[go: up one dir, main page]

CN112031497A - Vertical central tube corridor parking system - Google Patents

Vertical central tube corridor parking system Download PDF

Info

Publication number
CN112031497A
CN112031497A CN202010974794.7A CN202010974794A CN112031497A CN 112031497 A CN112031497 A CN 112031497A CN 202010974794 A CN202010974794 A CN 202010974794A CN 112031497 A CN112031497 A CN 112031497A
Authority
CN
China
Prior art keywords
sub
pipe gallery
parking
area
parking area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010974794.7A
Other languages
Chinese (zh)
Inventor
司徒贺聪
孙建平
罗秉汉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010974794.7A priority Critical patent/CN112031497A/en
Publication of CN112031497A publication Critical patent/CN112031497A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • E04H6/10Garages for many vehicles without mechanical means for shifting or lifting vehicles, e.g. with helically-arranged fixed ramps, with movable ramps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/08Vertical ducts; Channels, e.g. for drainage for receiving utility lines, e.g. cables, pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ventilation (AREA)

Abstract

The invention relates to a vertical type centralized pipe gallery parking system, which comprises a garage body; a pipe gallery area and a parking area are arranged on the ground of the garage body; the pipe gallery area is connected with the parking area; a vertical type centralized pipe gallery is arranged on the pipe gallery area; an exhaust pipe is arranged in the vertical type centralized pipe gallery. Under the condition of similar building areas, the storey height of the parking garage is greatly reduced, the occupied space (namely the volume) of the whole parking system is obviously reduced, the earthwork excavation, the foundation pit supporting and the precipitation drainage are reduced, and the loads of a bottom plate and a side wall of the basement are reduced, so that the effects of reducing the engineering quantity, the total manufacturing cost, energy conservation and emission reduction are achieved. Most pipelines in the garage body are laid in the vertical type centralized pipe gallery, so that the garage space is simple and attractive.

Description

一种立式集中管廊停车系统A vertical centralized pipe gallery parking system

技术领域technical field

本发明涉及汽车停车技术领域,更具体地说,它涉及一种立式集中管廊停车系统。The invention relates to the technical field of automobile parking, and more particularly, to a vertical centralized pipe gallery parking system.

背景技术Background technique

由于生活水平的提高,汽车走进千家万户,城市里停车问题急需解决。新建住宅小区及商业配套停车场因规划及实际需求,多向地下空间发展。Due to the improvement of living standards, cars have entered thousands of households, and the parking problem in the city needs to be solved urgently. Due to planning and actual needs, new residential quarters and commercial parking lots are mostly developed into underground spaces.

当前的地下车停车库,每层的设备管网普遍占用了500~800mm的高度,大幅增加了地下室的高度。In the current underground car parking garage, the equipment pipe network on each floor generally occupies a height of 500-800mm, which greatly increases the height of the basement.

地下建筑因土方开挖、基坑支护、绛水排水等原因成本高昂,如何有效减少地下室层高(或总的占用体积),控制土建成本,节能减排,是设计及工程界面临的巨大挑战。The cost of underground construction is high due to earthwork excavation, foundation pit support, and water drainage. How to effectively reduce the basement floor height (or total occupied volume), control civil construction costs, and save energy and reduce emissions is a huge challenge faced by the design and engineering community. challenge.

发明内容SUMMARY OF THE INVENTION

针对现有技术存在的不足,本发明的目的在于提供一种立式集中管廊停车系统,适用于新建的地下及半地下汽车停车库、单层和多高层停车库,通过降低无效建筑高度,达到大幅度地降低停车库的建造成本,节能环保,节约资源,并且使停车库的建筑空间简洁美观。In view of the deficiencies in the prior art, the purpose of the present invention is to provide a vertical centralized pipe gallery parking system, which is suitable for newly built underground and semi-underground car parking garages, single-story and multi-story parking garages, and by reducing the invalid building height, It can greatly reduce the construction cost of the parking garage, save energy and environmental protection, save resources, and make the building space of the parking garage simple and beautiful.

