CN112921733A - Rapid repairing method for broken pavement - Google Patents

Rapid repairing method for broken pavement Download PDF

Info

Publication number
CN112921733A
CN112921733A CN202110109293.7A CN202110109293A CN112921733A CN 112921733 A CN112921733 A CN 112921733A CN 202110109293 A CN202110109293 A CN 202110109293A CN 112921733 A CN112921733 A CN 112921733A
Authority
CN
China
Prior art keywords
concrete
bodies
repairing
metal
metal body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110109293.7A
Other languages
Chinese (zh)
Inventor
赵彩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tongshi Engineering Technology Co ltd
Original Assignee
Zhejiang Tongshi Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tongshi Engineering Technology Co ltd filed Critical Zhejiang Tongshi Engineering Technology Co ltd
Priority to CN202110109293.7A priority Critical patent/CN112921733A/en
Publication of CN112921733A publication Critical patent/CN112921733A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving
    • E01C7/147Repairing concrete pavings, e.g. joining cracked road sections by dowels, applying a new concrete covering

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to the technical field of traffic pavement repair, and discloses a quick repair method for a broken pavement, which solves the technical problems of complicated construction process and long construction and maintenance period of the conventional method for repairing road cracks; secondly, marking; thirdly, cutting; fourthly, chiseling; fifthly, cleaning; sixthly, wetting; seventhly, metal bodies and concrete bodies are installed in the joint cutting grooves at intervals, and a group of metal bodies can be arranged among the plurality of concrete bodies; eighthly, adding bonding materials into gaps on two sides between the concrete member monomer and the joint cutting grooves for fixing and sealing; ninthly, maintaining; and ten, opening traffic. According to the technical scheme, the metal body and the concrete body are arranged in the road crack at intervals, the concrete body is used as a main filling material, the metal body is used as a locking and fastening material, and the metal body is fixed through grouting through the grouting holes, so that the aim of quick repair is fulfilled.

Description

Rapid repairing method for broken pavement
Technical Field
The invention relates to the technical field of traffic pavement repair, in particular to a rapid repair method for a broken pavement.
Background
The highway is constructed according to the national technical standard and is approved by the highway administration department, and is connected among cities, villages and industrial and mining bases. The highway does not contain a lane naturally formed in the field or in the countryside, is mainly used for driving automobiles and has certain technical standards and facilities. The highway has the difference between a common highway and a special highway for automobiles, the latter is more and more in the highway grade, and the second-level highway has two specifications.
The road surface is easy to break and damage in the long-term use process. The existing way to solve the cracked road surface is:
marking: drawing a marking line around the crack according to the principle of strip repair;
cutting: cutting along the marked line, wherein the depth is not less than 5cm, and the specific depth is determined according to the crack disease condition;
chiseling: chiseling concrete in the joint cutting range by using an air pick, wherein the phenomenon of edge gnawing is avoided during chiseling;
cleaning: cleaning the chiseled concrete, and cleaning the joint cutting vertical surface by using a brush or an iron rag without floating ash;
wetting: fully wetting the cleaned pit surface with clean water, wherein clear water cannot be obtained before repairing, and if the clear water exists, cleaning the water out with a sponge or a mop;
stirring: adding the crack type cement pavement patching material and clean water into a stirrer according to the water cement ratio of 12.5%, stirring for 3-5 minutes until the materials are uniform, then adding 10% -50% of clean broken stone, and continuing stirring until the materials are uniform. (note: the proportion of the aggregate incorporated depends on the depth and width of the chisel, and the aggregate added is smaller at shallower and narrower portions, and has a continuous gradation of less than 30mm in diameter, preferably crushed stone washed with water)
Repairing: pouring the uniformly stirred repair material into a clean repair area, immediately using a scraping ruler to flush, and then using a cleaning cloth to collect light to realize primary forming, wherein the operation practice is controlled within 30 minutes, and secondary surface wiping and press finishing cannot be obtained after primary setting. (if conditional, the repair material is compacted by vibration, but not excessively vibrated)
And (5) maintenance: after finishing the final setting, immediately spraying water to cover for maintenance;
cutting a seam: and cutting a joint of not less than 6cm at the position of the original panel joint or construction joint after 1 hour of final setting, and beating the sealant.
Opening traffic: and after the repair is finished for 24 hours, the isolation is removed, and the traffic is opened. (if the conditions permit, the curing time can be appropriately prolonged).
However, the most obvious problems of the existing road crack repairing method are that the construction process is complicated, the construction and maintenance period is long, and the normal traffic order of the road is relatively affected, so a better construction method for repairing the road crack is needed, and the influence of the repaired road crack on the road traffic is reduced.
Disclosure of Invention
Aiming at the technical problems of complicated construction process and long construction and maintenance period of repairing road cracks in the background technology, the invention utilizes the metal body and the concrete body to be installed in the road cracks at intervals, the concrete body is used as a main filling material, the metal body is used as a locking and fastening material, the concrete bodies and the concrete body and the metal body are connected through connecting steel bars and connecting holes and are fixed through grouting holes, so as to achieve the purpose of quick repairing.
In order to achieve the purpose, the invention provides the following technical scheme:
a method for quickly repairing a cracked pavement comprises the following steps:
the concrete member single body is prefabricated and comprises a metal body and a concrete body, wherein one end of the concrete body is provided with a connecting steel bar, the other end of the concrete body is provided with a connecting hole matched with the connecting steel bar, and the top surface of the concrete body is provided with a grouting hole;
the top surface of the metal body is provided with a driving rod, the side surface of the metal body is provided with an extrusion rod, the driving rod and the extrusion rod are connected inside the metal body through a transmission assembly, the driving rod is rotated to drive the extrusion rod to extend outwards or retract inwards, and the two ends of the metal body are also provided with the connecting steel bars and the connecting holes;
secondly, marking, namely drawing a marking line around the crack;
cutting along the marked lines to form slit grooves;
chiseling out concrete in the joint cutting slot range;
cleaning, namely cleaning the chiseled concrete, and cleaning the vertical surface of the joint cutting groove by using a brush or an iron rag without floating ash;
wetting, namely fully wetting the surface of the cleaned pavement cutting groove by using clean water, wherein no open water is required before repairing, and if the open water exists, cleaning the water out by using a sponge or a mop;
seventhly, metal bodies and concrete bodies are installed in the joint cutting grooves at intervals, and a group of metal bodies can be arranged among the plurality of concrete bodies;
eighthly, adding bonding materials into gaps on two sides between the concrete member monomer and the joint cutting grooves for fixing and sealing;
ninth, maintenance, after finishing the final setting after repairing, natural air drying and maintenance are carried out immediately;
and tenthly, opening traffic, completing the repair for 4 hours, removing the isolation and opening the traffic.
According to the technical scheme, the metal bodies and the concrete bodies are arranged in the road cracks at intervals, the concrete bodies are used as main filling materials, the metal bodies are used as locking and fixing materials, the concrete bodies and the metal bodies are connected through the connecting steel bars and the connecting holes and are fixed through grouting of the grouting holes, and therefore the purpose of quick repair is achieved.
The invention is further configured to: the drive assembly is configured as a worm gear drive assembly.
The invention is further configured to: the grouting holes are in one-to-one correspondence and communicated with the connecting holes, and the grouting holes are provided with a plurality of holes.
Through above-mentioned technical scheme, set up the slip casting hole, follow the leading-in mud in the position of slip casting hole for with welded fastening between connecting reinforcement and the connecting hole.
The invention is further configured to: the size of the concrete member monomer is selected according to the size of the slit groove.
The invention is further configured to: the interval proportion of the metal body and the concrete body is different according to different requirements of the grooving position on the connection firmness degree.
The invention is further configured to: the dimensions of the plurality of metal bodies may be the same or different.
The invention is further configured to: the sizes of the concrete bodies are the same or different.
In conclusion, the invention has the following beneficial effects:
(1) the maintenance time is short, the whole construction period is short, and the time influencing road traffic is shortened;
(2) concrete is not required to be poured into the joint seams on site, the concrete body and the metal body are directly prefabricated, construction strength is reduced, and operation is facilitated.
Drawings
FIG. 1 is a schematic perspective view of a metal body and a concrete body;
fig. 2 is a schematic view of a pavement crack repairing structure.
Reference numerals: 1. a metal body; 11. a drive rod; 12. an extrusion stem; 2. a concrete body; 21. connecting reinforcing steel bars; 22. connecting holes; 23. grouting holes; 3. and a transmission assembly.
Detailed Description
The present invention will be described in further detail with reference to examples and drawings, but the present invention is not limited to these examples.
A method for rapidly repairing a cracked pavement, as can be seen from fig. 1 and 2, comprising the following steps:
firstly, prefabricating a concrete component monomer, wherein the concrete component monomer comprises a metal body 1 and a concrete body 2, one end of the concrete body 2 is provided with a connecting steel bar 21, the other end of the concrete body 2 is provided with a connecting hole 22 matched with the connecting steel bar 21, and the top surface of the concrete body 2 is provided with a grouting hole 23;
the top surface of the metal body 1 is provided with a driving rod 11, the side surface of the metal body 1 is provided with an extrusion rod 12, the driving rod 11 and the extrusion rod 12 are connected in the metal body 1 through a transmission component 3, the driving rod 11 is rotated to drive the extrusion rod 12 to extend outwards or retract, and two ends of the metal body 1 are also provided with connecting steel bars 21 and connecting holes 22;
secondly, marking, namely drawing a marking line around the crack;
cutting along the marked lines to form slit grooves;
chiseling out concrete in the joint cutting slot range;
cleaning, namely cleaning the chiseled concrete, and cleaning the vertical surface of the joint cutting groove by using a brush or an iron rag without floating ash;
wetting, namely fully wetting the surface of the cleaned pavement cutting groove by using clean water, wherein no open water is required before repairing, and if the open water exists, cleaning the water out by using a sponge or a mop;
seventhly, installing metal bodies 1 and concrete bodies 2 in the joint cutting grooves at intervals, wherein a group of metal bodies 1 can be arranged among the concrete bodies 2;
eighthly, adding bonding materials into gaps on two sides between the concrete member monomer and the joint cutting grooves for fixing and sealing;
ninth, maintenance, after finishing the final setting after repairing, natural air drying and maintenance are carried out immediately;
and tenthly, opening traffic, completing the repair for 4 hours, removing the isolation and opening the traffic.
The drive assembly 3 is configured as a worm gear drive assembly.
The grouting holes 23 correspond to and are communicated with the connecting holes 22 one by one, and a plurality of grouting holes 23 are formed.
The size of the concrete member monomer is selected according to the size of the slit groove.
The interval proportion of the metal body 1 and the concrete body 2 is different according to the requirement of the position of the cutting slot on the connection firmness degree.
The plurality of metal bodies 1 may be the same or different in size.
The plurality of concrete bodies 2 may be equal in size or different in size.
The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments, and all technical solutions belonging to the idea of the present invention belong to the protection scope of the present invention. It should be noted that modifications and embellishments within the scope of the invention may occur to those skilled in the art without departing from the principle of the invention, and are considered to be within the scope of the invention.

Claims (7)

1. A method for quickly repairing a cracked pavement is characterized by comprising the following steps:
the prefabricated concrete member single body comprises a metal body (1) and a concrete body (2), wherein one end of the concrete body (2) is provided with a connecting steel bar (21), the other end of the concrete body (2) is provided with a connecting hole (22) matched with the connecting steel bar (21), and the top surface of the concrete body (2) is provided with a grouting hole (23);
the top surface of the metal body (1) is provided with a driving rod (11), the side surface of the metal body (1) is provided with an extrusion rod (12), the driving rod (11) and the extrusion rod (12) are connected inside the metal body (1) through a transmission assembly (3), the driving rod (11) is rotated to drive the extrusion rod (12) to extend or retract outwards, and the two ends of the metal body (1) are also provided with the connecting steel bars (21) and the connecting holes (22);
secondly, marking, namely drawing a marking line around the crack;
cutting along the marked lines to form slit grooves;
chiseling out concrete in the joint cutting slot range;
cleaning, namely cleaning the chiseled concrete, and cleaning the vertical surface of the joint cutting groove by using a brush or an iron rag without floating ash;
wetting, namely fully wetting the surface of the cleaned pavement cutting groove by using clean water, wherein no open water is required before repairing, and if the open water exists, cleaning the water out by using a sponge or a mop;
seventhly, metal bodies (1) and concrete bodies (2) are installed in the joint cutting grooves at intervals, and a group of metal bodies (1) can be arranged among the concrete bodies (2);
eighthly, adding bonding materials into gaps on two sides between the concrete member monomer and the joint cutting grooves for fixing and sealing;
ninth, maintenance, after finishing the final setting after repairing, natural air drying and maintenance are carried out immediately;
and tenthly, opening traffic, completing the repair for 4 hours, removing the isolation and opening the traffic.
2. The method for rapidly repairing a cracked pavement according to claim 1, wherein the method comprises the following steps: the transmission assembly (3) is configured as a worm gear and worm transmission assembly.
3. The method for rapidly repairing a cracked pavement according to claim 1, wherein the method comprises the following steps: the grouting holes (23) are in one-to-one correspondence and communicated with the connecting holes (22), and a plurality of grouting holes (23) are formed.
4. The method for rapidly repairing a cracked pavement according to claim 1, wherein the method comprises the following steps: the size of the concrete member monomer is selected according to the size of the slit groove.
5. The method for rapidly repairing a cracked pavement according to claim 1, wherein the method comprises the following steps: the interval proportion of the metal body (1) and the concrete body (2) is different according to different requirements of the grooving position on the connection firmness degree.
6. The method for rapidly repairing a cracked pavement according to claim 1, wherein the method comprises the following steps: the dimensions of the metal bodies (1) are the same or different.
7. The method for rapidly repairing a cracked pavement according to claim 1, wherein the method comprises the following steps: the dimensions of the concrete bodies (2) are the same or different.
CN202110109293.7A 2021-01-27 2021-01-27 Rapid repairing method for broken pavement Pending CN112921733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110109293.7A CN112921733A (en) 2021-01-27 2021-01-27 Rapid repairing method for broken pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110109293.7A CN112921733A (en) 2021-01-27 2021-01-27 Rapid repairing method for broken pavement

Publications (1)

Publication Number Publication Date
CN112921733A true CN112921733A (en) 2021-06-08

Family

ID=76166742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110109293.7A Pending CN112921733A (en) 2021-01-27 2021-01-27 Rapid repairing method for broken pavement

Country Status (1)

Country Link
CN (1) CN112921733A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605196A (en) * 2021-08-10 2021-11-05 天津亚平市政工程集团有限公司 Road crack repairing device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498397A (en) * 2013-09-29 2014-01-08 华南理工大学 Prefabricated cement pavement slab for quick pavement repair
CN205874870U (en) * 2016-06-22 2017-01-11 刘精龙 Prefabricated construction is restoreed fast on road road surface
CN205893853U (en) * 2016-06-22 2017-01-18 广西裕达工程有限公司 Prefab is restoreed fast on town road road surface
KR20170035386A (en) * 2015-09-22 2017-03-31 현대건설주식회사 Precast concrete slabs using joint block
US20170198443A1 (en) * 2014-05-28 2017-07-13 Alfonso MOREIRA SERRO Load transmission device
CN210458891U (en) * 2019-07-01 2020-05-05 长春市城建维护集团股份有限公司 Road and bridge crack reinforcing apparatus
CN111470835A (en) * 2020-06-03 2020-07-31 杭州市城市建设基础工程有限公司 Method and process for repairing concrete cracks in road and bridge construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498397A (en) * 2013-09-29 2014-01-08 华南理工大学 Prefabricated cement pavement slab for quick pavement repair
US20170198443A1 (en) * 2014-05-28 2017-07-13 Alfonso MOREIRA SERRO Load transmission device
KR20170035386A (en) * 2015-09-22 2017-03-31 현대건설주식회사 Precast concrete slabs using joint block
CN205874870U (en) * 2016-06-22 2017-01-11 刘精龙 Prefabricated construction is restoreed fast on road road surface
CN205893853U (en) * 2016-06-22 2017-01-18 广西裕达工程有限公司 Prefab is restoreed fast on town road road surface
CN210458891U (en) * 2019-07-01 2020-05-05 长春市城建维护集团股份有限公司 Road and bridge crack reinforcing apparatus
CN111470835A (en) * 2020-06-03 2020-07-31 杭州市城市建设基础工程有限公司 Method and process for repairing concrete cracks in road and bridge construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605196A (en) * 2021-08-10 2021-11-05 天津亚平市政工程集团有限公司 Road crack repairing device and method
CN113605196B (en) * 2021-08-10 2023-01-10 天津亚平市政工程集团有限公司 Road crack repairing device and method

Similar Documents

Publication Publication Date Title
CN103233520B (en) Self-waterproof construction method of building external wall structure
CN105019365B (en) Structure for rapidly restoring hinge joint of hollow slab bridge and construction method thereof
CN105464396B (en) A kind of historical protective buildings exterior wall reinforcement means
CN108086113A (en) A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN109339632A (en) A kind of construction method of lightweight concrete slat partition wall door opening
CN103938514B (en) A kind of cement pavement Darkening process structure and construction method
CN110952464B (en) Bridge pier repairing and reinforcing construction method
CN105839677A (en) Advanced water prevention construction process for post-cast strip of side wall of basement
CN105714635A (en) Concrete drainage road surface and construction and repairing method thereof
CN110747733A (en) Construction method of ecological prefabricated anti-collision wall
CN112921733A (en) Rapid repairing method for broken pavement
CN113585351A (en) Soil covering plane settlement post-cast strip prefabrication advanced reverse order closed construction method
KR100786357B1 (en) Concrete pavement joint reinforcement device, its method
KR101021475B1 (en) Prefabricated concrete road using precast concrete panel and construction method
CN112195970A (en) River-crossing tunnel engineering waterproof construction method
CN211171537U (en) Road repairing roadbed structure
EP1521886A1 (en) Method for increasing load-bearing capacity of soil
CN113215914A (en) Building pavement assembly type rapid repairing method
CN102392404B (en) Local build-in precast repair slab for concrete road
CN113981838A (en) Connection construction method for widened bridge joint
CN206768879U (en) A kind of poured band of outer wall of basement structure
CN104846753A (en) Bridge deck opening maintaining method
CN213898201U (en) Horizontal post-cast strip protection and maintenance integrated structure
CN118933391A (en) A construction process for treating settlement damage of concrete lining slab
CN109469292A (en) A kind of decorative line and construction method of double drip line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210608