[go: up one dir, main page]

CN112366816A - Sequential control operation order uninterrupted checking method based on automatic setting of sequential control host - Google Patents

Sequential control operation order uninterrupted checking method based on automatic setting of sequential control host Download PDF

Info

Publication number
CN112366816A
CN112366816A CN202010927992.8A CN202010927992A CN112366816A CN 112366816 A CN112366816 A CN 112366816A CN 202010927992 A CN202010927992 A CN 202010927992A CN 112366816 A CN112366816 A CN 112366816A
Authority
CN
China
Prior art keywords
operation order
control operation
sequence control
checking
sequential control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010927992.8A
Other languages
Chinese (zh)
Other versions
CN112366816B (en
Inventor
滕井玉
顾全
王言国
金岩磊
葛立青
王建锋
杨敏
王亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
NR Engineering Co Ltd
Original Assignee
NR Electric Co Ltd
NR Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, NR Engineering Co Ltd filed Critical NR Electric Co Ltd
Priority to CN202010927992.8A priority Critical patent/CN112366816B/en
Publication of CN112366816A publication Critical patent/CN112366816A/en
Application granted granted Critical
Publication of CN112366816B publication Critical patent/CN112366816B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a sequential control operation order uninterrupted checking method based on automatic setting of a sequential control host, which comprises the following steps of: using a sequence control operation order editing tool to make a sequence control operation order, and storing the sequence control operation order as an uncorrected sequence control operation order; calling an uncorrected sequential control operation order by using a sequential control operation order editing tool, starting one-key sequential control in a check mode, and entering a simulation check interface; performing simulation check on a simulation check interface, changing the state of a switch knife switch in a database in an automatic setting mode of a sequence control host, and simulating the actual execution result of an operation item; the unchecked sequence control operation order is stored as a checked sequence control operation order after the simulation check of the unchecked sequence control operation order passes; and in the non-checking mode, the one-key sequential control judges the checking state of the sequential control operation order when the sequential control operation order is called. The sequence control operation order is subjected to simulation checking, the problems that the conventional sequence control operation order checking scheme does not have a power failure ticket checking condition and the checking period is too long are solved, the sequence control operation order checking period is shortened, and the safe and efficient operation of a power grid is guaranteed.

Description

Sequential control operation order uninterrupted checking method based on automatic setting of sequential control host
Technical Field
The invention relates to a sequential control operation order uninterrupted checking method based on automatic setting of a sequential control host, belongs to the technical field of automatic control of an electric power system, and relates to the technical field of one-key sequential control of a transformer substation of the electric power system.
Background
The one-key sequential control of the transformer substation is an efficient switching operation mode, and can realize the prefabrication of operation project software, the modular construction of operation tasks, the automatic judgment of equipment states, the intelligent check of error-proof interlocking, the one-key starting of operation steps and the automatic sequential execution of operation processes. The sequence control operation order is an operation item list which is stored in the transformer substation and used for one-key sequence control, comprises contents such as an operation object, a current equipment state, a target equipment state, an operation task name, an operation item, an operation condition, a target state and the like, and is debugged and verified before the one-key sequence control function is put into operation. The sequence control host is a monitoring host with a one-key sequence control function. At present, the debugging and verification of the sequence control operation order must adopt a checking mode of carrying out actual operation on the switch knife switch after the transformer substation turns partial power failure or all power failures, and the following defects exist:
(1) the power failure mode is complex: the commissioned transformer substation generally does not have all power failure conditions, a complex alternate power failure plan must be formulated for verifying sequence control operation tickets of the whole substation, and only alternate sequence control operation tickets with the power failure conditions are possible to be verified;
(2) the checking period is too long: by adopting a power failure mode of a turn-around part, the sequence control operation order of the station can be checked only in a long time, the checking period is long, and the working efficiency is low.
Based on the above analysis, the current sequential control operation order checking mode needs to be improved.
Disclosure of Invention
The invention aims to solve the technical problems that the power failure mode is complex and the checking period is too long in the sequence control operation order debugging and verifying scheme in the prior art, and provides a sequence control operation order uninterrupted checking method based on automatic setting of a sequence control host, which comprises the following steps:
step 1, using a sequence control operation order editing tool to make a sequence control operation order and storing the sequence control operation order as an uncorrected sequence control operation order;
step 2, using a sequence control operation order editing tool to call an unchecked sequence control operation order, starting one-key sequence control in a check mode, and entering a simulation check mode;
step 3, performing simulation check in a simulation check mode, changing the state of a switch knife switch in a database in an automatic setting mode of a sequence control host, and simulating the actual execution result of an operation project;
step 4, storing the unchecked sequence control operation order as a checked sequence control operation order after the simulation check of the unchecked sequence control operation order passes;
and 5, judging the checking state of the sequence control operation order when the sequence control operation order is called by one-key sequence control in the non-checking mode.
Preferably, the specific steps of step 1 are as follows:
step 11, a sequence control operation order editing tool is used for creating a sequence control operation order, and a source device state of the sequence control operation order, a target device state of the sequence control operation order, an operation task name of the sequence control operation order and a sequence control locking signal of the sequence control operation order are appointed;
step 12, adding an operation item list for each sequence control operation ticket, and specifying the type of each operation item, the operation object of each operation item, the execution precondition of each operation item and the confirmation condition of each operation item;
and step 13, storing the manufactured sequential control operation order into a database, wherein the type of the stored sequential control operation order is an uncorrected sequential control operation order.
Preferentially, in the step 1, the sequential control operation tickets are classified into unchecked sequential control operation tickets and checked sequential control operation tickets; in the step 1, if the sequence control operation order editing tool is opened to check the sequence control operation order, the type of the checked sequence control operation order is changed into an unchecked sequence control operation order after the checked sequence control operation order is modified and stored.
Preferably, the specific steps of step 2 are as follows:
step 21, displaying the transformer substation, the voltage grade, the interval and the sequence control operation order in a tree form by a sequence control operation order editing tool according to the hierarchy;
step 22, selecting an unchecked sequential control operation order, and checking the content of the unchecked sequential control operation order;
step 23, starting one-key sequential control in a checking mode, and entering a simulation checking interface;
in the step 2, the one-key sequential control is operated in a simulation checking mode, and an unchecked sequential control operation order can be called.
Preferably, in step 3, the simulation verification is performed on the simulation verification interface, and the operation flows of the one-touch sequence control in the non-verification mode are consistent, and both the operation flows of the simulation verification and the one-touch sequence control in the non-verification mode include generating an operation task, simulating rehearsal and executing an instruction, and one operation task includes a plurality of operation items.
Preferably, the specific steps of step 3 are as follows:
step 31, judging whether the current equipment state required by the operation task is consistent with the current equipment state of the operation object or not by one-key sequence control according to an uncorrected sequence control operation ticket selected by a sequence control operation ticket editing tool, and automatically setting the operation object to be the current equipment state required by the operation task if the current equipment state required by the operation task is inconsistent with the current equipment state of the operation object;
step 32, calling the selected non-check sequential control operation order from the database by one-key sequential control, automatically generating an operation task, and displaying the non-check sequential control operation order on a check interface of a check mode;
step 33, performing one-key sequence control simulation rehearsal, wherein the simulation rehearsal comprises starting the simulation rehearsal, checking operation conditions, checking the current equipment state before the rehearsal, checking the built-in anti-misoperation lock of the sequence control host, checking the intelligent anti-misoperation host and performing single-step simulation operation;
and step 34, executing a one-key sequence control instruction, wherein the instruction execution comprises starting instruction execution, checking operation conditions, checking the current equipment state before execution, judging sequence control locking signals, judging total station accident total judgment, judging conditions before single step execution, checking built-in anti-misoperation lock of the single-step sequence control host, checking the single-step intelligent anti-misoperation host by mistake, automatically setting single step and judging conditions for single step confirmation.
Preferentially, in the step 4, if the simulation check fails, the type of the unchecked sequential control operation order is still the unchecked sequential control operation order, and if the simulation check succeeds, the unchecked sequential control operation order is stored as the checked sequential control operation order; and after the simulation check is finished, automatically resetting the states of all the numbers.
Preferably, in step 5, the type of the sequential control operation order is determined when the sequential control operation order is called by one-key sequential control in the non-checking mode, and the sequential control operation order can be called only after being checked.
The invention achieves the following beneficial effects:
the sequence control operation order uninterrupted checking method based on automatic setting of the sequence control host overcomes the defect that partial power failure or all power failure must be carried out repeatedly in the existing sequence control operation order checking scheme, the sequence control operation order is checked in a simulation mode in a one-key sequence control automatic setting mode, the problems that the traditional sequence control operation order does not have power failure ticket checking conditions and the checking period is too long are solved, the sequence control operation order checking period is shortened, the operation and maintenance work efficiency of a transformer substation is improved, the application of a one-key sequence control technology is deepened, and the safe and efficient operation of a power grid is guaranteed.
Drawings
FIG. 1 is a flow chart of an embodiment of the present invention.
FIG. 2 is a schematic diagram of a one-key sequential control simulation verification process according to the present invention.
Detailed Description
The following examples are only for illustrating the technical solutions of the present invention more clearly, and the protection scope of the present invention is not limited thereby.
A sequential control operation order uninterrupted checking method based on automatic setting of a sequential control host comprises the following steps:
step 1, using a sequence control operation order editing tool to make a sequence control operation order and storing the sequence control operation order as an uncorrected sequence control operation order;
step 2, using a sequence control operation order editing tool to call an unchecked sequence control operation order, starting one-key sequence control in a check mode, and entering a simulation check mode;
step 3, performing simulation check in a simulation check mode, changing the state of a switch knife switch in a database in an automatic setting mode of a sequence control host, and simulating the actual execution result of an operation project;
step 4, storing the unchecked sequence control operation order as a checked sequence control operation order after the simulation check of the unchecked sequence control operation order passes;
and 5, judging the checking state of the sequence control operation order when the sequence control operation order is called by one-key sequence control in the non-checking mode.
Further, the specific steps of step 1 are as follows:
step 11, a sequence control operation order editing tool is used for creating a sequence control operation order, and a source device state of the sequence control operation order, a target device state of the sequence control operation order, an operation task name of the sequence control operation order and a sequence control locking signal of the sequence control operation order are appointed;
step 12, adding an operation item list for each sequence control operation ticket, and specifying the type of each operation item, the operation object of each operation item, the execution precondition of each operation item and the confirmation condition of each operation item;
and step 13, storing the manufactured sequential control operation order into a database, wherein the type of the stored sequential control operation order is an uncorrected sequential control operation order.
Further, in the step 1, the sequential control operation order types are divided into an unchecked sequential control operation order and a checked sequential control operation order; in the step 1, if the sequence control operation order editing tool is opened to check the sequence control operation order, the type of the checked sequence control operation order is changed into an unchecked sequence control operation order after the checked sequence control operation order is modified and stored.
Further, the specific steps of step 2 are as follows:
step 21, displaying the transformer substation, the voltage grade, the interval and the sequence control operation order in a tree form by a sequence control operation order editing tool according to the hierarchy;
step 22, selecting an unchecked sequential control operation order, and checking the content of the unchecked sequential control operation order;
step 23, starting one-key sequential control in a checking mode, and entering a simulation checking interface;
in the step 2, the one-key sequential control is operated in a simulation checking mode, and an unchecked sequential control operation order can be called.
Further, in step 3, performing simulation check on the simulation check interface to be consistent with the operation flow of the one-key sequence control in the non-check mode, wherein the operation flows of the simulation check and the one-key sequence control in the non-check mode both include generating an operation task, simulating rehearsal and executing an instruction, and one operation task includes a plurality of operation items.
Further, the specific steps of step 3 are as follows:
step 31, judging whether the current equipment state required by the operation task is consistent with the current equipment state of the operation object or not by one-key sequence control according to an uncorrected sequence control operation ticket selected by a sequence control operation ticket editing tool, and automatically setting the operation object to be the current equipment state required by the operation task if the current equipment state required by the operation task is inconsistent with the current equipment state of the operation object;
step 32, calling the selected non-check sequential control operation order from the database by one-key sequential control, automatically generating an operation task, and displaying the non-check sequential control operation order on a check interface of a check mode;
step 33, performing one-key sequence control simulation rehearsal, wherein the simulation rehearsal comprises starting the simulation rehearsal, checking operation conditions, checking the current equipment state before the rehearsal, checking the built-in anti-misoperation lock of the sequence control host, checking the intelligent anti-misoperation host and performing single-step simulation operation;
and step 34, executing a one-key sequence control instruction, wherein the instruction execution comprises starting instruction execution, checking operation conditions, checking the current equipment state before execution, judging sequence control locking signals, judging total station accident total judgment, judging conditions before single step execution, checking built-in anti-misoperation lock of the single-step sequence control host, checking the single-step intelligent anti-misoperation host by mistake, automatically setting single step and judging conditions for single step confirmation.
Further, in step 4, if the simulation check fails, the type of the unchecked sequence control operation order is still an unchecked sequence control operation order, and if the simulation check succeeds, the unchecked sequence control operation order is stored as a checked sequence control operation order; and after the simulation check is finished, automatically resetting the states of all the numbers.
Further, in step 5, the type of the sequential control operation order is judged when the sequential control operation order is called by one-key sequential control in the non-checking mode, and the sequential control operation order can be called only after being checked.
The flow chart is shown in fig. 1, and comprises the following steps:
step 1, using a sequence control operation order editing tool to make a sequence control operation order:
the sequential control operation order is created by taking an interval as an object, a plurality of sequential control operation orders can be created in one interval, and each sequential control operation order needs to specify information such as a source equipment state, a target equipment state, an operation task name, a sequential control locking signal and the like.
Adding an operation item list for each sequence control operation ticket, and setting information such as an operation item type of each operation item, an operation object of each operation item, a pre-execution condition of each operation item, a confirmation condition of each operation item and the like. The operation of the remote control type operation item is a switch knife switch, and a remote control point number and a remote control on-off type of the switch knife switch need to be specified.
And storing the sequence control operation order into a database, wherein the type of the stored operation order is not checked.
And after the sequential control operation order editing tool opens the checked operation order and modifies and stores the operation order, the type of the operation order is changed from checked to unchecked.
Step 2, calling an uncorrected operation order by using a sequence control operation order editing tool, starting one-key sequence control in a check mode, and entering a simulation check flow:
and the left side of the sequence control operation order editing tool displays the transformer substation, the voltage grade, the interval and the sequence control operation order in a tree list mode according to the hierarchy.
And after clicking a sequence control operation ticket on the tree list, displaying the content of the sequence control operation ticket on the right side for checking by an operator, wherein the displayed content comprises an operation ticket task name, a current state, a target state, version information, an operation item list and locking signal information. Clicking an unchecked operation order node on the sequential control operation order editing tool tree list by a right key, popping up a menu, selecting a menu item of 'simulation check', starting one-key sequential control in a check mode, and entering a simulation check interface, as shown in fig. 2.
Step 3, performing simulation check by one-key sequence control:
the simulation check process is consistent with the one-key sequence control operation process in the non-check mode, that is, a task is generated, preview is simulated, and an instruction is executed, as shown in fig. 2.
And after one-key sequential control is started, judging whether the current equipment state required by the operation task is consistent with the current equipment state of the operation object according to the operation ticket selected by the sequential control operation ticket editing tool, and if not, automatically setting the operation object to be the current state required by the operation task.
And calling the selected operation order from the order control operation order database by one-key order control, and displaying the information of the operation task name, the operation item list and the like of the order control operation order which is not checked on the checking interface.
Clicking a preview button to start simulating preview, wherein the whole process of simulating preview comprises starting simulating preview, checking operation conditions, checking the current equipment state before preview, checking the built-in anti-misoperation lock of the sequence control host, checking the intelligent anti-misoperation host, simulating single step and other links, and the completion of simulating preview can be confirmed only after all the links are successful.
And clicking a 'check' button to start instruction execution, wherein the whole instruction execution process comprises the steps of starting instruction execution, checking operation conditions, checking the current equipment state before execution, judging a sequence control locking signal, judging total station accident total judgment, judging conditions before single step execution, setting anti-misoperation locking check in the single-step sequence control host, performing anti-misoperation check in the single-step intelligent anti-misoperation host, automatically setting single step, judging conditions for single step confirmation and the like, and the instruction execution can be confirmed to be finished after all the steps are successful.
When the command is executed, the state of the switch knife switch in the database is changed in a mode of automatically setting the number of the command control host machine by the one-key command control system instead of sending a remote control command to the measurement and control device.
The automatic setting range of the sequence control host is the operation object of the operation item, namely the appointed switch knife switch. When the instruction is executed, the remote control closing operation of the switch disconnecting link is automatically closed, and the remote control separating operation of the switch disconnecting link is automatically separated. The state of the switch knife switch after automatic counting is consistent with the state of the switch knife switch returned by the measurement and control device during one-key sequential control actual operation.
In the single-step confirmation condition judgment, the switch knife switch specified by the operation item is automatically set to be in a target state, so that the switch knife switch position judgment in the confirmation condition is met. And automatically ignoring if the current-voltage criterion in the confirmation condition is not met. And automatically continuing to execute the next operation item after the single step confirmation condition is judged to be successful.
The sequential control operation ticket simulation check adopts the principle of double sets of anti-misoperation mechanism check, one set is an anti-misoperation logic lock built in the sequential control host, and the other set is the anti-misoperation logic check of the independent intelligent anti-misoperation host. After the sequence control host is automatically set, the intelligent anti-error host acquires the equipment state from the sequence control host. Simulating preview and instruction execution, simultaneously performing built-in anti-misoperation logic locking check and independent intelligent anti-misoperation logic check of the sequence control host, terminating operation if the built-in anti-misoperation logic locking check fails, popping up a prompt error, and lighting a built-in anti-misoperation locking indicator lamp; and if the error-proof logic check of the independent intelligent error-proof host fails, the operation is suspended, an error is prompted, an intelligent error-proof check indicating lamp is lightened, whether the error prompt of the error-proof check failure of the single-step intelligent error-proof host is ignored or not can be selected, the error prompt is verified through the authority during the neglect, and the check operation can be continued after the verification passes.
And 4, after passing the sequential control operation order check, saving the sequential control operation order as a checked operation order:
and after the simulation check is successful, popping up a dialog box to prompt whether the verified sequential control operation order is stored or not. And after clicking the 'confirm' button, the sequence control operation ticket is stored as a checked ticket, and the information of the checking state, the checking time, the checking person and the like of the sequence control ticket is recorded in the database. And updating the display state of the sequential control operation order on the sequential control operation order editing tool tree list to show that the sequential control operation order passes the check.
If the simulation check fails, the type of the sequence control operation ticket is not checked.
After the simulation check is finished, the simulation check interface is released, and the sequence control host automatically resets all the setting states.
Step 5, judging the checking state of the operation order when the one-key sequence control calls the sequence control operation order in the non-checking mode:
and carrying out one-key sequential control in the transformer substation, if the dispatched sequential control operation order is an uncorrected sequential control operation order, popping up an error prompt dialog box, prohibiting dispatching, and only if the checked sequential control operation order can be dispatched.
Preferably, in step 2, the unchecked operation tickets and the checked operation tickets are displayed in a distinguishing manner, the unchecked sequence control operation tickets display prefixes (unchecked) in front of sequence control operation ticket names on the tree list, and the checked sequence control operation tickets display prefixes (checked person name checked) in front of sequence control operation ticket names.
Preferably, in step 2, the font color is set to dark green when the checked sequence control operation order is displayed on the tree list, and the sequence control operation order is clearly distinguished from the unchecked sequence control operation order.
Preferably, in step 2, the contents of the different types of operation item displays are shown in table 1.
TABLE 1
Class of operation items Model (III) Displaying content
Remote control Task description, action object, command type, remote control type (opening and closing), remote control verification (general remote control, synchronous detection, no pressure detection and no detection), execution condition, confirmation condition and error processing (immediate stop, prompt and automatic detection) Continue), delay time, timeout time
Prompting Task description, command type, prompt type (continue after confirmation, confirm continue execution or stop execution, screen switch, check no prompt), execution condition, confirmation condition, error handling (stop immediately, prompt, self-check) Dynamic continuation), delay time, timeout time
The above description is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, several modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.

Claims (8)

1. A sequential control operation order uninterrupted checking method based on automatic setting of a sequential control host is characterized by comprising the following steps:
step 1, using a sequence control operation order editing tool to make a sequence control operation order and storing the sequence control operation order as an uncorrected sequence control operation order;
step 2, using a sequence control operation order editing tool to call an unchecked sequence control operation order, starting one-key sequence control in a check mode, and entering a simulation check mode;
step 3, performing simulation check in a simulation check mode, changing the state of a switch knife switch in a database in an automatic setting mode of a sequence control host, and simulating the actual execution result of an operation project;
step 4, storing the unchecked sequence control operation order as a checked sequence control operation order after the simulation check of the unchecked sequence control operation order passes;
and 5, judging the checking state of the sequence control operation order when the sequence control operation order is called by one-key sequence control in the non-checking mode.
2. The sequential control operation order uninterrupted checking method based on automatic counting of the sequential control host computer according to claim 1, characterized in that the specific steps of step 1 are as follows:
step 11, a sequence control operation order editing tool is used for creating a sequence control operation order, and a source device state of the sequence control operation order, a target device state of the sequence control operation order, an operation task name of the sequence control operation order and a sequence control locking signal of the sequence control operation order are appointed;
step 12, adding an operation item list for each sequence control operation ticket, and specifying the type of each operation item, the operation object of each operation item, the execution precondition of each operation item and the confirmation condition of each operation item;
and step 13, storing the manufactured sequential control operation order into a database, wherein the type of the stored sequential control operation order is an uncorrected sequential control operation order.
3. The sequential control operation order uninterrupted checking method based on automatic counting of the sequential control host computer according to claim 2, wherein in the step 1, the types of the sequential control operation orders are divided into an unchecked sequential control operation order and a checked sequential control operation order; in the step 1, if the sequence control operation order editing tool is opened to check the sequence control operation order, the type of the checked sequence control operation order is changed into an unchecked sequence control operation order after the checked sequence control operation order is modified and stored.
4. The sequential control operation order uninterrupted checking method based on automatic counting of the sequential control host computer according to claim 3, characterized in that the specific steps of the step 2 are as follows:
step 21, displaying the transformer substation, the voltage grade, the interval and the sequence control operation order in a tree form by a sequence control operation order editing tool according to the hierarchy;
step 22, selecting an unchecked sequential control operation order, and checking the content of the unchecked sequential control operation order;
step 23, starting one-key sequential control in a checking mode, and entering a simulation checking interface;
in the step 2, the one-key sequential control is operated in a simulation checking mode, and an unchecked sequential control operation order can be called.
5. The method for checking the sequence control operation order based on the automatic setting of the sequence control host computer according to claim 4, wherein in the step 3, the simulation check is performed on the simulation check interface to check that the operation flow of the sequence control of the next key in the non-check mode is consistent, the operation flows of the sequence control of the next key in the simulation check and non-check modes both comprise generating an operation task, simulating rehearsal and instruction execution, and one operation task comprises a plurality of operation items.
6. The sequential control operation order uninterrupted checking method based on automatic counting of the sequential control host computer according to claim 5, characterized in that the specific steps of step 3 are as follows:
step 31, judging whether the current equipment state required by the operation task is consistent with the current equipment state of the operation object or not by one-key sequence control according to an uncorrected sequence control operation ticket selected by a sequence control operation ticket editing tool, and automatically setting the operation object to be the current equipment state required by the operation task if the current equipment state required by the operation task is inconsistent with the current equipment state of the operation object;
step 32, calling the selected non-check sequential control operation order from the database by one-key sequential control, automatically generating an operation task, and displaying the non-check sequential control operation order on a check interface of a check mode;
step 33, performing one-key sequence control simulation rehearsal, wherein the simulation rehearsal comprises starting the simulation rehearsal, checking operation conditions, checking the current equipment state before the rehearsal, checking the built-in anti-misoperation lock of the sequence control host, checking the intelligent anti-misoperation host and performing single-step simulation operation;
and step 34, executing a one-key sequence control instruction, wherein the instruction execution comprises starting instruction execution, checking operation conditions, checking the current equipment state before execution, judging sequence control locking signals, judging total station accident total judgment, judging conditions before single step execution, checking built-in anti-misoperation lock of the single-step sequence control host, checking the single-step intelligent anti-misoperation host by mistake, automatically setting single step and judging conditions for single step confirmation.
7. The sequential control operation order uninterrupted checking method based on automatic counting of the sequential control host computer according to claim 1, wherein in step 4, if the simulation checking fails, the type of the un-checked sequential control operation order is still the un-checked sequential control operation order, and if the simulation checking succeeds, the un-checked sequential control operation order is stored as the checked sequential control operation order; and after the simulation check is finished, automatically resetting the states of all the numbers.
8. The method as claimed in claim 7, wherein in step 5, the one-key sequential control in the non-checking mode determines the type of the sequential control operation order when the sequential control operation order is called, and the sequential control operation order can only be called after checking.
CN202010927992.8A 2020-09-07 2020-09-07 Sequential control operation order uninterrupted checking method based on automatic setting of sequential control host Active CN112366816B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010927992.8A CN112366816B (en) 2020-09-07 2020-09-07 Sequential control operation order uninterrupted checking method based on automatic setting of sequential control host

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010927992.8A CN112366816B (en) 2020-09-07 2020-09-07 Sequential control operation order uninterrupted checking method based on automatic setting of sequential control host

Publications (2)

Publication Number Publication Date
CN112366816A true CN112366816A (en) 2021-02-12
CN112366816B CN112366816B (en) 2022-07-22

Family

ID=74516889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010927992.8A Active CN112366816B (en) 2020-09-07 2020-09-07 Sequential control operation order uninterrupted checking method based on automatic setting of sequential control host

Country Status (1)

Country Link
CN (1) CN112366816B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113177081A (en) * 2021-05-07 2021-07-27 国电南瑞科技股份有限公司 Uninterrupted visual checking method for one-key sequential control operation order
CN113691019A (en) * 2021-08-18 2021-11-23 国网湖北省电力有限公司检修公司 One-key sequential control operation and maintenance method, system, computer equipment and medium thereof
CN115328356A (en) * 2022-07-26 2022-11-11 国网浙江省电力有限公司 Electrical operation ticket mirror image debugging and acceptance method and device and readable storage medium
CN117090759A (en) * 2023-10-18 2023-11-21 江苏恒久机械股份有限公司 Safety control system and method for diaphragm compressor

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105302121A (en) * 2015-11-24 2016-02-03 积成电子股份有限公司 Sequential control operation order automatic anti-error check method based on simulation IED device
CN111614157A (en) * 2019-02-26 2020-09-01 南京南瑞继保电气有限公司 A sequence control system and method for switching off operation of a substation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105302121A (en) * 2015-11-24 2016-02-03 积成电子股份有限公司 Sequential control operation order automatic anti-error check method based on simulation IED device
CN111614157A (en) * 2019-02-26 2020-09-01 南京南瑞继保电气有限公司 A sequence control system and method for switching off operation of a substation

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113177081A (en) * 2021-05-07 2021-07-27 国电南瑞科技股份有限公司 Uninterrupted visual checking method for one-key sequential control operation order
CN113691019A (en) * 2021-08-18 2021-11-23 国网湖北省电力有限公司检修公司 One-key sequential control operation and maintenance method, system, computer equipment and medium thereof
CN113691019B (en) * 2021-08-18 2023-09-01 国网湖北省电力有限公司检修公司 One-key sequential control operation and maintenance method, system, computer equipment and media thereof
CN115328356A (en) * 2022-07-26 2022-11-11 国网浙江省电力有限公司 Electrical operation ticket mirror image debugging and acceptance method and device and readable storage medium
CN115328356B (en) * 2022-07-26 2023-08-11 国网浙江省电力有限公司 A method, device, and readable storage medium for commissioning and acceptance of electrical operation tickets
CN117090759A (en) * 2023-10-18 2023-11-21 江苏恒久机械股份有限公司 Safety control system and method for diaphragm compressor
CN117090759B (en) * 2023-10-18 2024-01-02 江苏恒久机械股份有限公司 Safety control system and method for diaphragm compressor

Also Published As

Publication number Publication date
CN112366816B (en) 2022-07-22

Similar Documents

Publication Publication Date Title
CN112366816B (en) Sequential control operation order uninterrupted checking method based on automatic setting of sequential control host
CN112104075B (en) Sequential control operation order uninterrupted checking method and system based on remote control message comparison of measurement and control device
CN112186739B (en) Sequential control operation order non-power-outage checking method and system
CN111614157B (en) A sequence control system and method for switching off operation of a substation
CN102073305B (en) Cross-platform power grid intelligent program control anti-misoperation system, operation method and interface communication mode
CN107611969B (en) Regulation and error prevention system with order regulation and constraint functions and method
CN107193250A (en) Evaluation system and evaluation method
CN111999579A (en) Automatic detection system and method for charging pile
CN110350660A (en) A kind of relay protection function pressing plate in-service monitoring method and system
CN108879663B (en) One-key sequence control method and system for electric power system with exception handling
CN110503215A (en) Method for identifying equipment status, faults and handling exceptions based on image recognition technology
CN107193251A (en) EVALUATION SYSTEM and EVALUATION METHOD
CN111882938A (en) Training, examining and evaluating method of one-stop-type locking and listing training and evaluating system
CN108448718A (en) One-button sequential control method and system for intelligent substation protection device
CN108682467B (en) Operation maintenance method for nuclear-grade digital instrument control system of pressurized water reactor nuclear power plant
CN109685682A (en) The method of regulator control system inspection operation ticket is intelligently generated based on relational database
CN113887997A (en) Intelligent management and control system for operation tickets
CN113065978A (en) An Analysis Method for Monitoring Information Defect Events
CN114498910A (en) One-key sequence control system and control method with anti-error function
CN113394778A (en) Configuration mode-based system-level debugging system and method for secondary equipment of transformer substation
CN111898993A (en) Operation ticket management system
CN113640601B (en) Power distribution network fault research and judgment post analysis system and method
CN106685088A (en) An anti-misoperation operating system for the secondary pressure plate of an electrical protection device
CN115882601A (en) One-button sequential control method and system for intelligent substation protection device
CN116383061A (en) Method and related device for testing basic platform interface of substation control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant