CN112575915A - Method for installing rock wool heat preservation template integrated combined wallboard - Google Patents
Method for installing rock wool heat preservation template integrated combined wallboard Download PDFInfo
- Publication number
- CN112575915A CN112575915A CN202011453636.3A CN202011453636A CN112575915A CN 112575915 A CN112575915 A CN 112575915A CN 202011453636 A CN202011453636 A CN 202011453636A CN 112575915 A CN112575915 A CN 112575915A
- Authority
- CN
- China
- Prior art keywords
- rock wool
- wool heat
- integrated combined
- preservation template
- template integrated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011490 mineral wool Substances 0.000 title claims abstract description 47
- 238000004321 preservation Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 22
- 239000002023 wood Substances 0.000 claims abstract description 43
- 238000009413 insulation Methods 0.000 claims abstract description 14
- 238000009434 installation Methods 0.000 claims abstract description 10
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 238000009415 formwork Methods 0.000 claims description 14
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 11
- 230000010354 integration Effects 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 238000004134 energy conservation Methods 0.000 description 3
- 239000004567 concrete Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/78—Heat insulating elements
- E04B1/80—Heat insulating elements slab-shaped
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/762—Exterior insulation of exterior walls
- E04B1/7629—Details of the mechanical connection of the insulation to the wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
- E04F21/1838—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
- E04F21/1844—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/244—Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Acoustics & Sound (AREA)
- Electromagnetism (AREA)
- Building Environments (AREA)
Abstract
A rock wool heat preservation template integrated combined wallboard installation method comprises the following steps: manufacturing a wood frame; fixing the wood frame; cutting the rock wool heat preservation template integrated combined wallboard according to the size of the wall surface to be constructed; sequentially splicing a plurality of rock wool heat-preservation template integrated combined wallboards and then placing the wallboards on the wood frame; connecting the wood frame and the rock wool heat-preservation template integrated combined wallboard by using a prefabricated anchor bolt; hoisting the wood frame to the wall surface to be constructed; and fixing the rock wool heat-insulation template integrated combined wallboard with the inner template at the position of the wall surface to be constructed by using split bolts. The application provides a rock wool heat preservation template integration combination wallboard mounting method's beneficial effect is: the insulation boards are assembled in advance, then large templates are installed, the construction speed is high, and the construction efficiency is improved; the insulation board and the wood frame are fixed through the prefabricated anchor bolts, and damage caused by concentrated stress during hoisting of the insulation board can be avoided.
Description
Technical Field
The invention belongs to the technical field of rock wool heat preservation templates, and particularly relates to a method for installing an integrated combined wallboard of a rock wool heat preservation template.
Background
In recent years, along with the development of the building industry, the country gradually uses green energy conservation as an important index of engineering construction, and advocates high efficiency and energy conservation of building construction. Aiming at the situation, the application of the rock wool heat-preservation template integrated combined wallboard enables the rock wool board to be used as an outer template of a cast-in-place reinforced concrete shear wall, so that the outer template is saved, the wallboard is connected with concrete by adopting an anchor bolt, the anchor bolt and the concrete are reliably anchored, the service life of the anchor bolt and the main structure can be the same, and the energy conservation and structural construction integration is achieved.
In current rock wool board hoist and mount in-process, generally directly utilize to penetrate the lifting hook that heated board heat preservation nail reserved hole to carry out the handling to the heated board, the condition that the heated board dropped in the handling in-process not only can appear in this kind of construction method, owing to the concentrated atress of heated board extremely easily makes the heated board take place to destroy in handling in-process moreover, on the other hand heated board needs the piecemeal substep handling to reduce the efficiency of heated board installation. .
Disclosure of Invention
In order to solve the problems, the invention provides a rock wool heat preservation template integrated combined wallboard installation method, which comprises the following steps:
manufacturing a wood frame;
fixing the wood frame;
cutting the rock wool heat preservation template integrated combined wallboard according to the size of the wall surface to be constructed;
sequentially splicing a plurality of rock wool heat-preservation template integrated combined wallboards and then placing the wallboards on the wood frame;
connecting the wood frame and the rock wool heat-preservation template integrated combined wallboard by using a prefabricated anchor bolt;
hoisting the wood frame to the wall surface to be constructed;
and fixing the rock wool heat-insulation template integrated combined wallboard with the inner template at the position of the wall surface to be constructed by using split bolts.
Preferably, the wood frame includes: the wood formwork comprises a wood formwork and battens, wherein the battens are connected to the wood formwork in a supporting mode.
Preferably, the wooden template and the batten are connected through iron nails.
Preferably, the wooden mold plate and the batten are perpendicular to each other.
Preferably, the step of connecting the wood frame and the rock wool heat preservation template integrated combined wallboard by using prefabricated anchor bolts comprises the following steps:
sequentially penetrating the first end of the prefabricated anchor bolt through the wood frame and the rock wool heat-preservation template integrated combined wallboard;
installing a fastener at a first end of the prefabricated anchor bolt;
and adjusting the position of the fastener to enable the fastener to be tightly abutted to the rock wool heat-preservation template integrated combined wallboard.
Preferably, the fastener is mounted on the barbed end of the preformed anchor.
Preferably, the fastener is a plastic disc.
The application provides a rock wool heat preservation template integration combination wallboard mounting method's beneficial effect is:
(1) the insulation boards are assembled in advance, then large templates are installed, the construction speed is high, and the construction efficiency is improved;
(2) the heat insulation board and the wood frame are fixed through the prefabricated anchor bolts, so that damage caused by concentrated stress during hoisting of the heat insulation board can be avoided;
(3) the wooden frame can be recycled after being lifted away from the wall surface, so that the construction efficiency is improved;
(4) the prefabricated screw cap can be repeatedly used after being detached, and the resource waste is reduced.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic installation diagram of an installation method of a rock wool heat preservation formwork integrated combined wallboard provided by the invention;
fig. 2 is an installation schematic view of the rock wool heat preservation formwork integrated combined wallboard installation method provided by the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings in conjunction with the following detailed description. It should be understood that the description is intended to be exemplary only, and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
Referring to fig. 1-2, in an embodiment of the present application, the present invention provides a rock wool insulation formwork integrated combination wallboard installation method, including:
manufacturing a wood frame;
fixing the wood frame;
cutting the rock wool heat preservation template integrated combined wallboard 1 according to the size of the wall surface to be constructed;
sequentially splicing a plurality of rock wool heat-preservation template integrated combined wallboards 1 and then placing the wallboards on the wood frame;
connecting the wood frame with the rock wool heat preservation template integrated combined wallboard 1 by using a prefabricated anchor bolt 2;
hoisting the wood frame to the wall surface to be constructed;
and fixing the rock wool heat-insulation template integrated combined wallboard 1 with the inner formwork at the position of the wall surface to be constructed by using split bolts.
As shown in fig. 1-2, in the embodiment of the present application, the wood frame includes: the wood formwork comprises a wood formwork 3 and battens 4, wherein the battens 4 are supported and connected to the wood formwork 3. A plurality of plank sheathing 3 parallel arrangement, a plurality of flitch 4 parallel arrangement, mutually perpendicular sets up between plank sheathing 3 and the flitch 4.
In the embodiment of the present application, as shown in fig. 1 to 2, the plank sheathing 3 and the batten 4 are connected by iron nails.
As shown in fig. 1 to 2, in the present embodiment, the wooden mold plate 3 and the batten 4 are perpendicular to each other.
Referring to fig. 1-2, in the embodiment of the present application, the connecting the wood frame and the rock wool heat preservation formwork integrated composite wall panel 1 by using the prefabricated anchor bolt 2 includes the steps of:
sequentially enabling the first end of the prefabricated anchor bolt 2 to penetrate through the wood frame and the rock wool heat-preservation template integrated combined wallboard 1;
installing a fastener 5 at a first end of the prefabricated anchor bolt 2;
and adjusting the position of the fastening piece 5 to enable the fastening piece to be tightly abutted to the rock wool heat-preservation template integrated combined wallboard 1.
In the present exemplary embodiment, the fastening means 5 is attached to the barbed end of the prefabricated anchor bolt 2, as shown in fig. 1-2.
In the present embodiment, the fastener 5 is a plastic disc, as shown in fig. 1-2.
The application provides a rock wool heat preservation template integration combination wallboard mounting method's beneficial effect is:
(1) the insulation boards are assembled in advance, then large templates are installed, the construction speed is high, and the construction efficiency is improved;
(2) the heat insulation board and the wood frame are fixed through the prefabricated anchor bolts, so that damage caused by concentrated stress during hoisting of the heat insulation board can be avoided;
(3) the wooden frame can be recycled after being lifted away from the wall surface, so that the construction efficiency is improved;
(4) the prefabricated screw cap can be repeatedly used after being detached, and the resource waste is reduced.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.
Claims (7)
1. A rock wool heat preservation template integrated combined wallboard installation method is characterized by comprising the following steps:
manufacturing a wood frame;
fixing the wood frame;
cutting the rock wool heat preservation template integrated combined wallboard according to the size of the wall surface to be constructed;
sequentially splicing a plurality of rock wool heat-preservation template integrated combined wallboards and then placing the wallboards on the wood frame;
connecting the wood frame and the rock wool heat-preservation template integrated combined wallboard by using a prefabricated anchor bolt;
hoisting the wood frame to the wall surface to be constructed;
and fixing the rock wool heat-insulation template integrated combined wallboard with the inner template at the position of the wall surface to be constructed by using split bolts.
2. The method for installing the rock wool heat preservation template integrated combined wallboard as claimed in claim 1, wherein the wood frame comprises: the wood formwork comprises a wood formwork and battens, wherein the battens are connected to the wood formwork in a supporting mode.
3. The method for installing the rock wool heat preservation template integrated combined wallboard as claimed in claim 2, wherein the wood template and the battens are connected through iron nails.
4. The method for installing the rock wool heat preservation template integrated combined wallboard as claimed in claim 2 or 3, wherein the wood template and the battens are perpendicular to each other.
5. The installation method of the rock wool heat preservation template integrated combined wallboard as claimed in claim 1, wherein the step of connecting the wood frame and the rock wool heat preservation template integrated combined wallboard by using the prefabricated anchor bolt comprises the steps of:
sequentially penetrating the first end of the prefabricated anchor bolt through the wood frame and the rock wool heat-preservation template integrated combined wallboard;
installing a fastener at a first end of the prefabricated anchor bolt;
and adjusting the position of the fastener to enable the fastener to be tightly abutted to the rock wool heat-preservation template integrated combined wallboard.
6. The method for installing the rock wool heat preservation template integrated combined wallboard as claimed in claim 5, wherein the fasteners are installed on the burr ends of the prefabricated anchor bolts.
7. The method for installing the rock wool heat preservation template integrated combined wallboard as claimed in claim 5 or 6, wherein the fastening piece is a plastic disc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011453636.3A CN112575915A (en) | 2020-12-12 | 2020-12-12 | Method for installing rock wool heat preservation template integrated combined wallboard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011453636.3A CN112575915A (en) | 2020-12-12 | 2020-12-12 | Method for installing rock wool heat preservation template integrated combined wallboard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112575915A true CN112575915A (en) | 2021-03-30 |
Family
ID=75131341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011453636.3A Pending CN112575915A (en) | 2020-12-12 | 2020-12-12 | Method for installing rock wool heat preservation template integrated combined wallboard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112575915A (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1241673A (en) * | 1999-07-07 | 2000-01-19 | 阎金江 | Universal building decorating machine |
GB0210028D0 (en) * | 2002-05-02 | 2002-06-12 | Ray Fisher Construction Ltd | Apparatus for use in tiling |
CN203420387U (en) * | 2013-07-22 | 2014-02-05 | 南京工业大学 | Prefabricated composite wood floor cover plate |
DE102015004948A1 (en) * | 2015-04-18 | 2016-10-20 | Michael H. Föhlings | Easy to handle cost-effective method and template for tile adaptation to tile mirror components for everyone |
CN205776904U (en) * | 2016-06-30 | 2016-12-07 | 三能集成房屋股份有限公司 | A kind of integrated wall plate and wallboard assembling combinative structure |
CN206052976U (en) * | 2016-08-29 | 2017-03-29 | 河北深科建筑材料有限公司 | For the anchoring piece of fixed building warming plate |
CN107761998A (en) * | 2017-10-19 | 2018-03-06 | 上海欧本钢结构有限公司 | The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor |
CN108797846A (en) * | 2018-06-27 | 2018-11-13 | 中铁四局集团建筑工程有限公司 | A kind of insulation construction integrated exterior wall heat preservation board construction method |
CN209703778U (en) * | 2019-03-04 | 2019-11-29 | 郑州大学 | A kind of assembled disassembly-free thermal-insulation form board with hoisting structure |
CN210342693U (en) * | 2019-06-28 | 2020-04-17 | 北京首钢建设集团有限公司 | Outer wall integration composite insulation board consolidates support |
CN211998412U (en) * | 2020-03-25 | 2020-11-24 | 北京天润建设有限公司 | Heated board hoist and mount hoist |
-
2020
- 2020-12-12 CN CN202011453636.3A patent/CN112575915A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1241673A (en) * | 1999-07-07 | 2000-01-19 | 阎金江 | Universal building decorating machine |
GB0210028D0 (en) * | 2002-05-02 | 2002-06-12 | Ray Fisher Construction Ltd | Apparatus for use in tiling |
CN203420387U (en) * | 2013-07-22 | 2014-02-05 | 南京工业大学 | Prefabricated composite wood floor cover plate |
DE102015004948A1 (en) * | 2015-04-18 | 2016-10-20 | Michael H. Föhlings | Easy to handle cost-effective method and template for tile adaptation to tile mirror components for everyone |
CN205776904U (en) * | 2016-06-30 | 2016-12-07 | 三能集成房屋股份有限公司 | A kind of integrated wall plate and wallboard assembling combinative structure |
CN206052976U (en) * | 2016-08-29 | 2017-03-29 | 河北深科建筑材料有限公司 | For the anchoring piece of fixed building warming plate |
CN107761998A (en) * | 2017-10-19 | 2018-03-06 | 上海欧本钢结构有限公司 | The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor |
CN108797846A (en) * | 2018-06-27 | 2018-11-13 | 中铁四局集团建筑工程有限公司 | A kind of insulation construction integrated exterior wall heat preservation board construction method |
CN209703778U (en) * | 2019-03-04 | 2019-11-29 | 郑州大学 | A kind of assembled disassembly-free thermal-insulation form board with hoisting structure |
CN210342693U (en) * | 2019-06-28 | 2020-04-17 | 北京首钢建设集团有限公司 | Outer wall integration composite insulation board consolidates support |
CN211998412U (en) * | 2020-03-25 | 2020-11-24 | 北京天润建设有限公司 | Heated board hoist and mount hoist |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110306722B (en) | An assembled integral large panel | |
CN111236499B (en) | Prefabricated superposed component and production method thereof, prefabricated superposed wall and construction method thereof | |
CN110872889A (en) | Prefabricated superposed outer wall integrated with heat-insulation formwork and construction method | |
CN113293890A (en) | Steel plate yield energy consumption-based dry-type connecting piece and construction method | |
CN103437494A (en) | Engineered wood-profiled steel sheet-lightweight aggregate concrete composite beam and preparation and installation method thereof | |
CN109057099B (en) | Steel structure engineering precast concrete composite integrated partition wall and manufacturing and using methods thereof | |
CN210917930U (en) | ALC assembled large plate | |
CN112575915A (en) | Method for installing rock wool heat preservation template integrated combined wallboard | |
CN213011533U (en) | Assembled concrete prefabricated staircase hoist | |
CN211286083U (en) | Prefabricated coincide component and prefabricated coincide outer wall of integrated heat preservation template | |
US6907697B2 (en) | Composite systems and methods for anchoring walls | |
CN219690953U (en) | Integrated integrated decorative external wall panel | |
CN115822126A (en) | High-rise building outer wall ALC plate structure and mounting method | |
CN214738224U (en) | Concrete prefabricated assembling tower crane foundation structure | |
CN210597724U (en) | Shear force wall-graphite alkene assembled wallboard | |
CN213682717U (en) | External special layer board of assembled steel construction building slat | |
CN212507498U (en) | Prefabricated wallboard of assembly type structure concrete solidifies placer | |
CN214169600U (en) | Laminated floor slab | |
CN112900475A (en) | Concrete prefabricated assembling tower crane foundation structure and laying method thereof | |
CN210105050U (en) | Corner type high-efficiency heat-preservation lattice type formwork | |
CN108412101B (en) | Steel structure integrated floor slab and construction method thereof | |
CN219384458U (en) | Overhead layer precast slab hoisting device | |
CN108487552B (en) | Picking piece of dismantling-free template system | |
CN219011587U (en) | ALC plate structure of outer wall of high-rise building | |
CN221523877U (en) | Structure integrated light concrete external heat-insulating wall and prefabricated external heat-insulating plate thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210330 |
|
RJ01 | Rejection of invention patent application after publication |