本发明的上述技术目的是通过以下技术方案得以实现的:一种立式集中管廊停车系统,包括车库本体;在所述车库本体的地面上设置有管廊区域和停车区域;所述管廊区域与所述停车区域相连接;在所述管廊区域上设置有立式集中管廊;在所述立式集中管廊内设置有排风管。The above technical purpose of the present invention is achieved through the following technical solutions: a vertical centralized pipe gallery parking system, comprising a garage body; a pipe gallery area and a parking area are provided on the ground of the garage body; the pipe gallery The area is connected with the parking area; a vertical centralized pipe gallery is arranged on the pipe gallery area; an exhaust pipe is arranged in the vertical centralized pipe gallery.

可选的,在所述停车区域上设置有送风机房、排风机房、车道和若干个停车位;所述车道与所述停车位相接;在所述送风机房内设置有用于给所述停车区域送风的送风装置;所述排风管与所述排风机房相连通。Optionally, a blower room, an exhaust blower room, a driveway and several parking spaces are arranged on the parking area; the driveway is connected to the parking spaces; An air supply device for regional air supply; the exhaust pipe is communicated with the exhaust fan room.

可选的,在所述管廊区域与所述停车区域之间设置有隔板;所述隔板设置在所述车库本体的地面上;在所述隔板的上端设置有百叶窗;在所述隔板上设置有活动门板。Optionally, a partition is arranged between the pipe gallery area and the parking area; the partition is arranged on the ground of the garage body; a shutter is arranged on the upper end of the partition; A movable door panel is arranged on the partition.

可选的,所述停车区域包括第一子停车区域和第二子停车区域;所述隔板包括第一子隔板与第二子隔板;所述第一子隔板与所述第二子隔板均设置在所述车库本体的地面上;所述立式集中管廊设置在所述第一子停车区域与第二子停车区域之间;所述第一子隔板设置在所述立式集中管廊与所述第一子停车区域之间;所述第二子隔板设置在所述立式集中管廊与所述第二子停车区域之间。Optionally, the parking area includes a first sub-parking area and a second sub-parking area; the partition includes a first sub-partition and a second sub-part; the first sub-part and the second The sub-partitions are all arranged on the ground of the garage body; the vertical centralized pipe gallery is arranged between the first sub-parking area and the second sub-parking area; the first sub-partition is arranged on the between the vertical centralized pipe gallery and the first sub-parking area; the second sub-partition is arranged between the vertical centralized pipe gallery and the second sub-parking area.

可选的,在所述第一子隔板上设置有第一消防栓;在第二子隔板上均设置有第二消防栓;在所述立式集中管廊内设置有用于给所述第一消防栓和第二消防栓供水的消防给水管;所述消防给水管分别与所述第一消防栓和第二消防栓连接。Optionally, a first fire hydrant is provided on the first sub-clapboard; a second fire hydrant is provided on each of the second sub-clapboards; Fire water supply pipes for supplying water to the first fire hydrant and the second fire hydrant; the fire water supply pipes are respectively connected with the first fire hydrant and the second fire hydrant.

可选的,在所述第一子隔板上设置有若干个第一充电桩;所述第一充电桩位于所述第一子停车区域内;在第二子隔板上设置有若干个第二充电桩;所述第二充电桩位于所述第二子停车区域内。Optionally, several first charging piles are arranged on the first sub-clapboard; the first charging piles are located in the first sub-parking area; Two charging piles; the second charging pile is located in the second sub-parking area.

可选的,在所述排风管上设置有若干个排风口。Optionally, a plurality of exhaust ports are provided on the exhaust pipe.

可选的,在所述排风机房内设置有排风机;所述排风管与所述排风机的引风口相连通。Optionally, an exhaust fan is arranged in the exhaust fan room; the exhaust duct communicates with the air inlet of the exhaust fan.

可选的,在所述立式集中管廊内还设置有用于纳置线缆的电缆桥架。Optionally, a cable tray for accommodating cables is further provided in the vertical centralized pipe gallery.

综上所述,本发明具有以下有益效果:在建筑面积相近的情况下,大幅度减少了停车库层高,使整个停车系统的空间占用(即体积)显著减少,减少土方开挖、基坑支护、降水排水、并减少了地下室底板和侧墙的荷载,从而达到减少工程量,降低总造价,节能减排的效果。车库本体内的大部分管线敷设在立式集中管廊内,使车库空间简洁美观。本申请的立式集中管廊停车系统可用于新建停车库,包括地下、半地下停车库及地上停车库,有层高或总高度要求建筑也可采用本申请的立式集中管廊停车系统。To sum up, the present invention has the following beneficial effects: when the building area is similar, the floor height of the parking garage is greatly reduced, the space occupation (ie volume) of the entire parking system is significantly reduced, and the earthwork excavation and foundation pit are reduced. Support, precipitation and drainage, and reduce the load of the basement floor and side walls, so as to reduce the amount of engineering, reduce the total cost, energy saving and emission reduction. Most of the pipelines in the garage body are laid in the vertical centralized pipe gallery, which makes the garage space simple and beautiful. The vertical centralized pipe gallery parking system of the present application can be used for new parking garages, including underground, semi-underground parking garages and above-ground parking garages. Buildings with floor height or total height requirements can also use the vertical centralized pipe gallery parking system of the present application.

附图说明Description of drawings

图1是本申请的具体实施方式一的平面示意图;1 is a schematic plan view of Embodiment 1 of the present application;

图2是本发明的具体实施方式一的立体结构示意图;Fig. 2 is the three-dimensional structure schematic diagram of the specific embodiment 1 of the present invention;

图3是图2中A的放大图;Fig. 3 is the enlarged view of A in Fig. 2;

图4是本申请的具体实施方式一的剖面示意图;4 is a schematic cross-sectional view of Embodiment 1 of the present application;

图5是本申请的具体实施方式一的管廊区域的局部放大示意图;5 is a partial enlarged schematic view of the pipe gallery area of the specific embodiment 1 of the present application;

图6是本申请的具体实施方式一的管廊区域的剖面图;Fig. 6 is the sectional view of the pipe gallery area of the specific embodiment 1 of the present application;

图7是本申请的具体实施方式二的立体结构示意图;FIG. 7 is a schematic three-dimensional structure diagram of Embodiment 2 of the present application;

图8是本申请的具体实施方式二的管廊区域的局部放大示意图;8 is a partial enlarged schematic view of the pipe gallery area of the second embodiment of the present application;

图9是本申请的具体实施方式三的平面示意图;9 is a schematic plan view of Embodiment 3 of the present application;

图10是本申请的具体实施方式三的立体结构示意图。FIG. 10 is a schematic three-dimensional structure diagram of Embodiment 3 of the present application.

图中:1、管廊区域;11、排风管;111、排风口;12、电缆桥架;2、停车区域;21、排风机房;22、送风机房;23、第二子停车区域;24、第一子停车区域;3、隔板;31、第一子隔板;32、第二子隔板;4、百叶窗;5、活动门板;6、第一消防栓;7、第二消防栓;8、消防给水管;9、第一充电桩;10、第二充电桩;13、车道。In the figure: 1. Pipe gallery area; 11. Exhaust duct; 111. Air outlet; 12. Cable tray; 2. Parking area; 21. Exhaust fan room; 22. Fan room; 23. Second sub-parking area; 24. The first sub-parking area; 3. Partition; 31. The first sub-partition; 32. The second sub-partition; 4. Shutters; 5. Movable door; 6. The first fire hydrant; 8. Fire water supply pipe; 9. The first charging pile; 10. The second charging pile; 13. The driveway.

具体实施方式Detailed ways

为使本发明的目的、特征和优点能够更加明显易懂,下面结合附图对本发明的具体实施方式做详细的说明。附图中给出了本发明的若干实施例。但是,本发明可以以许多不同的形式来实现,并不限于本文所描述的实施例。In order to make the objects, features and advantages of the present invention more clearly understood, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. Several embodiments of the invention are presented in the accompanying drawings. However, the present invention may be embodied in many different forms and is not limited to the embodiments described herein.

在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。In the present invention, unless otherwise expressly specified and limited, the terms "installed", "connected", "connected", "fixed" and other terms should be understood in a broad sense, for example, it may be a fixed connection or a detachable connection , or integrally connected; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or the internal communication between the two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations. The terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may expressly or implicitly include one or more of that feature.

在本发明中,除非另有明确的规定和限定,第一特征在第二特征之“上”或之“下”可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征“之上”、“上方”和“上面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”包括第一特征在第二特征正下方和斜下方,或仅仅表示第一特征水平高度小于第二特征。术语“垂直的”、“水平的”、“左”、“右”、“上”、“下”以及类似的表述只是为了说明的目的,而不是指示或暗示所指装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the present invention, unless otherwise expressly specified and limited, a first feature "on" or "under" a second feature may include the first and second features in direct contact, or may include the first and second features Not directly but through additional features between them. Also, the first feature being "above", "over" and "above" the second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is level higher than the second feature. The first feature is "below", "below" and "below" the second feature includes the first feature being directly below and diagonally below the second feature, or simply means that the first feature has a lower level than the second feature. The terms "vertical," "horizontal," "left," "right," "upper," "lower," and similar expressions are for illustration purposes only and do not indicate or imply that the device or element referred to must have a particular Orientation, construction and operation in a particular orientation, and therefore should not be construed as limiting the invention.

下面结合附图和实施例,对本发明进行详细描述。The present invention will be described in detail below with reference to the accompanying drawings and embodiments.

本申请提供一种立式集中管廊停车系统,参见图1~图5,其包括车库本体;在所述车库本体的地面上设置有管廊区域1和停车区域2;所述管廊区域1与所述停车区域2相连接;在所述管廊区域1上设置有立式集中管廊;在所述立式集中管廊内设置有排风管11。The application provides a vertical centralized pipe gallery parking system, see FIGS. 1 to 5 , which includes a garage body; a pipe gallery area 1 and a parking area 2 are provided on the ground of the garage body; the pipe gallery area 1 It is connected with the parking area 2; a vertical centralized pipe gallery is arranged on the pipe gallery area 1; an exhaust pipe 11 is arranged in the vertical centralized pipe gallery.

其中,在车库本体上划分管廊区域1和停车区域2,在管廊区域1上设置立式集中管廊,立式集中管廊立置在地面上,将排风管11、电缆桥架12设置在立式集中管廊内。使避免以往在车道13上方设置高度较大的送风管、排风管11、电缆桥架12、消防给水主管8等设备管线的情况,从而大幅降低停车库的无效建筑高度,并且避免出现停车库上方杂乱无章的设备管线的情况,使停车库的空间简洁美观。充分利用车库本体内部空间布局管廊区域1和停车区域2,使在建筑面积相近的情况下,大幅度减少了停车库层高,使整个停车库的空间占用(即体积)显著减少,减少土方开挖、基坑支护、降水排水、并减少了地下室底板和侧墙的荷载,从而达到减少工程量,降低总造价,节能减排的效果。Among them, a pipe gallery area 1 and a parking area 2 are divided on the garage body, and a vertical centralized pipe gallery is set on the pipe gallery area 1. The vertical centralized pipe gallery is erected on the ground, and the exhaust pipe 11 and the cable tray 12 are installed. In the vertical centralized pipe gallery. It avoids the situation of setting up high-height air supply pipes, exhaust pipes 11, cable trays 12, fire water supply pipes 8 and other equipment pipelines above the driveway 13 in the past, thereby greatly reducing the invalid building height of the parking garage and avoiding the appearance of parking garages. The condition of the disorganized equipment lines above makes the space of the parking garage simple and beautiful. Make full use of the inner space of the garage body to layout the pipe gallery area 1 and the parking area 2, so that when the building area is similar, the floor height of the parking garage is greatly reduced, the space occupation (ie volume) of the entire parking garage is significantly reduced, and the earthwork is reduced. Excavation, foundation pit support, precipitation and drainage, and the load on the basement floor and side walls are reduced, so as to reduce the amount of engineering, reduce the total cost, and save energy and reduce emissions.

进一步地,在所述停车区域2设置有送风机房22、排风机房21、车道13和若干个停车位;车道13与停车位相接;在所述机房内设置有用于给所述停车区域送风的送风装置;在所述停车区域2设置有送风机房22、排风机房21,所述排风管与所述排风机房相连通。使在车库本体内的气流可以形成循环。而且在排风机房21内设置排风机可有效加快车库本体内的气流循环。Further, the parking area 2 is provided with a blower room 22, an exhaust fan room 21, a driveway 13 and several parking spaces; the driveway 13 is connected with the parking spaces; An air supply device for wind; a blower room 22 and an exhaust fan room 21 are provided in the parking area 2, and the exhaust duct is communicated with the exhaust fan room. The airflow in the garage body can be circulated. Moreover, disposing an exhaust fan in the exhaust fan room 21 can effectively speed up the air circulation in the garage body.

在一种可能的实现方式中,本申请可在所述排风机房21内设置有排风机;所述排风管11与所述排风机的引风口相连通。In a possible implementation manner, the present application may be provided with an exhaust fan in the exhaust fan room 21 ; the exhaust duct 11 communicates with the air inlet of the exhaust fan.

或者,本申请的立式集中管廊停车系统的车库本体内如有自然进风时,则不需要在停车区域2上设置送风机房22,上述自然进风可从车库出入口、通风井等进入到车库本体内。Or, if there is natural air intake in the garage body of the vertical centralized pipe gallery parking system of the present application, it is not necessary to set up the air supply room 22 on the parking area 2, and the above-mentioned natural air intake can enter from the garage entrance, ventilation shaft, etc. Inside the garage itself.

另外,车库本体可以是采用现浇或装配式混凝土梁板柱结构或是金属结构、木结构、砌体结构或是化工材料制作,可根据实际情况选择,在此不作限定。In addition, the garage body can be made of cast-in-place or fabricated concrete beam-slab-column structure or metal structure, wood structure, masonry structure or chemical material, which can be selected according to the actual situation, which is not limited here.

在实际应用中,所述立式集中管廊可以采用各种材料封闭,也可以是开放式或半开放式设置,也即是对立式集中管廊不封闭或半封闭,封闭的方式可以包括采用隔板的方式、采用砌墙等方式。In practical applications, the vertical centralized pipe gallery can be closed with various materials, or it can be open or semi-open, that is, the vertical centralized pipe gallery is not closed or semi-closed, and the sealing method can include: The use of partitions, the use of walls and other methods.

此外,排风管11还可以替代为排烟管。In addition, the exhaust pipe 11 can also be replaced by a smoke exhaust pipe.

在一可选的实施例中,参见图5和图6,在所述管廊区域1与所述停车区域2之间设置有隔板3,所述隔板3设置在所述车库本体的地面上。并且管廊区域1和停车区域2处于同一水平面上,可以有效降低了车库本体的高度,隔板3可将管廊区域1和停车区域2隔开,使立式集中管廊内部的部件均设置隔板3内。在隔板3的上端设置有百叶窗4,使车库本体内的空气循环。在所述隔板3上设置有活动门板5,以满足集中立式集中管廊内下部管线的检修要求。In an optional embodiment, referring to FIG. 5 and FIG. 6 , a partition 3 is arranged between the pipe gallery area 1 and the parking area 2, and the partition 3 is arranged on the ground of the garage body. superior. And the pipe gallery area 1 and the parking area 2 are on the same horizontal plane, which can effectively reduce the height of the garage body. The partition 3 can separate the pipe gallery area 1 and the parking area 2, so that the components inside the vertical centralized pipe gallery are installed. in the partition 3. A shutter 4 is arranged on the upper end of the partition 3 to circulate the air in the garage body. A movable door panel 5 is arranged on the partition 3 to meet the maintenance requirements of the lower pipeline in the centralized vertical centralized pipeline gallery.

可选地,本申请在具体设置活动门板5时,可以通过在隔板3上开设安装槽,在安装槽内设置与安装槽相适配的门体,然后通过铰链将门体铰接在安装槽内,使工作人员在需要对立式集中管廊内的部件检修时,可以通过翻转门体使安装槽打开再进入到立式集中管廊内。Optionally, when the movable door panel 5 is specifically arranged in the present application, an installation groove can be opened on the partition plate 3, a door body adapted to the installation groove is arranged in the installation groove, and then the door body is hinged in the installation groove through a hinge. , so that when the staff needs to overhaul the components in the vertical centralized pipe gallery, they can open the installation slot by flipping the door body and then enter the vertical centralized pipe gallery.

另外,在实际应用中,门体还可以采用百叶门的方式,使停车区域2和管廊区域1的空间同时也可以通过百叶门互通。In addition, in practical applications, the door body can also be in the form of a shutter door, so that the spaces between the parking area 2 and the pipe gallery area 1 can also communicate with each other through the shutter door.

可选的,在所述立式集中管廊内还设置有用于纳置线缆的电缆桥架12。Optionally, a cable tray 12 for accommodating cables is further provided in the vertical centralized pipe gallery.

上述的管廊区域可针对不同的停车场结构选择不同的设置位置及方式,下面对管廊区域的设置进行阐述。The above-mentioned pipe gallery area can choose different setting positions and methods for different parking lot structures. The setting of the pipe gallery area will be described below.

实施例1:Example 1:

参见图1、图4和图5,本实施例中的停车区域2包括第一子停车区域24和第二子停车区域23;隔板3包括第一子隔板31与第二子隔板32,所述第一子隔板31与所述第二子隔板32均设置在所述车库本体的地面上;。立式集中管廊设置在所述第一子停车区域24与第二子停车区域23之间。所述第一子隔板31设置在所述立式集中管廊与所述第一子停车区域24之间;所述第二子隔板32设置在所述立式集中管廊与所述第二子停车区域23之间。则上述结构可使本申请的管廊区域1设置在立式集中管廊停车系统的中心位置,使在车库本体内的空气流通更加均匀。1 , 4 and 5 , the parking area 2 in this embodiment includes a first sub-parking area 24 and a second sub-parking area 23 ; the partition plate 3 includes a first sub-partition plate 31 and a second sub-partition plate 32 , the first sub-partition plate 31 and the second sub-partition plate 32 are both arranged on the ground of the garage body; The vertical centralized pipe gallery is arranged between the first sub-parking area 24 and the second sub-parking area 23 . The first sub-partition 31 is arranged between the vertical centralized pipe gallery and the first sub-parking area 24; the second sub-partition 32 is arranged between the vertical centralized pipe gallery and the first sub-parking area 24. Between two sub-parking areas 23. The above structure can make the pipe gallery area 1 of the present application set at the center of the vertical centralized pipe gallery parking system, so that the air circulation in the garage body is more uniform.

进一步地,参见图5和图6,在所述第一子隔板31上设置有第一消防栓6;在第二子隔板32上均设置有第二消防栓7;在所述立式集中管廊内设置有用于给所述第一消防栓6和第二消防栓7供水的消防给水管8;所述消防给水管8分别与所述第一消防栓6和第二消防栓7连接。Further, referring to FIG. 5 and FIG. 6 , a first fire hydrant 6 is provided on the first sub-partition 31 ; a second fire hydrant 7 is arranged on the second sub-partition 32 ; A fire water supply pipe 8 for supplying water to the first fire hydrant 6 and the second fire hydrant 7 is arranged in the centralized pipe gallery; the fire water supply pipe 8 is connected to the first fire hydrant 6 and the second fire hydrant 7 respectively. .

此外,参见图5和图6,为进一步地完善车库本体内的设施,在所述第一子隔板31上设置有若干个第一充电桩9;所述第一充电桩9位于所述第一子停车区域24内;与第二子隔板32上设置有若干个第二充电桩10;所述第二充电桩10位于所述第二停车区域2内。In addition, referring to FIG. 5 and FIG. 6 , in order to further improve the facilities in the garage body, several first charging piles 9 are arranged on the first sub-partition 31 ; the first charging piles 9 are located in the A plurality of second charging piles 10 are arranged in a sub-parking area 24 and on the second sub-partition 32 ; the second charging piles 10 are located in the second parking area 2 .

在设置立式集中管廊的具体位置时,在大型的停车系统中,可以在车库本体内设置两个立式集中管廊。在第一子隔板31上设置第一充电桩9,在第二子隔板32上设置第二充电桩10,可使第一充电桩9与第二充电桩10的线条集中放置在管廊区域1内的电缆桥架12上,使外部人员无法对线路进行破坏。另外,在立式集中管廊两侧分别设置第一充电桩9和第二充电桩10,有效节约车库本体的空间。When setting the specific location of the vertical centralized pipe gallery, in a large parking system, two vertical centralized pipe gallery can be set in the garage body. The first charging pile 9 is arranged on the first sub-partition 31, and the second charging pile 10 is arranged on the second sub-partition 32, so that the lines of the first charging pile 9 and the second charging pile 10 can be placed in the pipe gallery. On the cable tray 12 in area 1, outsiders cannot damage the line. In addition, the first charging pile 9 and the second charging pile 10 are respectively arranged on both sides of the vertical centralized pipe gallery, which effectively saves the space of the garage body.

实施例2:Example 2:

在设置立式集中管廊的具体位置时,参见图7和图8,还可以通过将立式集中管廊设置在车库本体的墙边,也即是可以通过将立式集中管廊的一边镂空贴紧墙边,第二子隔板32朝向车库本体的内部。When setting the specific location of the vertical centralized pipe gallery, see Figures 7 and 8, it is also possible to set the vertical centralized pipe gallery on the wall of the garage body, that is, by hollowing out one side of the vertical centralized pipe gallery Close to the wall, the second sub-partition 32 faces the interior of the garage body.

实施例3:Example 3:

在设置立式集中管廊的具体位置时,参见图9和图10,本实施例与具体实施方式一不同之处在于管廊区域1设置的位置不相同,可根据车库本体的大小去设置立式集中管廊的排布。When setting the specific position of the vertical centralized pipe gallery, refer to FIG. 9 and FIG. 10 , the difference between this embodiment and the specific embodiment 1 is that the location of the pipe gallery area 1 is not the same, and the vertical centralized pipe gallery can be set according to the size of the garage body. The layout of the centralized pipe gallery.

在一可选的实施例中,参见图8,在所述排风管1上设置有若干个排风口111。其中,排风口111可以将立式集中管廊内的空气吸入至排风管11内,并且在排风管上设置有若干个排风口111,可对立式集中管廊内的线路起到保护作用。在实际应用中,可在排风口111上设置防尘网等,以起到保护排风管1的作用。In an optional embodiment, referring to FIG. 8 , the exhaust pipe 1 is provided with several exhaust ports 111 . Among them, the exhaust port 111 can suck the air in the vertical centralized pipe gallery into the exhaust pipe 11, and a number of exhaust ports 111 are arranged on the exhaust pipe, which can remove the lines in the vertical centralized pipe gallery. to protection. In practical applications, a dust-proof net or the like may be provided on the exhaust port 111 to protect the exhaust pipe 1 .

以上所述仅是本发明的优选实施方式,本发明的保护范围并不仅局限于上述实施例,凡属于本发明思路下的技术方案均属于本发明的保护范围。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理前提下的若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above are only the preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above-mentioned embodiments, and all technical solutions under the idea of the present invention belong to the protection scope of the present invention. It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims (9)

1. A parking system of a vertical type centralized pipe gallery is characterized by comprising a garage body; a pipe gallery area and a parking area are arranged on the ground of the garage body; the pipe gallery area is connected with the parking area; a vertical type centralized pipe gallery is arranged on the pipe gallery area; an exhaust pipe is arranged in the vertical type centralized pipe gallery.
2. The vertical central tunnel parking system according to claim 1 wherein a blower fan room, a driveway and a plurality of parking spaces are provided on the parking area; the lane is connected with the parking space; an air supply device used for supplying air to the parking area is arranged in the air supply room; the exhaust pipe is communicated with the exhaust fan room.
3. The vertical central tube lane parking system of claim 2 wherein a partition is disposed between the tube lane area and the parking area; the partition plate is arranged on the ground of the garage body; a shutter is arranged at the upper end of the partition board; the partition board is provided with a movable door plate.
4. The vertical central tunnel parking system of claim 3 wherein the parking area comprises a first sub parking area and a second sub parking area; the partition plate comprises a first sub-partition plate and a second sub-partition plate; the first sub-partition plate and the second sub-partition plate are both arranged on the ground of the garage body; the vertical type centralized pipe gallery is arranged between the first sub-parking area and the second sub-parking area; the first sub-partition is arranged between the vertical type concentration pipe gallery and the first sub-parking area; the second sub-partition is arranged between the vertical type concentration pipe gallery and the second sub-parking area.
5. The vertical central tunnel parking system of claim 4 wherein a first fire hydrant is disposed on the first sub-bulkhead; the second sub-clapboards are provided with second fire hydrants; a fire-fighting water supply pipe used for supplying water to the first fire hydrant and the second fire hydrant is arranged in the vertical type centralized pipe gallery; the fire service water supply pipe is respectively connected with the first fire hydrant and the second fire hydrant.
6. The vertical central tunnel parking system according to claim 4 wherein a plurality of first charging piles are disposed on the first sub-partition; the first charging pile is positioned in the first sub-parking area; a plurality of second charging piles are arranged on the second sub-partition plates; the second charging pile is located in the second sub-parking area.
7. The vertical central tunnel parking system according to claim 3 wherein a plurality of air exit vents are provided on the air exhaust duct.
8. The vertical central tunnel parking system of claim 2 wherein an exhaust fan is disposed within the exhaust fan room; the exhaust pipe is communicated with an induced draft port of the exhaust fan.
9. The vertical manifold rack parking system of claim 1 further provided with a cable tray within the vertical manifold rack for receiving cables.
CN202010974794.7A 2020-09-16 2020-09-16 Vertical central tube corridor parking system Pending CN112031497A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010974794.7A CN112031497A (en) 2020-09-16 2020-09-16 Vertical central tube corridor parking system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010974794.7A CN112031497A (en) 2020-09-16 2020-09-16 Vertical central tube corridor parking system

Publications (1)

Publication Number Publication Date
CN112031497A true CN112031497A (en) 2020-12-04

Family

ID=73589602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010974794.7A Pending CN112031497A (en) 2020-09-16 2020-09-16 Vertical central tube corridor parking system

Country Status (1)

Country Link
CN (1) CN112031497A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020083661A1 (en) * 2000-12-29 2002-07-04 Walter Krauth Reduced frontage garage
CN107795188A (en) * 2017-12-05 2018-03-13 北京中岩大地科技股份有限公司 A kind of underground garage being combined with underground pipe gallery
CN111119535A (en) * 2018-11-01 2020-05-08 李志毅 It reduces high novel garage of layer to predetermine piping lane
CN111535632A (en) * 2020-04-28 2020-08-14 重庆椽檩工程管理咨询有限公司 Piping lane formula stereo garage
CN213015639U (en) * 2020-09-16 2021-04-20 司徒贺聪 Vertical central tube corridor parking system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020083661A1 (en) * 2000-12-29 2002-07-04 Walter Krauth Reduced frontage garage
CN107795188A (en) * 2017-12-05 2018-03-13 北京中岩大地科技股份有限公司 A kind of underground garage being combined with underground pipe gallery
CN111119535A (en) * 2018-11-01 2020-05-08 李志毅 It reduces high novel garage of layer to predetermine piping lane
CN111535632A (en) * 2020-04-28 2020-08-14 重庆椽檩工程管理咨询有限公司 Piping lane formula stereo garage
CN213015639U (en) * 2020-09-16 2021-04-20 司徒贺聪 Vertical central tube corridor parking system

Similar Documents

Publication Publication Date Title
RU90363U1 (en) VENTILATION VENTILATION SYSTEM OF MULTI-APARTMENT BUILDING
CN102660961A (en) Integral underground comprehensive pipe rack
CN111379451A (en) Compound parking garage
CN215977368U (en) A process node well for shield tunnel integrated pipe gallery
CN211368777U (en) A kind of comprehensive pipe gallery
CN110607927A (en) A split-level parking garage
Lstiburek et al. Air pressure and building envelopes
CN115821987A (en) Non-excavation formula buries utility tunnel working well deeply
CN213015639U (en) Vertical central tube corridor parking system
CN118564104B (en) New and old building nested composite structure capable of utilizing old and stable in internal environment
CN112031497A (en) Vertical central tube corridor parking system
CN220417551U (en) Pipe corridor ventilation structure
CN217423531U (en) Fan room structure
CN108474207A (en) The warm cooling system of the confession of modularization residential housing
CN213277182U (en) Building equipment teaching demonstration model
CN215906846U (en) Underground pipe gallery
CN113152503B (en) An integrated energy storage system
CN211666370U (en) Multilayer garage with air exhaust and smoke exhaust pipeline accommodating cavities
CN102691310A (en) Precast assembled comprehensive pipe gallery downcast shaft
CN102691311A (en) Precast assembled comprehensive pipe gallery fan house
CN204370766U (en) A kind of view ventilating shaft and building
CN210562294U (en) Underground structure of open cut tunnel and piping lane built jointly
CN202578060U (en) Prefabricated assembled comprehensive pipe rack ventilating engine room
CN209588322U (en) The vertical air duct connecting structure of assembled
CN107604943A (en) Comprehensive pipe gallery structure with vertical shaft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination