CN111634794A - A non-welded segmented crane - Google Patents

A non-welded segmented crane Download PDF

Info

Publication number
CN111634794A
CN111634794A CN202010558227.3A CN202010558227A CN111634794A CN 111634794 A CN111634794 A CN 111634794A CN 202010558227 A CN202010558227 A CN 202010558227A CN 111634794 A CN111634794 A CN 111634794A
Authority
CN
China
Prior art keywords
bottom plate
shaped
shaped clamping
connecting bottom
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010558227.3A
Other languages
Chinese (zh)
Inventor
何剑鸣
马立洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yangzi Mitsui Shipbuilding Co ltd
Original Assignee
Jiangsu Yangzi Mitsui Shipbuilding Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yangzi Mitsui Shipbuilding Co ltd filed Critical Jiangsu Yangzi Mitsui Shipbuilding Co ltd
Priority to CN202010558227.3A priority Critical patent/CN111634794A/en
Publication of CN111634794A publication Critical patent/CN111634794A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/62Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled
    • B66C1/66Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled for engaging holes, recesses, or abutments on articles specially provided for facilitating handling thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

本发明公开了一种非焊接式分段吊马,包括连接底板、螺栓,所述连接底板四周分别设有端部U型卡件,所述端部U型卡件呈U字形,所述端部U型卡件靠近连接底板的开口一端还设有螺纹套,所述螺纹套呈纵向贯通;工作时,所述端部U型卡件的一端开口顶靠在连接底板上表面,其另一端顶靠在T形排机构下表面,螺栓穿过螺纹套且螺栓底部顶靠在连接底板上表面,通过螺栓与螺纹套的螺纹配合进而锁紧,本发明的有益效果是,无需焊接,操作简单,使用效果佳,可循坏使用。

Figure 202010558227

The invention discloses a non-welded segmented hanging horse, comprising a connecting base plate and bolts. The connecting base plate is respectively provided with end U-shaped clips around it, and the end U-shaped clips are U-shaped. One end of the U-shaped clip close to the open end of the connecting base plate is also provided with a threaded sleeve, and the threaded sleeve is longitudinally penetrating; during operation, one end of the U-shaped clip at the end is open against the upper surface of the connecting base plate, and the other end Abutting on the lower surface of the T-shaped row mechanism, the bolts pass through the threaded sleeves and the bottom of the bolts abuts on the upper surface of the connecting base plate, and are locked by the threaded cooperation of the bolts and the threaded sleeves. The beneficial effect of the present invention is that no welding is required, and the operation is simple , the use effect is good, can be recycled.

Figure 202010558227

Description

一种非焊接式分段吊马A non-welded segmented crane

技术领域technical field

本发明涉及船舶吊装技术领域,特别是一种非焊接式分段吊马。The invention relates to the technical field of ship hoisting, in particular to a non-welded segmented crane.

背景技术Background technique

目前船舶在分段吊装时,通常采用将吊马焊接在对应的船体结构上,然后进行吊装,该种方式虽然也能满足船舶吊装的目的,但是该种方式在船体吊装完毕后,然后工作人员对船舶进行船体合拢安装完成后,此时需要人工将吊马通过割刀或碳刨机进行拆除,该操作过程需要消耗固定的资源,增加了造船成本,并且对于工作人员要求较高,需要会操作机器,并且拆除过程中会对船舶上的油漆造成一定的损坏,因此在拆装吊马后,工作人员还需要对船舶进行补漆操作,并且由于船舶本身工作环境比较特殊,资源比较紧俏。At present, when the ship is hoisted in sections, the crane is usually welded on the corresponding hull structure, and then hoisted. Although this method can also meet the purpose of hoisting the ship, after the hull is hoisted, the staff After the hull is folded and installed on the ship, it is necessary to manually dismantle the crane through a cutter or a carbon planer. This operation requires fixed resources consumption, increases the cost of shipbuilding, and requires high staff. Operate the machine, and the paint on the ship will be damaged to a certain extent during the dismantling process. Therefore, after the crane is dismantled and installed, the staff also needs to repaint the ship. Due to the special working environment of the ship itself, resources are relatively scarce.

鉴于上述情况,有必要对现有的船舶分段吊装方式加以改进,使其能够满足现在对船舶分段吊装成本以及人工劳动强度的需要。In view of the above situation, it is necessary to improve the existing way of hoisting ships in sections, so that it can meet the needs of the cost and labor intensity of hoisting ships in sections.

发明内容SUMMARY OF THE INVENTION

本发明的目的是为了解决现有的分段吊装方式通常采用焊接固定在船体上,然后船体合拢后还需要操作其他机器对其进行拆卸,该操作方式比较繁杂,对工作人员要求也较高,并且拆卸过程中还会损坏船舶上的油漆,增加了造船成本,又大大增加了人工劳动强度,因此我们设计了一种非焊接式分段吊马,结构简单,拆卸便捷,人工劳动强度小,可循坏使用,降低了造船成本。The purpose of the present invention is to solve the problem that the existing segmented hoisting method is usually fixed on the hull by welding, and then other machines need to be operated to disassemble the hull after the hull is closed. This operation method is complicated and requires high staff. In addition, the paint on the ship will be damaged during the disassembly process, which increases the cost of shipbuilding and greatly increases the labor intensity. Therefore, we designed a non-welded segmented crane, which has a simple structure, convenient disassembly, and low labor intensity. It can be recycled and used, which reduces the cost of shipbuilding.

实现上述目的本发明的技术方案为,一种非焊接式分段吊马,包括连接底板、螺栓,所述连接底板四周分别设有端部U型卡件,所述端部U型卡件呈U字形,所述端部U型卡件靠近连接底板的开口一端还设有螺纹套,所述螺纹套呈纵向贯通;工作时,所述端部U型卡件的一端开口顶靠在连接底板上表面,其另一端顶靠在T形排机构下表面,螺栓穿过螺纹套且螺栓底部顶靠在连接底板上表面,通过螺栓与螺纹套的螺纹配合进而锁紧。The technical solution of the present invention to achieve the above objects is that a non-welded segmented crane includes a connecting base plate and bolts, and end U-shaped clips are respectively arranged around the connecting base plate, and the end U-shaped clips are in the shape of a connecting plate. U-shaped, one end of the end U-shaped clip close to the open end of the connecting base plate is also provided with a threaded sleeve, and the threaded sleeve is longitudinally penetrating; during operation, one end of the end U-shaped clip is open against the connecting base plate. The other end of the upper surface abuts against the lower surface of the T-shaped row mechanism, the bolt passes through the threaded sleeve and the bottom of the bolt abuts on the upper surface of the connecting base plate, and is locked by the thread fit of the bolt and the threaded sleeve.

对本技术方案的进一步补充,所述连接底板的中部上下对称设有中部U型卡件。As a further supplement to the technical solution, the middle part of the connecting bottom plate is symmetrically provided with a middle U-shaped clip.

对本技术方案的进一步补充,所述中部U型卡件设有四个且两两设置于连接底板中部上下两侧。As a further supplement to the technical solution, there are four U-shaped clips in the middle part, and two of them are arranged on the upper and lower sides of the middle part of the connecting bottom plate.

对本技术方案的进一步补充,所述连接底板的中间位置处设有用于间隔上下两侧对称的中部U型卡件的主板。As a further supplement to the technical solution, the middle position of the connecting base plate is provided with a main board for spacing the middle U-shaped clips symmetrical on the upper and lower sides.

对本技术方案的进一步补充,端部U型卡件与中部U型卡件之间设有耳板,所述耳板设有两个且分别设置于所述主板的左右两侧,所述耳板与连接底板上表面固定连接。A further supplement to this technical solution, an ear plate is provided between the U-shaped clip at the end and the U-shaped clip in the middle, and two ear plates are provided on the left and right sides of the main board, respectively. It is fixedly connected to the upper surface of the connection base plate.

对本技术方案的进一步补充,所述连接底板上对应螺栓的下方均设有锥坑,所述锥坑的尺寸与螺栓的尺寸配合。As a further supplement to the technical solution, the connecting bottom plate is provided with a conical pit below the corresponding bolt, and the size of the conical pit matches the size of the bolt.

其有益效果在于,无需焊接,通过将连接底板放置于分段吊装的船体结构之间,然后通过U型卡件将连接底板与船体结构连接起来,操作简单,使用效果佳,可循坏使用,并且在船体合拢后无需通过割刀或碳刨机将吊马进行拆除,只需拆除螺栓即可将吊马拆下,减小了人工劳动强度,降低了造船成本,便于人们广泛地使用。The beneficial effect is that, without welding, the connecting bottom plate is placed between the hull structures that are hoisted in sections, and then the connecting bottom plate and the hull structure are connected through U-shaped clips, the operation is simple, the use effect is good, and it can be used repeatedly. Moreover, after the hull is closed, there is no need to remove the crane by a cutter or a carbon planer, and the crane can be removed only by removing the bolts, which reduces labor intensity and shipbuilding cost, and is convenient for people to use widely.

附图说明Description of drawings

图1是本发明工作状态示意图;Fig. 1 is the working state schematic diagram of the present invention;

图2是本发明整体安装结构的第一角度示意图;Fig. 2 is the first angle schematic diagram of the overall installation structure of the present invention;

图3是本发明整体安装结构的第二角度示意图;Fig. 3 is the second angle schematic diagram of the overall installation structure of the present invention;

图4是连接底板、主板、耳板安装结构示意图。FIG. 4 is a schematic diagram of the installation structure of the connection base plate, the main board and the ear plate.

图中,1、连接底板;11、锥坑;2、T形排机构;3、端部U型卡件;31、螺纹套;4、螺栓;5、中部U型卡件;6、主板;7、耳板。In the figure, 1. Connecting bottom plate; 11. Cone pit; 2. T-shaped row mechanism; 3. U-shaped clamp at the end; 31. Threaded sleeve; 4. Bolt; 5. U-shaped clamp in the middle; 6. Main board; 7, ear plate.

具体实施方式Detailed ways

本技术方案是基于现有的船舶分段吊装方式比较繁杂,效果也不是很好,在操作过程中也进一步增加了造船成本,并且人工劳动强度比较大,该种方式不适宜我们日益增长的需要,因此我们设计了本技术方案,用来解决现有的吊装方式存在的问题。This technical solution is based on the fact that the existing ship hoisting method is complicated and the effect is not very good, and the shipbuilding cost is further increased in the operation process, and the labor intensity is relatively large, this method is not suitable for our growing needs. , so we designed this technical solution to solve the problems existing in the existing hoisting methods.

为了便于本领域技术人员对本技术方案更加清楚,下面将结合附图1-4说明本技术方案的具体结构和原理:本发明适用于具有T形排机构2的船舶分段上,无需焊接,只需通过螺栓4进行拧紧即可;本发明包括起到连接作用的连接底板1,工作时,所述连接底板1紧靠在船舶分段船体结构上;为了固定连接底板1从而将分段结构安装在一起,所述连接底板1四周分别设有端部U型卡件3,用于将连接底板1固定在船体结构上的T形排机构2上;下面将对端部U型卡件3是如何实现固定作用做进一步地阐述,所述端部U型卡件3呈U字形,工作时,其一端开口顶靠在连接底板1上表面,其另一端顶靠在T形排机构2下表面,为了便于连接锁死,所述端部U型卡件3靠近连接底板1的开口一端设有螺纹套31,所述螺纹套31呈纵向贯通,工作时,螺栓4穿过螺纹套31且螺栓4底部顶靠在连接底板1上表面,通过螺栓4与螺纹套31的螺纹配合进而锁紧。In order to make the technical solution more clear to those skilled in the art, the specific structure and principle of the technical solution will be described below with reference to the accompanying drawings 1-4: It needs to be tightened by bolts 4; the present invention includes a connecting bottom plate 1 that plays a connecting role, and during operation, the connecting bottom plate 1 is closely abutted on the sectional hull structure of the ship; in order to fix the connecting bottom plate 1, the segmented structure is installed Together, the connecting bottom plate 1 is respectively provided with end U-shaped clips 3 around the connecting bottom plate 1 for fixing the connecting bottom plate 1 on the T-shaped row mechanism 2 on the hull structure; the following will describe the end U-shaped clips 3. How to realize the fixing effect will be further elaborated. The end U-shaped clip 3 is U-shaped. When working, one end of the U-shaped clip 3 is open against the upper surface of the connecting base plate 1, and the other end is against the lower surface of the T-shaped row mechanism 2. , In order to facilitate the connection and locking, the end U-shaped clip 3 is provided with a threaded sleeve 31 at the open end of the connecting base plate 1, and the threaded sleeve 31 is longitudinally penetrated. During operation, the bolt 4 passes through the threaded sleeve 31 and the bolt 4. The bottom is abutted against the upper surface of the connecting base plate 1, and the bolts 4 are engaged with the threads of the threaded sleeve 31 to be locked.

由于连接底板1的四周设有端部U型卡件3,其在工作中,连接底板1上的中部受力比较薄弱,因此为了提高连接底板1中部的受力,在连接底板1的中部上下对称设有中部U型卡件5,所述中部U型卡件5与端部U型卡件3工作原理相同,都是通过螺栓4与螺纹套31配合然后螺栓4底部顶靠在连接底板1上,通过螺栓4与螺纹套31之间的螺纹配合进行锁紧,所述中部U型卡件5也设有四个且两两设置于连接底板1中部上下两侧,使得分段的船体结构能够被更好地安装固定。Since there are end U-shaped clips 3 around the connecting base plate 1, the middle part of the connecting base plate 1 is relatively weak during operation. The middle U-shaped clip 5 is symmetrically arranged, and the middle U-shaped clip 5 and the end U-shaped clip 3 work in the same way, both of which are matched by the bolt 4 and the threaded sleeve 31, and then the bottom of the bolt 4 is pressed against the connecting base plate 1. The upper and lower sides of the middle part of the connecting bottom plate 1 are also provided with four U-shaped clips 5 in the middle part, so that the segmented hull structure is Can be installed and fixed better.

由于上下两侧相邻的中部U型卡件5安装后,两者之间在连接底板1上具有间隙,容易使得其间隙处的连接底板1凸起产生变形,因此在连接底板1的中间位置处设有用于间隔上下两侧对称的中部U型卡件5的主板6。Since the middle U-shaped clips 5 adjacent to the upper and lower sides are installed, there is a gap between the two on the connecting base plate 1, which is easy to cause the connecting base plate 1 at the gap to be deformed. Therefore, in the middle position of the connecting base plate 1 There is a main board 6 for spacing the middle U-shaped clips 5 symmetrical on the upper and lower sides.

由于端部U型卡件3与中部U型卡件5均安装在连接底板1上时,两者之间的空隙处容易变形,为了缓解连接底板1的纵向受力,因此在端部U型卡件3与中部U型卡件5之间设有耳板7,所述耳板7设有两个且分别设置于所述主板6的左右两侧,所述耳板7与连接底板1上表面固定连接。Since the end U-shaped clip 3 and the middle U-shaped clip 5 are both installed on the connecting base plate 1, the gap between them is easily deformed. An ear plate 7 is provided between the clip 3 and the middle U-shaped clip 5. The ear plate 7 is provided with two and is respectively arranged on the left and right sides of the main board 6. The ear plate 7 is connected to the connection base plate 1. Surface fixed connection.

为了使得端部U型卡件3与中部U型卡件5能够更好地与连接底板1接触从而固定,所述连接底板1上对应螺栓4的下方均设有锥坑11,所述锥坑11的尺寸与螺栓4的尺寸配合,即工作时,螺栓4能够顶靠在锥坑11内。In order to make the end U-shaped clips 3 and the middle U-shaped clips 5 better in contact with the connecting base plate 1 to be fixed, the connecting base plate 1 is provided with conical pits 11 below the corresponding bolts 4 . The size of the 11 matches the size of the bolt 4, that is, the bolt 4 can abut against the cone 11 during operation.

下面将对本发明的工作原理作详细的阐述,首先将连接底板1放置于分段吊装的船舶上的T形排机构2上,然后安装端部U型卡件3、中部U型卡件5,使得连接底板1、T形排机构2均位于端部U型卡件3、中部U型卡件5的开口内,然后使用螺栓穿过端部U型卡件3、中部U型卡件5上的螺纹套,然后旋紧螺栓,直至其底部紧紧顶靠在连接底板上的锥坑内,此时可以进行吊装,待船体合拢后,旋下螺栓,然后将端部U型卡件3、中部U型卡件5拆下,然后将连接底板移开即可,本吊马可以循坏进行使用,使用便捷。The working principle of the present invention will be described in detail below. First, the connecting bottom plate 1 is placed on the T-shaped row mechanism 2 on the ship that is hoisted in sections, and then the end U-shaped clips 3 and the middle U-shaped clips 5 are installed. Make the connecting base plate 1 and the T-shaped row mechanism 2 located in the openings of the end U-shaped clip 3 and the middle U-shaped clip 5, and then use bolts to pass through the end U-shaped clip 3 and the middle U-shaped clip 5. the threaded sleeve, and then tighten the bolts until the bottom is tightly against the conical pit on the connecting bottom plate. At this time, hoisting can be carried out. After the hull is closed, unscrew the bolts, and then place the end U-shaped clamps 3, the middle part The U-shaped clip 5 is removed, and then the connecting bottom plate can be removed. The hanging horse can be used in cycles and is convenient to use.

上述技术方案仅体现了本发明技术方案的优选技术方案,本技术领域的技术人员对其中某些部分所可能做出的一些变动均体现了本发明的原理,属于本发明的保护范围之内。The above technical solutions only represent the preferred technical solutions of the technical solutions of the present invention, and some changes that those skilled in the art may make to some parts of them all reflect the principles of the present invention and fall within the protection scope of the present invention.

Claims (6)

1. A non-welding type segmented hoisting horse comprises a connecting bottom plate (1) and bolts (4), and is characterized in that end U-shaped clamping pieces (3) are arranged on the periphery of the connecting bottom plate (1) respectively, the end U-shaped clamping pieces (3) are U-shaped, a threaded sleeve (31) is further arranged at one end, close to an opening of the connecting bottom plate (1), of each end U-shaped clamping piece (3), and the threaded sleeve (31) is longitudinally communicated; when the connecting device works, an opening at one end of the U-shaped clamping piece (3) at the end part abuts against the upper surface of the connecting bottom plate (1), the other end of the U-shaped clamping piece abuts against the lower surface of the T-shaped row mechanism (2), the bolt (4) penetrates through the threaded sleeve (31) and the bottom of the bolt (4) abuts against the upper surface of the connecting bottom plate (1), and the U-shaped clamping piece is matched with the thread of the threaded sleeve (31) through the bolt (4) and then locked.
2. The non-welding type segmented horse block according to claim 1, wherein the middle part of the connecting bottom plate (1) is provided with middle U-shaped clamping pieces (5) in an up-and-down symmetrical mode.
3. The non-welding type segmented horse block according to claim 2, wherein four middle U-shaped clamping pieces (5) are arranged on the upper side and the lower side of the middle of the connecting bottom plate (1) in pairs.
4. The non-welding type segmented horse block according to claim 3, wherein a main plate (6) for separating middle U-shaped clamping pieces (5) which are symmetrical up and down is arranged in the middle of the connecting bottom plate (1).
5. The non-welding type segmented horse hanging machine according to claim 4 is characterized in that two lug plates (7) are arranged between the end U-shaped clamping piece (3) and the middle U-shaped clamping piece (5), the two lug plates (7) are respectively arranged on the left side and the right side of the main board (6), and the lug plates (7) are fixedly connected with the upper surface of the connecting bottom board (1).
6. The non-welding type sectional crane horse according to claim 2, wherein conical pits (11) are formed in the connecting bottom plate (1) below the corresponding bolts (4), and the size of each conical pit (11) is matched with the size of each bolt (4).
CN202010558227.3A 2020-06-18 2020-06-18 A non-welded segmented crane Pending CN111634794A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010558227.3A CN111634794A (en) 2020-06-18 2020-06-18 A non-welded segmented crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010558227.3A CN111634794A (en) 2020-06-18 2020-06-18 A non-welded segmented crane

Publications (1)

Publication Number Publication Date
CN111634794A true CN111634794A (en) 2020-09-08

Family

ID=72325841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010558227.3A Pending CN111634794A (en) 2020-06-18 2020-06-18 A non-welded segmented crane

Country Status (1)

Country Link
CN (1) CN111634794A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112479023A (en) * 2020-12-02 2021-03-12 沪东中华造船(集团)有限公司 Hoisting device and hoisting method for enclosure system mounting platform module

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090132034A (en) * 2008-06-20 2009-12-30 정영재 Marine Lugs
CN202201627U (en) * 2011-07-21 2012-04-25 中煤第九十二工程处 steel structure lifting lug
KR20150047750A (en) * 2013-10-25 2015-05-06 삼성중공업 주식회사 Lifting device for ship-building
CN210530358U (en) * 2019-07-29 2020-05-15 浙江中南建设集团钢结构有限公司 A device for hoisting and temporary fixing of H-shaped steel beams
CN212292476U (en) * 2020-06-18 2021-01-05 江苏扬子三井造船有限公司 Non-welding type segmented hanging horse

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090132034A (en) * 2008-06-20 2009-12-30 정영재 Marine Lugs
CN202201627U (en) * 2011-07-21 2012-04-25 中煤第九十二工程处 steel structure lifting lug
KR20150047750A (en) * 2013-10-25 2015-05-06 삼성중공업 주식회사 Lifting device for ship-building
CN210530358U (en) * 2019-07-29 2020-05-15 浙江中南建设集团钢结构有限公司 A device for hoisting and temporary fixing of H-shaped steel beams
CN212292476U (en) * 2020-06-18 2021-01-05 江苏扬子三井造船有限公司 Non-welding type segmented hanging horse

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112479023A (en) * 2020-12-02 2021-03-12 沪东中华造船(集团)有限公司 Hoisting device and hoisting method for enclosure system mounting platform module

Similar Documents

Publication Publication Date Title
CN104191218A (en) Engineering hydraulic oil cylinder cover detaching mechanism
CN111634794A (en) A non-welded segmented crane
CN205916901U (en) Joist steel fixture
CN104043931A (en) Positioning inclined strut device for assisting construction of building wall panels on ship and use method of positioning inclined strut device
CN105127949A (en) Hydraulic separation tool for flanges
CN219684475U (en) Alignment device suitable for pipeline butt welding burns
CN212292476U (en) Non-welding type segmented hanging horse
CN216503184U (en) Experimental welding set of diffusion hydrogen
CN205363680U (en) Plug welding of test bridging plate cone of friction connects tensile strength's anchor clamps
CN108483301B (en) A kind of cable clamping counterweight
CN212401503U (en) Inclined ladder fixing device for ship subsection manufacturing
CN212599338U (en) Cutter for processing large-scale plate capable of being rapidly detached and replaced
CN205290127U (en) Steel sheet leveling device of boats and ships assembly usefulness
CN213981489U (en) Quick assembly disassembly fastener
CN209439655U (en) A kind of support device for passing through installation floor in hole using vertical bone installation
CN211949605U (en) Template connecting device
CN110497356B (en) Large motor rotor assembly and disassembly guard ring tooling device
CN223130499U (en) Auxiliary device for fast butt joint of belts
CN215545957U (en) laser-MAG composite welding clamp for high-strength steel for thick plate ship
CN207479901U (en) A kind of steel box column lifting connection temporary fastening device
CN210615643U (en) Boats and ships plate welding frock
CN105538193A (en) Fixture and method for testing tensile property of friction taper plug welding head for lapping plate
CN106670846B (en) A kind of engine air jet pipe positioning plate perforating clamp
CN205129228U (en) Top of tower group piece frock for tower crane
CN220204890U (en) Kinetic energy pipeline erection fixture and pipeline erection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200908