[go: up one dir, main page]

CN112738890A - eMBB CCE resource allocation method and device - Google Patents

eMBB CCE resource allocation method and device Download PDF

Info

Publication number
CN112738890A
CN112738890A CN201911033501.9A CN201911033501A CN112738890A CN 112738890 A CN112738890 A CN 112738890A CN 201911033501 A CN201911033501 A CN 201911033501A CN 112738890 A CN112738890 A CN 112738890A
Authority
CN
China
Prior art keywords
embb
cce
urllc
resource
pdcch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911033501.9A
Other languages
Chinese (zh)
Inventor
王子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201911033501.9A priority Critical patent/CN112738890A/en
Priority to PCT/CN2020/116210 priority patent/WO2021082796A1/en
Publication of CN112738890A publication Critical patent/CN112738890A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0048Allocation of pilot signals, i.e. of signals known to the receiver
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/53Allocation or scheduling criteria for wireless resources based on regulatory allocation policies

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides an eMBB CCE resource allocation method and a device, and the method comprises the following steps: in the eMBB CCE resource allocation, if the required CCE resource can be allocated in the RB resource occupied by the currently allocated CCE, the required CCE resource is allocated in the RB resource. In the invention, eMMC CCE resources are distributed more densely, and the probability of resource conflict between uRLLC and eMMC is reduced, thereby reducing the influence of uRLLC on eMMC downlink control channel resource preemption.

Description

eMB CCE resource allocation method and device
Technical Field
The present invention relates to the field of communications, and in particular, to a method and an apparatus for allocating Control Channel Element (CCE) resources in an Enhanced Mobile Broadband (eMBB).
Background
Ultra Reliable Low latency Communication (urrllc) over New Radio (NR) is a highly Reliable, Low latency network slice service with priority over the eMBB. In scheduling timing, the temporal processing granularity of the eMBB is a Slot (Slot) and the urrllc is a small Slot (minilot). For the same air interface time, once downlink concurrent scheduling carried by the uRLLC and the eMB occurs in a cell and RB resource conflict occurs, the uRLLC punctures a downlink control channel allocated by the eMB in a preemptive mode to ensure high-priority transmission of the uRLLC, but the puncturing of the eMB downlink control channel by the uRLLC can affect transmission of the eMB.
Disclosure of Invention
The embodiment of the invention provides an eBB CCE resource allocation method and device, which are used for at least solving the problem that eBB transmission is influenced by the punching of an eBB downlink control channel by uRLLC in the related technology.
According to an embodiment of the present invention, there is provided an eMBB CCE resource allocation method, including: in the eMBB CCE resource allocation, if the required CCE resource can be allocated in the RB resource occupied by the currently allocated CCE, the required CCE resource is allocated in the RB resource.
Wherein the method further comprises: if the required CCE Resource cannot be allocated within the RB Resource occupied by the currently allocated CCE, the required CCE Resource allocation is performed in the vicinity of a Resource Block (RB) occupied by a Physical Downlink Control Channel (PDCCH) or at the edge of a Control Resource set (CORESET) in the direction from low to high or from high to low.
Wherein the method further comprises: the eMBB scheduler counts the utilization rate of uRLLC scheduling RB;
and if the using rate of the uRLLC RB reaches a threshold value within a preset time length and exceeds n times, the eMBB scheduler controls CCE resource allocation in subsequent z slots, wherein n and z are positive integers.
Wherein the controlling, by the eMBB scheduler, CCE resource allocation within subsequent z slots comprises: and judging whether the number of RBs occupied by the allocated PDCCH reaches k, if so, not allocating CCE resources in the subsequent z slots, wherein k is a positive integer.
Wherein the method further comprises: and judging whether the CCE polymerization degree of the current scheduling user reaches a threshold value, if so, not allocating CCE resources in the subsequent z slots.
Wherein the method further comprises: through an interaction channel established between the eMBB and the uRLLC, at the downlink scheduling time corresponding to the air interface Minislot0, the eMBB notifies the uRLLC of the PDCCH resource allocation result, wherein the allocation result comprises air interface time and the RB resource set occupied by the PDCCH.
After the eMBB notifies the result of PDCCH resource allocation to the urrllc, the method further includes: when downlink RB resource allocation is carried out by the uRLLC, resources are allocated only on RBs which are not occupied by eMBB PDCCH resources in Part of Bandwidth (BWP) Bandwidth of the uRLLC, and information occupied by PDSCH RBs of the side is sent to the eMBBs.
Wherein, DMRS of uRLLC is configured on the first symbol of each Minislot, and the first symbol is PDCCH of eMBB, the method also includes: judging whether the base station transmits uRLLC downlink air interface data of the scheduling user in the RB resource range occupied by the eMBB PDCCH or not in the first t Minislots of the current Minislot 0; if yes, buffering Demodulation Reference Signal (DMRS) corresponding to a Physical Downlink Shared Channel (PDSCH) closest to the Minislot0 in the t minislots on the UE side, for demodulating the single-symbol PDSCH without the DMRS sent by the base station on the RB of the PDSCH.
Wherein, DMRS of uRLLC is configured on the first symbol of each Minislot, and the first symbol is PDCCH of eMBB, the method also includes: judging whether the base station transmits uRLLC downlink air interface data of the scheduling user in the RB resource range occupied by the eMBB PDCCH or not in the first t Minislots of the current Minislot 0; and if so, the base station transmits the single-symbol PDSCH without the DMRS on the RB resource which is transmitted by the PDSCH before.
According to another embodiment of the present invention, there is provided an eMBB CCE resource allocation apparatus including: the first allocating module is configured to, when eMBB CCE resource allocation is performed, allocate a required CCE resource within an RB resource occupied by a currently allocated CCE, if the required CCE resource can be allocated within the RB resource.
Wherein the apparatus further comprises: and the second allocating module is used for allocating the needed CCE resources to the RBs occupied by the PDCCH or the edges corresponding to the CORESET according to the direction from low to high or from high to low under the condition that the needed CCE resources cannot be allocated in the RB resources occupied by the currently allocated CCE.
Wherein the apparatus further comprises: the counting module is used for counting the utilization rate of the uRLLC scheduling RB; and the control module is used for controlling CCE resource allocation in subsequent z slots under the condition that the using rate of the uRLLC RB reaches a threshold value within a preset time length and exceeds n times, wherein n and z are positive integers.
Wherein the control module comprises: a first control unit, configured to control not to perform CCE resource allocation in subsequent z slots when the number of RBs occupied by the already allocated PDCCH reaches k, where k is a positive integer.
Wherein the control module comprises: and the second control unit is used for controlling that the CCE resource allocation of the current scheduling user is not carried out in the subsequent z slots under the condition that the CCE polymerization degree of the current scheduling user reaches a threshold value.
Wherein the apparatus further comprises: and the notification module is used for notifying the uRLLC of the PDCCH resource allocation result at the downlink scheduling time corresponding to the air interface Minislot0 through an interaction channel established between the eMBB and the uRLLC, wherein the allocation result comprises air interface time and an RB resource set occupied by the PDCCH.
Wherein, DMRS of urrllc is configured on a first symbol of each minilot, and the first symbol is a PDCCH of eMBB, the apparatus further includes: a second determining module, configured to determine whether, within an RB resource range occupied by an eMBB PDCCH in the first t minislots of the current Minislot0, a base station has uRLLC downlink air interface data transmission for the scheduling user; and a buffering module, configured to, if the determination result of the second determining module is yes, buffer, on the UE side, the DMRS corresponding to the PDSCH closest to the Minislot0 within the t minislots, and demodulate the single-symbol PDSCH without the DMRS, which is transmitted by the base station on the RB of the PDSCH.
Wherein, DMRS of urrllc is configured on a first symbol of each minilot, and the first symbol is a PDCCH of eMBB, the apparatus further includes: a third determining module, configured to determine whether, within an RB resource range occupied by an eMBB PDCCH in the first t minislots of the current Minislot0, a base station has uRLLC downlink air interface data transmission for the scheduling user; and a transmission module, configured to transmit the single symbol PDSCH without the DMRS on the RB resource to which the PDSCH has been previously transmitted, if the determination result of the third determination module is yes.
According to a further embodiment of the present invention, there is also provided a storage medium having a computer program stored therein, wherein the computer program is arranged to perform the steps of any of the above method embodiments when executed.
According to yet another embodiment of the present invention, there is also provided an electronic device, including a memory in which a computer program is stored and a processor configured to execute the computer program to perform the steps in any of the above method embodiments.
In the embodiment of the invention, the eMBB CCE resources are distributed more densely, so that the probability of resource conflict between the uRLLC and the eMBB is reduced, and the influence of the uRLLC on the control channel resource preemption of the eMBB is reduced.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without limiting the invention. In the drawings:
fig. 1 is a flowchart of an eMBB CCE resource allocation method according to an embodiment of the present invention;
fig. 2 is a schematic diagram of a radio resource configuration scenario according to an embodiment of the present invention;
fig. 3 is a CCE resource aggregation allocation flow diagram according to an embodiment of the invention;
fig. 4 is a flow chart of CCE resource allocation restriction according to an embodiment of the invention;
fig. 5 is a schematic diagram of a strategy for extending the effective period of DMRS according to an embodiment of the present invention;
fig. 6 is a schematic structural diagram of an eMBB CCE resource allocation apparatus according to an embodiment of the present invention;
fig. 7 is a schematic diagram of an eMBB CCE resource allocation device module according to an alternative embodiment of the invention.
Detailed Description
The invention will be described in detail hereinafter with reference to the accompanying drawings in conjunction with embodiments. It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict.
It should be noted that the terms "first," "second," and the like in the description and claims of the present invention and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order.
Aiming at a scene of cooperative scheduling of NR uRLLC network slices and eMBB slices, the embodiment of the invention provides an eMBB CCE resource allocation method in order to reduce the influence of resource punching on eMBB on the premise of ensuring high-priority processing of the uRLLC.
Fig. 1 is a flowchart of an eMBB CCE resource allocation method according to an embodiment of the present invention, where as shown in fig. 1, the flowchart includes the following steps:
step S102, when eMBB CCE resources are allocated, if the required CCE resources can be allocated in the RB resources occupied by the currently allocated CCE, the required CCE resources are allocated in the RB resources.
Before step S102 in this embodiment, the method may further include: and judging whether the required CCE resources can be allocated in the RB resources occupied by the currently allocated CCE.
In step S102 of this embodiment, if the required CCE resource cannot be allocated within the RB resource occupied by the currently allocated CCE, the required CCE resource allocation is performed in a direction from low to high or from high to low, immediately adjacent to the RB occupied by the PDCCH or an edge of a corresponding CORESET.
After step S102 in this embodiment, the method may further include: the eMBB scheduler counts the utilization rate of uRLLC scheduling RB; and if the using rate of the uRLLC RB reaches a threshold value within a preset time length and exceeds n times, the eMBB scheduler controls CCE resource allocation in subsequent z slots, wherein n and z are positive integers.
In this embodiment, the controlling, by the eMBB scheduler, CCE resource allocation within subsequent z slots includes: and judging whether the number of RBs occupied by the allocated PDCCH reaches k, if so, not allocating CCE resources in the subsequent z slots, wherein k is a positive integer.
In this embodiment, the controlling, by the eMBB scheduler, CCE resource allocation within subsequent z slots may further include: or judging whether the CCE polymerization degree of the current scheduling user reaches a threshold value, if so, not allocating CCE resources in the subsequent z slots.
In this embodiment, the method may further include the steps of: through an interaction channel established between the eMBB and the uRLLC, at a downlink scheduling time corresponding to an air interface Minislot0, the eMBB notifies the uRLLC of a PDCCH resource allocation result, wherein the allocation result comprises air interface time and an RB resource set occupied by the PDCCH, and when the uRLLC allocates downlink RB resources, the eMBB PDCCH resources are allocated only on RBs which are not occupied by eMBB PDCCH resources in a BWP bandwidth of the uRLLC, and the condition that PDSCH RBs of the local side are occupied is sent to the eMBB.
In this embodiment, for a scenario where the DMRS of the uRLLC is configured on the first symbol of each minilot and the first symbol is the PDCCH of the eMBB, the method may include the steps of: judging whether the base station transmits uRLLC downlink air interface data of the scheduling user in the RB resource range occupied by the eMBB PDCCH or not in the first t Minislots of the current Minislot 0; if yes, buffering DMRS corresponding to the PDSCH closest to the Minislot0 in t Minislots on the UE side, and demodulating the single-symbol PDSCH which is sent by the base station on the RB of the PDSCH and does not contain the DMRS.
In this embodiment, for a scenario where the DMRS of the uRLLC is configured on the first symbol of each minilot and the first symbol is a PDCCH of the eMBB, the method may further include the steps of: judging whether the base station transmits uRLLC downlink air interface data of the scheduling user in the RB resource range occupied by the eMBB PDCCH or not in the first t Minislots of the current Minislot 0; and if so, the base station transmits the single-symbol PDSCH without the DMRS on the RB resource which is transmitted by the PDSCH before.
In this embodiment, the influence of the urrllc on the eMBB control channel is avoided by a downlink RB scheduling avoidance and DMRS effective time extension strategy, and meanwhile, the urrllc service rate is guaranteed as much as possible.
In order to facilitate understanding of the technical solutions provided by the embodiments of the present invention, the following detailed description will be made with reference to embodiments having application scenarios.
Fig. 2 is a radio resource configuration scenario according to an embodiment of the present invention, and as shown in fig. 1, a Minislot resource configuration of an eMBB PDCCH is as follows: 2 OFDM symbols constitute 1 minilot, and in the urrllc scheduling timing in which 14 symbols within 1Slot are cut into 7 minilots, the first symbol of minilot 0 is the eMBB PDCCH.
In minilot configured with the eMBB PDCCH, if the urrllc data-sending PDSCH collides with the RB position of the PDCCH occupied by the eMBB, the urrllc PDSCH may puncture the eMBB PDCCH, which may cause failure in detecting UE Downlink Control Information (DCI), thereby causing loss of the transmission of the eMBB and abnormal HARQ status. Control channels are punctured, which is more serious than data channel puncturing and should be avoided as much as possible.
More particularly, in the above scenario, if DMRS of uRLLC is configured on the first symbol of each minilot, the second symbol on minilot 0 cannot be used to transmit uRLLC downlink data due to the presence of DMRS at the position where the uRLLC PDSCH and the eMBB PDCCH overlap in frequency domain, because the UE needs to demodulate with DMRS, and transmitting PDSCH is accompanied by transmitting DMRS on the configured first symbol, which will also cause the eMBB PDCCH to be punctured.
The simplest processing scheme for the above situation is to not schedule at Minislot0 or configure eMBB and urrllc frequency division cell bandwidths, and prevent resource collision by adopting a semi-static isolation manner. The former will cause the missing of Minislot0 scheduling, so that the key time delay of uRLLC is increased, and the flow is reduced; the latter can result in the reduction of the available bandwidth of uRLLC, the fragmentation of the message, the increase of the time delay and the reduction of the flow.
In order to solve the problem of eMBB transmission generated by puncturing the eMBB PDCCH resource in the radio air interface resource (including PDSCH and DMRS) occupied by the urlllc bearer in the miniport configured with the eMBB PDCCH, a scheduling strategy is provided in this embodiment to solve the problem. The scheduling strategy mainly comprises the following three strategies:
strategy 1: in order to realize scheduling avoidance of the RB occupied by the eMBB PDCCH and the RB occupied by the uRLLC PDSCH, special processing is required to be carried out on eMBB CCE resource allocation, the CCE resource allocation is not dispersed as much as possible, and the allocated PDCCH resources are aggregated. To ensure high priority transmission of urrllc, eMBB CCE resource usage should also tend to be conservative.
As shown in fig. 3, strategy 1 may adopt the following steps to try to aggregate the allocated PDCCH resources:
step S301, scheduling a user to perform eMBB CCE resource allocation;
step S302, judging whether the needed CCE resource can be distributed in the RB resource occupied by the currently distributed CCE, if so, executing step S303, and if not, executing step S304;
step S303, CCE is distributed in the RB resource range to realize PDCCH resource aggregation;
step S304, judging whether other CCE resources are distributed completely, if so, executing step S305, otherwise, executing step S306;
step S305, performing resource allocation on RBs occupied by the adjacent PDCCH according to the direction from low to high or from high to low so as to realize PDCCH resource aggregation;
in step S306, resource allocation is performed from the edge of the CORESET in the direction from low to high or from high to low, so as to realize PDCCH resource aggregation.
As shown in fig. 4, policy 1 may further include the following steps:
step S401, in the QoS of the eMBB scheduler, a counter of the uRLLC scheduling RB utilization rate is added, m is set as a uRLLC RB utilization rate threshold, and n is set as a threshold for counting the times that the uRLLC scheduling RB exceeds m in a sliding window t. And counting the times that the usage rate of the uRLLC RB exceeds a threshold within the sliding window t.
Step S402, judging whether the use rate of uRLLC RB exceeds a threshold m in a sliding window t and reaches n times, if so, considering that the current time is a heavy load time period of uRLLC service, executing step S403, and if not, executing step S407;
step S403, the eMBB scheduler adopts a strategy for limiting CCE resource allocation in the following z slots;
step S404, judging whether the number of RBs occupied by the allocated PDCCH reaches k, if so, executing step S406, and if not, executing step S405;
step S405, judging whether the CCE polymerization degree of the current user to be scheduled exceeds j, if so, executing step S406, and if not, executing step S407;
in step S406, the eMBB scheduler does not allocate CCE resources in the subsequent z slots, and abandons the eMBB user with poor channel condition in this period of time.
In step S407, the eMBB scheduler normally allocates CCE resources.
In this embodiment, m, n, t, z, k, and j are all configurable parameters.
The eMBB CCE resource allocation is more intensive or limited through the strategy 1, more RB resources are reserved for the uRLLC, and high-priority transmission of the uRLLC is guaranteed to the maximum extent.
Strategy 2: through an interaction channel established between the eMBB and the uRLLC, at the downlink scheduling time corresponding to the air interface Minislot0, the eMBB notifies the uRLLC of the PDCCH channel resource allocation result, the notification content mainly comprises air interface time and an RB resource set occupied by the PDCCH, and when the uRLLC performs downlink RB resource allocation, the RB occupied by the eMBB PDCCH is actively avoided, and only the RB which is not occupied by the eMBB PDCCH resource in the BWP bandwidth is used. Meanwhile, the urrllc needs to send the condition that the PDSCH RB of the local side is occupied to the eMBB to complete the statistics in step S401 of the policy 1.
Strategy 3: DMRS configuration for urlllc is on the first symbol of each minilot, and the first symbol is the common configuration of PDCCH of eMBB, as in fig. 2. After finishing the processing of scheduling strategies 1 and 2 on miniblot 0, the urrllc PDSCH and the eMBB PDCCH do not have RB overlap, and there is no situation that the urrllc punctures the eMBB PDCCH, and at this time, the second symbol of the RB occupied by the eMBB PDCCH is silent, so that the urrllc utilizes the part of air interface resources, the following processing is performed in strategy 3:
processing 1, if there is uRLLC downlink air interface data transmission to the user in the RB resource range occupied by the eMBB PDCCH at the time when the first t Minislot of the current Minislot0, the UE side caches DMRS corresponding to the PDSCH closest to the Minislot0 in t, and the DMRS is used for demodulating the single-symbol PDSCH which is possibly transmitted by the Minislot0 base station on the RBs and does not contain the DMRS.
And (3) treatment 2: if the base station has uRLLC downlink air interface data transmission for the user in the RB resource range occupied by the eMBB PDCCH at the first t Minislot of the current Minislot0, the Minislot0 base station can transmit the single-symbol PDSCH without the DMRS on the RB resources of the PDSCH which is transmitted before.
As shown in fig. 5, both Minislot5/6 have scheduling, and the UE buffers the DMRS closest to Minislot0, i.e., the DMRS of Minislot6 is used to demodulate the urrllc PDSCH of Minislot0, wherein the scheduled RBs of Minislot5/6 overlap with the scheduled RBs of Minislot 0.
In strategy 3, the temporal stability of the channel is exploited. As shown in fig. 5, t in processes 1 and 2 can be allocated, but t should not be set too large for reliability, and should be smaller than the distance between the preamble DMRS and the additional DMRS at the earliest position in the protocol. By the processing, RB resources occupied by eMBB PDCCH on Minislot0 can be fully utilized, especially when the uRLLC is in high-load operation, scheduling exists in the preamble Minislot of a probability Minislot0, so that effective transmission of the uRLLC can be formed in Minislot0, time delay is reduced, flow is increased, and meanwhile, the control channel of the eMBB is not influenced.
It should be noted that, in the present embodiment, the strategies 1 to 3 described above may be used alone or in combination according to actual scenarios.
In this embodiment, by the scheduling policy, service exception caused by preemption of the eMBB control channel by the urrllc is avoided, and a configurable DMRS effective policy is adopted, so that the urrllc utilizes radio resources as much as possible on the premise of not affecting the eMBB, thereby improving downlink throughput of the urrllc.
In the embodiment of the invention, the eMMC special CCE allocation algorithm and the uRLLC pointed RB allocation algorithm are adopted in the scheme, overlapping perforation of downlink RB resources is avoided through the cooperative interaction of the uRLLC and the eMMC, a strategy for prolonging the effective period of the DMRS is further adopted to realize the effective utilization of air interface resources, the influence of the uRLLC on the eMMC control channel resource preemption can be practically reduced, the time delay response and the effective bandwidth capacity of the uRLLC are improved, and the user experience of the uRLLC is optimized.
Through the above description of the embodiments, those skilled in the art can clearly understand that the method according to the above embodiments can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware, but the former is a better implementation mode in many cases. Based on such understanding, the technical solutions of the present invention may be embodied in the form of a software product, which is stored in a storage medium (e.g., ROM/RAM, magnetic disk, optical disk) and includes instructions for enabling a terminal device (e.g., a mobile phone, a computer, a server, or a network device) to execute the method according to the embodiments of the present invention.
In this embodiment, an eMBB CCE resource allocation apparatus is further provided, where the apparatus is configured to implement the foregoing embodiments and preferred embodiments, and details of the foregoing description are omitted. As used below, the term "module" or "unit" may implement a combination of software and/or hardware of predetermined functions. Although the means described in the embodiments below are preferably implemented in software, an implementation in hardware, or a combination of software and hardware is also possible and contemplated.
Fig. 6 is a block diagram of a structure of an eMBB CCE resource allocation apparatus according to an embodiment of the present invention, as shown in fig. 6, the apparatus includes a first allocation module 10.
The first allocating module 10 is configured to, when eMBB CCE resource allocation is performed, allocate a required CCE resource within an RB resource occupied by a currently allocated CCE, where the required CCE resource can be allocated within the RB resource.
Fig. 7 is a block diagram of an eMBB CCE resource allocation apparatus according to an alternative embodiment of the present invention, and as shown in fig. 7, the apparatus includes, in addition to all modules shown in fig. 6, a first determining module 20, a second allocating module 30, a counting module 40, and a control module 50.
The first determining module 20 is configured to determine whether the required CCE resources can be allocated within the RB resources occupied by the currently allocated CCE.
The second allocating module 30 is configured to, when the required CCE resource cannot be allocated within the RB resource occupied by the currently allocated CCE, perform the required CCE resource allocation in a direction from low to high or from high to low next to the occupied RB of the PDCCH or an edge of a corresponding CORESET.
The statistic module 40 is configured to count the utilization rate of the urrllc scheduling RB. The control module 50 is configured to control CCE resource allocation in subsequent z slots when the use rate of the urrllc RB reaches the threshold value for more than n times within a preset time duration, where n and z are positive integers.
Wherein the control module 50 comprises a first control unit 51 and a second control unit 52.
The first control unit 51 is configured to control that CCE resource allocation is not performed in subsequent z slots when the number of RBs occupied by the already allocated PDCCH reaches k, where k is a positive integer.
The second control unit 52 is configured to control not to perform CCE resource allocation for the current scheduling user in subsequent z slots when the CCE aggregation level of the current scheduling user reaches a threshold.
In one embodiment, the apparatus further comprises a notification module 60. The notification module 60 is configured to notify the urrllc of a PDCCH resource allocation result at a downlink scheduling time corresponding to the air interface Minislot0 through an interaction channel established between the eMBB and the urrllc, where the allocation result includes an air interface time and an RB resource set occupied by the PDCCH.
In an embodiment, the DMRS of the uRLLC is configured on the first symbol of each Minislot, and the first symbol is a PDCCH of the eMBB, the apparatus further includes a second determining module 70 and a buffering module 80
The second determining module 70 is configured to determine whether the base station has uRLLC downlink air interface data transmission to the scheduling user in an RB resource range occupied by the eMBB PDCCH in the first t minislots of the current Minislot 0.
The buffering module 80 is configured to, if the determination result of the second determining module is yes, buffer, on the UE side, the DMRS corresponding to the PDSCH closest to the Minislot0 within the t minislots, and demodulate the single-symbol PDSCH without the DMRS transmitted by the base station on the RB of the PDSCH.
In an embodiment, the DMRS of the uRLLC is configured on the first symbol of each Minislot, and the first symbol is a PDCCH of the eMBB, the apparatus further includes a third determining module 90 and a transmitting module 100.
The third determining module 90 is configured to determine whether the base station has a urrllc downlink air interface data transmission to the scheduling user in an RB resource range occupied by the eMBB PDCCH at the first t minislots of the current Minislot 0;
the transmission module 100 is configured to transmit the single symbol PDSCH not including the DMRS on the RB resource to which the PDSCH has been previously transmitted, if the determination result of the third determination module is yes.
It should be noted that, the above modules may be implemented by software or hardware, and for the latter, the following may be implemented, but not limited to: the modules are all positioned in the same processor; alternatively, the modules are respectively located in different processors in any combination.
Embodiments of the present invention also provide a storage medium having a computer program stored therein, wherein the computer program is arranged to perform the steps of any of the above method embodiments when executed.
Optionally, in this embodiment, the storage medium may include, but is not limited to: various media capable of storing computer programs, such as a usb disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a removable hard disk, a magnetic disk, or an optical disk.
Embodiments of the present invention also provide an electronic device comprising a memory having a computer program stored therein and a processor arranged to run the computer program to perform the steps of any of the above method embodiments.
Optionally, the specific examples in this embodiment may refer to the examples described in the above embodiments and optional implementation manners, and this embodiment is not described herein again.
It will be apparent to those skilled in the art that the modules or steps of the present invention described above may be implemented by a general purpose computing device, they may be centralized on a single computing device or distributed across a network of multiple computing devices, and alternatively, they may be implemented by program code executable by a computing device, such that they may be stored in a storage device and executed by a computing device, and in some cases, the steps shown or described may be performed in an order different than that described herein, or they may be separately fabricated into individual integrated circuit modules, or multiple ones of them may be fabricated into a single integrated circuit module. Thus, the present invention is not limited to any specific combination of hardware and software.
The above description is only a preferred embodiment of the present invention and is not intended to control the present invention, and various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, or improvement made within the principle of the present invention should be included in the protection scope of the present invention.

Claims (12)

1.一种增强移动宽带控制信道元eMBB CCE资源分配方法,其特征在于,包括:1. an enhanced mobile broadband control channel element eMBB CCE resource allocation method is characterized in that, comprising: 在eMBB CCE资源分配时,如果所需控制信道元CCE资源能在当前已分配的CCE所占用的资源块RB资源内分配,则在所述RB资源内分配所需CCE资源。During eMBB CCE resource allocation, if the required control channel element CCE resource can be allocated in the resource block RB resource occupied by the currently allocated CCE, the required CCE resource is allocated in the RB resource. 2.根据权利要求1所述的方法,其特征在于,还包括:2. The method of claim 1, further comprising: 如果所需控制信道元CCE资源不能在当前已分配的CCE所占用的资源块RB资源内分配,则按照自低向高或自高向低的方向紧邻物理下行控制信道PDCCH已占用的RB或对应控制资源集CORESET的边缘进行所需CCE资源分配。If the required control channel element CCE resources cannot be allocated in the resource block RB resources occupied by the currently allocated CCEs, the RBs occupied by the physical downlink control channel PDCCH or corresponding The edge of the control resource set CORESET performs the required CCE resource allocation. 3.根据权利要求1所述的方法,其特征在于,还包括:3. The method of claim 1, further comprising: eMBB调度器统计超可靠低时延通信uRLLC调度RB使用率;The eMBB scheduler counts the RB usage rate of the ultra-reliable and low-latency communication uRLLC scheduling; 如果在预设时长内,uRLLC RB使用率达到门限值超过n次,所述eMBB调度器控制后续z个时隙slot内的CCE资源分配,其中n、z均为正整数。If the uRLLC RB usage rate reaches the threshold for more than n times within a preset time period, the eMBB scheduler controls the allocation of CCE resources in the subsequent z time slots, where n and z are both positive integers. 4.根据权利要求1所述的方法,其特征在于,所述eMBB调度器控制后续z个slot内的CCE资源分配包括:4. The method according to claim 1, wherein the control of the eMBB scheduler to allocate CCE resources in the subsequent z slots comprises: 判断已经分配的PDCCH占用的RB数是否达到k个,如果是,则在后续z个slot内不进行CCE资源分配,其中k为正整数。It is judged whether the number of RBs occupied by the allocated PDCCH reaches k, and if so, no CCE resource allocation is performed in the subsequent z slots, where k is a positive integer. 5.根据权利要求1所述的方法,其特征在于,还包括:5. The method of claim 1, further comprising: 判断当前调度用户CCE聚合度是否达到阈值,如果是,则在后续z个slot内不进行CCE资源分配。It is judged whether the CCE aggregation degree of the currently scheduled user reaches the threshold, and if so, no CCE resource allocation is performed in the subsequent z slots. 6.根据权利要求1所述的方法,其特征在于,还包括:6. The method of claim 1, further comprising: 通过eMBB与uRLLC之间建立的交互通道,在空口小时隙Minislot0对应的下行调度时刻,eMBB将PDCCH资源分配结果通知uRLLC,其中,所述分配结果包括空口时间和PDCCH占用的RB资源集。Through the interaction channel established between the eMBB and the uRLLC, at the downlink scheduling time corresponding to the air interface minislot Minislot0, the eMBB notifies the uRLLC of the PDCCH resource allocation result, where the allocation result includes the air interface time and the RB resource set occupied by the PDCCH. 7.根据权利要求1所述的方法,其特征在于,eMBB将PDCCH资源分配结果通知uRLLC之后,还包括:7. The method according to claim 1, wherein after the eMBB notifies the uRLLC of the PDCCH resource allocation result, the method further comprises: 所述uRLLC在进行下行RB资源分配时,仅在其部分宽带BWP带宽内没有eMBB PDCCH资源占用的RB上分配资源,并将本侧PDSCH RB占用的信息发送给所述eMBB。When allocating downlink RB resources, the uRLLC allocates resources only on RBs that are not occupied by eMBB PDCCH resources within a part of the broadband BWP bandwidth, and sends the information of PDSCH RB occupancy on the local side to the eMBB. 8.根据权利要求1所述的方法,其特征在于,uRLLC的解调参考信号DMRS配置在每个Minislot的第一个符号上,且第一个符号为eMBB的PDCCH,所述方法还包括:8. The method according to claim 1, wherein the demodulation reference signal DMRS of uRLLC is configured on the first symbol of each Minislot, and the first symbol is the PDCCH of eMBB, the method further comprises: 判断在当前Minislot0的前t个Minislot,在eMBB PDCCH占用的RB资源范围内,基站是否存在对所述调度用户的uRLLC下行空口数据发送;Determine whether the base station has uRLLC downlink air interface data transmission for the scheduled user within the range of RB resources occupied by the eMBB PDCCH in the first t Minislots of the current Minislot0; 如果是,在UE侧缓存t个Minislot内离所述Minislot0最近的物理下行共享信道PDSCH对应的DMRS,用于解调所述基站在所述PDSCH的RB上发送的不含DMRS的单符号PDSCH。If so, the UE side buffers the DMRS corresponding to the physical downlink shared channel PDSCH closest to the Minislot0 within t Minislots, which is used to demodulate the single-symbol PDSCH without DMRS sent by the base station on the RB of the PDSCH. 9.根据权利要求1所述的方法,其特征在于,uRLLC的DMRS配置在每个Minislot的第一个符号上,且第一个符号为eMBB的PDCCH,所述方法还包括:9. The method according to claim 1, wherein the DMRS of uRLLC is configured on the first symbol of each Minislot, and the first symbol is the PDCCH of eMBB, the method further comprises: 判断在当前Minislot0的前t个Minislot,在eMBB PDCCH占用的RB资源范围内,基站是否存在对所述调度用户的uRLLC下行空口数据发送;Determine whether the base station has uRLLC downlink air interface data transmission for the scheduled user within the range of RB resources occupied by the eMBB PDCCH in the first t Minislots of the current Minislot0; 如果存在对所述调度用户的uRLLC下行空口数据发送,所述基站在之前发送过PDSCH的RB资源上发送不含DMRS的单符号PDSCH。If there is uRLLC downlink air interface data transmission for the scheduled user, the base station transmits a single-symbol PDSCH without DMRS on the RB resource that has previously transmitted the PDSCH. 10.一种增强移动宽带控制信道元eMBB CCE资源分配装置,其特征在于,包括:10. An enhanced mobile broadband control channel element eMBB CCE resource allocation device, characterized in that it comprises: 第一分配模块,用于在eMBB CCE资源分配时,在所需CCE资源能在当前已分配的CCE所占用的RB资源内分配的情况下,在所述RB资源内分配所需CCE资源。The first allocation module is configured to allocate the required CCE resources in the RB resources when the required CCE resources can be allocated in the RB resources occupied by the currently allocated CCEs when the eMBB CCE resources are allocated. 11.一种计算机可读存储介质,其特征在于,所述存储介质中存储有计算机程序,其中,所述计算机程序被设置为运行时执行所述权利要求1至9任一项中所述的方法。11. A computer-readable storage medium, wherein a computer program is stored in the storage medium, wherein the computer program is configured to execute the method described in any one of claims 1 to 9 when running. method. 12.一种电子装置,包括存储器和处理器,其特征在于,所述存储器中存储有计算机程序,所述处理器被设置为运行所述计算机程序以执行所述权利要求1至9任一项中所述的方法。12. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to run the computer program to execute any one of the claims 1 to 9 method described in.
CN201911033501.9A 2019-10-28 2019-10-28 eMBB CCE resource allocation method and device Pending CN112738890A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201911033501.9A CN112738890A (en) 2019-10-28 2019-10-28 eMBB CCE resource allocation method and device
PCT/CN2020/116210 WO2021082796A1 (en) 2019-10-28 2020-09-18 Embb cce resource allocation method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911033501.9A CN112738890A (en) 2019-10-28 2019-10-28 eMBB CCE resource allocation method and device

Publications (1)

Publication Number Publication Date
CN112738890A true CN112738890A (en) 2021-04-30

Family

ID=75588924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911033501.9A Pending CN112738890A (en) 2019-10-28 2019-10-28 eMBB CCE resource allocation method and device

Country Status (2)

Country Link
CN (1) CN112738890A (en)
WO (1) WO2021082796A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113993213A (en) * 2021-09-14 2022-01-28 苏州星恒通导航技术有限公司 Differential resource time-sharing management system and method for positioning terminal
CN114143816A (en) * 2021-12-20 2022-03-04 国网河南省电力公司信息通信公司 A dynamic scheduling method for 5G network resources based on power service quality assurance
WO2023104029A1 (en) * 2021-12-08 2023-06-15 中国电信股份有限公司 Downlink resource preemption method and apparatus and related device

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114222371B (en) * 2021-12-20 2025-03-11 北京邮电大学 Traffic scheduling method for coexistence of eMBB and uRLLC devices
CN114793362A (en) * 2022-03-29 2022-07-26 三维通信股份有限公司 Adjustment method, device, storage medium and electronic device of base station CFI

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104684086A (en) * 2013-11-28 2015-06-03 普天信息技术研究院有限公司 Allocation method of control channel elements
WO2018126934A1 (en) * 2017-01-05 2018-07-12 Jrd Communication (Shenzhen) Ltd METHODS AND DEVICES FOR DOWNLINK RESOURCE SHARING BETWEEN URLLC AND eMBB TRANSMISSIONS IN WIRELESS COMMUNICATION SYSTEMS
CN109151898A (en) * 2017-06-16 2019-01-04 华为技术有限公司 Method for transmitting signals, relevant apparatus and system
CN109874176A (en) * 2017-12-04 2019-06-11 珠海市魅族科技有限公司 A kind of indicating means of resource occupation, instruction device and communication equipment
CN109906659A (en) * 2016-10-21 2019-06-18 高通股份有限公司 Punching recovery and resource reclaim for multipriority scheduling
WO2019139955A1 (en) * 2018-01-10 2019-07-18 Idac Holdings, Inc. Methods for identifying resources of a new radio physical downlink control channel which have been preempted by ultra-reliable low latency communication
CN110089171A (en) * 2016-12-19 2019-08-02 Oppo广东移动通信有限公司 Transmit method, the network equipment and the terminal device of information
CN110249676A (en) * 2017-02-02 2019-09-17 Lg 电子株式会社 Indicate the method and its equipment of camp-on resource information

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140119317A1 (en) * 2011-06-30 2014-05-01 Lg Electronics Inc. Method and apparatus for allocating a downlink control channel in a wireless communication system
CN108633027A (en) * 2017-03-24 2018-10-09 华为技术有限公司 Communication means and its terminal device, the network equipment
CN110138502B (en) * 2018-02-09 2020-08-07 华为技术有限公司 Method and device for determining blind detection times

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104684086A (en) * 2013-11-28 2015-06-03 普天信息技术研究院有限公司 Allocation method of control channel elements
CN109906659A (en) * 2016-10-21 2019-06-18 高通股份有限公司 Punching recovery and resource reclaim for multipriority scheduling
CN110089171A (en) * 2016-12-19 2019-08-02 Oppo广东移动通信有限公司 Transmit method, the network equipment and the terminal device of information
WO2018126934A1 (en) * 2017-01-05 2018-07-12 Jrd Communication (Shenzhen) Ltd METHODS AND DEVICES FOR DOWNLINK RESOURCE SHARING BETWEEN URLLC AND eMBB TRANSMISSIONS IN WIRELESS COMMUNICATION SYSTEMS
CN110249676A (en) * 2017-02-02 2019-09-17 Lg 电子株式会社 Indicate the method and its equipment of camp-on resource information
CN109151898A (en) * 2017-06-16 2019-01-04 华为技术有限公司 Method for transmitting signals, relevant apparatus and system
CN109874176A (en) * 2017-12-04 2019-06-11 珠海市魅族科技有限公司 A kind of indicating means of resource occupation, instruction device and communication equipment
WO2019139955A1 (en) * 2018-01-10 2019-07-18 Idac Holdings, Inc. Methods for identifying resources of a new radio physical downlink control channel which have been preempted by ultra-reliable low latency communication

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
SEQUANS COMMUNICATIONS: "On PDCCH repetition for NR URLLC", 《3GPP TSG RAN WG1 MEETING #92BIS R1- 1804644》, 20 April 2018 (2018-04-20) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113993213A (en) * 2021-09-14 2022-01-28 苏州星恒通导航技术有限公司 Differential resource time-sharing management system and method for positioning terminal
WO2023104029A1 (en) * 2021-12-08 2023-06-15 中国电信股份有限公司 Downlink resource preemption method and apparatus and related device
CN114143816A (en) * 2021-12-20 2022-03-04 国网河南省电力公司信息通信公司 A dynamic scheduling method for 5G network resources based on power service quality assurance

Also Published As

Publication number Publication date
WO2021082796A1 (en) 2021-05-06

Similar Documents

Publication Publication Date Title
CN112738890A (en) eMBB CCE resource allocation method and device
RU2486699C2 (en) Mobile station, radio communication base station, communication control method and mobile communication system
RU2691599C1 (en) Adaptation of a communication line in multiple access systems without the need for permission
US11071094B2 (en) Data transmission method, user equipment, and radio access device
EP4145734B1 (en) Data transmission method, apparatus, and system
US12041647B2 (en) Method and device for determining and configuring scheduling request resource, and storage medium
US11039448B2 (en) Resource scheduling method and apparatus
CN109392176B (en) Information sending method and related equipment
CN110166182A (en) A kind of method and sending device of contention window management
AU2006223493A1 (en) Use of decremental assignments
CN106105087A (en) For supporting the method for radio communication, base station and wireless device
EP3012989B1 (en) Data transmission method and system, base station and user equipment
EP2999292B1 (en) Scheduling method and base station
US10624036B2 (en) Method and device in UE and base station used for low latency communication
CN106507494A (en) Group-based M2M Communication Uplink Semi-persistent Scheduling Method
JP7642717B2 (en) Resource allocation method and device
CN113301573B (en) Interference processing method, apparatus, terminal device, and computer-readable storage medium
CN110602796A (en) Resource scheduling method on mobile broadband shared channel and electronic equipment
CN107846702B (en) Resource allocation method for enhanced physical downlink control channel
US20240073886A1 (en) Pre-Configured Allocation for Non-Periodic Traffic Pattern
Ramli Performance of maximum-largest weighted delay first algorithm in long term evolution-advanced with carrier aggregation
CN109842948B (en) Enhanced control channel resource allocation method and device for 3D-MIMO base station
CN108811090B (en) Resource allocation indication method, device, network side equipment and user equipment
WO2021087904A1 (en) Method and apparatus for data transmission on unlicensed spectrum, and device and storage medium
WO2023155075A1 (en) Methods and systems for sharing a spectrum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination