CN111560849A - A positioning device for cable sheath installation - Google Patents

A positioning device for cable sheath installation Download PDF

Info

Publication number
CN111560849A
CN111560849A CN202010363555.8A CN202010363555A CN111560849A CN 111560849 A CN111560849 A CN 111560849A CN 202010363555 A CN202010363555 A CN 202010363555A CN 111560849 A CN111560849 A CN 111560849A
Authority
CN
China
Prior art keywords
handle
positioning device
arc
main body
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010363555.8A
Other languages
Chinese (zh)
Inventor
汤亮
张海良
谢颖奇
顾庆华
俞建群
何旭初
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Pujiang Cable Co Ltd
Zhejiang Pujiang Cable Co Ltd
Original Assignee
Shanghai Pujiang Cable Co Ltd
Zhejiang Pujiang Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Pujiang Cable Co Ltd, Zhejiang Pujiang Cable Co Ltd filed Critical Shanghai Pujiang Cable Co Ltd
Priority to CN202010363555.8A priority Critical patent/CN111560849A/en
Publication of CN111560849A publication Critical patent/CN111560849A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A positioning device for mounting a cable sheath tube comprises a fixed clamp, a movable clamp and a locking mechanism. The fixing clamp comprises a fixing handle and a first chuck. The movable clamp comprises a movable handle, a guide rail and a second chuck. The first chuck comprises a connecting arm and a first arc-shaped clamping plate. The second chuck comprises a sliding rod and a second arc-shaped clamping plate. The slide bar includes the slide bar main part, and the slip installation cover to and first locking screw. The locking mechanism comprises a spring arranged between the movable handle and the connecting arm, a support rod arranged between the movable handle and the fixed handle, and a second locking screw screwed at the end part of the movable handle. One end of the support rod is accommodated in the movable handle and is abutted against the second locking screw so as to limit the abutting of the position of the support rod and limit the position of the support rod. The positioning device for mounting the cable protective sleeve is simple and convenient to mount, convenient to use and good in locking effect, and mounting efficiency is improved.

Description

一种缆索护套管安装的定位装置A positioning device for cable sheath installation

技术领域technical field

本发明属于缆索安装工具技术领域,特别是一种缆索护套管安装的定位装置。The invention belongs to the technical field of cable installation tools, in particular to a positioning device for installation of a cable sheath.

背景技术Background technique

悬索桥指的是以通过索塔悬挂并锚固于两岸的缆索作为上部结构主要承重构件的桥梁。其缆索几何形状由力的平衡条件决定,一般接近抛物线。从缆索垂下许多吊杆,把桥面吊住,在桥面和吊杆之间常设置加劲梁,同缆索形成组合体系,以减小荷载所引起的挠度变形。Suspension bridges refer to bridges in which cables suspended by towers and anchored on both banks are used as the main load-bearing components of the upper structure. The cable geometry is determined by the equilibrium conditions of the forces, generally close to a parabola. Many suspension rods hang down from the cables to suspend the bridge deck. Stiffening beams are often set between the bridge deck and the suspension rods to form a combined system with the cables to reduce the deflection and deformation caused by the load.

缆索架设的过程中,还会在缆索的外侧套设护套管,其为了保护缆索,防止行人破坏缆索,而且在火情下可以保护缆索的PE层。但目前将护套管安装至缆索上时,护套管安装位置不准确,过程复杂,且难度极大且费事费力,效率极低。In the process of cable erection, a sheathing sleeve is also set on the outer side of the cable to protect the cable, prevent pedestrians from damaging the cable, and protect the PE layer of the cable in case of fire. However, at present, when the protective sleeve is installed on the cable, the installation position of the protective sleeve is inaccurate, the process is complicated, and it is extremely difficult and laborious, and the efficiency is extremely low.

发明内容SUMMARY OF THE INVENTION

有鉴于此,本发明提供了一种可以将安装方便的缆索护套管安装的定位装置,以满足工业需求。In view of this, the present invention provides a positioning device that can install a cable sheath that is easy to install, so as to meet industrial needs.

一种所述缆索护套管安装的定位装置,其包括一个固定夹,一个连接在所述固定夹一侧的活动夹,以及一个设置在所述固定夹与所述活动夹之间的锁紧机构。所述固定夹包括一个固定手柄,一个连接在固定手柄一端的第一夹头。所述活动夹包括一个活动手柄,一个设置在所述活动手柄上的导轨,一个设置在所述导轨一端的第二夹头。所述第一夹头包括一个连接在所述固定手柄上的连接臂,以及一个铰接在连接臂一端的第一弧形夹板。所述第二夹头包括一个滑动连接在所述导轨上的滑动杆,以及一个铰接在所述滑动杆一端的第二弧形夹板,所述滑动杆包括一个铰接所述第二弧形夹板的滑动杆主体,一个设置在所述滑动杆主体自由端且套设于所述导轨上的滑动安装套,以及一个螺接在所述滑动安装套上的第一锁紧螺钉。所述锁紧机构包括一个设置在所述活动手柄与所述连接臂之间弹簧,一个设置在所述活动手柄与所述固定手柄之间的撑杆,以及一个螺接在所述活动手柄端部的第二锁紧螺钉。所述撑杆的一端容置于所述活动手柄内且与所述第二锁紧螺钉抵接,以限制所述撑杆的位置。A positioning device for the installation of the cable sheath, comprising a fixed clip, a movable clip connected to one side of the fixed clip, and a locking device arranged between the fixed clip and the movable clip mechanism. The fixing clip includes a fixing handle and a first clamping head connected to one end of the fixing handle. The movable clip includes a movable handle, a guide rail arranged on the movable handle, and a second chuck arranged at one end of the guide rail. The first collet includes a connecting arm connected to the fixed handle, and a first arc-shaped splint hinged at one end of the connecting arm. The second collet includes a sliding rod slidably connected to the guide rail, and a second arc-shaped splint hinged at one end of the sliding rod, and the sliding rod includes a hinged second arc-shaped splint. A sliding rod main body, a sliding installation sleeve disposed on the free end of the sliding rod main body and sleeved on the guide rail, and a first locking screw screwed on the sliding installation sleeve. The locking mechanism includes a spring arranged between the movable handle and the connecting arm, a strut arranged between the movable handle and the fixed handle, and a spring connected to the end of the movable handle. part of the second locking screw. One end of the strut is accommodated in the movable handle and abuts with the second locking screw to limit the position of the strut.

进一步地,所述固定手柄包括一个固定手柄主体,一个铰接在所述固定手柄主体上的辅助手柄,所述辅助手柄的一侧可与所述撑杆抵接。Further, the fixed handle includes a fixed handle main body and an auxiliary handle hinged on the fixed handle main body, and one side of the auxiliary handle can abut with the strut.

进一步地,所述第一弧形夹板包括一个第一弧形夹板主体,一个设置在所述第一弧形夹板主体侧壁上的第一铰接座。Further, the first arc-shaped splint includes a first arc-shaped splint body and a first hinge seat disposed on the side wall of the first arc-shaped splint body.

进一步地,所述第二弧形夹板包括一个第二弧形夹板主体,一个设置在所述第二弧形夹板主体侧壁上的第二铰接座。Further, the second arc-shaped splint includes a second arc-shaped splint body and a second hinge seat disposed on the side wall of the second arc-shaped splint body.

进一步地,所述第二锁紧螺钉与所述第一锁紧螺钉的端头均设置滚花。Further, the ends of the second locking screw and the first locking screw are both provided with knurling.

进一步地,所述弹簧的延伸方向与所述撑杆的延伸方向始终相互平行。Further, the extending direction of the spring and the extending direction of the strut are always parallel to each other.

进一步地,所述导轨与所述活动手柄的延伸方向相互垂直。Further, the extending directions of the guide rail and the movable handle are perpendicular to each other.

进一步地,所述撑杆靠近所述第二锁紧螺钉的一端端头轮廓成直线。Further, the contour of one end of the strut close to the second locking screw is in a straight line.

进一步地,所述导轨包括一个固定连接在所述活动手柄上的导轨主体,一个设置导轨主体自由端端头的限位块,以及两个分别设置在所述导轨主体两侧侧面上的凹槽。Further, the guide rail includes a guide rail main body fixedly connected to the movable handle, a limit block provided with the free end of the guide rail main body, and two grooves respectively arranged on both sides of the guide rail main body. .

进一步地,所述滑动安装套包括一个安装套主体,一个设置在所述安装套主体上的安装孔,以及两个分别设置在所述安装套主体上且在所述安装孔内的凸块,所述凸块容置于所述凹槽内。Further, the sliding installation sleeve includes a main body of the installation sleeve, an installation hole arranged on the main body of the installation sleeve, and two protrusions respectively arranged on the main body of the installation sleeve and in the installation holes, The bump is accommodated in the groove.

与现有技术相比,本发明提供的缆索护套管安装的定位装置通过所述锁紧机构将所述固定夹与所述活动夹锁紧。所述固定夹包括一个固定手柄,一个连接在固定手柄一端的第一夹头。所述活动夹包括一个活动手柄,一个设置在所述活动手柄上的导轨,一个设置在所述导轨一端的第二夹头。所述第二夹头的所述滑动杆可沿所述导轨滑动,以调节所述第一夹头与所述第一夹头之间的距离。并且所述滑动杆可通过所述第一锁紧螺钉限制所述第二夹头位置。当需将所述固定夹与所述活动夹锁死时,通过拧紧所述锁紧机构中的所述第二锁紧螺钉,使所述第二锁紧螺钉抵接在所述撑杆一端,以使所述撑杆与所述第二锁紧螺钉形成死点,达到锁死的目的。该缆索护套管安装的定位装置安装简便,使用方便,锁紧效果好,提高了安装效率,使安装位置准确,方便工人操作。Compared with the prior art, the positioning device for installing the cable sheath provided by the present invention locks the fixed clip and the movable clip through the locking mechanism. The fixing clip includes a fixing handle and a first clamping head connected to one end of the fixing handle. The movable clip includes a movable handle, a guide rail arranged on the movable handle, and a second chuck arranged at one end of the guide rail. The sliding rod of the second collet can slide along the guide rail to adjust the distance between the first collet and the first collet. And the sliding rod can limit the position of the second collet through the first locking screw. When the fixed clip and the movable clip need to be locked, the second locking screw in the locking mechanism is tightened so that the second locking screw abuts on one end of the strut, In order to make the strut and the second locking screw form a dead point, the purpose of locking is achieved. The positioning device installed by the cable protective sleeve is easy to install, easy to use, and has a good locking effect, which improves the installation efficiency, makes the installation position accurate, and is convenient for workers to operate.

附图说明Description of drawings

图1为本发明提供的缆索护套管安装的定位装置的结构示意图。FIG. 1 is a schematic structural diagram of a positioning device for installing a cable sheathing provided by the present invention.

图2为图1的缆索护套管安装的定位装置在A处的局部放大结构示意图。FIG. 2 is a partial enlarged structural schematic diagram of the positioning device installed at the position A of the cable sheath of FIG. 1 .

图3为图1的缆索护套管安装的定位装置的剖面结构示意图。FIG. 3 is a schematic cross-sectional structural diagram of the positioning device installed on the cable sheath of FIG. 1 .

具体实施方式Detailed ways

以下对本发明的具体实施例进行进一步详细说明。应当理解的是,此处对本发明实施例的说明并不用于限定本发明的保护范围。The specific embodiments of the present invention will be described in further detail below. It should be understood that the descriptions of the embodiments of the present invention herein are not intended to limit the protection scope of the present invention.

如图1至图3所示,其为本发明提供的缆索护套管安装的定位装置的结构示意图。所述缆索护套管安装的定位装置包括一个固定夹10,一个连接在所述固定夹20一侧的活动夹20,以及一个设置在所述固定夹10与所述活动夹20之间的锁紧机构30。所述缆索护套管安装的定位装置还包括其他的一些功能模块,如组装组件等等,其应当为本领域技术人员所习知的技术,在此不再一一详细说明。As shown in FIGS. 1 to 3 , which are schematic structural diagrams of the positioning device for installing the cable sheathing provided by the present invention. The positioning device installed on the cable sheath includes a fixed clip 10 , a movable clip 20 connected to one side of the fixed clip 20 , and a lock arranged between the fixed clip 10 and the movable clip 20 Tightening mechanism 30. The positioning device installed on the cable sheath also includes other functional modules, such as assembly components, etc., which should be known to those skilled in the art, and will not be described in detail here.

所述固定夹10包括一个固定手柄11,一个连接在固定手柄11一端的第一夹头12。The fixing clip 10 includes a fixing handle 11 and a first clamping head 12 connected to one end of the fixing handle 11 .

所述固定手柄11包括一个固定手柄主体111,一个铰接在所述固定手柄主体111上的辅助手柄112。所述辅助手柄112会结合所述锁紧机构30进行详细说明。The fixed handle 11 includes a fixed handle main body 111 and an auxiliary handle 112 hinged on the fixed handle main body 111 . The auxiliary handle 112 will be described in detail in conjunction with the locking mechanism 30 .

所述第一夹头12包括一个连接在所述固定手柄11上的连接臂121,以及一个铰接在连接臂121一端的第一弧形夹板122。The first collet 12 includes a connecting arm 121 connected to the fixed handle 11 , and a first curved splint 122 hinged to one end of the connecting arm 121 .

所述第一弧形夹板122包括一个第一弧形夹板主体1221,一个设置在所述第一弧形夹板主体1221侧壁上的第一铰接座1222。所述连接臂121的一端铰接在所述第一铰接座1222连接,可以想到的是,所述第一弧形夹板122可绕所述连接臂121的一端转动。The first arc-shaped splint 122 includes a first arc-shaped splint body 1221 and a first hinge seat 1222 disposed on the side wall of the first arc-shaped splint body 1221 . One end of the connecting arm 121 is hingedly connected to the first hinge seat 1222 , and it is conceivable that the first arc-shaped splint 122 can rotate around one end of the connecting arm 121 .

所述活动夹20包括一个活动手柄21,一个设置在所述活动手柄21上的导轨22,一个设置在所述导轨22一端的第二夹头23。The movable clip 20 includes a movable handle 21 , a guide rail 22 arranged on the movable handle 21 , and a second chuck 23 arranged at one end of the guide rail 22 .

所述活动手柄21以及所述所述固定手柄11分别与所述连接臂121铰接在一起,从而所述固定夹10与所述活动夹20连接在一起,且所述固定手柄11与所述活动手柄21皆可转动,以调节所述活动手柄21以及所述第一夹头12的位置。The movable handle 21 and the fixed handle 11 are hinged with the connecting arm 121 respectively, so that the fixed clip 10 and the movable clip 20 are connected together, and the fixed handle 11 and the movable The handle 21 can be rotated to adjust the position of the movable handle 21 and the first chuck 12 .

所述导轨22包括一个固定连接在所述活动手柄21上的导轨主体221,一个设置导轨主体221自由端端头的限位块222,以及两个分别设置在所述导轨主体221两侧侧面上的凹槽223。所述导轨22用于引导所述第二夹头23移动,以改变所述第一夹头12与所述第二夹头23之间的距离。所述导轨22与所述活动手柄21的延伸方向相互垂直。The guide rail 22 includes a guide rail main body 221 fixedly connected to the movable handle 21 , a limit block 222 provided with the free end of the guide rail main body 221 , and two on both sides of the guide rail main body 221 respectively. the groove 223. The guide rail 22 is used to guide the movement of the second chuck 23 to change the distance between the first chuck 12 and the second chuck 23 . The extending directions of the guide rail 22 and the movable handle 21 are perpendicular to each other.

所述第二夹头23包括一个滑动连接在所述导轨22上的滑动杆231,以及一个铰接在所述滑动杆231一端的第二弧形夹板232。The second collet 23 includes a sliding rod 231 slidably connected to the guide rail 22 , and a second arc-shaped clamping plate 232 hinged on one end of the sliding rod 231 .

所述滑动杆231包括一个铰接所述第二弧形夹板232的滑动杆主体2311,一个设置在所述滑动杆主体2311自由端且套设于所述导轨22上的滑动安装套2312,以及一个螺接在所述滑动安装套2312上的第一锁紧螺钉2313。通过驱动所述滑动杆231沿所述导轨22滑动,以改变所述第一夹头12与所述第二夹头23之间的距离,以使用于不同直径的索塔。通过拧动所述第一锁紧螺钉2313,以限制所述滑动杆231在所述导轨22位置。The sliding rod 231 includes a sliding rod main body 2311 hinged to the second arc-shaped splint 232, a sliding installation sleeve 2312 disposed on the free end of the sliding rod main body 2311 and sleeved on the guide rail 22, and a sliding rod body 2312. The first locking screw 2313 screwed on the sliding mounting sleeve 2312. By driving the sliding rod 231 to slide along the guide rail 22 , the distance between the first chuck 12 and the second chuck 23 can be changed, so as to be used for cable towers with different diameters. By screwing the first locking screw 2313 , the position of the sliding rod 231 on the guide rail 22 is restricted.

所述滑动安装套2312包括一个安装套主体2312a,一个设置在所述安装套主体2312a上的安装孔2312b,以及两个分别设置在所述安装套主体2312a上且在所述安装孔2312b内的凸块2312c。所述凸块2312c容置于所述凹槽223内,以使所述滑动安装套2312沿所述导轨22时稳定。The sliding installation sleeve 2312 includes an installation sleeve main body 2312a, an installation hole 2312b disposed on the installation sleeve main body 2312a, and two installation sleeves respectively disposed on the installation sleeve main body 2312a and in the installation hole 2312b. Bump 2312c. The protrusion 2312c is accommodated in the groove 223 to stabilize the sliding mounting sleeve 2312 along the guide rail 22 .

所述第二弧形夹板232包括一个第二弧形夹板主体2321,一个设置在所述第二弧形夹板主体2321侧壁上的第二铰接座2322。所述第二铰接座2322与所述滑动杆231的一端铰接在一起,可以想到的是,所述第二弧形夹板232可在滑动杆231的一端转动。所述第一弧形夹板122与所述第二弧形夹板232皆可转动,从而便于调节所述第一弧形夹板122与所述第二弧形夹板232的位置,使所述第一弧形夹板122与所述第二弧形夹板232贴合在所述安装座上。索塔为一个圆柱体,因此所述第一弧形夹板122与所述第二弧形夹板232设置在该索塔上时,所述第一弧形夹板122与所述第二弧形夹板232贴合索塔的轮廓,以使所述固定夹10与所述活动夹20在索塔上稳定。The second arc-shaped splint 232 includes a second arc-shaped splint body 2321 and a second hinge seat 2322 disposed on the side wall of the second arc-shaped splint body 2321 . The second hinge seat 2322 is hinged with one end of the sliding rod 231 , and it is conceivable that the second arc-shaped clamping plate 232 can rotate at one end of the sliding rod 231 . Both the first arc-shaped splint 122 and the second arc-shaped splint 232 are rotatable, so that the positions of the first arc-shaped splint 122 and the second arc-shaped splint 232 can be adjusted so that the first arc-shaped splint 232 can be adjusted. The shaped splint 122 and the second arc-shaped splint 232 are attached to the mounting seat. The cable tower is a cylinder, so when the first arc-shaped clamping plate 122 and the second arc-shaped clamping plate 232 are arranged on the cable tower, the first arc-shaped clamping plate 122 and the second arc-shaped clamping plate 232 Fit the outline of the cable tower, so that the fixed clip 10 and the movable clip 20 are stable on the cable tower.

所述锁紧机构30包括一个设置在所述活动手柄21与所述连接臂121之间弹簧31,一个设置在所述活动手柄21与所述固定手柄之间的撑杆32,以及一个螺接在所述活动手柄21端部的第二锁紧螺钉33。The locking mechanism 30 includes a spring 31 arranged between the movable handle 21 and the connecting arm 121, a strut 32 arranged between the movable handle 21 and the fixed handle, and a threaded connection. A second locking screw 33 at the end of the movable handle 21 .

所述弹簧31的一端连接所述连接臂121,另一端连接所述活动手柄21,从而将所述固定手柄11与所述活动手柄21连接在一起,且所述弹簧31利用自身弹性,使所述固定手柄11与所述活动手柄21相互靠近。所述弹簧31的延伸方向与所述撑杆32的延伸方向始终相互平行,以使所述弹簧31的拉力的方向与所述撑杆32的延伸方向一致,以便于所述固定手柄11与所述活动手柄21合并在一起。One end of the spring 31 is connected to the connecting arm 121, and the other end is connected to the movable handle 21, so as to connect the fixed handle 11 and the movable handle 21 together. The fixed handle 11 and the movable handle 21 are close to each other. The extension direction of the spring 31 and the extension direction of the support rod 32 are always parallel to each other, so that the direction of the pulling force of the spring 31 is consistent with the extension direction of the support rod 32, so that the fixed handle 11 and the The movable handles 21 are combined together.

所述撑杆32的一端铰接在所述固定手柄11上,所述撑杆32的一端容置于所述活动手柄21内且与所述第二锁紧螺钉33抵接,以限制所述撑杆32的位置。另外,所述辅助手柄112的一侧可与所述撑杆32抵接,以限制所述撑杆32的位置,并驱动所述撑杆32移动。所述撑杆32靠近所述第二锁紧螺钉33的一端端头轮廓成直线,以使所述撑杆32可与所述第二锁紧螺钉33存分接触,从而使所述第二锁紧螺钉33与所述撑杆32抵接在一起时稳定。One end of the support rod 32 is hinged on the fixed handle 11 , and one end of the support rod 32 is accommodated in the movable handle 21 and abuts with the second locking screw 33 to limit the support The position of the rod 32. In addition, one side of the auxiliary handle 112 can be in contact with the support rod 32 to limit the position of the support rod 32 and drive the support rod 32 to move. The contour of one end of the strut 32 close to the second locking screw 33 is in a straight line, so that the strut 32 can be in contact with the second locking screw 33, so that the second locking The tightening screw 33 is stable when it is in contact with the strut 32 .

所述第二锁紧螺钉33与所述第一锁紧螺钉2313的端头均设置滚花,从而以增大所述第二锁紧螺钉33与所述第一锁紧螺钉2313端头外侧的摩擦力,以便于拧动所述所述第二锁紧螺钉33与第一锁紧螺钉2313。The ends of the second locking screw 33 and the first locking screw 2313 are both provided with knurling, so as to increase the distance between the outer ends of the second locking screw 33 and the first locking screw 2313. friction force, so as to screw the second locking screw 33 and the first locking screw 2313 .

当所述固定夹10与所述活动夹20需锁死时,将所述第一夹头12与所述第二夹头23调整至合适的距离,放入索塔上,并压下活动手柄21,此时,索塔被夹持住,但需要对索塔施加更大的夹紧力时,则需用拧紧所述第二锁紧螺钉33,使所述第二锁紧螺钉33抵接在所述撑杆32一端,以使所述撑杆32与所述第二锁紧螺钉33形成死点,达到锁死的目的,并且将护套管(图未示)通过夹具(图未示)夹设至所述导轨22,以对该护套管进行定位且位置固定,使护套管安装位置准确。When the fixed clip 10 and the movable clip 20 need to be locked, adjust the first chuck 12 and the second chuck 23 to a suitable distance, put them on the cable tower, and press down the movable handle 21. At this time, the pylon is clamped, but when a larger clamping force needs to be applied to the pylon, the second locking screw 33 needs to be tightened to make the second locking screw 33 abut At one end of the strut 32, the strut 32 and the second locking screw 33 form a dead point to achieve the purpose of locking, and the sheath tube (not shown) is passed through a clamp (not shown in the figure). ) is clamped to the guide rail 22 to position and fix the protective sleeve, so that the installation position of the protective sleeve is accurate.

当所述固定夹10与所述活动夹20需解锁时,拧动所述第二锁紧螺钉33,使所述撑杆32与所述第二锁紧螺钉33解除死点状态,并扳动所述辅助手柄112以便让所述固定手柄11与所述活动手柄21松开,以进一步调整所述第一夹头12与所述第二夹头23之间的间距,达到解锁的目的。When the fixed clip 10 and the movable clip 20 need to be unlocked, the second locking screw 33 is rotated to release the dead-point state of the support rod 32 and the second locking screw 33, and then the second locking screw 33 is rotated. The auxiliary handle 112 is used to release the fixed handle 11 and the movable handle 21 to further adjust the distance between the first chuck 12 and the second chuck 23 to achieve the purpose of unlocking.

与现有技术相比,本发明提供的缆索护套管安装的定位装置通过所述锁紧机构30将所述固定夹10与所述活动夹20锁紧。所述固定夹10包括一个固定手柄11,一个连接在固定手柄11一端的第一夹头12。所述活动夹20包括一个活动手柄21,一个设置在所述活动手柄21上的导轨22,一个设置在所述导轨22一端的第二夹头23。所述第二夹头23的所述滑动杆231可沿所述导轨22滑动,以调节所述第一夹头12与所述第一夹头12之间的距离。并且所述滑动杆231可通过所述第一锁紧螺钉2313限制所述第二夹头23位置。当需将所述固定夹10与所述活动夹20锁死时,通过拧紧所述锁紧机构30中的所述第二锁紧螺钉33,使所述第二锁紧螺钉33抵接在所述撑杆32一端,以使所述撑杆32与所述第二锁紧螺钉33形成死点,达到锁死的目的。该缆索护套管安装的定位装置安装简便,使用方便,锁紧效果好,提高了安装效率,使安装位置准确,方便工人操作。Compared with the prior art, the positioning device for installing the cable sheath provided by the present invention locks the fixed clip 10 and the movable clip 20 through the locking mechanism 30 . The fixing clip 10 includes a fixing handle 11 and a first clamping head 12 connected to one end of the fixing handle 11 . The movable clip 20 includes a movable handle 21 , a guide rail 22 arranged on the movable handle 21 , and a second chuck 23 arranged at one end of the guide rail 22 . The sliding rod 231 of the second chuck 23 can slide along the guide rail 22 to adjust the distance between the first chuck 12 and the first chuck 12 . And the sliding rod 231 can restrict the position of the second collet 23 by the first locking screw 2313 . When the fixed clip 10 and the movable clip 20 need to be locked, the second locking screw 33 in the locking mechanism 30 is tightened to abut the second locking screw 33 One end of the support rod 32 is closed so that the support rod 32 and the second locking screw 33 form a dead point to achieve the purpose of locking. The positioning device installed by the cable protective sleeve is easy to install, easy to use, and has a good locking effect, which improves the installation efficiency, makes the installation position accurate, and is convenient for workers to operate.

以上仅为本发明的较佳实施例,并不用于局限本发明的保护范围,任何在本发明精神内的修改、等同替换或改进等,都涵盖在本发明的权利要求范围内。The above are only preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modifications, equivalent replacements or improvements within the spirit of the present invention are all included within the scope of the claims of the present invention.

Claims (10)

1.一种缆索护套管安装的定位装置,其特征在于:所述缆索护套管安装的定位装置包括一个固定夹,一个连接在所述固定夹一侧的活动夹,以及一个设置在所述固定夹与所述活动夹之间的锁紧机构,所述固定夹包括一个固定手柄,一个连接在固定手柄一端的第一夹头,所述活动夹包括一个活动手柄,一个设置在所述活动手柄上的导轨,一个设置在所述导轨一端的第二夹头,所述第一夹头包括一个连接在所述固定手柄上的连接臂,以及一个铰接在连接臂一端的第一弧形夹板,所述第二夹头包括一个滑动连接在所述导轨上的滑动杆,以及一个铰接在所述滑动杆一端的第二弧形夹板,所述滑动杆包括一个铰接所述第二弧形夹板的滑动杆主体,一个设置在所述滑动杆主体自由端且套设于所述导轨上的滑动安装套,以及一个螺接在所述滑动安装套上的第一锁紧螺钉,所述锁紧机构包括一个设置在所述活动手柄与所述连接臂之间弹簧,一个设置在所述活动手柄与所述固定手柄之间的撑杆,以及一个螺接在所述活动手柄端部的第二锁紧螺钉,所述撑杆的一端容置于所述活动手柄内且与所述第二锁紧螺钉抵接,以限制所述撑杆的位置。1. A positioning device for installing a cable sheath, characterized in that: the positioning device for installing the cable sheath comprises a fixed clip, a movable clip connected to one side of the fixed clip, and a The locking mechanism between the fixed clip and the movable clip, the fixed clip includes a fixed handle, a first chuck connected to one end of the fixed handle, the movable clip includes a movable handle, and a A guide rail on the movable handle, a second collet located at one end of the guide rail, the first collet includes a connecting arm connected to the fixed handle, and a first arc hinged on one end of the connecting arm A splint, the second collet includes a sliding rod slidably connected to the guide rail, and a second arc-shaped splint hinged at one end of the sliding rod, the sliding rod includes a hinged second arc The sliding rod main body of the splint, a sliding mounting sleeve disposed on the free end of the sliding rod main body and sleeved on the guide rail, and a first locking screw screwed on the sliding mounting sleeve, the lock The tightening mechanism includes a spring arranged between the movable handle and the connecting arm, a strut arranged between the movable handle and the fixed handle, and a first screw connected to the end of the movable handle. Two locking screws, one end of the strut is accommodated in the movable handle and abuts with the second locking screw to limit the position of the strut. 2.如权利要求1所述的缆索护套管安装的定位装置,其特征在于:所述固定手柄包括一个固定手柄主体,一个铰接在所述固定手柄主体上的辅助手柄,所述辅助手柄的一侧可与所述撑杆抵接。2 . The positioning device for the installation of the cable protective sleeve according to claim 1 , wherein the fixed handle comprises a fixed handle main body, an auxiliary handle hinged on the fixed handle main body, and the auxiliary handle is hinged on the fixed handle main body. One side can abut with the strut. 3.如权利要求1所述的缆索护套管安装的定位装置,其特征在于:所述第一弧形夹板包括一个第一弧形夹板主体,一个设置在所述第一弧形夹板主体侧壁上的第一铰接座。3. The positioning device for the installation of the cable protective sleeve according to claim 1, wherein the first arc-shaped clamping plate comprises a first arc-shaped clamping plate main body, and one is arranged on the side of the first arc-shaped clamping plate main body. The first hinge seat on the wall. 4.如权利要求1所述的缆索护套管安装的定位装置,其特征在于:所述第二弧形夹板包括一个第二弧形夹板主体,一个设置在所述第二弧形夹板主体侧壁上的第二铰接座。4. The positioning device for the installation of the cable protective sleeve according to claim 1, wherein the second arc-shaped clamping plate comprises a second arc-shaped clamping plate main body, and one is arranged on the side of the second arc-shaped clamping plate main body. A second hinged seat on the wall. 5.如权利要求1所述的缆索护套管安装的定位装置,其特征在于:所述第二锁紧螺钉与所述第一锁紧螺钉的端头均设置滚花。5 . The positioning device for the installation of the cable sheath according to claim 1 , wherein knurling is provided on the ends of the second locking screw and the first locking screw. 6 . 6.如权利要求1所述的缆索护套管安装的定位装置,其特征在于:所述弹簧的延伸方向与所述撑杆的延伸方向始终相互平行。6 . The positioning device for installing a cable sheath as claimed in claim 1 , wherein the extending direction of the spring and the extending direction of the strut are always parallel to each other. 7 . 7.如权利要求1所述的缆索护套管安装的定位装置,其特征在于:所述导轨与所述活动手柄的延伸方向相互垂直。7 . The positioning device for installing a cable sheath according to claim 1 , wherein the extending direction of the guide rail and the movable handle are perpendicular to each other. 8 . 8.如权利要求1所述的缆索护套管安装的定位装置,其特征在于:所述撑杆靠近所述第二锁紧螺钉的一端端头轮廓成直线。8 . The positioning device for the installation of the cable protective sleeve according to claim 1 , wherein the contour of one end of the strut close to the second locking screw is in a straight line. 9 . 9.如权利要求1所述的缆索护套管安装的定位装置,其特征在于:所述导轨包括一个固定连接在所述活动手柄上的导轨主体,一个设置导轨主体自由端端头的限位块,以及两个分别设置在所述导轨主体两侧侧面上的凹槽。9 . The positioning device for the installation of the cable sheath according to claim 1 , wherein the guide rail comprises a guide rail body fixedly connected to the movable handle, and a limiter for setting the free end of the guide rail body. 10 . block, and two grooves respectively provided on the side surfaces of both sides of the guide rail body. 10.如权利要求9所述的缆索护套管安装的定位装置,其特征在于:所述滑动安装套包括一个安装套主体,一个设置在所述安装套主体上的安装孔,以及两个分别设置在所述安装套主体上且在所述安装孔内的凸块,所述凸块容置于所述凹槽内。10. The positioning device for the installation of the cable protective sleeve according to claim 9, wherein the sliding installation sleeve comprises an installation sleeve main body, an installation hole provided on the installation sleeve main body, and two respectively A convex block is arranged on the main body of the mounting sleeve and in the mounting hole, and the convex block is accommodated in the groove.
CN202010363555.8A 2020-04-30 2020-04-30 A positioning device for cable sheath installation Pending CN111560849A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010363555.8A CN111560849A (en) 2020-04-30 2020-04-30 A positioning device for cable sheath installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010363555.8A CN111560849A (en) 2020-04-30 2020-04-30 A positioning device for cable sheath installation

Publications (1)

Publication Number Publication Date
CN111560849A true CN111560849A (en) 2020-08-21

Family

ID=72070677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010363555.8A Pending CN111560849A (en) 2020-04-30 2020-04-30 A positioning device for cable sheath installation

Country Status (1)

Country Link
CN (1) CN111560849A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113789721A (en) * 2021-09-14 2021-12-14 上海浦江缆索股份有限公司 An installation structure and installation method for a guide strip of a stay cable

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1070722A (en) * 1978-01-09 1980-01-29 Dale J. Hackbarth Adjustable clamp
US5076552A (en) * 1990-04-27 1991-12-31 Brian Challis Adjustable vise
US6578837B1 (en) * 1997-07-23 2003-06-17 Wolfcraft Gmbh Clamping tool, especially a clamping clip, clamping rod or clamping bench
WO2015192365A1 (en) * 2014-06-20 2015-12-23 杭州巨星工具有限公司 Powerful plier
CN212223614U (en) * 2020-04-30 2020-12-25 上海浦江缆索股份有限公司 A positioning device for cable sheath installation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1070722A (en) * 1978-01-09 1980-01-29 Dale J. Hackbarth Adjustable clamp
US5076552A (en) * 1990-04-27 1991-12-31 Brian Challis Adjustable vise
US6578837B1 (en) * 1997-07-23 2003-06-17 Wolfcraft Gmbh Clamping tool, especially a clamping clip, clamping rod or clamping bench
WO2015192365A1 (en) * 2014-06-20 2015-12-23 杭州巨星工具有限公司 Powerful plier
CN212223614U (en) * 2020-04-30 2020-12-25 上海浦江缆索股份有限公司 A positioning device for cable sheath installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113789721A (en) * 2021-09-14 2021-12-14 上海浦江缆索股份有限公司 An installation structure and installation method for a guide strip of a stay cable
CN113789721B (en) * 2021-09-14 2023-05-02 上海浦江缆索股份有限公司 Stay cable guide bar installation structure and installation method

Similar Documents

Publication Publication Date Title
US6439344B1 (en) Concrete mounted safety stanchion and apparatus and methods for mounting to concrete
US6173809B1 (en) Safety stanchions
CN212223614U (en) A positioning device for cable sheath installation
CN111560849A (en) A positioning device for cable sheath installation
CN110492384A (en) A kind of disengaging extra-high voltage strain rod tower insulator chain supplementary insulation bar
US20070187555A1 (en) Securing elements to pipes or tubes
CN210767802U (en) Scaffold fixing device
WO2008073398A1 (en) Securing system
CN103078284A (en) Rapid working clamp of pre-hanging type power distribution line de-icing engaged line
CN210707820U (en) Hatch coaming bracing structure
CN213742671U (en) Building guardrail for civil engineering
US11525762B2 (en) Material testing system having improved hydraulic wedge clips
CN106451230A (en) Vibration-proofing hammer electric installation tool
CN100517892C (en) Tools for replacing metal fittings of transmission lines
CN112097727B (en) A sensor installation fixture and installation method for deformation test of high-speed train skirt
US20250102082A1 (en) Damper clamp
CN108253926A (en) A kind of installation pedestal of strain gauge
RU2544337C1 (en) Railway overhead catenary bracket
CN210318832U (en) Suspender reinforcing device
CN212849757U (en) Support for bus duct
CN210508622U (en) a transmission tower
CN221609505U (en) Hanging die device capable of being movably spliced
FI102332B (en) Cable suspension support
JP2000102152A (en) Vernier metal fitting and method of adjusting slackness of aerial transmission line using the same
CN219286080U (en) 1553B bus cable for aerospace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination