CN111591708A CN202010443268.8A CN202010443268A CN111591708A CN 111591708 A CN111591708 A CN 111591708A CN 202010443268 A CN202010443268 A CN 202010443268A CN 111591708 A CN111591708 A CN 111591708A
Authority
CN
China
Prior art keywords
belt
conveying
conveyor belt
conveyor
laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010443268.8A
Other languages
Chinese (zh)
Other versions
CN111591708B (en
Inventor
刘勉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN202010443268.8A priority Critical patent/CN111591708B/en
Publication of CN111591708A publication Critical patent/CN111591708A/en
Application granted granted Critical
Publication of CN111591708B publication Critical patent/CN111591708B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G39/00Rollers, e.g. drive rollers, or arrangements thereof incorporated in roller-ways or other types of mechanical conveyors 
    • B65G39/10Arrangements of rollers
    • B65G39/12Arrangements of rollers mounted on framework
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G23/00Driving gear for endless conveyors; Belt- or chain-tensioning arrangements
    • B65G23/44Belt or chain tensioning arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Belt Conveyors (AREA)

Abstract

The invention provides a laying method of a conveying belt of a long-distance belt conveyor, which comprises the steps of manufacturing a dragging chuck and a temporary fixer of the conveying belt, calculating the torsion required by dragging the conveying belt and selecting a winch, determining the quantity of required rubber belt rolls and erecting a rubber belt roll bracket, erecting and dragging the winch, laying the conveying belt and closing the loop joint of the conveying belt. The invention is a set of complete, detailed, concrete, general and strong-operability technical scheme, can finish the laying of the long-distance belt conveyor conveying rubber belt quickly, efficiently and with high quality on the basis of ensuring the safety, has low construction cost and good construction quality, can ensure the rights of owners, can obtain better economic benefits for constructors, can also obtain positive social benefits, can effectively guide the laying operation of the similar or similar long-distance belt conveyor conveying rubber belt, has pioneering and instructive significance, and has great popularization and application values.

Description

长距离皮带输送机输送胶带的敷设方法Laying method of conveyor belt for long distance belt conveyor

技术领域technical field

本发明涉及一种皮带输送机输送胶带的敷设方法,尤其涉及一种长距离皮带输送机输送胶带的敷设方法,属于物料运输装备安装技术领域。The invention relates to a method for laying a conveyor belt of a belt conveyor, in particular to a method for laying a conveyor belt of a long-distance belt conveyor, and belongs to the technical field of material transportation equipment installation.

背景技术Background technique

皮带输送机是一种摩擦驱动以连续方式运输物料的机械,主要由机架、输送胶带、托辊、滚筒、张紧装置、传动装置等组成,可以将物料在一定的输送线上,从最初的供料点到最终的卸料点间形成一种物料的输送通道,既可以进行散碎物料的输送,也可进行成件物品的输送,除进行纯粹的物料输送外,还可与企业的生产流程相配合,形成有节奏的流水作业运输线。Belt conveyor is a friction-driven machine that transports materials in a continuous manner. It is mainly composed of racks, conveyor belts, idlers, rollers, tensioning devices, transmission devices, etc. From the feeding point to the final discharge point, a material conveying channel is formed, which can not only carry out the conveying of bulk materials, but also carry out the conveying of finished items. The production process is coordinated to form a rhythmic assembly line.

皮带输送机的输送线路灵活、适应性强,线路长度可根据需要确定,短则几米,长则可达数公里;可以安装在小型隧道内,也可以架设在地面交通混乱和危险地区的上空,因此,是一种用途极为广泛的物料运输装备。The conveying line of the belt conveyor is flexible and adaptable. The length of the line can be determined according to the needs, from a few meters as short as a few kilometers. It can be installed in small tunnels or erected above the ground traffic chaos and dangerous areas. Therefore, it is an extremely versatile material transportation equipment.

通常,皮带输送机的输送胶带与货载一起在托辊上运行,输送胶带既是牵引机构,又是承载机构,货载与输送胶带之间没有相对运动。Usually, the conveyor belt of the belt conveyor runs on the idler together with the load, and the conveyor belt is both a traction mechanism and a bearing mechanism, and there is no relative movement between the load and the conveyor belt.

皮带输送机一般先进行机架等固定设备设施的安装调试,在机架等安装验收合格后,再进行输送胶带的敷设和环合。Belt conveyors are generally installed and debugged for fixed equipment and facilities such as racks. After the racks and other installations have been accepted and accepted, the conveyor belts are laid and looped.

输送胶带是皮带输送机安装中、调试运行前的最后一道工序,是按时完成输送机安装任务中十分重要的一个环节,同时,输送胶带敷设质量的好坏与否,将直接影响到皮带输送机的正常运行和使用寿命,是保证生产和业主利益的关键。The conveyor belt is the last process during the installation of the belt conveyor and before commissioning and operation. It is a very important part of completing the installation task of the conveyor on time. At the same time, the quality of the conveyor belt laying will directly affect the belt conveyor. The normal operation and service life of the machine are the key to ensure the production and the interests of the owner.

一般的皮带输送机由于输送胶带短,敷设相对容易,但对于长距离皮带输送机来说,由于使用的输送胶带不仅需要很长的长度,同时,需要保证具有很好的强度,所以,长距离皮带输送机上的输送胶带不仅长,而且重,敷设相当困难,而且要保证长距离的输送胶带使用不产生跑偏等质量问题,敷设难度相当巨大。The general belt conveyor is relatively easy to lay due to the short conveyor belt, but for the long-distance belt conveyor, the conveyor belt used not only needs a long length, but also needs to ensure good strength. The conveyor belt on the belt conveyor is not only long, but also heavy, and it is very difficult to lay. Moreover, it is very difficult to ensure that the long-distance conveyor belt does not cause quality problems such as deviation.

现有技术中,已有一些常规皮带输送机输送胶带敷设方法的指导性意见及操作规范,但对于长距离皮带输送机输送胶带的敷设,尚无具有指导和启发意义的启示性文献和切实可行的操作方法。In the prior art, there are some guiding opinions and operating specifications for the laying method of the conventional belt conveyor belt conveyor, but there are no enlightening documents and practical documents with guiding and enlightening significance for the laying of the long distance belt conveyor belt conveyor belt. method of operation.

发明内容SUMMARY OF THE INVENTION

为解决现有技术的不足,本发明实施例提供一种长距离皮带输送机输送胶带的敷设方法,目的在于,在保证安全的基础上,快速、高效、高质量地完成长距离皮带输送机输送胶带的敷设,保证按时完成长距离皮带输送机的安装和业主的权益。In order to solve the deficiencies of the prior art, the embodiment of the present invention provides a method for laying a long-distance belt conveyor conveyor belt, the purpose is to quickly, efficiently and high-quality complete the long-distance belt conveyor conveying on the basis of ensuring safety. The laying of the tape ensures that the installation of the long-distance belt conveyor is completed on time and the owner's rights and interests.

为达上述目的,本发明实施例提供如下的技术方案:For reaching the above-mentioned purpose, the embodiments of the present invention provide the following technical solutions:

一种长距离皮带输送机输送胶带的敷设方法,所述长距离皮带输送机包括不少于一个皮带输送节段,各所述皮带输送节段至少包括各自的机架和各自的输送胶带;A method for laying a conveyor belt for a long-distance belt conveyor, wherein the long-distance belt conveyor includes no less than one belt conveyor segment, and each of the belt conveyor segments at least includes a respective frame and a respective conveyor belt;

所述机架包括用于安装驱动滚筒的头架、安装改向滚筒的尾架、以及设置在所述驱动滚筒和所述改向滚筒间的中间架;The frame includes a head frame for installing a driving roller, a tail frame for installing a redirecting roller, and an intermediate frame arranged between the driving roller and the redirecting roller;

所述输送胶带环合紧套在所述驱动滚筒和所述改向滚筒之间,其中,工作时段承载输送物料的所述输送胶带部分称之为承载输送带,工作时段空载回程的所述输送胶带部分称之为回程输送带,所述输送胶带包装出厂时的原始状态为卷绕在梭芯上的胶带卷;The conveying belt is tightly sleeved between the driving roller and the redirecting roller, wherein the portion of the conveying belt that carries the conveyed material during the working period is called the carrying conveyor belt, and the portion of the conveying belt that carries the conveying material during the working period is called the carrying conveyor belt. The conveyor belt part is called the return conveyor belt, and the original state of the conveyor belt when it leaves the factory is the tape roll wound on the bobbin;

所述中间架上设有用以支撑所述承载输送带的上托辊、用以支撑所述回程输送带的下托辊;The intermediate frame is provided with an upper idler for supporting the carrying conveyor belt and a lower idler for supporting the return conveyor belt;

其特征在于,包括:It is characterized in that it includes:

S1)输送胶带拖动夹头和临时固定器的制作步骤,S2)拖动输送胶带所需扭力的计算及卷扬机的选定步骤,S3)所需胶带卷数量的确定和胶带卷支架的架设步骤,S4)卷扬机的架设和拖拉准备步骤,S5)输送胶带的敷设步骤,S6)输送胶带的环接闭合步骤;S1) the production steps of the conveyor belt dragging chuck and the temporary fixer, S2) the calculation of the torque required to drag the conveyor belt and the selection steps of the hoist, S3) the determination of the required tape roll quantity and the erection steps of the tape roll support , S4) the erection of the hoist and the preparation step for dragging, S5) the laying step of the conveying tape, and S6) the looping and closing step of the conveying tape;

其中:in:

S1)输送胶带拖动夹头和临时固定器的制作步骤,包括:S1) the production steps of the conveyor belt dragging chuck and the temporary fixer, including:

S11)制作两块大小一致、形状相同的丁字形夹板,所述丁字形夹板包括矩形主体和所述矩形主体一侧中部凸出的拉耳,且所述矩形主体上开设有螺栓孔,以此构成所述拖动夹头;S11) Making two T-shaped splints with the same size and shape, the T-shaped splint includes a rectangular body and a pull lug protruding from the middle of one side of the rectangular body, and the rectangular body is provided with bolt holes, so as to forming the drag chuck;

S12)截取两段长度超过所述机架宽度的型钢,且在型钢的两端分别开设螺栓孔,使之能够通过螺栓的锁紧将所述输送胶带临时对夹固定在所述机架上,以此构成所述临时固定器;S12) intercepting two sections of section steel whose length exceeds the width of the frame, and respectively opening bolt holes at both ends of the section steel, so that the conveyor belt can be temporarily clamped and fixed on the frame by the locking of the bolts, Thereby forming the temporary fixer;

S2)拖动输送胶带所需扭力的计算及卷扬机的选定步骤,包括:S2) Calculation of the torque required to drag the conveyor belt and the selection steps of the hoist, including:

S21)通过以下计算公式计算出拖动输送胶带所需扭力F:S21) Calculate the torque F required to drag the conveyor belt through the following formula:

F=k×(G1+G2)×R×P±G1×HF=k×(G 1 +G 2 )×R×P±G 1 ×H

其中:in:

F:为所述输送胶带在所述上托辊或所述下托辊上拖动时所需的扭力;F: is the torque required when the conveyor belt is dragged on the upper idler or the lower idler;

k:卷扬机扭力系数;k: hoist torque coefficient;

G1:每米所述输送胶带的自重;G 1 : the self-weight of the conveyor belt per meter;

G2:所述上托辊或所述下托辊每米长度上可转动部分的自重;G 2 : the self-weight of the rotatable part per meter length of the upper idler or the lower idler;

R:所述胶带卷展开后在水平面上的投影面积;R: the projected area of the tape roll on the horizontal plane after unwinding;

P:所述上托辊或所述下托辊的阻力系数;P: the resistance coefficient of the upper idler or the lower idler;

H:所述胶带卷展开后的上下高度差;H: the upper and lower height difference after the tape roll is unfolded;

+:表示所述输送胶带从低处向高处拖动时的运算;+: Indicates the operation when the conveyor belt is dragged from a low place to a high place;

-:表示所述输送胶带从高处向低处拖动时的运算;-: Indicates the operation when the conveyor belt is dragged from a high place to a low place;

S22)根据步骤S21)计算所得所述输送胶带在所述上托辊或所述下托辊上拖动时所需扭力的最大值选定与此所述扭力最大值相匹配的卷扬机,备用;S22) according to step S21), the maximum value of the required torsion force when the conveyor belt is dragged on the upper idler or the lower idler calculated by step S21) selects the hoist that matches the maximum value of the torsion, for standby;

S3)所需胶带卷数量的确定和胶带卷支架的架设步骤,包括:S3) Determination of the number of required tape rolls and the erection steps of the tape roll support, including:

S31)首先确定到达施工现场的所述胶带卷每卷的长度和接头位置,然后计算出各所述驱动滚筒和所述改向滚筒上所需缠绕而多耗的所述输送胶带长度、以及所述输送胶带因接头产生的搭接长度,推断出每卷所述胶带卷的所述输送胶带在所述长距离皮带输送机上敷设的距离,以此最终确定敷设时所需胶带卷的数量;S31) First determine the length and joint position of each roll of the tape that arrives at the construction site, and then calculate the length of the conveying tape that needs to be wound on each of the driving rollers and the redirecting rollers, and the length of the conveyor belt The lap length of the conveying tape due to the joints, infer the distance that the conveying tape of each roll of the tape roll is laid on the long-distance belt conveyor, so as to finally determine the number of tape rolls required for laying;

S32)在距所述头架前一段距离的位置上架设起胶带卷支架,然后在所述胶带卷的梭芯中穿入转轴,再用起重设备将所述胶带卷吊起架设在所述胶带卷支架上,使所述胶带卷能通过所述转轴在所述胶带卷支架上转动,且使所述输送胶带能从所述胶带卷上落下敷设在所述机架上;S32) erect a tape roll support at a distance from the head frame, then insert a rotating shaft into the bobbin of the tape roll, and then use a lifting device to hoist the tape roll and set it up on the tape roll On the tape roll support, the tape roll can be rotated on the tape roll support through the rotating shaft, and the conveyor tape can be dropped from the tape roll and laid on the frame;

S4)卷扬机的架设和拖拉准备步骤,包括:S4) the erection and hauling preparation steps of the hoist, including:

S41)在距所述尾架后一段距离的位置上架设起卷扬机操作台,然后将所述卷扬机固定在所述卷扬机操作台上,且使所述卷扬机的钢丝绳始终对准所述机架的中轴线;S41) Set up a winch operating table at a distance behind the tailstock, then fix the winch on the winch operating table, and make the wire rope of the winch always align with the middle of the frame axis;

S42)将架设在所述胶带卷支架上所述胶带卷的起始端头部放下,用螺栓将所述拖动夹头的两块所述丁字形夹板对夹固定在所述起始端头部上,然后用所述卷扬机上的钢丝绳与所述拖动夹头上的拉耳连接;S42) Put down the starting end head of the tape roll erected on the tape roll support, and fix the two T-shaped splints of the dragging chuck on the starting end head with bolts , and then use the wire rope on the hoist to connect with the pull ear on the drag chuck;

S5)输送胶带的敷设步骤,包括:S5) the laying step of conveying tape, including:

S51)回程输送带的敷设步骤、S52)承载输送带的敷设步骤,其中:S51) the laying step of the return conveyor belt, S52) the laying step of the bearing conveyor belt, wherein:

S51)回程输送带的敷设步骤具体为:S51) The laying steps of the return conveyor belt are as follows:

将所述机架上的所述上托辊全部拆下,保留全部所述下托辊,然后启动所述卷扬机,通过所述卷扬机钢丝绳的拉动和所述拖动夹头的带动,将所述输送胶带承载面朝下从所述胶带卷上拖下,敷设在所述下托辊上,当所述下托辊上敷设了所有所述输送胶带后,将所述输送胶带从所述胶带卷上割下,用所述临时固定器将所述输送胶带的末尾端头部固定在所述头架附近的机架上,继续拉紧所述钢丝绳使所述输送胶带保持一定张力,再通过所述临时固定器将所述起始端头部固定在所述尾架附近的所述机架上,即完成所述回程输送带的敷设;Remove all the upper idlers on the frame, keep all the lower idlers, and then start the hoist, through the pulling of the wire rope of the hoist and the driving of the drag chuck, the The conveyor belt is pulled down from the tape roll with the bearing surface facing down, and laid on the lower idler roller. After all the conveyor belts are laid on the lower idler roller, the conveyor belt is removed from the tape roll Cut up and down, use the temporary fixer to fix the end of the conveyor belt on the frame near the head frame, continue to tighten the wire rope to keep the conveyor belt in a certain tension, and then pass the The temporary fixer fixes the starting end head on the frame near the tailstock, that is, the laying of the return conveyor belt is completed;

S52)承载输送带的敷设步骤具体为:S52) the laying steps of the carrying conveyor belt are as follows:

将所述上托辊全部安装在所述机架的原有位置上,然后启动所述卷扬机,通过所述卷扬机钢丝绳的拉动和所述拖动夹头的带动,将所述输送胶带承载面朝上从所述胶带卷上拖下,敷设在所述上托辊上,当所述上托辊上敷设了所有所述输送胶带后,在预留了搭接接头长度后,将所述输送胶带从所述胶带卷上割下,用所述临时固定器将所述输送胶带的末尾端头部固定在所述头架附近的所述机架上,继续拉紧所述钢丝绳使所述输送胶带保持一定张力,再通过所述临时固定器将所述起始端头部固定在所述尾架附近的所述机架上,即完成所述承载输送带的敷设;All the upper rollers are installed on the original position of the frame, and then the hoist is started, and the carrying surface of the conveyor belt is pulled by the pulling of the wire rope of the hoist and the driving of the drag chuck. It is dragged from the tape roll and laid on the upper idler roller. After all the conveying tapes are laid on the upper idler, after the length of the lap joint is reserved, the conveying tape is Cut from the tape roll, use the temporary fixer to fix the end of the conveyor tape on the frame near the head frame, and continue to tighten the wire rope to make the conveyor tape Maintain a certain tension, and then fix the starting end head on the frame near the tailstock through the temporary fixer, that is, the laying of the carrying conveyor belt is completed;

S6)输送胶带的环接闭合步骤,包括:S6) the looping and closing step of conveying tape, comprising:

S61)分别将裸露于所述临时固定器外部的所述回程输送带的末尾端头部与所述承载输送带的末尾端头部缠绕所述驱动滚筒后采用硫化胶结法连接起来,再分别将裸露于所述临时固定器外部的所述回程输送带的起始端头部与所述承载输送带的起始端头部缠绕所述改向滚筒后采用硫化胶结法将连接起来,拆除所述临时固定器,即完成一个所述长距离皮带输送节段输送胶带的敷设;S61) Respectively wrap the rear end of the return conveyor belt exposed outside the temporary fixer and the rear end of the bearing conveyor belt around the driving roller and connect them by vulcanization bonding, and then connect the The initial end head of the return conveyor belt exposed outside the temporary fixer and the initial end head of the bearing conveyor belt are wound around the redirecting roller and then connected by vulcanization and bonding, and the temporary fixation is removed. device, that is, to complete the laying of the conveyor belt for one of the long-distance belt conveyor segments;

S62)重复步骤S3)至S61)的操作,完成所述长距离皮带输送机各所有所述皮带输送节段输送胶带的敷设,即完成所述皮带输送机输送胶带的敷设。S62) Repeat the operations of steps S3) to S61) to complete the laying of the conveyor belts of all the belt conveyor segments of the long-distance belt conveyor, that is, to complete the laying of the conveyor belts of the belt conveyor.

进一步的:further:

所述卷扬机扭力系数k,在考虑了静摩擦力后取值为1.5;The torque coefficient k of the hoist is 1.5 after considering static friction;

以滚动轴承连接安装的所述上托辊或所述下托辊的阻力系数P,取值为0.055。The resistance coefficient P of the upper idler or the lower idler, which is connected and installed with a rolling bearing, is 0.055.

进一步的,在所述S5)步骤中,还包括:S53)输送胶带的接续步骤,具体为:Further, in the described S5) step, it also includes: S53) the continuation step of conveying the tape, specifically:

当一卷所述胶带卷上的所述输送胶带全部敷设在所述上托辊或所述下托辊上后仍不能敷满应敷盖的所有所述上托辊或所述下托辊时,则先用起重设备将已无所述输送胶带的梭芯从所述胶带卷支架上取下后再换上新的一卷所述胶带卷,放下新一卷所述胶带卷的起始端头部与敷设在所述上托辊或所述下托辊的上一卷所述胶带卷的所述输送胶带末尾端头部采用硫化胶结法进行接续,然后继续进行S51)或S52)步骤的操作。When all the conveying tapes on a roll of the tape roll are laid on the upper or lower rollers and still cannot cover all the upper or lower rollers that should be covered , then first use a lifting device to remove the bobbin without the conveyor tape from the tape roll support, then replace it with a new roll of the tape, and put down the starting end of the new roll of the tape The head is connected with the end of the conveying tape of the last roll of the tape roll laid on the upper idler or the lower idler by a vulcanization bonding method, and then proceed to step S51) or S52) step. operate.

进一步的:所述胶带卷支架骑跨设置在所述机架的中轴线上或所述机架上,且两侧分别设置有斜向支撑。Further: the tape roll support is straddled on the central axis of the frame or on the frame, and two sides are respectively provided with diagonal supports.

进一步的:所述卷扬机操作台骑跨设置在所述机架的中轴线上或所述机架上,且两侧分别设置有斜向支撑。Further: the hoist operating platform is arranged astride on the central axis of the frame or on the frame, and two sides are respectively provided with diagonal supports.

进一步的:所述丁字形夹板由12mm厚的钢板制成,且其所述矩形主体上设有8颗M10×80的高强度螺栓。Further: the T-shaped splint is made of 12mm thick steel plate, and the rectangular body is provided with 8 M10×80 high-strength bolts.

进一步的:制作所述临时固定器的型钢为75×8的角钢。Further: the section steel for making the temporary fixer is a 75×8 angle steel.

进一步的:所述拖动夹头其矩形主体的前端边缘距所述输送胶带起始端头部的边缘线为200mm以上,所述钢丝绳通过5t卡环与所述拉耳连接。Further: the front edge of the rectangular main body of the dragging chuck is more than 200mm away from the edge line of the starting end of the conveyor belt, and the steel wire rope is connected to the pulling ear through a 5t snap ring.

进一步的:所述长距离皮带输送机其长度为9.5km以上。Further: the length of the long-distance belt conveyor is more than 9.5km.

进一步的:所述输送胶带为St1600-1200、6/4、φ5.4型钢丝绳芯输送带。Further: the conveyor belt is St1600-1200, 6/4, φ5.4 type steel cord conveyor belt.

与现有技术相比,本发明实施例有益效果及显著进步在于:Compared with the prior art, the beneficial effects and significant progress of the embodiments of the present invention are:

1)本发明实施例提供的长距离皮带输送机输送胶带的敷设方法,通过输送胶带拖动夹头和临时固定器的制作步骤、拖动输送胶带所需扭力的计算及卷扬机的选定步骤、所需胶带卷数量的确定和胶带卷支架的架设步骤、卷扬机的架设和拖拉准备步骤、输送胶带的敷设步骤、输送胶带的环接闭合步骤,提供了一套长距离皮带输送机输送胶带的完整敷设方法,根据此方法,可以在保证安全的基础上,快速、高效、高质量地完成长距离皮带输送机输送胶带的敷设;1) the laying method of the long-distance belt conveyor conveying tape provided by the embodiment of the present invention, through the manufacturing step of dragging the chuck and the temporary fixer by the conveying tape, the calculation of the torque required for dragging the conveying tape and the selected step of the hoist, Determination of the required number of tape rolls and the erection steps of the tape roll support, the erection of the hoist and the preparation steps for hauling, the laying steps of the conveyor belt, and the looping and closing steps of the conveyor belt provide a complete set of conveyor belts for long-distance belt conveyors. Laying method, according to this method, on the basis of ensuring safety, the laying of the long-distance belt conveyor conveyor belt can be completed quickly, efficiently and with high quality;

2)本发明实施例提供的长距离皮带输送机输送胶带的敷设方法,详尽、具体,不仅充分考虑了安全性,而且通用性和可操作性强,能按时完成长距离皮带输送机输送胶带的敷设,并有效保障输送胶带的敷设质量,还能有效指导同类或类似长距离皮带输送机输送胶带的安装敷设,具有开创性和指导性意义;2) The laying method of the long-distance belt conveyor conveyor belt provided by the embodiment of the present invention is detailed and specific, not only fully considers safety, but also has strong versatility and operability, and can complete the long-distance belt conveyor conveyor belt on time. It can effectively guarantee the laying quality of the conveyor belt, and can also effectively guide the installation and laying of the conveyor belt of the same or similar long-distance belt conveyor, which is of pioneering and instructive significance;

3)本发明实施例提供的长距离皮带输送机输送胶带的敷设方法,不仅能够保证按时完成输送胶带的敷设,而且施工成本低,施工质量能够得到切实的保障,既能保证业主的权益,施工方也能获得较好的经济利益,还能取得积极的社会效益,因此,极具推广和应用价值。3) The laying method of the long-distance belt conveyor conveyor belt provided by the embodiment of the present invention can not only ensure that the laying of the conveyor belt is completed on time, but also the construction cost is low, the construction quality can be effectively guaranteed, and the rights and interests of the owners can be guaranteed. It can also obtain better economic benefits and positive social benefits. Therefore, it has great promotion and application value.

附图说明Description of drawings

为更清楚地说明本发明的技术方案,下面将对本发明的实施例所需使用的附图作一简单介绍。In order to illustrate the technical solutions of the present invention more clearly, the following briefly introduces the accompanying drawings required for the embodiments of the present invention.

显而易见地,下面描述中的附图仅是本发明中的部分实施例的附图,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图,但这些其他的附图同样属于本发明实施例所需使用的附图之内。Obviously, the drawings in the following description are only drawings of some embodiments of the present invention. For those of ordinary skill in the art, without creative effort, other drawings can also be obtained from these drawings. The accompanying drawings, but these other drawings also belong to the drawings required to be used in the embodiments of the present invention.

图1为本发明实施例提供的一种长距离皮带输送机输送胶带的敷设方法中皮带输送节段的结构示意图;1 is a schematic structural diagram of a belt conveying segment in a method for laying a long-distance belt conveyor conveying tape according to an embodiment of the present invention;

图2为本发明实施例提供的一种长距离皮带输送机输送胶带的敷设方法的施工流程示意框图;2 is a schematic block diagram of a construction process of a method for laying a long-distance belt conveyor conveying tape according to an embodiment of the present invention;

图3为本发明实施例提供的一种长距离皮带输送机输送胶带的敷设方法中使用的拖动夹头的结构及其工作过程示意图;3 is a schematic diagram of the structure and working process of a drag chuck used in a method for laying a long-distance belt conveyor conveying tape according to an embodiment of the present invention;

图4为本发明实施例提供的一种长距离皮带输送机输送胶带的敷设方法中使用的临时固定器的立体结构示意图。4 is a schematic three-dimensional structural diagram of a temporary fixer used in a method for laying a long-distance belt conveyor conveying tape according to an embodiment of the present invention.

图中:In the picture:

100-机架、110-头架、111-驱动滚筒,120-尾架、121-改向滚筒,130-中间架、131-上托辊、132-下托辊;100-frame, 110-head frame, 111-drive roller, 120-tailstock, 121-reversing roller, 130-intermediate frame, 131-upper roller, 132-lower idler;

200-输送胶带,210-承载输送带,220-回程输送带;200-conveyor belt, 210-carrying conveyor belt, 220-return conveyor belt;

300-拖动夹头,310-矩形主体,320-拉耳,330-螺栓孔;300-drag chuck, 310-rectangular body, 320-pull ear, 330-bolt hole;

400-临时固定器,410-型钢,420-螺栓孔;400-temporary fixer, 410-section steel, 420-bolt hole;

500-钢丝绳。500-Wire rope.

具体实施方式Detailed ways

为使本发明实施例的目的、技术方案、有益效果及显著进步更加清楚,下面,将结合本发明实施例中所提供的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所有描述的这些实施例仅是本发明的部分实施例,而不是全部的实施例;基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purposes, technical solutions, beneficial effects and significant progress of the embodiments of the present invention clearer, the following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings provided in the embodiments of the present invention, Obviously, all the described embodiments are only part of the embodiments of the present invention, not all of the embodiments; based on the embodiments of the present invention, all other implementations obtained by those of ordinary skill in the art without creative efforts For example, all belong to the protection scope of the present invention.

需要说明的是,本发明的说明书和权利要求书以及本发明实施例附图中的术语“首先”、“其次”等,仅是用于区别不同的对象,而非用于描述特定的顺序。此外,术语“包括”以及它们的任何变形,意图在于覆盖不排他的包含。例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备没有限定于已列出的步骤或单元,而是可选地还包括没有列出的步骤或单元,或可选地还包括对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first" and "secondary" in the description and claims of the present invention and the drawings of the embodiments of the present invention are only used to distinguish different objects, rather than to describe a specific order. Furthermore, the term "comprising" and any variations thereof are intended to cover non-exclusive inclusion. For example, a process, method, system, product or device comprising a series of steps or elements is not limited to the listed steps or elements, but optionally also includes unlisted steps or elements, or optionally also Include other steps or units inherent to these processes, methods, products or devices.

需要理解的是,在本发明实施例的描述中,使用到的一些指示性方位或位置用词,仅为基于本发明实施例附图所示的方位或位置关系,是为了便于描述本发明的实施例和简化说明,而不是指示或暗示所述的装置或元件必须具有的特定方位、特定的方位构造和操作,因此,不能理解为是对本发明的限制。It should be understood that, in the description of the embodiments of the present invention, some indicative azimuth or position terms used are only based on the azimuth or positional relationship shown in the drawings of the embodiments of the present invention, for the convenience of describing the present invention The examples and simplified descriptions are not intended to indicate or imply the particular orientation, particular orientation configuration and operation that the described device or element must have, and therefore should not be construed as limiting the invention.

在本发明中,除非另有明确的规定和限定,术语“安装”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接或活动连接,亦可是成为一体;可以是直接连接,也可以是通过中间媒介的间接,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定。In the present invention, unless otherwise expressly specified and limited, the terms "installation", "connection", "fixed" and other terms should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection or an active connection, It can also be integrated; it can be a direct connection or an indirect connection through an intermediate medium, and it can be an internal communication between two elements or an interaction relationship between the two elements, unless otherwise expressly defined.

对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.

还需要说明的是,以下的具体实施例可以相互结合,对于其中相同或相似的概念或过程可能在某些实施例中不再赘述。It should also be noted that the following specific embodiments may be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments.

下面,以具体的实施例对本发明的技术方案进行详细说明。Hereinafter, the technical solutions of the present invention will be described in detail with specific embodiments.

实施例Example

本实施例提供一种长距离皮带输送机输送胶带的敷设方法。This embodiment provides a method for laying a long-distance belt conveyor conveying tape.

如图1本发明实施例提供的一种长距离皮带输送机输送胶带的敷设方法中皮带输送节段的结构示意图所示:As shown in FIG. 1 , a schematic structural diagram of a belt conveying segment in a method for laying a long-distance belt conveyor conveying tape provided by an embodiment of the present invention:

本实施例中,所述的长距离皮带输送机包括不少于一个皮带输送节段,各皮带输送节段至少包括各自的机架100和各自的输送胶带200;In this embodiment, the long-distance belt conveyor includes no less than one belt conveying segment, and each belt conveying segment at least includes a respective frame 100 and a respective conveying tape 200;

机架100包括用于安装驱动滚筒111的头架110、安装改向滚筒121的尾架120、以及设置在驱动滚筒111和改向滚筒121间的中间架130;The frame 100 includes a headstock 110 for installing the driving drum 111 , a tailstock 120 for installing the redirecting drum 121 , and an intermediate frame 130 disposed between the driving drum 111 and the redirecting drum 121 ;

输送胶带200环合紧套在驱动滚筒111和改向滚筒121之间,其中,工作时段承载输送物料的输送胶带部分称之为承载输送带210,工作时段空载回程的输送胶带部分称之为回程输送带220,输送胶带200包装出厂时的原始状态为卷绕在梭芯上的胶带卷;The conveyor belt 200 is looped and tightly sleeved between the driving roller 111 and the reversing roller 121 . The part of the conveyor belt that carries the conveyed material during the working period is called the carrying conveyor belt 210 , and the part of the conveyor belt that carries the no-load return journey during the working period is called the conveyor belt 210 . The return conveyor belt 220, the original state of the conveyor belt 200 when it is packaged and shipped from the factory is the tape roll wound on the bobbin;

中间架130上设有用以支撑承载输送带210的上托辊131、用以支撑回程输送带220的下托辊132。The intermediate frame 130 is provided with an upper idler 131 for supporting the carrying conveyor belt 210 and a lower idler 132 for supporting the return conveyor belt 220 .

如图2本发明实施例提供的一种长距离皮带输送机输送胶带的敷设方法的施工流程示意框图所示,本实施例提供的一种长距离皮带输送机输送胶带的敷设方法包括:As shown in the schematic block diagram of the construction process of a method for laying a long-distance belt conveyor conveyor belt provided in FIG. 2 according to an embodiment of the present invention, the laying method for a long-distance belt conveyor conveyor belt provided by the present embodiment includes:

S1)输送胶带拖动夹头和临时固定器的制作步骤,S2)拖动输送胶带所需扭力的计算及卷扬机的选定步骤,S3)所需胶带卷数量的确定和胶带卷支架的架设步骤,S4)卷扬机的架设和拖拉准备步骤,S5)输送胶带的敷设步骤,S6)输送胶带的环接闭合步骤。S1) the production steps of the conveyor belt dragging chuck and the temporary fixer, S2) the calculation of the torque required to drag the conveyor belt and the selection steps of the hoist, S3) the determination of the required tape roll quantity and the erection steps of the tape roll support , S4) the erection and hauling preparation steps of the hoist, S5) the laying steps of the conveying tape, and S6) the looping and closing steps of the conveying tape.

如图3本发明实施例提供的一种长距离皮带输送机输送胶带的敷设方法中使用的拖动夹头的结构及其工作过程示意图所示:The structure of the drag chuck used in the laying method of the long-distance belt conveyor conveying tape provided by the embodiment of the present invention and the schematic diagram of its working process are shown in Figure 3:

拖动夹头300包括两块大小一致、形状相同的丁字形夹板,丁字形夹板包括矩形主体310和矩形主体310一侧中部凸出的拉耳320,且矩形主体310上开设有螺栓孔330。The drag chuck 300 includes two T-shaped splints of the same size and shape. The T-shaped splint includes a rectangular body 310 and a pull lug 320 protruding from one side of the rectangular body 310, and the rectangular body 310 is provided with bolt holes 330.

如图4本发明实施例提供的一种长距离皮带输送机输送胶带的敷设方法中使用的临时固定器的立体结构示意图所示:Figure 4 is a schematic diagram of a three-dimensional structure of a temporary fixer used in a method for laying a long-distance belt conveyor conveyor belt provided by an embodiment of the present invention:

临时固定器400为两段长度超过机架100宽度的型钢410,且在型钢410的两端分别开设螺栓孔420,使之能够通过螺栓的锁紧将输送胶带200临时对夹固定在机架100上。The temporary fixer 400 is two sections of section steel 410 with a length exceeding the width of the frame 100, and bolt holes 420 are respectively provided at both ends of the section steel 410, so that the conveyor belt 200 can be temporarily clamped to the frame 100 by locking the bolts. superior.

在完成了S1)输送胶带拖动夹头和临时固定器的制作步骤后,进行如下的操作步骤:After completing S1) the production steps of the conveyor belt drag chuck and the temporary fixer, carry out the following operation steps:

S2)拖动输送胶带所需扭力的计算及卷扬机的选定步骤,具体包括:S2) Calculation of the torque required to drag the conveyor belt and the selection steps of the hoist, specifically including:

S21)通过以下计算公式计算出拖动输送胶带所需扭力F:S21) Calculate the torque F required to drag the conveyor belt through the following formula:

F=k×(G1+G2)×R×P±G1×HF=k×(G 1 +G 2 )×R×P±G 1 ×H

其中:in:

F:为输送胶带在上托辊或下托辊上拖动时所需的扭力;F: It is the torque required when the conveyor belt is dragged on the upper or lower idler roller;

k:卷扬机扭力系数;k: hoist torque coefficient;

G1:每米输送胶带的自重;G 1 : the self-weight of the conveyor belt per meter;

G2:上托辊或下托辊每米长度上可转动部分的自重;G 2 : The self-weight of the rotatable part per meter length of the upper idler or lower idler;

R:胶带卷展开后在水平面上的投影面积;R: the projected area of the tape roll on the horizontal plane after unwinding;

P:上托辊或下托辊的阻力系数;P: the resistance coefficient of the upper idler or lower idler;

H:胶带卷展开后的上下高度差;H: The upper and lower height difference after the tape roll is unfolded;

+:表示输送胶带从低处向高处拖动时的运算;+: Indicates the operation when the conveyor belt is dragged from a low place to a high place;

-:表示输送胶带从高处向低处拖动时的运算;-: Indicates the operation when the conveyor belt is dragged from a high place to a low place;

S22)根据步骤S21)计算所得输送胶带在上托辊或下托辊上拖动时所需扭力的最大值选定与此扭力最大值相匹配的卷扬机,备用;S22) according to step S21) the maximum value of the required torsion force when the obtained conveying tape is calculated and dragged on the upper idler or the lower idler roller is selected and the hoist that matches the maximum value of this torsion is selected for standby;

S3)所需胶带卷数量的确定和胶带卷支架的架设步骤,具体包括:S3) Determination of the number of required tape rolls and the erection steps of the tape roll support, specifically including:

S31)首先确定到达施工现场的胶带卷每卷的长度和接头位置,然后计算出各驱动滚筒和改向滚筒上所需缠绕而多耗的输送胶带长度、以及输送胶带因接头产生的搭接长度,推断出每卷胶带卷的输送胶带在长距离皮带输送机上敷设的距离,以此最终确定敷设时所需胶带卷的数量;S31) First, determine the length and joint position of each roll of tape that arrives at the construction site, and then calculate the length of the conveying tape that needs to be wrapped around each driving drum and the redirecting drum, and the length of the lap of the conveying tape due to the joint. , deduce the distance that the conveyor belt of each roll of tape rolls is laid on the long-distance belt conveyor, so as to finally determine the number of rolls of tape required for laying;

S32)在距头架前一段距离的位置上架设起胶带卷支架,然后在胶带卷的梭芯中穿入转轴,再用起重设备将胶带卷吊起架设在胶带卷支架上,使胶带卷能通过转轴在胶带卷支架上转动,且使输送胶带能从胶带卷上落下敷设在机架上;S32) Set up the tape roll support at a distance from the head frame, then insert the rotating shaft into the bobbin of the tape roll, and then use a lifting device to hoist the tape roll and set it on the tape roll support to make the tape roll It can be rotated on the tape roll support through the rotating shaft, and the conveyor tape can be dropped from the tape roll and laid on the frame;

S4)卷扬机的架设和拖拉准备步骤,具体包括:S4) the erection and hauling preparation steps of the hoist, specifically including:

S41)在距尾架后一段距离的位置上架设起卷扬机操作台,然后将卷扬机固定在卷扬机操作台上,且使卷扬机的钢丝绳始终对准机架的中轴线;S41) erect the winch operating table at a distance behind the tailstock, then fix the winch on the winch operating table, and make the wire rope of the winch always align with the central axis of the frame;

S42)将架设在胶带卷支架上胶带卷的起始端头部放下,用螺栓将拖动夹头的两块丁字形夹板对夹固定在起始端头部上,然后用卷扬机上的钢丝绳与拖动夹头上的拉耳连接;S42) Put down the head of the starting end of the tape roll erected on the tape roll support, and fix the two T-shaped splints of the drag chuck on the head of the starting end with bolts, and then use the wire rope on the hoist to drag the Pull-ear connection on the collet;

S5)输送胶带的敷设步骤,具体包括:S5) the laying step of conveying tape, specifically comprises:

S51)回程输送带的敷设步骤、S52)承载输送带的敷设步骤,其中:S51) the laying step of the return conveyor belt, S52) the laying step of the bearing conveyor belt, wherein:

S51)回程输送带的敷设步骤具体为:S51) The laying steps of the return conveyor belt are as follows:

将机架上的上托辊全部拆下,保留全部下托辊,然后启动卷扬机,通过卷扬机钢丝绳的拉动和拖动夹头的带动,将输送胶带承载面朝下从胶带卷上拖下,敷设在下托辊上,当下托辊上敷设了所有输送胶带后,将输送胶带从胶带卷上割下,用临时固定器将输送胶带的末尾端头部固定在头架附近的机架上,继续拉紧钢丝绳使输送胶带保持一定张力,再通过临时固定器将起始端头部固定在尾架附近的机架上,即完成回程输送带的敷设;Remove all the upper rollers on the frame, keep all the lower rollers, and then start the hoist, through the pulling of the wire rope of the hoist and the driving of the drag chuck, the conveyor belt is dragged down from the tape roll with the bearing surface facing down, and laid. On the lower idler, after all the conveyor tapes are laid on the lower idler, cut the conveyor tape from the tape roll, use a temporary fixer to fix the end of the conveyor tape on the frame near the head frame, and continue to pull Tighten the steel wire rope to maintain a certain tension of the conveyor belt, and then fix the head of the starting end on the frame near the tailstock through the temporary fixer, that is, the laying of the return conveyor belt is completed;

S52)承载输送带的敷设步骤具体为:S52) the laying steps of the carrying conveyor belt are as follows:

将上托辊全部安装在机架的原有位置上,然后启动卷扬机,通过卷扬机钢丝绳的拉动和拖动夹头的带动,将输送胶带承载面朝上从胶带卷上拖下,敷设在上托辊上,当上托辊上敷设了所有输送胶带后,在预留了搭接接头长度后,将输送胶带从胶带卷上割下,用临时固定器将输送胶带的末尾端头部固定在头架附近的机架上,继续拉紧钢丝绳使输送胶带保持一定张力,再通过临时固定器将起始端头部固定在尾架附近的机架上,即完成承载输送带的敷设;Install the upper rollers on the original position of the frame, then start the hoist, and drag the conveyor belt bearing surface upward from the tape roll by pulling the wire rope of the hoist and driving the chuck, and lay it on the upper support. On the roller, when all the conveyor tapes are laid on the upper idler, after reserving the length of the lap joint, cut the conveyor tape from the tape roll, and use a temporary fixer to fix the end of the conveyor tape to the head. On the frame near the rack, continue to tighten the steel wire rope to keep the conveyor belt in a certain tension, and then fix the starting end head on the rack near the tail frame through the temporary fixer, that is, the laying of the carrying conveyor belt is completed;

S6)输送胶带的环接闭合步骤,具体包括:S6) the looping and closing step of conveying tape, specifically includes:

S61)分别将裸露于临时固定器外部的回程输送带的末尾端头部与承载输送带的末尾端头部缠绕驱动滚筒后采用硫化胶结法连接起来,再分别将裸露于临时固定器外部的回程输送带的起始端头部与承载输送带的起始端头部缠绕改向滚筒后采用硫化胶结法将连接起来,拆除临时固定器,即完成一个长距离皮带输送节段输送胶带的敷设;S61) Respectively wrap the trailing end of the return conveyor belt exposed outside the temporary fixer with the trailing end of the load-carrying conveyor belt by wrapping the drive drum and connecting them by vulcanization and bonding, and then connect the return travel exposed outside the temporary fixture respectively. The initial end head of the conveyor belt and the initial end head of the carrying conveyor belt are wound around the redirecting roller and then connected by vulcanization bonding method, and the temporary fixer is removed, that is, the laying of the conveyor belt of a long-distance belt conveying segment is completed;

S62)重复步骤S3)至S61)的操作,完成长距离皮带输送机各所有皮带输送节段输送胶带的敷设,即完成皮带输送机输送胶带的敷设。S62) Repeat the operations from steps S3) to S61) to complete the laying of the conveying tapes of all the belt conveying segments of the long-distance belt conveyor, that is, to complete the laying of the conveying tapes of the belt conveyor.

在上述长距离皮带输送机输送胶带的敷设方法的具体实施过程中:In the specific implementation process of the above-mentioned long-distance belt conveyor conveying tape laying method:

在考虑了静摩擦力后,卷扬机扭力系数k取值为1.5;After considering the static friction, the torque coefficient k of the hoist is 1.5;

以滚动轴承连接安装的上托辊或下托辊的阻力系数P,取值为0.055。The resistance coefficient P of the upper idler or lower idler connected with rolling bearings is 0.055.

同样,在上述长距离皮带输送机输送胶带的敷设方法的具体实施过程中:Similarly, in the specific implementation process of the above-mentioned long-distance belt conveyor conveying tape laying method:

胶带卷支架骑跨设置在机架的中轴线上或机架上,且两侧分别用斜向支撑加固;The tape roll bracket is mounted on the central axis of the frame or on the frame, and the two sides are respectively reinforced with diagonal supports;

卷扬机操作台骑跨设置在机架的中轴线上或机架上,且两侧分别用斜向支撑加固。The hoist operating table is arranged astride on the central axis of the frame or on the frame, and the two sides are respectively reinforced with oblique supports.

本实施例中,拖动夹头300中的丁字形夹板可以采用12mm厚的钢板进行制作,且其矩形主体310上设置8颗M10×80的高强度螺栓,用以与输送胶带200有效牢固连接。In this embodiment, the T-shaped splint in the drag chuck 300 can be made of a steel plate with a thickness of 12 mm, and eight M10×80 high-strength bolts are arranged on the rectangular main body 310 for effective and firm connection with the conveyor belt 200 .

此外,拖动夹头300其矩形主体310的前端边缘距输送胶带200起始端头部的边缘线为200mm以上,以此保证输送胶带200的起始端头部不致被拉开裂。In addition, the front edge of the rectangular main body 310 of the drag chuck 300 is more than 200 mm away from the edge line of the starting end of the conveyor belt 200, so as to ensure that the starting end of the conveyor belt 200 will not be pulled and cracked.

在一种可选择的实施过程中,钢丝绳500通过5t卡环(图中未示出)与拉耳320连接。In an optional implementation process, the wire rope 500 is connected to the pull lug 320 through a 5t snap ring (not shown in the figure).

同样,在一种可选择的实施过程中,制作临时固定器的型钢为75×8的角钢。Also, in an optional implementation process, the section steel for making the temporary fixer is a 75×8 angle steel.

进一步的,实施在S5)步骤中,还包括:Further, be implemented in S5) in step, also include:

S53)输送胶带的接续步骤,具体为:S53) the continuation steps of conveying the tape, specifically:

当一卷胶带卷上的输送胶带全部敷设在上托辊或下托辊上后仍不能敷满应敷盖的所有上托辊或下托辊时,则先用起重设备将已无输送胶带的梭芯从胶带卷支架上取下后再换上新的一卷胶带卷,放下新一卷胶带卷的起始端头部与敷设在上托辊或下托辊的上一卷胶带卷的输送胶带末尾端头部采用硫化胶结法进行接续,然后继续进行S51)或S52)步骤的操作,以此来充分利用输送胶带。When the conveying tape on a roll of tape roll is all laid on the upper or lower roller and still cannot cover all the upper or lower rollers that should be covered, first use lifting equipment to remove the empty conveying tape. The bobbin is removed from the tape roll support and then replaced with a new roll of tape, and the starting end head of the new roll of tape is put down and the conveying of the previous roll of tape laid on the upper or lower roller. The end of the tape is connected by the vulcanization bonding method, and then the operation of step S51) or S52) is continued, so as to make full use of the conveying tape.

进一步的,本实施例中,所述的长距离皮带输送机其长度为9.5km以上。Further, in this embodiment, the length of the long-distance belt conveyor is more than 9.5km.

进一步的,本实施例中,输送胶带选用St1600-1200、6/4、φ5.4型钢丝绳芯输送带,以满足生产的需要。Further, in this embodiment, the conveyor belt is selected from St1600-1200, 6/4, φ5.4 type steel cord conveyor belt to meet the needs of production.

综上所述可以看出:From the above, it can be seen that:

首先,本实施例提供的长距离皮带输送机输送胶带的敷设方法,通过输送胶带拖动夹头和临时固定器的制作步骤、拖动输送胶带所需扭力的计算及卷扬机的选定步骤、所需胶带卷数量的确定和胶带卷支架的架设步骤、卷扬机的架设和拖拉准备步骤、输送胶带的敷设步骤、输送胶带的环接闭合步骤,提供了一套长距离皮带输送机输送胶带的完整敷设方法,根据此方法,可以在保证安全的基础上,快速、高效、高质量地完成长距离皮带输送机输送胶带的敷设;First of all, the method for laying the long-distance belt conveyor conveyor belt provided in this embodiment includes the steps of manufacturing the chuck and the temporary fixer by the conveyor belt, the calculation of the torque required for dragging the conveyor belt, and the selection steps of the hoist. Determination of the number of tape rolls and the steps of erecting the tape roll support, the erection of the hoist and the preparation steps for hauling, the laying steps of the conveyor belt, and the looping and closing steps of the conveyor belt, providing a complete set of long-distance belt conveyor conveyor belt laying steps According to this method, the laying of the long-distance belt conveyor conveyor belt can be completed quickly, efficiently and with high quality on the basis of ensuring safety;

其次,本实施例提供的长距离皮带输送机输送胶带的敷设方法,详尽、具体,不仅充分考虑了安全性,而且通用性和可操作性强,能按时完成长距离皮带输送机输送胶带的敷设,并有效保障输送胶带的敷设质量,还能有效指导同类或类似长距离皮带输送机输送胶带的安装敷设,具有开创性和指导性意义;Secondly, the laying method of the long-distance belt conveyor conveyor belt provided in this embodiment is detailed and specific, not only fully considers the safety, but also has strong versatility and operability, and can complete the laying of the long-distance belt conveyor conveyor belt on time. , and effectively ensure the laying quality of the conveyor belt, and can also effectively guide the installation and laying of the conveyor belt of the same or similar long-distance belt conveyor, which is of pioneering and instructive significance;

再次,本实施例提供的长距离皮带输送机输送胶带的敷设方法,不仅能够保证按时完成输送胶带的敷设,而且施工成本低,施工质量能够得到切实的保障,既能保证业主的权益,施工方也能获得较好的经济利益,还能取得积极的社会效益,因此,极具推广和应用价值。Thirdly, the method for laying the conveyor belt of the long-distance belt conveyor provided in this embodiment can not only ensure that the laying of the conveyor belt is completed on time, but also the construction cost is low, the construction quality can be effectively guaranteed, and the rights and interests of the owner can be guaranteed. It can also obtain better economic benefits and positive social benefits. Therefore, it has great promotion and application value.

在上述说明书的描述过程中:During the description of the above specification:

术语“本实施例”、“本发明实施例”、“如……所示”、“进一步的”、“作为一种可选的技术方案”等的描述,意指该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中;The description of the terms "this embodiment", "this embodiment of the present invention", "as shown", "further", "as an optional technical solution", etc., means the description of the embodiment or example. A particular feature, structure, material, or characteristic is included in at least one embodiment or example of the present invention;

在本说明书中,对上述术语的示意性表述不是必须针对相同的实施例或示例,而且,描述的具体特征、结构、材料或者特点等可以在任意一个或者多个实施例或示例中以合适的方式结合或组合;In this specification, schematic representations of the above terms are not necessarily directed to the same embodiment or example, and the particular features, structures, materials, or characteristics, etc. described may be used in any one or more embodiments or examples as appropriate in combination or combination;

此外,在不产生矛盾的前提下,本领域的普通技术人员可以将本说明书中描述的不同实施例或示例以及不同实施例或示例的特征进行结合或组合。Furthermore, those of ordinary skill in the art may combine or combine the different embodiments or examples described in this specification and the features of the different embodiments or examples without creating a contradiction.

最后应说明的是:以上各实施例仅用以说明本发明的技术方案,而非是对其的限制,尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换,而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围,本领域技术人员根据本说明书内容所做出的非本质改进和调整或者替换,均属本发明所要求保护的范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, not to limit them. Although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that , it is still possible to modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements to some or all of the technical features, and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the technology of each embodiment of the present invention. The scope of the solution, and the non-essential improvements, adjustments or replacements made by those skilled in the art according to the contents of this specification are all within the scope of the claimed protection of the present invention.

Claims (10)

1. A method of laying down a conveyor belt of an long-reach belt conveyor, the long-reach belt conveyor comprising at least one belt conveyor segment, each of the belt conveyor segments comprising at least a respective frame and a respective conveyor belt;
the rack comprises a head frame for mounting a driving roller, a tail frame for mounting a turnabout roller and an intermediate frame arranged between the driving roller and the turnabout roller;
the conveying rubber belt is tightly sleeved between the driving roller and the direction-changing roller in a surrounding mode, wherein the part of the conveying rubber belt which bears conveying materials in the working period is called a bearing conveying belt, the part of the conveying rubber belt which does not bear return load in the working period is called a return conveying belt, and the original state of the conveying rubber belt package when leaving a factory is a rubber belt roll wound on a shuttle core;
an upper carrier roller for supporting the bearing conveyer belt and a lower carrier roller for supporting the return conveyer belt are arranged on the middle frame;
it is characterized by comprising:
s1) manufacturing steps of the conveying belt dragging chuck and the temporary fixer, which comprise:
s11) manufacturing two T-shaped clamping plates with the same size and shape, wherein each T-shaped clamping plate comprises a rectangular main body and a pull lug protruding from the middle part of one side of the rectangular main body, and the rectangular main body is provided with a bolt hole so as to form the dragging chuck;
s12) cutting two sections of section steel with the length exceeding the width of the frame, and respectively arranging bolt holes at two ends of the section steel so that the section steel can be locked by the bolts to temporarily clamp and fix the conveying rubber belt on the frame to form the temporary fixer;
s2) calculating the torque force required by dragging the conveying rubber belt and selecting a winch, wherein the method comprises the following steps:
s21) calculating the torque force F required by dragging the conveying rubber belt by the following calculation formula:
F=k×(G1+G2)×R×P±G1×H
wherein:
f: the torque force is required when the conveying rubber belt is dragged on the upper carrier roller or the lower carrier roller;
k: the torque coefficient of the winch;
G1: the self weight of each meter of the conveying rubber belt;
G2: the self weight of the rotatable part on each meter of length of the upper carrier roller or the lower carrier roller;
r: the projection area of the adhesive tape roll on the horizontal plane after being unfolded;
p: the resistance coefficient of the upper carrier roller or the lower carrier roller;
h: the height difference of the upper part and the lower part of the adhesive tape roll after being unfolded;
+: an operation showing that the conveyor belt is dragged from a low position to a high position;
-: an operation showing that the conveyor belt is dragged from a high position to a low position;
s22) selecting a winch matched with the maximum torque value according to the maximum torque value required by dragging the conveying rubber belt on the upper carrier roller or the lower carrier roller obtained by calculation in the step S21) for standby;
s3), the determination of the required adhesive tape roll quantity and the erection of the adhesive tape roll bracket comprise the following steps:
s31), firstly determining the length and joint position of each roll of the adhesive tape roll arriving at the construction site, then calculating the length of the conveyor belt which is required to be wound on each driving roller and each direction-changing roller and the length of the lap joint of the conveyor belt caused by the joint, deducing the distance of the conveyor belt of each roll of the adhesive tape roll laid on the long-distance belt conveyor, and finally determining the number of the adhesive tape rolls required during laying;
s32) erecting a tape roll bracket at a distance from the front of the headstock, then penetrating a rotating shaft into a shuttle peg of the tape roll, and then hoisting the tape roll by using a hoisting device to erect the tape roll on the tape roll bracket, so that the tape roll can rotate on the tape roll bracket through the rotating shaft, and the conveying tape can fall off from the tape roll and is laid on the rack;
s4) the preparation steps of erection and hauling of the hoist include:
s41) erecting a winch operation table at a position a distance away from the rear part of the tail frame, fixing the winch on the winch operation table, and enabling a steel wire rope of the winch to be always aligned with the central axis of the rack;
s42) putting down the head of the starting end of the adhesive tape roll erected on the adhesive tape roll bracket, oppositely clamping and fixing two T-shaped clamping plates of the dragging chuck on the head of the starting end by using bolts, and then connecting a steel wire rope on the winch with a pull lug on the dragging chuck;
s5) a step of laying a transfer tape, comprising:
s51) laying a return conveyer belt, specifically:
the upper carrier rollers on the rack are completely detached, all the lower carrier rollers are reserved, then the winch is started, the conveying rubber belt is pulled downwards from the rubber belt roll by pulling of a steel wire rope of the winch and driving of the dragging chuck and laid on the lower carrier rollers, after all the conveying rubber belts are laid on the lower carrier rollers, the conveying rubber belts are cut off from the rubber belt roll, the tail end heads of the conveying rubber belts are fixed on the rack near the headstock by the temporary fixing devices, the steel wire rope is continuously tensioned to enable the conveying rubber belts to keep certain tension, and the starting end heads are fixed on the rack near the tailstock by the temporary fixing devices, so that the laying of the return conveying belt is completed;
s52) laying of the bearing conveyor belt, which comprises the following specific steps:
mounting all the upper carrier rollers on the original positions of the rack, then starting the winch, pulling the steel wire rope of the winch and driving the dragging chuck to drag the bearing surface of the conveying belt upwards from the belt roll to lay the belt on the upper carrier rollers, cutting the conveying belt from the belt roll after the length of a lap joint is reserved after all the conveying belt is laid on the upper carrier rollers, fixing the tail end part of the conveying belt on the rack near the headstock by using the temporary fixator, continuously tensioning the steel wire rope to keep the conveying belt at a certain tension, and fixing the starting end part on the rack near the tailstock by using the temporary fixator, thus finishing the laying of the bearing conveying belt;
s6) a loop closing step of the transfer tape, including:
s61) respectively winding the tail end head of the return belt exposed outside the temporary fixer around the driving roller and then connecting the tail end head of the return belt with the tail end head of the carrier belt by a vulcanized rubber bonding method, then winding the start end head of the return belt exposed outside the temporary fixer around the direction-changing roller and then connecting the start end head of the carrier belt by a vulcanized rubber bonding method, and removing the temporary fixer, thereby completing the laying of the long-distance belt conveying section conveying rubber belt;
s62) repeating the operations of the steps S3) to S61), and completing the application of the conveyor belt of each belt conveying segment of the long-distance belt conveyor, namely completing the application of the conveyor belt of the belt conveyor.
2. A method of laying down a long distance belt conveyor belt according to claim 1, wherein:
the torsion coefficient k of the winch takes 1.5 after static friction is considered;
and the resistance coefficient P of the upper carrier roller or the lower carrier roller which is connected and installed by the rolling bearing takes the value of 0.055.
3. The method of laying down long-distance belt conveyor belt according to claim 1, wherein in said step S5), further comprising: s53), a connecting step of the conveying adhesive tape, which comprises the following specific steps:
when the conveying adhesive tape on one tape roll is completely laid on the upper carrier roller or the lower carrier roller and cannot be fully covered with all the upper carrier rollers or the lower carrier rollers to be covered, firstly, the shuttle peg without the conveying adhesive tape is taken off from the tape roll bracket by using a hoisting device, then a new tape roll is replaced, the head of the starting end of the new tape roll is put down and the head of the tail end of the conveying adhesive tape of the last tape roll laid on the upper carrier roller or the lower carrier roller are connected by adopting a vulcanized rubber bonding method, and then the operation of the step S51) or S52) is continued.
4. A method of laying down a long distance belt conveyor belt according to claim 1, wherein: the adhesive tape roll support is arranged on the central axis of the frame in a straddling manner or on the frame, and two sides of the adhesive tape roll support are respectively provided with an oblique support.
5. A method of laying down a long distance belt conveyor belt according to claim 1, wherein: the winch operation platform is arranged on the central axis of the frame in a bestriding mode or on the frame, and the two sides of the winch operation platform are respectively provided with an inclined support.
6. A method of laying down a long distance belt conveyor belt according to claim 1, wherein: the T-shaped clamping plate is made of a steel plate with the thickness of 12mm, and 8M 10 multiplied by 80 high-strength bolts are arranged on the rectangular main body.
7. A method of laying down a long distance belt conveyor belt according to claim 1, wherein: the section steel for manufacturing the temporary fixator is angle steel of 75 multiplied by 8.
8. A method of laying down a long distance belt conveyor belt according to claim 1, wherein: the edge distance between the front end edge of the rectangular main body of the dragging chuck and the edge line of the head of the starting end of the conveying rubber belt is more than 200mm, and the steel wire rope is connected with the pulling lug through a 5t clamping ring.
9. A method of laying down a long distance belt conveyor belt according to claim 1, wherein: the length of the long-distance belt conveyor is more than 9.5 km.
10. A method of laying down a long distance belt conveyor belt according to claim 1, wherein: the conveying adhesive tape is a steel wire rope core conveying belt with St1600-1200, 6/4 and phi 5.4.
CN202010443268.8A 2020-05-22 2020-05-22 Method for laying conveying adhesive tape of long-distance belt conveyor Active CN111591708B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010443268.8A CN111591708B (en) 2020-05-22 2020-05-22 Method for laying conveying adhesive tape of long-distance belt conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010443268.8A CN111591708B (en) 2020-05-22 2020-05-22 Method for laying conveying adhesive tape of long-distance belt conveyor

Publications (2)

Publication Number Publication Date
CN111591708A true CN111591708A (en) 2020-08-28
CN111591708B CN111591708B (en) 2024-12-17

Family

ID=72183984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010443268.8A Active CN111591708B (en) 2020-05-22 2020-05-22 Method for laying conveying adhesive tape of long-distance belt conveyor

Country Status (1)

Country Link
CN (1) CN111591708B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114604566A (en) * 2020-12-08 2022-06-10 泰富重工制造有限公司 A method of wearing long-distance tape by using a variety of process platform trusses

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050158155A1 (en) * 2004-01-16 2005-07-21 Grain Way Manufacturing Incline grain conveyor for grain bins
CN104150153A (en) * 2014-08-27 2014-11-19 杜昌峰 Belt conveyors with curves
CN104909112A (en) * 2015-06-04 2015-09-16 山西晋城无烟煤矿业集团有限责任公司 Fast replacement process for long-distance steel cord belt
KR20160063665A (en) * 2014-11-27 2016-06-07 대은엠비코(주) A transfer roller having a plurality of rollers sharing a one axis

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050158155A1 (en) * 2004-01-16 2005-07-21 Grain Way Manufacturing Incline grain conveyor for grain bins
CN104150153A (en) * 2014-08-27 2014-11-19 杜昌峰 Belt conveyors with curves
KR20160063665A (en) * 2014-11-27 2016-06-07 대은엠비코(주) A transfer roller having a plurality of rollers sharing a one axis
CN104909112A (en) * 2015-06-04 2015-09-16 山西晋城无烟煤矿业集团有限责任公司 Fast replacement process for long-distance steel cord belt

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114604566A (en) * 2020-12-08 2022-06-10 泰富重工制造有限公司 A method of wearing long-distance tape by using a variety of process platform trusses

Also Published As

Publication number Publication date
CN111591708B (en) 2024-12-17

Similar Documents

Publication Publication Date Title
IT201900001841A1 (en) CABLE RECOVERY MACHINE
CN111285009A (en) Continuous-mining and continuous-transporting cooperative conveying system
PL168767B1 (en) A method of manipulating a continuous, flexible product and a device for manipulating a continuous, flexible product.
KR102616986B1 (en) Device and method for installing cable, and moving cart
US11597626B2 (en) Cable recovery machine
KR102616987B1 (en) Device and method for installing cable, and moving cart
CN113021699A (en) Method for quickly replacing adhesive tape of long-distance large-bandwidth mining belt conveyor for ten million-ton mine
CN111591708A (en) Laying method of long-distance belt conveyor conveying rubber belt
WO2017045012A1 (en) An improved conveyor belt system
CN112728028B (en) Belt changing method of belt conveyor under uninterrupted operation condition
JP6579703B2 (en) Tarpaulin roll cradle, tarpaulin laying mechanism and laying method
CN108996139A (en) A kind of large capacity vertically stores up band device
CA1089397A (en) Method and apparatus for extending conveyor belts
CN106477398B (en) A tape dismantling vehicle
CN212126455U (en) Continuous-mining and continuous-transporting cooperative conveying system
JP2873198B2 (en) Method for reinforcing columnar structure and reinforcing wire winding device used therefor
CN208897905U (en) A kind of large capacity vertically stores up band device
KR100890399B1 (en) Geotextile laying method using geotextile winder
US4227660A (en) Method and apparatus for extending conveyor belts
JP2024111764A (en) Simple carrier transport device for materials using power lines and method for transporting materials using said transport device
CN114408449A (en) A belt conveyor belt changing device for belt conveyor under limited space conditions
CN107487729A (en) A kind of cable drum device of bridge crane
CN223016034U (en) Belt releasing machine with double heads in tunnel and continuous belt conveyor vulcanization belt releasing system
CN111977254A (en) Automatic deviation correcting device for belt storage bin of belt conveyor
JP2851090B2 (en) How to lay an optical cable around an overhead line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant