CN111945591A - A kind of inspection device for sound barrier screen body - Google Patents
A kind of inspection device for sound barrier screen body Download PDFInfo
- Publication number
- CN111945591A CN111945591A CN202010819435.4A CN202010819435A CN111945591A CN 111945591 A CN111945591 A CN 111945591A CN 202010819435 A CN202010819435 A CN 202010819435A CN 111945591 A CN111945591 A CN 111945591A
- Authority
- CN
- China
- Prior art keywords
- sound barrier
- barrier screen
- inspection
- screen body
- obstacle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 94
- 230000004888 barrier function Effects 0.000 title claims abstract description 86
- 230000009193 crawling Effects 0.000 claims abstract description 39
- 238000001514 detection method Methods 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 5
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 description 10
- 230000008878 coupling Effects 0.000 description 9
- 238000010168 coupling process Methods 0.000 description 9
- 238000005859 coupling reaction Methods 0.000 description 9
- 238000012423 maintenance Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000008602 contraction Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F8/00—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62D—MOTOR VEHICLES; TRAILERS
- B62D57/00—Vehicles characterised by having other propulsion or other ground- engaging means than wheels or endless track, alone or in addition to wheels or endless track
- B62D57/02—Vehicles characterised by having other propulsion or other ground- engaging means than wheels or endless track, alone or in addition to wheels or endless track with ground-engaging propulsion means, e.g. walking members
- B62D57/024—Vehicles characterised by having other propulsion or other ground- engaging means than wheels or endless track, alone or in addition to wheels or endless track with ground-engaging propulsion means, e.g. walking members specially adapted for moving on inclined or vertical surfaces
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D1/00—Control of position, course, altitude or attitude of land, water, air or space vehicles, e.g. using automatic pilots
- G05D1/02—Control of position or course in two dimensions
- G05D1/021—Control of position or course in two dimensions specially adapted to land vehicles
- G05D1/0212—Control of position or course in two dimensions specially adapted to land vehicles with means for defining a desired trajectory
- G05D1/0214—Control of position or course in two dimensions specially adapted to land vehicles with means for defining a desired trajectory in accordance with safety or protection criteria, e.g. avoiding hazardous areas
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Rehabilitation Tools (AREA)
Abstract
本发明公开了一种声屏障屏体的巡检装置,一种声屏障屏体的巡检装置,包括爬行装置、两组巡检组件、越障行走组件和声屏障屏体本体,所述爬行装置设于所述声屏障屏体本体的顶端,所述两组巡检组件分别与所述爬行装置的两侧连接并分布在所述声屏障屏体本体的内外侧壁上,所述越障行走组件安装在所述巡检组件上并附着于所述声屏障屏体本体的侧壁上。本发明的巡检装置可以直接依附于声屏障本体进行越障爬行,空间利用率、作业效率及巡检效率高,不存在劳动人身安全隐患。
The invention discloses an inspection device for a sound barrier screen body, and an inspection device for a sound barrier screen body, comprising a crawling device, two groups of inspection components, an obstacle walking component and a sound barrier screen body. The device is arranged at the top of the sound barrier screen body, and the two groups of inspection components are respectively connected to both sides of the crawling device and distributed on the inner and outer side walls of the sound barrier screen body. The walking assembly is installed on the inspection assembly and attached to the side wall of the sound barrier screen body. The patrol inspection device of the present invention can be directly attached to the sound barrier body to perform obstacle crawling, the space utilization rate, operation efficiency and patrol inspection efficiency are high, and there is no hidden danger of labor and personal safety.
Description
技术领域technical field
本发明涉及声屏障巡检设备技术领域,具体涉及一种声屏障屏体的巡检装置。The invention relates to the technical field of sound barrier inspection equipment, in particular to a sound barrier screen inspection device.
背景技术Background technique
声屏障,主要用于铁路、高速公路、高架复合道路和城市地铁等噪声源的隔声降噪,通常来说指的是为减轻行车噪声对附近居民的影响而设置在铁路和公路侧旁的墙式构造物。声屏障有非常可观的应用前景,因为它具有很多的应用优势,但需要进行定期进行对螺栓、焊缝及构件安全性等进行检测来防范不必要的危险。Sound barriers are mainly used for sound insulation and noise reduction of noise sources such as railways, highways, elevated composite roads and urban subways. Generally speaking, it refers to the noise barriers set on the side of railways and highways to reduce the impact of traffic noise on nearby residents. wall structure. The sound barrier has very considerable application prospects, because it has many application advantages, but it needs to carry out regular inspection of bolts, welds and component safety to prevent unnecessary dangers.
