CN111969876A - High-frequency inverter power supply networking control method and system - Google Patents

High-frequency inverter power supply networking control method and system Download PDF

Info

Publication number
CN111969876A
CN111969876A CN202010867478.XA CN202010867478A CN111969876A CN 111969876 A CN111969876 A CN 111969876A CN 202010867478 A CN202010867478 A CN 202010867478A CN 111969876 A CN111969876 A CN 111969876A
Authority
CN
China
Prior art keywords
frequency inverter
historical
power supply
power
supply network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010867478.XA
Other languages
Chinese (zh)
Inventor
李佳
王嘉鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Xinzhijie Technology Co ltd
Original Assignee
Liaoning Xinzhijie Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Xinzhijie Technology Co ltd filed Critical Liaoning Xinzhijie Technology Co ltd
Priority to CN202010867478.XA priority Critical patent/CN111969876A/en
Publication of CN111969876A publication Critical patent/CN111969876A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of AC power input into DC power output; Conversion of DC power input into AC power output
    • H02M7/42Conversion of DC power input into AC power output without possibility of reversal
    • H02M7/44Conversion of DC power input into AC power output without possibility of reversal by static converters
    • H02M7/48Conversion of DC power input into AC power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • H02M7/493Conversion of DC power input into AC power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode the static converters being arranged for operation in parallel

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a networked control method and a networked control system for a high-frequency inverter power supply, wherein the method comprises the following steps: acquiring historical demand power parameters of a load on a bus; acquiring a current output power parameter of a first high-frequency inverter power supply network; judging whether the current output power parameter is larger than the historical required power parameter or not; if yes, supplying power to all loads through a first high-frequency inverter power supply network; and if not, calculating the number of the high-frequency inverter power supplies accessed into the first high-frequency inverter power supply network according to the historical required power parameters and the current output power parameters to obtain a second high-frequency inverter power supply network, and supplying power to all loads through the second high-frequency inverter power supply network. According to the method and the device, the composition of the high-frequency inverter power supply in the high-frequency inverter power supply network is flexibly adjusted according to the judgment result between the historical demand power parameter and the current demand power parameter, the power supply to the load can be met, and the power supply flexibility of the high-frequency inverter power supply network is improved.

Description

High-frequency inverter power supply networking control method and system
Technical Field
The invention belongs to the technical field of high-frequency inverter power supplies, and particularly relates to a networked control method and a networked control system for a high-frequency inverter power supply.
Background
The high-frequency inverter power supply can be used for supplying power to a load, and obviously, a plurality of high-frequency inverter power supplies are required to be configured to supply power to a plurality of loads, so that the power supply requirements of the plurality of loads can be met. However, the working states of a plurality of loads are complicated and changeable, and are not necessarily turned on or off at the same time, which causes complicated changes of fluctuation of required power; meanwhile, the management of the multiple high-frequency inverter power supplies also increases the complexity, and how to manage the multiple high-frequency inverter power supplies so as to supply power to multiple loads which need power to fluctuate and change at any moment is an urgent problem to be solved.
Disclosure of Invention
In order to solve the above problems, the present invention provides a networked control method for a high-frequency inverter power supply, comprising the steps of:
acquiring historical demand power parameters of a load on a bus;
acquiring a current output power parameter of a first high-frequency inverter power supply network;
judging whether the current output power parameter is larger than the historical required power parameter or not;
if yes, supplying power to all the loads through the first high-frequency inverter power supply network;
if not, calculating the number of the high-frequency inverter power supplies accessed into the first high-frequency inverter power supply network according to the historical required power parameters and the current output power parameters to obtain a second high-frequency inverter power supply network, and supplying power to all the loads through the second high-frequency inverter power supply network.
Preferably, the step of obtaining the historical demanded power parameter of the load on the bus comprises the steps of:
acquiring historical instantaneous required power of all the loads at each moment in a preset time period;
sorting each historical instantaneous demand power in a descending order;
and taking the first historical instantaneous required power in the sequencing sequence as the historical required power parameter.
Preferably, the step of obtaining the historical demanded power parameter of the load on the bus comprises the steps of:
acquiring historical instantaneous required power of all the loads at each moment in a preset time period;
calculating the sum of the required power of all the historical instantaneous required power in a preset time period;
calculating the required power and the average required power in a preset time period;
and taking the average required power as the historical required power parameter.
Preferably, before the obtaining of the historical demanded power parameter of the load on the bus, the method further comprises the steps of:
acquiring all the loads;
carrying out array arrangement on all the loads;
carrying out matrix division on the load array to obtain a first high-frequency inverter power supply network;
and calculating the matrix historical demand power parameter of each load matrix.
Preferably, the calculating the matrix historical demand power parameter of each load matrix comprises the steps of:
acquiring historical instantaneous required power of each load in each load matrix at each moment in a preset time period;
sorting each historical instantaneous demand power in a descending order;
and acquiring the first historical instantaneous demand power in the sequencing sequence as the historical demand power parameter of the matrix.
Preferably, the calculating the matrix historical demand power parameter of each load matrix comprises the steps of:
acquiring historical instantaneous required power of each load in each load matrix at each moment in a preset time period;
calculating the sum of the required power of all the historical instantaneous required power in a preset time period;
calculating the required power and the matrix average required power in a preset time period;
and taking the matrix average required power as the historical required power parameter of the matrix.
Preferably, the step of calculating the number of the high-frequency inverter power supplies connected to the first high-frequency inverter power supply network according to the historical required power parameter and the current output power parameter to obtain a second high-frequency inverter power supply network includes:
calculating the difference value between the historical required power parameter and the current output power parameter
Figure DEST_PATH_IMAGE002
;
Obtaining rated output power of single high-frequency inverter power supply
Figure DEST_PATH_IMAGE004
Calculating a difference value
Figure DEST_PATH_IMAGE002A
To rated output power
Figure DEST_PATH_IMAGE004A
The ratio of (A) to (B);
and A high-frequency inverter power supplies are connected into the first high-frequency inverter power supply network to obtain a second high-frequency inverter power supply network.
The invention also provides a high-frequency inverter power supply networked control system, which comprises:
the historical demand power parameter acquisition unit is used for acquiring the historical demand power parameter of the load on the bus;
the current output power parameter acquisition unit is used for acquiring current output power parameters of the first high-frequency inverter power supply network;
the judging unit is used for judging whether the current output power parameter is larger than the historical required power parameter or not;
the execution unit is used for executing preset operation according to the judgment result of the judgment unit;
when the judgment result of the judgment unit is yes, the execution unit supplies power to all the loads through the first high-frequency inverter power supply network; and when the judgment result of the judgment unit is negative, the execution unit calculates the number of the high-frequency inverter power supplies accessed into the first high-frequency inverter power supply network according to the historical required power parameter and the current output power parameter to obtain a second high-frequency inverter power supply network, and supplies power to all the loads through the second high-frequency inverter power supply network.
Preferably, the method further comprises the following steps: a load storage unit for storing all the loads; the load storage unit is connected with the historical demand power parameter acquisition unit.
Preferably, the method further comprises the following steps: the high-frequency inverter power supply network storage unit is used for storing the high-frequency inverter power supply network; and the high-frequency inverter power supply network storage unit is connected with the current output power parameter acquisition unit.
Compared with the prior art, the invention has the following beneficial effects:
(1) acquiring historical demand power parameters of the load, and taking the historical demand power parameters as the basis of the current demand power parameters of the load, thereby providing a data basis for judging the current output power parameters of the high-frequency inverter power supply network and the historical demand power parameters of the load;
(2) the composition of a high-frequency inverter power supply in the high-frequency inverter power supply network is flexibly adjusted according to the judgment result between the historical required power parameter and the current required power parameter, so that on one hand, the power supply to a load can be met, and on the other hand, the condition that resources are wasted due to the fact that excessive high-frequency inverter power supplies are connected into the network is reduced;
(3) the maximum historical instantaneous demand power of the load is used as a historical demand power parameter, so that the current output power parameter of the high-frequency inverter power supply network can bear the maximum value of the demand power of the load in the current and previous preset time period, and the electric energy can be supplied to all the loads;
(4) the average required power of the load is used as a historical required power parameter, so that the current output power parameter of the high-frequency inverter power supply network can bear the average value of the required power of the load in the current and previous preset time period, and the electric energy can be supplied to most of the loads;
(5) the multiple high-frequency inverter power supplies are arranged in an array mode and divided in a matrix mode, on one hand, the calculated amount of each parameter is reduced, and on the other hand, the management of the multiple high-frequency inverter power supplies is facilitated.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic flow chart of an embodiment 1 of a networked control method for a high-frequency inverter power supply according to the present invention;
fig. 2 is a schematic flow chart of an embodiment 2 of a networked control method for a high-frequency inverter power supply according to the present invention;
fig. 3 is a schematic flow chart of an embodiment 3 of a networked control method for a high-frequency inverter power supply according to the present invention;
fig. 4 is a schematic flow chart of an embodiment 4 of a networked control method for a high-frequency inverter power supply according to the present invention;
fig. 5 is a schematic structural diagram of a networked control system for a high-frequency inverter power supply provided by the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings in conjunction with the following detailed description. It should be understood that the description is intended to be exemplary only, and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
Example 1
As shown in fig. 1, in the embodiment of the present application, the present invention provides a networked control method for a high-frequency inverter power supply, where the method includes the steps of:
s1: acquiring historical demand power parameters of a load on a bus;
s2: acquiring a current output power parameter of a first high-frequency inverter power supply network;
s3: judging whether the current output power parameter is larger than the historical required power parameter or not;
s4: if yes, supplying power to all the loads through the first high-frequency inverter power supply network;
s5: if not, calculating the number of the high-frequency inverter power supplies accessed into the first high-frequency inverter power supply network according to the historical required power parameters and the current output power parameters to obtain a second high-frequency inverter power supply network, and supplying power to all the loads through the second high-frequency inverter power supply network.
In the embodiment of the application, a historical demand power parameter of a load on a bus is obtained at first, wherein the historical demand power parameter is a historical demand power parameter of the load in a current previous preset time period; then obtaining a current output power parameter of the first high-frequency inverter power supply network, wherein the current output power parameter is the current output power parameter of the first high-frequency inverter power supply network at the current moment; then judging whether the current output power parameter is greater than the historical demand power parameter, if so, indicating that the current output power parameter provided by the first high-frequency inverter power supply network can completely bear the historical demand power parameter of the load on the bus, so that the current demand power parameter of the load on the bus can be borne with a higher probability; if the current output power parameter is smaller than the historical demand power parameter, the current output power parameter provided by the first high-frequency inverter power supply network cannot completely bear the historical demand power parameter of the load on the bus, therefore, the current required power parameter of the load on the bus can not be borne with a larger probability, so the number of the high-frequency inverter power supplies accessed into the first high-frequency inverter power supply network is calculated according to the historical required power parameter and the current output power parameter, and the calculated number of high-frequency inverter power supplies are accessed into the first high-frequency inverter power supply network to obtain a second high-frequency inverter power supply network, and all the loads are supplied with power through the second high-frequency inverter power supply network, therefore, the current output power parameter provided by the second high-frequency inverter power supply network can completely bear the historical required power parameter of the load on the bus.
Example 2
As shown in fig. 2, in the embodiment of the present application, the obtaining of the historical demanded power parameter of the load on the busbar in step S1 includes the steps of:
s201: acquiring historical instantaneous required power of all the loads at each moment in a preset time period;
s202: sorting each historical instantaneous demand power in a descending order;
s203: and taking the first historical instantaneous required power in the sequencing sequence as the historical required power parameter.
In an embodiment of the present application, the historical demanded power parameter may be a maximum historical instantaneous demanded power of a load on the bus. The maximum historical instantaneous demand power is the maximum instantaneous demand power of the load in the current previous preset time period, and when the current output power parameter of the first high-frequency inverter power supply network can bear the maximum historical instantaneous demand power, other lower instantaneous demand powers can also be borne with a higher probability. Specifically, historical instantaneous demand power of all the loads at each moment in a preset time period is obtained, and then each historical instantaneous demand power is sorted in a descending order, so that the first historical instantaneous demand power in the sorting order is the historical demand power parameter.
Example 3
As shown in fig. 3, in the embodiment of the present application, the obtaining of the historical demanded power parameter of the load on the busbar in step S1 includes the steps of:
s301: acquiring historical instantaneous required power of all the loads at each moment in a preset time period;
s302: calculating the sum of the required power of all the historical instantaneous required power in a preset time period;
s303: calculating the required power and the average required power in a preset time period;
s304: and taking the average required power as the historical required power parameter.
In the embodiment of the present application, the historical demanded power parameter may be an average demanded power of a load on the bus. The average required power is the average required power of the load in the current previous preset time period, and when the current output power parameter of the first high-frequency inverter power supply network can bear the average required power, other instantaneous required power can also be borne with a higher probability. Specifically, the historical instantaneous demand power of all the loads at each moment in a preset time period is obtained, then the sum of the demand power of all the historical instantaneous demand power in the preset time period is calculated, and then the average demand power of the demand power and the average demand power in the preset time period is calculated, so that the average demand power is the historical demand power parameter.
Example 4
As shown in fig. 4, in the embodiment of the present application, before obtaining the historical required power parameter of the load on the bus in step S1, the method further includes the steps of:
s401: acquiring all the loads;
s402: carrying out array arrangement on all the loads;
s403: carrying out matrix division on the load array to obtain a first high-frequency inverter power supply network;
s404: and calculating the matrix historical demand power parameter of each load matrix.
In the embodiment of the application, before the operation of acquiring the historical required power parameters of the load on the bus, the first high-frequency inverter power supply network is required to be constructed. Specifically, all the loads may be obtained first, and all the loads may be arranged in an array, so that all the loads are arranged in order; then matrix division is carried out on the load array so as to divide the load array into a plurality of load matrixes and obtain a first high-frequency inverter power supply network; and finally, calculating the matrix historical demand power parameter of each load matrix, wherein the matrix historical demand power parameter is used as the historical demand power parameter of the load and can be used for subsequent judgment operation.
In an embodiment of the present application, the calculating the matrix historical demand power parameter of each load matrix includes:
acquiring historical instantaneous required power of each load in each load matrix at each moment in a preset time period;
sorting each historical instantaneous demand power in a descending order;
and acquiring the first historical instantaneous demand power in the sequencing sequence as the historical demand power parameter of the matrix.
Accordingly, in the embodiment of the present application, the matrix historical demanded power parameter may be the maximum historical instantaneous demanded power of the load matrix. The maximum historical instantaneous demand power is the maximum instantaneous demand power of the load matrix in the current previous preset time period, and when the current output power parameter of the first high-frequency inverter power supply network can bear the maximum historical instantaneous demand power, other lower instantaneous demand powers can also be borne with a higher probability. Specifically, historical instantaneous demand power of all the loads at each moment in a preset time period is obtained, then each historical instantaneous demand power is sorted in a descending order, and the first historical instantaneous demand power in the sorting order is the matrix historical demand power parameter.
In an embodiment of the present application, the calculating the matrix historical demand power parameter of each load matrix includes:
acquiring historical instantaneous required power of each load in each load matrix at each moment in a preset time period;
calculating the sum of the required power of all the historical instantaneous required power in a preset time period;
calculating the required power and the matrix average required power in a preset time period;
and taking the matrix average required power as the historical required power parameter of the matrix.
Accordingly, in the embodiment of the present application, the matrix historical required power may be an average required power of the load matrix. The average required power is the average required power of the load matrix in the current previous preset time period, and when the current output power parameter of the first high-frequency inverter power supply network can bear the average required power, other instantaneous required powers can also be borne with a high probability. Specifically, historical instantaneous demand power of each load in each load matrix at each moment in a preset time period is obtained, then the sum of the demand power of all the historical instantaneous demand power in the preset time period is calculated, then the average demand power of the demand power and the average demand power in the preset time period is calculated, and the average demand power is the historical demand power of the matrix.
In this embodiment of the present application, the step S5 of calculating the number of the high-frequency inverter power supplies connected to the first high-frequency inverter power supply network according to the historical required power parameter and the current output power parameter to obtain a second high-frequency inverter power supply network includes the steps of:
calculating the difference value between the historical required power parameter and the current output power parameter
Figure DEST_PATH_IMAGE002AA
;
Obtaining rated output power of single high-frequency inverter power supply
Figure DEST_PATH_IMAGE004AA
Calculating a difference value
Figure DEST_PATH_IMAGE002AAA
To rated output power
Figure DEST_PATH_IMAGE004AAA
The ratio of (A) to (B);
and A high-frequency inverter power supplies are connected into the first high-frequency inverter power supply network to obtain a second high-frequency inverter power supply network.
In the embodiment of the application, when the current output power parameter is lower than the historical required power parameter, a plurality of high-frequency inverter power supplies are required to be connected into the first high-frequency inverter power supply network to obtain a second high-frequency inverter power supply network, and power is supplied to the load through the second high-frequency inverter power supply network. Specifically, the difference between the historical required power parameter and the current output power parameter is calculated firstly
Figure DEST_PATH_IMAGE002AAAA
Then obtaining a single high-frequency inverterRated output power of the source
Figure DEST_PATH_IMAGE004AAAA
And calculating the difference
Figure DEST_PATH_IMAGE002AAAAA
To rated output power
Figure DEST_PATH_IMAGE004AAAAA
The ratio A is the number of the high-frequency inverter power supplies to be accessed, and finally, A high-frequency inverter power supplies are accessed into the first high-frequency inverter power supply network to obtain a second high-frequency inverter power supply network, and power is supplied to the load through the second high-frequency inverter power supply network, so that the power supply requirement on the load can be ensured.
As shown in fig. 5, in the embodiment of the present application, the present invention further provides a networked control system for a high-frequency inverter power supply, where the system includes:
a historical required power parameter obtaining unit 10, configured to obtain a historical required power parameter of a load on a bus;
a current output power parameter obtaining unit 20, configured to obtain a current output power parameter of the first high-frequency inverter power supply network;
a judging unit 30, configured to judge whether the current output power parameter is greater than the historical required power parameter;
an execution unit 40, configured to execute a preset operation according to the determination result of the determination unit 30;
when the judgment result of the judgment unit 30 is yes, the execution unit 40 supplies power to all the loads through the first high-frequency inverter power supply network; when the judgment result of the judgment unit 30 is negative, the execution unit 40 calculates the number of the high-frequency inverter power supplies connected to the first high-frequency inverter power supply network according to the historical required power parameter and the current output power parameter to obtain a second high-frequency inverter power supply network, and supplies power to all the loads through the second high-frequency inverter power supply network.
In the embodiment of the application, a historical demand power parameter of a load on a bus is obtained through a historical demand power parameter obtaining unit 10, wherein the historical demand power parameter is a historical demand power parameter of the load in a current previous preset time period; then, a current output power parameter of the first high-frequency inverter power supply network is obtained through a current output power parameter obtaining unit 20, wherein the current output power parameter is a current output power parameter of the first high-frequency inverter power supply network at the current moment; then, the judging unit 30 judges whether the current output power parameter is greater than the historical required power parameter, if the current output power parameter is greater than the historical required power parameter, it indicates that the current output power parameter provided by the first high-frequency inverter power supply network can completely bear the historical required power parameter of the load on the bus, and therefore there is a higher probability of bearing the current required power parameter of the load on the bus, so that the executing unit 40 supplies power to all the loads through the first high-frequency inverter power supply network; if the current output power parameter is smaller than the historical demand power parameter, the current output power parameter provided by the first high-frequency inverter power supply network cannot completely bear the historical demand power parameter of the load on the bus, and therefore there is a high probability that the current required power parameter of the load on the bus cannot be borne, so that the execution unit 40 calculates the number of the high-frequency inverter power supplies connected to the first high-frequency inverter power supply network according to the historical required power parameter and the current output power parameter, and the calculated number of high-frequency inverter power supplies are accessed into the first high-frequency inverter power supply network to obtain a second high-frequency inverter power supply network, and all the loads are supplied with power through the second high-frequency inverter power supply network, therefore, the current output power parameter provided by the second high-frequency inverter power supply network can completely bear the historical required power parameter of the load on the bus.
As shown in fig. 5, in the embodiment of the present application, the present invention further provides a networked control system for a high-frequency inverter power supply, further including: a load storage unit 50 for storing all the loads; the load storage unit 50 is connected to the historical required power parameter obtaining unit 10.
As shown in fig. 5, in the embodiment of the present application, the present invention further provides a networked control system for a high-frequency inverter power supply, further including: the high-frequency inverter power network storage unit 60 is used for storing the high-frequency inverter power network; the high-frequency inverter power network storage unit 60 is connected with the current output power parameter acquisition unit 20.
The networked control method and the networked control system for the high-frequency inverter power supply have the following beneficial effects:
acquiring historical demand power parameters of the load, and taking the historical demand power parameters as the basis of the current demand power parameters of the load, thereby providing a data basis for judging the current output power parameters of the high-frequency inverter power supply network and the historical demand power parameters of the load; the composition of a high-frequency inverter power supply in the high-frequency inverter power supply network is flexibly adjusted according to the judgment result between the historical required power parameter and the current required power parameter, so that on one hand, the power supply to a load can be met, and on the other hand, the condition that resources are wasted due to the fact that excessive high-frequency inverter power supplies are connected into the network is reduced; the maximum historical instantaneous demand power of the load is used as a historical demand power parameter, so that the current output power parameter of the high-frequency inverter power supply network can bear the maximum value of the demand power of the load in the current and previous preset time period, and the electric energy can be supplied to all the loads; the average required power of the load is used as a historical required power parameter, so that the current output power parameter of the high-frequency inverter power supply network can bear the average value of the required power of the load in the current and previous preset time period, and the electric energy can be supplied to most of the loads; the multiple high-frequency inverter power supplies are arranged in an array mode and divided in a matrix mode, on one hand, the calculated amount of each parameter is reduced, and on the other hand, the management of the multiple high-frequency inverter power supplies is facilitated.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.

Claims (10)

1. A networked control method for a high-frequency inverter power supply is characterized by comprising the following steps:
acquiring historical demand power parameters of a load on a bus;
acquiring a current output power parameter of a first high-frequency inverter power supply network;
judging whether the current output power parameter is larger than the historical required power parameter or not;
if yes, supplying power to all the loads through the first high-frequency inverter power supply network;
if not, calculating the number of the high-frequency inverter power supplies accessed into the first high-frequency inverter power supply network according to the historical required power parameters and the current output power parameters to obtain a second high-frequency inverter power supply network, and supplying power to all the loads through the second high-frequency inverter power supply network.
2. The networked control method for the high-frequency inverter power supply according to claim 1, wherein the step of obtaining the historical power demand parameters of the load on the bus comprises the steps of:
acquiring historical instantaneous required power of all the loads at each moment in a preset time period;
sorting each historical instantaneous demand power in a descending order;
and taking the first historical instantaneous required power in the sequencing sequence as the historical required power parameter.
3. The networked control method for the high-frequency inverter power supply according to claim 1, wherein the step of obtaining the historical power demand parameters of the load on the bus comprises the steps of:
acquiring historical instantaneous required power of all the loads at each moment in a preset time period;
calculating the sum of the required power of all the historical instantaneous required power in a preset time period;
calculating the required power and the average required power in a preset time period;
and taking the average required power as the historical required power parameter.
4. The networked control method for the high-frequency inverter power supply according to claim 1, further comprising, before the obtaining of the historical required power parameter of the load on the bus, the steps of:
acquiring all the loads;
carrying out array arrangement on all the loads;
carrying out matrix division on the load array to obtain a first high-frequency inverter power supply network;
and calculating the matrix historical demand power parameter of each load matrix.
5. The networked control method for the high-frequency inverter power supply according to claim 4, wherein the step of calculating the matrix historical demand power parameter of each load matrix comprises the steps of:
acquiring historical instantaneous required power of each load in each load matrix at each moment in a preset time period;
sorting each historical instantaneous demand power in a descending order;
and acquiring the first historical instantaneous demand power in the sequencing sequence as the historical demand power parameter of the matrix.
6. The networked control method for the high-frequency inverter power supply according to claim 4, wherein the step of calculating the matrix historical demand power parameter of each load matrix comprises the steps of:
acquiring historical instantaneous required power of each load in each load matrix at each moment in a preset time period;
calculating the sum of the required power of all the historical instantaneous required power in a preset time period;
calculating the required power and the matrix average required power in a preset time period;
and taking the matrix average required power as the historical required power parameter of the matrix.
7. The networked control method for the high-frequency inverter power supply according to claim 1, wherein the step of calculating the number of the high-frequency inverter power supplies connected to the first high-frequency inverter power supply network according to the historical required power parameter and the current output power parameter to obtain a second high-frequency inverter power supply network comprises the steps of:
calculating the difference value between the historical required power parameter and the current output power parameter;
obtaining rated output power of a single high-frequency inverter power supply;
calculating the ratio A of the difference value to rated output power;
and A high-frequency inverter power supplies are connected into the first high-frequency inverter power supply network to obtain a second high-frequency inverter power supply network.
8. A networked control system for a high frequency inverter power supply, the system comprising:
the historical demand power parameter acquisition unit is used for acquiring the historical demand power parameter of the load on the bus;
the current output power parameter acquisition unit is used for acquiring current output power parameters of the first high-frequency inverter power supply network;
the judging unit is used for judging whether the current output power parameter is larger than the historical required power parameter or not;
the execution unit is used for executing preset operation according to the judgment result of the judgment unit;
when the judgment result of the judgment unit is yes, the execution unit supplies power to all the loads through the first high-frequency inverter power supply network; and when the judgment result of the judgment unit is negative, the execution unit calculates the number of the high-frequency inverter power supplies accessed into the first high-frequency inverter power supply network according to the historical required power parameter and the current output power parameter to obtain a second high-frequency inverter power supply network, and supplies power to all the loads through the second high-frequency inverter power supply network.
9. The networked control system for a high-frequency inverter power supply according to claim 8, further comprising: a load storage unit for storing all the loads; the load storage unit is connected with the historical demand power parameter acquisition unit.
10. The networked control system for a high-frequency inverter power supply according to claim 8, further comprising: the high-frequency inverter power supply network storage unit is used for storing the high-frequency inverter power supply network; and the high-frequency inverter power supply network storage unit is connected with the current output power parameter acquisition unit.
CN202010867478.XA 2020-08-25 2020-08-25 High-frequency inverter power supply networking control method and system Pending CN111969876A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010867478.XA CN111969876A (en) 2020-08-25 2020-08-25 High-frequency inverter power supply networking control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010867478.XA CN111969876A (en) 2020-08-25 2020-08-25 High-frequency inverter power supply networking control method and system

Publications (1)

Publication Number Publication Date
CN111969876A true CN111969876A (en) 2020-11-20

Family

ID=73390428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010867478.XA Pending CN111969876A (en) 2020-08-25 2020-08-25 High-frequency inverter power supply networking control method and system

Country Status (1)

Country Link
CN (1) CN111969876A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118095790A (en) * 2024-04-23 2024-05-28 中国电建集团昆明勘测设计研究院有限公司 A method and system for configuring hydropower station resources based on multi-source equipment status

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102664411A (en) * 2012-03-31 2012-09-12 东北大学 A maximum power tracking wind power generation system and its control method
CN103501020A (en) * 2013-10-12 2014-01-08 电子科技大学 Hybrid power supply system consisting of mains supply network and photovoltaic assembly and control method thereof
CN109804547A (en) * 2016-09-16 2019-05-24 三菱电机株式会社 Power-converting device
CN111327211A (en) * 2020-02-14 2020-06-23 中国电子科技集团公司第十四研究所 Power supply power fluctuation control method for pulse load

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102664411A (en) * 2012-03-31 2012-09-12 东北大学 A maximum power tracking wind power generation system and its control method
CN103501020A (en) * 2013-10-12 2014-01-08 电子科技大学 Hybrid power supply system consisting of mains supply network and photovoltaic assembly and control method thereof
CN109804547A (en) * 2016-09-16 2019-05-24 三菱电机株式会社 Power-converting device
CN111327211A (en) * 2020-02-14 2020-06-23 中国电子科技集团公司第十四研究所 Power supply power fluctuation control method for pulse load

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118095790A (en) * 2024-04-23 2024-05-28 中国电建集团昆明勘测设计研究院有限公司 A method and system for configuring hydropower station resources based on multi-source equipment status

Similar Documents

Publication Publication Date Title
CN110626205B (en) Charging equipment power distribution method, storage medium and system
US9825474B2 (en) Secondary battery system with plural batteries and method of distributing charge/discharge power
US8326467B2 (en) Controller and method of controlling a power system
EP4167417A1 (en) Device power supply method, system, and related device
CN113162112B (en) Bus voltage control method of photovoltaic grid-connected/off-grid system and photovoltaic grid-connected/off-grid system
CN114465260B (en) Control method for balancing photovoltaic energy storage battery
CN113910961B (en) Flexible charging power distribution method, device and system for electric automobile
JP6712802B2 (en) Power storage system, control device, and power storage device
WO2025139433A1 (en) Energy management method and system for peak shaving and frequency regulation for energy storage power station, and apparatus, electronic device, storage medium and product
CN108462217B (en) Scheduling algorithm of power supply unit of charging pile and power supply system of charging pile
CN117081180A (en) Voltage reactive power control method and device, storage medium and computer equipment
CN112467774A (en) Energy storage system control method and device based on global energy efficiency optimization and SOC self-adaption
CN111969876A (en) High-frequency inverter power supply networking control method and system
CN116968581B (en) Charging regulation and control system taking intelligent fusion terminal as core
CN117713249A (en) Micro-grid control method and device with flexible networking function and computer equipment
CN118232523A (en) Power supply scheduling control method and system
CN116683486A (en) Method and device for power scheduling control of cluster energy storage system
CN113949149B (en) Data center control method and control system
EP4152545A1 (en) Output distribution method of power supply system
CN210092954U (en) Direct current micro-grid system
CN114825407B (en) Charging and discharging switching method, device, system and medium of bidirectional converter
CN104734199A (en) Operation scheduling method for micro-grid type photovoltaic-diesel hybrid power supply system
US20240313550A1 (en) Method for overcurrent regulation of energy storage system and energy storage system
EP4089871B1 (en) Energy storage system and related method
CN115514012B (en) Control method and device of island microgrid system and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20201120

WD01 Invention patent application deemed withdrawn after publication