CN112897277B - Cage protection device on civil engineering construction site - Google Patents
Cage protection device on civil engineering construction site Download PDFInfo
- Publication number
- CN112897277B CN112897277B CN202110201148.1A CN202110201148A CN112897277B CN 112897277 B CN112897277 B CN 112897277B CN 202110201148 A CN202110201148 A CN 202110201148A CN 112897277 B CN112897277 B CN 112897277B
- Authority
- CN
- China
- Prior art keywords
- cage
- fixedly connected
- spring
- civil engineering
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 239000000725 suspension Substances 0.000 claims abstract 9
- 230000000694 effects Effects 0.000 claims abstract 3
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 238000004804 winding Methods 0.000 claims description 11
- 230000000903 blocking effect Effects 0.000 claims description 6
- 230000006978 adaptation Effects 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 claims 1
- 208000027418 Wounds and injury Diseases 0.000 abstract description 4
- 230000006378 damage Effects 0.000 abstract description 4
- 208000014674 injury Diseases 0.000 abstract description 4
- 238000003780 insertion Methods 0.000 description 23
- 230000037431 insertion Effects 0.000 description 23
- 238000000034 method Methods 0.000 description 10
- 230000008569 process Effects 0.000 description 9
- 238000010586 diagram Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 5
- 230000009471 action Effects 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005381 potential energy Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/02—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
- B66B5/12—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions in case of rope or cable slack
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/02—Cages, i.e. cars
- B66B11/0226—Constructional features, e.g. walls assembly, decorative panels, comfort equipment, thermal or sound insulation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
- B66B11/043—Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
- B66B11/08—Driving gear ; Details thereof, e.g. seals with hoisting rope or cable operated by frictional engagement with a winding drum or sheave
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/02—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
- B66B5/16—Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well
- B66B5/26—Positively-acting devices, e.g. latches, knives
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
Description
技术领域technical field
本发明涉及土木工程技术领域,具体为一种土木工程施工工地上的吊笼保护装置。The invention relates to the technical field of civil engineering, in particular to a hanging cage protection device on a civil engineering construction site.
背景技术Background technique
在土木工程施工的过程中,经常需要使用到吊笼对施工过程中的物料和施工人员进行提升,将地面的材料和人员输送到高层的建筑面上进行施工,以此达到提高物料的运送效率,同时降低施工人员的劳动强度。In the process of civil engineering construction, it is often necessary to use the hanging cage to lift the materials and construction personnel during the construction process, and transport the ground materials and personnel to the high-rise building surface for construction, so as to improve the material transportation efficiency. , while reducing the labor intensity of construction workers.
但在吊笼使用的过程中,通常是在建筑物旁边架设支撑架,然后将吊笼滑动连接在支撑架的侧面,同时在支撑架的顶端通过提升设备与吊笼进行连接,通过钢索带动吊笼上升下降,但是在实际使用过程中,由于吊笼运送物料时载重较大,而且施工过程中经常是三班倒,吊笼处于24小时工作状态,如果疏忽检查,可能会在调运的过程中,用于连接提升设备和吊笼之间的钢索发生断裂,使得吊笼急速下落,很容易造成重大的安全事故,因此需要对现有的吊笼作出改进以解决上述问题。However, in the process of using the hanging cage, a support frame is usually erected beside the building, and then the hanging cage is slidably connected to the side of the supporting frame, and at the same time, the top of the supporting frame is connected to the hanging cage through a lifting device, and is driven by a steel cable. The hanging cage rises and falls, but in the actual use process, due to the large load of the hanging cage when transporting materials, and often three shifts during the construction process, the hanging cage is in a 24-hour working state. If the inspection is neglected, it may be in the process of transfer. , the steel cable used to connect the hoisting equipment and the hanging cage breaks, causing the hanging cage to fall rapidly, which is likely to cause major safety accidents. Therefore, it is necessary to improve the existing hanging cage to solve the above problems.
发明内容SUMMARY OF THE INVENTION
(一)解决的技术问题(1) Technical problems solved
针对现有技术的不足,本发明提供了一种土木工程施工工地上的吊笼保护装置,以解决上述背景技术中提出的问题。Aiming at the deficiencies of the prior art, the present invention provides a cage protection device on a civil engineering construction site to solve the problems raised in the above background technology.
(二)技术方案(2) Technical solutions
为实现以上目的,本发明通过以下技术方案予以实现:一种土木工程施工工地上的吊笼保护装置,包括底板,所述底板的上表面两侧均固定连接有支撑架,所述支撑架的顶端固定连接有顶板,所述顶板的上表面固定连接有电机,所述电机的输出端传动连接有绕线辊,所述底板的上表面且位于支撑架的内侧固定连接有导轨,所述导轨的外表面滑动连接有垂直吊笼,所述垂直吊笼的顶部固定连接有钢索,所述钢索远离垂直吊笼的一端穿过顶板固定连接在绕线辊的外表面,所述垂直吊笼的两侧均转动连接有转轴,所述转轴的外表面固定连接有挂钩,所述转轴的端部固定连接有转动杆,两组所述转动杆远离转轴的一端内部活动卡接有固定组件,所述固定组件远离转动杆的一端延伸至垂直吊笼的内部与垂直吊笼的内侧壁固定连接,所述转动杆靠近转轴的一端下表面活动铰接有伸缩组件,所述伸缩组件固定连接在垂直吊笼的侧壁上;In order to achieve the above purpose, the present invention is achieved through the following technical solutions: a cage protection device on a civil engineering construction site, comprising a bottom plate, and both sides of the upper surface of the bottom plate are fixedly connected with a support frame, and the support frame is The top end is fixedly connected with a top plate, the upper surface of the top plate is fixedly connected with a motor, the output end of the motor is driven and connected with a winding roller, and the upper surface of the bottom plate is fixedly connected to the inner side of the support frame with a guide rail, the guide rail A vertical hanging cage is slidably connected to the outer surface of the vertical hanging cage, and the top of the vertical hanging cage is fixedly connected with a steel cable, and the end of the steel wire away from the vertical hanging cage is fixedly connected to the outer surface of the winding roller through the top plate. Both sides of the cage are rotatably connected with a rotating shaft, the outer surface of the rotating shaft is fixedly connected with a hook, the end of the rotating shaft is fixedly connected with a rotating rod, and one end of the two sets of the rotating rods away from the rotating shaft is internally movably clamped with a fixed component One end of the fixed component away from the rotating rod extends to the interior of the vertical hanging cage and is fixedly connected to the inner side wall of the vertical hanging cage. The lower surface of one end of the rotating rod close to the rotating shaft is hinged with a telescopic component, and the telescopic component is fixedly connected to on the side walls of the vertical cage;
所述伸缩组件包括固定柱、活动槽、第一弹簧、T形杆、和轴座,所述固定柱的内部开设有活动槽,所述第一弹簧活动卡接在活动槽的内部,所述T形杆的底端活动插接在活动槽的内部,所述T形杆的顶端活动铰接在轴座的内部。The telescopic assembly includes a fixed column, a movable slot, a first spring, a T-shaped rod, and a shaft seat, a movable slot is opened inside the fixed column, the first spring is movably clamped inside the movable slot, and the The bottom end of the T-shaped rod is movably inserted inside the movable groove, and the top end of the T-shaped rod is movably hinged inside the axle seat.
优选的,所述固定柱固定连接在垂直吊笼的外侧壁上,所述轴座固定连接在转动杆的下表面,所述第一弹簧的一端与活动槽的内底部相抵,所述第一弹簧的另一端与T形杆的下表面相抵。Preferably, the fixed column is fixedly connected to the outer side wall of the vertical hanging cage, the axle seat is fixedly connected to the lower surface of the rotating rod, one end of the first spring is in contact with the inner bottom of the movable groove, the first The other end of the spring is against the lower surface of the T-bar.
优选的,所述固定组件包括插杆、固定套筒、移动槽、挡环和第二弹簧,所述插杆活动插接在固定套筒的内部,所述固定套筒的内部开设有移动槽,所述挡环固定连接在插杆的外表面,所述第二弹簧活动套接在插杆的外表面,所述挡环和第二弹簧均处于移动槽的内部。Preferably, the fixing assembly includes an insertion rod, a fixing sleeve, a moving groove, a blocking ring and a second spring, the insertion rod is movably inserted into the interior of the fixing sleeve, and the interior of the fixing sleeve is provided with a moving groove , the retaining ring is fixedly connected to the outer surface of the insertion rod, the second spring is movably sleeved on the outer surface of the insertion rod, and both the retaining ring and the second spring are located inside the moving groove.
优选的,所述固定套筒固定连接在垂直吊笼的内侧壁上,所述插杆贯穿固定套筒并延伸至垂直吊笼的内部固定连接有拨杆,所述第二弹簧的一端与挡环的侧面相抵,所述第二弹簧的另一端与移动槽的内侧壁且靠近拨杆的一端相抵。Preferably, the fixing sleeve is fixedly connected to the inner side wall of the vertical hanging cage, the insertion rod penetrates the fixing sleeve and extends to the interior of the vertical hanging cage and is fixedly connected with a lever, and one end of the second spring is connected to the stopper. The sides of the ring are abutted against each other, and the other end of the second spring is abutted against the inner sidewall of the moving groove and one end close to the lever.
优选的,所述垂直吊笼的外表面且与转动杆相对的一侧转动连接有挡板,所述垂直吊笼的上表面固定连接有弧形吊杆,所述钢索的底端固定连接在弧形吊杆的外表面。Preferably, a baffle plate is rotatably connected to the outer surface of the vertical hanging cage and the side opposite to the rotating rod, the upper surface of the vertical hanging cage is fixedly connected with an arc-shaped hanging rod, and the bottom end of the steel cable is fixedly connected On the outer surface of the curved boom.
优选的,所述垂直吊笼的两侧均固定连接有转动座,所述转轴转动连接在转动座的内部。Preferably, both sides of the vertical hanging cage are fixedly connected with a rotating seat, and the rotating shaft is rotatably connected inside the rotating seat.
优选的,所述垂直吊笼的两侧且位于转动座的上下两侧均固定连接有滑动环,所述滑动环活动的那个套接在导轨的外表面。Preferably, sliding rings are fixedly connected on both sides of the vertical cage and on the upper and lower sides of the rotating base, and the movable sliding ring is sleeved on the outer surface of the guide rail.
优选的,一组转动杆的端部开设有卡槽,另一组所述转动杆的端部固定连接有卡条,所述卡条活动卡接在卡槽的内部,所述卡槽和卡条的侧面均开设有与插杆相适配的插槽。Preferably, the ends of one set of rotating rods are provided with clipping slots, and the ends of the other set of rotating rods are fixedly connected with clipping strips, the clipping strips are movably clipped inside the clipping slots, and the clipping slots are connected to the clipping strips. The sides of the strips are all provided with slots that are adapted to the insertion rods.
优选的,所述垂直吊笼的侧面且位于两组转动杆的上方均开设有弧形槽,所述转动杆的侧面固定连接有滑动块,所述滑动块滑动连接在弧形槽的内部。Preferably, arc grooves are formed on the sides of the vertical cage and above the two sets of rotating rods, and sliding blocks are fixedly connected to the sides of the rotating rods, and the sliding blocks are slidably connected inside the arc grooves.
本发明提供了一种土木工程施工工地上的吊笼保护装置,其具备的有益效果如下:The invention provides a hanging cage protection device on a civil engineering construction site, which has the following beneficial effects:
1、该土木工程施工工地上的吊笼保护装置,通过将插杆在固定套筒的内部向垂直吊笼内部拉动,此时插杆的端部从卡槽和卡条侧面的插槽内部脱离,同时第一弹簧释放使得T形杆的底端在固定柱内部的活动槽内向上移动,此时T形杆的顶端向上移动并将转动杆向上顶起,此时转动杆以转轴为轴心进行转动,同时轴座在T形杆的顶端外表面转动,此时转轴与转动杆同部在转动座的内部转动,带动挂钩以转轴为轴心向垂直吊笼的两侧转动开来,使得挂钩的顶端与支撑架的侧面的横向杆迅速卡住,避免吊笼坠落,对人员造成伤害。1. The cage protection device on the construction site of this civil engineering works by pulling the insertion rod from the inside of the fixed sleeve to the interior of the vertical hanging cage, at this time, the end of the insertion rod is disengaged from the card slot and the slot on the side of the card bar. , at the same time the first spring is released so that the bottom end of the T-shaped rod moves upward in the movable groove inside the fixed column, at this time the top of the T-shaped rod moves upward and pushes the rotating rod upwards, at this time the rotating rod takes the rotating shaft as the axis At the same time, the shaft seat rotates on the outer surface of the top end of the T-shaped rod. At this time, the rotating shaft and the rotating rod rotate inside the rotating seat at the same part, which drives the hook to rotate to the two sides of the vertical cage with the rotating shaft as the axis center, so that the The top of the hook and the lateral rod on the side of the support frame are quickly stuck to prevent the cage from falling and causing injury to personnel.
2、该土木工程施工工地上的吊笼保护装置,通过在垂直吊笼的两侧均固定连接有转动座,转轴转动连接在转动座的内部,同时一组转动杆的端部开设有卡槽,另一组转动杆的端部固定连接有卡条,卡条活动卡接在卡槽的内部,卡槽和卡条的侧面均开设有与插杆相适配的插槽,在安装时将两组转动杆的端部活动卡接在一起并通过插杆进行卡接,在使用时拉动一组插杆,使得两侧的挂钩同时向两侧翻转进行卡接,减少避险操作的步骤,在下坠过程中能够迅速完成垂直吊笼的卡停,同时两组挂钩使得吊笼卡停更加稳定安全。2. The cage protection device on the civil engineering construction site is fixedly connected with a rotating seat on both sides of the vertical hanging cage, the rotating shaft is rotatably connected to the inside of the rotating seat, and a set of rotating rods are provided at the end with a clamping slot. , the end of the other set of rotating rods is fixedly connected with a card strip, the card strip is movably clamped inside the card slot, and the sides of the card slot and the card strip are provided with slots that are compatible with the insertion rod. The ends of the two sets of rotating rods are movably clamped together and are clamped through the insertion rods. When in use, a group of insertion rods are pulled, so that the hooks on both sides are flipped to both sides for clamping at the same time, reducing the steps of risk-avoiding operations. During the falling process, the vertical cage can be quickly stopped, and at the same time, two sets of hooks make the cage more stable and safe.
3、该土木工程施工工地上的吊笼保护装置,通过在垂直吊笼的侧面且位于两组转动杆的上方均开设有弧形槽,转动杆的侧面固定连接有滑动块,滑动块滑动连接在弧形槽的内部,在转动杆发生翻转时,滑动块沿着弧形槽进行滑动,避免转动杆的转动方向发生偏斜导致T形杆的顶端与轴座卡住,使得T形杆无法通过第一弹簧向上推动转动杆完全翻转,导致挂钩无法与支撑架的横向杆挂住的情况发生。3. The cage protection device on the civil engineering construction site is provided with arc grooves on the side of the vertical cage and above the two sets of rotating rods. The sides of the rotating rods are fixedly connected with sliding blocks, and the sliding blocks are slidably connected. Inside the arc-shaped groove, when the rotating rod is turned over, the sliding block slides along the arc-shaped groove to avoid the deflection of the rotating direction of the rotating rod, causing the top of the T-shaped rod and the shaft seat to be stuck, making the T-shaped rod unable to The first spring pushes the rotating rod upwards to completely turn over, resulting in the situation that the hook cannot be hung with the transverse rod of the support frame.
附图说明Description of drawings
图1为本发明主体结构示意图;Fig. 1 is the main structure schematic diagram of the present invention;
图2为本发明垂直吊笼结构示意图;Fig. 2 is the structural schematic diagram of the vertical hanging cage of the present invention;
图3为本发明转轴外表面结构示意图;3 is a schematic diagram of the structure of the outer surface of the rotating shaft of the present invention;
图4为本发明图2的A部分结构示意图;Fig. 4 is the structural representation of part A of Fig. 2 of the present invention;
图5为本发明伸缩组件结构示意图;5 is a schematic structural diagram of a telescopic assembly of the present invention;
图6为本发明固定组件结构示意图。FIG. 6 is a schematic structural diagram of the fixing assembly of the present invention.
图中:1、底板;2、支撑架;3、顶板;4、电机;5、绕线辊;6、导轨;7、垂直吊笼;8、挡板;9、弧形吊杆;10、转轴;11、滑动环;12、伸缩组件;121、固定柱;122、活动槽;123、第一弹簧;124、T形杆;125、轴座;13、转动座;14、挂钩;15、转动杆;16、滑动块;17、卡槽;18、卡条;19、固定组件;191、插杆;192、固定套筒;193、移动槽;194、挡环;195、第二弹簧;20、弧形槽。In the picture: 1. Bottom plate; 2. Support frame; 3. Top plate; 4. Motor; 5. Winding roller; 6. Guide rail; 7. Vertical hanging cage; 8. Baffle plate; Rotating shaft; 11, sliding ring; 12, telescopic assembly; 121, fixed column; 122, movable groove; 123, first spring; 124, T-bar; 125, shaft seat; 13, rotating seat; 14, hook; 15, Rotating rod; 16, sliding block; 17, card slot; 18, clip; 19, fixing assembly; 191, inserting rod; 192, fixing sleeve; 193, moving groove; 194, retaining ring; 195, second spring; 20. Arc groove.
具体实施方式Detailed ways
本发明实施例提供一种土木工程施工工地上的吊笼保护装置,如图1-6所示,包括底板1,底板1的上表面两侧均固定连接有支撑架2,支撑架2的顶端固定连接有顶板3,顶板3的上表面固定连接有电机4,电机4的输出端传动连接有绕线辊5,底板1的上表面且位于支撑架2的内侧固定连接有导轨6,导轨6的外表面滑动连接有垂直吊笼7,垂直吊笼7的顶部固定连接有钢索,钢索远离垂直吊笼7的一端穿过顶板3固定连接在绕线辊5的外表面,垂直吊笼7的两侧均转动连接有转轴10,转轴10的外表面固定连接有挂钩14,转轴10的端部固定连接有转动杆15,两组转动杆15远离转轴10的一端内部活动卡接有固定组件19,固定组件19远离转动杆15的一端延伸至垂直吊笼7的内部与垂直吊笼7的内侧壁固定连接,转动杆15靠近转轴10的一端下表面活动铰接有伸缩组件12,伸缩组件12固定连接在垂直吊笼7的侧壁上,通过将插杆191从卡槽17和卡条18侧面的插槽内部拉出,使得转动杆15在第一弹簧123的作用下以转轴10为轴心进行转动,此时转轴10带动挂钩14以转轴10为轴心向垂直吊笼7的两侧转动开来,使得挂钩14的顶端与支撑架2的侧面的横向杆迅速卡住,避免垂直吊笼7坠落对人员造成伤害。An embodiment of the present invention provides a cage protection device on a civil engineering construction site. As shown in Figures 1-6, it includes a
进一步的,垂直吊笼7的外表面且与转动杆15相对的一侧转动连接有挡板8,垂直吊笼7的上表面固定连接有弧形吊杆9,钢索的底端固定连接在弧形吊杆9的外表面,垂直吊笼7的两侧均固定连接有转动座13,转轴10转动连接在转动座13的内部,垂直吊笼7的两侧且位于转动座13的上下两侧均固定连接有滑动环11,滑动环11活动的那个套接在导轨6的外表面,滑动环11在垂直吊笼7上下移动的过程中,始终在导轨6的外表面上下滑动,对垂直吊笼7进行限位,防止垂直吊笼7移动过程中发生晃动。Further, the outer surface of the
进一步的,一组转动杆15的端部开设有卡槽17,另一组转动杆15的端部固定连接有卡条18,卡条18活动卡接在卡槽17的内部,卡槽17和卡条18的侧面均开设有与插杆191相适配的插槽,垂直吊笼7的侧面且位于两组转动杆15的上方均开设有弧形槽20,转动杆15的侧面固定连接有滑动块16,滑动块16滑动连接在弧形槽20的内部,在转动杆15发生翻转时,滑动块16沿着弧形槽20进行滑动,避免转动杆15的转动方向发生偏斜导致T形杆124的顶端与轴座125卡住,使得T形杆124无法通过第一弹簧123向上推动转动杆15完全翻转,导致挂钩14无法与支撑架2的横向杆挂住的情况发生。Further, the ends of one set of
更为具体的是,伸缩组件12包括固定柱121、活动槽122、第一弹簧123、T形杆124、和轴座125,固定柱121的内部开设有活动槽122,第一弹簧123活动卡接在活动槽122的内部,T形杆124的底端活动插接在活动槽122的内部,T形杆124的顶端活动铰接在轴座125的内部,固定柱121固定连接在垂直吊笼7的外侧壁上,轴座125固定连接在转动杆15的下表面,第一弹簧123的一端与活动槽122的内底部相抵,第一弹簧123的另一端与T形杆124的下表面相抵,在安装时将两组转动杆15的端部活动卡接在一起并通过插杆191进行卡接,此时T形杆124在固定柱121的内部向下滑动,使得T形杆124的底端将第一弹簧123向下按压,使得第一弹簧123处于压缩状态,此时第一弹簧123积攒势能,具有向上舒展的运动趋势,当两组转动杆15的端部相分离开时,第一弹簧123释放使得T形杆124的底端在固定柱121内部的活动槽122内向上移动,此时T形杆124的顶端向上移动并将转动杆15向上顶起,使得转动杆15在释放瞬间迅速完成转动。More specifically, the
更为具体的是,固定组件19包括插杆191、固定套筒192、移动槽193、挡环194和第二弹簧195,插杆191活动插接在固定套筒192的内部,固定套筒192的内部开设有移动槽193,挡环194固定连接在插杆191的外表面,第二弹簧195活动套接在插杆191的外表面,挡环194和第二弹簧195均处于移动槽193的内部,固定套筒192固定连接在垂直吊笼7的内侧壁上,插杆191贯穿固定套筒192并延伸至垂直吊笼7的内部固定连接有拨杆,第二弹簧195的一端与挡环194的侧面相抵,第二弹簧195的另一端与移动槽193的内侧壁且靠近拨杆的一端相抵,在安装时将两组转动杆15的端部活动卡接在一起并通过插杆191进行卡接,此时插杆191在第二弹簧195的作用下始终保持卡接在插槽的内部,避免在垂直吊笼7使用过程中发生误触,使得挂钩14在正常状态下舒展开来,同时在使用时拉动一组插杆191,使得两侧的挂钩14同时向两侧翻转进行卡接,减少避险操作的步骤,在下坠过程中能够迅速完成垂直吊笼7的卡停,同时两组挂钩14使得垂直吊笼7卡停更加稳定安全。More specifically, the fixing
工作原理:本发明公开了一种土木工程施工工地上的吊笼保护装置,该装置通过在底板1的上表面两侧均固定连接有支撑架2,支撑架2的顶端固定连接有顶板3,顶板3的上表面固定连接有电机4,电机4的输出端传动连接有绕线辊5,底板1的上表面且位于支撑架2的内侧固定连接有导轨6,导轨6的外表面滑动连接有垂直吊笼7,垂直吊笼7的顶部固定连接有钢索,钢索远离垂直吊笼7的一端穿过顶板3固定连接在绕线辊5的外表面,通过电机4驱动绕线辊5转动对钢索进行收卷,使得垂直吊笼7沿着导轨6向上移动,在下降时,通过电机4反转,使得绕线辊5对钢索进行释放,此时垂直吊笼7在重力的作用下缓慢向下滑动,对建筑施工过程中的工人和物料进行提升输送;Working principle: The present invention discloses a cage protection device on a civil engineering construction site. The device is fixedly connected with a
但是在使用过程中,如果发生意外情况,使得钢索断裂,此时垂直吊笼7会在重力的作用下迅速向下滑落,此时乘坐在垂直吊笼7内的人员在感知到危险时,迅速做出反应将垂直吊笼7内侧壁的插杆191在固定套筒192的内部向垂直吊笼7内部拉动,此时插杆191的端部从卡槽17和卡条18侧面的插槽内部脱离,并通过挡环194带动第二弹簧195压缩,同时在固定状态时第一弹簧123处于压缩状态,当两组转动杆15的端部相分离开时,第一弹簧123释放使得T形杆124的底端在固定柱121内部的活动槽122内向上移动,此时T形杆124的顶端向上移动并将转动杆15向上顶起,此时转动杆15以转轴10为轴心进行转动,使得滑动块16在弧形槽20的内部滑动,同时轴座125在T形杆124的顶端外表面转动,此时转轴10与转动杆15同部在转动座13的内部转动,带动挂钩14以转轴10为轴心向垂直吊笼7的两侧转动开来,使得挂钩14的顶端与支撑架2的侧面的横向杆活动卡接,该过程在将插杆191从固定套筒192内部向外拉动的瞬间迅速发生,使得挂钩14在垂直吊笼7发生意外坠落的过程中与两侧的支撑架2迅速卡住,避免垂直吊笼7坠落,对人员造成伤害。However, in the process of use, if an accident occurs and the steel cable is broken, the
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above. Those skilled in the art should understand that the present invention is not limited by the above-mentioned embodiments, and the descriptions in the above-mentioned embodiments and the description are only to illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will have Various changes and modifications fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110201148.1A CN112897277B (en) | 2021-02-23 | 2021-02-23 | Cage protection device on civil engineering construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110201148.1A CN112897277B (en) | 2021-02-23 | 2021-02-23 | Cage protection device on civil engineering construction site |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112897277A CN112897277A (en) | 2021-06-04 |
CN112897277B true CN112897277B (en) | 2022-06-24 |
Family
ID=76124341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110201148.1A Active CN112897277B (en) | 2021-02-23 | 2021-02-23 | Cage protection device on civil engineering construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112897277B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113602938A (en) * | 2021-07-16 | 2021-11-05 | 陕西省神木市建筑设计院 | Cage protection device on civil engineering building site |
CN115353038A (en) * | 2022-10-19 | 2022-11-18 | 江苏盛浩工程科技有限公司 | Attached lifting device for building engineering |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0717330B2 (en) * | 1988-10-12 | 1995-03-01 | 三菱電機株式会社 | Elevator emergency stop device |
JP4031228B2 (en) * | 2001-10-31 | 2008-01-09 | 岐阜工業株式会社 | Manual lifting cage |
CN102897624B (en) * | 2012-10-09 | 2015-04-29 | 长春理工大学 | Fall-prevention safety protection device for vertical lift elevator |
CN104555646A (en) * | 2015-01-26 | 2015-04-29 | 浙江西传电气科技有限公司 | Rotating fall protector of lifting unit |
CN105293244B (en) * | 2015-12-11 | 2017-08-25 | 郭贤良 | Suspension type elevator anti-fall device |
CN207192530U (en) * | 2017-06-27 | 2018-04-06 | 商丘职业技术学院 | A kind of construction safety lift |
CN207030659U (en) * | 2017-08-09 | 2018-02-23 | 浙江飞亚电梯有限公司 | A kind of anti-accidental movement device of fool proof elevator |
-
2021
- 2021-02-23 CN CN202110201148.1A patent/CN112897277B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN112897277A (en) | 2021-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112897277B (en) | Cage protection device on civil engineering construction site | |
CN218619838U (en) | A steel pipe truss hoisting auxiliary device | |
CN206580481U (en) | A kind of indoor horizontal lifting pipeline erecting device | |
CN117775957A (en) | Lifting appliance and crane adapted to lifting of concrete prefabricated member | |
CN116374866A (en) | A hoisting mechanism for floor bearing plates used in the construction of steel structure workshops | |
CN115806241A (en) | Fan-shaped asymmetric integrated steel structure corridor body hoisting device and construction method thereof | |
CN214456164U (en) | Hanging bar frame for steel plate loading and unloading vehicle | |
CN212315387U (en) | Bridge floor crane | |
CN117550482B (en) | Building construction hoisting device | |
CN206447449U (en) | A kind of vertical soft Stady On The Auxiliary Transportation Systems for skyscraper | |
CN116788978B (en) | Electric pole hoisting device for electric power construction | |
CN111252683A (en) | Bridge deck crane and application method thereof applied to bridge dismantling | |
CN203428792U (en) | Retractable type high rise hoisting machine | |
CN217264404U (en) | A kind of curtain wall lifting equipment for high-rise buildings | |
CN211004305U (en) | A turnover-free lifting device | |
CN215287782U (en) | A kind of non-excavation pipeline lining repair traction device | |
CN215331379U (en) | Elevator shaft lifting operation platform | |
CN204624973U (en) | A kind of scissors suspender lifting stacking sheet material | |
CN214298789U (en) | Anti-falling device of elevator | |
CN112299243B (en) | Intelligent hoisting method for assembly type building | |
CN114150858A (en) | Eminence construction auxiliary device for building engineering | |
CN2420255Y (en) | Braking and stopping device for construction wellhead cradle | |
CN116986493B (en) | Crane | |
CN204983685U (en) | Perpendicular conveyor of large -scale venue curtain decorative board | |
CN220815013U (en) | Green construction lifting anti-falling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240304 Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee after: Dragon totem Technology (Hefei) Co.,Ltd. Country or region after: China Address before: 467036 Longxiang Avenue, new town, Pingdingshan, Henan, China, Henan University Of Urban Construction Patentee before: Henan University of Urban Construction Country or region before: China |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240403 Address after: 710075 West Xian New District, Xi'an City, Shaanxi Province Jinghe New City Gaozhuang Town Lujia Village Origin Management Wholesale Base North Zone, 18th Row 5-200001005 Patentee after: Xi'an Bangdianda Architectural Decoration Engineering Co.,Ltd. Country or region after: China Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee before: Dragon totem Technology (Hefei) Co.,Ltd. Country or region before: China |
|
TR01 | Transfer of patent right |