传统高速铁路声屏障检查维护方法主要是采用夜间入网巡视、人工摸排观测的方法进行,检查维护手段主要包括目测、垂球、钢卷尺量测、检查锤敲击、扭力扳手、塞尺等;声屏障外侧则主要采用撬杠撬起后再进行检查维护等方式进行,由于缺乏有效的检查作业方法和手段,对声屏障外侧的检查维护难度很大,危险系数高,检查维护工作人员的工作强度大,工作效率也很低。The traditional high-speed railway sound barrier inspection and maintenance methods are mainly carried out by means of network inspection at night and manual inspection and observation. The outside of the barrier is mainly carried out by means of crowbar prying and then inspection and maintenance. Due to the lack of effective inspection methods and means, the inspection and maintenance of the outside of the sound barrier is very difficult and the risk factor is high. large, and the work efficiency is also very low.
目前京沪铁路采用的是李庆云发明的声屏障检修智能机械设备,这套设备是基于铁轨进行行走,重点解决高铁线路两侧的声屏障立柱固定螺栓的检测、涂油保养和复拧紧固等作业项目,但是这样的行走方式会影响铁路的正常运营,从而间接的影响了工作效率。At present, the Beijing-Shanghai Railway adopts the intelligent mechanical equipment for sound barrier maintenance invented by Li Qingyun. This equipment is based on rails for walking, focusing on the detection, oiling maintenance and re-tightening of the sound barrier column fixing bolts on both sides of the high-speed rail line. project, but this way of walking will affect the normal operation of the railway, thus indirectly affecting the work efficiency.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种声屏障屏体的巡检装置,可以直接依附于声屏障本体进行越障爬行,空间利用率、作业效率及巡检效率高,不存在劳动人身安全隐患,以解决背景技术中提到的技术问题。The purpose of the present invention is to provide a sound barrier screen inspection device, which can be directly attached to the sound barrier body to crawl over obstacles, with high space utilization, operation efficiency and inspection efficiency, and there is no hidden danger of labor and personal safety, so as to solve the problem of crawling over obstacles. Technical problems mentioned in the background art.
本发明的目的是通过以下技术方案来实现的:The purpose of this invention is to realize through the following technical solutions:
一种声屏障屏体的巡检装置,包括爬行装置、两组巡检组件、越障行走组件和声屏障屏体本体,所述爬行装置设于所述声屏障屏体本体的顶端,所述两组巡检组件分别与所述爬行装置的两侧连接并分布在所述声屏障屏体本体的内外侧壁上,所述越障行走组件安装在所述巡检组件上并附着于所述声屏障屏体本体的侧壁上。An inspection device for a sound barrier screen body, comprising a crawling device, two groups of inspection components, an obstacle walking component and a sound barrier screen body, the crawling device is arranged at the top of the sound barrier screen body, and the Two sets of inspection components are respectively connected to both sides of the crawling device and distributed on the inner and outer side walls of the sound barrier screen body, and the obstacle walking components are installed on the inspection components and attached to the on the side wall of the sound barrier screen body.
本发明的巡检组件及越障行走组件直接依附于声屏障本体进行越障爬行,爬行装置沿着所述声屏障屏体本体的顶端进行越障爬行,巡检组件、越障行走组件及爬行装置互相联动同步完成声屏障本体的越障爬行。The inspection component and the obstacle-crossing walking component of the present invention are directly attached to the sound barrier body to perform obstacle-surmounting crawling, and the crawling device performs obstacle-surmounting crawling along the top of the sound barrier screen body. The devices are linked and synchronized with each other to complete the obstacle crawling of the sound barrier body.
进一步地,所述爬行装置包括连接板、框架、前进轮、第一执行元件和支撑杆,所述连接板安装在所述框架的中部,两组巡检组件分别与所述连接板的两侧铰接,所述支撑杆转动安装在所述框架的两端,所述支撑杆的中部连接有安装柱,所述前进轮安装在所述安装柱上,所述前进轮与所述声屏障屏体本体顶端的横梁贴合;Further, the crawling device includes a connecting plate, a frame, a forward wheel, a first executive element and a support rod, the connecting plate is installed in the middle of the frame, and two sets of inspection components are respectively connected to both sides of the connecting plate. Hinged, the support rod is rotatably installed at both ends of the frame, the middle part of the support rod is connected with a mounting post, the advancing wheel is mounted on the mounting post, and the advancing wheel is connected to the sound barrier screen. The beam at the top of the body fits together;
所述框架上关于所述连接板对称转动安装有支杆,所述第一执行元件的一端与所述支杆铰接,所述第一执行元件的另一端与所述安装柱铰接,所述安装柱上安装有距离传感检测器。A strut is mounted on the frame symmetrically about the connecting plate, one end of the first actuator is hinged with the strut, the other end of the first actuator is hinged with the mounting post, and the mounting A distance sensing detector is mounted on the column.
