Method and system for determining blackable window period of main equipment of power grid Download PDFInfo
- Publication number
- CN111917139A CN111917139A CN202010664727.5A CN202010664727A CN111917139A CN 111917139 A CN111917139 A CN 111917139A CN 202010664727 A CN202010664727 A CN 202010664727A CN 111917139 A CN111917139 A CN 111917139A
- Authority
- CN
- China
- Prior art keywords
- equipment
- power
- period
- window period
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 38
- 230000005540 biological transmission Effects 0.000 claims abstract description 98
- 230000009466 transformation Effects 0.000 claims abstract description 37
- 238000012423 maintenance Methods 0.000 claims abstract description 34
- 238000010248 power generation Methods 0.000 claims description 14
- 230000005611 electricity Effects 0.000 claims description 7
- 230000006870 function Effects 0.000 description 16
- 238000010586 diagram Methods 0.000 description 13
- 238000004590 computer program Methods 0.000 description 7
- 230000001932 seasonal effect Effects 0.000 description 6
- 230000008569 process Effects 0.000 description 5
- 238000012545 processing Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000003860 storage Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000005265 energy consumption Methods 0.000 description 3
- 238000010924 continuous production Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000003973 irrigation Methods 0.000 description 2
- 230000002262 irrigation Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/466—Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
- H02J3/472—For selectively connecting the AC sources in a particular order, e.g. sequential, alternating or subsets of sources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Power Engineering (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明涉及一种电网主设备可停电窗口期确定方法及系统,所述方法包括:一种电网主设备可停电窗口期确定方法,其特征在于,所述方法包括:步骤1:根据输变电设备的功用确定所述输变电设备在电网中的功用分类的分类类型;步骤2:根据所述分类类型采集所述分类类型对应的基础数据;步骤3:根据所述基础数据确定所述输变电设备的可停电窗口期;步骤4:输出并显示所述可停电窗口期。本发明根据输变电设备在电网中的功用分类的分类类型采集相对应的基础数据,根据所述基础数据确定并输出显示所述输变电设备的可停电窗口期,确定方法科学合理,能够减少设备陪停,减少因检修带来的电网安全隐患。
The invention relates to a method and a system for determining a power outage window period for main equipment of a power grid. The method includes: a method for determining a power outage window period for main equipment of a power grid. The function of the equipment determines the classification type of the function classification of the power transmission and transformation equipment in the power grid; step 2: collect basic data corresponding to the classification type according to the classification type; step 3: determine the transmission and transformation equipment according to the basic data. The power outage window period of the substation equipment; Step 4: Output and display the power outage window period. The invention collects corresponding basic data according to the classification type of the function classification of the power transmission and transformation equipment in the power grid, determines and outputs the blackout window period of the power transmission and transformation equipment according to the basic data, the determination method is scientific and reasonable, and can Reduce equipment stoppages and reduce power grid security risks caused by maintenance.
Description
技术领域technical field
本发明属于电力系统及其自动化领域,尤其涉及一种电网主设备可停电窗口期确定方法及系统。The invention belongs to the field of electric power systems and automation thereof, and in particular relates to a method and a system for determining a blackout window period for main equipment of a power grid.
背景技术Background technique
随着特高压电网的快速发展和新能源大规模高比例并网,电网结构越来越复杂,设备停电安排难度越来越大。停电计划安排不仅涉及电网安全和电力电量平衡,还影响着特高压建设、市政迁改、铁路施工的顺利实施以及国家清洁能源消纳战略目标的实现。电网的复杂性和设备停电的重要性决定了停电计划的安排必须统筹兼顾、科学合理,靠人工经验来编排停电计划的模式已无法适应电网发展的新形势。此外,随着电网的发展,停电需求越来越多,可用的设备停电时间非常有限,如何确定设备停电可用时间、如何尽量科学、全面、客观的安排设备停电就变得尤为重要,迫切需要运用先进的技术手段来指导和规范设备停电计划的编排。电网主设备的可停电窗口期是主设备安全可停电的时间范围,通过停电窗口期的计算,为编制高效、合理的检修计划提供依据。可以最大限度减少重复停电,提高一停多用效率,减少设备陪停,减少因检修带来的电网安全隐患,保障电网的正常运行。但目前电网的可停电窗口期的确定不够科学、设备陪停情况严重,因检修带来的电网安全隐患较大。With the rapid development of UHV power grids and the large-scale and high proportion of new energy grids connected to the grid, the structure of the power grid is becoming more and more complex, and it is becoming more and more difficult to arrange power outages for equipment. The blackout plan not only involves grid security and power balance, but also affects UHV construction, municipal relocation, the smooth implementation of railway construction, and the realization of the national clean energy consumption strategy. The complexity of the power grid and the importance of equipment power outages determine that the power outage plan must be coordinated, scientific and rational. In addition, with the development of the power grid, the demand for power outages is increasing, and the available equipment outage time is very limited. How to determine the available time for equipment outages and how to arrange equipment outages as scientifically, comprehensively and objectively as possible has become particularly important. It is urgent to use Advanced technical means to guide and standardize the arrangement of equipment outage plans. The power outage window period of the main equipment of the power grid is the time range in which the main equipment can be safely outaged. The calculation of the power outage window period provides a basis for compiling an efficient and reasonable maintenance plan. It can minimize repeated power outages, improve the efficiency of one-stop multi-use, reduce equipment downtime, reduce power grid safety hazards caused by maintenance, and ensure the normal operation of the power grid. However, at present, the determination of the blackout window period of the power grid is not scientific enough, and the equipment has been shut down seriously, and the power grid security risks caused by maintenance are relatively large.
发明内容SUMMARY OF THE INVENTION
本发明的主要目的在于克服现有技术的缺点与不足,提供一种电网主设备可停电窗口期确定方法及系统,本发明根据输变电设备在电网中的功用分类的分类类型采集相对应的基础数据,根据所述基础数据确定并输出显示所述输变电设备的可停电窗口期,确定方法科学合理,能够减少设备陪停,减少因检修带来的电网安全隐患。The main purpose of the present invention is to overcome the shortcomings and deficiencies of the prior art, and to provide a method and system for determining the power outage window period of the main equipment of the power grid. Based on the basic data, the power outage window period of the power transmission and transformation equipment can be determined and outputted according to the basic data.
根据本发明的一个方面,本发明提供一种电网主设备可停电窗口期确定方法,所述方法包括:According to one aspect of the present invention, the present invention provides a method for determining a power outage window period of a main power grid device, the method comprising:
根据输变电设备的功用确定所述输变电设备在电网中的功用分类的分类类型;Determine the classification type of the function classification of the power transmission and transformation equipment in the power grid according to the function of the power transmission and transformation equipment;
根据所述分类类型采集所述分类类型对应的基础数据;Collect basic data corresponding to the classification type according to the classification type;
根据所述基础数据确定所述输变电设备的可停电窗口期。The blackout window period of the power transmission and transformation equipment is determined according to the basic data.
优选的,还包括输出并显示所述可停电窗口期的步骤。Preferably, it also includes the step of outputting and displaying the blackout window period.
优选地,所述功用分类的分类类型包括下述中的至少一种:风电送出通道设备、水电送出通道设备、光伏送出通道设备、核电送出通道设备、火电送出通道设备、跨区设备及对跨区通道能力有影响的设备、跨省设备及对跨省通道能力有影响的设备、断面设备及对断面限额有影响的设备、馈供负荷设备。Preferably, the classification types of the functional classification include at least one of the following: wind power transmission channel equipment, hydropower transmission channel equipment, photovoltaic transmission channel equipment, nuclear power transmission channel equipment, thermal power transmission channel equipment, cross-regional equipment and cross-connection equipment Equipment that affects the capacity of the district passage, equipment that affects the cross-provincial passage, equipment that affects the capacity of the inter-provincial passage, equipment that has an impact on the cross-section limit, and equipment that feeds the load.
优选地,当所述分类类型为风电送出通道设备时,所述基础数据包括下述中的至少一种:预设年限内的风速趋势曲线和受通道阻塞的区域负荷曲线;确定所述输变电设备的可停电窗口期的步骤包括:将全年内负荷与风速折合电力的代数差最大时段确定为停电窗口期;如阻塞区域内没有负荷,则选取风力发电最小时段为可停电窗口期。Preferably, when the classification type is wind power transmission channel equipment, the basic data includes at least one of the following: a wind speed trend curve within a preset year and a regional load curve blocked by the channel; The steps of the power outage window period of the electrical equipment include: determining the maximum period of the algebraic difference between the load and the wind speed converted to electricity throughout the year as the power outage window period; if there is no load in the blocked area, select the minimum period of wind power generation as the power outage window period.
优选地,当所述分类类型为水电送出通道设备时,所述基础数据包括:水电年度发电电力曲线;确定所述输变电设备的可停电窗口期的步骤包括:将水电枯水期确定为可停电窗口期。Preferably, when the classification type is hydropower transmission channel equipment, the basic data includes: annual hydropower generation power curve; the step of determining the power outage window period of the power transmission and transformation equipment includes: determining the hydropower dry season as a power outage possible window period.
优选地,当所述分类类型为跨区设备及对跨区通道能力有影响的设备时,所述基础数据包括:送端电网年度负荷曲线、受端电网年度负荷曲线、送端电网清洁能源送出需求曲线;确定所述输变电设备的可停电窗口期的步骤包括:送出能力大于送出需求的时段为停电窗口期1;送端电网清洁能源送出需求曲线最小时段为停电窗口期2;受端电网发电机组检修计划、跨省通道停电计划配合调整后,满足受端电网电力电量平衡的时段为停电窗口期3;将停电窗口期1、2、3重叠时段确定为最终的可停电窗口期。Preferably, when the classification type is a cross-regional device and a device that has an impact on the cross-regional channel capability, the basic data includes: the annual load curve of the sending-end power grid, the annual load curve of the receiving-end power grid, and the clean energy transmission of the sending-end power grid. Demand curve; the step of determining the blackout window period of the power transmission and transformation equipment includes: the period when the sending capacity is greater than the sending demand is the blackout window period 1; the minimum period of the clean energy sending demand curve of the sending end power grid is the
根据本发明的另一个方面,本发明还提供一种电网主设备可停电窗口期确定系统,所述系统包括:According to another aspect of the present invention, the present invention also provides a system for determining a power outage window period for a main power grid device, the system comprising:
确定模块,用于根据输变电设备的功用确定所述输变电设备在电网中的功用分类的分类类型;a determining module, configured to determine the classification type of the function classification of the power transmission and transformation equipment in the power grid according to the function of the power transmission and transformation equipment;
采集模块,用于根据所述分类类型采集所述分类类型对应的基础数据;a collection module, configured to collect basic data corresponding to the classification type according to the classification type;
判断模块,用于根据所述基础数据确定所述输变电设备的可停电窗口期。A judgment module, configured to determine the blackout window period of the power transmission and transformation equipment according to the basic data.
优选的,还包括:输出模块,用于输出并显示所述可停电窗口期。Preferably, it also includes: an output module, configured to output and display the blackout window period.
优选地,所述功用分类的分类类型包括下述中的至少一种:风电送出通道设备、水电送出通道设备、光伏送出通道设备、核电送出通道设备、火电送出通道设备、跨区设备及对跨区通道能力有影响的设备、跨省设备及对跨省通道能力有影响的设备、断面设备及对断面限额有影响的设备、馈供负荷设备。Preferably, the classification types of the functional classification include at least one of the following: wind power transmission channel equipment, hydropower transmission channel equipment, photovoltaic transmission channel equipment, nuclear power transmission channel equipment, thermal power transmission channel equipment, cross-regional equipment and cross-connection equipment Equipment that affects the capacity of the district passage, equipment that affects the cross-provincial passage, equipment that affects the capacity of the inter-provincial passage, equipment that has an impact on the cross-section limit, and equipment that feeds the load.
优选地,当所述分类类型为风电送出通道设备时,所述基础数据包括下述中的至少一种:预设年限内的风速趋势曲线和受通道阻塞的区域负荷曲线;确定所述输变电设备的可停电窗口期的步骤包括:如阻塞区域内有负荷,将全年内负荷与风速折合电力的代数差最大时段确定为停电窗口期;如阻塞区域内没有负荷,则选取风力发电最小时段为可停电窗口期。Preferably, when the classification type is wind power transmission channel equipment, the basic data includes at least one of the following: a wind speed trend curve within a preset year and a regional load curve blocked by the channel; The steps of the blackout window period of the electrical equipment include: if there is load in the blocked area, the maximum period of the algebraic difference between the load and the wind speed converted to electricity in the whole year is determined as the blackout window period; if there is no load in the blocked area, the minimum period of wind power generation is selected. It is the window period for power outages.
优选地,当所述分类类型为水电送出通道设备时,所述基础数据包括:水电年度发电电力曲线;所述停电窗口期确定步骤包括:将水电枯水期确定为可停电窗口期。Preferably, when the classification type is a hydropower transmission channel device, the basic data includes: an annual hydropower generation power curve; the step of determining a power outage window period includes: determining a hydropower dry season as a power outage window period.
优选地,当所述分类类型为跨区设备及对跨区通道能力有影响的设备时,所述基础数据包括:送端电网年度负荷曲线、受端电网年度负荷曲线、送端电网清洁能源送出需求曲线;确定所述输变电设备的可停电窗口期的步骤包括:送出能力大于送出需求的时段为停电窗口期1;送端电网清洁能源送出需求曲线最小时段为停电窗口期2;受端电网发电机组检修计划、跨省通道停电计划配合调整后,满足受端电网电力电量平衡的时段为停电窗口期3;将停电窗口期1、2、3重叠时段确定为最终的可停电窗口期。Preferably, when the classification type is a cross-regional device and a device that has an impact on the cross-regional channel capability, the basic data includes: the annual load curve of the sending-end power grid, the annual load curve of the receiving-end power grid, and the clean energy transmission of the sending-end power grid. Demand curve; the step of determining the blackout window period of the power transmission and transformation equipment includes: the period when the sending capacity is greater than the sending demand is the blackout window period 1; the minimum period of the clean energy sending demand curve of the sending end power grid is the
有益效果:本发明根据输变电设备在电网中的功用分类的分类类型采集相对应的基础数据,根据所述基础数据确定并输出显示所述输变电设备的可停电窗口期,确定方法科学合理,能够减少设备陪停,减少因检修带来的电网安全隐患。Beneficial effects: the present invention collects corresponding basic data according to the classification type of the function classification of the power transmission and transformation equipment in the power grid, determines and outputs the blackout window period of the power transmission and transformation equipment according to the basic data, and the determination method is scientific Reasonable, can reduce equipment stoppage and reduce the hidden danger of power grid security caused by maintenance.
通过参照以下附图及对本发明的具体实施方式的详细描述,本发明的特征及优点将会变得清楚。The features and advantages of the present invention will become apparent by reference to the following drawings and detailed description of specific embodiments of the present invention.
附图说明Description of drawings
构成本申请的一部分的说明书附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The accompanying drawings forming a part of the present application are used to provide further understanding of the present invention, and the exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the attached image:
图1是电网主设备可停电窗口期确定方法示意图;Fig. 1 is a schematic diagram of the method for determining the window period for power outages of main equipment of the power grid;
图2-8是根据分类类型确定可停电窗口期的流程示意图;Figure 2-8 is a schematic diagram of the process of determining the blackout window period according to the classification type;
图9是可停电窗口期的确定结果显示示意图;FIG. 9 is a schematic diagram showing the determination result of the blackout window period;
图10是电网主设备可停电窗口期确定系统结构示意图。FIG. 10 is a schematic diagram of the structure of the system for determining the available power outage window period of the main equipment of the power grid.
具体实施方式Detailed ways
下面结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
除非另有定义,本文所使用的所有的技术和科学术语与属于本发明的技术领域的技术人员通常理解的含义相同。本文中在本发明的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本发明。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terms used herein in the description of the present invention are for the purpose of describing specific embodiments only, and are not intended to limit the present invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
实施例1Example 1
图1是电网主设备可停电窗口期确定方法示意图。如图1所示,本发明提供本发明提供一种电网主设备可停电窗口期确定方法,所述方法包括:FIG. 1 is a schematic diagram of a method for determining the window period for power outages of main equipment in the power grid. As shown in FIG. 1 , the present invention provides a method for determining a power outage window period for main equipment of a power grid. The method includes:
步骤1:根据输变电设备的功用确定所述输变电设备在电网中的功用分类的分类类型;Step 1: Determine the classification type of the function classification of the power transmission and transformation equipment in the power grid according to the function of the power transmission and transformation equipment;
本步骤中,所述功用分类的分类类型包括:风电送出通道设备、水电送出通道设备、光伏送出通道设备、核电送出通道设备、火电送出通道设备、跨区设备及对跨区通道能力有影响的设备、跨省设备及对跨省通道能力有影响的设备、断面设备及对断面限额有影响的设备、馈供负荷设备,其中馈供负荷设备又包括有并网电厂的馈供负荷设备和无并网电厂的馈供负荷设备。In this step, the classification types of the functional classification include: wind power transmission channel equipment, hydropower transmission channel equipment, photovoltaic transmission channel equipment, nuclear power transmission channel equipment, thermal power transmission channel equipment, cross-regional equipment, and cross-regional channel capacity. Equipment, inter-provincial equipment and equipment that affects the capacity of inter-provincial passages, section equipment and equipment that affects the section limit, feed-in load equipment, and feed-in load equipment includes feed-in load equipment with grid-connected power plants and no Feed and supply load equipment of grid-connected power plants.
步骤2:根据所述分类类型采集所述分类类型对应的基础数据;Step 2: collecting basic data corresponding to the classification type according to the classification type;
本步骤中,基础数据一般是风速趋势曲线、发电电力曲线、区域负荷曲线、年度负荷曲线、需求曲线等。In this step, the basic data is generally a wind speed trend curve, a power generation curve, a regional load curve, an annual load curve, a demand curve, and the like.
步骤3:根据所述基础数据确定所述输变电设备的可停电窗口期;Step 3: Determine the blackout window period of the power transmission and transformation equipment according to the basic data;
本步骤中,停电窗口期重叠时,进行如下处理:In this step, when the power outage window period overlaps, the following processing is performed:
(1)产生共同影响时,跨区设备及对跨区通道能力有影响设备的停电窗口期不作为跨省设备停电窗口期。(1) When there is a common impact, the power outage window period of the cross-regional equipment and the equipment that has an impact on the cross-region channel capability is not regarded as the power outage window period of the cross-provincial equipment.
(2)当电网安全、电力平衡和清洁能源消纳等优化目标冲突,无法确定停电窗口期时,按照电网安全、电力平衡和清洁能源消纳的优先级顺序进行取舍,即首先保障安全,然后保障供应,最后保障清洁能源消纳。(2) When the optimization objectives of grid security, power balance and clean energy consumption conflict, and it is impossible to determine the blackout window period, the priority order of grid security, power balance and clean energy consumption shall be selected, that is, first to ensure safety, and then Guarantee the supply, and finally guarantee the consumption of clean energy.
(3)送受端电网设备检修对跨区跨省设备送电需求形成反向约束的时段,不作为受端电网设备停电窗口期。(3) The time period during which the maintenance of the power grid equipment at the sending and receiving end forms a reverse constraint on the power transmission demand of cross-regional and cross-provincial equipment is not regarded as the power outage window period for the power grid equipment at the receiving end.
(4)电厂并网设备(线路、主变、母线、串抗)检修影响发电能力时,应评估发电能力降低对局部、全网电力平衡以及交易合约的影响;单回路、双回路、同塔多回路辐射线等特殊接线方式不满足上述要求时,可通过负荷倒供、低压备自投保障电力供应,必要时可采取需求侧管理措施。(4) When the power generation capacity is affected by the maintenance of the grid-connected equipment (lines, main transformers, busbars, and series resistance) of the power plant, the impact of the reduction of the power generation capacity on the local, whole-grid power balance and transaction contracts should be evaluated; single-circuit, double-circuit, same-tower When special wiring methods such as multi-circuit radiating lines do not meet the above requirements, power supply can be guaranteed through load reverse supply and low-voltage backup self-switching, and demand-side management measures can be taken if necessary.
(5)处于大用户直接交易双方供电路径的输变电设备,停电窗口期应尽可能保持一致。(5) For the power transmission and transformation equipment located in the power supply path between the two parties of the direct transaction of large users, the power outage window period should be as consistent as possible.
(6)同塔多回线除按照单回线给出窗口期外,也应按照多回线同停给出窗口期。(6) In addition to the window period given according to the single-circuit line, the multi-circuit line on the same tower should also be given the window period according to the same stop of the multi-circuit line.
(7)施工跨越、穿越等需要非同塔多回线同时停电时,应单独确定停电窗口期(7) When the construction spanning, crossing, etc. require simultaneous power outages on different towers and multi-circuit lines, the outage window period should be determined separately
步骤4:输出并显示所述可停电窗口期。Step 4: Output and display the blackout window period.
本步骤中,将确定的可停电窗口期在用户界面中显示出来,直观可靠。In this step, the determined blackout window period is displayed in the user interface, which is intuitive and reliable.
以下结合输变电设备在电网中的功用分类的分类类型逐一进行介绍确定可停电窗口期的方法。The method for determining the blackout window period will be introduced one by one in combination with the classification types of the function classification of the power transmission and transformation equipment in the power grid.
请参阅图2所示,确定风电送出通道设备的可停电窗口期的方法,包括以下步骤:Referring to Figure 2, the method for determining the blackout window period of wind power transmission channel equipment includes the following steps:
首先采集基础数据,其包括:First collect basic data, which includes:
采集1-3年10米风速趋势曲线;Collect 10-meter wind speed trend curve for 1-3 years;
判断1-3年受通道阻塞的区域负荷曲线:如该通道是跨省通道,则为送出省网的负荷曲线;如该通道是跨区通道,则为送出端区域电网的负荷曲线;Judging the regional load curve blocked by the channel in 1-3 years: if the channel is an inter-provincial channel, it is the load curve of the sending provincial grid; if the channel is an inter-regional channel, it is the load curve of the regional grid at the sending end;
其次确定停电窗口期,步骤如下:Next, determine the outage window period. The steps are as follows:
判断阻塞区域内是否有负荷:如果有负荷,全年内负荷与风速折合电力的代数差最大时段为停电窗口期;如阻塞区域内没有负荷,则选取风力发电最小时段为停电窗口期。Determine whether there is a load in the blocked area: if there is a load, the maximum period of the algebraic difference between the load and the wind speed converted to electricity throughout the year is the power outage window period; if there is no load in the blocked area, the minimum wind power generation period is selected as the power outage window period.
图3示出了确定水电送出通道设备的可停电窗口期的流程示意图。FIG. 3 shows a schematic flow chart of determining the blackout window period of the hydropower transmission channel equipment.
首先采集基础数据,即采集水电年度发电电力曲线(8760点),其次确定停电窗口期,将水电枯水期确定为停电窗口期。First, the basic data is collected, that is, the annual hydropower generation power curve (8760 points) is collected, and then the power outage window period is determined, and the hydropower dry season is determined as the power outage window period.
请参阅图4所示,确定光伏送出通道设备的可停电窗口期的方法,包括以下步骤:Referring to Fig. 4, the method for determining the blackout window period of photovoltaic output channel equipment includes the following steps:
首先采集基础数据,其包括:First collect basic data, which includes:
采集1-3年光伏发电趋势曲线(新增装机按原装机的同时率折合)Collect the trend curve of photovoltaic power generation in 1-3 years (the new installed capacity is converted to the simultaneous rate of the original machine)
采集1-3年受通道阻塞的区域负荷曲线:如该通道是跨省通道,则为送出省网的负荷曲线;如该通道是跨区通道,则为送出端区域电网的负荷曲线。Collect the regional load curve blocked by the channel in 1-3 years: if the channel is an inter-provincial channel, it is the load curve of the sending provincial grid; if the channel is a cross-regional channel, it is the load curve of the regional grid at the sending end.
其次确定停电窗口期,步骤包括:Next, determine the outage window period. The steps include:
判断阻塞区域内是否有负荷:阻塞区域内有负荷,全年内负荷与光资源折合电力的代数差最大时段为停电窗口期;如阻塞区域内没有负荷,则选取光伏发电最小时段为停电窗口期。Determine whether there is load in the blocked area: there is load in the blocked area, and the maximum period of algebraic difference between the load and the converted power of optical resources in the whole year is the power outage window period; if there is no load in the blocked area, the minimum period of photovoltaic power generation is selected as the power outage window period.
请参阅图5所示,确定跨区设备及对跨区通道能力有影响的设备的可停电窗口期的方法,包括以下步骤:Referring to Figure 5, the method for determining the blackout window period of cross-regional equipment and equipment that has an impact on cross-region channel capability includes the following steps:
首先采集基础数据,其包括:First collect basic data, which includes:
采集送端电网年度负荷曲线;Collect the annual load curve of the sending-end power grid;
采集受端电网年度负荷曲线;Collect the annual load curve of the receiving end power grid;
采集送端电网清洁能源送出需求(曲线)。Collect the clean energy sending demand (curve) of the sending end grid.
其次,根据采集的送端电网年度负荷曲线、受端电网年度负荷曲线和送端电网清洁能源送出需求极性窗口期计算窗口期,包括:Secondly, the window period is calculated according to the collected annual load curve of the sending-end power grid, the annual load curve of the receiving-end power grid, and the polar window period of the clean energy sending demand of the sending-end power grid, including:
送出能力大于送出需求的时段为停电窗口期1;The period when the delivery capacity is greater than the delivery demand is the power outage window period 1;
送端电网清洁能源送出需求(曲线)最小时段为窗口期2;The minimum period of demand (curve) for sending clean energy from the sending end grid is
受端电网发电机组检修计划、跨省通道停电计划配合调整后,满足受端电网电力电量平衡的时段为停电窗口期3;After the adjustment of the receiving-end power grid generator set maintenance plan and the cross-provincial channel power outage plan, the period that meets the power and electricity balance of the receiving-end power grid is the power
停电窗口期1、2、3做并计算,重叠时段为停电窗口期。The power
请参阅图6所示,确定断面设备及对断面限额有影响的设备的可停电窗口期的方法,包括:Referring to Figure 6, the method for determining the outage window period for equipment with an impact on the section quota includes:
首先采集基础数据,其包括:First collect basic data, which includes:
采集断面阻塞区域内的负荷曲线;Collect the load curve in the blocked area of the section;
采集断面阻塞区域内的发电机组检修计划;Collect the maintenance plan of the generator set in the blocked area of the section;
采集断面送电能力对区域外电力平衡的影响;The influence of the power transmission capacity of the collection section on the power balance outside the area;
采集断面阻塞区域内的清洁能源发电需求。Collect clean energy power generation demand in the blocked area of the section.
其次,根据采集的断面阻塞区域内的负荷曲线、断面阻塞区域内的发电机组检修计划、断面送电能力对区域外电力平衡的影响和断面阻塞区域内的清洁能源发电需求计算窗口期,包括:Secondly, according to the collected load curve in the blocked area of the section, the maintenance plan of the generator set in the blocked area of the section, the influence of the power transmission capacity of the section on the power balance outside the area, and the demand for clean energy power generation in the blocked area of the section, the window period is calculated, including:
断面阻塞区域电力平衡满足备用要求的时段,或调整阻塞区域内发电机组检修计划后可满足备用的时段为停电窗口期1。The period when the power balance in the blocked area of the section meets the standby requirements, or the period when the maintenance plan of the generator sets in the blocked area can meet the standby requirements is the power outage window period 1.
断面阻塞区域内负荷-发电-清洁能源发电需求最大的时段为停电窗口期2。The time period when the demand for load-power-generation-clean energy power generation in the blockage area of the section is the largest is the power
断面送电能力不影响阻塞区域外电力平衡的时段为停电窗口期3。The period when the cross-section power transmission capacity does not affect the power balance outside the blocking area is the power
停电窗口期1、2、3做并计算,重叠时段为停电窗口期。The power
请参阅图7所示,确定有并网电厂的馈供负荷设备的可停电窗口期的方法,包括:Referring to Figure 7, the method for determining the outage window period of the feed-in load equipment of the grid-connected power plant includes:
首先采集基础数据,其包括:First collect basic data, which includes:
采集馈供区负荷年度曲线;Collect the annual load curve of the feeder area;
采集馈供区连续生产性重要负荷检修计划;Collect the maintenance plan of continuous productive important loads in the feeding area;
采集馈供区季节性重要负荷年度趋势(如农灌负荷);Collect annual trends of seasonal important loads in feeding areas (such as agricultural irrigation loads);
采集馈供区内发电机组检修计划及出力趋势。Collect the maintenance plan and output trend of generator sets in the feeder area.
其次,根据采集的馈供区负荷年度曲线、馈供区连续生产性重要负荷检修计划、馈供区季节性重要负荷年度趋势和馈供区内发电机组检修计划及出力趋势计算窗口期,包括:Secondly, the window period is calculated according to the annual load curve of the feeder area, the maintenance plan of the continuous productive important load in the feeder area, the annual trend of seasonal important loads in the feeder area, and the maintenance plan and output trend of the generator sets in the feeder area, including:
馈供区年度负荷低谷时段为停电窗口期1;The annual load trough period in the feeding area is the power outage window period 1;
馈供区连续生产重要负荷停产检修时段为停电窗口期2;The period for maintenance and maintenance of continuous production of important loads in the feeder area is the power
馈供区季节性重要负荷年度非高峰期为停电窗口期3;The annual off-peak period of seasonal important loads in the feeder area is the power outage window period3;
馈供区内发电机组出力满足区域对外交换为零功率的时段为停电窗口期4;The period when the output of the generator sets in the feeding and supplying area meets the zero power exchange with the outside world is the blackout window period 4;
停电窗口期1、2、3、4做并计算,重叠时段为停电窗口期。The power
请参阅图8所示,确定无并网电厂的馈供负荷设备的可停电窗口期的方法,包括:Referring to Figure 8, the method for determining the outage window period of the feeder-supplied load equipment of the non-grid-connected power plant includes:
首先采集基础数据,其包括:First collect basic data, which includes:
采集馈供区负荷年度曲线;Collect the annual load curve of the feeder area;
采集馈供区连续生产性重要负荷检修计划;Collect the maintenance plan of continuous productive important loads in the feeding area;
采集馈供区季节性重要负荷年度趋势(如农灌负荷)。Collect annual trends of seasonal important loads in feeding areas (such as agricultural irrigation loads).
其次,根据采集的馈馈供区负荷年度曲线、馈供区连续生产性重要负荷检修计划和馈供区季节性重要负荷年度趋势计算窗口期,包括:Secondly, calculate the window period according to the annual load curve of the feeder and supply area, the maintenance plan of the continuous productive important load in the feeder and supply area, and the annual trend of seasonal important loads in the feeder and supply area, including:
馈供区年度负荷低谷时段为停电窗口期1;The annual load trough period in the feeding area is the power outage window period 1;
馈供区连续生产重要负荷停产检修时段为停电窗口期2;The period for maintenance and maintenance of continuous production of important loads in the feeder area is the power
馈供区季节性重要负荷年度非高峰期为停电窗口期3;The annual off-peak period of seasonal important loads in the feeder area is the power outage window period3;
停电窗口期1、2、3做并计算,重叠时段为停电窗口期。The power
此外,也可以确定核电送出通道设备和火电送出通道设备的可停电窗口期,在确定停电窗口期之后,配合核电机组检修,在不影响平衡和外送时,配合火电机组检修;跨区系统配套电源送出线路配合跨区系统进行检修。In addition, it is also possible to determine the outage window period of the nuclear power transmission channel equipment and thermal power transmission channel equipment. After the power outage window period is determined, cooperate with the nuclear power unit maintenance, and cooperate with the thermal power unit maintenance when it does not affect the balance and external transmission; The power outgoing line cooperates with the cross-regional system for maintenance.
也可以确定跨省设备及对跨省通道能力有影响的设备的可停电窗口期,首先采集基础数据,包括:It is also possible to determine the blackout window period for cross-provincial equipment and equipment that has an impact on the cross-provincial channel capability. First, collect basic data, including:
(1)送端电网年度负荷曲线;(1) The annual load curve of the sending end power grid;
(2)受端电网年度负荷曲线;(2) The annual load curve of the receiving end power grid;
(3)送端电网清洁能源送出需求(曲线)。(3) The demand (curve) for sending clean energy from the power grid at the sending end.
其次确定可停电窗口期,步骤包括:Next, determine the window period for power outages. The steps include:
(1)送出能力大于送出需求的时段为停电窗口期1;(1) The period when the delivery capacity is greater than the delivery demand is the power outage window period 1;
(2)送端电网清洁能源送出需求(曲线)最小时段为窗口期2;(2) The minimum period of demand (curve) for sending clean energy from the sending end grid is
(3)受端电网发电机组检修计划、跨区通道停电计划配合调整后,满足受端电网电力电量平衡的时段为停电窗口期2;(3) After the adjustment of the receiving-end power grid generator set maintenance plan and the cross-regional channel power outage plan, the period that meets the power and electricity balance of the receiving-end power grid is the power
停电窗口期1、2、3重叠时段为停电窗口期。The overlapping period of
图9是可停电窗口期的确定结果显示示意图。结合图9,给出一个具体的实施过程。FIG. 9 is a schematic diagram showing the determination result of the blackout window period. With reference to Figure 9, a specific implementation process is given.
锦苏直流系统西起四川锦屏东至江苏苏州,全长2058公里,额定容量720万千瓦,送端锦屏和官地机组装机1080万千瓦,落点苏南地区属于用电高负荷地区,设备的检修对于西南重点水电厂水位消落和受端电力平衡影响巨大,检修时机的选择异常复杂。The Jinsu DC system starts from the east of Jinping, Sichuan to Suzhou, Jiangsu, with a total length of 2,058 kilometers and a rated capacity of 7.2 million kilowatts. The maintenance of equipment has a huge impact on the water level fluctuation and the balance of power at the receiving end of the key hydropower plants in the southwest, and the selection of maintenance timing is extremely complicated.
通过结合锦苏直流历史送电水平和水库水位消落曲线,以及受端负荷预测和受电交流断面能力,科学的计算出了锦苏直流系统的停电窗口:By combining the historical power transmission level of Jinsu HVDC and the water level fluctuation curve of the reservoir, as well as the load prediction of the receiving terminal and the power receiving AC section capacity, the outage window of the Jinsu HVDC system is scientifically calculated:
(一)判据(公式):[锦西上游水位]<1860∩[锦苏直流]<3600∩[川电外送需求]<5100∩[江苏总负荷]*0.15<12000∩[苏南交流断面]<5000。(1) Criterion (formula): [Jinxi upstream water level]<1860∩[Jinsu DC]<3600∩[Sichuan power delivery demand]<5100∩[Jiangsu total load]*0.15<12000∩[South Jiangsu AC Section] < 5000.
(二)考虑因素:一是锦苏直流外送需求较小且锦西电厂有一定库容(水位1860米以下);二是四川水电外送需求较小,锦苏检修情况下避免发生弃水,即[川电外送需求]<5100(锦苏检修情况下复奉、宾金及川渝交流断面最少能力5100);(3)受端苏南负荷较低,且交流受电断面功率较低,锦苏停电避免造成苏南地区限负荷,即[江苏总负荷]*0.15<12000∩[苏南交流断面]<5000。(2) Factors to consider: First, the Jinsu DC delivery demand is small and the Jinxi Power Plant has a certain storage capacity (the water level is below 1860 meters); the second is the Sichuan hydropower delivery demand is small, and the Jinsu maintenance situation avoids water abandonment. That is [Sichuan power delivery demand] < 5100 (the minimum capacity of Fufeng, Binjin and Sichuan-Chongqing AC cross-sections is 5100 in the case of Jinsu maintenance); (3) The load at the receiving end of southern Jiangsu is low, and the power of the AC receiving section is low, Jinsu power outage avoids load limit in southern Jiangsu, that is, [Jiangsu total load]*0.15<12000∩[Southern Jiangsu AC section]<5000.
将可停电窗口期显示出来,显示结果如图9所示。Display the available power outage window period, and the display result is shown in Figure 9.
实施例2Example 2
图10是电网主设备可停电窗口期确定系统结构示意图。电网主设备可停电窗口期确定系统包括:FIG. 10 is a schematic structural diagram of a system for determining the available power outage window period of the main equipment of the power grid. The system for determining the available power outage window period for the main equipment of the power grid includes:
确定模块,用于根据输变电设备的功用确定所述输变电设备在电网中的功用分类的分类类型;a determining module, configured to determine the classification type of the function classification of the power transmission and transformation equipment in the power grid according to the function of the power transmission and transformation equipment;
采集模块,用于根据所述分类类型采集所述分类类型对应的基础数据;a collection module, configured to collect basic data corresponding to the classification type according to the classification type;
判断模块,用于根据所述基础数据确定所述输变电设备的可停电窗口期;a judgment module, configured to determine the blackout window period of the power transmission and transformation equipment according to the basic data;
输出模块,用于输出并显示所述可停电窗口期。The output module is used for outputting and displaying the blackout window period.
优选地,所述功用分类的分类类型包括:风电送出通道设备、水电送出通道设备、光伏送出通道设备、核电送出通道设备、火电送出通道设备、跨区设备及对跨区通道能力有影响的设备、跨省设备及对跨省通道能力有影响的设备、断面设备及对断面限额有影响的设备、馈供负荷设备。Preferably, the classification types of the functional classification include: wind power transmission channel equipment, hydropower transmission channel equipment, photovoltaic transmission channel equipment, nuclear power transmission channel equipment, thermal power transmission channel equipment, cross-regional equipment and equipment that has an impact on cross-regional channel capability , Cross-provincial equipment and equipment that has an impact on cross-provincial channel capacity, cross-section equipment, equipment that affects cross-section quota, and feeder load equipment.
优选地,当所述分类类型为风电送出通道设备时,所述基础数据包括:预设年限内的风速趋势曲线和受通道阻塞的区域负荷曲线;所述停电窗口期确定步骤包括:将全年内负荷与风速折合电力的代数差最大时段确定为停电窗口期;如阻塞区域内没有负荷,则选取风力发电最小时段为可停电窗口期。Preferably, when the classification type is wind power transmission channel equipment, the basic data includes: a wind speed trend curve within a preset year and a regional load curve blocked by the channel; the step of determining the power outage window period includes: The maximum period of the algebraic difference between the load and wind speed converted power is determined as the blackout window period; if there is no load in the blocked area, the minimum period of wind power generation is selected as the blackout window period.
优选地,当所述分类类型为水电送出通道设备时,所述基础数据包括:水电年度发电电力曲线;所述停电窗口期确定步骤包括:将水电枯水期确定为可停电窗口期。Preferably, when the classification type is a hydropower transmission channel device, the basic data includes: an annual hydropower generation power curve; the step of determining a power outage window period includes: determining a hydropower dry season as a power outage window period.
优选地,当所述分类类型为跨区设备及对跨区通道能力有影响的设备时,所述基础数据包括:送端电网年度负荷曲线、受端电网年度负荷曲线、送端电网清洁能源送出需求曲线;所述停电窗口期确定步骤包括:送出能力大于送出需求的时段为停电窗口期1;送端电网清洁能源送出需求曲线最小时段为停电窗口期2;受端电网发电机组检修计划、跨省通道停电计划配合调整后,满足受端电网电力电量平衡的时段为停电窗口期3;将停电窗口期1、2、3重叠时段确定为最终的可停电窗口期。Preferably, when the classification type is a cross-regional device and a device that has an impact on the cross-regional channel capability, the basic data includes: the annual load curve of the sending-end power grid, the annual load curve of the receiving-end power grid, and the clean energy transmission of the sending-end power grid. Demand curve; the step of determining the power outage window period includes: the period when the transmission capacity is greater than the transmission demand is the outage window period 1; the minimum period of the clean energy transmission demand curve of the sending end power grid is the power
本实施例中各个模块功能的实现过程与实施例1中的方法步骤的实现过程相同,此处不再赘述。The implementation process of the functions of each module in this embodiment is the same as the implementation process of the method steps in Embodiment 1, and will not be repeated here.
本发明根据输变电设备在电网中的功用分类的分类类型采集相对应的基础数据,根据所述基础数据确定并输出显示所述输变电设备的可停电窗口期,确定方法科学合理,能够减少设备陪停,减少因检修带来的电网安全隐患。The invention collects corresponding basic data according to the classification type of the function classification of the power transmission and transformation equipment in the power grid, determines and outputs the blackout window period of the power transmission and transformation equipment according to the basic data, the determination method is scientific and reasonable, and can Reduce equipment stoppages and reduce power grid security risks caused by maintenance.
本领域内的技术人员应明白,本申请的实施例可提供为方法、系统、或计算机程序产品。因此,本申请可采用完全硬件实施例、完全软件实施例、或结合软件和硬件方面的实施例的形式。而且,本申请可采用在一个或多个其中包含有计算机可用程序代码的计算机可用存储介质(包括但不限于磁盘存储器、CD-ROM、光学存储器等)上实施的计算机程序产品的形式。As will be appreciated by those skilled in the art, the embodiments of the present application may be provided as a method, a system, or a computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) having computer-usable program code embodied therein.
本申请是参照根据本申请实施例的方法、设备(系统)、和计算机程序产品的流程图和/或方框图来描述的。应理解可由计算机程序指令实现流程图和/或方框图中的每一流程和/或方框、以及流程图和/或方框图中的流程和/或方框的结合。可提供这些计算机程序指令到通用计算机、专用计算机、嵌入式处理机或其他可编程数据处理设备的处理器以产生一个机器,使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的装置。The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the present application. It will be understood that each flow and/or block in the flowchart illustrations and/or block diagrams, and combinations of flows and/or blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to the processor of a general purpose computer, special purpose computer, embedded processor or other programmable data processing device to produce a machine such that the instructions executed by the processor of the computer or other programmable data processing device produce Means for implementing the functions specified in a flow or flow of a flowchart and/or a block or blocks of a block diagram.
这些计算机程序指令也可存储在能引导计算机或其他可编程数据处理设备以特定方式工作的计算机可读存储器中,使得存储在该计算机可读存储器中的指令产生包括指令装置的制造品,该指令装置实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能。These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory result in an article of manufacture comprising instruction means, the instructions The apparatus implements the functions specified in the flow or flows of the flowcharts and/or the block or blocks of the block diagrams.
这些计算机程序指令也可装载到计算机或其他可编程数据处理设备上,使得在计算机或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理,从而在计算机或其他可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的步骤。These computer program instructions can also be loaded on a computer or other programmable data processing device to cause a series of operational steps to be performed on the computer or other programmable device to produce a computer-implemented process such that The instructions provide steps for implementing the functions specified in the flow or blocks of the flowcharts and/or the block or blocks of the block diagrams.
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求保护范围之内。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the above embodiments, those of ordinary skill in the art should understand that: the present invention can still be Modifications or equivalent replacements are made to the specific embodiments of the present invention, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention shall be included within the protection scope of the claims of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010664727.5A CN111917139A (en) | 2020-07-10 | 2020-07-10 | Method and system for determining blackable window period of main equipment of power grid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010664727.5A CN111917139A (en) | 2020-07-10 | 2020-07-10 | Method and system for determining blackable window period of main equipment of power grid |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111917139A true CN111917139A (en) | 2020-11-10 |
Family
ID=73226335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010664727.5A Pending CN111917139A (en) | 2020-07-10 | 2020-07-10 | Method and system for determining blackable window period of main equipment of power grid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111917139A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112928779A (en) * | 2021-02-18 | 2021-06-08 | 中国电力科学研究院有限公司 | Method and system for determining new energy direct current transmission power |
CN113590682A (en) * | 2021-07-20 | 2021-11-02 | 中国电力科学研究院有限公司 | Power grid power failure window period generation method and device, electronic equipment and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5592074A (en) * | 1992-06-26 | 1997-01-07 | Canon Kabushiki Kaisha | Battery power supply system |
CN105680448A (en) * | 2016-03-23 | 2016-06-15 | 中国电力科学研究院 | Year-month power-cut plan combination method |
CN106779442A (en) * | 2016-12-26 | 2017-05-31 | 国网山东省电力公司泰安供电公司 | Have a power failure the generation method and device planned |
-
2020
- 2020-07-10 CN CN202010664727.5A patent/CN111917139A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5592074A (en) * | 1992-06-26 | 1997-01-07 | Canon Kabushiki Kaisha | Battery power supply system |
CN105680448A (en) * | 2016-03-23 | 2016-06-15 | 中国电力科学研究院 | Year-month power-cut plan combination method |
CN106779442A (en) * | 2016-12-26 | 2017-05-31 | 国网山东省电力公司泰安供电公司 | Have a power failure the generation method and device planned |
Non-Patent Citations (2)
Title |
---|
YU JIANG等: "Fault Section Estimation in Bulk Power Grid Based on Discrete Event System", 《 INTERNATIONAL CONFERENCE ON SUSTAINABLE POWER GENERATION AND SUPPLY (SUPERGEN 2012)》 * |
杨才明等: "电网停电计划自学习约束规则专家库构建", 《中国科技信息》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112928779A (en) * | 2021-02-18 | 2021-06-08 | 中国电力科学研究院有限公司 | Method and system for determining new energy direct current transmission power |
CN113590682A (en) * | 2021-07-20 | 2021-11-02 | 中国电力科学研究院有限公司 | Power grid power failure window period generation method and device, electronic equipment and storage medium |
CN113590682B (en) * | 2021-07-20 | 2022-09-27 | 中国电力科学研究院有限公司 | Power grid power failure window period generation method and device, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Li et al. | Economic dispatching strategy of distributed energy storage for deferring substation expansion in the distribution network with distributed generation and electric vehicle | |
CN105337301B (en) | The selection method and device of micro-grid connection point | |
CN109995089B (en) | Distributed power supply absorption capacity assessment method and system | |
CN104659780A (en) | Implementation method for absorbing energy source Internet of large-scale distributive power supplies | |
CN101431240A (en) | Space-saving integrated AVC system control method considering step power station | |
CN104599067A (en) | Novel index evaluation system establishment method based on mountainous area power distribution network power supply model | |
CN105528653A (en) | Photovoltaic connection optimization method considering economy and safety | |
CN211790786U (en) | Client side energy storage energy management system | |
CN107742898A (en) | A virtual power plant source-network collaborative energy management system for photovoltaic multi-level access | |
CN111917139A (en) | Method and system for determining blackable window period of main equipment of power grid | |
Rugthaicharoencheep et al. | Smart grid for energy management on distribution system with distributed generation | |
CN105740966A (en) | Expansion planning method of power distribution network containing distributed power sources | |
Guo et al. | The impact of integrating distributed generations on the losses in the smart grid | |
Liu et al. | Transitioning to a new power system with high renewable penetration in the context of China’s carbon peak and neutrality: Challenges and key technologies | |
CN117674266B (en) | Advanced prediction control method and system for cascade hydropower and photovoltaic cooperative operation | |
Yu et al. | Challenges and R&D opportunities of smart distribution grids in China | |
Libin et al. | Research on regional power grid voltage control technology based on reactive power support capability of controllable power sources | |
Shengli et al. | Research and Application of a Clear Diamond-Shaped Distribution Network Structure | |
Arendarski et al. | Concept of rural intelligent grid interactive planning methodology | |
CN110932306B (en) | Power grid voltage deviation constraint index apportionment method and system | |
Wang et al. | Multi-Time-Scale analysis of power balance considering coordination between distributed and centralized PV power generation | |
Ma et al. | Multi-Source Trans-Provincial Coordinative Optimal Technology Considering Trans-provincial Transaction Costs | |
Li et al. | Power balance warning method of regional power grid considering photovoltaic capacity ratio | |
Li et al. | The review and prospect of key technologies for distributed PV grid-connection and consumption under the county-wide promotion mode | |
Shen et al. | Research on the Construction of Rural Power Systems with High Proportions of Distributed Generation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201110 |