-12-17 2020-04-21 广州中电荔新电力实业有限公司 Single machine cold state starting method without auxiliary steam source
CN111335976A (en) * 2020-03-17 2020-06-26 西安热工研究院有限公司 One-key starting method of coal-fired generator set based on steam feed pump starting mode

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6055945A (en) * 1998-12-14 2000-05-02 Combustion Engineering, Inc. Full range feedwater control system for pressurized water reactor steam generators
CN102506407A (en) * 2011-07-20 2012-06-20 皖能合肥发电有限公司 Cold start oil auxiliary heating system of boiler and heat source-less independent starting method of generating set
CN105782948A (en) * 2016-04-14 2016-07-20 长安益阳发电有限公司 Method for starting thermal power generating unit under recycling fault of turbine driven feed water pumps
CN111042882A (en) * 2019-12-17 2020-04-21 广州中电荔新电力实业有限公司 Single machine cold state starting method without auxiliary steam source
CN111335976A (en) * 2020-03-17 2020-06-26 西安热工研究院有限公司 One-key starting method of coal-fired generator set based on steam feed pump starting mode

Also Published As

Publication number Publication date
CN113007692A (en) 2021-06-22

Similar Documents

Publication Publication Date Title
CN107747503A (en) A kind of system and operation method of Thermal generation unit Ultra-low load operation
CN113007692B (en) A full-process automatic start-up control method for coal-fired units based on a steam-driven feed pump
CN104373164B (en) An IGCC power plant system and working method with supplementary combustion type waste heat boiler
CN212154886U (en) A Cascade Utilization System of Industrial Steam Residual Pressure Applied in the Mode of Shutdown of Coal-fired Steam Supply Unit
CN108953083B (en) A distributed power generation system and method based on trough solar gas combined cycle
CN102094690A (en) Engine exhaust gas and waste heat utilization system based on single-screw expansion engine
CN111335976B (en) One-key start method of coal-fired generator set based on steam-driven feed pump start method
CN103398385B (en) The residual neat recovering system of a kind of boats and ships incinerator and power set and recovery method
CN110725725B (en) A gas-steam combined cycle system and method based on regenerative start-up
CN111485961B (en) Gas-steam combined cycle thermodynamic system with steam extraction and backheating functions
CN112879890B (en) Automatic starting control method for whole process of coal-fired unit based on electric water feeding pump
CN216110877U (en) A shaft seal steam supply system for a gas-steam combined cycle heating unit
CN109296413B (en) Bypass secondary reheating power generation device and method cooled by deep seawater
CN112833378B (en) Reheating system capable of improving heat supply capacity
JPH11173110A (en) Generating plant
CN203880720U (en) Waste heat recovery system for marine incinerator and marine power device
CN111335975B (en) One-key start method of coal-fired generator set based on electric feed pump start method
CN207297115U (en) A kind of energy-saving starter in IGCC power stations
CN207177981U (en) A kind of SSS clutches Combined Cycle Unit condensate configures system
CN113531920B (en) A solar-gas combined cycle power generation system
CN104594964A (en) Novel single-shaft natural gas combined cycle heat supply unit system
CN214303962U (en) Rapid air pre-warming starting system of steam turbine set
CN112879161B (en) Temperature control heating type solar and gas combined cycle power generation system and method thereof
CN115324661A (en) A system and operation method for split shaft and high pressure cylinder cutting cylinder of steam turbine of thermal power plant
CN114458561A (en) Combined power generation system based on sludge drying incineration and photothermal and its operation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20210622

Assignee: JINGNENG SHIYAN THERMOELECTRICITY CO.,LTD.

Assignor: Xi'an Thermal Power Research Institute Co.,Ltd.

Contract record no.: X2025980001190

Denomination of invention: A fully automatic start-up control method for coal-fired power units based on steam driven feedwater pumps

Granted publication date: 20220719

License type: Common License

Record date: 20250115

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20210622

Assignee: Dalat banner power generation branch of North United Power Co.,Ltd.

Assignor: Xi'an Thermal Power Research Institute Co.,Ltd.

Contract record no.: X2025980002988

Denomination of invention: A fully automatic start-up control method for coal-fired power units based on steam driven feedwater pumps

Granted publication date: 20220719

License type: Common License

Record date: 20250127

EE01 Entry into force of recordation of patent licensing contract