上述优选方案的有益效果是:连接板支撑于声屏障屏体本体顶端并分别与分布在声屏障屏体本体的凹面和凸面的巡检组件串联联动,当距离传感检测器检到前方需要越障时,通过控制爬行装置改变状态,靠近障碍物附近的第一执行元件进行回缩,前进轮回缩,依靠后两个越障行走组件的支撑和驱动前行,等靠近障碍物附近的前进轮越过声屏障屏体本体上的凸起部分,再通过第一执行元件伸长,将靠近障碍物附近的前进轮恢复原位,依次将靠近障碍物附近的前进轮重复前一个前进轮的工作状态,最终实现顶部的越障功能。The beneficial effect of the above-mentioned preferred solution is that the connecting plate is supported on the top of the sound barrier screen body and is linked in series with the inspection components distributed on the concave and convex surfaces of the sound barrier screen body. When the obstacle is encountered, the state is changed by controlling the crawling device, the first actuator near the obstacle is retracted, the forward wheel is retracted, and it is supported and driven by the last two obstacle-surmounting components to move forward, and then move forward near the obstacle. The wheel goes over the raised part on the body of the sound barrier screen body, and then extends through the first actuator to restore the forward wheel near the obstacle to its original position, and repeat the work of the previous forward wheel for the forward wheel near the obstacle in turn. state, and finally realize the obstacle crossing function at the top.
进一步地,所述框架包括一组横杆和一组竖杆,一组所述横杆和一组所述竖杆依次首尾连接,一组所述横杆穿设于所述连接板并与所述连接板一体成型。Further, the frame includes a group of cross bars and a group of vertical bars, a group of the cross bars and a group of the vertical bars are connected end to end in sequence, and a group of the cross bars is passed through the connecting plate and is connected with all the bars. The connecting plate is integrally formed.
上述优选方案的有益效果是:框架由一组横杆和一组竖杆首尾连接而成并与连接板构成一体成型的结构,提高了爬行装置在声屏障屏体本体顶端的行走稳定性。The beneficial effect of the above preferred solution is that the frame is formed by connecting a set of horizontal bars and a set of vertical bars end-to-end, and forms an integral structure with the connecting plate, which improves the walking stability of the crawling device on the top of the sound barrier screen body.
进一步地,两组所述巡检组件结构相同,所述巡检组件包括若干个依次连接的巡检单元,所述巡检单元包括第一关节杆、第二关节杆和第二执行元件,所述第一关节杆和第二关节杆均为三角形关节杆,且均包括第一内角、第二内角和第三内角,所述第二关节杆的第二内角与所述第一关节杆的第一内角铰接,所述第一关节杆的第三内角与所述第二关节杆的第三内角通过所述第二执行元件铰接。Further, the two groups of the inspection assemblies have the same structure, and the inspection assemblies include several inspection units connected in sequence, and the inspection units include a first joint rod, a second joint rod and a second execution element, so The first joint rod and the second joint rod are both triangular joint rods, and each includes a first inner angle, a second inner angle and a third inner angle, and the second inner angle of the second joint rod is the same as the first joint rod. An inner angle is hinged, and the third inner angle of the first joint rod and the third inner angle of the second joint rod are hinged through the second actuator.
上述优选方案的有益效果是:若干个巡检单元串联构成巡检组件,第一关节杆和第二关节杆通过第二执行元件连接,通过第二执行元件的伸缩使得巡检组件能适应所述声屏障屏体巡检装置的形状,以适应声屏障屏体的外形形状。The beneficial effect of the above preferred solution is that: a number of inspection units are connected in series to form an inspection assembly, the first joint rod and the second joint rod are connected by a second actuator, and the expansion and contraction of the second actuator enables the inspection assembly to adapt to the The shape of the sound barrier screen inspection device is adapted to the shape of the sound barrier screen.
进一步地,位于所述巡检组件一端的巡检单元的第二关节杆的第一内角处安装有检测组件。Further, a detection assembly is installed at the first inner corner of the second joint rod of the inspection unit at one end of the inspection assembly.
上述优选方案的有益效果是:The beneficial effects of the above preferred solution are:
进一步地,位于所述巡检组件另一端的巡检单元的第一关节杆的第二内角与所述爬行装置的一侧的底端铰接,所述第一关节杆的第三内角通过联动杆与所述爬行装置的一侧的顶端铰接。Further, the second inner angle of the first joint rod of the inspection unit located at the other end of the inspection assembly is hinged with the bottom end of one side of the crawling device, and the third inner angle of the first joint rod passes through the linkage rod. It is hinged with the top end of one side of the crawler.
上述优选方案的有益效果是:巡检组件通过联动杆与爬行装置连接构成整体。The beneficial effect of the above preferred solution is that the inspection component is connected with the crawling device through the linkage rod to form a whole.
进一步地,所述越障行走组件包括若干个行走单元、联轴器和十字接头架,所述行走单元间隔安装在多个所述第二关节杆上,所述十字接头架间隔安装在多个所述第一关节杆上,所述十字接头架的第一端通过所述联轴器与所述行走单元连接,所述十字接头架的第二端通过所述联轴器与相邻的行走单元连接。Further, the obstacle walking assembly includes several walking units, couplings and cross joint frames, the walking units are installed on a plurality of the second joint rods at intervals, and the cross joint frames are installed at intervals on a plurality of second joint rods. On the first joint rod, the first end of the cross joint frame is connected to the traveling unit through the coupling, and the second end of the cross joint frame is connected to the adjacent walking unit through the coupling. unit connection.
上述优选方案的有益效果是:相邻的行走单元通过联轴器及十字接头连接,因此相邻的行走单元之间的角度可以随巡检路形发生适应性改变。The beneficial effect of the above preferred solution is that the adjacent traveling units are connected by couplings and cross joints, so the angle between the adjacent traveling units can be adaptively changed with the shape of the inspection road.
进一步地,所述行走单元包括第一安装座及套接在所述第一安装座上的连接轴,所述连接轴上套接有大齿轮,所述大齿轮的两端分别啮合安装有小齿轮和越障轮。Further, the walking unit includes a first mounting seat and a connecting shaft sleeved on the first mounting seat, a large gear is sleeved on the connecting shaft, and two ends of the large gear are meshed and installed with small gears respectively. Gears and obstacle wheels.
上述优选方案的有益效果是:本发明可优选通过安装电机,以驱动大齿轮转动,大齿轮带动小齿轮和越障轮同步转动,越障轮可以适应一定的角度变化进而翻越声屏障屏体本体的凹面和凸面的障碍物。The beneficial effects of the above preferred solution are: the present invention can preferably install a motor to drive the large gear to rotate, the large gear drives the pinion and the obstacle-crossing wheel to rotate synchronously, and the obstacle-crossing wheel can adapt to a certain angle change and then climb over the sound barrier screen body. Concave and convex obstacles.
进一步地,所述十字接头架包括第二安装座及套接在所述第二安装座上的连接杆。Further, the cross joint frame includes a second mounting seat and a connecting rod sleeved on the second mounting seat.
上述优选方案的有益效果是:采用第二安装座及套接在所述第二安装座上的连接杆的连接结构将相邻的行走单元连接起来,结构简单易于实现,且连接稳定性强。The beneficial effect of the above preferred solution is that the adjacent traveling units are connected by the connection structure of the second mounting seat and the connecting rod sleeved on the second mounting seat, the structure is simple and easy to realize, and the connection stability is strong.
进一步地,所述声屏障屏体本体上设有立柱。Further, the sound barrier screen body is provided with uprights.
上述优选方案的有益效果是:所述的立柱就是声屏障屏体本体上的凸起部分,也就障碍物。The beneficial effect of the above preferred solution is that the upright column is the raised part on the body of the sound barrier screen body, that is, the obstacle.
本发明的有益效果是:The beneficial effects of the present invention are:
本发明的声屏障屏体的巡检装置,巡检组件及越障行走组件依附于声屏障本体进行越障爬行,爬行装置沿着所述声屏障屏体本体的顶端进行越障爬行,巡检组件、越障行走组件及爬行装置互相联动同步完成声屏障本体的越障爬行。巡检组件通过若干个巡检单元串联,使得巡检装置的伸缩性较强,稳定性较好,结构紧凑,质量轻便。本发明的巡检装置通过改变自身的状态,可以适应不同的声屏障结构,达到通用性要求。巡检装置本体是直接依附于声屏障本体进行越障爬行,将空间利用率最大化,巡检效率最大化,且不存在劳动人身安全隐患。In the patrol inspection device of the sound barrier screen of the present invention, the patrol inspection component and the obstacle-crossing walking component are attached to the sound barrier body to perform obstacle-surmounting crawling. The components, the obstacle walking component and the crawling device are linked and synchronized with each other to complete the obstacle crawling of the sound barrier body. The inspection components are connected in series through several inspection units, so that the inspection device has strong scalability, good stability, compact structure and light weight. The inspection device of the present invention can adapt to different sound barrier structures by changing its own state, so as to meet the requirement of versatility. The body of the inspection device is directly attached to the body of the sound barrier for obstacle crawling, which maximizes the space utilization rate, maximizes the inspection efficiency, and has no hidden dangers to labor and personal safety.
附图说明Description of drawings
图1为本发明声屏障屏体的巡检装置的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the inspection device of the sound barrier screen body of the present invention;
图2为为本发明爬行装置的结构示意图;Fig. 2 is the structural representation of the crawling device of the present invention;
图3为为本发明声屏障屏体的巡检装置的立体侧视图;Fig. 3 is the three-dimensional side view of the inspection device of the sound barrier screen body of the present invention;
图4为为本发明声屏障屏体的巡检装置的立体轴测图;Fig. 4 is the three-dimensional axonometric view of the inspection device of the sound barrier screen of the present invention;
图5为为本发明越障行走组件和巡检组件的安装结构示意图;5 is a schematic diagram of the installation structure of the obstacle walking assembly and the inspection assembly of the present invention;
图中,1-声屏障屏体本体,101-横梁,102-立柱,2-连接板,3-框架,301-横杆,302-竖杆,4-前进轮,5-第一执行元件,6-支撑杆,7-安装柱,8-支杆,9-距离传感检测器,10-第一关节杆,11-第二关节杆,12-第二执行元件,13-检测组件,14-联动杆,15-行走单元,1501-第一安装座,1502-连接轴,1503-大齿轮,1504-小齿轮,1505-越障轮,16-联轴器,1601-第二安装座,1602-连接杆,17-十字接头架。In the figure, 1-sound barrier screen body, 101-beam, 102-post, 2-connecting plate, 3-frame, 301-crossbar, 302-vertical bar, 4-forward wheel, 5-first actuator, 6-Support rod, 7-Installation column, 8-Strut, 9-Distance sensor detector, 10-First joint rod, 11-Second joint rod, 12-Second actuator, 13-Detection assembly, 14 - Linkage lever, 15- Travel unit, 1501- First mounting seat, 1502- Connecting shaft, 1503- Large gear, 1504- Pinion gear, 1505- Obstacle wheel, 16- Coupling, 1601- Second mounting seat, 1602 - connecting rod, 17 - cross joint frame.
具体实施方式Detailed ways
下面将结合实施例,对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域技术人员在没有付出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative efforts shall fall within the protection scope of the present invention.
实施例1Example 1
参阅图1-5,本发明提供一种技术方案:Referring to Figures 1-5, the present invention provides a technical solution:
请参照图1,一种声屏障屏体的巡检装置,包括爬行装置、两组巡检组件、越障行走组件和声屏障屏体本体1,所述爬行装置设于所述声屏障屏体本体1的顶端,所述两组巡检组件分别与所述爬行装置的两侧连接并分布在所述声屏障屏体本体1的内外侧壁上,所述越障行走组件安装在所述巡检组件上并附着于所述声屏障屏体本体1的侧壁上。Please refer to FIG. 1 , an inspection device for a sound barrier screen, including a crawling device, two groups of inspection components, an obstacle-crossing component, and a sound barrier screen body 1. The crawling device is provided on the sound barrier screen body. At the top of the main body 1, the two groups of inspection components are respectively connected to both sides of the crawling device and distributed on the inner and outer side walls of the sound barrier screen body 1, and the obstacle-crossing components are installed on the patrol device. The detection component is attached to the side wall of the sound barrier screen body 1 .
本发明的巡检组件及越障行走组件直接依附于声屏障本体进行越障爬行,爬行装置沿着所述声屏障屏体本体1的顶端进行越障爬行,巡检组件、越障行走组件及爬行装置互相联动并同共同协作完成声屏障本体的越障爬行。The inspection component and the obstacle-surmounting walking component of the present invention are directly attached to the sound barrier body to perform obstacle-surmounting crawling. The crawling devices are linked with each other and cooperate with each other to complete the obstacle crawling of the sound barrier body.
请参照图2,所述爬行装置包括连接板2、框架3、前进轮4、第一执行元件5和支撑杆6,所述连接板2安装在所述框架3的中部,两组巡检组件分别与所述连接板2的两侧铰接,所述支撑杆6转动安装在所述框架3的两端,所述支撑杆6的中部连接有安装柱7,所述前进轮4安装在所述安装柱7上,所述前进轮4与所述声屏障屏体本体1顶端的横梁101贴合;Please refer to FIG. 2 , the crawling device includes a connecting
所述框架3上关于所述连接板2对称转动安装有支杆8,所述第一执行元件5的一端与所述支杆8铰接,所述第一执行元件5的另一端与所述安装柱7铰接,所述安装柱7上安装有距离传感检测器9。A
本发明的爬行装置,连接板2支撑于声屏障屏体本体1顶端并分别与分布在声屏障屏体本体1的凹面和凸面的巡检组件串联联动,当距离传感检测器9检到前方需要越障时,通过控制爬行装置改变状态,靠近障碍物附近的第一执行元件5进行回缩,前进轮4回缩,依靠后两个越障行走组件的支撑和驱动前行,等靠近障碍物附近的前进轮4越过声屏障屏体本体1上的凸起部分,再通过第一执行元件5伸长,将靠近障碍物附近的前进轮4恢复原位,依次将靠近障碍物附近的前进轮4重复前一个前进轮4的工作状态,最终实现顶部的越障功能。In the crawling device of the present invention, the connecting
所述的第一执行元件5可选用液压缸。The
请参照图2,所述框架3包括一组横杆301和一组竖杆302,一组所述横杆301和一组所述竖杆302依次首尾连接,一组所述横杆301穿设于所述连接板2并与所述连接板2一体成型。Please refer to FIG. 2 , the
本发明的框架3由一组横杆301和一组竖杆302首尾连接而成并与连接板2构成一体成型的结构,提高了爬行装置在声屏障屏体本体1顶端的行走稳定性。The
请参照图3-4,两组所述巡检组件结构相同,所述巡检组件包括若干个依次连接的巡检单元,所述巡检单元包括第一关节杆10、第二关节杆11和第二执行元件12,所述第一关节杆10和第二关节杆11均为三角形关节杆,且均包括第一内角、第二内角和第三内角,所述第二关节杆11的第二内角与所述第一关节杆10的第一内角铰接,所述第一关节杆10的第三内角与所述第二关节杆11的第三内角通过所述第二执行元件12铰接。3-4, the two groups of the inspection components have the same structure. The inspection components include several inspection units connected in sequence. The inspection units include a first
本发明的若干个巡检单元串联构成巡检组件,第一关节杆10和第二关节杆11通过第二执行元件12连接,通过第二执行元件12的伸缩使得巡检组件能适应所述声屏障屏体巡检装置的形状,以适应声屏障屏体的外形形状。Several inspection units of the present invention are connected in series to form an inspection assembly. The first
所述的第一执行元件12可选用伸缩缸。The
所述的巡检单元不局限于三角形结构的关节杆。The inspection unit is not limited to the joint rod of the triangular structure.
本发明的巡检单元的数量优选为4个,根据工程需要不局限于4个,可以自由组合。The number of inspection units in the present invention is preferably 4, which is not limited to 4 according to engineering needs, and can be freely combined.
请参照图4,位于所述巡检组件一端的巡检单元的第二关节杆11的第一内角处安装有检测组件13。Referring to FIG. 4 , a
所述检测组件13采用现有技术,主要包括摄像机和图片采集装置,其工作原理和过程是:巡检装置在行走的过程中,摄像机和图片采集装置采集声屏障屏体本体1、立柱102,立柱102的固定螺栓等的状态,查看是否有损失或者松动,进行视频的录入和存储,并通过接口将信息传输到计算机终端上,便于回放检查和分析。请参照图4,位于所述巡检组件另一端的巡检单元的第一关节杆10的第二内角与所述爬行装置的一侧的底端铰接,所述第一关节杆10的第三内角通过联动杆14与所述爬行装置的一侧的顶端铰接。The
本发明的巡检组件通过联动杆14与爬行装置连接构成整体。The inspection assembly of the present invention is connected with the crawling device through the
请参照图4-5,所述越障行走组件包括若干个行走单元15、联轴器16和十字接头架17,所述行走单元15间隔安装在多个所述第二关节杆11上,所述十字接头架17间隔安装在多个所述第一关节杆10上,所述十字接头架17的第一端通过所述联轴器16与所述行走单元15连接,所述十字接头架17的第二端通过所述联轴器16与相邻的行走单元15连接。Referring to FIGS. 4-5 , the obstacle-surmounting walking assembly includes a plurality of walking
本发明的行走单元15的数量与巡检单元的数量相适配,相邻的行走单元15通过联轴器16及十字接头连接,因此相邻的行走单元15之间的角度可以随巡检路形发生适应性改变。The number of the walking
请参照图5,所述行走单元15包括第一安装座1501及套接在所述第一安装座1501上的连接轴1502,所述连接轴1502上套接有大齿轮1503,所述大齿轮1503的两端分别啮合安装有小齿轮1504和越障轮1505。Please refer to FIG. 5 , the walking
本发明可优选通过安装电机,以驱动大齿轮1503转动,大齿轮1503带动小齿轮1504和越障轮1505同步转动,越障轮1505可以适应一定的角度变化进而翻越声屏障屏体本体1的凹面和凸面的障碍物。In the present invention, it is preferable to install a motor to drive the
请参照图5,所述十字接头架17包括第二安装座1601及套接在所述第二安装座1601上的连接杆1602。Referring to FIG. 5 , the cross
本发明采用第二安装座1601及套接在所述第二安装座1601上的连接杆1602的连接结构将相邻的行走单元15连接起来,此结构简单易于实现,且连接稳定性强。所述第二安装座1601是固定安装在第二关节杆11上。The present invention uses the connection structure of the second mounting
请参照图3,所述声屏障屏体本体1上设有立柱102。所述的立柱102就是声屏障屏体本体1上的凸起部分,也就障碍物。Referring to FIG. 3 , the sound barrier screen body 1 is provided with a
本发明的声屏障屏体的巡检装置的工作过程是:巡检组件在声屏障屏体本体1的凹面和凸面上爬行,越过声屏障的立柱102,进而继续前进。The working process of the inspection device for the sound barrier screen of the present invention is as follows: the inspection component crawls on the concave and convex surfaces of the sound barrier screen body 1, passes over the
当距离传感检测器9检到前方需要越障时,通过控制爬行装置改变状态,靠近障碍物附近的第一执行元件5进行回缩,前进轮4回缩,依靠后两个越障行走组件的支撑和驱动前行,等靠近障碍物附近的前进轮4越过声屏障屏体本体1上的凸起部分即立柱102,再通过第一执行元件5伸长,将靠近障碍物附近的前进轮4恢复原位,依次将靠近障碍物附近的前进轮4重复前一个前进轮4的工作状态,最终实现顶部的越障功能。When the
同时,本发明的检测组件13检测到前方需要越障时,通过驱动电机带动大齿轮1503转动,大齿轮1503带动小齿轮1504和越障轮1505同步转动,越障轮1505可以适应一定的角度变化进而翻越声屏障屏体本体1的凹面和凸面的立柱102。At the same time, when the
以上所述仅是本发明的优选实施方式,应当理解本发明并非局限于本文所披露的形式,不应看作是对其他实施例的排除,而可用于各种其他组合、修改和环境,并能够在本文所述构想范围内,通过上述教导或相关领域的技术或知识进行改动。而本领域人员所进行的改动和变化不脱离本发明的精神和范围,则都应在本发明所附权利要求的保护范围内。The foregoing are only preferred embodiments of the present invention, and it should be understood that the present invention is not limited to the forms disclosed herein, and should not be construed as an exclusion of other embodiments, but may be used in various other combinations, modifications, and environments, and Modifications can be made within the scope of the concepts described herein, from the above teachings or from skill or knowledge in the relevant field. However, modifications and changes made by those skilled in the art do not depart from the spirit and scope of the present invention, and should all fall within the protection scope of the appended claims of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010819435.4A CN111945591B (en) | 2020-08-14 | 2020-08-14 | Inspection device for sound barrier screen body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010819435.4A CN111945591B (en) | 2020-08-14 | 2020-08-14 | Inspection device for sound barrier screen body |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111945591A true CN111945591A (en) | 2020-11-17 |
CN111945591B CN111945591B (en) | 2021-09-28 |
Family
ID=73342379
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010819435.4A Active CN111945591B (en) | 2020-08-14 | 2020-08-14 | Inspection device for sound barrier screen body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111945591B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113118681A (en) * | 2021-04-06 | 2021-07-16 | 中铁第四勘察设计院集团有限公司 | Robot system for detecting and welding weld joints of sound barrier stand columns |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101220581A (en) * | 2008-01-25 | 2008-07-16 | 上海天泉建筑装饰工程有限公司 | Tridimensional greening sound-proof wall and method for manufacturing same |
CN105133515A (en) * | 2015-09-21 | 2015-12-09 | 武汉市聚力恒隆自动化设备工程有限公司 | Route inspection maintenance equipment for sound barrier |
JP2019078103A (en) * | 2017-10-26 | 2019-05-23 | アスゲッティ株式会社 | Sound barrier, undermost layer sound insulation panel, and base plate |
CN110900628A (en) * | 2019-12-03 | 2020-03-24 | 南方电网科学研究院有限责任公司 | Automatic obstacle-crossing inspection robot |
CN210315268U (en) * | 2019-04-28 | 2020-04-14 | 山西尚风科技股份有限公司 | Bridge railway sound barrier steel stand convenient to overhaul and maintain |
CN111478223A (en) * | 2020-04-09 | 2020-07-31 | 山东欧玛嘉宝电气科技有限公司 | Obstacle crossing assembly of cable inspection robot |
-
2020
- 2020-08-14 CN CN202010819435.4A patent/CN111945591B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101220581A (en) * | 2008-01-25 | 2008-07-16 | 上海天泉建筑装饰工程有限公司 | Tridimensional greening sound-proof wall and method for manufacturing same |
CN105133515A (en) * | 2015-09-21 | 2015-12-09 | 武汉市聚力恒隆自动化设备工程有限公司 | Route inspection maintenance equipment for sound barrier |
JP2019078103A (en) * | 2017-10-26 | 2019-05-23 | アスゲッティ株式会社 | Sound barrier, undermost layer sound insulation panel, and base plate |
CN210315268U (en) * | 2019-04-28 | 2020-04-14 | 山西尚风科技股份有限公司 | Bridge railway sound barrier steel stand convenient to overhaul and maintain |
CN110900628A (en) * | 2019-12-03 | 2020-03-24 | 南方电网科学研究院有限责任公司 | Automatic obstacle-crossing inspection robot |
CN111478223A (en) * | 2020-04-09 | 2020-07-31 | 山东欧玛嘉宝电气科技有限公司 | Obstacle crossing assembly of cable inspection robot |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113118681A (en) * | 2021-04-06 | 2021-07-16 | 中铁第四勘察设计院集团有限公司 | Robot system for detecting and welding weld joints of sound barrier stand columns |
Also Published As
Publication number | Publication date |
---|---|
CN111945591B (en) | 2021-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746455A (en) | Working method of large-height bridge wall cleaning vehicle | |
CN203142829U (en) | Multifunctional hydraulic rescue robot | |
CN111945591A (en) | A kind of inspection device for sound barrier screen body | |
CN108842613B (en) | Bridge guardrail telescoping device | |
WO2023011664A1 (en) | Emergency drainage vehicle and operating apparatus of emergency drainage vehicle | |
CN112407079A (en) | A crawler-type forest fire early monitoring robot | |
CN216997374U (en) | Tyre type universal portal crane | |
CN203578255U (en) | Full-automatic rail-type tunnel lamp cleaning device | |
CN209538545U (en) | Presetting system Multi-functional green house covered with plastic film snow-removing device | |
CN217638747U (en) | High-speed railway sound barrier maintenance platform | |
CN206428624U (en) | A kind of adjustable wiper mechanism for road sound barrier in position | |
CN213705601U (en) | A crawler-type forest fire early monitoring robot | |
CN215702600U (en) | Big case roof beam centre form template cleaning device of high-speed railway | |
CN116463937A (en) | A New Parallel Double Sling Inspection Robot | |
CN211922221U (en) | Little table department preventive maintenance device in road surface | |
CN212294335U (en) | Leveling device for overhauled truss car on steel truss arch bridge arch | |
CN112664235A (en) | Walking type pipe gallery formwork supporting device | |
CN219793623U (en) | Spliced sectional road and bridge protective fence | |
CN220927666U (en) | Road cleaning device | |
CN220469938U (en) | Tunnel lining maintenance differential obstacle avoidance portal structure | |
CN215164908U (en) | Warning device for road construction | |
CN220831018U (en) | Agricultural multi-span greenhouse with hail prevention device | |
CN110121957A (en) | A kind of farm machinery chassis stability height and be easily installed | |
CN214246897U (en) | Warning guardrail is used in public road bridge roof beam engineering construction | |
CN221590673U (en) | Road bridge construction pavement protector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |