CN112180469B - Method for testing wired consistency of seismic source - Google Patents
Method for testing wired consistency of seismic source Download PDFInfo
- Publication number
- CN112180469B CN112180469B CN201910594724.6A CN201910594724A CN112180469B CN 112180469 B CN112180469 B CN 112180469B CN 201910594724 A CN201910594724 A CN 201910594724A CN 112180469 B CN112180469 B CN 112180469B
- Authority
- CN
- China
- Prior art keywords
- test
- vehicles
- source
- production
- consistency
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 409
- 238000000034 method Methods 0.000 title claims abstract description 56
- 238000004519 manufacturing process Methods 0.000 claims abstract description 163
- 238000012545 processing Methods 0.000 claims abstract description 58
- 238000004088 simulation Methods 0.000 claims abstract description 36
- 230000008569 process Effects 0.000 claims description 10
- 238000003860 storage Methods 0.000 claims description 9
- 238000010998 test method Methods 0.000 claims description 5
- 238000010586 diagram Methods 0.000 description 14
- 238000010276 construction Methods 0.000 description 10
- 238000004590 computer program Methods 0.000 description 7
- 238000009826 distribution Methods 0.000 description 6
- 230000003287 optical effect Effects 0.000 description 6
- 238000006243 chemical reaction Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 230000001360 synchronised effect Effects 0.000 description 3
- 238000004220 aggregation Methods 0.000 description 2
- 230000002776 aggregation Effects 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V13/00—Manufacturing, calibrating, cleaning, or repairing instruments or devices covered by groups G01V1/00 – G01V11/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/02—Generating seismic energy
- G01V1/04—Details
- G01V1/09—Transporting arrangements, e.g. on vehicles
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geophysics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Remote Sensing (AREA)
- Manufacturing & Machinery (AREA)
- Acoustics & Sound (AREA)
- Environmental & Geological Engineering (AREA)
- Geology (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The invention provides a method for testing wired consistency of a seismic source, which comprises the following steps: establishing a simulation auxiliary channel in the secondary arrangement; modifying the test shot point processing type from the production processing type to the test processing type; selecting a group of test focus vehicles from a plurality of focus vehicles to which the test shot belongs; when a production arrangement cross station CX1 exists in the test range of the group of test source vehicles, setting the secondary arrangement as a test mode, and connecting the production arrangement cross station CX1 with the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; acquiring seismic source consistency test data through an analog auxiliary channel and transmitting the seismic source consistency test data to an instrument host; when the production arrangement cross station CX1 is not in the test range of the group of test source vehicles, the secondary arrangement is set to be connected with the test source vehicles in a data acquisition mode, source consistency test data are acquired through the simulation auxiliary channel, and the next production arrangement cross station CX1 is searched and transmitted to the instrument host.
Description
Technical Field
The invention relates to the technical field of seismic exploration, in particular to a seismic source wired consistency testing method.
Background
The wired consistency test of the seismic source is an important basis for detecting the performance of the seismic source. The existing seismic source consistency test is to collect and record seismic source test data to an instrument through a seismic channel. Because the amplitude of the output signal of the DSD wired test of the electric cabinet body is larger during the seismic source consistency test, important production parameters, namely default seismic channel gains, need to be modified in order to prevent signals from being 'clipped', so that the seismic source consistency test cannot be performed simultaneously during production, and the production cannot be performed when the seismic source consistency test is performed. In addition, since the seismic traces have fixed line numbers and stake marks, the test range needs to be fixed in a certain wire harness range, and the line numbers and stake marks corresponding to the seismic source and the seismic source data thereof need to be recorded. The seismic sources also need to be gathered at selected positions (big and small in front and back rows) for long distance running from each arranged position, the running distance is generally 6-7 km, and the number of the seismic sources at each position is 6-10. If the source at a certain position cannot pass the test once, the field position information needs to be repeatedly tested and verified, the arrangement and instrument parameters cannot be recovered until all the source consistency tests pass, and the production can not be started until the source returns to the original position.
In the high-efficiency large-channel number acquisition project, a mode of simultaneous construction of multiple wire harnesses and front and back rows is generally adopted, so that the number of source allocation is generally about 32. Because the traditional wired consistency test of the seismic source is completed on the basis of production stoppage, each test needs to occupy about 3 hours of effective production time, and personnel and equipment investment is more. In addition, in the efficient collection project, as long as production stoppage is involved, the working pressure of the relevant teams is increased virtually, and the higher the pressure is, the higher the safety risk is, and the probability of error is increased.
There is no method in the prior art that can perform wired consistency testing at the same time when the seismic source is normally produced.
Disclosure of Invention
The embodiment of the invention provides a method for testing the wired consistency of a seismic source, which realizes the normal production of a seismic source vehicle and simultaneously carries out the wired consistency test of the seismic source, and comprises the following steps:
establishing a simulation auxiliary channel in the secondary arrangement;
modifying the test shot point processing type from the production processing type to the test processing type;
selecting a group of test focus vehicles from a plurality of focus vehicles to which the test shot belongs;
when a production arrangement cross station CX1 exists in the test range of the group of test source vehicles, setting the secondary arrangement as a test mode, and connecting the production arrangement cross station CX1 with the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the second-level arrangement collects consistency test data of the group of test source vehicles through the simulation auxiliary channel and transmits the consistency test data to the instrument host through the production arrangement cross station CX1;
when the production arrangement cross station CX1 is not in the test range of the group of test source vehicles, setting the secondary arrangement as a data acquisition mode, and connecting the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the second-level arrangement acquires the consistency test data of the group of test source vehicles through the simulation auxiliary channel, searches for the next production arrangement cross station CX1 and is connected, and the consistency test data of the group of test source vehicles is transmitted to the instrument host through the connected production arrangement cross station CX1;
selecting a set of test source vehicles from a plurality of source vehicles to which the test shot belongs, comprising: selecting at least two source vehicles from a plurality of source vehicles to which the test shot belongs as a group of test source vehicles;
the secondary arrangement includes: a two-level arrangement cross station CX2 and two large lines, wherein each large line comprises 4 field digital acquisition units FDU;
establishing a simulation auxiliary channel in the secondary arrangement comprises:
setting the seismic channel gains of 8 field digital acquisition units FDU of two large lines as test seismic channel gains from production seismic channel gains;
adding serial numbers of the 8 field digital acquisition units FDU to a defined simulation auxiliary channel list, and adding names corresponding to each auxiliary channel to an auxiliary channel list of a test processing type;
two large wires are connected to a two-level arrangement cross station CX2.
According to the method for testing the wired consistency of the seismic source, provided by the invention, the problem that the normal production of the seismic source vehicle is required to be stopped in the wired consistency test in the prior art is solved by establishing the simulation auxiliary channel, so that the normal production of the seismic source vehicle and the wired consistency test of the seismic source can be synchronously performed, the effective production time is improved, the investment of personnel and equipment is reduced, and the efficient and safe operation of the efficient large-channel number acquisition item is realized.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art. In the drawings:
FIG. 1 is a schematic diagram of a method for testing wired consistency of a seismic source according to an embodiment of the invention.
Fig. 2 is a schematic diagram of a testing method for testing wired consistency of a seismic source according to an embodiment of the invention, in which a production arrangement cross station CX1 is provided in the testing range.
Fig. 3 is a schematic diagram of a testing method for testing wired consistency of a seismic source according to an embodiment of the invention, when the alignment cross station CX1 is not produced within the testing range.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the embodiments of the present invention will be described in further detail with reference to the accompanying drawings. The exemplary embodiments of the present invention and their descriptions herein are for the purpose of explaining the present invention, but are not to be construed as limiting the invention.
As shown in a schematic diagram of a method for testing wired consistency of a seismic source in the embodiment of the invention in FIG. 1, the embodiment of the invention provides a method for testing wired consistency of a seismic source, which realizes normal production of a seismic source vehicle and performs wired consistency testing of the seismic source, and comprises the following steps:
step 101: establishing a simulation auxiliary channel in the secondary arrangement;
step 102: modifying the test shot point processing type from the production processing type to the test processing type;
step 103: selecting a group of test focus vehicles from a plurality of focus vehicles to which the test shot belongs;
step 104: when a production arrangement cross station CX1 exists in the test range of the group of test source vehicles, setting the secondary arrangement as a test mode, and connecting the production arrangement cross station CX1 with the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the secondary arrangement collects the focus consistency test data of the group of test focus vehicles through the simulation auxiliary channel, and transmits the focus consistency test data to the instrument host through the production arrangement cross station CX1;
step 105: when the production arrangement cross station CX1 is not in the test range of the group of test source vehicles, setting the secondary arrangement as a data acquisition mode, and connecting the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the secondary arrangement collects the focus consistency test data of the group of test focus vehicles through the simulation auxiliary channel, searches for the next production arrangement cross station CX1 and is connected, and the focus consistency test data of the group of test focus vehicles is transmitted to the instrument host through the connected production arrangement cross station CX1.
The inventor finds that the method for simultaneously carrying out the wired consistency test of the seismic source is not available in the prior art when researching the wired consistency test of the seismic source, and based on the method, the inventor researches and discovers that a 508XT acquisition system can establish a simulation auxiliary channel, thereby providing a foundation for simultaneously carrying out the wired consistency test of the seismic source when the seismic source vehicle is normally produced. By utilizing the characteristics of the simulation auxiliary channel and the unique characteristics of the cross station in the 508XT acquisition system, the invention provides a method for testing the wired consistency of the seismic source, which realizes normal field production and can test the wired consistency of the seismic source vehicle to be tested; the cross station in the 508XT acquisition system comprises a test mode and a data acquisition mode, the two modes provide great convenience for cutting in the analog auxiliary channel, a production arrangement is not required to be disconnected, one production arrangement cross station CX1 is selected from the production arrangements, the analog auxiliary channel is connected to the production arrangement cross station CX1, the instrument host identifies the serial number of the analog auxiliary channel through the production arrangement cross station CX1, and the identification of the analog auxiliary channel is realized, so that the wired consistency test of the seismic source is performed; the method has the following characteristics: 1) The normal production of the seismic source vehicle does not need to be completely stopped, and only the seismic source vehicle to be tested needs to be stopped and set, so that the synchronous performance of efficient acquisition and seismic source test is realized; 2) The focus vehicles do not need long-distance aggregation for centralized test, and only need to connect the secondary arrangement with the focus vehicles needing test, so that the driving risk and the damage to the production arrangement cross station CX1 in the driving process are reduced; 3) The original production arrangement is not required to be disconnected when the auxiliary simulation channel is cut in, the connection of the secondary arrangement is flexible, and the test can be performed at any time and any place; 4) The method is simple and easy to operate through actual production inspection, and the original production arrangement and the arrangement of the seismic source vehicles are not changed, so that errors are not easy to occur, and the once-through rate is high. The method for testing the wired consistency of the seismic source can enable normal production of the seismic source vehicle and the wired consistency test of the seismic source to be synchronously carried out, improves effective production time, reduces investment of personnel and equipment, and achieves efficient and safe operation of high-efficiency large-channel number acquisition items.
Based on a 508XT acquisition system, the embodiment of the invention provides a method for testing wired consistency of a seismic source, which comprises the following steps: establishing a simulation auxiliary channel in the secondary arrangement; modifying the test shot point processing type from the production processing type to the test processing type; selecting a group of test focus vehicles from a plurality of focus vehicles to which the test shot belongs; when a production arrangement cross station CX1 exists in the test range of the group of test source vehicles, setting the secondary arrangement as a test mode, and connecting the production arrangement cross station CX1 with the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the secondary arrangement collects the focus consistency test data of the group of test focus vehicles through the simulation auxiliary channel, and transmits the focus consistency test data to the instrument host through the production arrangement cross station CX1; when the production arrangement cross station CX1 is not in the test range of the group of test source vehicles, setting the secondary arrangement as a data acquisition mode, and connecting the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the secondary arrangement collects the focus consistency test data of the group of test focus vehicles through the simulation auxiliary channel, searches for the next production arrangement cross station CX1 and is connected, and the focus consistency test data of the group of test focus vehicles is transmitted to the instrument host through the connected production arrangement cross station CX1.
As shown in a test schematic diagram of the method for testing wired consistency of a seismic source in the embodiment of the invention in fig. 2 when there is a production alignment intersection CX1 in the test range and a test schematic diagram of the method for testing wired consistency of a seismic source in the embodiment of the invention in fig. 3 when there is no production alignment intersection CX1 in the test range, the 508XT acquisition system includes: an instrument host machine-1, a production arrangement cross station CX1-2, a secondary arrangement cross station CX 3, a secondary arrangement cross station CX2-4, a production group and a test group; a plurality of production arrangement cross stations CX1 are arranged according to a production plan to form a production arrangement; the production arrangement formed by a plurality of production arrangement cross stations CX1 is connected with an instrument host computer, and collected data is transmitted to the instrument host computer; the aforementioned instrument host is used for collecting data collected by the production arrangement cross station CX1, analyzing the data, setting and controlling the production arrangement cross station CX1, setting and controlling the seismic source, setting and controlling the secondary arrangement cross station CX2, and the like; the aforementioned plurality of production spread cross stations CX1 are used for collecting the data generated by the source vehicle during production, comprising: production data and/or various types of seismic data reflected by the formation; the production arrangement cross stations CX1 are arranged according to specific construction requirements to form production arrangement (namely primary arrangement), for example, in a specific example of the embodiment of the invention, 45 lines are fully arranged, 13 production arrangement cross stations CX1 which are sequentially connected through optical cables are distributed on each line, each line is connected through optical cables, and finally all the lines are connected to an instrument host to form a network for collecting data production arrangement, a plurality of source vehicles included in a production group are arranged in the network for production arrangement according to the set construction positions, and the production group can include one to a plurality of source vehicles according to the production requirements during actual production; the test group comprises a plurality of seismic source vehicles which need to be subjected to seismic source wired consistency test, in order to rapidly test the seismic source wired consistency test data of the seismic source vehicles, two seismic source vehicles can be selected as one test group to be tested, the number of the test seismic sources in the test group can be increased or reduced according to the test requirement during actual production, and the two seismic source vehicles are not used as limitations. The earthquake source vehicle receives an earthquake starting signal of the instrument host, the earthquake source Che Qi is used for producing, a production arrangement cross station CX1 in the production arrangement collects data, and the collected data is transmitted to the instrument host, so that the normal production process is realized. The earthquake focus vehicle can receive the control signal of the instrument host, and start or stop according to the control signal of the instrument host; the seismic source vehicle and the instrument host are connected in a wireless mode, a wireless local area network is established at the construction site, the whole construction site is covered, and the instrument host can control the seismic source vehicle through the wireless local area network; the seismic source vehicle and the instrument host can be connected in a wired mode, and the seismic source vehicle can be connected with the instrument host through optical fibers when in implementation, and the instrument host transmits various control signals to the instrument host.
To ensure that the source vehicle is capable of performing a source wire consistency test during normal production, in an embodiment, a simulation auxiliary channel needs to be established in a secondary arrangement. Because the seismic channel gain of the analog auxiliary channel is not limited by the default seismic channel gain, the analog auxiliary channel can be different from the production seismic channel gain, so that the situation that all the seismic source vehicles are stopped due to modification of the production seismic channel gain can be avoided, the seismic source wired consistency test is carried out on the seismic source vehicles in normal production, the auxiliary channel does not need line numbers and pile numbers, only the auxiliary channel is needed to be cut into the production arrangement of production, and the instrument host machine identification can be used for testing. Thus, a simulated auxiliary channel may be created in the secondary arrangement, which is cut into the production arrangement.
After the simulation auxiliary channel is established, in the embodiment, the test shot processing type is required to be modified from the production processing type to the test processing type next; when the vibration source is producing, the processing type of the shot point to which the vibration source belongs is the production processing type, and the vibration source vehicle to be subjected to the vibration source wired consistency test needs to be modified into the test processing type so as to distinguish different states of the vibration source vehicle and carry out different control: when the shot point of the seismic source vehicle is in the production processing type, the seismic source vehicle is normally produced; and when the shot point of the seismic source vehicle is in the test processing type, the seismic source vehicle performs wired consistency test. In one embodiment, the test processing class includes a consistency processing type and a pulse processing type. In an example of an embodiment of the present invention, in the Process of setting the 508XT acquisition system and the source vehicle, the code of the consistency processing Type (Process Type) is 3, the code of the pulse processing Type (Process Type) is 6, and the code of the production processing Type (Process Type) is 4. When the cable consistency test of the seismic source is carried out according to the test plan, on the day of carrying out the test plan, the shot points which are finished in production are processed to be test shot points, the processing type of the test shot points is changed from the production processing type to the test processing type, and the setting of the shot points is completed.
After modifying the test shot point processing type from the production processing type to the test processing type, selecting a source vehicle to be tested, wherein in the embodiment, a group of test source vehicles is selected from a plurality of source vehicles to which the test shot point belongs. The shot points are a coordinate range in production, and are displayed in a point on an instrument host, each shot point comprises a plurality of source vehicles, and the source vehicles are arranged in the shot points according to the set construction positions. When the method for testing the wired consistency of the seismic source is carried out, only the selected testing seismic source vehicle is required to be operated, other seismic source vehicles still carry out normal production according to the original construction plan, therefore, a group of testing seismic source vehicles are required to be selected from a plurality of seismic source vehicles which are provided with testing shots, the wired consistency of the seismic source is only tested for the group of testing seismic source vehicles, and other non-selected seismic source vehicles carry out normal production, so that the testing and the production can be synchronously carried out, the T-D rule in production is met, and the T-D rule is not influenced; in an embodiment, after the set of test source vehicles is selected, the set of test source vehicles is parked, and the corresponding set of source vehicles is also displayed on the instrument host in preparation for the source wire consistency test.
After the test source vehicles are selected, the secondary arrangement is required to be connected with the test source vehicles, and in the embodiment, when the production arrangement cross station CX1 is arranged in the test range of the group of test source vehicles, the secondary arrangement is set into a test mode, and the production arrangement cross station CX1 is connected with the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the secondary array collects source consistency test data for the set of test source vehicles via the analog auxiliary channels and transmits the data to the instrument host via the production array cross station CX1. When performing a wired consistency test of a seismic source, determining a test range of the group of test seismic source vehicles; the test range is determined by shot distribution, seismic source distribution, production arrangement distribution, seismic source vehicle performance parameters and the like which are divided by a construction plan in specific construction. When the production arrangement cross station CX1 exists in the test range of the selected group of test source vehicles, setting the secondary arrangement as a test mode; the secondary arrangement has two modes of operation: the test mode and the data acquisition mode, the initial default working mode of the secondary arrangement is the test mode, if the data acquisition mode needs to be set, the secondary arrangement needs to be connected with an instrument host, and the secondary arrangement is set through the instrument host, which specifically can comprise: connecting the secondary arrangement with an instrument host, detecting the accessed secondary arrangement by the instrument host, establishing a connection relation, identifying an initial working mode of the secondary arrangement as a test mode, displaying device identifiers of the secondary arrangement on the instrument host after establishing the connection relation, selecting the device identifiers of the secondary arrangement, clicking GO beside an acquisition, and completing the conversion from the test mode to a data acquisition mode. In an embodiment, the conversion from the test mode to the data acquisition mode may be performed on a computer provided in the host computer of the apparatus. If the secondary arrangement is required to be converted from a data acquisition mode to a test mode, one method is to restart the secondary arrangement, and the secondary arrangement can restore the initial default test mode; the second method is to power down the secondary arrangement, which will also resume the default test mode when power is re-turned on. After the secondary arrangement is set to a test mode, as shown in a test schematic diagram when a production arrangement cross station CX1 is provided in a test range in the method for testing the wired consistency of the seismic source in the embodiment of the invention in fig. 2, the secondary arrangement is connected with the production arrangement cross station CX1 and the group of test seismic source vehicles, namely, the seismic source vehicles are connected with the production arrangement cross station CX1 through the secondary arrangement; then, the testing shot points are associated with the group of testing seismic source vehicles on the instrument host, the instrument host sends a seismic start signal to the seismic source vehicles, and the group of testing seismic sources Che Qizhen; the secondary arrangement collects the focus consistency test data of the group of test focus vehicles through the simulation auxiliary channel, and transmits the focus consistency test data to the instrument host through the connected production arrangement cross station CX1 to complete the collection of primary test data; after the wired consistency test of the vibration source of the group of test vibration source vehicles is finished, replacing other test vibration source vehicles, and performing wired consistency test of vibration source on other test vibration source vehicles; the set of seismic source vehicles which are tested is controlled to be restored to the working state of normal production through the arrangement of the instrument host.
Since the shot distribution, the source distribution and the production arrangement distribution are different according to the construction plan, and the working positions of the source vehicles are not provided with the production arrangement intersection CX1 in the test range, another test method is needed in the embodiment: when the production arrangement cross station CX1 is not in the test range of the group of test source vehicles, setting the secondary arrangement as a data acquisition mode, and connecting the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the secondary arrangement collects the focus consistency test data of the group of test focus vehicles through the simulation auxiliary channel, searches for the next production arrangement cross station CX1 and is connected, and the focus consistency test data of the group of test focus vehicles is transmitted to the instrument host through the connected production arrangement cross station CX1. According to the setting method of the secondary arrangement, the secondary arrangement is set as a data acquisition mode: connecting the secondary arrangement with an instrument host, detecting the accessed secondary arrangement by the instrument host, establishing a connection relation, identifying an initial working mode of the secondary arrangement as a test mode, displaying device identifiers of the secondary arrangement on the instrument host after establishing the connection relation, selecting the device identifiers of the secondary arrangement, clicking GO beside an acquisition, and completing the conversion from the test mode to a data acquisition mode. As shown in the test schematic diagram of the test method for the wired consistency of the seismic source in the embodiment of the invention in the test range when the production arrangement cross station CX1 is not generated, the production arrangement cross station CX1 is not generated in the test range, so that in the first step, synchronous test is carried out, and only the two-level arrangement is connected with the group of test seismic source vehicles; then, the testing shot points are associated with the group of testing seismic source vehicles on the instrument host, the instrument host sends a seismic start signal to the seismic source vehicles, and the group of testing seismic sources Che Qizhen; the secondary arrangement collects consistency test data of the group of test seismic source vehicles through the simulation auxiliary channel, and the seismic source consistency test data are temporarily stored in a secondary arrangement intersection CX 2; and then, carrying out a second step of data recovery, after the acquisition of the focus consistency test data of the group of test focus vehicles is completed, searching for the next production arrangement cross station CX1 according to a test plan, connecting the second-level arrangement with the production arrangement cross station CX1, and transmitting the stored focus consistency test data of the group of test focus vehicles to an instrument host through the connected production arrangement cross station CX1 to complete the acquisition of primary test data. After the wired consistency test of the vibration source of the group of test vibration source vehicles is finished, replacing other test vibration source vehicles, and performing wired consistency test of vibration source on other test vibration source vehicles; the set of seismic source vehicles which are tested is controlled to be restored to the working state of normal production through the arrangement of the instrument host.
In implementing the foregoing method for testing wired consistency of a seismic source, in one embodiment, selecting a set of test seismic source vehicles from a plurality of seismic source vehicles to which a test shot belongs may include: selecting at least two source vehicles from a plurality of source vehicles to which the test shot belongs as a group of test source vehicles; the secondary arrangement includes: a two-level arrangement cross station CX2 and two large lines, each large line comprising 4 field digital acquisition units FDUs. In the embodiment, the two-level arrangement cross station CX2 is connected with two large wires through an optical cable; in the embodiment, two source vehicles are generally adopted as a production group during production, so that when the wired consistency test of the source is carried out, one production group, namely two source vehicles, can be selected as a group of test source vehicles for faster wired consistency test; in the specific implementation, more than two source vehicles can be connected and selected as a group of test source vehicles, and the two source vehicles are not used as limitations. The secondary arrangement comprises a secondary arrangement cross station CX2 and large lines Link, and each large line Link comprises 4 field digital acquisition units FDU; when two source vehicles are selected as a group of test source vehicles, the corresponding secondary arrangement also needs to comprise two large lines Link, and at the moment, the secondary arrangement comprises 8 field digital acquisition units FDU. In the implementation, the number of large lines Link included in the secondary arrangement is not limited to two, and is determined by the number of the selected group of test source vehicles, for example, if the selected test source vehicles include 3 large lines Link corresponding to the secondary arrangement are 3, and the number of field digital acquisition units FDU included in the secondary arrangement is 12; if the number of the selected test seismic source vehicles is 4, the number of large lines Link corresponding to the secondary arrangement is 4, the number of the field digital acquisition units FDU is 16, and so on.
In implementing the foregoing method for testing the wired consistency of the seismic sources, the foregoing method for creating the simulation auxiliary channel in the secondary arrangement may include, in one embodiment: setting the seismic channel gains of 8 field digital acquisition units FDU of two large lines as test seismic channel gains from production seismic channel gains; adding serial numbers of the 8 field digital acquisition units FDU to a defined simulation auxiliary channel list, and adding names corresponding to each auxiliary channel to an auxiliary channel list of a test processing type; two large wires are connected with a two-level arrangement cross station CX2 to complete the setting of an analog auxiliary channel. In the embodiment, when two seismic source vehicles are selected as a group of test seismic source vehicles, the two-level arrangement corresponding comprises two large lines Link,8 field digital acquisition units FDU, and 8 signals are acquired, so that when an analog auxiliary channel is established, the seismic channel gains of the 8 field digital acquisition units FDU are required to be modified, and the production seismic channel gains are set as test seismic channel gains for performing seismic source consistency test; adding serial numbers of the 8 field digital acquisition units FDU with the seismic channel gains to a defined analog auxiliary channel list, adding names corresponding to each auxiliary channel to an auxiliary channel list of a test processing type, and finally connecting the two large lines to a two-level arrangement cross station CX2 to complete the establishment of the analog auxiliary channel; the instrument host identifies the simulation auxiliary channels of the secondary arrangement through identifying the serial numbers of the field digital acquisition units FDU, so that the simulation auxiliary channels of the secondary arrangement are cut into the production arrangement, and the seismic source consistency test is carried out. Then, the set large line Link including 8 field digital acquisition units FDUs is connected to the two-level arrangement cross station CX2 to complete the establishment of the analog auxiliary channel.
To power the secondary array, when implementing the foregoing method for testing the wired consistency of the seismic sources, in one embodiment, the secondary array may further include: the storage battery is connected with the two-level arrangement cross station CX2 and supplies power for the two-level arrangement cross station CX2 and the two large lines Link. In the embodiment, the secondary arrangement comprises a secondary arrangement cross station CX2 and two large lines Link which are connected, and a storage battery is required to be connected for power supply when the secondary arrangement cross station CX2 works so as to maintain normal work when the seismic source wired consistency test is carried out. Because the secondary arrangement comprises a test mode and a data acquisition mode, the initial default working mode of the secondary arrangement is the test mode, namely, the working mode is the test mode when the secondary arrangement is disconnected and reconnected or restarted; if the working mode of the secondary arrangement is modified into the data acquisition mode by the instrument host, the secondary arrangement needs to be connected with the storage battery when the secondary arrangement is always in the data acquisition mode, namely, the secondary arrangement needs to be connected with the storage battery when only the source vehicle is tested and when the next production arrangement cross station CX1 is found.
When the channel gain of the field digital acquisition unit FDU is set from the production channel gain to the test channel gain, in one embodiment, the production channel gain is 12dB, and the test channel gain is 0dB. During normal production, the production seismic channel gain of the field digital acquisition unit FDU is 12dB, and during the seismic source consistency test, the amplitude of the wired test output signal of the electric control box DSD is larger, so that the signal is not clipped, and the seismic channel gain of the field digital acquisition unit FDU is set to be 0dB.
In implementing the method for testing the wired consistency of the seismic sources, the establishing the simulation auxiliary channel in the secondary arrangement may further include: a digital auxiliary track for recording a digital pilot signal pilot of the digital pilot signal generator DPG; adding serial numbers of the 8 field digital acquisition units FDU to a defined simulation auxiliary channel list, adding names corresponding to each auxiliary channel to a test processing type auxiliary channel list, setting the auxiliary channels as simulation auxiliary channels, and further comprising: the auxiliary channel list of the test processing type comprises 9 auxiliary channels A1-A9; adding a serial number of a digital auxiliary channel to an auxiliary channel A1, setting the serial number as the digital auxiliary channel, adding a name of the digital auxiliary channel to an auxiliary channel list of a test processing type, and recording a digital pilot signal pilot of a digital pilot signal generator DPG; and adding serial numbers of the 8 field digital acquisition units FDU to the auxiliary channels A2-A9, setting the auxiliary channels as analog auxiliary channels, correspondingly adding names of the 8 analog auxiliary channels to an auxiliary channel list of a test processing type, and acquiring seismic source consistency test data. In an embodiment, the foregoing digital auxiliary channel does not have a corresponding field digital acquisition unit FDU, is used for recording a digital pilot signal pilot of the digital pilot signal generator DPG, so in implementing the foregoing adding serial numbers of 8 field digital acquisition units FDU to a defined analog auxiliary channel list, and then adding a name corresponding to each auxiliary channel to a test processing type auxiliary channel list, setting the auxiliary channel as an analog auxiliary channel, and further may include: the auxiliary channel list of the test processing type comprises 9 auxiliary channels A1-A9, the serial number of the digital auxiliary channel is added to the auxiliary channel A1 of the test processing type and is set as the digital auxiliary channel, and the name of the digital auxiliary channel is added to the auxiliary channel list of the test processing type and is used for recording the digital pilot signal pilot of the digital pilot signal generator DPG; the test processing type is provided with 8 auxiliary channels A2-A9, serial numbers of the 8 field digital acquisition units FDU are added to the auxiliary channels A2-A9 and set as analog auxiliary channels, names of the 8 analog auxiliary channels are correspondingly added to an auxiliary channel list of the test processing type and used for acquiring seismic source consistency test data, and the 9 auxiliary channel lists of the test processing type can be filled up through the setting of the digital auxiliary channels and the analog auxiliary channels.
When the method for testing the wired consistency of the seismic sources is implemented, the method for testing the wired consistency of the seismic sources can set the secondary arrangement into a test mode when the production arrangement cross station CX1 exists in the test range of the set of test seismic source vehicles, and connect the production arrangement cross station CX1 with the set of test seismic source vehicles, and in an embodiment, the method can comprise the following steps: setting a two-level arrangement cross station CX2 as a test mode, connecting 4 field digital acquisition units FDU of a first large line Link with one of the set of test source vehicles, and connecting 4 field digital acquisition units FDU of a second large line Link with the other of the set of test source vehicles; the secondary alignment cross station CX2 is connected by an optical cable to produce the alignment cross station CX1. In the embodiment, a secondary arrangement cross station CX2 in a secondary arrangement is started, a default working mode is a test mode, 4 field digital acquisition units FDU included in a first large line Link are connected with one of the group of test source vehicles to acquire source consistency test data of the one source vehicle, 4 field digital acquisition units FDU included in a second large line are connected with the other of the group of test source vehicles to acquire source consistency test data of the other source vehicle, the secondary arrangement cross station CX2 is connected with a production arrangement cross station CX1, and the source consistency test data of the group of test source vehicles acquired by 8 field digital acquisition units FDU included in the two large lines Link are transmitted to an instrument host through the production arrangement cross station CX1; in the embodiment, the secondary alignment cross station CX2 may be used to produce the alignment cross station CX1 by optical cable connection, but is not limited thereto, and other connection methods may be used.
When the method for testing the wired consistency of the seismic source is implemented, the method for testing the wired consistency of the seismic source can set the secondary arrangement into a data acquisition mode when the production arrangement cross station CX1 is not in the test range of the set of test seismic source vehicles, and connect the set of test seismic source vehicles, and in an embodiment, the method may include: the two-level arrangement cross station CX2 is set as a test mode, 4 field digital acquisition units FDU of a first large line Link are connected with one of the set of test source vehicles, and 4 field digital acquisition units FDU of a second large line Link are connected with the other of the set of test source vehicles. In the embodiment, the second-level arrangement cross station CX2 in the second-level arrangement is turned on, and the second-level arrangement is set to the data acquisition mode by using the foregoing setting method: connecting the secondary arrangement with an instrument host, detecting the accessed secondary arrangement by the instrument host, establishing a connection relation, identifying an initial working mode of the secondary arrangement as a test mode, displaying device identifiers of the secondary arrangement on the instrument host after establishing the connection relation, selecting the device identifiers of the secondary arrangement, clicking GO beside an acquisition, and completing the conversion from the test mode to a data acquisition mode. Connecting the storage batteries with a secondary arrangement, keeping the secondary arrangement in a data acquisition mode, connecting 4 field digital acquisition units FDU included in a first large line Link with one of the group of test source vehicles, acquiring source consistency test data of the one source vehicle, connecting 4 field digital acquisition units FDU included in a second large line Link with the other of the group of test source vehicles, acquiring source consistency test data of the other source vehicle, storing the acquired source consistency test data of the group of test source vehicles by a secondary arrangement cross station CX2, searching for the next production arrangement cross station CX1, connecting the secondary arrangement with the production arrangement cross station CX1, and transmitting the stored consistency test data of the group of test source vehicles to an instrument host through the connected production arrangement cross station CX1.
After the foregoing secondary arrangement transmits the source consistency test data to the instrument host via the production arrangement cross station CX1, in an embodiment, the method may further include: and the instrument host receives the focus consistency test data of the test focus vehicle, generates a test file and performs quality analysis. In the embodiment, the instrument host receives the seismic source consistency test data through the connected production arrangement cross station CX1, generates a test file, adds a file number and a corresponding seismic source number, performs quality analysis and completes the report.
In summary, the method for testing the wired consistency of the seismic source provided by the embodiment of the invention solves the problem that the normal production of the seismic source vehicle is required to be stopped for testing the wired consistency in the prior art by establishing the simulation auxiliary channel, so that the normal production of the seismic source vehicle and the wired consistency test of the seismic source can be synchronously performed, the effective production time is improved, the investment of personnel and equipment is reduced, and the efficient and safe operation of the efficient large-channel number acquisition item is realized. Simultaneously has the following advantages: 1) The normal production of the seismic source vehicle does not need to be completely stopped, and only the seismic source vehicle to be tested needs to be stopped and set, so that the synchronous performance of efficient acquisition and seismic source test is realized; 2) The focus vehicles do not need long-distance aggregation for centralized test, and only need to connect the secondary arrangement with the focus vehicles needing test, so that the driving risk and the damage to production arrangement cross stations in the driving process are reduced; 3) The original production arrangement is not required to be disconnected when the auxiliary simulation channel is cut in, the connection of the secondary arrangement is flexible, and the test can be performed at any time and any place; 4) The method is simple and easy to operate through actual production inspection, and the original production arrangement and the arrangement of the seismic source vehicles are not changed, so that errors are not easy to occur, and the once-through rate is high.
It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flowchart illustrations and/or block diagrams, and combinations of flows and/or blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
The foregoing description of the embodiments has been provided for the purpose of illustrating the general principles of the invention, and is not meant to limit the scope of the invention, but to limit the invention to the particular embodiments, and any modifications, equivalents, improvements, etc. that fall within the spirit and principles of the invention are intended to be included within the scope of the invention.
Claims (8)
1. A method for testing wired consistency of a seismic source, comprising:
establishing a simulation auxiliary channel in the secondary arrangement;
modifying the test shot point processing type from the production processing type to the test processing type;
selecting a group of test focus vehicles from a plurality of focus vehicles to which the test shot belongs;
when a production arrangement cross station CX1 exists in the test range of the group of test source vehicles, setting the secondary arrangement as a test mode, and connecting the production arrangement cross station CX1 with the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the secondary arrangement collects the focus consistency test data of the group of test focus vehicles through the simulation auxiliary channel, and transmits the focus consistency test data to the instrument host through the production arrangement cross station CX1;
when the production arrangement cross station CX1 is not in the test range of the group of test source vehicles, setting the secondary arrangement as a data acquisition mode, and connecting the group of test source vehicles; associating the test shots to the set of test source vehicles and associating the set of test sources Che Qizhen; the second-level arrangement acquires the focus consistency test data of the group of test focus vehicles through the simulation auxiliary channel, searches for the next production arrangement cross station CX1 and is connected, and transmits the focus consistency test data of the group of test focus vehicles to the instrument host through the connected production arrangement cross station CX1;
selecting a set of test source vehicles from a plurality of source vehicles to which the test shot belongs, comprising: selecting at least two source vehicles from a plurality of source vehicles to which the test shot belongs as a group of test source vehicles;
the secondary arrangement includes: a two-level arrangement cross station CX2 and two large lines, wherein each large line comprises 4 field digital acquisition units FDU;
establishing a simulation auxiliary channel in the secondary arrangement comprises:
setting the seismic channel gains of 8 field digital acquisition units FDU of two large lines as test seismic channel gains from production seismic channel gains;
adding serial numbers of the 8 field digital acquisition units FDU to a defined simulation auxiliary channel list, and adding names corresponding to each auxiliary channel to an auxiliary channel list of a test processing type;
two large wires are connected to a two-level arrangement cross station CX2.
2. The method of claim 1, wherein,
the secondary arrangement further comprises: the storage battery is connected with the two-level arrangement cross station CX2 and supplies power for the two-level arrangement cross station CX2 and the two large lines Link.
3. The method of claim 1, wherein,
the production trace gain was 12dB and the test trace gain was 0dB.
4. The method of testing the wired consistency of the seismic source of claim 1, further comprising a digital auxiliary channel for recording a digital pilot signal of the digital pilot signal generator DPG;
adding serial numbers of the 8 field digital acquisition units FDU to a defined analog auxiliary channel list, adding names corresponding to each auxiliary channel to an auxiliary channel list of a test processing type, and further comprising:
the auxiliary channel list of the test processing type comprises 9 auxiliary channels A1-A9;
adding a serial number of a digital auxiliary channel to an auxiliary channel A1, setting the serial number as the digital auxiliary channel, adding a name of the digital auxiliary channel to an auxiliary channel list of a test processing type, and recording a digital pilot signal of a digital pilot signal generator DPG;
and adding serial numbers of the 8 field digital acquisition units FDU to the auxiliary channels A2-A9, setting the auxiliary channels as analog auxiliary channels, correspondingly adding names of the 8 analog auxiliary channels to an auxiliary channel list of a test processing type, and acquiring seismic source consistency test data.
5. The method of testing the wired consistency of the seismic sources of claim 1, wherein when there is a production spread intersection CX1 within the test range of the set of test seismic source vehicles, setting the secondary spread to a test mode, connecting the production spread intersection CX1 and the set of test seismic source vehicles, comprising:
setting a two-level arrangement cross station CX2 as a test mode, connecting 4 field digital acquisition units FDU of a first large line Link with one of the set of test source vehicles, and connecting 4 field digital acquisition units FDU of a second large line Link with the other of the set of test source vehicles;
the second order alignment cross station CX2 is connected to the production alignment cross station CX1.
6. The method of testing the wired consistency of the seismic sources of claim 1, wherein setting the secondary array to a data acquisition mode when there is no production array cross station CX1 within the test range of the set of test source vehicles, connecting the set of test source vehicles, comprises:
the two-level arrangement cross station CX2 is set as a test mode, 4 field digital acquisition units FDU of a first large line Link are connected with one of the set of test source vehicles, and 4 field digital acquisition units FDU of a second large line Link are connected with the other of the set of test source vehicles.
7. The method of claim 1, wherein,
test process types include a consistency process type and a pulse process type.
8. The method of source wired consistency testing as recited in claim 1, further comprising:
and the instrument host receives the focus consistency test data of the test focus vehicle, generates a test file and performs quality analysis.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910594724.6A CN112180469B (en) | 2019-07-03 | 2019-07-03 | Method for testing wired consistency of seismic source |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910594724.6A CN112180469B (en) | 2019-07-03 | 2019-07-03 | Method for testing wired consistency of seismic source |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112180469A CN112180469A (en) | 2021-01-05 |
CN112180469B true CN112180469B (en) | 2023-10-27 |
Family
ID=73915012
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910594724.6A Active CN112180469B (en) | 2019-07-03 | 2019-07-03 | Method for testing wired consistency of seismic source |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112180469B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4639901A (en) * | 1982-12-29 | 1987-01-27 | Standard Oil Company | Method for testing cableless seismic digital field recorders |
CN102798889A (en) * | 2012-04-26 | 2012-11-28 | 吉林大学 | Phased source consistency determining method |
CN104536046A (en) * | 2014-12-26 | 2015-04-22 | 吉林大学 | Focus excitation signal consistency evaluating method based on earthquake records |
CN204302505U (en) * | 2014-11-19 | 2015-04-29 | 北京霍里思特科技有限公司 | Distributed seismic data acquisition system |
CN106054280A (en) * | 2016-05-06 | 2016-10-26 | 广州海洋地质调查局 | Ocean bottom seismograph (OBS) performance and technical index test method based on QT program |
CN106094024A (en) * | 2016-06-21 | 2016-11-09 | 中国石油天然气集团公司 | A kind of controlled source slip scan data acquisition treatment method and device |
CN107831556A (en) * | 2017-12-07 | 2018-03-23 | 合肥国为电子有限公司 | A kind of method for testing wave detector uniformity |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8050867B2 (en) * | 2006-05-03 | 2011-11-01 | Exxonmobil Upstream Research Co. | Data adaptive vibratory source acquisition method |
-
2019
- 2019-07-03 CN CN201910594724.6A patent/CN112180469B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4639901A (en) * | 1982-12-29 | 1987-01-27 | Standard Oil Company | Method for testing cableless seismic digital field recorders |
CN102798889A (en) * | 2012-04-26 | 2012-11-28 | 吉林大学 | Phased source consistency determining method |
CN204302505U (en) * | 2014-11-19 | 2015-04-29 | 北京霍里思特科技有限公司 | Distributed seismic data acquisition system |
CN104536046A (en) * | 2014-12-26 | 2015-04-22 | 吉林大学 | Focus excitation signal consistency evaluating method based on earthquake records |
CN106054280A (en) * | 2016-05-06 | 2016-10-26 | 广州海洋地质调查局 | Ocean bottom seismograph (OBS) performance and technical index test method based on QT program |
CN106094024A (en) * | 2016-06-21 | 2016-11-09 | 中国石油天然气集团公司 | A kind of controlled source slip scan data acquisition treatment method and device |
CN107831556A (en) * | 2017-12-07 | 2018-03-23 | 合肥国为电子有限公司 | A kind of method for testing wave detector uniformity |
Non-Patent Citations (4)
Title |
---|
周德茂等.G3i仪器同步激发系统的改进与完善.物探装备.2015,第95-99页. * |
周晓攀等.508XT仪器在生产施工中的应用.物探装备.2017,第88-92页. * |
张贝贝等.508XT仪器与DSS系统在高效地震采集中的应用.物探装备.2017,第356-359页. * |
杨艳平等.一种震源有线一致性同步测试技术在高效采集生产中的应用.物探装备.2018,第179-182页. * |
Also Published As
Publication number | Publication date |
---|---|
CN112180469A (en) | 2021-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103914353B (en) | Combined Trials method in conjunction with software reliability test with hardware reliability test | |
CN108255649B (en) | Diagnosis strategy design method based on modeling simulation cooperative analysis | |
CN102354209B (en) | Test device and method for train control system | |
CN104794057B (en) | A kind of crossing event automated testing method and device | |
CN111784207A (en) | Open type radar health management system | |
CN112532299B (en) | Satellite test automatic execution system based on module splicing | |
CN104614601A (en) | Terminal fault positioning method, device and system | |
CN104850111B (en) | A kind of hardware-in―the-loop test method and system | |
CN109298702A (en) | ECU automatic test approach and system | |
CN106815147B (en) | A kind of test script generation method and device | |
CN106841878A (en) | A kind of photovoltaic inverter test system and method | |
CN106294121B (en) | The embedded real-time diagnosis reasoning algorithm test method of aircraft | |
CN105365579B (en) | A kind of dynamical system and its safety detecting method and device and electric automobile | |
CN113433921A (en) | Method and device for testing real vehicle function and control equipment | |
CN108508477B (en) | Seismic data acquisition system and method | |
CN113580983A (en) | Remote management method and system for operation and maintenance of charging pile | |
CN112180469B (en) | Method for testing wired consistency of seismic source | |
CN116227395A (en) | Simulation test method and device for digital chip and electronic equipment | |
CN111475358A (en) | Automatic testing method and device for controller interface | |
CN107943692A (en) | The automatic test approach and device that a kind of batch original table passes down | |
CN103196691B (en) | Method for establishing relevance fault testing matrix based on main diagonal element domination fuzzy relation matrix | |
CN105183766A (en) | Method and system for eliminating historical route redundant points of maps | |
CN111983989B (en) | Offline detection method and control equipment | |
CN110570646A (en) | A four-remote signal acceptance method and system based on historical data | |
CN205263224U (en) | A automatic test platform for TWC single -deck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |