CN112486892B
CN112486892B CN202011477904.5A CN202011477904A CN112486892B CN 112486892 B CN112486892 B CN 112486892B CN 202011477904 A CN202011477904 A CN 202011477904A CN 112486892 B CN112486892 B CN 112486892B
Authority
CN
China
Prior art keywords
bonding
letter
denoted
equal
assuming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011477904.5A
Other languages
Chinese (zh)
Other versions
CN112486892A (en
Inventor
蔡响齐
李艳国
廉泽阳
王国
吴辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Canyon Circuit Technology Huizhou Co ltd
Original Assignee
Canyon Circuit Technology Huizhou Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Canyon Circuit Technology Huizhou Co ltd filed Critical Canyon Circuit Technology Huizhou Co ltd
Priority to CN202011477904.5A priority Critical patent/CN112486892B/en
Publication of CN112486892A publication Critical patent/CN112486892A/en
Application granted granted Critical
Publication of CN112486892B publication Critical patent/CN112486892B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F15/00Digital computers in general; Data processing equipment in general
    • G06F15/02Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators
    • G06F15/0241Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators of the IC-card-like type
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F15/00Digital computers in general; Data processing equipment in general
    • G06F15/02Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators
    • G06F15/025Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators adapted to a specific application
    • G06F15/0258Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators adapted to a specific application for unit conversion
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F15/00Digital computers in general; Data processing equipment in general
    • G06F15/76Architectures of general purpose stored program computers
    • G06F15/78Architectures of general purpose stored program computers comprising a single central processing unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computing Systems (AREA)
  • Design And Manufacture Of Integrated Circuits (AREA)

Abstract

The invention relates to the technical field of management and control calculation, and discloses a calculation method of a bonding IC management and control calculator, which comprises the following steps: judging the position of the bonding IC, inputting the position of the bonding IC, selecting the copper thickness, and inputting the ratio of the client to the IC bonding pad tolerance value; clicking the calculation button calculator directly obtains the final result. The step of judging the position of the bonding IC and inputting the position of the bonding IC, and inputting the ratio of the client to the IC bonding pad tolerance value after selecting the copper thickness is as follows: bonding IC header (mil): indicated by the letter a; (1) Let us assume that the input customer design value requirement is 5, denoted by the letter V. According to the invention, the phenomena of manual calculation, conversion, comparison conflict, decision and value taking according to rules are omitted, the result is directly obtained after the operation is changed, the result is obtained after about 2 minutes on average, the efficiency is improved to about 90%, and the phenomena of manual input calculation errors, comparison judgment errors, final decision and value taking errors and the like are completely avoided.

Description

Calculation method of bonding IC (integrated circuit) management and control calculator
Technical Field
The invention relates to the technical field of management and control calculation, in particular to a calculation method of a bonding IC management and control calculator.
Background
At present, bonding plate numbers of companies are increased, but the difficulty of bonding plate control is in controlling the width of bonding IC, so that an engineer needs to give an accurate control range when engineering design; the control range has specificity, and the comparison image is twitched, and various conflicting factors are needed to be considered during conversion, so that a final control value is determined, and the human conversion and the conflict determination process need too much time and have high error rate; for this purpose, we propose a calculation method of the bonding IC management and control calculator.
Disclosure of Invention
(One) solving the technical problems
Aiming at the defects of the prior art, the invention provides a calculation method of a bonding IC management and control calculator.
(II) technical scheme
In order to achieve the above purpose, the present invention provides the following technical solutions: the calculation method of the bonding IC management and control calculator comprises the following steps:
judging the position of the bonding IC, inputting the position of the bonding IC, selecting the copper thickness, and inputting the ratio of the client to the IC bonding pad tolerance value;
clicking the calculation button calculator directly obtains the final result.
Preferably, the step of determining the position of the bonding IC and inputting the size of the position of the bonding IC, and inputting the ratio of the customer to the IC pad tolerance value after selecting the copper thickness, includes:
Bonding IC header (mil): indicated by the letter a;
(1) Assuming that the input customer design value requirement is 5, denoted by the letter V;
(2) Assuming that the minimum requirement of the bonding pad required by the input customer is 4.8, and the minimum requirement is denoted by the letter H;
(3) Assuming that the copper thickness required by the customer is Hoz, denoted by the letter T, the corresponding first-part design value tolerance is 0.3, denoted by the letter TF; the corresponding process design value tolerance is 0.4, which is indicated by the letter TC;
(4) Assume that the compensation value defined inside the company is 0.1, denoted by the letter Z.
Preferably, the bonding IC headpiece (mil) is calculated:
If V-TF < H+Z and H+Z is less than or equal to V+TF, then A= [ (H+Z) + (V+TF) ]/2.+ -. (V+TF) - (H+Z) ]/2, i.e., [ (4.8+0.1) + (5+0.3) ]/2.+ -. (5+0.3) - (4.8+0.1) ]/2.
If V-TF is equal to or greater than H+Z and V-TF is equal to or greater than V+TF, then A= [ (V-TF) + (V+TF) ]/2.+ - [ (V+TF) - (V-TF) ]/2, i.e., [ (5-0.3) + (5+0.3) ]/2.+ - [ (5+0.3) - (5-0.3) ]/2;
the output bonding IC first part is A.
Preferably, the step of determining the position of the bonding IC and inputting the size of the position of the bonding IC, and inputting the ratio of the customer to the IC pad margin value after selecting the copper thickness is as follows:
Bonding IC process (mil): indicated by letter B;
(1) Assuming that the input customer design value requirement is 5, denoted by the letter V;
(2) Assuming that the minimum requirement of the bonding pad required by the input customer is 4.8, and the minimum requirement is denoted by the letter H;
(3) Assuming that the copper thickness required by the customer is Hoz, denoted by the letter T, the corresponding first-part design value tolerance is 0.3, denoted by the letter TF; the corresponding process design value tolerance is 0.4, which is indicated by the letter TC;
(4) Assume that the compensation value defined inside the company is 0.1, denoted by the letter Z.
Preferably, the bonding IC process (mil) specifically comprises the following steps:
If V-TC is less than H+Z and H+Z is less than or equal to V+TC, then A is more than or equal to H+Z, namely more than or equal to 4.8+0.1;
If V-TC is greater than or equal to H+Z and V-TC is greater than or equal to V+TC, then A= [ (V-TC) + (V+TC) ]/2 + - [ (V+TC) - (V-TC) ]/2, i.e., [ (5-0.4) + (5+0.4) ]/2 ] (5+0.4) - (5-0.4) ]/2;
The output bonding IC process is B.
Preferably, the specific algorithm for directly obtaining the H09 same PCS requirement <1/6 range (mil) in the final result by the click calculation button calculator is as follows:
h09 the same PCS requires <1/6 very bad (mil): indicated by letter C;
(1) Assuming that the input customer design value requirement is 5, denoted by the letter V;
(2) Assuming an extremely poor requirement of 1/6, denoted by the letter G;
then c= (V/G) rounding off to 2-bit fraction, i.e., (5/1/6)) rounding off to 2-bit fraction;
The H09 output is the same PCS requiring <1/6 very bad (mil) as C.
(III) beneficial effects
Compared with the prior art, the invention provides a calculation method of the bonding IC management and control calculator, which has the following beneficial effects:
The calculation method of the bonding IC management and control calculator omits the phenomena of manual calculation, conversion, comparison conflict, decision and value taking according to rules, directly outputting the result after the operation is changed, averaging the result about 2 minutes, improving the efficiency by about 90 percent, and completely avoiding the phenomena of how many manual inputs are used for calculation errors, comparison judgment errors, final decision and value taking errors and the like.
Detailed Description
The technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention, and it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Examples: a calculation method of a bonding IC management and control calculator comprises the following steps:
judging the position of the bonding IC, inputting the position of the bonding IC, selecting the copper thickness, and inputting the ratio of the client to the IC bonding pad tolerance value;
clicking the calculation button calculator directly obtains the final result.
The step of judging the position of the bonding IC and inputting the position of the bonding IC, and inputting the ratio of the client to the IC bonding pad tolerance value after selecting the copper thickness is as follows:
Bonding IC header (mil): indicated by the letter a;
(1) Assuming that the input customer design value requirement is 5, denoted by the letter V;
(2) Assuming that the minimum requirement of the bonding pad required by the input customer is 4.8, and the minimum requirement is denoted by the letter H;
(3) Assuming that the copper thickness required by the customer is Hoz, denoted by the letter T, the corresponding first-part design value tolerance is 0.3, denoted by the letter TF; the corresponding process design value tolerance is 0.4, which is indicated by the letter TC;
(4) Assume that the compensation value defined inside the company is 0.1, denoted by the letter Z.
The bonding IC headpiece (mil) is calculated:
If V-TF < H+Z and H+Z is less than or equal to V+TF, then A= [ (H+Z) + (V+TF) ]/2.+ -. (V+TF) - (H+Z) ]/2, i.e., [ (4.8+0.1) + (5+0.3) ]/2.+ -. (5+0.3) - (4.8+0.1) ]/2.
If V-TF is equal to or greater than H+Z and V-TF is equal to or greater than V+TF, then A= [ (V-TF) + (V+TF) ]/2.+ - [ (V+TF) - (V-TF) ]/2, i.e., [ (5-0.3) + (5+0.3) ]/2.+ - [ (5+0.3) - (5-0.3) ]/2;
the output bonding IC first part is A.
The step of bonding IC process (mil) in the proportion of the difference value of the bonding pads of the customer and the IC after the copper thickness is selected is as follows:
Bonding IC process (mil): indicated by letter B;
(1) Assuming that the input customer design value requirement is 5, denoted by the letter V;
(2) Assuming that the minimum requirement of the bonding pad required by the input customer is 4.8, and the minimum requirement is denoted by the letter H;
(3) Assuming that the copper thickness required by the customer is Hoz, denoted by the letter T, the corresponding first-part design value tolerance is 0.3, denoted by the letter TF; the corresponding process design value tolerance is 0.4, which is indicated by the letter TC;
(4) Assume that the compensation value defined inside the company is 0.1, denoted by the letter Z.
The bonding IC process (mil) comprises the following specific calculation steps:
If V-TC is less than H+Z and H+Z is less than or equal to V+TC, then A is more than or equal to H+Z, namely more than or equal to 4.8+0.1;
If V-TC is greater than or equal to H+Z and V-TC is greater than or equal to V+TC, then A= [ (V-TC) + (V+TC) ]/2 + - [ (V+TC) - (V-TC) ]/2, i.e., [ (5-0.4) + (5+0.4) ]/2 ] (5+0.4) - (5-0.4) ]/2;
The output bonding IC process is B.
The specific algorithm for directly obtaining H09 and the same PCS in the final result by clicking the calculation button calculator, wherein the requirement of the specific algorithm is <1/6 (mil):
h09 the same PCS requires <1/6 very bad (mil): indicated by letter C;
(1) Assuming that the input customer design value requirement is 5, denoted by the letter V;
(2) Assuming an extremely poor requirement of 1/6, denoted by the letter G;
then c= (V/G) rounding off to 2-bit fraction, i.e., (5/1/6)) rounding off to 2-bit fraction;
The H09 output is the same PCS requiring <1/6 very bad (mil) as C.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (1)

1. The calculation method of the bonding IC management and control calculator is characterized by comprising the following steps of:
judging the position of the bonding IC, inputting the position of the bonding IC, selecting the copper thickness, inputting the ratio of the client to the IC bonding pad polar value, and bonding the first piece of the IC, wherein the bonding IC comprises the following steps:
bonding IC first part: indicated by the letter a;
(1) Assuming that the input customer design value requirement is 5, denoted by the letter V;
(2) Assuming that the minimum requirement of the bonding pad required by the input customer is 4.8, and the minimum requirement is denoted by the letter H;
(3) Assuming that the copper thickness required by the customer is Hoz, denoted by the letter T, the corresponding first-part design value tolerance is 0.3, denoted by the letter TF; the corresponding process design value tolerance is 0.4, which is indicated by the letter TC;
(4) Assume that the compensation value defined inside the company is 0.1, denoted by the letter Z;
the bonding IC first part is calculated by:
If V-TF < H+Z and H+Z is less than or equal to V+TF, then A= [ (H+Z) + (V+TF) ]/2.+ -. (V+TF) - (H+Z) ]/2, i.e., [ (4.8+0.1) + (5+0.3) ]/2.+ -. (5+0.3) - (4.8+0.1) ]/2.
If V-TF is equal to or greater than H+Z and V-TF is equal to or greater than V+TF, then A= [ (V-TF) + (V+TF) ]/2.+ - [ (V+TF) - (V-TF) ]/2, i.e., [ (5-0.3) + (5+0.3) ]/2.+ - [ (5+0.3) - (5-0.3) ]/2;
the output bonding IC first part is A;
Bonding IC process: indicated by letter B;
(1) Assuming that the input customer design value requirement is 5, denoted by the letter V;
(2) Assuming that the minimum requirement of the bonding pad required by the input customer is 4.8, and the minimum requirement is denoted by the letter H;
(3) Assuming that the copper thickness required by the customer is Hoz, denoted by the letter T, the corresponding first-part design value tolerance is 0.3, denoted by the letter TF; the corresponding process design value tolerance is 0.4, which is indicated by the letter TC;
(4) Assume that the compensation value defined inside the company is 0.1, denoted by the letter Z;
the bonding IC process comprises the following specific calculation steps:
If V-TC is less than H+Z and H+Z is less than or equal to V+TC, then A is more than or equal to H+Z, namely more than or equal to 4.8+0.1;
If V-TC is greater than or equal to H+Z and V-TC is greater than or equal to V+TC, then A= [ (V-TC) + (V+TC) ]/2 + - [ (V+TC) - (V-TC) ]/2, i.e., [ (5-0.4) + (5+0.4) ]/2 ] (5+0.4) - (5-0.4) ]/2;
the output bonding IC process is B;
Clicking the calculation button calculator directly to obtain the final result, and the specific algorithm of H09 same PCS requiring <1/6 extremely bad is as follows:
h09 same PCS requires <1/6 very bad: indicated by letter C;
(1) Assuming that the input customer design value requirement is 5, denoted by the letter V;
(2) Assuming an extremely poor requirement of 1/6, denoted by the letter G;
then c= (V/G) rounding off to 2-bit fraction, i.e., (5/1/6)) rounding off to 2-bit fraction;
the output H09 is equal to PCS and requires <1/6 to be very bad as C.
CN202011477904.5A 2020-12-15 2020-12-15 Calculation method of bonding IC (integrated circuit) management and control calculator Active CN112486892B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011477904.5A CN112486892B (en) 2020-12-15 2020-12-15 Calculation method of bonding IC (integrated circuit) management and control calculator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011477904.5A CN112486892B (en) 2020-12-15 2020-12-15 Calculation method of bonding IC (integrated circuit) management and control calculator

Publications (2)

Publication Number Publication Date
CN112486892A CN112486892A (en) 2021-03-12
CN112486892B true CN112486892B (en) 2024-07-26

Family

ID=74917071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011477904.5A Active CN112486892B (en) 2020-12-15 2020-12-15 Calculation method of bonding IC (integrated circuit) management and control calculator

Country Status (1)

Country Link
CN (1) CN112486892B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104051675A (en) * 2014-06-06 2014-09-17 昆山工研院新型平板显示技术中心有限公司 Display device and binding method thereof
CN104409371A (en) * 2014-12-03 2015-03-11 无锡中微高科电子有限公司 Method for improving long-term reliability of gold-aluminum bonding

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4753820A (en) * 1986-10-20 1988-06-28 United Technologies Corporation Variable pitch IC bond pad arrangement
JP2644263B2 (en) * 1988-03-31 1997-08-25 株式会社東芝 Position recognition device
JP2769008B2 (en) * 1990-01-25 1998-06-25 富士通株式会社 Wire bonding method
JP2522458B2 (en) * 1990-10-01 1996-08-07 日本電気株式会社 Method of generating land pattern data for wire bonding
JP3923248B2 (en) * 1996-12-27 2007-05-30 松下電器産業株式会社 Method of mounting electronic component on circuit board and circuit board
US20030113947A1 (en) * 2001-12-19 2003-06-19 Vandentop Gilroy J. Electrical/optical integration scheme using direct copper bonding
CN102437147B (en) * 2011-12-09 2014-04-30 天水华天科技股份有限公司 Dense-pitch small-pad copper-line bonded intelligent card (IC) chip stacking packing piece and preparation method thereof
JP6143577B2 (en) * 2013-06-26 2017-06-07 サイプレス セミコンダクター コーポレーション Semiconductor integrated circuit and operation method of semiconductor integrated circuit
CN105405770A (en) * 2015-12-14 2016-03-16 深圳崇达多层线路板有限公司 Method for making super-small-sized bound bonding pad
CN205231045U (en) * 2015-12-22 2016-05-11 山东力合美电子科技有限公司 Packaging structure of power IC chip
US10521363B2 (en) * 2016-11-23 2019-12-31 Nuvoton Technology Corporation Fully-digital multiple pin value detector apparatus and sampling methods useful in conjunction therewith

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104051675A (en) * 2014-06-06 2014-09-17 昆山工研院新型平板显示技术中心有限公司 Display device and binding method thereof
CN104409371A (en) * 2014-12-03 2015-03-11 无锡中微高科电子有限公司 Method for improving long-term reliability of gold-aluminum bonding

Also Published As

Publication number Publication date
CN112486892A (en) 2021-03-12

Similar Documents

Publication Publication Date Title
CN112486892B (en) Calculation method of bonding IC (integrated circuit) management and control calculator
CN101629994B (en) Method for automatically calibrating terminal in batch
CN112600629B (en) Method and system for realizing power calibration and data processing of radio frequency receiver of MIMO channel simulator
WO2020140188A1 (en) Intelligent mixed fertilizer control method and control system
CN118170196A (en) Electronic load current precision control circuit, method and electronic load
CN114023235B (en) Display panel driving method, electronic device, and computer-readable storage medium
CN107968667A (en) A kind of DC maladjustment eliminates circuit and method
CN112528230B (en) Parameter consistency control method and device based on precision and distribution conversion correction
CN113267752A (en) Multi-channel wide dynamic data adaptive synthesis and health diagnosis method
CN110598236B (en) A Signal Integrity Testing Method and System Based on Simulation Model and Free Topology
US7468687B2 (en) Signal processing device and signal processing method
CN115792689B (en) Power supply range switching method and system and power supply
CN207352481U (en) Adaptive range rotating speed modulate circuit
CN101022269A (en) Audio frequency control method and system
TWI440015B (en) Image processing method in liquid crystal display
CN110416111A (en) It realizes the matched method of multiple chambers and realizes multiple matched devices of chamber
TWI779576B (en) Digital-to-analog conversion apparatus and method having signal calibration mechanism
CN116599410B (en) A method for estimating load torque of motor speed regulation system based on hyperbolic sine function
US12273973B2 (en) Automatic compensation method based on temperature characteristics of RGB LEDs
CN119179834B (en) A method for assisting in determining the number of electronic equipment repair tools
WO2024103472A1 (en) Control method for improving bonding ic etching precision
Pang et al. The research of probabilistic shaping signal transmission scheme based on neural network LLR calculation
TWI788619B (en) Signal equalizer
CN117214645A (en) Automatic gear shifting method and system for SMU board card
CN114280503B (en) A method for evaluating transformer functional age and aging status

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant