[go: up one dir, main page]

CN1125290A - Pressure pulse oscilation deblocking method - Google Patents

Pressure pulse oscilation deblocking method Download PDF

Info

Publication number
CN1125290A
CN1125290A CN 94119787 CN94119787A CN1125290A CN 1125290 A CN1125290 A CN 1125290A CN 94119787 CN94119787 CN 94119787 CN 94119787 A CN94119787 A CN 94119787A CN 1125290 A CN1125290 A CN 1125290A
Authority
CN
China
Prior art keywords
pressure
well
section
program
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 94119787
Other languages
Chinese (zh)
Inventor
王国丙
周洪志
李斌
张国旗
陈现华
倪宝群
盛鸿飞
王雅黎
孙国悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luda Energy Source Tech Development Co Beijing
Original Assignee
Luda Energy Source Tech Development Co Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luda Energy Source Tech Development Co Beijing filed Critical Luda Energy Source Tech Development Co Beijing
Priority to CN 94119787 priority Critical patent/CN1125290A/en
Publication of CN1125290A publication Critical patent/CN1125290A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The pressure pulse oscilation deblocking method uses the pipeline and equipment of well-flushing operation to alternatively apply the rated highest pressure action and rated lowest pressure action to the blocked formation by means of liquid. Its operation process includes the pressure-raising section, high-pressure retaining section, pressure-releasing section, and low-pressure retaining section, and those procedures are circularly implemented, so that the blocked material can be broken and pushed out from the formation by the action of pressure pulses.

Description

Pressure pulse oscilation deblocking method
The present invention relates to from well producing oil, gas, water, solubilized and maybe can dissolve material or slurry of mineral, particularly in well or well, salvage or get rid of object.
The oil-producing well in oil field, after producing a period of time, because other materials in stratum or the well come together near the well head stratum or the borehole wall gradually and the hole on stratum are blocked, make oil stream not smooth, output descends or produce oil not, need carry out de-plugging this moment, common employed de-plugging way is that the down-hole is washed with flushing fluid or blockages relieving fluid, but flushing fluid circulates in well, and pressure can not be excessive, generally be that the circulation that can finish flushing fluid gets final product, so can only play flushing and chemical action to the borehole wall, but to leaning on the obstruction in the stratum slightly, then effect is not worked even not quite, therefore plugging removal effect is not good, especially on the borehole wall when accounting for well the formed borehole wall of mud, or other attachments are in case enter oil reservoir or be attached to the borehole wall, be difficult to remove, all can influence the output of oil from start to finish.
The purpose of this invention is to provide and a kind ofly utilize existing well washing equipment that the stratum of oil well is carried out that obstruction is removed in the pressure pulse vibration and the method for removing obstruction.
The objective of the invention is to realize by following technical scheme, pressure pulse oscilation deblocking method can utilize pipeline and the equipment or the special equipment of clean-out service, and one valve is housed at the loop exit of well, alternately boost and pressure release to stopping up the stratum by liquid, and obstruction is broken under the effect of pressure pulse and is pushed out the stratum and is taken out of and de-plugging by well, its concrete parameters relationship and operation sequence are as follows:
1. the section of boosting, make the pressure on stratum rise at short notice fixed maximum pressure;
2. high pressure keeps section, pressurize a period of time under deciding maximum pressure;
3. pressure release section, make the pressure on stratum reduce at short notice decide minimum pressure;
4. low pressure keeps section, in deciding minimum pressure pressurize a period of time;
5. by 1. above-mentioned-4. program circulates;
6. check, when keeping the section program at a certain high pressure, pressure rises to institute decide maximum pressure after, termination of pumping, whether inspection pressure descends, and as pressure decline, proves stratum " imbibition ", de-plugging is finished, and can carry out well-flushing, does not descend as pressure, then proceeds 1.-4. program.
Below in conjunction with drawings and Examples pressure pulse oscilation deblocking method of the present invention is described in detail.
Fig. 1 is the schematic diagram of the existing well washing equipment of pressure pulse oscilation deblocking method utilization of the present invention when carrying out the de-plugging operation;
Fig. 2 is the flow diagram of pressure pulse oscilation deblocking method of the present invention.
Fig. 1 shows the situation of utilizing existing well washing equipment to carry out the de-plugging operation with method for removing blockage of the present invention, has sleeve pipe 1 in the oil well, oil pipe 2, well head has production tree 3, blowout preventer 4, oil pipe 2 is hung by crane and is parked in certain position, and can carry out clean-out service this moment, also can carry out the de-plugging operation, can be by also carrying out de-plugging in the sleeve pipe by pumping into blockages relieving fluid in the oil pipe, Fig. 1 arrow is depicted as by pumping into blockages relieving fluid in the sleeve pipe 1 and by returning the operation that circulation is finished on ground in the oil pipe 2, when implementing de-plugging operation of the present invention, should have valve 5 in the outlet of pipeloop, valve 5 is closed, can make in the well and boost, valve 5 is opened, can make pressure release in the well.Oil pipe under the degree of depth depend on the needs, when can not de-plugging in some degree of depth or de-plugging undesirable, carry out again after can changing the degree of depth.
Pressure pulse oscilation deblocking method carries out according to following parameters relationship and program, as shown in Figure 2, and 1., 6 are the section of boosting, make borehole pressure rise to decide maximum pressure Pmax, the time is that The faster the better, 2., 7 are high pressure maintenance section, scavenging pump work, and make borehole pressure remain on decide maximum pressure Pmax, keep a period of time, preferably 2-3 minute, 3., 8 for the pressure release section, make in the well pressure reduce to decide minimum pressure Pmin, time also is short more good more, 4., 9 are that low pressure keeps section, make in the well pressure remain on decide minimum pressure Pmin, keep a period of time, preferably 2-3 minute, 5. by 1. above-mentioned-4. program cycle is boosted, step-down is in a certain program 2. the time, after for example carrying out 5-10 circulation, can keep section termination of pumping inspection at high pressure, 6., check section 10, if pressure descends after the termination of pumping, the proof stratum is " imbibition ", then can carry out well-flushing and produce oil operation, if pressure does not descend, illustrate that then formation blockage fails to remove, should proceed 1. above-mentioned-4. program.
Said to decide maximum pressure Pmax and deciding minimum pressure Pmin be different and different according to the condition of each well, and direct relevant with the size of strata pressure, no matter but strata pressure how, as the difference that makes Pmax and Pmin is greater than 30kg/cm 2The time, should be effectively with this method de-plugging, in general, decide maximum pressure Pmax and should equal strata pressure and add 20-100kg/cm 2, decide minimum pressure Pmin and should be lower than strata pressure 10kg/cm 2Below, promptly decide minimum pressure Pmin and subtract 10kg/cm less than strata pressure 2, this condition can be implemented for the high well of strata pressure, because of strata pressure greater than head of liquid in the well, but, then can't implement, so for the lower well of strata pressure for the lower well of strata pressure, it is that valve 5 is all opened that its Pmin picks and places sky, and the desirable Pmin30kg/cm that is higher than of its Pmax 2Pressure.
Method for removing blockage of the present invention, flushing fluid or blockages relieving fluid (being added with the dedicated liquid that oil reservoir is had the de-plugging agent of de-plugging effect) are boosted by instantaneous, pressure release and produce pressure oscillation, the formation blockage thing is being subjected under the percussion of pulse, reach the fatigue failure state or on attachment, get loose, the liquid stream that pressure oscillation obstruction again that these are broken or that get loose forms along with the vibration of pressure flows and sends the stratum, and pit shaft proposed along with next step well-flushing, therefore can effectively reach cleaning, the purpose of de-plugging, this method only need be utilized well washing equipment, can hocket with clean-out service, need not increase any equipment, be a kind of simple, feasible de-plugging measure, than de-plugging or other de-plugging measures of routine, every well can be saved more than 10,000 yuan.

Claims (4)

1, a kind of pressure pulse oscilation deblocking method is characterized in that by liquid alternately being boosted and pressure release in the stratum in well, and parameters relationship and program are as follows:
1. the section of boosting 6, and valve-off 5 makes in the shortest time that pressure rises to Pmax in the well;
2. high pressure keeps section 7, makes Pmax keep a period of time in well;
3. pressure release section 8 is opened valve 5, makes in the well pressure reduce to Pmin in the shortest time;
4. low pressure keeps section 9, makes Pmin keep a period of time in well;
5. by 1. above-mentioned-4. program repeats;
6. check section 10, when in a certain program 2. the time, pressure rises to termination of pumping behind the Pmax, checks whether pressure descends, and as descending, prove stratum " imbibition ", and de-plugging is finished, as not descending, and 1.-4. program of continuation then.
The difference of said Pmax and Pmin should be greater than 30kg/cm 2
2, method for removing blockage as claimed in claim 1 is characterized in that
The kg/cm of Pmax=strata pressure+(20-100) 2
Pmin≤strata pressure-10kg/cm 2
3, method for removing blockage as claimed in claim 1 is characterized in that the said section 10 of 6. checking carries out after 1.-4. program is carried out 5-10 time.
4, method for removing blockage as claimed in claim 1, it is characterized in that said program 2. high pressure keep section 7 and 4. low pressure to keep time of sections 9 be 2-3 minute.
CN 94119787 1994-12-22 1994-12-22 Pressure pulse oscilation deblocking method Pending CN1125290A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94119787 CN1125290A (en) 1994-12-22 1994-12-22 Pressure pulse oscilation deblocking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94119787 CN1125290A (en) 1994-12-22 1994-12-22 Pressure pulse oscilation deblocking method

Publications (1)

Publication Number Publication Date
CN1125290A true CN1125290A (en) 1996-06-26

Family

ID=5039382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94119787 Pending CN1125290A (en) 1994-12-22 1994-12-22 Pressure pulse oscilation deblocking method

Country Status (1)

Country Link
CN (1) CN1125290A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005111516A1 (en) * 2004-05-13 2005-11-24 Tsinghua Solar Ltd. Glass vacuum heat pipe type solar heat collection pipe
CN102031945A (en) * 2010-12-31 2011-04-27 谢晓峰 Oil- water well blockage removal method and oil-water well blockage removal system
CN105201475A (en) * 2015-09-21 2015-12-30 中国石油大学(北京) High-energy-gathering repeated high-impulse-wave polymer injection well or oil well blockage removing method and device
CN105387994A (en) * 2015-12-15 2016-03-09 西南石油大学 Hydrate fidelity transport device and blockage relieving method thereof
CN118498956A (en) * 2024-07-22 2024-08-16 西安坤瑞石油科技有限公司 Continuous relay wave resonant pulse blocking removing device and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005111516A1 (en) * 2004-05-13 2005-11-24 Tsinghua Solar Ltd. Glass vacuum heat pipe type solar heat collection pipe
CN102031945A (en) * 2010-12-31 2011-04-27 谢晓峰 Oil- water well blockage removal method and oil-water well blockage removal system
CN105201475A (en) * 2015-09-21 2015-12-30 中国石油大学(北京) High-energy-gathering repeated high-impulse-wave polymer injection well or oil well blockage removing method and device
CN105201475B (en) * 2015-09-21 2019-04-05 中国石油大学(北京) High cumulative repeats flash wave injection well or de-plugging of well method and apparatus
CN105387994A (en) * 2015-12-15 2016-03-09 西南石油大学 Hydrate fidelity transport device and blockage relieving method thereof
CN118498956A (en) * 2024-07-22 2024-08-16 西安坤瑞石油科技有限公司 Continuous relay wave resonant pulse blocking removing device and method

Similar Documents

Publication Publication Date Title
CN105804680B (en) A kind of oil gas field workover operation device with pressure and method
CN1125290A (en) Pressure pulse oscilation deblocking method
RU2359114C2 (en) Method and facility for simultaneous selective treatment of perforation channels and treatment of bottomhole of conditionally endless thickness layer
CN2307102Y (en) Downhole Oil-Water Separation Water Injection Production Device
EA005614B1 (en) Gas turbine for oil lifting
CN117231177B (en) Underground pressurized jet deep liquid extraction device and use method
CA2410267C (en) Operation mode of an oil well pumping unit for well development and device for performing said operation mode
CN207315305U (en) A kind of well washing apparatus of cannula cleaning inner wall
CN206495664U (en) Hydraulic running and pulling formula sand, coal dust discharging and gas-producing unit
CN201835785U (en) Oil-water well device capable of automatically controlling pressure relief and liquid discharge as well as pumping discharged liquid to production pipeline
RU2213859C2 (en) Device for stimulation and cleaning of bottomhole formation zone
RU2225938C1 (en) Methods for exploiting oil extracting wells
RU2445446C1 (en) Flushing method of sand plug in gas well in conditions of abnormally low formation pressures
CN200982171Y (en) Multi-stage diversion filtering type salvaging cup for workover treatment
RU2188301C1 (en) Method of preparation and performance of well servicing
CN106437584A (en) Negative-pressure-type continuous sand-bailing device
RU2190087C2 (en) Process of extraction of well fluid
CN111706273A (en) A system and method for non-stop pressure-stabilizing pumping and washing of coalbed methane wells
RU2315858C1 (en) Method for bottomhole productive reservoir zone treatment
RU20128U1 (en) DEVICE FOR INFLUENCE ON BOTTOM BOREHOLD ZONE OF WELL AND ITS CLEANING
RU2238400C1 (en) System and method for restoring well productiveness and extraction of oil by pump method, including case after stopping
RU2821078C1 (en) Method for operation of water-flooded gas and gas condensate wells
CN222228496U (en) Sand washer for drilling and repairing well
CN222228522U (en) A rod pump drainage gas production device for flushing coal powder in coalbed methane wells
RU2215137C1 (en) Method of well completion

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication