CN112879232A - Fan impeller assembling platform and construction method - Google Patents

Fan impeller assembling platform and construction method Download PDF

Info

Publication number
CN112879232A
CN112879232A CN202110102666.8A CN202110102666A CN112879232A CN 112879232 A CN112879232 A CN 112879232A CN 202110102666 A CN202110102666 A CN 202110102666A CN 112879232 A CN112879232 A CN 112879232A
Authority
CN
China
Prior art keywords
platform
fan
supporting platform
counterweight device
counterweight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110102666.8A
Other languages
Chinese (zh)
Inventor
任灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202110102666.8A priority Critical patent/CN112879232A/en
Publication of CN112879232A publication Critical patent/CN112879232A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The application provides a fan impeller assembling platform and a construction method, wherein the method comprises the following steps: step one, a supporting platform is arranged, and a fan hub is arranged on the supporting platform; step two, arranging a counterweight device, and arranging a single counterweight device on the supporting platform; step three, setting a fan blade, and setting a single fan blade at the position opposite to the counterweight device set in the step two; and step four, repeating the step two to the step three until the fan impeller is assembled. According to the fan impeller assembling platform and the construction method, when the fan blades are installed, the counterweight device is arranged at the relative position, the balance of the fan blades is guaranteed, the fan blades are prevented from being continuously hoisted, free pitch change of the single fan blade can be carried out, conditions are created for fastening of the torque of the fan blades, the torque fastening efficiency is improved, the assembling time of the fan blades is shortened, the supporting platform can be repeatedly used, and the time cost is greatly improved.

Description

Fan impeller assembling platform and construction method
Technical Field
The invention belongs to the technical field of wind power new energy construction, and particularly relates to a platform capable of increasing the assembling stability and the efficiency of a graded impeller and a construction method thereof.
Background
Wind power generation is used as a clean and continuous new energy, has incomparable advantages with other energy, and has very important significance for adjusting energy structure, reducing environmental pollution and promoting economic development.
Because the size of the existing fan blade is large, the length of a single blade is more than 70 meters or even longer, and the impeller is difficult to assemble in a mountain wind field under a complex terrain condition. After a blade is installed, the blade needs to be hung by using an auxiliary automobile sling in order to ensure the balance of a hub, so that the blade cannot be fastened by changing the pitch and the moment, and the assembly efficiency is influenced. Before three blades of the impeller are installed, two auxiliary truck cranes are required to hang two blades which are installed firstly respectively, so that the overall stability of the impeller is ensured, and the problems of low use efficiency of mechanical equipment and large requirement on platform stations are caused. At present, in the assembling process of an impeller on a fan platform, the whole impeller is stressed on a hub tool, the bearing area is small, and great potential safety hazards are easily caused when the impeller is not placed flatly. Therefore, under the condition of complex terrain, how to effectively utilize the existing field, ensure the construction efficiency, save the equipment resources, improve the service efficiency of hoisting equipment, respond to the call of green civilized construction, and is a problem to be solved at present.
Disclosure of Invention
In view of the above, the present invention provides a fan impeller assembling platform and a construction method thereof, so as to solve or at least overcome at least one technical problem in the prior art.
In a first aspect, a method for constructing a fan impeller assembly platform is provided, which includes the following steps:
step one, a supporting platform is arranged, and a fan hub is arranged on the supporting platform;
step two, arranging a counterweight device, and arranging a single counterweight device on the supporting platform;
step three, a fan blade is arranged, and a single fan blade is arranged at the position opposite to the counterweight device arranged in the step two;
and step four, repeating the step two to the step three until the fan impeller is assembled.
Further, in the first step, a lifting appliance is adopted to transport the fan hub, and the fan hub is installed on the first installation part in the center of the supporting platform.
Further, in the second step, the method for arranging the single counterweight device on the supporting platform comprises:
hoisting a single counterweight device to the supporting platform, and installing the single counterweight device to the supporting platform when the step two is repeated;
or,
and D, removing the counterweight device from the supporting platform to enable only a single counterweight device to be left on the supporting platform, and installing the single counterweight device on the supporting platform when the step two is repeated.
Further, still include:
and fifthly, removing the connection between the fan hub and the supporting platform.
In a second aspect, there is provided a fan wheel assembly platform comprising:
a support platform;
the first mounting part is used for mounting a fan hub;
and at least three counterweight devices are detachably connected to the supporting platform, and the counterweight devices are circumferentially and uniformly distributed by taking the first installation part as a center.
Further, supporting platform's cross-section is circular, first installation department with the counter weight device all sets up on same side.
Further, first installation department sets up supporting platform's middle part, first installation department is including setting up a plurality of bolts on the supporting platform.
Further, a plurality of second installation parts are arranged on the supporting platform, and the second installation parts are used for correspondingly installing the counterweight device.
Furthermore, each second mounting part is a counterweight groove;
each counterweight groove comprises a groove formed in the supporting platform, or is formed by splicing a plurality of baffle plates arranged on the supporting platform.
Furthermore, a plurality of lifting lugs are arranged on the supporting platform.
The application has the following beneficial effects:
the utility model provides a fan wheel assembles platform and construction method, fan wheel hub is installed to the first installation department on the supporting platform, directly assemble fan blade through fan wheel hub, when installing fan blade, set up the counter weight device in relative position, fan blade's equilibrium has been guaranteed, the continuation hoist and mount to fan blade has been avoided, and can also carry out the freedom of single fan blade and become the oar, the condition has been created for the fastening of fan blade moment, the efficiency of moment fastening has been improved, fan blade's equipment time has been shortened, and supporting platform can used repeatedly, the time cost has greatly been promoted.
Drawings
The above and other objects, features and advantages of the present invention will become more apparent from the following description of the embodiments of the present invention with reference to the accompanying drawings.
Fig. 1 is a schematic flow chart of a construction method of a fan impeller assembly platform according to an embodiment of the present invention;
FIG. 2 is a simplified structural schematic diagram of a fan wheel assembly platform according to an embodiment of the present invention;
FIG. 3 is a schematic structural view of a single fan blade mounted to a fan wheel assembly platform according to an embodiment of the present invention;
fig. 4 is an assembled fan wheel provided in a fan wheel assembly platform according to an embodiment of the present invention.
The system comprises a support platform 1, a fan hub 2, a counterweight device 3, a counterweight groove 4, a lifting lug 5 and a fan blade 6.
Detailed Description
Various embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Like elements in the various figures are denoted by the same or similar reference numerals. For purposes of clarity, the various features in the drawings are not necessarily drawn to scale.
In a first aspect, referring to fig. 1 to 4, a method for constructing a fan impeller assembly platform is provided, which includes the following steps: step one, a supporting platform 1 is arranged, and a fan hub 2 is arranged on the supporting platform 1; step two, arranging a counterweight device 3, and arranging a single counterweight device 3 on the supporting platform 1; step three, arranging a fan blade 6, and arranging a single fan blade 6 at the position opposite to the counterweight device 3 arranged in the step two; and step four, repeating the step two to the step three until the fan impeller is assembled.
In this embodiment, install fan wheel hub 2 through supporting platform 1, and realize fan wheel hub 2's stability, can be through installing counter weight device 3 additional when installing fan blade 6, realize fan blade 6's stability, avoid because guarantee fan blade 6's balance and the hoist and mount to fan blade 6 that last, and can also carry out the free of 360 degrees of single blade and become the oar, created the condition for the fastening of blade moment, the efficiency of moment fastening has been improved, the equipment time of every group fan wheel hub 2 has been shortened.
In the first step, the fan hub 2 is transported by a lifting appliance, the fan hub 2 is installed on the first installation part at the center of the supporting platform 1, the fan hub 2 is arranged at the center of the supporting platform 1, and the stability of the whole supporting platform 1 is guaranteed.
In the second step, the method for arranging the single counterweight device 3 on the supporting platform 1 comprises the following steps: the first method is to hoist the single counterweight device 3 to the supporting platform 1, and when the second step is repeated, the single counterweight device 3 is installed on the supporting platform 1. And a second method, namely, removing the counterweight device 3 from the supporting platform 1 to ensure that only a single counterweight device 3 is left on the supporting platform 1, and installing the single counterweight device 3 on the supporting platform 1 when the second step is repeated.
As will be understood by those skilled in the art, the first method is suitable for assembling the fan by using the support platform 1 for the first time, and the second method is suitable for assembling the fan at the later stage, after the fan is assembled for the first time, the counterweight device 3 is still on the support platform 1 after the assembled fan is hoisted, and then the counterweight device 3 is hoisted, so that one counterweight device 3 on the support platform 1 is remained, the single counterweight device 3 hoisted for the first time in the first method is reduced, and the single counterweight device 3 arranged on the support platform 1 does not cause the inclination of the support platform 1.
In this embodiment, the method further includes: and fifthly, removing the connection between the fan hub 2 and the supporting platform 1. It will be appreciated that the counterweight 3 may be left on the support platform 1 without the need for lifting.
In a second aspect, referring to fig. 2 to 4, there is provided a fan impeller assembling platform, which is applied to the fan impeller assembling platform construction method of the first aspect, and includes: a support platform 1; a first mounting portion for mounting the fan hub 2; and at least three counterweight devices 3 are detachably connected to the supporting platform 1, and the counterweight devices 3 are circumferentially and uniformly distributed by taking the first mounting part as a center.
The cross-section of supporting platform 1 is circular, first installation department with counter weight device 3 all sets up on same side. Supporting platform 1 can be formed by the welding of circular shape steel sheet, and first installation department predetermines according to fan wheel hub 2's mounting structure on supporting platform 1, guarantee to install fan wheel hub 2 smoothly, make fan wheel hub 2 more stable.
First installation department sets up supporting platform 1's middle part, first installation department is including setting up a plurality of bolts on supporting platform 1. A plurality of bolted connections that set up are on supporting platform 1, install it on first installation department through hoist and mount fan wheel hub 2 to connect the nut.
The supporting platform 1 is provided with a plurality of second installation parts, and the second installation parts are used for correspondingly installing the counterweight device 3. Each second mounting part is a counterweight groove 4; each counterweight groove 4 comprises a groove formed in the supporting platform 1, or is formed by splicing a plurality of baffle plates arranged on the supporting platform 1. It should be understood that the counterweight grooves 4 are provided for installing the counterweight devices 3, and can play a role of stabilizing each counterweight device 3, and prevent the counterweight devices 3 from sliding on the supporting platform 1 to cause safety accidents. Furthermore, a jacking bolt can be arranged on the baffle plate of the counterweight groove 4 to jack the counterweight device 3, so that the counterweight device 3 can be fastened and the like.
In this embodiment, the supporting platform 1 is provided with a plurality of lifting lugs 5, and each lifting lug 5 is used for lifting the supporting platform 1 by the lifting device.
The utility model provides a fan wheel assembles platform and construction method, fan wheel hub 2 is installed to the first installation department on supporting platform 1, directly assemble fan blade 6 through fan wheel hub 2, when installing fan blade 6, set up counter weight device 3 in relative position, the equilibrium of fan blade 6 has been guaranteed, the continuation hoist and mount to fan blade 6 has been avoided, and can also carry out the free of single fan blade 6 and become the oar, the condition has been created for the fastening of fan blade 6 moment, the efficiency of moment fastening has been improved, the equipment time of fan blade 6 has been shortened, and supporting platform 1 can used repeatedly, the time cost has greatly been promoted.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Finally, it should be noted that: it should be understood that the above examples are only for clearly illustrating the present invention and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications of the invention may be made without departing from the scope of the invention.

Claims (10)

1. A construction method of a fan impeller assembly platform is characterized by comprising the following steps:
step one, a supporting platform is arranged, and a fan hub is arranged on the supporting platform;
step two, arranging a counterweight device, and arranging a single counterweight device on the supporting platform;
step three, a fan blade is arranged, and a single fan blade is arranged at the position opposite to the counterweight device arranged in the step two;
and step four, repeating the step two to the step three until the fan impeller is assembled.
2. The fan impeller assembling platform construction method according to claim 1, wherein in the first step, the fan hub is transported by a hanger and mounted on the first mounting portion at the center of the supporting platform.
3. The fan impeller assembling platform construction method according to claim 1, wherein in the second step, the method for arranging the single counterweight device on the supporting platform comprises the following steps:
hoisting a single counterweight device to the supporting platform, and installing the single counterweight device to the supporting platform when the step two is repeated;
or,
and D, removing the counterweight device from the supporting platform to enable only a single counterweight device to be left on the supporting platform, and installing the single counterweight device on the supporting platform when the step two is repeated.
4. The fan impeller assembling platform construction method according to any one of claims 1 to 3, further comprising:
and fifthly, removing the connection between the fan hub and the supporting platform.
5. A fan wheel assembly platform, comprising:
a support platform;
the first mounting part is used for mounting a fan hub;
and at least three counterweight devices are detachably connected to the supporting platform, and the counterweight devices are circumferentially and uniformly distributed by taking the first installation part as a center.
6. The fan impeller assembly platform of claim 5, wherein the support platform is circular in cross-section, and the first mounting portion and the counterweight device are both disposed on the same side.
7. The fan impeller assembly platform of claim 5, wherein the first mounting portion is disposed in a middle portion of the support platform, the first mounting portion including a plurality of bolts disposed on the support platform.
8. The fan impeller assembling platform according to claim 5, wherein the supporting platform is provided with a plurality of second mounting portions, and the second mounting portions are used for correspondingly mounting the counterweight devices.
9. The fan impeller assembly platform of claim 8, wherein each of the second mounting portions is a counterweight groove;
each counterweight groove comprises a groove formed in the supporting platform, or is formed by splicing a plurality of baffle plates arranged on the supporting platform.
10. The fan impeller assembly platform of claim 9, wherein the support platform is provided with a plurality of lifting lugs.
CN202110102666.8A 2021-01-26 2021-01-26 Fan impeller assembling platform and construction method Pending CN112879232A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110102666.8A CN112879232A (en) 2021-01-26 2021-01-26 Fan impeller assembling platform and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110102666.8A CN112879232A (en) 2021-01-26 2021-01-26 Fan impeller assembling platform and construction method

Publications (1)

Publication Number Publication Date
CN112879232A true CN112879232A (en) 2021-06-01

Family

ID=76053212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110102666.8A Pending CN112879232A (en) 2021-01-26 2021-01-26 Fan impeller assembling platform and construction method

Country Status (1)

Country Link
CN (1) CN112879232A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118008706A (en) * 2024-04-10 2024-05-10 山西省安装集团股份有限公司 Supporting device for installing impeller of wind driven generator

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102459892A (en) * 2009-05-18 2012-05-16 维斯塔斯风力系统有限公司 A hub for a wind turbine
CN102644562A (en) * 2012-05-14 2012-08-22 江苏龙源振华海洋工程有限公司 Process for installing impeller assembly elephant foot balance bracket of offshore wind power field
CN102979685A (en) * 2012-11-29 2013-03-20 北京金风科创风电设备有限公司 Installation equipment and installation method for impeller in offshore wind generating set
US20130272876A1 (en) * 2012-04-11 2013-10-17 Peter Loevenskjold Falkenberg Arrangement and method to rotate the hub of a wind turbine
US20150275854A1 (en) * 2014-03-28 2015-10-01 Alstom Renewable Technologies Counterweighting a wind turbine hub
CN205277701U (en) * 2015-12-30 2016-06-01 江苏金风科技有限公司 Equipment of wind generating set impeller is with assembling device
CN106224170A (en) * 2016-07-21 2016-12-14 新疆金风科技股份有限公司 Wind power generating set impeller sets to device and impeller sets to method
TWI677624B (en) * 2018-10-18 2019-11-21 潤弘精密工程事業股份有限公司 Offshore wind power generation apparatus and offshore wind power generation system
CN111721491A (en) * 2020-07-21 2020-09-29 上海电气风电集团股份有限公司 Fan full-size blade two-axis loading fatigue test method and two-axis loading equipment
KR102173574B1 (en) * 2019-04-26 2020-11-03 두산중공업 주식회사 Counter weight apparatus for installing wind turbine, and installing method of wind turbine using the same
CN112145359A (en) * 2019-06-26 2020-12-29 江苏金风科技有限公司 Impeller assembling tool and impeller assembling method for offshore wind generating set

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102459892A (en) * 2009-05-18 2012-05-16 维斯塔斯风力系统有限公司 A hub for a wind turbine
US20130272876A1 (en) * 2012-04-11 2013-10-17 Peter Loevenskjold Falkenberg Arrangement and method to rotate the hub of a wind turbine
CN102644562A (en) * 2012-05-14 2012-08-22 江苏龙源振华海洋工程有限公司 Process for installing impeller assembly elephant foot balance bracket of offshore wind power field
CN102979685A (en) * 2012-11-29 2013-03-20 北京金风科创风电设备有限公司 Installation equipment and installation method for impeller in offshore wind generating set
US20150275854A1 (en) * 2014-03-28 2015-10-01 Alstom Renewable Technologies Counterweighting a wind turbine hub
CN205277701U (en) * 2015-12-30 2016-06-01 江苏金风科技有限公司 Equipment of wind generating set impeller is with assembling device
CN106224170A (en) * 2016-07-21 2016-12-14 新疆金风科技股份有限公司 Wind power generating set impeller sets to device and impeller sets to method
TWI677624B (en) * 2018-10-18 2019-11-21 潤弘精密工程事業股份有限公司 Offshore wind power generation apparatus and offshore wind power generation system
KR102173574B1 (en) * 2019-04-26 2020-11-03 두산중공업 주식회사 Counter weight apparatus for installing wind turbine, and installing method of wind turbine using the same
CN112145359A (en) * 2019-06-26 2020-12-29 江苏金风科技有限公司 Impeller assembling tool and impeller assembling method for offshore wind generating set
CN111721491A (en) * 2020-07-21 2020-09-29 上海电气风电集团股份有限公司 Fan full-size blade two-axis loading fatigue test method and two-axis loading equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118008706A (en) * 2024-04-10 2024-05-10 山西省安装集团股份有限公司 Supporting device for installing impeller of wind driven generator

Similar Documents

Publication Publication Date Title
CN112879232A (en) Fan impeller assembling platform and construction method
CN218931433U (en) Offshore wind power bolt assembly hoisting tool
CN117489535A (en) Tower barrel structure of detachable hoisting platform and hoisting method thereof
CN217105888U (en) Indoor rotation steel ladder
CN113896084A (en) Single loop wheel machine hoist and mount overlength fan blade gallows
CN210286456U (en) Wind wheel hoisting tool
CN109306938B (en) Wind turbine tower, tower installation method and wind turbine
CN212076198U (en) Machine table structure of tower crane for hoisting fan
CN216945817U (en) Lifting hanging beam for mounting wind driven generator cabin
CN212222254U (en) Self-erecting and self-disassembling device for crane boom
CN211174480U (en) Tool for replacing high-speed shafting by using 3MW wind power gear box for overhead maintenance
CN116180602A (en) Welding construction method for curved surface special-shaped inner concrete outer steel main tower decorative plate
CN219730252U (en) Hoisting device for wind wheel system
CN114148888A (en) Lifting hanging beam for mounting wind driven generator cabin and operation method
CN221169839U (en) Tower barrel structure of detachable hoisting platform
CN219412059U (en) Tower pole for power transmission
CN201885870U (en) Interval change type pitch test device
CN214092144U (en) Impeller assembling and fixing device of wind generating set
CN218778665U (en) Jacking sleeve frame and tower crane
CN218958457U (en) Tubular busbar hoisting bracket special for wind power stepped concrete tower
CN216807910U (en) Land single blade replacing tool
CN216638762U (en) Movable pulley block structure suitable for large-angle diagonal-pulling working condition gantry hoist
CN205737707U (en) A kind of novel combination type crossbeam
CN219837689U (en) Pump equipment bearing box fixing device
CN117869200B (en) Fan dismantling method and system in tower bending state

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210601