[go: up one dir, main page]

CN112123749A - A B port control device for eliminating wrinkles in the pipe - Google Patents

A B port control device for eliminating wrinkles in the pipe Download PDF

Info

Publication number
CN112123749A
CN112123749A CN202011055536.5A CN202011055536A CN112123749A CN 112123749 A CN112123749 A CN 112123749A CN 202011055536 A CN202011055536 A CN 202011055536A CN 112123749 A CN112123749 A CN 112123749A
Authority
CN
China
Prior art keywords
liner
pipeline
pipe
shaped pipeline
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011055536.5A
Other languages
Chinese (zh)
Inventor
陈毅斌
朱志英
赵伟
王清顺
廖宝成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Anyue Trenchless Engineering Technology Co ltd
Original Assignee
Xiamen Anyue Trenchless Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Anyue Trenchless Engineering Technology Co ltd filed Critical Xiamen Anyue Trenchless Engineering Technology Co ltd
Priority to CN202011055536.5A priority Critical patent/CN112123749A/en
Publication of CN112123749A publication Critical patent/CN112123749A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C63/00Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
    • B29C63/26Lining or sheathing of internal surfaces
    • B29C63/34Lining or sheathing of internal surfaces using tubular layers or sheathings
    • B29C63/343Lining or sheathing of internal surfaces using tubular layers or sheathings the tubular sheathing having a deformed non-circular cross-section prior to introduction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C53/00Shaping by bending, folding, twisting, straightening or flattening; Apparatus therefor
    • B29C53/16Straightening or flattening
    • B29C53/20Straightening or flattening of tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

本公开实施例中提供了一种消除管内皱褶的B口控制装置,属于热塑成型管道修复技术领域,具体包括L型管路,所述L型管路的一端部设置有90°球阀,所述L型管路的另一端连接有消音器,所述L型管路上靠近所述90°球阀的侧面设置进气口,所述进气口通过导管与塞入待修复衬管端部的汽塞相连。通过本公开的处理方案,能够实现在快速憋压放压循环操作的同时,保证衬管内部的压力不超过设定值,从而实现安全排出管道内部积水,消除衬管褶皱。

Figure 202011055536

An embodiment of the present disclosure provides a B port control device for eliminating wrinkles in a pipe, which belongs to the technical field of thermoplastic molding pipe repair, and specifically includes an L-shaped pipeline, one end of the L-shaped pipeline is provided with a 90° ball valve, The other end of the L-shaped pipeline is connected with a muffler, and an air inlet is provided on the L-shaped pipeline near the side of the 90° ball valve. Steam plugs are connected. Through the treatment scheme of the present disclosure, the pressure inside the liner can be ensured that the pressure inside the liner does not exceed the set value while the cyclic operation of quickly holding and releasing the pressure can be achieved, so as to safely discharge the accumulated water inside the pipeline and eliminate the wrinkles of the liner.

Figure 202011055536

Description

一种消除管内皱褶的B口控制装置A B port control device for eliminating wrinkles in the pipe

技术领域technical field

本公开涉及热塑成型管道修复技术领域,尤其涉及一种消除管内皱褶的B口控制装置。The present disclosure relates to the technical field of repairing thermoplastic forming pipes, in particular to a B port control device for eliminating wrinkles in the pipe.

背景技术Background technique

FIPP原位热塑成型管道修复技术是将工厂预制的工字型或C字型断面的衬管在施工现场加热软化,牵引置入原有管道内部,通过加热加压方式使其紧贴于原有管道内壁,然后冷却形成具有结构强度的内衬管,实现老化管道的修复。在管道修复过程中小管径衬管可能出现因管道内部积水导致衬管出现皱褶的情况。The FIPP in-situ thermoplastic pipe repair technology is to heat and soften the factory-prefabricated I-shaped or C-shaped liner at the construction site, drag it into the original pipe, and make it close to the original pipe by heating and pressurizing. There is an inner wall of the pipe, and then it is cooled to form a lined pipe with structural strength to achieve the repair of aging pipes. During the pipeline repair process, the small diameter liner may be wrinkled due to the accumulation of water inside the pipeline.

衬管皱褶可以通过衬管快速憋压放压循环多次,挤走管道内部积水,从而消除衬管修复过程中产生的褶皱。现有的热塑成型管道修复B口控制装置对衬管进行快速憋压时,无法快速准确控制衬管内部压力,当压力超过一定值时,衬管会被涨破。Liner wrinkles can be quickly pressed and released through the liner for several times to squeeze out the accumulated water inside the pipeline, thereby eliminating the wrinkles generated during the repair process of the liner. When the existing B port control device for repairing a thermoplastic formed pipe rapidly pressurizes the liner, it cannot quickly and accurately control the internal pressure of the liner. When the pressure exceeds a certain value, the liner will be swelled and broken.

发明内容SUMMARY OF THE INVENTION

有鉴于此,本公开实施例提供一种消除管内皱褶的B口控制装置,能够实现在快速憋压放压循环操作的同时,保证衬管内部的压力不超过设定值,从而实现安全排出管道内部积水,消除衬管褶皱。In view of this, the embodiment of the present disclosure provides a B port control device for eliminating wrinkles in the pipe, which can realize the rapid pressure holding and pressure releasing cycle operation while ensuring that the pressure inside the liner does not exceed the set value, thereby realizing safe discharge Water builds up inside the pipe, eliminating liner folds.

一种消除管内皱褶的B口控制装置,包括L型管路,所述L型管路的一端部设置有90°球阀,所述L型管路的另一端连接有消音器,所述L型管路上靠近所述90°球阀的侧面设置进气口,所述进气口通过导管与塞入待修复衬管端部的汽塞相连。A B port control device for eliminating wrinkles in a pipe, comprising an L-shaped pipeline, one end of the L-shaped pipeline is provided with a 90° ball valve, the other end of the L-shaped pipeline is connected with a silencer, the L-shaped pipeline is An air inlet is arranged on the side of the 90° ball valve near the 90° ball valve, and the air inlet is connected to a steam plug inserted into the end of the liner to be repaired through a conduit.

进一步地,所述L型管路上靠近所述消音器位置连接有阀门。Further, a valve is connected to the L-shaped pipeline near the muffler.

进一步地,所述L型管路上靠近所述阀门位置设置有温度表,用于监测反复循环加压放压过程中L型管路内温度。Further, a temperature gauge is provided on the L-shaped pipeline near the valve position, which is used to monitor the temperature in the L-shaped pipeline during the repeated cycle of pressurizing and releasing.

进一步地,所述L型管路上靠近所述温度表位置设置有压力表,用于监测反复循环加压放压过程中L型管路内的压力。Further, a pressure gauge is provided on the L-shaped pipeline near the temperature gauge for monitoring the pressure in the L-shaped pipeline during the repeated cycle of pressurization and depressurization.

进一步地,所述进气口采用快速接头结构。Further, the air inlet adopts a quick joint structure.

附图说明Description of drawings

为了更清楚地说明本公开实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本公开的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。In order to explain the technical solutions of the embodiments of the present disclosure more clearly, the following briefly introduces the accompanying drawings that need to be used in the embodiments. Obviously, the accompanying drawings in the following description are only some embodiments of the present disclosure. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.

图1为本发明一种消除管内皱褶的B口控制装置的结构主视示意图;1 is a schematic front view of the structure of a B port control device for eliminating wrinkles in a pipe of the present invention;

图2为本发明一种消除管内皱褶的B口控制装置的结构右视示意图。Fig. 2 is a schematic right side view of the structure of a B port control device for eliminating wrinkles in the pipe according to the present invention.

有益效果beneficial effect

本发明运用于FIPP热塑成型管道修复工程,进气口通过导管与特制汽塞相连。热塑成型修复的衬管预热拖入待修管道后,衬管A、B端塞入特制汽塞。根据具体使用情况,FIPP衬管预热后,通过调节阀门对衬管进行保温、保压。此时FIPP衬管会膨胀,FIPP衬管与待修复管道会紧密贴合在一起。因管道内部积水,FIPP衬管会出现皱褶情况,这时就可以通过90°球阀开始对FIPP衬管内部进行放压、加压,反复循环可排除管道内部积水,消除FIPP衬管皱褶。本发明能够实现在快速憋压放压循环操作的同时,保证衬管内部的压力不超过设定值,从而实现安全排出管道内部积水,消除衬管褶皱。The invention is applied to the repairing project of FIPP thermoplastic forming pipeline, and the air inlet is connected with the special steam plug through the duct. After the liner repaired by thermoplastic molding is preheated and dragged into the pipeline to be repaired, the A and B ends of the liner are inserted into special steam plugs. According to the specific usage, after the FIPP liner is preheated, the liner is kept warm and pressure maintained by adjusting the valve. At this time, the FIPP liner will expand, and the FIPP liner and the pipeline to be repaired will closely fit together. Due to the accumulation of water inside the pipeline, the FIPP liner will be wrinkled. At this time, you can start to release and pressurize the inside of the FIPP liner through the 90° ball valve. Repeated circulation can remove the accumulated water in the pipeline and eliminate the wrinkles of the FIPP liner. pleated. The invention can realize the rapid pressure holding and releasing cycle operation while ensuring that the pressure inside the liner does not exceed the set value, thereby realizing the safe discharge of accumulated water in the pipeline and eliminating the wrinkles of the liner.

具体实施方式Detailed ways

下面结合附图1和附图2对本公开实施例进行详细描述。The embodiments of the present disclosure will be described in detail below with reference to FIG. 1 and FIG. 2 .

以下通过特定的具体实例说明本公开的实施方式,本领域技术人员可由本说明书所揭露的内容轻易地了解本公开的其他优点与功效。显然,所描述的实施例仅仅是本公开一部分实施例,而不是全部的实施例。本公开还可以通过另外不同的具体实施方式加以实施或应用,本说明书中的各项细节也可以基于不同观点与应用,在没有背离本公开的精神下进行各种修饰或改变。需说明的是,在不冲突的情况下,以下实施例及实施例中的特征可以相互组合。基于本公开中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本公开保护的范围。The embodiments of the present disclosure are described below through specific specific examples, and those skilled in the art can easily understand other advantages and effects of the present disclosure from the contents disclosed in this specification. Obviously, the described embodiments are only some, but not all, embodiments of the present disclosure. The present disclosure can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present disclosure. It should be noted that the following embodiments and features in the embodiments may be combined with each other under the condition of no conflict. Based on the embodiments in the present disclosure, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present disclosure.

要说明的是,下文描述在所附权利要求书的范围内的实施例的各种方面。应显而易见,本文中所描述的方面可体现于广泛多种形式中,且本文中所描述的任何特定结构及/或功能仅为说明性的。基于本公开,所属领域的技术人员应了解,本文中所描述的一个方面可与任何其它方面独立地实施,且可以各种方式组合这些方面中的两者或两者以上。举例来说,可使用本文中所阐述的任何数目个方面来实施设备及/或实践方法。另外,可使用除了本文中所阐述的方面中的一或多者之外的其它结构及/或功能性实施此设备及/或实践此方法。To illustrate, various aspects of embodiments within the scope of the appended claims are described below. It should be apparent that the aspects described herein may be embodied in a wide variety of forms and that any specific structure and/or function described herein is illustrative only. Based on this disclosure, those skilled in the art should appreciate that an aspect described herein may be implemented independently of any other aspects and that two or more of these aspects may be combined in various ways. For example, an apparatus may be implemented and/or a method may be practiced using any number of the aspects set forth herein. Additionally, such an apparatus may be implemented and/or such a method may be practiced using other structure and/or functionality in addition to one or more of the aspects set forth herein.

还需要说明的是,以下实施例中所提供的图示仅以示意方式说明本公开的基本构想,图式中仅显示与本公开中有关的组件而非按照实际实施时的组件数目、形状及尺寸绘制,其实际实施时各组件的型态、数量及比例可为一种随意的改变,且其组件布局型态也可能更为复杂。It should also be noted that the drawings provided in the following embodiments are only illustrative of the basic concept of the present disclosure, and the drawings only show the components related to the present disclosure rather than the number, shape and the number of components in actual implementation. For dimension drawing, the type, quantity and proportion of each component can be changed at will in actual implementation, and the component layout may also be more complicated.

另外,在以下描述中,提供具体细节是为了便于透彻理解实例。然而,所属领域的技术人员将理解,可在没有这些特定细节的情况下实践所述方面。Additionally, in the following description, specific details are provided to facilitate a thorough understanding of the examples. However, one skilled in the art will understand that the described aspects may be practiced without these specific details.

参阅附图1和附图2,本公开实施例提供一种消除管内皱褶的B口控制装置,包括L型管路1,所述L型管路1的一端部设置有90°球阀2,所述L型管路1的另一端连接有消音器3,所述L型管路1上靠近所述90°球阀2的侧面设置进气口4,所述进气口4通过导管与塞入待修复衬管端部的汽塞相连。Referring to FIG. 1 and FIG. 2, an embodiment of the present disclosure provides a B port control device for eliminating wrinkles in a pipe, including an L-shaped pipeline 1, and one end of the L-shaped pipeline 1 is provided with a 90° ball valve 2, The other end of the L-shaped pipeline 1 is connected with a muffler 3, and an air inlet 4 is arranged on the side of the L-shaped pipeline 1 close to the 90° ball valve 2, and the air inlet 4 is inserted into the pipe through a pipe. The steam plug at the end of the liner to be repaired is connected.

该实施例中,阀门在打开放气后会产生一定分贝的噪音,出气口通过增加消音器可以过滤掉大部分噪音,降低施工过程中噪音对环境的影响。In this embodiment, after the valve is opened and vented, a certain decibel noise will be generated, and most of the noise can be filtered out by adding a muffler at the air outlet, thereby reducing the impact of noise on the environment during construction.

根据本发明的一个实施例,如图1所示,所述L型管路1上靠近所述消音器3位置连接有阀门5。According to an embodiment of the present invention, as shown in FIG. 1 , a valve 5 is connected to the L-shaped pipeline 1 near the muffler 3 .

根据本发明的一个实施例,如图1所示,所述L型管路1上靠近所述阀门5位置设置有温度表6,用于监测反复循环加压放压过程中L型管路1内温度。According to an embodiment of the present invention, as shown in FIG. 1 , a temperature gauge 6 is provided on the L-shaped pipeline 1 near the valve 5 for monitoring the L-shaped pipeline 1 during the repeated cycle of pressurization and depressurization. internal temperature.

根据本发明的一个实施例,如图1所示,所述L型管路1上靠近所述温度表6位置设置有压力表7,用于监测反复循环加压放压过程中L型管路1内的压力。According to an embodiment of the present invention, as shown in FIG. 1 , a pressure gauge 7 is provided on the L-shaped pipeline 1 near the temperature gauge 6 for monitoring the L-shaped pipeline during the repeated cycle of pressurization and depressurization. 1 pressure.

根据本发明的一个实施例,如图1所示,所述进气口4采用快速接头结构,这样能够快速实现进气口与特质汽塞之间的连接,提高工作效率。According to an embodiment of the present invention, as shown in FIG. 1 , the air inlet 4 adopts a quick joint structure, which can quickly realize the connection between the air inlet and the special steam plug and improve the working efficiency.

本发明的工作原理:本发明运用于FIPP热塑成型管道修复工程,进气口通过导管与特制汽塞相连。热塑成型修复的衬管预热拖入待修管道后,衬管A、B端塞入特制汽塞。根据具体使用情况,FIPP衬管预热后,通过调节阀门对衬管进行保温、保压。此时FIPP衬管会膨胀,FIPP衬管与待修复管道会紧密贴合在一起。因管道内部积水,FIPP衬管会出现皱褶情况,这时就可以通过90°球阀开始对FIPP衬管内部进行放压、加压,反复循环可排除管道内部积水,消除FIPP衬管皱褶。The working principle of the present invention: the present invention is applied to the repairing project of FIPP thermoplastic molding pipeline, and the air inlet is connected with the special steam plug through the conduit. After the liner repaired by thermoplastic molding is preheated and dragged into the pipeline to be repaired, the A and B ends of the liner are inserted into special steam plugs. According to the specific usage, after the FIPP liner is preheated, the liner is kept warm and pressure maintained by adjusting the valve. At this time, the FIPP liner will expand, and the FIPP liner and the pipeline to be repaired will closely fit together. Due to the accumulation of water in the pipeline, the FIPP liner will be wrinkled. At this time, you can start to release and pressurize the inside of the FIPP liner through the 90° ball valve. Repeated circulation can remove the accumulated water in the pipeline and eliminate the wrinkles of the FIPP liner. pleated.

以上所述,仅为本公开的具体实施方式,但本公开的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本公开揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本公开的保护范围之内。因此,本公开的保护范围应以权利要求的保护范围为准。The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited to this. Any person skilled in the art who is familiar with the technical scope of the present disclosure can easily think of changes or substitutions. All should be included within the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be subject to the protection scope of the claims.

Claims (5)

1. The utility model provides a eliminate B mouth controlling means of intraductal fold, its characterized in that includes L type pipeline, an end of L type pipeline is provided with 90 ball valves, the other end of L type pipeline is connected with the muffler, the L type pipeline is close to the side of 90 ball valves sets up the air inlet, the air inlet links to each other with the vapour plug of plugging in the bushing pipe tip of waiting to restore through the pipe.
2. The port B device of claim 1, wherein a valve is connected to the L-shaped conduit near the muffler.
3. The port B control device for removing wrinkles in a pipe as claimed in claim 2, wherein a thermometer is disposed on the L-shaped pipeline near the valve for monitoring the temperature in the L-shaped pipeline during the pressure increasing and releasing process of the repeated circulation.
4. The port B control device for removing wrinkles in a pipe as claimed in claim 3, wherein a pressure gauge is provided on the L-shaped pipeline near the thermometer for monitoring the pressure in the L-shaped pipeline during the pressure increasing and releasing process of the repeated circulation.
5. The device as claimed in any one of claims 1 to 4, wherein the air inlet is of a quick-coupling structure.
CN202011055536.5A 2020-09-29 2020-09-29 A B port control device for eliminating wrinkles in the pipe Pending CN112123749A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011055536.5A CN112123749A (en) 2020-09-29 2020-09-29 A B port control device for eliminating wrinkles in the pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011055536.5A CN112123749A (en) 2020-09-29 2020-09-29 A B port control device for eliminating wrinkles in the pipe

Publications (1)

Publication Number Publication Date
CN112123749A true CN112123749A (en) 2020-12-25

Family

ID=73843220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011055536.5A Pending CN112123749A (en) 2020-09-29 2020-09-29 A B port control device for eliminating wrinkles in the pipe

Country Status (1)

Country Link
CN (1) CN112123749A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4986951A (en) * 1987-07-27 1991-01-22 Pipe Liners, Inc. Pipe liner process
CN109162698A (en) * 2018-10-22 2019-01-08 当雄县羊易地热电站有限公司 Novel James's Boucherie process logging equipment and test method
CN208841657U (en) * 2018-08-22 2019-05-10 河南中拓石油工程技术股份有限公司 A kind of pipeline CIPP liner vapor solidification control device
CN213441167U (en) * 2020-09-29 2021-06-15 厦门安越非开挖工程技术股份有限公司 B port control device for eliminating wrinkles in pipe

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4986951A (en) * 1987-07-27 1991-01-22 Pipe Liners, Inc. Pipe liner process
US4986951B1 (en) * 1987-07-27 1997-10-21 Pipe Liners Inc Pipe liner process
CN208841657U (en) * 2018-08-22 2019-05-10 河南中拓石油工程技术股份有限公司 A kind of pipeline CIPP liner vapor solidification control device
CN109162698A (en) * 2018-10-22 2019-01-08 当雄县羊易地热电站有限公司 Novel James's Boucherie process logging equipment and test method
CN213441167U (en) * 2020-09-29 2021-06-15 厦门安越非开挖工程技术股份有限公司 B port control device for eliminating wrinkles in pipe

Similar Documents

Publication Publication Date Title
CN104005820A (en) Hydraulic pipeline urea evacuation method for vapour-pressure type urea measurement injection system
CN112123749A (en) A B port control device for eliminating wrinkles in the pipe
CN103983299B (en) A kind of simulation system for boiler superheater oxide skin irrigation tests
CN213441167U (en) B port control device for eliminating wrinkles in pipe
CN206951209U (en) Sieve purification system
CN215075438U (en) An energy-saving system for a drum dryer
CN205535072U (en) 2 platform coke oven steam is incorporated into power networks and sweeps single main steam pipeline and target practice test system
CN111289369A (en) Pipe expansion and pressure-resistant sealing detection device of surface cooler
CN204984370U (en) Automatic high -tension bushing gas recovery unit is prevented blockking up in decompression
CN201401955Y (en) A temperature detection and protection structure of the buffer water tank of a quick water boiler
CN104566413B (en) A kind of method of fast selecting boiler blow piping parameter
CN202485976U (en) Gas feeding and exhausting device for thermal state test device of pressure vessel
CN106729793A (en) A kind of prefilled syringe sterilizing cabinet
CN203848861U (en) Simulation device used for boiler superheater oxide skin flushing testing
CN201951625U (en) Motorcycle and exhaust heating device thereof
CN207609993U (en) Medium supply device for oil and gas pipeline safety detection simulation system
CN204471691U (en) A kind of steam vulcanizing pipeline without boiler
CN206229163U (en) Blasting regeneration formula drying machine
KR101302000B1 (en) Dehumidifying agent recycling apparatus and method of absorption type dryer using compression heat
CN205908903U (en) Take screw ferrule in pressure release hole
CN216522975U (en) System for get rid of moisture in steel bottle
CN218095878U (en) A connection device between coal-fired boiler steam and gas-fired waste heat boiler
CN109210920A (en) A kind of pneumatics constant-temperature heating system
CN208052377U (en) A kind of mold temperature control device
CN207342407U (en) Suppressing dust with dry mist nozzle anti-blocking plug device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination