[go: up one dir, main page]

CN111618090A - A roll change traverse device for heavy-duty H-beam and cloud rail tandem rolling mills - Google Patents

A roll change traverse device for heavy-duty H-beam and cloud rail tandem rolling mills Download PDF

Info

Publication number
CN111618090A
CN111618090A CN202010258301.XA CN202010258301A CN111618090A CN 111618090 A CN111618090 A CN 111618090A CN 202010258301 A CN202010258301 A CN 202010258301A CN 111618090 A CN111618090 A CN 111618090A
Authority
CN
China
Prior art keywords
sets
traverse
trolley
roll
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010258301.XA
Other languages
Chinese (zh)
Inventor
曹明辉
何家宝
蒲春雷
张向军
芦强
李博宇
张赵宁
辛星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN202010258301.XA priority Critical patent/CN111618090A/en
Publication of CN111618090A publication Critical patent/CN111618090A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/08Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling structural sections, i.e. work of special cross-section, e.g. angle steel
    • B21B1/088H- or I-sections
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/08Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling structural sections, i.e. work of special cross-section, e.g. angle steel
    • B21B1/085Rail sections
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B31/00Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames
    • B21B31/08Interchanging rolls, roll mountings, or stand frames, e.g. using C-hooks; Replacing roll chocks on roll shafts
    • B21B31/10Interchanging rolls, roll mountings, or stand frames, e.g. using C-hooks; Replacing roll chocks on roll shafts by horizontally displacing, i.e. horizontal roll changing

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Rolling (AREA)

Abstract

本发明公开一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置。包括:轨道;在轨道一端的中间通过支座设置有平移液压缸;在所述的轨道上串联设置有多组的横移小车;所述的平移液压缸的扁头铰接在远液压缸的横移小车上;所述横移小车包括横移车架;在横移车架的底部都固定有四组带支架车轮;在每一组横移车架上面固定有两组辊系小车轨道,该辊系小车轨道配合相对应的辊系小车移动。本发明能实现三机架辊系同时换辊,减少了换辊时间,提高生产效率。

Figure 202010258301

The invention discloses a roll changing traverse device for heavy-duty H-section steel and cloud rail tandem rolling mills. Including: a track; a translation hydraulic cylinder is arranged in the middle of one end of the track through a support; a plurality of groups of traversing trolleys are arranged in series on the track; the flat head of the translation hydraulic cylinder is hinged on the horizontal of the far hydraulic cylinder The traverse trolley includes a traverse frame; four groups of wheels with brackets are fixed at the bottom of the traverse frame; The track of the roller trolley moves with the corresponding roller trolley. The invention can realize the simultaneous roll change of the three-stand roll system, reduce the roll change time and improve the production efficiency.

Figure 202010258301

Description

一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置A roll change traverse device for heavy-duty H-beam and cloud rail tandem rolling mills

技术领域technical field

本发明涉及串列轧机领域,具体的说是一种针对用于轧制超宽超厚H型钢和云轨三架串列轧机辊系同时换辊横移的装置。The invention relates to the field of tandem rolling mills, in particular to a device for rolling super-wide and super-thick H-beams and cloud rail three-stand tandem rolling mill rolls for simultaneous roll change and lateral movement.

背景技术Background technique

在超宽超厚H型钢和云轨轧钢生产线上,精轧机组通产采用紧凑式布置方式,该布置方式也被称为CCS,三架轧机沿轧制中心线依次串联布置,即万能粗轧(UR)、轧边(E)、万能精轧(UF),采用这种方式轧钢可以大大降低钢厂的备辊量、降低成本,但同时也存在弊端,轧制不同规格的产品,需要同时更换三架轧机的辊系,以往辊系的更换都是采用单机更换,若采用单机更换的方式,非常耗时,并且效率低下,因此开发一种更换三机架轧辊辊系横移装置是亟待解决的问题。On the super-wide and super-thick H-beam and cloud rail rolling production lines, the finishing rolling unit adopts a compact layout, which is also called CCS. Three rolling mills are arranged in series along the rolling center line, that is, universal rough rolling. (UR), edge rolling (E), and universal finishing (UF), rolling steel in this way can greatly reduce the amount of rolls prepared by the steel mill and reduce costs, but there are also disadvantages. Rolling products of different specifications requires simultaneous Replacing the roll system of the three-stand rolling mill. In the past, the replacement of the roll system was performed by a single machine. If the single-machine replacement method is used, it is very time-consuming and inefficient. Therefore, it is urgent to develop a three-stand roll system. solved problem.

发明内容SUMMARY OF THE INVENTION

针对上述问题,本发明提出一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置,该装置采用液压方式驱动,易维护检修。In view of the above problems, the present invention proposes a roll changing and traversing device for heavy-duty H-beam and cloud-rail tandem rolling mills. The device is driven by hydraulic pressure and is easy to maintain and repair.

为达到上述目的,本发明一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置,包括:In order to achieve the above-mentioned purpose, the present invention is a roll-changing and traversing device for heavy-duty H-beam and cloud rail tandem rolling mills, comprising:

轨道;track;

在轨道一端的中间通过支座设置有平移液压缸;A translation hydraulic cylinder is arranged through the support in the middle of one end of the track;

在所述的轨道上串联设置有多组的横移小车;所述的平移液压缸的扁头铰接在远液压缸的横移小车上;A plurality of groups of traverse trolleys are arranged in series on the track; the flat head of the translation hydraulic cylinder is hinged on the traverse trolley of the remote hydraulic cylinder;

所述横移小车包括横移车架;在横移车架的底部都固定有四组带支架车轮;The traverse trolley includes a traverse frame; four groups of wheels with brackets are fixed on the bottom of the traverse frame;

在每一组横移车架上面固定有两组辊系小车轨道,该辊系小车轨道配合相对应的辊系小车移动。Two sets of roller trolley tracks are fixed on each set of transverse carriages, and the roller trolley tracks move in coordination with the corresponding roller trolleys.

进一步的,所述的的横移小车为六组,其中:Further, the traversing trolleys are in six groups, wherein:

固定在第一组和第四组横移车架上面的两组辊系小车轨道与UR辊系小车纵向移动轨道重合,且在高度方向上也在同一标高;The two sets of roller trolley tracks fixed on the first and fourth sets of traversing frames overlap with the longitudinal moving tracks of the UR roller trolley, and are also at the same elevation in the height direction;

固定在第二组和第五组横移车架上面的两组辊系小车轨道与E辊系小车纵向移动轨道重合,且在高度方向上也在同一标高;The two sets of roller trolley tracks fixed on the second and fifth sets of traversing carriages overlap with the longitudinal moving track of the E roller trolley, and are also at the same elevation in the height direction;

固定在第三组和第六组横移车架上面的两组辊系小车轨道与UF辊系小车纵向移动轨道重合,且在高度方向上也在同一标高。The two sets of roller trolley tracks fixed on the third and sixth sets of traversing carriages coincide with the longitudinal moving track of the UF roller trolley, and are also at the same elevation in the height direction.

进一步的,在每一组横移车架两侧面都固定有两组锁紧液压缸,两组锁紧插头分别固定在两组锁紧液压缸活塞杆上,相邻两组横移车架之间的连接依靠两组连接插头相连,两组连接插头依靠螺栓连接;在两组连接插头之间还安装了调整垫片组。Further, two sets of locking hydraulic cylinders are fixed on both sides of each set of traverse frames, and the two sets of locking plugs are respectively fixed on the piston rods of the two sets of locking hydraulic cylinders. The connection between the two sets of connecting plugs is connected by two sets of connecting plugs, and the two sets of connecting plugs are connected by bolts; an adjusting shim set is also installed between the two sets of connecting plugs.

本发明一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置及方法,UR万能轧机、E轧边机、UF万能轧机组成串列机组轧制重载型H型钢、云轨时,UR辊系小车、E辊系小车、UF辊系小车分别隐藏在UR万能轧机、E轧边机、UF万能轧机的机腹中,另外在第四、五、六组横移车架上分别有待更换UR辊系小车、E辊系小车、UF辊系小车,在轧制的产品规格及品种更换之前,首先在线下将相应的新辊系在对应的第四组UR辊系小车、第五组E辊系小车、第六组UF辊系小车装配好,在新辊系装配之前,驱动固定在第四组横移车架两侧装有锁紧插头的锁紧液压缸伸出,两侧的锁紧插头插入该组对应的UR辊系小车两侧的耳座A、耳座B,驱动固定在第五组横移车架两侧装有锁紧插头的锁紧液压缸伸出,两侧的锁紧插头插入该组对应的E辊系小车两侧的耳座C、耳座D,驱动固定在第六组横移车架两侧装有锁紧插头的锁紧液压缸伸出,两侧的锁紧插头插入该组对应的UF辊系小车两侧的耳座E、耳座F,上述锁紧过程可同时进行,而后完成新辊系的装配,为了便于说明整个横移换辊过程,现将装有新辊系的UR辊系小车、E辊系小车、UF辊系小车命名为B组辊系,隐藏在UR万能轧机、E轧边机、UF万能轧机的机腹中装有旧辊系UR辊系小车、E辊系小车、UF辊系小车命名为A组辊系,当轧制的产品规格及品种需要更换时,只需要将位于UR万能轧机、E轧边机、UF万能轧机的机腹中三组辊系通过对应的UR辊系小车、E辊系小车、UF辊系小车沿着所对应的UR辊系小车纵向移动轨道、E辊系小车纵向移动轨道、UF辊系小车纵向移动轨道从轧制中心线移动到移动至换辊横移中心线的位置,驱动UR辊系小车、E辊系小车、UF辊系小车进行纵向移动的驱动系统不再做描述,而后驱动固定在第一组横移车架两侧装有锁紧插头的锁紧液压缸伸出,两侧的锁紧插头插入该组对应的UR辊系小车两侧的耳座A、耳座B,驱动固定在第二组横移车架两侧装有锁紧插头的锁紧液压缸伸出,两侧的锁紧插头插入该组对应的E辊系小车两侧的耳座C、耳座D,驱动固定在第三组横移车架两侧装有锁紧插头的锁紧液压缸伸出,两侧的锁紧插头插入该组对应的UF辊系小车两侧的耳座E、耳座F,上述锁紧过程可同时进行。然后驱动平移驱动系统中的平移液压缸将A组辊系沿着轨道系统中的轨道由位置1移动至位置3,B组辊系由位置2移动至原有A组辊系所处的位置1。然后驱动位于位置2的B组新辊系中固定在第四组横移车架两侧装有锁紧插头的锁紧液压缸缩回,两侧的锁紧插头从该组对应的UR辊系小车两侧的耳座A、耳座B脱出,驱动固定在第五组横移车架两侧装有锁紧插头的锁紧液压缸缩回,两侧的锁紧插头从该组对应的E辊系小车两侧的耳座C、耳座D脱出,驱动固定在第六组横移车架两侧装有锁紧插头的锁紧液压缸缩回,两侧的锁紧插头从该组对应的UF辊系小车两侧的耳座E、耳座F脱出,上述锁紧打开过程可同时进行。而后驱动位于B组辊系中装有新辊系UR辊系小车、E辊系小车、UF辊系小车沿着UR辊系小车纵向移动轨道、E辊系小车纵向移动轨道、UF辊系小车纵向移动轨道从换辊横移中心线移动至轧制中心线的位置。与此同时,然后驱动位于位置3的A组旧辊系中固定在第一组横移车架两侧装有锁紧插头的锁紧液压缸缩回,两侧的锁紧插头从该组对应的UR辊系小车两侧的耳座A、耳座B脱出,驱动固定在第二组横移车架两侧装有锁紧插头的锁紧液压缸缩回,两侧的锁紧插头从该组对应的E辊系小车两侧的耳座C、耳座D脱出,驱动固定在第三组横移车架两侧装有锁紧插头的锁紧液压缸缩回,两侧的锁紧插头从该组对应的UF辊系小车两侧的耳座E、耳座F脱出,通过厂房的吊车将旧辊系运送至机修间进行拆辊。当需要再次换辊时,驱动平移驱动系统中的平移液压缸将A组新辊系沿着轨道系统中的轨道由位置3移动至位置1,B组旧辊系由位置1移动至位置2,其余流程同上。The present invention is a roll changing device and method for heavy-duty H-beam and cloud rail tandem rolling mill rolls. , cloud track, UR roll trolley, E roll trolley, UF roll trolley are hidden in the belly of UR universal rolling mill, E edge rolling machine, UF universal rolling mill, and the fourth, fifth and sixth groups of traverse There are UR roll trolleys, E roll trolleys and UF roll trolleys to be replaced on the frame respectively. Before changing the specifications and varieties of rolled products, firstly tie the corresponding new rolls to the corresponding fourth group of UR rolls offline. The trolley, the fifth group of E roller trolleys, and the sixth group of UF roller trolleys are assembled. Before the new roller system is assembled, the locking hydraulic cylinders with locking plugs installed on both sides of the fourth group of traverse frames are driven to extend. Out, the locking plugs on both sides are inserted into the ear sockets A and B on both sides of the corresponding UR roller trolley, and the locking hydraulic cylinders with locking plugs installed on both sides of the fifth group of traverse frames are driven to drive. Extend, the locking plugs on both sides are inserted into the corresponding ear sockets C and D on both sides of the E-roller trolley to drive the locking hydraulic pressure fixed with locking plugs on both sides of the sixth group of traverse frames. The cylinder is extended, and the locking plugs on both sides are inserted into the corresponding ear sockets E and F on both sides of the UF roller system. The above locking process can be carried out at the same time, and then the assembly of the new roller system is completed. During the roll change process, the UR roll car, E roll car, and UF roll car with new rolls are now named as B group rolls, which are hidden in the UR universal rolling mill, E edge rolling machine, and UF universal rolling mill. The belly of the machine is equipped with the old roll series UR roll series trolley, E roll series trolley and UF roll series trolley named as group A roll series. The three sets of rolls in the belly of the edger and UF universal rolling mill pass through the corresponding UR roll car, E roll car, and UF roll car along the longitudinal movement track of the corresponding UR roll car, E roll car longitudinally The moving track and the longitudinal moving track of the UF roll trolley move from the rolling center line to the position where it moves to the center line of the roll change traverse, and the drive system that drives the UR roll trolley, E roll trolley, and UF roll trolley to move longitudinally does not work. Describe again, and then drive the locking hydraulic cylinders fixed on both sides of the first group of traversing frames with locking plugs to extend, and the locking plugs on both sides are inserted into the corresponding ear sockets on both sides of the UR roller trolley. A. Ear seat B, driving the locking hydraulic cylinders fixed on both sides of the second group of traversing frames with locking plugs to extend, and the locking plugs on both sides are inserted into the ears on both sides of the corresponding E-roller trolleys of this group Seat C, ear seat D, drive the locking hydraulic cylinders fixed on both sides of the third group of traversing frames with locking plugs to extend, and the locking plugs on both sides are inserted into the corresponding UF roller trolleys on both sides of the group. For the ear seat E and the ear seat F, the above locking process can be performed at the same time. Then drive the translation hydraulic cylinder in the translation drive system to move the rollers of group A from position 1 to position 3 along the track in the track system, and the rollers of group B from position 2 to position 1 where the original rollers of group A were located. . Then drive the locking hydraulic cylinders with locking plugs installed on both sides of the fourth group of traversing frames in the new roller system of group B at position 2 to retract, and the locking plugs on both sides are removed from the corresponding UR roller system of this group. The ear seat A and the ear seat B on both sides of the trolley are disengaged, and the locking hydraulic cylinders with locking plugs fixed on both sides of the fifth group of traversing frames are driven to retract, and the locking plugs on both sides are removed from the corresponding E of the group. The ear bases C and D on both sides of the roller trolley are disengaged, and the locking hydraulic cylinders with locking plugs fixed on both sides of the sixth group of traversing frames are driven to retract, and the locking plugs on both sides are corresponding to this group. The ear seat E and the ear seat F on both sides of the UF roller system trolley are disengaged, and the above locking and opening process can be carried out at the same time. Then the drive is located in the B group roller system, which is equipped with the new roller system UR roller system trolley, E roller system trolley, UF roller system trolley along the longitudinal moving track of the UR roller system trolley, the E roller system trolley longitudinal moving track, and the UF roller system trolley longitudinally. The moving track moves from the roll change traverse center line to the position of the rolling center line. At the same time, then drive the locking hydraulic cylinders with locking plugs installed on both sides of the first group of traversing frames in the old roller system of group A at position 3 to retract, and the locking plugs on both sides are corresponding to the group. The ear seat A and the ear seat B on both sides of the UR roller system trolley are disengaged, and the locking hydraulic cylinders fixed on both sides of the second group of traversing frames with locking plugs are retracted, and the locking plugs on both sides are retracted from the The ear bases C and D on both sides of the corresponding E-roller trolleys are disengaged, and the locking hydraulic cylinders installed with locking plugs fixed on both sides of the third group of traversing frames are driven to retract, and the locking plugs on both sides are retracted. From the ear bases E and F on both sides of the corresponding UF roller system trolleys of the group, the old roller systems are transported to the machine repair room by the crane in the factory building to remove the rollers. When the roller needs to be changed again, the translation hydraulic cylinder in the translation drive system is driven to move the new roller system of group A from position 3 to position 1 along the track in the track system, and the old roller system of group B from position 1 to position 2. The rest of the process is the same as above.

如此反复,可大大节省时间,提高生产效率,减少人工作业时间,维护方便简单。This repetition can greatly save time, improve production efficiency, reduce manual operation time, and maintain convenient and simple.

附图说明Description of drawings

图1是本发明一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置实施例的主视图;Fig. 1 is a front view of an embodiment of a roll changing and traversing device for heavy-duty H-beam and cloud rail tandem rolling mills according to the present invention;

图2是本发明一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置实施例的俯视图;Fig. 2 is a top view of an embodiment of a roll changing and traversing device for heavy-duty H-beam and cloud rail tandem rolling mills according to the present invention;

图3是本发明一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置实施例的西南等轴测视图;Fig. 3 is a southwest isometric view of an embodiment of a roll changing and traversing device for heavy-duty H-beam and cloud rail tandem rolling mills according to the present invention;

图4-1是本发明一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置实施例的连接插头放大图;图4-2是图4-1的A-A向剖视图。Fig. 4-1 is an enlarged view of a connecting plug of an embodiment of the present invention for a heavy-duty H-beam, cloud rail tandem rolling mill roll changing roll shift device; Fig. 4-2 is a cross-sectional view taken along the A-A direction of Fig. 4-1 .

图5为图2中U-R辊系部分的局部放大示意图。FIG. 5 is a partial enlarged schematic view of the U-R roller system in FIG. 2 .

图6为图1中U-R辊系部分的局部放大示意图。FIG. 6 is a partial enlarged schematic view of the U-R roller system in FIG. 1 .

具体实施方式Detailed ways

下面结合说明书附图对本发明做进一步的描述。The present invention will be further described below with reference to the accompanying drawings.

实施例1Example 1

如图1-6所示,本实施例一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置及方法,包括轨道系统、平移驱动系统、横移小车系统。As shown in Figures 1-6, the present embodiment is a roll changing device and method for heavy-duty H-beam and cloud rail tandem rolling mill rolls, including a rail system, a translation drive system, and a traverse trolley system.

所述轨道系统沿换辊横移中心线对称布置如图2所示,所述轨道1系统包括轨道1、垫板2、压板3、锚栓4,位于换辊横移中心线一侧的多组锚栓4穿过该侧的多组垫板2,将该侧多组垫板2固定在土建基础上,该侧的多组锚栓4锚固在土建基础上,该侧的多组压板3将轨道1压紧在多组垫板2的上方,位于换辊横移中心线另一侧的多组锚栓4穿过该侧的多组垫板2,将该侧多组垫板2固定在土建基础上,该侧的多组锚栓4锚固在土建基础上,该侧的多组压板3将轨道1压紧在多组垫板2的上方如图1、2所示。The track system is symmetrically arranged along the center line of the roll change and traverse, as shown in Figure 2, the track 1 system includes a track 1, a backing plate 2, a pressure plate 3, and an anchor bolt 4. The sets of anchor bolts 4 pass through the multiple sets of backing plates 2 on this side, and the multiple sets of backing plates 2 on this side are fixed on the civil foundation. The multiple sets of anchor bolts 4 on this side are anchored on the civil foundation. Press the rail 1 above the multiple sets of backing plates 2, and the multiple sets of anchor bolts 4 located on the other side of the center line of the roll change traverse pass through the multiple sets of backing plates 2 on this side, and fix the multiple sets of backing plates 2 on this side On the civil foundation, multiple sets of anchor bolts 4 on this side are anchored on the civil foundation, and multiple sets of pressure plates 3 on this side press the track 1 above the multiple sets of backing plates 2 as shown in Figures 1 and 2.

所述平移驱动系统包括平移液压缸11、支座10、连接座12,平移液压缸11的缸筒固定支座10上,支座10固定土建基础上,平移液压缸11的扁头铰接在连接座12,连接座12固定在第四组横一小车下部如图1、3所示。The translational drive system includes a translational hydraulic cylinder 11, a support 10, and a connecting seat 12. The cylinder of the translational hydraulic cylinder 11 is fixed on the support 10, the support 10 is fixed on the foundation of civil engineering, and the flat head of the translational hydraulic cylinder 11 is hinged on the connection. The seat 12, the connecting seat 12 is fixed on the lower part of the fourth group of horizontal trolleys as shown in Figures 1 and 3.

所述横移小车系统包括锁紧液压缸5、锁紧插头6、辊系小车轨道7、横移车架8、带支架车轮9、连接插头12、调整垫片组13,沿换辊横移中心线依次布置六组横移车架8,在每一组横移车架8的底部都固定有四组带支架车轮9,在每一组横移车架8两侧面都固定有两组锁紧液压缸5,两组锁紧插头6分别固定在两组锁紧液压缸5活塞杆上,在每一组横移车架8上面固定有两组辊系小车轨道7,该辊系小车轨道7是配合相对应的辊系小车移动,固定在第一组横移车架8上面的两组辊系小车轨道7与UR辊系小车纵向移动轨道重合,且在高度方向上也在同一标高,固定在第二组横移车架8上面的两组辊系小车轨道7与E辊系小车纵向移动轨道重合,且在高度方向上也在同一标高,固定在第三组横移车架8上面的两组辊系小车轨道7与UF辊系小车纵向移动轨道重合,且在高度方向上也在同一标高如图1、2所示。以第一组横移车架8与第二组横移车架8为例说明组与组之间的连接情况,组与组之间的连接依靠两组连接插头12相连,其中一组连接插头12铰接在第一组横移车架8下部耳板,另外一组连接插头12铰接在第二组横移车架8,两组连接插头12依靠螺栓连接在一起,在两组连接插头12之间还安装了调整垫片组13如图4所示,第二组横移车架8与第三组横移车架8、第三组横移车架8与第四组横移车架8、第四组横移车架8与第五组横移车架8、第五组横移车架8与第六组横移车架8裂解情况同上如图1、2、3所示。The traversing trolley system includes a locking hydraulic cylinder 5, a locking plug 6, a roller trolley track 7, a traversing frame 8, a wheel with brackets 9, a connecting plug 12, and a set of adjusting shims 13. Six groups of traverse frames 8 are arranged in turn on the center line, four groups of wheels 9 with brackets are fixed at the bottom of each group of traverse frames 8, and two sets of locks are fixed on both sides of each group of traverse frames 8 The hydraulic cylinder 5 is tightened, the two sets of locking plugs 6 are respectively fixed on the piston rods of the two sets of locking hydraulic cylinders 5, and two sets of roller trolley tracks 7 are fixed on each set of traverse frames 8. The roller trolley tracks 7 is to move with the corresponding roller trolley, and the two sets of roller trolley tracks 7 fixed on the first group of traversing carriages 8 coincide with the longitudinal moving track of the UR roller trolley, and are also at the same elevation in the height direction. The two sets of roller trolley tracks 7 fixed on the second set of traverse frames 8 overlap with the longitudinal moving rails of the E roller trolleys, and are also at the same elevation in the height direction, and are fixed on the third set of traverse frames 8 The two sets of roller trolley tracks 7 overlap with the longitudinal moving track of the UF roller trolley, and are also at the same elevation in the height direction as shown in Figures 1 and 2. Taking the first group of traverse frames 8 and the second group of traverse frames 8 as examples to illustrate the connection between groups, the connection between groups is connected by two sets of connection plugs 12, one of which is connected with plugs 12 is hinged on the lower ear plate of the first set of traverse frames 8, and another set of connection plugs 12 is hinged on the second set of traverse frames 8. An adjusting shim group 13 is also installed between them. As shown in FIG. 4, the second group of traverse frames 8 and the third group of traverse frames 8, the third group of traverse frames 8 and the fourth group of traverse frames 8 , The fourth group of traverse frames 8 and the fifth group of traverse frames 8, and the fifth group of traverse frames 8 and the sixth group of traverse frames 8 are cracked as shown in Figures 1, 2, and 3 above.

实施例2Example 2

在上述实施例的基础上,如图1、图2、图3和图5所示:UR万能轧机、E轧边机、UF万能轧机组成串列机组轧制重载型H型钢、云轨时,UR辊系小车、E辊系小车、UF辊系小车分别隐藏在UR万能轧机、E轧边机、UF万能轧机的机腹中,另外在第四、五、六组横移车架8上分别有待更换UR辊系小车、E辊系小车、UF辊系小车,在轧制的产品规格及品种更换之前,首先在线下将相应的新辊系在对应的第四组UR辊系小车、第五组E辊系小车、第六组UF辊系小车装配好,在新辊系装配之前,驱动固定在第四组横移车架8两侧装有锁紧插头6的锁紧液压缸5伸出,两侧的锁紧插头6插入该组对应的UR辊系小车两侧的耳座A、耳座B,驱动固定在第五组横移车架8两侧装有锁紧插头6的锁紧液压缸5伸出,两侧的锁紧插头6插入该组对应的E辊系小车两侧的耳座C、耳座D,驱动固定在第六组横移车架8两侧装有锁紧插头6的锁紧液压缸5伸出,两侧的锁紧插头6插入该组对应的UF辊系小车两侧的耳座E、耳座F,上述锁紧过程可同时进行,而后完成新辊系的装配,为了便于说明整个横移换辊过程,现将装有新辊系的UR辊系小车、E辊系小车、UF辊系小车命名为B组辊系,隐藏在UR万能轧机、E轧边机、UF万能轧机的机腹中装有旧辊系UR辊系小车、E辊系小车、UF辊系小车命名为A组辊系,当轧制的产品规格及品种需要更换时,只需要将位于UR万能轧机、E轧边机、UF万能轧机的机腹中三组辊系通过对应的UR辊系小车、E辊系小车、UF辊系小车沿着所对应的UR辊系小车纵向移动轨道1、E辊系小车纵向移动轨道1、UF辊系小车纵向移动轨道1从轧制中心线移动到移动至换辊横移中心线的位置,驱动UR辊系小车、E辊系小车、UF辊系小车进行纵向移动的驱动系统不再做描述,而后驱动固定在第一组横移车架8两侧装有锁紧插头6的锁紧液压缸5伸出,两侧的锁紧插头6插入该组对应的UR辊系小车两侧的耳座A、耳座B,驱动固定在第二组横移车架8两侧装有锁紧插头6的锁紧液压缸5伸出,两侧的锁紧插头6插入该组对应的E辊系小车两侧的耳座C、耳座D,驱动固定在第三组横移车架8两侧装有锁紧插头6的锁紧液压缸5伸出,两侧的锁紧插头6插入该组对应的UF辊系小车两侧的耳座E、耳座F,上述锁紧过程可同时进行。然后驱动平移驱动系统中的平移液压缸11将A组辊系沿着轨道系统中的轨道1由位置1移动至位置3,B组辊系由位置2移动至原有A组辊系所处的位置1。然后驱动位于位置2的B组新辊系中固定在第四组横移车架8两侧装有锁紧插头6的锁紧液压缸5缩回,两侧的锁紧插头6从该组对应的UR辊系小车两侧的耳座A、耳座B脱出,驱动固定在第五组横移车架8两侧装有锁紧插头6的锁紧液压缸5缩回,两侧的锁紧插头6从该组对应的E辊系小车两侧的耳座C、耳座D脱出,驱动固定在第六组横移车架8两侧装有锁紧插头6的锁紧液压缸5缩回,两侧的锁紧插头6从该组对应的UF辊系小车两侧的耳座E、耳座F脱出,上述锁紧打开过程可同时进行。而后驱动位于B组辊系中装有新辊系UR辊系小车、E辊系小车、UF辊系小车沿着UR辊系小车纵向移动轨道、E辊系小车纵向移动轨道、UF辊系小车纵向移动轨道1从换辊横移中心线移动至轧制中心线的位置。与此同时,然后驱动位于位置3的A组旧辊系中固定在第一组横移车架8两侧装有锁紧插头6的锁紧液压缸5缩回,两侧的锁紧插头6从该组对应的UR辊系小车两侧的耳座A、耳座B脱出,驱动固定在第二组横移车架8两侧装有锁紧插头6的锁紧液压缸5缩回,两侧的锁紧插头6从该组对应的E辊系小车两侧的耳座C、耳座D脱出,驱动固定在第三组横移车架8两侧装有锁紧插头6的锁紧液压缸5缩回,两侧的锁紧插头6从该组对应的UF辊系小车两侧的耳座E、耳座F脱出,通过厂房的吊车将旧辊系运送至机修间进行拆辊。当需要再次换辊时,驱动平移驱动系统中的平移液压缸11将A组新辊系沿着轨道系统中的轨道1由位置3移动至位置1,B组旧辊系由位置1移动至位置2,其余流程同上。反复重复以上流程,便可实现CCS轧机三机架换辊。On the basis of the above embodiment, as shown in Figure 1, Figure 2, Figure 3 and Figure 5: UR universal rolling mill, E edge rolling mill, and UF universal rolling mill form a tandem unit to roll heavy-duty H-beams and cloud rails. , UR roll trolley, E roll trolley and UF roll trolley are hidden in the belly of UR universal rolling mill, E edge rolling machine and UF universal rolling mill respectively, and also on the fourth, fifth and sixth groups of traverse frame 8 The UR roll trolley, E roll trolley and UF roll trolley are to be replaced respectively. Before changing the specifications and varieties of rolled products, firstly tie the corresponding new rolls to the corresponding fourth group of UR roll trolleys and the first offline. The five groups of E-roller trolleys and the sixth group of UF roller-type trolleys are assembled. Before the new rollers are assembled, drive the locking hydraulic cylinders 5 fixed on both sides of the fourth group of traverse frames 8 and equipped with locking plugs 6 to extend Out, the locking plugs 6 on both sides are inserted into the ear sockets A and B on both sides of the corresponding UR roller trolley, and the locks with the locking plugs 6 installed on both sides of the fifth group of transverse carriages 8 are driven and fixed. The tightening hydraulic cylinder 5 is extended, and the locking plugs 6 on both sides are inserted into the ear sockets C and D on both sides of the corresponding E-roller trolley, and the drive is fixed on the sixth group of transverse carriages 8. Both sides are equipped with locks. The locking hydraulic cylinder 5 of the tightening plug 6 is extended, and the locking plugs 6 on both sides are inserted into the corresponding ear sockets E and F on both sides of the UF roller trolley. The above-mentioned locking process can be carried out at the same time, and then the new The assembly of the roll system, in order to facilitate the description of the entire roll change process, the UR roll trolley, E roll trolley and UF roll trolley equipped with the new roll system are now named as the B group roll system, which are hidden in the UR universal rolling mill, The belly of E edge rolling mill and UF universal rolling mill is equipped with old roll series UR roll series trolley, E roll series trolley and UF roll series trolley named as group A roll series. When the specifications and varieties of rolled products need to be replaced, It is only necessary to pass the three sets of rolls in the belly of the UR universal mill, E edger, and UF universal mill through the corresponding UR roll car, E roll car, UF roll car along the corresponding UR roll car. Longitudinal movement track 1, E roll car longitudinal movement track 1, UF roll car longitudinal movement track 1 Move from the rolling center line to the position where it moves to the center line of the roll change, drive the UR roll car, E roll car . The drive system of the UF roller trolley for longitudinal movement will not be described again, and then the locking hydraulic cylinder 5 with locking plugs 6 installed on both sides of the first group of traversing frame 8 is driven out, and the locking cylinders 5 on both sides are The plug 6 is inserted into the ear sockets A and B on both sides of the corresponding UR roller trolley, and the locking hydraulic cylinder 5 with the locking plug 6 fixed on both sides of the second group of traversing carriages 8 is driven to extend, The locking plugs 6 on both sides are inserted into the ear sockets C and D on both sides of the corresponding E-roller trolley to drive the locking hydraulic pressure fixed on both sides of the third group of traverse frames 8 equipped with the locking plugs 6. The cylinder 5 is extended, and the locking plugs 6 on both sides are inserted into the corresponding ear sockets E and F on both sides of the UF roller trolley. The above locking process can be performed simultaneously. Then drive the translation hydraulic cylinder 11 in the translation drive system to move the rollers of group A from position 1 to position 3 along track 1 in the track system, and the rollers of group B from position 2 to the position where the original rollers of group A are located. position 1. Then drive the locking hydraulic cylinders 5 with locking plugs 6 installed on both sides of the fourth group of traverse frames 8 in the new roller system of the B group at position 2 to retract, and the locking plugs 6 on both sides are corresponding to the group. The ear seat A and the ear seat B on both sides of the UR roller system trolley are disengaged, and the locking hydraulic cylinder 5 with the locking plug 6 fixed on both sides of the fifth group of traversing frame 8 is driven to retract, and the locking The plug 6 is disengaged from the ear sockets C and D on both sides of the corresponding E-roller trolley, and the locking hydraulic cylinder 5 with the locking plug 6 fixed on both sides of the sixth group of transverse carriages 8 is driven to retract. , the locking plugs 6 on both sides are disengaged from the ear seats E and F on both sides of the corresponding UF roller trolleys of the group, and the above locking and opening processes can be performed simultaneously. Then the drive is located in the B group roller system, which is equipped with the new roller system UR roller system trolley, E roller system trolley, UF roller system trolley along the longitudinal moving track of the UR roller system trolley, the E roller system trolley longitudinal moving track, and the UF roller system trolley longitudinally. The moving rail 1 moves from the roll change traverse center line to the position of the rolling center line. At the same time, then drive the locking hydraulic cylinder 5 with locking plugs 6 installed on both sides of the first group of traverse frame 8 in the old roller system of group A at position 3 to retract, and the locking plugs 6 on both sides From the ear seat A and the ear seat B on both sides of the corresponding UR roller trolley of this group, the locking hydraulic cylinder 5 with the locking plug 6 installed on both sides of the second group of traversing frame 8 is driven to retract, and the two The locking plugs 6 on the side are disengaged from the ear sockets C and D on both sides of the corresponding E-roller trolley, and drive the locking hydraulic pressure fixed on both sides of the third group of transverse carriages 8 equipped with the locking plugs 6. The cylinder 5 is retracted, and the locking plugs 6 on both sides are released from the lugs E and F on both sides of the corresponding UF roller trolley. When it is necessary to change the rolls again, drive the translational hydraulic cylinder 11 in the translational drive system to move the new rolls of group A from position 3 to position 1 along track 1 in the track system, and the old rolls of group B from position 1 to position 1 2. The rest of the process is the same as above. Repeating the above process repeatedly can realize the roll change of the three stands of the CCS mill.

实施例6Example 6

在上述实施例的基础上,由于这种用于重载型H型钢、云轨串列轧机辊系换辊横移装置的定位精度和三机架轧机安装精度有关系,当三机架轧制精度安装有位置偏差时,可通过调整组与组之间的调整垫片组13来调整固定在横移台架上的轨道匹配UR辊系小车、E辊系小车、UF辊系小车中心,为三机架轧机换辊提供强有力的保证。如图4-1和4-2所示。On the basis of the above-mentioned embodiment, since the positioning accuracy of the roll changing and traversing device for heavy-duty H-beam and cloud rail tandem rolling mills is related to the installation accuracy of the three-stand rolling mill, when the three-stand rolling mill is rolled When there is a positional deviation in the precision installation, the track fixed on the traverse platform can be adjusted to match the center of the UR roller trolley, the E roller trolley and the UF roller trolley by adjusting the adjustment shim group 13 between the groups. Three-stand rolling mill roll change provides a strong guarantee. As shown in Figures 4-1 and 4-2.

以上,仅为本发明的较佳实施例,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求所界定的保护范围为准。The above are only preferred embodiments of the present invention, but the protection scope of the present invention is not limited to this. Any person skilled in the art who is familiar with the technical scope disclosed by the present invention can easily think of changes or replacements. should be included within the protection scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.

Claims (3)

1.一种用于重载型H型钢、云轨串列轧机辊系换辊横移装置,其特征在于:包括:1. a roll-changing traverse device for heavy-duty type H-beam, cloud rail tandem rolling mill roll system, is characterized in that: comprising: 轨道;track; 在轨道一端的中间通过支座设置有平移液压缸;A translation hydraulic cylinder is arranged through the support in the middle of one end of the track; 在所述的轨道上串联设置有多组的横移小车;所述的平移液压缸的扁头铰接在远液压缸的横移小车上;A plurality of groups of traverse trolleys are arranged in series on the track; the flat head of the translation hydraulic cylinder is hinged on the traverse trolley of the remote hydraulic cylinder; 所述横移小车包括横移车架;在横移车架的底部都固定有四组带支架车轮;The traverse trolley includes a traverse frame; four groups of wheels with brackets are fixed on the bottom of the traverse frame; 在每一组横移车架上面固定有两组辊系小车轨道,该辊系小车轨道配合相对应的辊系小车移动。Two sets of roller trolley tracks are fixed on each set of transverse carriages, and the roller trolley tracks move in coordination with the corresponding roller trolleys. 2.如权利要求1所述的用于重载型H型钢、云轨串列轧机辊系换辊横移装置,其特征在于:所述的横移小车为六组,其中:2. The roll-changing traverse device for heavy-duty H-beam and cloud rail tandem rolling mills as claimed in claim 1, characterized in that: the traverse trolleys are six groups, wherein: 固定在第一组和第四组横移车架上面的两组辊系小车轨道与UR辊系小车纵向移动轨道重合,且在高度方向上也在同一标高;The two sets of roller trolley tracks fixed on the first and fourth sets of traversing frames overlap with the longitudinal moving tracks of the UR roller trolley, and are also at the same elevation in the height direction; 固定在第二组和第五组横移车架上面的两组辊系小车轨道与E辊系小车纵向移动轨道重合,且在高度方向上也在同一标高;The two sets of roller trolley tracks fixed on the second and fifth sets of traversing carriages overlap with the longitudinal moving track of the E roller trolley, and are also at the same elevation in the height direction; 固定在第三组和第六组横移车架上面的两组辊系小车轨道与UF辊系小车纵向移动轨道重合,且在高度方向上也在同一标高。The two sets of roller trolley tracks fixed on the third and sixth sets of traversing carriages coincide with the longitudinal moving track of the UF roller trolley, and are also at the same elevation in the height direction. 3.如权利要求1所述的用于重载型H型钢、云轨串列轧机辊系换辊横移装置,其特征在于:在每一组横移车架两侧面都固定有两组锁紧液压缸,两组锁紧插头分别固定在两组锁紧液压缸活塞杆上,相邻两组横移车架之间的连接依靠两组连接插头相连,两组连接插头依靠螺栓连接;在两组连接插头之间还安装了调整垫片组。3. The roll-changing traverse device for heavy-duty H-section steel and cloud rail tandem rolling mill as claimed in claim 1, characterized in that: two groups of locks are fixed on both sides of each group of traverse carriages Tighten the hydraulic cylinder, the two sets of locking plugs are respectively fixed on the piston rods of the two sets of locking hydraulic cylinders, the connection between the adjacent two sets of traverse frames is connected by two sets of connection plugs, and the two sets of connection plugs are connected by bolts; An adjustment shim set is also installed between the two sets of connection plugs.
CN202010258301.XA 2020-04-02 2020-04-02 A roll change traverse device for heavy-duty H-beam and cloud rail tandem rolling mills Pending CN111618090A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010258301.XA CN111618090A (en) 2020-04-02 2020-04-02 A roll change traverse device for heavy-duty H-beam and cloud rail tandem rolling mills

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010258301.XA CN111618090A (en) 2020-04-02 2020-04-02 A roll change traverse device for heavy-duty H-beam and cloud rail tandem rolling mills

Publications (1)

Publication Number Publication Date
CN111618090A true CN111618090A (en) 2020-09-04

Family

ID=72255903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010258301.XA Pending CN111618090A (en) 2020-04-02 2020-04-02 A roll change traverse device for heavy-duty H-beam and cloud rail tandem rolling mills

Country Status (1)

Country Link
CN (1) CN111618090A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1037099A (en) * 1988-02-22 1989-11-15 Sms舒路曼-斯玛公司 Rolling train, in particular for section steel rolling mills
US5941115A (en) * 1997-01-16 1999-08-24 Sms Schloemann-Siemag Aktiengesellschaft Rolling train
US5979206A (en) * 1997-01-15 1999-11-09 Sms Schloemann-Siemag Aktiegesellschaft Rolling train
US20020108424A1 (en) * 2001-01-27 2002-08-15 Sms Demag Aktiengesellschaft Rolling mill train with staggered mills, especially as a tandem rolling installation
CN1720112A (en) * 2002-12-05 2006-01-11 Sms迪马格股份公司 Rolling mill comprising means for exchanging the rolls
CN1921959A (en) * 2004-02-18 2007-02-28 Sms迪马格股份公司 Method and device for exchanging sets of rolls in rolling frames of a rolling mill
CN201239740Y (en) * 2008-08-13 2009-05-20 中国第一重型机械集团公司 Centering and locking device for roll changing cart
CN108126984A (en) * 2017-11-30 2018-06-08 马鞍山钢铁股份有限公司 The control method of H-Beam Rolling Mill roughing mills mill roll trolley regional location identification
CN212018934U (en) * 2020-04-02 2020-11-27 中冶华天工程技术有限公司 Roller-changing transverse device for heavy-load H-shaped steel and cloud-rail tandem rolling mill roller system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1037099A (en) * 1988-02-22 1989-11-15 Sms舒路曼-斯玛公司 Rolling train, in particular for section steel rolling mills
US5979206A (en) * 1997-01-15 1999-11-09 Sms Schloemann-Siemag Aktiegesellschaft Rolling train
US5941115A (en) * 1997-01-16 1999-08-24 Sms Schloemann-Siemag Aktiengesellschaft Rolling train
US20020108424A1 (en) * 2001-01-27 2002-08-15 Sms Demag Aktiengesellschaft Rolling mill train with staggered mills, especially as a tandem rolling installation
CN1720112A (en) * 2002-12-05 2006-01-11 Sms迪马格股份公司 Rolling mill comprising means for exchanging the rolls
CN1921959A (en) * 2004-02-18 2007-02-28 Sms迪马格股份公司 Method and device for exchanging sets of rolls in rolling frames of a rolling mill
CN201239740Y (en) * 2008-08-13 2009-05-20 中国第一重型机械集团公司 Centering and locking device for roll changing cart
CN108126984A (en) * 2017-11-30 2018-06-08 马鞍山钢铁股份有限公司 The control method of H-Beam Rolling Mill roughing mills mill roll trolley regional location identification
CN212018934U (en) * 2020-04-02 2020-11-27 中冶华天工程技术有限公司 Roller-changing transverse device for heavy-load H-shaped steel and cloud-rail tandem rolling mill roller system

Similar Documents

Publication Publication Date Title
WO2022165920A1 (en) Intelligent cross wedge rolling mill for large-sized axle in rail traffic
DE3132339C2 (en)
WO2005089972A1 (en) Method and device for exchanging sets of rolls in rolling frames of a rolling mill
CN114932147A (en) DS rolling mill complete equipment and rolling process for controlling plate shape thereof
CN106111704A (en) A kind of wide and heavy plate mill roller block changing device
CN115382919A (en) An installation method for moving the main body of the sinking assembly next to a large rolling mill
CN212018934U (en) Roller-changing transverse device for heavy-load H-shaped steel and cloud-rail tandem rolling mill roller system
CN204564760U (en) The vertical punch of a kind of two roller
CN111618090A (en) A roll change traverse device for heavy-duty H-beam and cloud rail tandem rolling mills
CN113828639B (en) Quick replacement system and method for horizontal and vertical machine train short stress line rolling mill
CN113695402B (en) Complete equipment for preparing plate by utilizing snake-shaped rolling and process method thereof
CN112974540B (en) Wedge cross rolling mill for quickly replacing roller die of large axle
CN107116292B (en) A rail flat car fixed flash welding machine equipment
US3367162A (en) Apparatus for reducing slab width
CN219597684U (en) Roll changing mechanism of single-frame leveling machine with online use function
US4038855A (en) Stretch reducing mill
CN212770882U (en) Integral transverse moving device suitable for roller-hearth tunnel heating furnace
CN204529208U (en) A kind of improved type wheel drop mechanism transfer bridge interlock system
CN205869074U (en) Device is changed to wide heavy plate mill roller piece
US2929280A (en) Rolling mill platform
CN203565471U (en) Four-roller continuous rolling pipe mill
CN113246079A (en) Width-adjustable vehicle body erecting platform of rail engineering vehicle
CN217665427U (en) Finish rolling working roll bearing box packing machine device for hot rolled plate strip production line
CN222817613U (en) A new type of roll changing device for four-roller rolling mill
CN110328228A (en) A kind of the three-roll rolling device and milling method of F fashioned iron

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200904