CN112502003B - Road bridge roadbed maintenance device with cleaning and repairing functions - Google Patents
Road bridge roadbed maintenance device with cleaning and repairing functions Download PDFInfo
- Publication number
- CN112502003B CN112502003B CN202011084539.1A CN202011084539A CN112502003B CN 112502003 B CN112502003 B CN 112502003B CN 202011084539 A CN202011084539 A CN 202011084539A CN 112502003 B CN112502003 B CN 112502003B
- Authority
- CN
- China
- Prior art keywords
- repairing
- ball
- water
- parts
- cleaning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004140 cleaning Methods 0.000 title claims abstract description 15
- 238000012423 maintenance Methods 0.000 title abstract description 15
- 239000000203 mixture Substances 0.000 claims abstract description 42
- 238000010276 construction Methods 0.000 claims abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 55
- 239000000463 material Substances 0.000 claims description 49
- 230000007062 hydrolysis Effects 0.000 claims description 21
- 238000006460 hydrolysis reaction Methods 0.000 claims description 21
- 238000002156 mixing Methods 0.000 claims description 14
- 230000001737 promoting effect Effects 0.000 claims description 12
- 239000012783 reinforcing fiber Substances 0.000 claims description 11
- 239000011248 coating agent Substances 0.000 claims description 7
- 238000000576 coating method Methods 0.000 claims description 7
- 239000007884 disintegrant Substances 0.000 claims description 7
- 239000006249 magnetic particle Substances 0.000 claims description 7
- 238000003825 pressing Methods 0.000 claims description 6
- 239000011398 Portland cement Substances 0.000 claims description 4
- 239000006004 Quartz sand Substances 0.000 claims description 4
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 claims description 4
- 239000000654 additive Substances 0.000 claims description 4
- 230000000996 additive effect Effects 0.000 claims description 4
- 239000000853 adhesive Substances 0.000 claims description 4
- 230000001070 adhesive effect Effects 0.000 claims description 4
- 239000003638 chemical reducing agent Substances 0.000 claims description 4
- 239000003245 coal Substances 0.000 claims description 4
- 239000013013 elastic material Substances 0.000 claims description 4
- 239000010881 fly ash Substances 0.000 claims description 4
- 229910052500 inorganic mineral Inorganic materials 0.000 claims description 4
- 239000011707 mineral Substances 0.000 claims description 4
- 239000000843 powder Substances 0.000 claims description 4
- 239000002994 raw material Substances 0.000 claims description 4
- 230000001846 repelling effect Effects 0.000 claims description 3
- 238000003756 stirring Methods 0.000 claims description 2
- 230000009471 action Effects 0.000 abstract description 37
- 230000007547 defect Effects 0.000 abstract description 33
- 230000001976 improved effect Effects 0.000 abstract description 11
- 238000000034 method Methods 0.000 abstract description 8
- 230000008569 process Effects 0.000 abstract description 7
- 238000002347 injection Methods 0.000 abstract description 6
- 239000007924 injection Substances 0.000 abstract description 6
- 230000005484 gravity Effects 0.000 abstract description 4
- 239000002689 soil Substances 0.000 description 16
- 230000008439 repair process Effects 0.000 description 11
- 230000000903 blocking effect Effects 0.000 description 8
- 230000000694 effects Effects 0.000 description 8
- 230000001502 supplementing effect Effects 0.000 description 7
- 230000008602 contraction Effects 0.000 description 5
- 238000010408 sweeping Methods 0.000 description 5
- 238000006243 chemical reaction Methods 0.000 description 3
- 238000000354 decomposition reaction Methods 0.000 description 3
- 230000005489 elastic deformation Effects 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 239000000243 solution Substances 0.000 description 3
- 230000001960 triggered effect Effects 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000001595 contractor effect Effects 0.000 description 2
- 239000004743 Polypropylene Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000011049 filling Methods 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000011553 magnetic fluid Substances 0.000 description 1
- 230000005389 magnetism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- -1 polypropylene Polymers 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
- 238000010926 purge Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 230000008093 supporting effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
- E01C23/09—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
- E01C23/096—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for forming, opening-out, cleaning, drying or heating and filling
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/02—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
- C04B28/04—Portland cements
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Structural Engineering (AREA)
- Ceramic Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Road Repair (AREA)
Abstract
The invention discloses a road and bridge subgrade maintenance device with cleaning and repairing functions, which belongs to the technical field of road and bridge construction, can realize the innovative introduction of a maintenance device on an engineering vehicle, automatically senses the ground defects through repairing balls in the process of running on a subgrade, cleans sundries on the ground, triggers a pulling force signal after sensing the ground defects, automatically stops running the engineering vehicle, triggers the sinking action of the repairing balls under the action of gravity, further triggers the stretching action of the repairing balls in the defects to form multi-hole high-strength connection with the subgrade, simultaneously releases a repairing mixture, gradually rises under the action of buoyancy along with the continuous injection of the repairing mixture to separate from the defects, controls the engineering vehicle to continue running after the repairing balls are reset, and solidifies in the defects to form high-strength high-quality repairing, the roadbed maintenance efficiency and quality are greatly improved.
Description
Technical Field
The invention relates to the technical field of road and bridge construction, in particular to a road and bridge roadbed maintenance device with a cleaning and repairing function.
Background
With the continuous development of society, roads and bridges in China are greatly developed, the development of the road and bridge industry in China is very optimistic in recent years, but a plurality of imperfect places exist in the development process.
The roadbed is a structure formed by filling or excavation and directly supporting the rails, and is also called a line infrastructure. The roadbed is connected with the bridge and the tunnel to jointly form a circuit. The subgrade has two basic forms according to different terrain conditions: embankment and cutting, commonly known as fill and excavation. The railway roadbed is used for directly laying a track structure on a roadbed, so that the roadbed is the foundation of the track, and roadbed load bears the weight of the track structure, namely static load, and dynamic load transmitted by the track when a train runs. The roadbed and the track together form a circuit structure which is in a relatively loose connection structure form and weak in dynamic load resistance. The material for constructing the roadbed, whether filled or excavated, is mainly an earth-rock type discrete material, so the roadbed is an earth structure, is often attacked and damaged by changes of natural conditions such as geology, water, rainfall, climate, earthquake and the like, and has poor resistance, and therefore, the roadbed should have sufficient firmness, stability and durability. For a high-speed railway, the roadbed should have reasonable rigidity so as to ensure the stability and comfort of a train in high-speed running.
The quality and the strength of the roadbed are seriously influenced by inevitable introduction of impurities or defects such as local pits and even cracks in the roadbed in the construction process, and the mode of manual inspection and repair is often adopted in the prior art, so that the efficiency is extremely low, and the repair strength is poor.
Disclosure of Invention
1. Technical problem to be solved
Aiming at the problems in the prior art, the invention aims to provide a road and bridge subgrade maintenance device with a cleaning and repairing function, which can realize the innovative introduction of a maintenance device on an engineering vehicle, automatically sense the ground defects through repairing balls in the process of running on a subgrade, clean sundries on the ground, trigger a pulling force signal after sensing the ground defects, automatically stop the running of the engineering vehicle, trigger the sinking action of the repairing balls under the action of gravity, further trigger the stretching action of the repairing balls in the defects to form multi-hole high-strength connection with the subgrade, simultaneously release a repairing mixture, gradually rise under the action of buoyancy to separate from the defects along with the continuous injection of the repairing mixture, control the engineering vehicle to continue running after the repairing balls are reset, and solidify the repairing mixture in the defects to form high-strength high-quality repairing, the roadbed maintenance efficiency and quality are greatly improved.
2. Technical scheme
In order to solve the above problems, the present invention adopts the following technical solutions.
A road and bridge roadbed maintenance device with cleaning and repairing functions comprises an engineering truck body, wherein the lower end of the engineering truck body is connected with a material supplementing box, the lower end of the material supplementing box is connected with a plurality of communicated row sweeping pipes, the inner end of each row sweeping pipe is provided with a reducing flow passage, each reducing flow passage comprises an upper blocking section and a lower opening section which are integrated into a whole, a material blocking ball is connected in the blocking section in a sliding manner, the lower end of the material blocking ball is connected with a connecting pipe, the lower end of the connecting pipe is connected with a repairing ball, a tension sensor is installed on the inner end top wall of the material supplementing box, a connecting stay wire is connected between the tension sensor and the corresponding material blocking ball, the joint of the blocking section and the opening section is connected with a repelling magnet, an inserted magnet is connected on the material blocking ball in a sliding manner, the lower end of the inserted magnet is connected with a water squeezing column, the water squeezing column is inserted in the connecting pipe, and a water-containing base ball is connected in the repairing ball, the water-containing base ball is characterized in that a water pressing hole is formed in the upper end of the water-containing base ball, a water squeezing column penetrates through the repairing ball and extends into the water pressing hole, the outer end of the repairing ball is connected with a plurality of wear-resisting rings which are uniformly distributed, matched self-connection telescopic rods are slidably connected in the wear-resisting rings, and the self-connection telescopic rods are connected with the water-containing base ball and are communicated with the water-containing base ball.
Furthermore, the self-connection telescopic rod comprises a ground breaking cone and a hydraulic elastic pipe which are connected with each other, the hydraulic elastic pipe is communicated with the water-containing foundation ball, a plurality of flow promoting rods which are uniformly distributed are embedded and connected on the hydraulic elastic pipe, the ground breaking cone plays a role in breaking ground, under the action of stretching after water is injected under pressure into the hydraulic elastic pipe, ground breaking power is provided for the ground breaking cone, the high-strength connection with a roadbed defect surface is formed, the flow promoting rods trigger high-frequency vibration action in the defect, on one hand, the flowing of the repairing mixture in the defect is accelerated, the repairing time is shortened, on the other hand, the performance of the repairing mixture can be improved, and the strength after the repairing mixture is solidified is improved.
Furthermore, promote the flow pole including the ball of hydrolysising, wrap up in the semi-closed waterproof shell and mix the material pole of the ball outside of hydrolysising, and mix the material pole and connect in the outer end of semi-closed waterproof shell, semi-closed waterproof shell can be followed the extension and the shrink action of hydraulic elastic tube and realized closing and opening, cuts off the contact of ball of hydrolysising and water during closing, and water and ball of hydrolysising contact force it to take place decomposition reaction during opening, produce a large amount of gas fast, force to mix the material pole and trigger the high frequency vibration action.
Further, semi-closed waterproof case includes half shell of normal close and a pair of open half shell, half shell of normal close is connected in the outside of hydrolysising the ball, and is a pair of half shell symmetric connection is inboard in the ball of hydrolysising, and open half shell both ends are connected with half shell of normal close and hydraulic elastic tube respectively, and half shell of normal close plays the effect that the ball outside was hydrolysised to the normal close, and half shell of normal close then is used for following hydraulic elastic tube's extension and contraction action and realizes closing and opening.
Further, the ball of hydrolysising adopts the effervescent disintegrant to make, it adopts elastic material to make to mix the material pole, the normally closed half shell and open half shell all adopt flexible ventilative waterproof material to make, and the effervescent disintegrant can acutely release a large amount of gas after meeting water, provides power for the high frequency vibration of mixing the material pole, and normally closed half shell and open half shell then allow the gas that the reaction produced to escape.
Furthermore, an elastic telescopic rod is inserted into the hydraulic elastic pipe, two ends of the elastic telescopic rod are respectively connected with the water-containing base ball and the ground breaking cone, the elastic telescopic rod assists in improving the overall strength of the self-connection telescopic rod on one hand, and on the other hand, the elastic telescopic rod provides a guiding effect for the extension of the ground breaking cone.
Furthermore, the ground breaking cone is made of a high-hardness material, the surface of the ground breaking cone is coated with a LINE-X coating, the hydraulic elastic pipe is made of an elastic waterproof material, the high hardness and the coating protection of the ground breaking cone can enable the ground breaking cone to break smoothly and form deep connection with a roadbed, and the hydraulic elastic pipe can form elastic deformation with high expansion and contraction quantity.
Further, the outer end of the soil breaking cone is wrapped by a magnetic friction layer, the magnetic friction layer comprises a plurality of magnetic particles which are bonded together by an adhesive, the magnetic friction layer can fall off the lower part of the magnetic particles under the friction action when the soil breaking cone breaks the soil, and after the soil breaking cone leaves the hole formed, the magnetic reinforcing fibers in the repairing mixture can enter the hole under the magnetic attraction action, so that the high-strength connecting action is effectively formed, and the connecting strength of the solidified repairing mixture and the roadbed is improved.
Furthermore, the tension sensor is in signal connection with the controller, the controller is connected with the engineering truck body, and the height information of the repairing ball is indirectly acquired through the signal change of the tension sensor, so that the driving and stopping of the engineering truck body are controlled, and the repairing ball is conveniently unfolded to perform repairing action.
Further, a repairing mixture is filled in the feed box, and the repairing mixture comprises the following raw materials in parts by weight: 60-80 parts of portland cement, 30-50 parts of fly ash, 10-20 parts of coal gangue, 5-10 parts of mineral powder, 5-10 parts of quartz sand, 2-5 parts of magnetic reinforcing fibers, 1-5 parts of a water reducing agent, 1-5 parts of an additive and 50-80 parts of water, wherein the repairing mixture has higher strength after being solidified, so that the repairing mixture can repair the defects of the roadbed and play a certain role in reinforcement, and in addition, the magnetic reinforcing fibers can be matched with a magnetic friction layer to improve the connection strength of the solidified repairing mixture and the roadbed.
3. Advantageous effects
Compared with the prior art, the invention has the advantages that:
(1) the scheme can realize innovativeness, the maintenance device is introduced into the engineering truck, the ground defects are automatically sensed through the repairing balls in the process of running on the roadbed, sundries on the ground can be cleaned, a tension signal is triggered after the ground defects are sensed, the engineering truck automatically stops running, the sinking action of the repairing balls is triggered under the action of gravity, the stretching action of the repairing balls in the defects is further triggered, the high-strength connection with multiple channels is formed with the roadbed, meanwhile, the repairing mixture is released, the repairing balls gradually rise under the action of buoyancy and break away from the defects along with continuous injection of the repairing mixture, the engineering truck is controlled to continue running after the repairing balls are reset, the repairing mixture is solidified in the defects to form high-strength high-quality repairing, and the roadbed maintenance efficiency and quality are greatly improved.
(2) The self-connection telescopic rod comprises a soil breaking cone and a hydraulic elastic pipe which are connected with each other, the hydraulic elastic pipe is communicated with the water-containing base ball, a plurality of flow promoting rods which are uniformly distributed are embedded and connected on the hydraulic elastic pipe, the soil breaking cone plays a role in breaking soil, under the action of stretching after pressurized water injection in the hydraulic elastic pipe, soil breaking power is provided for the soil breaking cone, the high-strength connection with a multi-hole channel is formed on the roadbed defect surface, the flow promoting rods trigger high-frequency vibration action in the defect, on one hand, the flowing of a repairing mixture in the defect is accelerated, the repairing time is shortened, on the other hand, the performance of the repairing mixture can be improved, and the strength after the repairing mixture is solidified is improved.
(3) The flow promoting rod comprises a hydrolysis ball, a semi-closed waterproof shell wrapped on the outer side of the hydrolysis ball and a material mixing rod, the material mixing rod is connected to the outer end of the material mixing rod, the semi-closed waterproof shell can realize closing and opening along with the stretching and contracting actions of the hydraulic elastic pipe, the contact between the hydrolysis ball and water is isolated during closing, the water and the hydrolysis ball contact during opening to force the hydrolysis ball to generate decomposition reaction, a large amount of gas is rapidly generated, and the material mixing rod is forced to trigger high-frequency vibration action.
(4) Semi-closed waterproof case includes half shell of normal close and a pair of open half shell, and half shell of normal close is connected in the outside of hydrolysising the ball, and a pair of open half shell symmetric connection is inboard in the ball of hydrolysising, and open half shell both ends are connected with half shell of normal close and hydraulic elastic tube respectively, and half shell of normal close plays the effect that the ball outside was hydrolysised to the normal close, and half shell of normal close then is used for following the extension and the shrink action of hydraulic elastic tube and realizes sealing and opening.
(5) The hydrolysis ball is made of an effervescent disintegrant, the material mixing rod is made of an elastic material, the normally closed half shell and the open half shell are both made of flexible breathable waterproof materials, the effervescent disintegrant can violently release a large amount of gas after meeting water to provide power for high-frequency vibration of the material mixing rod, and the normally closed half shell and the open half shell allow the gas generated by reaction to escape.
(6) The hydraulic elastic pipe is internally inserted with an elastic telescopic rod, two ends of the elastic telescopic rod are respectively connected with the water-containing foundation ball and the ground breaking cone, the elastic telescopic rod assists to improve the overall strength of the self-connection telescopic rod on one hand, and on the other hand, the elastic telescopic rod provides a guiding effect for the extension of the ground breaking cone.
(7) The high-hardness ground breaking cone is made of a high-hardness material, the surface of the ground breaking cone is coated with a LINE-X coating, the hydraulic elastic pipe is made of an elastic waterproof material, the high hardness and the coating protection of the ground breaking cone can enable the ground breaking cone to break earth smoothly and form deep connection with a roadbed, and the hydraulic elastic pipe can form elastic deformation with high expansion and contraction quantity.
(8) The outer end of the soil breaking cone is wrapped by the magnetic friction layer, the magnetic friction layer comprises a plurality of magnetic particles which are bonded together by an adhesive, the magnetic friction layer can fall off part of the magnetic particles under the friction action in the process of soil breaking along with the soil breaking cone, and after the soil breaking cone leaves the formed hole, the magnetic reinforcing fibers in the repairing mixture can enter the hole under the action of magnetic attraction, so that the high-strength connecting action is effectively formed, and the connecting strength of the solidified repairing mixture and the roadbed is improved.
(9) The tension sensor is in signal connection with the controller, the controller is connected with the engineering truck body, and the height information of the repairing ball is indirectly acquired through signal change of the tension sensor, so that running and stopping of the engineering truck body are controlled, and the repairing ball is conveniently unfolded to perform repairing action.
(10) The repairing mixture is filled in the material supplementing box and comprises the following raw materials in parts by weight: 60-80 parts of portland cement, 30-50 parts of fly ash, 10-20 parts of coal gangue, 5-10 parts of mineral powder, 5-10 parts of quartz sand, 2-5 parts of magnetic reinforcing fibers, 1-5 parts of a water reducing agent, 1-5 parts of an additive and 50-80 parts of water, wherein the repairing mixture has higher strength after being solidified, so that the repairing mixture can repair the defects of the roadbed and play a certain role in reinforcement, and in addition, the magnetic reinforcing fibers can be matched with a magnetic friction layer to improve the connection strength of the solidified repairing mixture and the roadbed.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of a portion of the purging tube and the repair ball of the present invention;
FIG. 3 is a schematic view of the structure at A in FIG. 2;
FIG. 4 is a schematic structural view of the repairing ball of the present invention in a normal state;
FIG. 5 is a schematic view of the structure at B in FIG. 4;
FIG. 6 is a schematic structural view of a flow promoting stem portion of the present invention;
fig. 7 is a schematic structural view of the repairing ball in an extended state according to the present invention.
The reference numbers in the figures illustrate:
the engineering truck comprises an engineering truck body 1, a supplement box 2, a sweeping pipe 3, a repair ball 4, a wear-resistant ring 5, a self-connection telescopic rod 6, a ground breaking cone 61, a hydraulic elastic pipe 62, a flow promoting rod 63, a hydrolysis ball 631, a material stirring rod 632, a normally closed half shell 633, an open half shell 634, an elastic telescopic rod 64, a magnetic friction layer 65, a water-containing base ball 7, a water squeezing column 8, a material blocking ball 9, a connecting pipe 10, a repulsive magnet 11, a connecting pull wire 12 and an inserted magnet 13.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention; it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "sleeved/connected," "connected," and the like are to be construed broadly, e.g., "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1:
referring to fig. 1-3, a road and bridge roadbed maintenance device with cleaning and repairing functions comprises an engineering truck body 1, wherein a material supplementing box 2 is connected to the lower end of the engineering truck body 1, a plurality of communicated row sweeping pipes 3 are connected to the lower end of the material supplementing box 2, a variable diameter flow passage is formed in the inner ends of the row sweeping pipes 3 and comprises a plugging section and an open section which are integrated up and down, a material plugging ball 9 is connected in the plugging section in a sliding mode, a connecting pipe 10 is connected to the lower end of the material plugging ball 9, a repairing ball 4 is connected to the lower end of the connecting pipe 10, a tension sensor is mounted on the top wall of the inner end of the material supplementing box 2, a connecting pull wire 12 is connected between the tension sensor and the corresponding material plugging ball 9, a repelling magnet 11 is connected to the joint of the plugging section and the open section, an inner inserting magnet 13 is connected to the plugging ball 9 in a sliding mode, an extruding column 8 is connected to the lower end of the inner inserting magnet 13, and the extruding column 8 is inserted in the connecting pipe 10.
Referring to fig. 4, a water-containing base ball 7 is connected in the repairing ball 4, a water pressing hole is formed at the upper end of the water-containing base ball 7, a water squeezing column 8 penetrates through the repairing ball 4 and extends into the water pressing hole, a plurality of wear-resisting rings 5 which are uniformly distributed are connected at the outer end of the repairing ball 4, matched self-connecting telescopic rods 6 are connected in the wear-resisting rings 5 in a sliding manner, and the self-connecting telescopic rods 6 are connected with the water-containing base ball 7 and are communicated with each other.
Referring to fig. 5, the self-linking telescopic rod 6 includes a ground breaking cone 61 and a hydraulic elastic tube 62 which are connected with each other, the hydraulic elastic tube 62 is communicated with the water-containing foundation ball 7, a plurality of flow promoting rods 63 which are uniformly distributed are embedded and connected on the hydraulic elastic tube 62, the ground breaking cone 61 plays a role of breaking ground, under the action of stretching after pressurized water injection in the hydraulic elastic tube 62, the ground breaking cone 61 is provided with ground breaking power to be connected with the high strength of a roadbed defect surface to form a multi-hole channel, and the flow promoting rods 63 trigger high-frequency vibration action in the defect, on one hand, the flow of the repairing mixture in the defect is accelerated, the repairing time is shortened, on the other hand, the performance of the repairing mixture can be improved, and the strength after solidification of the repairing mixture can be improved.
Referring to fig. 6, the flow promoting rod 63 includes a hydrolysis ball 631, a semi-closed waterproof shell wrapped outside the hydrolysis ball 631, and a material mixing rod 632, and the material mixing rod 632 is connected to an outer end of the semi-closed waterproof shell, the semi-closed waterproof shell can be closed and opened along with the expansion and contraction of the hydraulic elastic tube 62, the contact between the hydrolysis ball 631 and water is blocked when closed, the water is in contact with the hydrolysis ball 631 when opened to force the hydrolysis ball 631 to generate decomposition reaction, so as to rapidly generate a large amount of gas, and the material mixing rod 632 is forced to trigger high-frequency vibration.
The semi-closed waterproof shell comprises a normally closed half shell 633 and a pair of open half shells 634, wherein the normally closed half shell 633 is connected to the outer side of the hydrolysis ball 631, the pair of open half shells 634 are symmetrically connected to the inner side of the hydrolysis ball 631, two ends of the open half shell 634 are respectively connected with the normally closed half shell 633 and the hydraulic elastic tube 62, the normally closed half shell 633 serves as the outer side of the normally closed hydrolysis ball 631, and the normally closed half shell 633 is used for achieving closing and opening along with the extending and contracting actions of the hydraulic elastic tube 62.
The hydrolysis ball 631 is made of effervescent disintegrant, the material mixing rod 632 is made of elastic material, the normally closed half shell 633 and the open half shell 634 are both made of flexible, breathable and waterproof material, the effervescent disintegrant violently releases a large amount of gas after contacting water to provide power for high-frequency vibration of the material mixing rod 632, and the normally closed half shell 633 and the open half shell 634 allow the gas generated by the reaction to escape.
An elastic telescopic rod 64 is inserted into the hydraulic elastic tube 62, two ends of the elastic telescopic rod 64 are respectively connected with the water-containing base ball 7 and the ground breaking cone 61, and the elastic telescopic rod 64 assists to improve the overall strength of the self-connection telescopic rod 6 on one hand and provides a guiding effect for the extension and retraction of the ground breaking cone 61 on the other hand.
The ground breaking cone 61 is made of a high-hardness material, such as a stainless steel material, the surface of the ground breaking cone 61 is coated with a LINE-X coating, the hydraulic elastic pipe 62 is made of an elastic waterproof material, the high hardness and coating protection of the ground breaking cone 61 can enable the ground breaking cone to break earth smoothly and form deep connection with a roadbed, and the hydraulic elastic pipe 62 can form elastic deformation with high expansion and contraction quantity.
The tension sensor is connected with the controller through signals, the controller is connected with the engineering truck body 1, and the height information of the repairing ball 4 is indirectly acquired through signal changes of the tension sensor, so that the driving and stopping of the engineering truck body 1 are controlled, and the repairing ball 4 is conveniently unfolded to perform repairing actions.
The repair mixture is filled in the repair box 2 and comprises the following raw materials in parts by weight: 60-80 parts of portland cement, 30-50 parts of fly ash, 10-20 parts of coal gangue, 5-10 parts of mineral powder, 5-10 parts of quartz sand, 2-5 parts of magnetic reinforcing fibers, 1-5 parts of a water reducing agent, 1-5 parts of an additive and 50-80 parts of water, wherein the repairing mixture has higher strength after being solidified, so that the repairing mixture can repair the defects of the roadbed and play a certain role in reinforcement, and in addition, the magnetic reinforcing fibers can be matched with the magnetic friction layer 65 to improve the connection strength of the solidified repairing mixture and the roadbed.
The magnetic reinforcing fiber is prepared by impregnating polypropylene fiber into magnetic fluid and drying.
The invention can realize the innovative introduction of a maintenance device on the engineering truck, autonomously sense the ground defect through the repairing balls 4 in the process of running on the roadbed, clean sundries on the ground, trigger a pulling force signal after sensing the ground defect, automatically stop the running of the engineering truck, trigger the sinking action of the repairing balls 4 under the action of gravity, further trigger the stretching action of the repairing balls 4 in the defect, please refer to fig. 7, form a multi-hole high-strength connection with the roadbed, simultaneously release a repairing mixture, gradually rise under the action of buoyancy to separate from the defect along with the continuous injection of the repairing mixture, and control the engineering truck to continuously run after the repairing balls 4 are reset, the repairing mixture is solidified in the defect to form high-strength high-quality repairing, thereby greatly improving the roadbed maintenance efficiency and quality.
The foregoing is only a preferred embodiment of the present invention; the scope of the invention is not limited thereto. Any person skilled in the art should be able to cover the technical scope of the present invention by equivalent or modified solutions and modifications within the technical scope of the present invention.
Claims (9)
1. The utility model provides a road bridge road bed curing means with clean restoration function, includes machineshop car body (1), its characterized in that: the utility model discloses a construction vehicle, including engineering vehicle body (1), pipe (3) are swept to the row that the lower extreme of benefit workbin (2) is connected with a plurality of being linked together, the row is swept pipe (3) the inner and has been seted up the reducing runner, the reducing runner includes integrative shutoff section and open section from top to bottom, sliding connection has shutoff ball (9) in the shutoff section, shutoff ball (9) lower extreme is connected with connecting pipe (10), connecting pipe (10) lower extreme is connected with repaiies ball (4), install force sensor on the inner roof of benefit workbin (2), be connected with between force sensor and corresponding shutoff ball (9) and connect acting as go-between (12), the junction of shutoff section and open section is connected with repelling magnet (11), sliding connection has interpolation magnet (13) on shutoff ball (9), interpolation magnet (13) lower extreme is connected with crowded water column (8), the water squeezing column (8) is inserted into the connecting pipe (10), the repairing ball (4) is internally connected with a water-containing base ball (7), the upper end of the water-containing base ball (7) is provided with a water pressing hole, the water squeezing column (8) penetrates through the repairing ball (4) and extends into the water pressing hole, the outer end of the repairing ball (4) is connected with a plurality of wear-resisting rings (5) which are uniformly distributed, the wear-resisting rings (5) are internally connected with matched self-connecting telescopic rods (6) in a sliding manner, and the self-connecting telescopic rods (6) are connected with the water-containing base ball (7) and keep communicated with each other;
the self-connection telescopic rod (6) comprises a ground breaking cone (61) and a hydraulic elastic tube (62) which are connected with each other, the hydraulic elastic tube (62) is communicated with the water-containing base ball (7), and a plurality of flow promoting rods (63) which are uniformly distributed are embedded and connected on the hydraulic elastic tube (62).
2. The device for maintaining road and bridge foundation with cleaning and repairing functions as claimed in claim 1, wherein: the flow promoting rod (63) comprises a hydrolysis ball (631), a semi-closed waterproof shell wrapping the outer side of the hydrolysis ball (631), and a material mixing rod (632), wherein the material mixing rod (632) is connected to the outer end of the semi-closed waterproof shell.
3. The device for maintaining road and bridge foundation with cleaning and repairing functions as claimed in claim 2, wherein: the semi-closed waterproof shell comprises a normally closed half shell (633) and a pair of open half shells (634), wherein the normally closed half shell (633) is connected to the outer side of the hydrolysis ball (631), the pair of open half shells (634) are symmetrically connected to the inner side of the hydrolysis ball (631), and two ends of each open half shell (634) are respectively connected with the normally closed half shell (633) and the hydraulic elastic pipe (62).
4. The device for maintaining road and bridge foundation with cleaning and repairing functions as claimed in claim 3, wherein: the hydrolysis ball (631) is made of an effervescent disintegrant, the stirring rod (632) is made of an elastic material, and the normally closed half shell (633) and the open half shell (634) are both made of a flexible breathable waterproof material.
5. The device for maintaining road and bridge foundation with cleaning and repairing functions as claimed in claim 1, wherein: an elastic telescopic rod (64) is inserted into the hydraulic elastic tube (62), and two ends of the elastic telescopic rod (64) are respectively connected with the water-containing foundation ball (7) and the ground breaking cone (61).
6. The device for maintaining road and bridge foundation with cleaning and repairing functions as claimed in claim 1, wherein: the ground breaking cone (61) is made of a high-hardness material, the surface of the ground breaking cone (61) is coated with a LINE-X coating, and the hydraulic elastic pipe (62) is made of an elastic waterproof material.
7. The device for maintaining road and bridge foundation with cleaning and repairing functions as claimed in claim 1, wherein: the outer end of the ground breaking cone (61) is wrapped with a magnetic friction layer (65), and the magnetic friction layer (65) comprises a plurality of magnetic particles which are bonded together by an adhesive.
8. The device for maintaining road and bridge foundation with cleaning and repairing functions as claimed in claim 1, wherein: the tension sensor is in signal connection with a controller, and the controller is connected with the engineering truck body (1).
9. The device for maintaining road and bridge foundation with cleaning and repairing functions as claimed in claim 1, wherein: the repairing mixture is filled in the repairing box (2), and comprises the following raw materials in parts by weight: 60-80 parts of portland cement, 30-50 parts of fly ash, 10-20 parts of coal gangue, 5-10 parts of mineral powder, 5-10 parts of quartz sand, 2-5 parts of magnetic reinforcing fiber, 1-5 parts of water reducing agent, 1-5 parts of additive and 50-80 parts of water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011084539.1A CN112502003B (en) | 2020-10-12 | 2020-10-12 | Road bridge roadbed maintenance device with cleaning and repairing functions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011084539.1A CN112502003B (en) | 2020-10-12 | 2020-10-12 | Road bridge roadbed maintenance device with cleaning and repairing functions |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112502003A CN112502003A (en) | 2021-03-16 |
CN112502003B true CN112502003B (en) | 2021-12-10 |
Family
ID=74953769
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011084539.1A Active CN112502003B (en) | 2020-10-12 | 2020-10-12 | Road bridge roadbed maintenance device with cleaning and repairing functions |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112502003B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130024998A (en) * | 2011-08-26 | 2013-03-11 | 주식회사 로드씰 | Material for asphalt-series joint filler used for concrete paving, and construction methd using the same |
CN108999133A (en) * | 2018-08-07 | 2018-12-14 | 王本勋 | A kind of express highway pavement restorative procedure |
CN110258272A (en) * | 2019-05-17 | 2019-09-20 | 谢紫祥 | A kind of cooling asphalt pavement crack of filler that can accelerate fills up machine |
CN111593648A (en) * | 2020-06-11 | 2020-08-28 | 包九月 | Vehicle rolling pavement repairing device for construction site |
-
2020
- 2020-10-12 CN CN202011084539.1A patent/CN112502003B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130024998A (en) * | 2011-08-26 | 2013-03-11 | 주식회사 로드씰 | Material for asphalt-series joint filler used for concrete paving, and construction methd using the same |
CN108999133A (en) * | 2018-08-07 | 2018-12-14 | 王本勋 | A kind of express highway pavement restorative procedure |
CN110258272A (en) * | 2019-05-17 | 2019-09-20 | 谢紫祥 | A kind of cooling asphalt pavement crack of filler that can accelerate fills up machine |
CN111593648A (en) * | 2020-06-11 | 2020-08-28 | 包九月 | Vehicle rolling pavement repairing device for construction site |
Also Published As
Publication number | Publication date |
---|---|
CN112502003A (en) | 2021-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100494581C (en) | Concrete Bottom Cover and Tube Pile Hole Maker with Pile Wing and Construction Technology | |
CN102051896B (en) | Dam piping rescue high polymer closed grouting method | |
CN103195441A (en) | Supporting and reinforcing structure of coal mine tunnel and construction technology thereof | |
CN109518690A (en) | Formula film pouch-type umbrella enlarged footing and its construction method are planted after pre- reaming | |
CN203223228U (en) | Coal mine roadway supporting and reinforcing structure | |
CN101994316A (en) | Recyclable composite anchor rod and construction method thereof | |
CN109680705A (en) | A kind of mast foundation for overhead contact wire system anti-freeze expansion system and its preparation process | |
CN103452100A (en) | Construction method of post-grouting squeezing and expanding combination cast-in-place bored pile | |
CN111997654B (en) | Shield constructs quick-witted slip casting system | |
CN102562146A (en) | Construction gap filling method and device for shield through air pushing section | |
CN107740434B (en) | Construction method for waterproof curtain of foundation pit with dam for broken sand pebbles and dolomite | |
CN112761174A (en) | Grouting plugging method suitable for large karst cave under high-flow-rate flowing water condition | |
CN114718060B (en) | Winged inflatable anchor pipe and construction method thereof | |
CN105220714B (en) | Built-in anchor cable fills core compound prestress pile tube float Structure construction method | |
CN108411912A (en) | A kind of convenient method of bolt stress slip casting | |
CN112502003B (en) | Road bridge roadbed maintenance device with cleaning and repairing functions | |
CN108266207A (en) | A kind of push pipe export & import water-stopping method and device suitable for deep water-rich sand layer area | |
JP4990042B2 (en) | Stabilization method of natural ground, stabilization structure of natural ground, filler, method of forming a space in natural ground, tunnel construction method using propulsion method, tunnel constructed by this method, tunnel construction by excavator Method, tunnel constructed by this method, method for constructing drain well for draining pressurized groundwater, drain well for draining pressurized groundwater | |
CN207121916U (en) | Shut-in well structure | |
CN208441096U (en) | Soil nailing port closing device | |
CN109763486A (en) | A kind of displaced type rotary jet grouting anchor pole and construction method | |
CN110565452B (en) | Railway roadbed body steel flower pipe grouting reinforcement method and railway roadbed | |
CN109837811B (en) | A reaction force structure for lateral rectification of ballastless track in subgrade section and its manufacturing method | |
CN209482303U (en) | Formula film pouch-type umbrella enlarged footing is planted after pre- reaming | |
CN208718676U (en) | Joint Support Structure for Concrete Segment Anchor Offset |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |