CN111780637A - A kind of deep water blast hole charging device and charging method thereof - Google Patents
A kind of deep water blast hole charging device and charging method thereof Download PDFInfo
- Publication number
- CN111780637A CN111780637A CN202010698298.3A CN202010698298A CN111780637A CN 111780637 A CN111780637 A CN 111780637A CN 202010698298 A CN202010698298 A CN 202010698298A CN 111780637 A CN111780637 A CN 111780637A
- Authority
- CN
- China
- Prior art keywords
- deep
- water
- rubber
- blasting
- charging device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
- F42D1/08—Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
- F42D1/14—Hand-operated tamping or loading
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
- F42D1/08—Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
- F42D1/22—Methods for holding or positioning for blasting cartridges or tamping cartridges
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Revetment (AREA)
Abstract
本发明提供一种应用于矿山爆破技术领域的深水炮孔装药装置,本发明还涉及一种深水炮孔装药方法,所述的深水炮孔装药装置的伸缩连杆(2)一端套装在外杆(1)一端,外杆(1)上拧装固定螺丝(3),外杆(1)另一端设置配重头橡胶(4),配重头橡胶(4)内设置配重头(5),伸缩连杆(2)另一端设置浮力尾部橡胶(6),外杆(1)上靠近配重头橡胶(4)位置设置滑轮基座(7),滑轮基座(7)上安装能够自由转动的滑轮(8),牵引绳(9)绕过滑轮(8),牵引绳(9)上设置炸药捆绑部,本发明的深水炮孔装药装置及装药方法,使炸药有效克服水的浮力而到达设定装药位置,装药效率高,施工人员劳动强度明显降级,后期爆破精确。
The invention provides a deep-water blasting charging device applied to the technical field of mine blasting, and the invention also relates to a deep-water blasting charging method. One end of the telescopic connecting rod (2) of the deep-water blasting charging device is sleeved On one end of the outer rod (1), the outer rod (1) is screwed with a fixing screw (3), the other end of the outer rod (1) is provided with a weighted rubber (4), and a weighted head (5) is set in the rubber (4) of the weighted head, The other end of the telescopic link (2) is provided with a buoyancy tail rubber (6), and a pulley base (7) is set on the outer rod (1) near the counterweight rubber (4), and a freely rotatable pulley base (7) is installed on the pulley base (7). The pulley (8), the traction rope (9) goes around the pulley (8), and the explosive binding part is arranged on the traction rope (9). Reaching the set charging position, the charging efficiency is high, the labor intensity of the construction personnel is significantly reduced, and the later blasting is accurate.
Description
技术领域technical field
本发明属于矿山爆破技术领域,更具体地说,是涉及一种深水炮孔装药装置,本发明还涉及一种深水炮孔装药方法。The invention belongs to the technical field of mine blasting, and more particularly, relates to a deep-water blasthole charging device, and also relates to a deep-water blasthole charging method.
背景技术Background technique
目前,在露天开采作业中,由于环境气候或者地质条件等原因,钻机钻孔后,炮孔内往往存在积水严重等情况。积水情况的出现,导致岩石乳化炸药因为孔内水的浮力而无法下沉到孔底或技术要求的特定位置,影响后续的装药量、装药长度以及填塞长度,最终影响爆破效果或导致爆破事故。现有技术中,矿山通常采用竹竿或者木棍将乳化炸药分节或多节压入孔底,再快速填孔的方法;或先用抽水泵逐一孔内抽水,再装药、填充等。这样的方法,虽然能够在一定程度解决孔内积水问题,但是劳动量较大,装药效率较低,存在安全风险。At present, in open-pit mining operations, due to environmental climate or geological conditions, after the drilling rig drills, there is often serious water accumulation in the blasthole. The occurrence of water accumulation makes the rock emulsion explosive unable to sink to the bottom of the hole or the specific position required by the technical requirements due to the buoyancy of the water in the hole, which affects the subsequent charge amount, charge length and packing length, and finally affects the blasting effect or causes. Blasting accident. In the prior art, bamboo poles or wooden sticks are usually used in mines to press the emulsion explosive into the bottom of the hole in sections or in multiple sections, and then quickly fill the hole; Although this method can solve the problem of water accumulation in the hole to a certain extent, it requires a lot of labor, and the charging efficiency is low, and there is a safety risk.
发明内容SUMMARY OF THE INVENTION
本发明所要解决的技术问题是:针对现有技术的不足,提供一种结构简单,能够安全可靠地实现存在积水的炮孔的炸药装入,使炸药有效克服水的浮力而到达设定装药位置,解决现有技术中存在积水的炮孔装药难、装药不到位等难处,最终达到装药效率高,施工人员劳动强度明显降级,并且后期爆破精确的深水炮孔装药装置。The technical problem to be solved by the present invention is: in view of the deficiencies of the prior art, a simple structure is provided, which can safely and reliably realize the loading of explosives into the blastholes with accumulated water, so that the explosives can effectively overcome the buoyancy of water and reach the set device. It solves the difficulties in the prior art, such as the difficulty of charging the water in the blasthole, and the charging is not in place. Finally, the charging efficiency is high, the labor intensity of the construction personnel is significantly degraded, and the deep-water blasting charging device with accurate blasting in the later stage is achieved. .
要解决以上所述的技术问题,本发明采取的技术方案为:To solve the above-mentioned technical problems, the technical solution adopted by the present invention is:
本发明为一种深水炮孔装药装置,包括中空的外杆、伸缩连杆,伸缩连杆一端活动套装在外杆一端,外杆上的螺纹孔内拧装固定螺丝,外杆另一端设置配重头橡胶,配重头橡胶内设置配重头,伸缩连杆另一端设置浮力尾部橡胶,所述的外杆上靠近配重头橡胶位置设置滑轮基座,滑轮基座上安装能够自由转动的滑轮,牵引绳绕过滑轮,牵引绳上设置炸药捆绑部。The invention relates to a charging device for deep-water blasting holes, which comprises a hollow outer rod and a telescopic connecting rod. Heavy head rubber, a counterweight head is set in the counterweight head rubber, a buoyancy tail rubber is set at the other end of the telescopic link, a pulley base is set on the outer rod near the counterweight head rubber, and a freely rotatable pulley is installed on the pulley base. Go around the pulley, and set the explosive binding part on the traction rope.
所述的伸缩连杆设置为能够相对于外杆伸缩的结构,固定螺丝设置为能够穿透外杆与伸缩连杆接触的结构。The telescopic connecting rod is configured to be able to expand and contract relative to the outer rod, and the fixing screw is configured to be able to penetrate the outer rod and contact the telescopic connecting rod.
所述的配重头橡胶外侧设置多个凸出的配重头橡胶触手;所述的浮力尾部橡胶外侧设置多个凸出的尾部橡胶触手。A plurality of protruding weight head rubber tentacles are arranged on the outer side of the weight head rubber; and a plurality of protruding tail rubber tentacles are arranged on the outer side of the buoyancy tail rubber.
所述的深水炮孔装药装置放置到炮孔内安装炸药时,牵引绳两端端头均设置为能够延伸到炮孔外部位置的结构。When the deep-water blast hole charging device is placed in the blast hole to install explosives, both ends of the traction rope are set to a structure that can extend to the outside of the blast hole.
所述的牵引绳上设置刻度线。A scale line is set on the traction rope.
所述的深水炮孔装药装置放置到炮孔内安装炸药时,将牵引绳两端端头同时向上提拉时,深水炮孔装药装置的配重头橡胶设置为能够卡装在炮孔一侧内壁上的结构,浮力尾部橡胶设置为能够卡装在炮孔另一侧内壁上的结构。When the deep-water blasting charging device is placed in the blasting hole to install explosives, and the ends of the two ends of the traction rope are simultaneously pulled upward, the rubber of the counterweight head of the deep-water blasting charging device is set to be able to be clamped on the first one of the blasting hole. The structure on the inner wall of the side, the buoyancy tail rubber is arranged to be a structure that can be clamped on the inner wall of the other side of the gun hole.
所述的深水炮孔装药装置的配重头橡胶外侧部到浮力尾部橡胶外侧部之间的长度尺寸设置为大于炮孔直径尺寸的结构。The length dimension between the outer part of the rubber of the counterweight head and the outer part of the rubber of the buoyancy tail of the deep-water blasting device is set to be larger than the diameter of the blasting hole.
所述的深水炮孔装药装置的配重头橡胶和浮力尾部橡胶卡装在炮孔内壁时,深水炮孔装药装置的外杆和伸缩连杆均设置为处于倾斜状态的结构。When the weighted rubber and the buoyant tail rubber of the deep-water blasting device are clamped on the inner wall of the blasting hole, the outer rod and the telescopic connecting rod of the deep-water blasting charging device are both arranged in an inclined state.
本发明还涉及一种步骤简单,能够安全可靠地实现存在积水的炮孔的炸药装入,使炸药有效克服水的浮力而到达设定装药位置,解决现有技术中存在积水的炮孔装药难、装药不到位等难处,最终达到装药效率高,施工人员劳动强度明显降级,并且后期爆破精确深水炮孔装药方法,所述的装药方法为:The invention also relates to a simple procedure, which can safely and reliably realize the loading of explosives into the gun holes with accumulated water, so that the explosives can effectively overcome the buoyancy of water to reach the set charging position, and solve the problem of the existing guns with accumulated water in the prior art. Difficulties such as hole charging are difficult and the charging is not in place. Finally, the charging efficiency is high, the labor intensity of the construction personnel is obviously degraded, and the deep-water blasting hole charging method is accurately blasted in the later stage. The charging method is as follows:
1)拧松固定螺丝,根据炮孔直径尺寸大小调整伸缩连杆相对于外杆的位置,使得深水炮孔装药装置的配重头橡胶外侧部到浮力尾部橡胶外侧部之间的长度尺寸大于炮孔直径尺寸,确定好长度后拧紧固定螺丝,牵引绳绕过滑轮;1) Loosen the fixing screw and adjust the position of the telescopic link relative to the outer rod according to the diameter of the blast hole, so that the length between the outer part of the rubber of the counterweight head and the outer part of the rubber of the buoyancy tail of the deep-water blasting device is larger than that of the gun. The diameter of the hole is determined, and the fixing screw is tightened after the length is determined, and the traction rope goes around the pulley;
2)操作人员手握牵引绳两端端头,将深水炮孔装药装置向炮孔内放入,深水炮孔装药装置未到指定位置时切勿提拉牵引绳两端端头;2) The operator holds the two ends of the traction rope and puts the deep-water blasting charging device into the blasting hole. Do not pull the two ends of the traction rope when the deep-water blasting charging device has not reached the designated position;
3)当深水炮孔装药装置到达指定位置后,向上同时提拉牵引绳两端端头,缓慢用力提拉,直至深水炮孔装药装置的配重头橡胶卡装在炮孔一侧内壁上,浮力尾部橡胶卡装在炮孔另一侧内壁上,深水炮孔装药装置与炮孔实现定位;3) When the deep-water blasting charging device reaches the designated position, pull both ends of the traction rope upward at the same time, and pull slowly and forcefully until the rubber counterweight head of the deep-water blasting charging device is clamped on the inner wall of one side of the blasting hole. , the buoyant tail rubber is clamped on the inner wall of the other side of the blasthole, and the deep-water blasthole charging device is positioned with the blasthole;
4)在牵引绳上设置有炸药捆绑部的一端捆绑炸药,捆绑完毕后,缓慢拉动牵引绳另一端向上,此时炸药随着牵引绳的移动而在炮孔内下移,直至炸药到达指定位置,完成深水炮孔装药。4) Bind the explosive on the end of the traction rope with the explosive binding part. After the binding is completed, slowly pull the other end of the traction rope upward. At this time, the explosive moves down in the gun hole with the movement of the traction rope until the explosive reaches the designated position. , to complete the deep-water blasting charge.
所述的炸药在炮孔内下移直至炸药到达指定位置后,将牵引绳两端端头在炮孔外部进行固定,实现炸药定位。After the explosive moves down in the blast hole until the explosive reaches the designated position, the two ends of the traction rope are fixed outside the blast hole to realize the positioning of the explosive.
采用本发明的技术方案,能得到以下的有益效果:Adopting the technical scheme of the present invention, the following beneficial effects can be obtained:
本发明所述的深水炮孔装药装置及装药方法,针对现有技术中炮孔存在积水而产生浮力的情况,提出一种全新的技术方案。利用深水炮孔装药装置的牵引绳、滑轮的配合,使得深水炮孔装药装置一方面能够方便可靠放入到炮孔的底部或设定的位置实现与炮孔的定位,对形成一个能够满足牵引绳在炮孔内上下移动的支点,另一方面,通过牵引绳相对于滑轮的移动,牵引绳上能够绑紧炸药,从而带动炸药在炮孔内向下移动,直到将炸药移动到设定位置。而在炸药移动过程中,牵引绳可靠施力,有效克服浮力,从而能够方便、快捷、准确实现炸药的移动到位,降低装药难度,保障后期爆破精准。进行装药时,拧松固定螺丝,根据炮孔直径尺寸大小调整伸缩连杆相对于外杆的位置,使得深水炮孔装药装置的配重头橡胶外侧部到浮力尾部橡胶外侧部之间的长度尺寸大于炮孔直径尺寸,确定好长度后拧紧固定螺丝,牵引绳绕过滑轮;操作人员手握牵引绳两端端头,将深水炮孔装药装置向炮孔内放入,深水炮孔装药装置未到指定位置时切勿提拉牵引绳两端端头;在放入过程中,由于牵引绳本身就是偏心连接,并且配中头的重量大于浮力尾部橡胶,因此,深水炮孔装药装置在下降过程中,始终处于倾斜状态。当深水炮孔装药装置到达指定位置后,向上同时提拉牵引绳两端端头,缓慢用力提拉,由于深水炮孔装药装置始终处于倾斜状态,且深水炮孔装药装置的长度尺寸大于炮孔的直径尺寸,因此,在施加向上的拉力后,深水炮孔装药装置会抵靠在炮孔内壁上,从而能够方便实现深水炮孔装药装置的配重头橡胶卡装在炮孔一侧内壁上,浮力尾部橡胶卡装在炮孔另一侧内壁上,这样,深水炮孔装药装置与炮孔实现定位;而在牵引绳上设置有炸药捆绑部的一端捆绑炸药,捆绑完毕后,缓慢拉动牵引绳另一端向上,此时炸药随着牵引绳的移动而在炮孔内下移,直至炸药到达指定位置,完成深水炮孔装药。这样,本发明的装置和方法,能够广泛应用于露天矿山深孔炮孔或水下爆破装药,在垂直炮孔、倾斜炮孔孔内积水较多的情况下能够可靠使用,采用本发明的技术,可以轻松准确将炸药装入积水的炮孔,避免炸药因水的浮力无法装填到设计位置或炸药间间隔过大等情况出现,从而也就不会出现影响爆破效果,甚至造成盲炮或残炮现象的出现。本发明所述的深水炮孔装药装置及装药方法,装置结构简单,方法步骤简单,能够安全可靠地实现存在积水的炮孔的炸药装入,使炸药有效克服水的浮力而到达设定装药位置,解决现有技术中存在积水的炮孔装药难、装药不到位等难处,最终达到装药效率高,施工人员劳动强度明显降级,并且后期爆破精确。The deep-water blasthole charging device and charging method of the present invention propose a brand-new technical solution for the situation in which buoyancy is generated due to accumulated water in blastholes in the prior art. Using the cooperation of the traction rope and pulley of the deep-water blasting charging device, on the one hand, the deep-water blasting charging device can be conveniently and reliably placed at the bottom of the blasting hole or at a set position to achieve positioning with the blasting hole. Satisfy the fulcrum of the traction rope moving up and down in the gun hole. On the other hand, through the movement of the traction rope relative to the pulley, the explosive can be fastened on the traction rope, thereby driving the explosive to move down in the gun hole until the explosive is moved to the set point. Location. During the movement of the explosive, the traction rope reliably exerts force and effectively overcomes the buoyancy, so that the explosive can be moved in place conveniently, quickly and accurately, reducing the difficulty of charging and ensuring the accuracy of blasting in the later stage. When charging, loosen the fixing screws, and adjust the position of the telescopic link relative to the outer rod according to the diameter of the blast hole, so that the length between the outer part of the rubber of the counterweight head and the outer part of the rubber of the buoyancy tail of the deep-water blasting device The size is larger than the diameter of the blast hole. After determining the length, tighten the fixing screw, and the traction rope goes around the pulley; Do not pull the ends of the traction rope when the drug device has not reached the designated position; during the placing process, because the traction rope itself is eccentrically connected, and the weight of the middle head is greater than the buoyant tail rubber, therefore, the deep water gun hole is charged The device is always in a tilted state during the descending process. When the deep-water blasting device reaches the designated position, pull both ends of the traction rope upward at the same time, and pull slowly and forcefully, because the deep-water blasting charging device is always in an inclined state, and the length of It is larger than the diameter of the blast hole. Therefore, after the upward pulling force is applied, the deep water blast hole charging device will abut on the inner wall of the blast hole, so that it is convenient to realize that the rubber of the counterweight head of the deep water blast hole charging device is clamped in the blast hole. On the inner wall of one side, the buoyant tail rubber is clamped on the inner wall of the other side of the gun hole, so that the charging device of the deep water gun hole can be positioned with the gun hole; and the end of the tying part of the explosive is set on the traction rope to bind the explosive, and the binding is completed. Then, slowly pull the other end of the traction rope upwards, at this time, the explosive moves down in the blasthole with the movement of the traction rope, until the explosive reaches the designated position, and the charging of the deep-water blasthole is completed. In this way, the device and method of the present invention can be widely used in deep-hole blastholes or underwater blasting charges in open-pit mines, and can be used reliably when there is a lot of water in vertical blastholes and inclined blastholes. The technology can easily and accurately load the explosive into the water-filled blasthole, avoiding the situation that the explosive cannot be loaded to the design position due to the buoyancy of the water or the interval between the explosives is too large, so that the blasting effect will not be affected, or even cause blindness. Emergence of cannon or residual cannon phenomenon. The deep-water blasthole charging device and charging method of the present invention have the advantages of simple device structure and simple method steps, which can safely and reliably realize the charging of explosives in blastholes with accumulated water, so that the explosives can effectively overcome the buoyancy of water and reach the device. The fixed charging position solves the difficulties in the prior art, such as the difficulty of charging the blasthole with water accumulation, and the charging is not in place. Finally, the charging efficiency is high, the labor intensity of the construction personnel is obviously degraded, and the blasting is accurate in the later stage.
附图说明Description of drawings
下面对本说明书各附图所表达的内容及图中的标记作出简要的说明:Below is a brief description of the contents expressed in the drawings of this specification and the symbols in the drawings:
图1为本发明所述的深水炮孔装药装置的整体结构示意图;1 is a schematic diagram of the overall structure of the deep-water blasthole charging device according to the present invention;
图2为本发明所述的深水炮孔装药装置的剖视结构示意图;Fig. 2 is the sectional structure schematic diagram of the deep-water blasthole charging device according to the present invention;
图3为本发明所述的深水炮孔装药装置的外杆与伸缩连杆连接的结构示意图;3 is a schematic structural diagram of the connection between the outer rod and the telescopic connecting rod of the deep-water blasting charging device according to the present invention;
图4为本发明所述的深水炮孔装药装置使用时的结构示意图;4 is a schematic structural diagram of the deep-water blasthole charging device according to the present invention in use;
附图中标记分别为:1、外杆;2、伸缩连杆;3、固定螺丝;4、配重头橡胶;5、配重头;6、浮力尾部橡胶;7、滑轮基座;8、滑轮;9、牵引绳;10、配重头橡胶触手;11、尾部橡胶触手;12、炮孔;13、炸药。The symbols in the accompanying drawings are: 1, outer rod; 2, telescopic connecting rod; 3, fixing screw; 4, weight head rubber; 5, weight head; 6, buoyancy tail rubber; 7, pulley base; 8, pulley; 9. Traction rope; 10. Rubber tentacles at the head of the counterweight; 11. Rubber tentacles at the tail; 12. Gun holes; 13. Explosives.
具体实施方式Detailed ways
下面对照附图,通过对实施例的描述,对本发明的具体实施方式如所涉及的各构件的形状、构造、各部分之间的相互位置及连接关系、各部分的作用及工作原理等作进一步的详细说明:In the following, referring to the accompanying drawings, through the description of the embodiments, the specific embodiments of the present invention, such as the shape and structure of each component involved, the mutual position and connection relationship between each part, the function and working principle of each part, etc. will be further described. Details of:
如附图1-附图4所示,本发明为一种深水炮孔装药装置,包括中空的外杆1、伸缩连杆2,伸缩连杆2一端活动套装在外杆1一端,外杆1上的螺纹孔内拧装固定螺丝3,外杆1另一端设置配重头橡胶4,配重头橡胶4内设置配重头5,伸缩连杆2另一端设置浮力尾部橡胶6,所述的外杆1上靠近配重头橡胶4位置设置滑轮基座7,滑轮基座7上安装能够自由转动的滑轮8,牵引绳9绕过滑轮8,牵引绳9上设置炸药捆绑部。针对现有技术中炮孔12存在积水而产生浮力的情况,提出一种全新的技术方案。利用深水炮孔装药装置的牵引绳、滑轮的配合,使得深水炮孔装药装置一方面能够方便可靠放入到炮孔12的底部或设定的位置实现与炮孔12的定位,对形成一个能够满足牵引绳在炮孔12内上下移动的支点,另一方面,通过牵引绳相对于滑轮的移动,牵引绳上能够绑紧炸药,从而带动炸药在炮孔12内向下移动,直到将炸药移动到设定位置。而在炸药移动过程中,牵引绳可靠施力,有效克服浮力,从而能够方便、快捷、准确实现炸药的移动到位,降低装药难度,保障后期爆破精准。进行装药时,拧松固定螺丝3,根据炮孔12直径尺寸大小调整伸缩连杆2相对于外杆1的位置,使得深水炮孔装药装置的配重头橡胶4外侧部到浮力尾部橡胶6外侧部之间的长度尺寸大于炮孔12直径尺寸,确定好长度后拧紧固定螺丝3,牵引绳9绕过滑轮8;操作人员手握牵引绳9两端端头,将深水炮孔装药装置向炮孔12内放入,深水炮孔装药装置未到指定位置时切勿提拉牵引绳9两端端头;在放入过程中,由于牵引绳本身就是偏心连接,并且配中头的重量大于浮力尾部橡胶6,因此,深水炮孔装药装置在下降过程中,始终处于倾斜状态。当深水炮孔装药装置到达指定位置后,向上同时提拉牵引绳9两端端头,缓慢用力提拉,由于深水炮孔装药装置始终处于倾斜状态,且深水炮孔装药装置的长度尺寸大于炮孔的直径尺寸,因此,在施加向上的拉力后,深水炮孔装药装置会抵靠在炮孔内壁上,从而能够方便实现深水炮孔装药装置的配重头橡胶4卡装在炮孔12一侧内壁上,浮力尾部橡胶6卡装在炮孔12另一侧内壁上,这样,深水炮孔装药装置与炮孔12实现定位;而在牵引绳9上设置有炸药捆绑部的一端捆绑炸药,捆绑完毕后,缓慢拉动牵引绳9另一端向上,此时炸药随着牵引绳9的移动而在炮孔12内下移,直至炸药到达指定位置,完成深水炮孔装药。这样,本发明的装置和方法,能够广泛应用于露天矿山深孔炮孔或水下爆破装药,在垂直炮孔、倾斜炮孔孔内积水较多的情况下能够可靠使用,采用本发明的技术,可以轻松准确将炸药装入积水的炮孔,避免炸药因水的浮力无法装填到设计位置或炸药间间隔过大等情况出现,从而也就不会出现影响爆破效果,甚至造成盲炮或残炮现象的出现。本发明所述的深水炮孔装药装置及装药方法,装置结构简单,方法步骤简单,针对特定问题使用,能够安全可靠地实现存在积水的炮孔的炸药装入,使炸药有效克服水的浮力而到达设定装药位置,解决现有技术中存在积水的炮孔装药难、装药不到位等难处,最终达到装药效率高,施工人员劳动强度明显降级,后期爆破精确,满足需求。As shown in Figures 1 to 4, the present invention is a deep-water blasting hole charging device, comprising a hollow
所述的伸缩连杆2设置为能够相对于外杆1伸缩的结构,固定螺丝3设置为能够穿透外杆1与伸缩连杆2接触的结构。上述结构,通过伸缩连杆和外杆的相对位置的调节,能够改变深水炮孔装药装置的整体长度,从而适用于不同直径的炮孔使用,装置通用性得到提高。The
所述的配重头橡胶4外侧设置多个凸出的配重头橡胶触手10;所述的浮力尾部橡胶6外侧设置多个凸出的尾部橡胶触手11。上述结构,橡胶触手可在多种不同类型的孔壁以及水体环境中,能够确保装置可靠到达指定位置时,牢固受力,确保装置能够正常发挥其作用。A plurality of protruding
所述的深水炮孔装药装置放置到炮孔12内安装炸药时,牵引绳9两端端头均设置为能够延伸到炮孔12外部位置的结构。When the deep-water blasting charging device is placed in the blasting
所述的牵引绳9上设置刻度线。上述结构,通过刻度线的设置,在牵引绳上下移动时,能够方便可靠掌握距离,炸药准确移动到位。A scale line is set on the
所述的深水炮孔装药装置放置到炮孔12内安装炸药时,将牵引绳9两端端头同时向上提拉时,深水炮孔装药装置的配重头橡胶4设置为能够卡装在炮孔12一侧内壁上的结构,浮力尾部橡胶6设置为能够卡装在炮孔12另一侧内壁上的结构。所述的深水炮孔装药装置的配重头橡胶4外侧部到浮力尾部橡胶6外侧部之间的长度尺寸设置为大于炮孔12直径尺寸的结构。所述的深水炮孔装药装置的配重头橡胶4和浮力尾部橡胶6卡装在炮孔12内壁时,深水炮孔装药装置的外杆1和伸缩连杆2均设置为处于倾斜状态的结构。上述结构,在深水炮孔装药装置放入过程中,由于牵引绳本身就是偏心连接,并且配中头的重量大于浮力尾部橡胶6,因此,深水炮孔装药装置在下降过程中,始终处于倾斜状态。当深水炮孔装药装置到达指定位置后,向上同时提拉牵引绳9两端端头,缓慢用力提拉,由于深水炮孔装药装置始终处于倾斜状态,且深水炮孔装药装置的长度尺寸大于炮孔的直径尺寸,因此,在施加向上的拉力后,深水炮孔装药装置会抵靠在炮孔内壁上,从而能够方便实现深水炮孔装药装置的配重头橡胶4卡装在炮孔12一侧内壁上,浮力尾部橡胶6卡装在炮孔12另一侧内壁上,这样,深水炮孔装药装置与炮孔12实现定位,且不会轻易脱离。上述结构,炸药装入到位后,深水炮孔装药装置放置不需要回收该装置。因此,在使用中,每个深水炮孔装药装置放置都是一次性使用。而装置多为可降解材料。这样,不会对作业造成影响,且容易降解。When the described deep-water blasting device is placed in the blasting
本发明还涉及一种步骤简单,能够安全可靠地实现存在积水的炮孔的炸药装入,使炸药有效克服水的浮力而到达设定装药位置,解决现有技术中存在积水的炮孔装药难、装药不到位等难处,最终达到装药效率高,施工人员劳动强度明显降级,并且后期爆破精确深水炮孔装药方法,所述的装药方法为:The invention also relates to a simple procedure, which can safely and reliably realize the loading of explosives into the gun holes with accumulated water, so that the explosives can effectively overcome the buoyancy of water to reach the set charging position, and solve the problem of the existing guns with accumulated water in the prior art. Difficulties such as hole charging are difficult and the charging is not in place. Finally, the charging efficiency is high, the labor intensity of the construction personnel is obviously degraded, and the deep-water blasting hole charging method is accurately blasted in the later stage. The charging method is as follows:
1)拧松固定螺丝3,根据炮孔12直径尺寸大小调整伸缩连杆2相对于外杆1的位置,使得深水炮孔装药装置的配重头橡胶4外侧部到浮力尾部橡胶6外侧部之间的长度尺寸大于炮孔12直径尺寸,确定好长度后拧紧固定螺丝3,牵引绳9绕过滑轮8;1) Loosen the fixing
2)操作人员手握牵引绳9两端端头,将深水炮孔装药装置向炮孔12内放入,深水炮孔装药装置未到指定位置时切勿提拉牵引绳9两端端头;2) The operator holds the two ends of the
3)当深水炮孔装药装置到达指定位置后,向上同时提拉牵引绳9两端端头,缓慢用力提拉,直至深水炮孔装药装置的配重头橡胶4卡装在炮孔12一侧内壁上,浮力尾部橡胶6卡装在炮孔12另一侧内壁上,深水炮孔装药装置与炮孔12实现定位;3) When the deep-water blasting charging device reaches the designated position, pull up both ends of the
4)在牵引绳9上设置有炸药捆绑部的一端捆绑炸药,捆绑完毕后,缓慢拉动牵引绳9另一端向上,此时炸药随着牵引绳9的移动而在炮孔12内下移,直至炸药到达指定位置,完成深水炮孔装药。4) On the
所述的炸药在炮孔12内下移直至炸药到达指定位置后,将牵引绳9两端端头在炮孔12外部进行固定,实现炸药定位。After the explosive moves down in the
本发明所述的深水炮孔装药装置及装药方法,针对现有技术中炮孔存在积水而产生浮力的情况,提出一种全新的技术方案。利用深水炮孔装药装置的牵引绳、滑轮的配合,使得深水炮孔装药装置一方面能够方便可靠放入到炮孔的底部或设定的位置实现与炮孔的定位,对形成一个能够满足牵引绳在炮孔内上下移动的支点,另一方面,通过牵引绳相对于滑轮的移动,牵引绳上能够绑紧炸药,从而带动炸药在炮孔内向下移动,直到将炸药移动到设定位置。而在炸药移动过程中,牵引绳可靠施力,有效克服浮力,从而能够方便、快捷、准确实现炸药的移动到位,降低装药难度,保障后期爆破精准。进行装药时,拧松固定螺丝,根据炮孔直径尺寸大小调整伸缩连杆相对于外杆的位置,使得深水炮孔装药装置的配重头橡胶外侧部到浮力尾部橡胶外侧部之间的长度尺寸大于炮孔直径尺寸,确定好长度后拧紧固定螺丝,牵引绳绕过滑轮;操作人员手握牵引绳两端端头,将深水炮孔装药装置向炮孔内放入,深水炮孔装药装置未到指定位置时切勿提拉牵引绳两端端头;在放入过程中,由于牵引绳本身就是偏心连接,并且配中头的重量大于浮力尾部橡胶,因此,深水炮孔装药装置在下降过程中,始终处于倾斜状态。当深水炮孔装药装置到达指定位置后,向上同时提拉牵引绳两端端头,缓慢用力提拉,由于深水炮孔装药装置始终处于倾斜状态,且深水炮孔装药装置的长度尺寸大于炮孔的直径尺寸,因此,在施加向上的拉力后,深水炮孔装药装置会抵靠在炮孔内壁上,从而能够方便实现深水炮孔装药装置的配重头橡胶卡装在炮孔一侧内壁上,浮力尾部橡胶卡装在炮孔另一侧内壁上,这样,深水炮孔装药装置与炮孔实现定位;而在牵引绳上设置有炸药捆绑部的一端捆绑炸药,捆绑完毕后,缓慢拉动牵引绳另一端向上,此时炸药随着牵引绳的移动而在炮孔内下移,直至炸药到达指定位置,完成深水炮孔装药。这样,本发明的装置和方法,能够广泛应用于露天矿山深孔炮孔或水下爆破装药,在垂直炮孔、倾斜炮孔孔内积水较多的情况下能够可靠使用,采用本发明的技术,可以轻松准确将炸药装入积水的炮孔,避免炸药因水的浮力无法装填到设计位置或炸药间间隔过大等情况出现,从而也就不会出现影响爆破效果,甚至造成盲炮或残炮现象的出现。本发明所述的深水炮孔装药装置及装药方法,装置结构简单,方法步骤简单,能够安全可靠地实现存在积水的炮孔的炸药装入,使炸药有效克服水的浮力而到达设定装药位置,解决现有技术中存在积水的炮孔装药难、装药不到位等难处,最终达到装药效率高,施工人员劳动强度明显降级,并且后期爆破精确。The deep-water blasthole charging device and charging method of the present invention propose a brand-new technical solution for the situation in which buoyancy is generated due to accumulated water in blastholes in the prior art. Using the cooperation of the traction rope and pulley of the deep-water blasting charging device, on the one hand, the deep-water blasting charging device can be conveniently and reliably placed at the bottom of the blasting hole or at a set position to achieve positioning with the blasting hole. Satisfy the fulcrum of the traction rope moving up and down in the gun hole. On the other hand, through the movement of the traction rope relative to the pulley, the explosive can be fastened on the traction rope, thereby driving the explosive to move down in the gun hole until the explosive is moved to the set point. Location. During the movement of the explosive, the traction rope reliably exerts force and effectively overcomes the buoyancy, so that the explosive can be moved in place conveniently, quickly and accurately, reducing the difficulty of charging and ensuring the accuracy of blasting in the later stage. When charging, loosen the fixing screws, and adjust the position of the telescopic link relative to the outer rod according to the diameter of the blast hole, so that the length between the outer part of the rubber of the counterweight head and the outer part of the rubber of the buoyancy tail of the deep-water blasting device The size is larger than the diameter of the blast hole. After determining the length, tighten the fixing screw, and the traction rope goes around the pulley; Do not pull the ends of the traction rope when the drug device has not reached the designated position; during the placing process, because the traction rope itself is eccentrically connected, and the weight of the middle head is greater than the buoyant tail rubber, therefore, the deep water gun hole is charged The device is always in a tilted state during the descending process. When the deep-water blasting device reaches the designated position, pull both ends of the traction rope upward at the same time, and pull slowly and forcefully, because the deep-water blasting charging device is always in an inclined state, and the length of It is larger than the diameter of the blast hole. Therefore, after the upward pulling force is applied, the deep water blast hole charging device will abut on the inner wall of the blast hole, so that it is convenient to realize that the rubber of the counterweight head of the deep water blast hole charging device is clamped in the blast hole. On the inner wall of one side, the buoyant tail rubber is clamped on the inner wall of the other side of the gun hole, so that the charging device of the deep water gun hole can be positioned with the gun hole; and the end of the tying part of the explosive is set on the traction rope to bind the explosive, and the binding is completed. Then, slowly pull the other end of the traction rope upwards, at this time, the explosive moves down in the blasthole with the movement of the traction rope, until the explosive reaches the designated position, and the charging of the deep-water blasthole is completed. In this way, the device and method of the present invention can be widely used in deep-hole blastholes or underwater blasting charges in open-pit mines, and can be used reliably when there is a lot of water in vertical blastholes and inclined blastholes. The technology can easily and accurately load the explosive into the water-filled blasthole, avoiding the situation that the explosive cannot be loaded to the design position due to the buoyancy of the water or the interval between the explosives is too large, so that the blasting effect will not be affected, or even cause blindness. Emergence of cannon or residual cannon phenomenon. The deep-water blasthole charging device and charging method of the present invention have the advantages of simple device structure and simple method steps, which can safely and reliably realize the charging of explosives in blastholes with accumulated water, so that the explosives can effectively overcome the buoyancy of water and reach the device. The fixed charging position solves the difficulties in the prior art, such as the difficulty of charging the blasthole with water accumulation, and the charging is not in place. Finally, the charging efficiency is high, the labor intensity of the construction personnel is obviously degraded, and the blasting is accurate in the later stage.
上面结合附图对本发明进行了示例性的描述,显然本发明具体的实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进将本发明的构思和技术方案直接应用于其他场合的,均在本发明的保护范围内。The present invention has been exemplarily described above in conjunction with the accompanying drawings. Obviously, the specific implementation of the present invention is not limited by the above-mentioned methods, as long as various improvements made by the method concept and technical solutions of the present invention are adopted, or the present invention is modified without improvement. If the concept and technical solutions of the invention are directly applied to other occasions, they are all within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010698298.3A CN111780637B (en) | 2020-07-20 | 2020-07-20 | A deep water blasthole charging device and charging method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010698298.3A CN111780637B (en) | 2020-07-20 | 2020-07-20 | A deep water blasthole charging device and charging method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111780637A true CN111780637A (en) | 2020-10-16 |
CN111780637B CN111780637B (en) | 2025-01-21 |
Family
ID=72763486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010698298.3A Active CN111780637B (en) | 2020-07-20 | 2020-07-20 | A deep water blasthole charging device and charging method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111780637B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113639603A (en) * | 2021-09-22 | 2021-11-12 | 六盘水华安爆破工程有限公司 | Water hole explosive filling device and filling method |
CN113983885A (en) * | 2021-11-04 | 2022-01-28 | 保山金厂河矿业有限公司 | An open-air underground water-resistant large-hole bagged water-resistant explosive charging device and method |
CN115012815A (en) * | 2022-07-07 | 2022-09-06 | 国家能源集团宁夏煤业有限责任公司 | Vertical shaft blasting presplitting grouting method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU150393U1 (en) * | 2014-09-18 | 2015-02-20 | Виктор Сергеевич Федотенко | DEVICE FOR DISTRIBUTING A BORE CHARGE |
CN207193962U (en) * | 2017-09-22 | 2018-04-06 | 国家电网公司 | A kind of overhead transmission line concrete precast pipe pile is implanted into pile-driving system |
CN209326480U (en) * | 2018-12-18 | 2019-08-30 | 何勇芳 | A kind of charge constitution for water bearing blasthole explosion |
CN110631441A (en) * | 2019-11-05 | 2019-12-31 | 安徽海螺建材设计研究院有限责任公司 | Mine medium-length hole charging method and mine medium-length hole charging device |
CN210268385U (en) * | 2019-07-31 | 2020-04-07 | 洛阳理工学院 | A cartridge bag positioner for water pressure blasting |
CN212692707U (en) * | 2020-07-20 | 2021-03-12 | 湖南海螺水泥有限公司 | A kind of deep water blast hole charging device |
-
2020
- 2020-07-20 CN CN202010698298.3A patent/CN111780637B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU150393U1 (en) * | 2014-09-18 | 2015-02-20 | Виктор Сергеевич Федотенко | DEVICE FOR DISTRIBUTING A BORE CHARGE |
CN207193962U (en) * | 2017-09-22 | 2018-04-06 | 国家电网公司 | A kind of overhead transmission line concrete precast pipe pile is implanted into pile-driving system |
CN209326480U (en) * | 2018-12-18 | 2019-08-30 | 何勇芳 | A kind of charge constitution for water bearing blasthole explosion |
CN210268385U (en) * | 2019-07-31 | 2020-04-07 | 洛阳理工学院 | A cartridge bag positioner for water pressure blasting |
CN110631441A (en) * | 2019-11-05 | 2019-12-31 | 安徽海螺建材设计研究院有限责任公司 | Mine medium-length hole charging method and mine medium-length hole charging device |
CN212692707U (en) * | 2020-07-20 | 2021-03-12 | 湖南海螺水泥有限公司 | A kind of deep water blast hole charging device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113639603A (en) * | 2021-09-22 | 2021-11-12 | 六盘水华安爆破工程有限公司 | Water hole explosive filling device and filling method |
CN113639603B (en) * | 2021-09-22 | 2024-02-06 | 六盘水华安爆破工程有限公司 | Water hole explosive filling method |
CN113983885A (en) * | 2021-11-04 | 2022-01-28 | 保山金厂河矿业有限公司 | An open-air underground water-resistant large-hole bagged water-resistant explosive charging device and method |
CN115012815A (en) * | 2022-07-07 | 2022-09-06 | 国家能源集团宁夏煤业有限责任公司 | Vertical shaft blasting presplitting grouting method |
Also Published As
Publication number | Publication date |
---|---|
CN111780637B (en) | 2025-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111780637A (en) | A kind of deep water blast hole charging device and charging method thereof | |
CN104033169A (en) | Impact-resistant constant-resistance anchor cable | |
CN104375167A (en) | Down-hole coal seam earthquake CT detection vibroseis and method based on seismal waves excited by spring | |
CN206804438U (en) | Realize moment of torsion and the pull-out test device for anchor cable of axle power decoupling | |
CN105857520A (en) | Anchor mooring positioning structure of ship | |
CN212692707U (en) | A kind of deep water blast hole charging device | |
CN202202807U (en) | On-vehicle large-torque hydraulic drilling machine device | |
CN204690747U (en) | One easily hammers into earth anchor drilling | |
CN103670466A (en) | Constant-resistance deformer | |
CN205138349U (en) | Spring contraction type detonator big gun line fixing device | |
CN104912074B (en) | A kind of use rotate impact method realize anchor body enter ground earth anchor drilling structure | |
CN109238058A (en) | A kind of method for sealing based on swollen plasticity non-Newtonian fluid material | |
CN205102712U (en) | Piston detonator big gun line fixing device | |
CN216348127U (en) | Mine water hole powder charge auxiliary device | |
CN212003090U (en) | A auxiliary device for salvaging rock core in pit | |
CN203716905U (en) | Wire line coring drill bit fisher | |
CN206409262U (en) | A kind of rich water soft-rock tunnel roofbolt sleeve type fixing device | |
CN116105562B (en) | A charging device for mine blasting | |
CN219826810U (en) | Simple perforation length measuring device for deep hole sectional blasting well formation | |
CN205786142U (en) | A kind of pipeline coagulation soil weight coating impact test device | |
RU150393U1 (en) | DEVICE FOR DISTRIBUTING A BORE CHARGE | |
RU209835U1 (en) | RESTAIN FOR SELF-PROPELLED DRILLING RIG | |
CN216482569U (en) | Underwater explosive throwing device | |
CN210598895U (en) | Underground rock engineering test drilling orifice protection device suitable for different apertures | |
CN221346851U (en) | Propulsion device for logging probe after clamping hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |