CN111963094B - 集束管两气共采生产管柱 - Google Patents
集束管两气共采生产管柱 Download PDFInfo
- Publication number
- CN111963094B CN111963094B CN202010933046.4A CN202010933046A CN111963094B CN 111963094 B CN111963094 B CN 111963094B CN 202010933046 A CN202010933046 A CN 202010933046A CN 111963094 B CN111963094 B CN 111963094B
- Authority
- CN
- China
- Prior art keywords
- bundling
- tube
- gas
- pipe
- cluster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/04—Casing heads; Suspending casings or tubings in well heads
- E21B33/047—Casing heads; Suspending casings or tubings in well heads for plural tubing strings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Chemical & Material Sciences (AREA)
- Treating Waste Gases (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010933046.4A CN111963094B (zh) | 2020-09-08 | 2020-09-08 | 集束管两气共采生产管柱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010933046.4A CN111963094B (zh) | 2020-09-08 | 2020-09-08 | 集束管两气共采生产管柱 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111963094A CN111963094A (zh) | 2020-11-20 |
CN111963094B true CN111963094B (zh) | 2022-11-01 |
Family
ID=73392544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010933046.4A Active CN111963094B (zh) | 2020-09-08 | 2020-09-08 | 集束管两气共采生产管柱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111963094B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113389530A (zh) * | 2021-08-04 | 2021-09-14 | 北京中海沃邦能源投资有限公司石楼分公司 | 一种用于深部储层两气同采管柱及地面流程 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2342094Y (zh) * | 1998-06-25 | 1999-10-06 | 中国海洋石油渤海公司 | 同井抽注井口装置 |
US6454010B1 (en) * | 2000-06-01 | 2002-09-24 | Pan Canadian Petroleum Limited | Well production apparatus and method |
CN2665354Y (zh) * | 2001-05-17 | 2004-12-22 | 新疆石油管理局采油工艺研究院 | 一种双管热采井口装置 |
CN201087714Y (zh) * | 2007-09-20 | 2008-07-16 | 江苏金石油气井口科技有限公司 | 双油管井口装置 |
CN201802338U (zh) * | 2010-05-12 | 2011-04-20 | 中国石油天然气股份有限公司 | 分支水平井双管采油井口装置 |
US9038728B1 (en) * | 2011-06-14 | 2015-05-26 | Trendsetter Engineering, Inc. | System and method for diverting fluids from a wellhead by using a modified horizontal christmas tree |
CN202250010U (zh) * | 2011-09-20 | 2012-05-30 | 中国石油天然气股份有限公司 | 注采一体双管热采井口装置 |
CN202500540U (zh) * | 2011-12-30 | 2012-10-24 | 中国石油天然气股份有限公司 | 三通道注采井口装置 |
GB2545339B (en) * | 2014-07-10 | 2020-11-11 | Halliburton Energy Services Inc | Multilateral junction fitting for intelligent completion of well |
CN104389544A (zh) * | 2014-11-18 | 2015-03-04 | 江苏双辉机械制造有限公司 | 一种异径式双管采油井口套管头 |
CN104989314B (zh) * | 2015-06-12 | 2017-10-20 | 美钻能源科技(上海)有限公司 | 水下泥线采油树及其安装方法 |
CN205400656U (zh) * | 2016-03-02 | 2016-07-27 | 克拉玛依市昌达机械有限责任公司 | 带压作业或环空测试两用型井口装置 |
CN207315289U (zh) * | 2017-09-08 | 2018-05-04 | 中国石油天然气股份有限公司 | 双管热采井口装置 |
CN207715122U (zh) * | 2018-01-10 | 2018-08-10 | 盐城市琪航石油机械有限公司 | 双孔水平采油树井口装置 |
CN209195329U (zh) * | 2018-11-12 | 2019-08-02 | 中国石油天然气股份有限公司 | 一种井口设备 |
CN110656908A (zh) * | 2019-10-08 | 2020-01-07 | 中国石油集团渤海石油装备制造有限公司 | 一种可用于斜井的全金属密封双管注汽井口装置 |
CN111188592B (zh) * | 2019-12-12 | 2021-11-26 | 中国石油化工股份有限公司 | 定滑轮悬挂式单井多泵平衡负载低功耗举升系统及方法 |
-
2020
- 2020-09-08 CN CN202010933046.4A patent/CN111963094B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN111963094A (zh) | 2020-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7950454B2 (en) | Technique and system for completing a well | |
US7191832B2 (en) | Gravel pack completion with fiber optic monitoring | |
MX2012001439A (es) | Metodos y aparato para la estimulacion multilateral multietapica de un pozo. | |
US9562414B2 (en) | Isolation assembly for inflow control device | |
US20110011596A1 (en) | Wellbore drilled and equipped for in-well rigless intervention esp | |
CN103615199A (zh) | 水平井注汽、采油、以及温度压力实时监测三管同井筒采油工艺设备 | |
CN105649578B (zh) | 煤层气直井双层分压合采方法及其装置 | |
CN108625830A (zh) | 投球式分层防砂工艺管柱及其方法 | |
CN201705276U (zh) | 水平井的完井、采油管柱 | |
CN111963094B (zh) | 集束管两气共采生产管柱 | |
CN110593846A (zh) | 一种气井气液分采完井管柱 | |
WO1999004137A1 (en) | Simultaneous production and water injection well system | |
CN107740685A (zh) | 一种带潜油电泵的下采上注完井生产管柱 | |
CN109372474A (zh) | 一种煤层气与砂岩气同井生产管柱及开采方法 | |
CN101338658B (zh) | 可进行钢丝作业的密闭电潜泵生产完井系统及操作方法 | |
CN110107230A (zh) | 双层管柱的分层采气装置 | |
RU2007103969A (ru) | Способ добычи из подземной залежи тяжелых и/или высоковязких углеводородов | |
CN203685053U (zh) | 水平井注汽、采油、以及温度压力实时监测三管同井筒采油工艺设备 | |
CN114856504B (zh) | 一种用于浅水水下卧式采油树的修井系统及其操作方法 | |
CN202745939U (zh) | 连续油管悬挂器 | |
CN111963093B (zh) | 集束管穿越式井口悬挂装置及地面悬挂装置 | |
CN107476785A (zh) | 一种油气井串联双潜油电泵密闭生产管柱 | |
CN203822271U (zh) | 一种多煤层合采煤层气井排采专用筛管 | |
CN201606005U (zh) | 暂封口开孔套管分支井固井完井结构 | |
RU79935U1 (ru) | Конструкция многозабойной скважины для одновременной эксплуатации нескольких пластов разной продуктивности |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221228 Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen Patentee after: PetroChina Company Limited Patentee after: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd. Patentee after: CNPC JIANGHAN MACHINERY RESEARCH INSTITUTE Co.,Ltd. Patentee after: BEIJING PETROLEUM MACHINERY Co.,Ltd. Address before: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen Patentee before: PetroChina Company Limited Patentee before: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd. Patentee before: CNPC JIANGHAN MACHINERY RESEARCH INSTITUTE Co.,Ltd. |