CN111444650A - 一种大跨度网架屋盖结构整体提升施工方法 - Google Patents
一种大跨度网架屋盖结构整体提升施工方法 Download PDFInfo
- Publication number
- CN111444650A CN111444650A CN202010217293.4A CN202010217293A CN111444650A CN 111444650 A CN111444650 A CN 111444650A CN 202010217293 A CN202010217293 A CN 202010217293A CN 111444650 A CN111444650 A CN 111444650A
- Authority
- CN
- China
- Prior art keywords
- lifting
- construction
- roof structure
- net rack
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种大跨度网架屋盖结构整体提升施工方法,属于屋盖结构施工技术领域。本发明的步骤为:步骤1:拟定方案;步骤2:应用Midas/Gen有限元分析软件分别对各个提升区域进行提升阶段的施工模拟分析以及整个区域提升阶段的施工模拟分析;步骤3:根据步骤2的确定的施工方案进行屋盖网架结构拼装;步骤4:在各个提升区域设置提升平台和提升吊点;步骤5:张拉钢绞线使其均匀受力;步骤6:分级加载同步提升网架屋盖结构至距设计标高100‑200mm处;步骤7:进行液压提升系统逐级卸载,将荷载转移至两侧支承立柱上后,拆除提升设备和临时加固结构,完成结构整体提升。本发明采用网架屋盖结构分段拼装后整体提升,施工速率高,安全可靠。
Description
技术领域
本发明涉及屋盖结构施工技术领域,更具体地说,涉及一种大跨度网架屋盖结构整体提升施工方法。
背景技术
随着当代科学技术水平的提高,大跨度钢结构越来越多的应用于现实生活中,如大型体育馆,剧院等。作为大跨度钢结构的一种,网架屋盖网架结构也越来越多的应用在车站、港口等大型工程中。而目前大跨度钢结构常用的施工安装方法主要有两类:一类是在高空设计安装位置直接拼装或高空拼装后滑移到设计位置,如高空散装法、高空滑移法等;另一类是在地面先拼装然后再一步步安装到设计位置,如分段吊装法。这些方法工序复杂,施工效率低,安全防护措施要求高,不经济。
发明内容
1、要解决的问题
针对现有技术存在的缺陷与不足,本发明提供了一种大跨度网架屋盖结构整体提升施工方法,施工方法采用网架屋盖结构分段拼装后整体提升,施工速率高,安全可靠。
2、技术方案
为达到上述目的,本发明提供的技术方案为:
一种大跨度网架屋盖结构整体提升施工方法,其步骤为:
步骤1:拟定方案,根据屋盖组成形式划分提升区域和提升阶段,进行提升点构造设计;
步骤2:应用Midas/Gen有限元分析软件分别对各个提升区域进行提升阶段的施工模拟分析以及整个区域提升阶段的施工模拟分析,包括分析结构应力比、变形是否符合要求,同时验算提升点的设计是否合理;然后应用Midas/Gen有限元分析软件对整个网架屋盖结构提升全过程进行有限元分析,分析提升全过程中网架结构最大竖向位移与杆件应力是否符合规范要求,从而验证方案的可行性,确定施工方案;
步骤3:根据步骤2的确定的施工方案进行屋盖网架结构拼装,拼装过程采用正投影原位拼装,拼装顺序按照划分的提升区域依次由中间区域向四周区域进行,直至拼装成一完整屋盖结构;
步骤4:在各个提升区域设置提升平台和提升吊点,安装液压同步提升设备、钢绞线等,设置临时加固结构,在提升区域结构与提升点对应位置安装临时吊具,并与提升点通过专用的地锚和钢绞线连接;
步骤5:张拉钢绞线使其均匀受力,并检查提升结构与提升器具是否满足设计要求,同时调试液压同步提升系统;
步骤6:分级加载同步提升网架屋盖结构至距设计标高100-200mm处,停止提升,测量各提升吊点的位置,并与设计安装位置进行对比核验,利用液压同步提升系统对各吊点进行竖直方向微调,使各吊点均达到设计位置,然后进行后装杆件安装;
步骤7:进行液压提升系统逐级卸载,将荷载转移至两侧支承立柱上后,拆除提升设备和临时加固结构,完成结构整体提升。
更进一步的,所述步骤1中的提升点构造设计依据各个提升点的实际支承及受力情况进行设计,包括:提升器型号、提升器数量、钢绞线数量等。
更进一步的,所述步骤2中的提升过程有限元分析还包括对提升平台、提升吊具、临时加固结构等承载力和稳定性验算。
更进一步的,所述步骤3中的提升平台设置于网架结构两侧固定支承柱上;所述提升吊点设置于提升平台上。
3、有益效果
相比于现有技术,本发明的有益效果为:
本发明的一种大跨度网架屋盖结构整体提升施工方法,采用将网架屋架结构进行地面分区拼装,整体一次性提升,提高了施工速率,降低了施工成本,同时运用有限元分析软件对提升过程中杆件及结构的应力与变形等状态进行施工模拟分析,保障了施工安全,可行性大大提高,便于施工。
附图说明
图1是本发明的施工流程图。
具体实施方式
下面结合具体实施例和附图对本发明进一步进行描述:
实施例1
本实施例的一种大跨度网架屋盖结构整体提升施工方法,其步骤为:
步骤1:拟定方案,根据屋盖组成形式划分提升区域和提升阶段,进行提升点构造设计;
步骤2:应用Midas/Gen有限元分析软件分别对各个提升区域进行提升阶段的施工模拟分析以及整个区域提升阶段的施工模拟分析,包括分析结构应力比、变形是否符合要求,同时验算提升点的设计是否合理;然后应用Midas/Gen有限元分析软件对整个网架屋盖结构提升全过程进行有限元分析,分析提升全过程中网架结构最大竖向位移与杆件应力是否符合规范要求,从而验证方案的可行性,确定施工方案;
步骤3:根据步骤2的确定的施工方案进行屋盖网架结构拼装,拼装过程采用正投影原位拼装,拼装顺序按照划分的提升区域依次由中间区域向四周区域进行,直至拼装成一完整屋盖结构;
步骤4:在各个提升区域设置提升平台和提升吊点,安装液压同步提升设备、钢绞线等,设置临时加固结构,在提升区域结构与提升点对应位置安装临时吊具,并与提升点通过专用的地锚和钢绞线连接;
步骤5:张拉钢绞线使其均匀受力,并检查提升结构与提升器具是否满足设计要求,同时调试液压同步提升系统;
步骤6:分级加载同步提升网架屋盖结构至距设计标高100-200mm处,停止提升,测量各提升吊点的位置,并与设计安装位置进行对比核验,利用液压同步提升系统对各吊点进行竖直方向微调,使各吊点均达到设计位置,然后进行后装杆件安装;
步骤7:进行液压提升系统逐级卸载,将荷载转移至两侧支承立柱上后,拆除提升设备和临时加固结构,完成结构整体提升。
所述步骤1中的提升点构造设计依据各个提升点的实际支承及受力情况进行设计,包括:提升器型号、提升器数量、钢绞线数量等。
所述步骤2中的提升过程有限元分析还包括对提升平台、提升吊具、临时加固结构等承载力和稳定性验算。
所述步骤3中的提升平台设置于网架结构两侧固定支承柱上;所述提升吊点设置于提升平台上。
本发明采用将网架屋架结构进行地面分区拼装,整体一次性提升,提高了施工速率,降低了施工成本,同时运用有限元分析软件对提升过程中杆件及结构的应力与变形等状态进行施工模拟分析,保障了施工安全,可行性大大提高,便于施工。
以上示意性的对本发明及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本发明的实施方式之一,实际的方法并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本发明创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本发明的保护范围。
Claims (4)
1.一种大跨度网架屋盖结构整体提升施工方法,其特征在于:其步骤为:
步骤1:拟定方案,根据屋盖组成形式划分提升区域和提升阶段,进行提升点构造设计;
步骤2:应用Midas/Gen有限元分析软件分别对各个提升区域进行提升阶段的施工模拟分析以及整个区域提升阶段的施工模拟分析,包括分析结构应力比、变形是否符合要求,同时验算提升点的设计是否合理;然后应用Midas/Gen有限元分析软件对整个网架屋盖结构提升全过程进行有限元分析,分析提升全过程中网架结构最大竖向位移与杆件应力是否符合规范要求,从而验证方案的可行性,确定施工方案;
步骤3:根据步骤2的确定的施工方案进行屋盖网架结构拼装,拼装过程采用正投影原位拼装,拼装顺序按照划分的提升区域依次由中间区域向四周区域进行,直至拼装成一完整屋盖结构;
步骤4:在各个提升区域设置提升平台和提升吊点,安装液压同步提升设备、钢绞线等,设置临时加固结构,在提升区域结构与提升点对应位置安装临时吊具,并与提升点通过专用的地锚和钢绞线连接;
步骤5:张拉钢绞线使其均匀受力,并检查提升结构与提升器具是否满足设计要求,同时调试液压同步提升系统;
步骤6:分级加载同步提升网架屋盖结构至距设计标高100-200mm处,停止提升,测量各提升吊点的位置,并与设计安装位置进行对比核验,利用液压同步提升系统对各吊点进行竖直方向微调,使各吊点均达到设计位置,然后进行后装杆件安装;
步骤7:进行液压提升系统逐级卸载,将荷载转移至两侧支承立柱上后,拆除提升设备和临时加固结构,完成结构整体提升。
2.根据权利要求1所述的一种大跨度网架屋盖结构整体提升施工方法,其特征在于:所述步骤1中的提升点构造设计依据各个提升点的实际支承及受力情况进行设计,包括:提升器型号、提升器数量、钢绞线数量等。
3.根据权利要求1所述的一种大跨度网架屋盖结构整体提升施工方法,其特征在于:所述步骤2中的提升过程有限元分析还包括对提升平台、提升吊具、临时加固结构等承载力和稳定性验算。
4.根据权利要求1所述的一种大跨度网架屋盖结构整体提升施工方法,其特征在于:所述步骤3中的提升平台设置于网架结构两侧固定支承柱上;所述提升吊点设置于提升平台上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010217293.4A CN111444650B (zh) | 2020-03-25 | 2020-03-25 | 一种大跨度网架屋盖结构整体提升施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010217293.4A CN111444650B (zh) | 2020-03-25 | 2020-03-25 | 一种大跨度网架屋盖结构整体提升施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111444650A true CN111444650A (zh) | 2020-07-24 |
CN111444650B CN111444650B (zh) | 2023-01-24 |
Family
ID=71650964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010217293.4A Active CN111444650B (zh) | 2020-03-25 | 2020-03-25 | 一种大跨度网架屋盖结构整体提升施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111444650B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112374344A (zh) * | 2020-10-29 | 2021-02-19 | 上海宝冶冶金工程有限公司 | 钢厂大型煤气柜柜顶安装方法 |
CN112554345A (zh) * | 2020-11-27 | 2021-03-26 | 中国二冶集团有限公司 | 一种大跨度焊接球网架地面拼装整体提升工法 |
CN113268904A (zh) * | 2021-05-08 | 2021-08-17 | 中铁建工集团有限公司 | 单层平板网壳屋盖结构逆作建设全周期的风险控制方法 |
CN113737957A (zh) * | 2021-09-13 | 2021-12-03 | 中铁十八局集团有限公司 | 一种大跨度机库的施工方法 |
CN113738124A (zh) * | 2021-10-14 | 2021-12-03 | 中铁六局集团有限公司 | 一种大跨度钢结构网架提升施工工法 |
CN113944273A (zh) * | 2021-10-28 | 2022-01-18 | 江苏沪宁钢机股份有限公司 | 一种单层平板网壳屋盖结构的逆作施工方法 |
CN114858379A (zh) * | 2022-04-01 | 2022-08-05 | 中铁二十局集团第二工程有限公司 | 一种增强金属屋面板抗风揭能力的方法 |
CN114996831A (zh) * | 2022-08-04 | 2022-09-02 | 北京建工集团有限责任公司 | 大跨度悬垂脊线双曲反拱斜交网格结构的精益建造方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103696494A (zh) * | 2013-12-11 | 2014-04-02 | 中冶天工上海十三冶建设有限公司 | 复杂空间桁架结构的计算机控制液压同步提升施工方法 |
CN105064697A (zh) * | 2015-07-15 | 2015-11-18 | 安徽跨宇钢结构网架工程有限公司 | 屋面网架提升方法 |
CN106812328A (zh) * | 2015-11-27 | 2017-06-09 | 天津三建建筑工程有限公司 | 带吊挂层的张弦预应力钢结构网架整体二步提升施工方法 |
-
2020
- 2020-03-25 CN CN202010217293.4A patent/CN111444650B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103696494A (zh) * | 2013-12-11 | 2014-04-02 | 中冶天工上海十三冶建设有限公司 | 复杂空间桁架结构的计算机控制液压同步提升施工方法 |
CN105064697A (zh) * | 2015-07-15 | 2015-11-18 | 安徽跨宇钢结构网架工程有限公司 | 屋面网架提升方法 |
CN106812328A (zh) * | 2015-11-27 | 2017-06-09 | 天津三建建筑工程有限公司 | 带吊挂层的张弦预应力钢结构网架整体二步提升施工方法 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112374344A (zh) * | 2020-10-29 | 2021-02-19 | 上海宝冶冶金工程有限公司 | 钢厂大型煤气柜柜顶安装方法 |
CN112554345A (zh) * | 2020-11-27 | 2021-03-26 | 中国二冶集团有限公司 | 一种大跨度焊接球网架地面拼装整体提升工法 |
CN113268904A (zh) * | 2021-05-08 | 2021-08-17 | 中铁建工集团有限公司 | 单层平板网壳屋盖结构逆作建设全周期的风险控制方法 |
CN113268904B (zh) * | 2021-05-08 | 2022-04-01 | 中铁建工集团有限公司 | 单层平板网壳屋盖结构逆作建设全周期的风险控制方法 |
CN113737957A (zh) * | 2021-09-13 | 2021-12-03 | 中铁十八局集团有限公司 | 一种大跨度机库的施工方法 |
CN113738124A (zh) * | 2021-10-14 | 2021-12-03 | 中铁六局集团有限公司 | 一种大跨度钢结构网架提升施工工法 |
CN113944273A (zh) * | 2021-10-28 | 2022-01-18 | 江苏沪宁钢机股份有限公司 | 一种单层平板网壳屋盖结构的逆作施工方法 |
CN114858379A (zh) * | 2022-04-01 | 2022-08-05 | 中铁二十局集团第二工程有限公司 | 一种增强金属屋面板抗风揭能力的方法 |
CN114996831A (zh) * | 2022-08-04 | 2022-09-02 | 北京建工集团有限责任公司 | 大跨度悬垂脊线双曲反拱斜交网格结构的精益建造方法 |
CN114996831B (zh) * | 2022-08-04 | 2022-11-25 | 北京建工集团有限责任公司 | 大跨度悬垂脊线双曲反拱斜交网格结构的精益建造方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111444650B (zh) | 2023-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111444650B (zh) | 一种大跨度网架屋盖结构整体提升施工方法 | |
CN101200916B (zh) | 一种预应力悬挂式建筑结构的施工方法 | |
CN102777043B (zh) | 一种拱形结构“零变形”状态提升施工方法 | |
CN110409837A (zh) | 一种大跨度双层钢网壳屋盖分单元吊装施工方法 | |
CN106337501A (zh) | 一种拱形网壳倒装提升安装方法 | |
CN104863362A (zh) | 设置拱形钢网格胎架滑移安装的拱形筒状网壳施工工艺 | |
CN110374200A (zh) | 大跨度刚度不均匀混合网架高空散装方法 | |
CN109138452A (zh) | 大型建筑螺栓球钢管网架整体快速提升施工工艺 | |
CN103352576A (zh) | 中/小跨度钢结构屋面网架外扩拼装转换提升方法 | |
WO2021120335A1 (zh) | 一种大跨度不等高双向曲面网架的累积提升方法 | |
CN111382538A (zh) | 一种球形网架悬挂拼装整体提升施工方法 | |
CN109208915A (zh) | 一种冷却塔系统与钢连廊整体提升施工方法 | |
CN109812021A (zh) | 一种大跨度焊接球网架的安装方法 | |
CN114837483B (zh) | 一种高低跨门式钢架建筑结构及其施工工艺 | |
CN111779274A (zh) | 一种大跨度不等高钢结构网架整体提升临时吊点施工方法 | |
CN117569586A (zh) | 一种不规则多曲三角锥焊接球网架施工方法 | |
CN105781126B (zh) | 一种张弦结构被动建立预应力施工方法 | |
CN114941433B (zh) | 一种大重量船型采光顶钢结构的施工方法 | |
CN116181079B (zh) | 重型钢桁架与大直径铝合金网壳结构整体提升装置及方法 | |
CN111428410A (zh) | 一种基于bim的大跨度网架结构施工方法 | |
CN116415329A (zh) | 一种大跨度钢结构交叉环形管桁架卸载方法 | |
CN117569609A (zh) | 一种用于大跨度张弦梁整体吊装施工方法 | |
CN114215366B (zh) | 一种大跨拱形屋盖密吊点提升施工方法 | |
CN116791760A (zh) | 一种大跨度多曲面单层相贯圆管网壳的施工方法 | |
CN115749298A (zh) | 一种高铁站房主体钢结构施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |