CN111395813A - Conventional Hospital and Infectious Disease Hospital, Combination Hospital with Pandemic and Epidemic and Construction Method - Google Patents

Conventional Hospital and Infectious Disease Hospital, Combination Hospital with Pandemic and Epidemic and Construction Method Download PDF

Info

Publication number
CN111395813A
CN111395813A CN202010206587.7A CN202010206587A CN111395813A CN 111395813 A CN111395813 A CN 111395813A CN 202010206587 A CN202010206587 A CN 202010206587A CN 111395813 A CN111395813 A CN 111395813A
Authority
CN
China
Prior art keywords
hospital
corridor
ward
area
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010206587.7A
Other languages
Chinese (zh)
Inventor
王平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202010206587.7A priority Critical patent/CN111395813A/en
Publication of CN111395813A publication Critical patent/CN111395813A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/08Hospitals, infirmaries, or the like; Schools; Prisons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/16Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against adverse conditions, e.g. extreme climate, pests

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Pest Control & Pesticides (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Accommodation For Nursing Or Treatment Tables (AREA)

Abstract

A tie epidemic combining hospital of a conventional hospital and an infectious disease hospital and a construction method thereof relate to the field of buildings. This general hospital and infectious disease hospital tie epidemic prevention combine hospital include at least one deck floor structure, every floor structure all includes at least one and nurses the office area, a plurality of wards and at least one inboard corridor, at least one inboard corridor is used for communicateing and nurses office area and each ward, every ward all communicates the ward between the parcel, the ward is separated by the vertical partition wall of taking the door even window between the ward and the parcel that corresponds, separate through the horizontal partition wall of detachable assembled between the ward between each parcel, make each inter-parcel ward and at least one ward communicate each other and form the contamination zone outside corridor after each assembled horizontal partition wall is demolishd. The general hospital and infectious disease hospital tie-epidemic hospital and the construction method thereof can be efficiently switched between the general hospital and the infectious disease hospital to receive and treat general patients at ordinary times and infectious disease patients at infectious disease period.

Description

常规医院与传染病医院平疫结合医院及其建造方法Conventional Hospital and Infectious Disease Hospital, Combination Hospital with Pandemic and Epidemic and Construction Method

技术领域technical field

本申请涉及建筑领域,具体而言,涉及一种常规医院与传染病医院平疫结合医院及其建造方法。The present application relates to the field of construction, in particular, to a conventional hospital and an infectious disease hospital combined with an epidemiological and epidemic prevention hospital and a construction method thereof.

背景技术Background technique

在常规医院的设计和建造过程中,不可能、也没有事先考虑在疫情发生时,如何将常规医院向传染病医院转换进行技术、方法和材料、装配式部品部件等方面的准备,因此,常规医院的设计和建造过程中存在以下五个方面的问题。During the design and construction of conventional hospitals, it is impossible and has not considered in advance how to convert conventional hospitals into infectious disease hospitals to prepare for technology, methods, materials, prefabricated parts, etc. The following five problems exist in the design and construction of hospitals.

第一、由于传染性,从常规医院经营方面考虑,常规医院自身没有动力和动机将常规医院的科室和病房转化为传染病医院的科室和病房。First, due to contagiousness, from the perspective of conventional hospital operations, conventional hospitals have no motivation or motivation to convert the departments and wards of conventional hospitals into departments and wards of infectious disease hospitals.

第二、传统的常规医院病房两边的墙均为砖砌体和粉刷面层,没有预先安排设置待拆除的墙;并且,由于氧气输送管道、呼叫报警系统、电线等均布置在床头旁的砖砌体墙上,没有考虑疫情发生时如何便于拆除。因比,常规医院设计中根本没有考虑与传染病医院的平疫结合之间的转换;此外,砖砌体墙和粉刷面层在拆除时,会产生很多的污染和建筑垃圾及噪音,从而影响医院的使用。Second, the walls on both sides of traditional conventional hospital wards are made of bricks and stucco, and there is no pre-arranged wall to be demolished; moreover, because the oxygen delivery pipes, call alarm systems, wires, etc. are all arranged at the bedside The brick masonry walls did not consider how to facilitate demolition when the epidemic occurred. Because of this, the conventional hospital design does not consider the conversion between the combination with the infectious disease hospital; in addition, when the brick masonry walls and the stucco surface are demolished, a lot of pollution, construction waste and noise will be generated, which will affect the health of the hospital. use in hospitals.

第三、部分常规医院中根本就没有设置传染病科室和病房;设置了传染病科室和病房的部分常规医院中的传染病科室的病房占比也非常小。因此,常规医院的设计和建造过程中,不可能、也没有事先考虑在疫情发生时,如何将常规医院向传染病医院转换进行技术、方法和材料、装配式部品部件等方面的准备。Third, some conventional hospitals do not have infectious disease departments and wards at all; the proportion of infectious disease departments in some conventional hospitals with infectious disease departments and wards is also very small. Therefore, in the design and construction process of conventional hospitals, it is impossible and has not considered in advance how to convert conventional hospitals into infectious disease hospitals in preparation for technology, methods, materials, prefabricated parts, etc. when an epidemic occurs.

第四、传统的常规医院均将患者、探访者、医护人员使用的多个电梯集中设置,并设置集中多个电梯的前室和通道;常规医院中没有设置独立的医护人员专用电梯及其前室和独立的患者专用电梯及其前室,这主要是仅从成本问题考虑的结果;但是,从疫情防控方面考虑,如不进行污染区、洁净区、半洁净区的相互隔离会出现交叉感染的情况。Fourth, traditional conventional hospitals set up multiple elevators used by patients, visitors, and medical staff in a centralized manner, and set up front rooms and passages where multiple elevators are concentrated; in conventional hospitals, there is no independent elevator for medical staff and its front This is mainly due to the consideration of cost; however, from the perspective of epidemic prevention and control, if the mutual isolation of contaminated areas, clean areas and semi-clean areas is not carried out, there will be crossovers. Infection situation.

第五、传统的常规医院将医生办公室和医护站即医护办公区与病房混合和融合在一起设计,以便于医护人员为病患者服务;但在疫情发生时,如不进行污染区、洁净区、半洁净区的相互隔离,传统常规医院的医护办公区将成为传染区或污染区,将产生医患之间的传染,危险极大。Fifth, traditional conventional hospitals are designed to mix and integrate doctor offices and medical stations, that is, medical office areas and wards, so that medical staff can serve patients; Due to the isolation of semi-clean areas, the medical and nursing office areas of traditional conventional hospitals will become infectious or polluted areas, which will cause infection between doctors and patients, which is extremely dangerous.

因此,当疫情发生时,传统常规医院的设计和建造模式导致“病人等床”、“一床难求”的状况,需要在常规医院的设计和建造时,预先统筹设计和建造一种能够在传统常规医院与传染病医院之间相互转换的平战结合的医院及其建造方法,在平常时期满足常规医院正常运行的情况下,为应对突发疫情,高效实现将常规医院转换为传染病医院,以满足疫情防控的紧急需求;并在疫情结束后,再高效转换为原常规医院,保证常规医院的正常运行。Therefore, when the epidemic occurs, the design and construction mode of traditional conventional hospitals leads to the situation of "patients waiting for beds" and "one bed is hard to find". It is necessary to pre-plan the design and construction of a conventional hospital that can be A hospital combining peacetime and war between a traditional conventional hospital and an infectious disease hospital and its construction method, under the condition that the normal operation of the conventional hospital is satisfied in normal times, in order to cope with the sudden epidemic situation, the conventional hospital can be efficiently converted into an infectious disease hospital , to meet the urgent needs of epidemic prevention and control; and after the epidemic is over, it will be efficiently converted into the original conventional hospital to ensure the normal operation of the conventional hospital.

发明内容SUMMARY OF THE INVENTION

本申请的目的在于提供一种常规医院与传染病医院平疫结合医院及其建造方法,其能够在平时作为常规医院提供大量的床位对普通病患进行收治;并在传染病爆发时高效改建成专门的传染病医院以迅速收治传染病患者;在疫情结束后,再高效转换为原常规医院,保证常规的医院正常运行。The purpose of the present application is to provide a conventional hospital and an infectious disease hospital combined with an epidemiological hospital and a construction method thereof, which can provide a large number of beds as a conventional hospital to treat ordinary patients in normal times; The specialized infectious disease hospital can quickly admit and treat patients with infectious diseases; after the epidemic is over, it will be efficiently converted into the original conventional hospital to ensure the normal operation of the conventional hospital.

本申请的实施例是这样实现的:The embodiments of the present application are implemented as follows:

本申请实施例提供一种常规医院与传染病医院平疫结合医院,其包括至少一层楼面结构,每层楼面结构均包括至少一个医护办公区、多个病房及至少一条内侧走廊,至少一条内侧走廊用于连通医护办公区和各个病房,每个病房均连通有小包间病房,病房与对应的小包间病房之间由带门连窗的纵向隔断墙分隔,各个小包间病房之间通过可拆卸的装配式横向隔断墙分隔,在装配式横向隔断墙两边的竖向柱和上部水平梁上安装角钢,且将互相垂直的角钢的阴角相对设置,将装配式横向隔断墙嵌入三个角钢中并连接固定;各个装配式横向隔断墙拆除后使各个小包间病房及至少一个病房相互连通形成污染区外侧走廊。The embodiment of the present application provides a combined conventional hospital and an infectious disease hospital, which includes at least one floor structure, and each floor structure includes at least one medical office area, multiple wards, and at least one inner corridor, at least one floor structure. An inner corridor is used to connect the medical office area and each ward. Each ward is connected to a small private room. The ward and the corresponding small private room are separated by a longitudinal partition wall with a door and a window. The detachable prefabricated horizontal partition wall is separated, and angle steel is installed on the vertical columns and upper horizontal beams on both sides of the prefabricated horizontal partition wall, and the inner corners of the angle steel that are perpendicular to each other are set opposite each other, and the prefabricated horizontal partition wall is embedded in three The angle steel is connected and fixed; after each prefabricated horizontal partition wall is removed, each small private room ward and at least one ward are connected to each other to form the outer corridor of the polluted area.

在一些可选的实施例中,装配式横向隔断墙设有氧气输送管道、呼叫装置、插座、灯具及对应的开关装置。In some optional embodiments, the prefabricated transverse partition wall is provided with oxygen delivery pipes, call devices, sockets, lamps and corresponding switch devices.

在一些可选的实施例中,楼面结构还设有至少一个用预先设计和建造的特定的病房或办公室改造的装配式消洗更衣室,装配式消洗更衣室具有污水收集功能,且分别与污染区外侧走廊和至少一条内侧走廊连通。In some optional embodiments, the floor structure is further provided with at least one prefabricated cleaning and dressing room renovated with a pre-designed and built specific ward or office, the prefabricated cleaning and dressing room has a sewage collection function, and respectively Connect to the outer corridor and at least one inner corridor of the contaminated area.

在一些可选的实施例中,医护办公区与至少一个装配式消洗更衣室连通。In some optional embodiments, the medical office area is in communication with at least one prefabricated washroom.

在一些可选的实施例中,在内侧走廊预先设计和建造的特定的位置或房间中还通过可拆装的装配式隔离墙分隔形成至少一个装配式缓冲区,装配式缓冲区用于将至少一条内侧走廊分隔成内侧走廊洁净区和内侧走廊半洁净区,并将医护办公区与病房进行隔离,内侧走廊洁净区的两端分别连通医护办公区和装配式缓冲区,内侧走廊半洁净区的两端分别连通装配式缓冲区和至少一个病房。In some optional embodiments, at least one prefabricated buffer zone is formed by a detachable prefabricated partition wall in a pre-designed and constructed specific location or room in the inner corridor, and the prefabricated buffer zone is used for at least one prefabricated buffer zone. An inner corridor is divided into the inner corridor clean area and the inner corridor semi-clean area, and the medical office area is separated from the ward. Both ends of the inner corridor clean area are connected to the medical office area and the prefabricated buffer area respectively. The two ends are respectively connected to the prefabricated buffer zone and at least one ward.

在一些可选的实施例中,在楼面结构预先设计和建造的特定的房间中还设有至少一个装配式更衣缓冲室,装配式更衣缓冲室分别与内侧走廊洁净区和内侧走廊半洁净区连通。In some optional embodiments, at least one prefabricated dressing buffer room is further provided in a specific room pre-designed and constructed by the floor structure, and the prefabricated dressing buffer room is respectively connected with the clean area of the inner corridor and the semi-clean area of the inner corridor Connected.

在一些可选的实施例中,楼面结构还设有至少一个独立的医护和患者平疫结合相互转换使用的专用电梯和独立的医护和患者平疫结合相互转换使用的专用电梯的前室,独立的医护和患者平疫结合相互转换使用的专用电梯与污染区外侧走廊连通。In some optional embodiments, the floor structure is further provided with at least one dedicated elevator for use in combination with mutual conversion between medical care and patient epidemics, and a front room for an independent dedicated elevator for use in combination with mutual conversion between medical care and patient epidemics, The dedicated elevators used in combination with independent medical care and patient epidemic control are connected to the outer corridor of the polluted area.

本申请实施例还提供一种常规医院与传染病医院平疫结合医院,其包括至少一层楼面结构,每层楼面结构均包括至少一个医护办公区、多个病房及至少一条内侧走廊,至少一条内侧走廊用于连通医护办公区和各个病房,每个病房远离内侧走廊的一端两侧均与相邻的病房由可单独拆装的装配式横向隔断墙分隔;各个装配式横向隔断墙拆除后使每个病房的一部分相互连通形成污染区外侧走廊;每个病房内分别安装带门连窗的纵向隔断墙,使各个病房分别与污染区外侧走廊相连并分隔。The embodiment of the present application also provides a combined conventional hospital and an infectious disease hospital, which includes at least one floor structure, and each floor structure includes at least one medical office area, multiple wards, and at least one inner corridor, At least one inner corridor is used to connect the medical office area and each ward, and each ward is separated from the adjacent ward at one end and two sides away from the inner corridor by a separately removable prefabricated transverse partition wall; each prefabricated transverse partition wall is removed Afterwards, a part of each ward is connected to each other to form the outer corridor of the polluted area; longitudinal partition walls with doors and windows are installed in each ward respectively, so that each ward is connected to and separated from the outer corridor of the polluted area.

本申请还提供了一种常规医院与传染病医院平疫结合医院的建造方法,其是基于上述的常规医院与传染病医院平疫结合医院进行的:The present application also provides a construction method of a conventional hospital and an infectious disease hospital combined with epidemic prevention and control, which is based on the above-mentioned conventional hospital and infectious disease hospital combined with epidemic prevention and control:

正常情况下,在常规医院的病房远离内侧走廊的一侧设置小包间病房,病房与对应的小包间病房之间由带门连窗的纵向隔断墙分隔;各个小包间病房之间通过可拆卸的装配式横向隔断墙分隔,在装配式横向隔断墙两边的竖向柱和上部水平梁上安装角钢,且将互相垂直的角钢的阴角相对设置,将装配式横向隔断墙嵌入三个角钢中并连接固定;装配式横向隔断墙上预先设置了氧气输送管道、呼叫装置、插座、灯具及对应的开关装置;Under normal circumstances, small private room wards are set up on the side of the ward of a conventional hospital away from the inner corridor, and the ward and the corresponding small private room ward are separated by a longitudinal partition wall with a door and a window; The prefabricated horizontal partition wall is separated, and angle steel is installed on the vertical columns and upper horizontal beams on both sides of the prefabricated horizontal partition wall, and the inner corners of the angle steel that are perpendicular to each other are set opposite each other, and the prefabricated horizontal partition wall is embedded in the three angle steel. The connection is fixed; the prefabricated horizontal partition wall is pre-set with oxygen delivery pipes, call devices, sockets, lamps and corresponding switch devices;

在传染病疫情期间,将常规医院的各个装配式横向隔断墙拆除,使各个小包间病房及至少一个病房相互连通形成作为污染区的污染区外侧走廊;During the epidemic period of infectious diseases, dismantle each prefabricated horizontal partition wall in conventional hospitals, so that each small private room ward and at least one ward are connected to each other to form the outer corridor of the contaminated area as the contaminated area;

在传染病疫情结束后,在污染区外侧走廊中再安装装配式横向隔断墙,装配式横向隔断墙上预先设置了氧气输送管道、呼叫装置、插座、灯具及对应的开关装置,重新形成常规医院的各个小包间病房,将传染病医院污染区外侧走廊再高效转换为常规医院的多个小包间病房。After the epidemic of infectious diseases is over, a prefabricated horizontal partition wall will be installed in the corridor outside the polluted area. The prefabricated horizontal partition wall is pre-set with oxygen delivery pipes, call devices, sockets, lamps and corresponding switch devices to re-form a conventional hospital. Each small private room ward in the hospital will efficiently convert the outer corridor of the contaminated area of the infectious disease hospital into multiple small private room wards in the conventional hospital.

在一些可选的实施例中,正常情况下,在常规医院中设置至少一个独立的医护和患者相互转换使用的专用电梯及独立的医护和患者相互转换使用的专用电梯的前室,独立的医护和患者相互转换使用的专用电梯及独立的医护和患者相互转换使用的专用电梯的前室供医护人员使用;In some optional embodiments, under normal circumstances, in a conventional hospital, at least one dedicated elevator for mutual transfer between independent medical staff and patients and a front room of a dedicated elevator for independent medical care and patients are provided. The front room of the special elevator that can be used interchangeably with patients and the front room of the special elevator that can be interchanged between independent medical staff and patients is for medical staff to use;

在传染病疫情期间,独立的医护和患者相互转换使用的专用电梯和独立的医护和患者相互转换使用的专用电梯的前室供患者使用;独立的医护和患者相互转换使用的专用电梯及独立的医护和患者相互转换使用的专用电梯的前室与污染区外侧走廊连通;During the epidemic of infectious diseases, the front room of the special elevator used by independent medical care and patients and the special elevator used by independent medical care and patients is for patients to use; the special elevator used by independent medical care and patients and the independent elevator The front room of the special elevator used by medical staff and patients is connected to the outer corridor of the polluted area;

在传染病疫情期间,将至少一个预先设计和建造的特定的病房或办公室改造成装配式消洗更衣室,装配式消洗更衣室具有污水收集功能,并使装配式消洗更衣室分别与污染区外侧走廊和至少一条内侧走廊连通;在楼面结构的内侧走廊预先设计和建造的特定的位置或房间中通过可拆卸的装配式隔离墙分隔形成至少一个装配式缓冲区,装配式缓冲区用于将至少一条内侧走廊分隔成内侧走廊洁净区和内侧走廊半洁净区,内侧走廊洁净区的两端分别连通医护办公区和装配式缓冲区,内侧走廊半洁净区的两端分别连通装配式缓冲区和至少一个病房;在楼面结构预先设计和建造的特定的房间中安装至少一个装配式更衣缓冲室,使装配式更衣缓冲室分别与内侧走廊洁净区和内侧走廊半洁净区连通;安装装配式隔离门将内侧走廊和污染区外侧走廊分隔;During the epidemic of infectious diseases, transform at least one pre-designed and built specific ward or office into a prefabricated washing and changing room with sewage collection function, and make the prefabricated washing and changing room separate from the pollution The outer corridor of the area is connected with at least one inner corridor; at least one prefabricated buffer zone is formed by a detachable prefabricated partition wall in a pre-designed and constructed specific location or room of the inner corridor of the floor structure. At least one inner corridor is divided into inner corridor clean area and inner corridor semi-clean area. area and at least one ward; install at least one prefabricated dressing buffer room in a specific room pre-designed and constructed by the floor structure, so that the prefabricated dressing buffer room is connected with the clean area of the inner corridor and the semi-clean area of the inner corridor respectively; installation and assembly The type isolation door separates the inner corridor and the outer corridor of the polluted area;

在传染病疫情结束后,将装配式消洗更衣室拆除,再转换为原常规医院的病房或办公室;拆除装配式隔离墙以去除装配式缓冲区,拆除装配式隔离门,再转换为原常规医院的内侧走廊;拆除装配式更衣缓冲室,再转换为原常规医院的病房或办公室。After the epidemic of infectious diseases is over, the prefabricated washing and dressing room will be dismantled and converted into a ward or office of the original conventional hospital; the prefabricated partition wall will be dismantled to remove the prefabricated buffer zone, the prefabricated isolation door will be removed, and then converted into the original routine The inner corridor of the hospital; dismantled the prefabricated changing buffer room, and then converted it into the ward or office of the original conventional hospital.

本申请的有益效果是:本实施例提供的常规医院与传染病医院平疫结合医院及其建造方法能够在平时作为常规医院提供大量的床位对普通病患进行收治,并在传染病爆发时高效改建成专门的传染病医院以迅速收治传染病患者,在疫情结束后再高效转换为原常规医院,保证常规的医院正常运行。The beneficial effects of the present application are as follows: the conventional hospital and the infectious disease hospital combined with the epidemic prevention and epidemic prevention hospital and the construction method thereof provided by the present embodiment can provide a large number of beds as a conventional hospital to treat ordinary patients in peacetime, and can be highly efficient in the event of an infectious disease outbreak. It will be transformed into a special infectious disease hospital to quickly treat patients with infectious diseases. After the epidemic is over, it will be efficiently converted into the original conventional hospital to ensure the normal operation of the conventional hospital.

附图说明Description of drawings

为了更清楚地说明本申请实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本申请的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the embodiments of the present application more clearly, the following drawings will briefly introduce the drawings that need to be used in the embodiments. It should be understood that the following drawings only show some embodiments of the present application, and therefore do not It should be regarded as a limitation of the scope, and for those of ordinary skill in the art, other related drawings can also be obtained according to these drawings without any creative effort.

图1为本申请实施例1提供的常规医院与传染病医院平疫结合医院作为常规医院使用时的楼面结构示意图;Fig. 1 is the floor structure schematic diagram when the conventional hospital provided by the embodiment 1 of this application and the infectious disease hospital and the combined hospital for epidemic prevention and control are used as a conventional hospital;

图2为本申请实施例1提供的常规医院与传染病医院平疫结合医院作为传染病医院使用时的楼面结构示意图;Fig. 2 is the floor structure schematic diagram when the conventional hospital provided by the embodiment 1 of the present application and the infectious disease hospital and the combined hospital for epidemic prevention and control are used as the infectious disease hospital;

图3为本申请实施例提供的常规医院与传染病医院平疫结合医院中装配式横向隔断墙通过角钢与竖向柱连接的结构示意图;3 is a schematic structural diagram of the connection between a conventional hospital and an infectious disease hospital and a combined hospital for epidemic prevention and control through an angle steel and a vertical column in a conventional hospital provided by the embodiment of the present application;

图4为本申请实施例提供的常规医院与传染病医院平疫结合医院中装配式横向隔断墙通过角钢与上部水平梁连接的结构示意图;4 is a schematic structural diagram of the connection between a conventional hospital and an infectious disease hospital and an epidemiological combination hospital provided by the embodiment of the present application, and the assembled horizontal partition wall is connected to an upper horizontal beam by an angle steel;

图5为本申请实施例2提供的常规医院与传染病医院平疫结合医院作为常规医院使用时的楼面结构示意图;5 is a schematic diagram of the floor structure when the conventional hospital provided by the embodiment 2 of the present application and the infectious disease hospital combined with epidemic prevention and control are used as a conventional hospital;

图6为本申请实施例2提供的常规医院与传染病医院平疫结合医院作为传染病医院使用时的楼面结构示意图;6 is a schematic diagram of the floor structure when the conventional hospital provided by the embodiment 2 of the present application and the infectious disease hospital combined with epidemic prevention and control are used as an infectious disease hospital;

图7为本申请实施例3提供的常规医院与传染病医院平疫结合医院作为常规医院使用时的楼面结构示意图。FIG. 7 is a schematic diagram of the floor structure when the conventional hospital and the infectious disease hospital combined with epidemic prevention and epidemic disease are used as a conventional hospital provided in Example 3 of the present application.

图中:100、楼面结构;110、医护办公区;120、病房;130、内侧走廊;131、内侧走廊洁净区;132、内侧走廊半洁净区;140、污染区外侧走廊;150、装配式横向隔断墙;151、竖向柱;152、上部水平梁;153、角钢;160、小包间病房;170、装配式消洗更衣室;180、装配式隔离墙;190、装配式缓冲区;200、带门连窗的纵向隔断墙;210、装配式隔离门;220、专用电梯;230、装配式更衣缓冲室;240、前室。In the picture: 100, floor structure; 110, medical office area; 120, ward; 130, inner corridor; 131, clean area of inner corridor; 132, semi-clean area of inner corridor; 140, outer corridor of polluted area; 150, prefabricated Horizontal partition wall; 151, vertical column; 152, upper horizontal beam; 153, angle steel; 160, small private room ward; 170, prefabricated washing and dressing room; 180, prefabricated partition wall; 190, prefabricated buffer zone; 200 , Longitudinal partition wall with doors and windows; 210, prefabricated isolation door; 220, special elevator; 230, prefabricated dressing buffer room; 240, front room.

具体实施方式Detailed ways

为使本申请实施例的目的、技术方案和优点更加清楚,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本申请一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本申请实施例的组件可以以各种不同的配置来布置和设计。In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of the present application, but not all of the embodiments. The components of the embodiments of the present application generally described and illustrated in the drawings herein may be arranged and designed in a variety of different configurations.

因此,以下对在附图中提供的本申请的实施例的详细描述并非旨在限制要求保护的本申请的范围,而是仅仅表示本申请的选定实施例。基于本申请中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。Thus, the following detailed description of the embodiments of the application provided in the accompanying drawings is not intended to limit the scope of the application as claimed, but is merely representative of selected embodiments of the application. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present application.

应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters refer to like items in the following figures, so once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.

在本申请的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该申请产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。此外,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of this application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship that the product of the application is usually placed in use, and is only for the convenience of describing the application and simplifying the description, rather than indicating or implying The device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as a limitation of the present application. Furthermore, the terms "first", "second", "third", etc. are only used to differentiate the description and should not be construed as indicating or implying relative importance.

此外,术语“水平”、“竖直”、“悬垂”等术语并不表示要求部件绝对水平或悬垂,而是可以稍微倾斜。如“水平”仅仅是指其方向相对“竖直”而言更加水平,并不是表示该结构一定要完全水平,而是可以稍微倾斜。Furthermore, the terms "horizontal", "vertical", "overhanging" etc. do not imply that a component is required to be absolutely horizontal or overhang, but rather may be slightly inclined. For example, "horizontal" only means that its direction is more horizontal than "vertical", it does not mean that the structure must be completely horizontal, but can be slightly inclined.

在本申请的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本申请中的具体含义。In the description of this application, it should also be noted that, unless otherwise expressly specified and limited, the terms "arrangement", "installation", "connection" and "connection" should be interpreted in a broad sense, for example, it may be a fixed connection, It can also be a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or the internal communication between the two components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood in specific situations.

在本申请中,除非另有明确的规定和限定,第一特征在第二特征之“上”或之“下”可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征“之上”、“上方”和“上面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”包括第一特征在第二特征正下方和斜下方,或仅仅表示第一特征水平高度小于第二特征。In this application, unless otherwise expressly specified and defined, a first feature "on" or "under" a second feature may include direct contact between the first and second features, or may include the first and second features Not directly but through additional features between them. Also, the first feature being "above", "over" and "above" the second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is level higher than the second feature. The first feature is "below", "below" and "below" the second feature includes the first feature being directly below and diagonally below the second feature, or simply means that the first feature has a lower level than the second feature.

以下结合实施例对本申请的常规医院与传染病医院平疫结合医院的特征和性能作进一步的详细描述。The characteristics and performance of the conventional hospital and the infectious disease hospital combined with the general hospital and the epidemiological hospital of the present application will be described in further detail below with reference to the embodiments.

实施例1Example 1

本实施例提供了一种常规医院与传染病医院平疫结合医院,其包括十层楼面结构100。The present embodiment provides a combined conventional hospital and an infectious disease hospital and an epidemiological hospital, which includes a ten-story floor structure 100 .

图1是可高效转换为传染病医院的常规医院,其每层楼面结构100均包括一条内侧走廊130、位于内侧走廊130中部一侧的医护办公区110、十六个病房120、可高效转换为装配式消洗更衣室170的房间、可高效转换为装配式更衣缓冲室230的房间、独立的医护和患者平疫结合相互转换使用的专用电梯220、独立的医护和患者相互转换使用的专用电梯的前室240。在平常时期,独立的医护和患者平疫结合相互转换使用的专用电梯220、独立的医护和患者相互转换使用的专用电梯的前室240供医护人员单独使用。十六个病房120和医护办公区110均与内侧走廊130连通,十六个病房120分别设置于内侧走廊130的一端两侧及另一端一侧,十六个病房120远离内侧走廊130的一侧分别连通有对应的小包间病房160,病房120与对应的小包间病房160之间通过带门连窗的纵向隔断墙200分隔,相邻的小包间病房160之间通过可拆卸的装配式横向隔断墙150分隔,如图3和图4所示,在装配式横向隔断墙150两边的竖向柱151和上部水平梁152上安装角钢153,且将互相垂直的角钢153的阴角相对设置,将装配式横向隔断墙150嵌入三个角钢153中,并使装配式横向隔断墙150与三个角钢153连接固定,每个装配式横向隔断墙150均设有氧气输送管道、呼叫装置、插座、灯具及对应的开关装置;安装带门连窗的纵向隔断墙200的方法,也参照装配式横向隔断墙150的安装方法,即将带门连窗的纵向隔断墙200的两端和顶部分别用对应的角钢固定,既便于安装又便于后续拆除。1 is a conventional hospital that can be efficiently converted into an infectious disease hospital. Each floor structure 100 includes an inner corridor 130, a medical office area 110 located on the middle side of the inner corridor 130, and sixteen wards 120, which can be efficiently converted It is the room of the prefabricated cleaning changing room 170, the room that can be efficiently converted into the prefabricated changing buffer room 230, the special elevator 220 used for the mutual conversion of independent medical care and patient epidemic prevention, and the special elevator 220 used for the mutual conversion of independent medical care and patients. Front room 240 of the elevator. In normal times, the dedicated elevator 220 used by the independent medical staff and patients in combination with the epidemic, and the front room 240 of the dedicated elevator used by the independent medical staff and the patients are interchanged for the medical staff to use alone. The sixteen wards 120 and the medical office area 110 are all connected to the inner corridor 130 , the sixteen wards 120 are respectively arranged on one side of one end and one side of the other end of the inner corridor 130 , and the sixteen wards 120 are far away from the side of the inner corridor 130 . Corresponding small private room wards 160 are respectively connected, the ward 120 and the corresponding small private room ward 160 are separated by a longitudinal partition wall 200 with a door and a window, and the adjacent small private room wards 160 are separated by a detachable assembled horizontal partition The wall 150 is separated, as shown in Figure 3 and Figure 4, the angle steel 153 is installed on the vertical column 151 and the upper horizontal beam 152 on both sides of the prefabricated horizontal partition wall 150, and the inner corners of the angle steel 153 that are perpendicular to each other are set relative to each other. The prefabricated transverse partition wall 150 is embedded in the three angle steels 153, and the prefabricated transverse partition wall 150 is connected and fixed with the three angle steels 153. Each prefabricated transverse partition wall 150 is provided with oxygen transmission pipelines, call devices, sockets, lamps and lanterns. And the corresponding switch device; the method of installing the longitudinal partition wall 200 with doors and windows, also refer to the installation method of the prefabricated transverse Angle steel is fixed, which is convenient for installation and subsequent removal.

在常规医院中打破常规,预先设计和建造小包间病房160,且病房120与对应的小包间病房160之间通过带门连窗的纵向隔断墙200分隔,相邻的小包间病房160之间通过可拆卸的装配式横向隔断墙150分隔,每个装配式横向隔断墙150均设有氧气输送管道、呼叫装置、插座、灯具及对应的开关装置,是为了将常规医院高效转换为传染病医院,即把各个装配式横向隔断墙150拆除后使各个小包间病房160和三个病房120相互连通形成围绕各个病房120布置的污染区外侧走廊140。在常规医院中打破常规,预先设计和建造可高效转换为装配式消洗更衣室170的房间、可高效转换为装配式更衣缓冲室230的房间、独立的医护和患者平疫结合相互转换使用的专用电梯220、独立的医护和患者相互转换使用的专用电梯的前室240也是为了将常规医院高效转换为传染病医院。Breaking the routine in conventional hospitals, small private room wards 160 are designed and constructed in advance, and the ward 120 and the corresponding small private room ward 160 are separated by a longitudinal partition wall 200 with a door and a window, and the adjacent small private room wards 160 are separated by a longitudinal partition wall 200 . Detachable prefabricated horizontal partition walls 150 are separated, and each prefabricated horizontal partition wall 150 is provided with oxygen delivery pipes, call devices, sockets, lamps and corresponding switch devices, in order to efficiently convert conventional hospitals into infectious disease hospitals, That is, after removing each prefabricated transverse partition wall 150 , each small private room ward 160 and three wards 120 are connected to each other to form an outer corridor 140 in the polluted area arranged around each ward 120 . Break the routine in conventional hospitals, pre-design and build a room that can be efficiently converted into a prefabricated washing and dressing room 170, a room that can be efficiently converted into a prefabricated changing buffer room 230, and independent medical care and patient epidemics. The special elevator 220, the front room 240 of the special elevator used by the independent medical care and the patient is also used for efficient conversion of a conventional hospital into an infectious disease hospital.

图2是由常规医院高效转换成的传染病医院。将常规医院的内侧走廊130的中部预先设定好的位置通过可拆卸的装配式隔离墙180分隔形成两个装配式缓冲区190,两个装配式缓冲区190将内侧走廊130的中部分隔形成与医护办公区110连通的内侧走廊洁净区131,并在内侧走廊130的两端分别隔离形成与病房120连通的内侧走廊半洁净区132,内侧走廊130的两端分别通过可拆卸的装配式隔离门210与污染区外侧走廊140连通;在常规医院预先设计和建造好的房间的楼面上安装装配式消洗更衣室170,装配式消洗更衣室170同时具有污水收集功能,污水不直接排入医院的排水系统,直接收集回收送往医疗污物处理站;装配式消洗更衣室170分别与内侧走廊洁净区131、医护办公区110和污染区外侧走廊140连通;在内侧走廊130的中部预先设定好的房间中还设有可拆卸的装配式更衣缓冲室230,装配式更衣缓冲室230分别与一个装配式缓冲区190、内侧走廊洁净区131连通;独立的医护和患者平疫结合相互转换使用的专用电梯220设于楼面结构100的一端,且通过独立的医护和患者平疫结合相互转换使用的专用电梯的前室240与污染区外侧走廊140连通,当疫情发生时,该独立的医护和患者平疫结合相互转换使用的专用电梯220和独立的医护和患者平疫结合相互转换使用的专用电梯的前室240供患者单独使用;将常规医院中预先设计和建造好的各个装配式横向隔断墙150拆除后,使各个小包间病房160和各个病房120相互连通形成围绕各个病房120布置的污染区外侧走廊140,以便于运送患者、患者活动,且便于医护人员通过污染区外侧走廊140和装配式消洗更衣室170回到医护办公区110。Figure 2 is an infectious disease hospital efficiently converted from a conventional hospital. The pre-set position of the middle of the inner corridor 130 of the conventional hospital is separated by the detachable assembled partition wall 180 to form two prefabricated buffer areas 190. The two prefabricated buffer areas 190 separate the middle of the inner corridor 130 to form a The inner corridor clean area 131 connected with the medical and nursing office area 110 is isolated at both ends of the inner corridor 130 to form an inner corridor semi-clean area 132 connected with the ward 120. Both ends of the inner corridor 130 pass through detachable assembled isolation doors respectively. 210 is connected to the outer corridor 140 of the polluted area; the prefabricated cleaning and dressing room 170 is installed on the floor of the pre-designed and constructed room of the conventional hospital. The prefabricated cleaning and dressing room 170 also has the function of collecting sewage, and the sewage is not directly discharged into The drainage system of the hospital is directly collected and recycled and sent to the medical waste treatment station; the prefabricated washing and dressing rooms 170 are respectively connected with the clean area 131 of the inner corridor, the medical office area 110 and the outer corridor 140 of the polluted area; The set room is also provided with a detachable prefabricated dressing buffer room 230. The prefabricated dressing buffer room 230 is respectively connected with a prefabricated buffer area 190 and an inner corridor clean area 131; independent medical care and patient epidemic prevention are combined with each other. The dedicated elevator 220 used for conversion is set at one end of the floor structure 100, and the front room 240 of the dedicated elevator used for conversion is connected to the outer corridor 140 of the polluted area through the combination of independent medical care and patient epidemic prevention. The special elevator 220 used in the combination of medical care and patient epidemic and the front room 240 of the independent special elevator used in the combination of medical care and patient epidemic is for individual use by patients; the pre-designed and constructed assemblies in conventional hospitals After the horizontal partition wall 150 is removed, each small private room ward 160 and each ward 120 are connected to each other to form the outer corridor 140 of the contaminated area arranged around each ward 120, so as to facilitate the transportation of patients and patient activities, and facilitate the passage of medical staff through the outer corridor of the contaminated area. 140 and the prefabricated decontamination changing room 170 return to the medical office area 110 .

本实施例提供的常规医院与传染病医院平疫结合医院能够在平常时期的常规医院和疫情时期的传染病医院的功能之间进行高效转换,满足和实现以下三种需求和功能:一是平常的常规医院治疗服务功能和需求,同时,在常规医院中预先统筹设计和建造了可高效转换为传染病医院的技术工艺、装配式横向隔断墙、小包间病房、带门连窗的纵向隔断墙、独立的医护和患者平疫结合相互转换使用的专用电梯、独立的医护和患者平疫结合相互转换使用的专用电梯的前室;在常规医院预先设计和建造好可高效安装装配式消洗更衣室和装配式更衣缓冲室的房间等;二是又可在传染病疫情流行期间将常规医院高效转换为传染病医院,满足传染病疫情防控的要求,避免医护和患者的相互交叉感染,高效进行疫情防控;三是疫情结束后,还可以将传染病医院再高效转换为常规医院,满足常规医院平常时期的运行。The conventional hospital provided in this embodiment and the infectious disease hospital combined with the epidemiological hospital can perform efficient conversion between the functions of the conventional hospital in the normal period and the infectious disease hospital in the epidemic period, and meet and realize the following three needs and functions: First, the normal hospital At the same time, the technical process, prefabricated horizontal partition wall, small private room, and longitudinal partition wall with doors and windows that can be efficiently converted into infectious disease hospitals are pre-planned and constructed in conventional hospitals. , dedicated elevators that can be used interchangeably between independent medical care and patient epidemics, and the front room of dedicated elevators that are interchanged between independent medical care and patient epidemiology; pre-designed and built in conventional hospitals for efficient installation of prefabricated cleaning and changing Second, during the epidemic of infectious diseases, conventional hospitals can be efficiently converted into infectious disease hospitals to meet the requirements of infectious disease epidemic prevention and control, avoid cross-infection between medical staff and patients, and efficiently Carry out epidemic prevention and control; third, after the epidemic is over, infectious disease hospitals can be efficiently converted into conventional hospitals to meet the normal operation of conventional hospitals.

在传染病流行期需要提供传染病防控服务时,为了满足收治传染病病患者的隔离要求和确保医护人员安全的要求,需要拆除常规医院中已预先已安设好的各个装配式横向隔断墙150,使各个小包间病房160及两个山墙端部病房120连通形成污染区外侧走廊140,以便于运送患者、患者活动,且便于医护人员通过污染区外侧走廊140和装配式消洗更衣室170回到医护办公区110;在常规医院中,在预先已设定好的位置安装两个装配式隔离门210,并安装装配式隔离墙180隔离形成两个装配式缓冲区190,将装配式成品风淋、淋浴消毒房、更衣室等安装在装配式消洗更衣室170内,装配式消洗更衣室170安装在常规医院预先设计和建造好的房间的楼面上,同时具有污水收集功能,不直接排入医院的排水系统,直接收集回收送往医疗污物处理站。When it is necessary to provide infectious disease prevention and control services during the epidemic period of infectious diseases, in order to meet the requirements for isolation of patients with infectious diseases and to ensure the safety of medical staff, it is necessary to dismantle all pre-installed prefabricated horizontal partition walls in conventional hospitals. 150, connecting each small private room ward 160 and the two gable end wards 120 to form the outer corridor 140 of the contaminated area, so as to facilitate the transportation of patients and patient activities, and facilitate the medical staff to pass through the outer corridor 140 of the contaminated area and the prefabricated washing and changing room 170 Back to the medical office area 110; in a conventional hospital, two prefabricated isolation doors 210 are installed at pre-set positions, and two prefabricated buffer zones 190 are formed by installing prefabricated partition walls 180, and the prefabricated finished products The air shower, shower disinfection room, changing room, etc. are installed in the prefabricated cleaning and changing room 170. The prefabricated cleaning and changing room 170 is installed on the floor of the pre-designed and built room of the conventional hospital, and has the function of collecting sewage. It is not directly discharged into the drainage system of the hospital, but is directly collected and recycled and sent to the medical sewage treatment station.

在常规医院中,在预先已设定好的内侧走廊130的中部安装装配式更衣缓冲室230,装配式更衣缓冲室230分别与一个装配式缓冲区190、内侧走廊洁净区131连通;医护人员工作时首先从医护办公区110旁边的内侧走廊洁净区131进入装配式更衣缓冲室230穿着工作服、防护服,随后通过装配式缓冲区190进入内侧走廊半洁净区132,对各个病房120内的患者进行诊断和治疗,最后医护人员从各个病房120转入污染区外侧走廊140后进入装配式消洗更衣室170,在装配式消洗更衣室170进行风淋、淋浴消毒和更衣后返回医护办公区110;疫情发生时,常规医院中原供医护人员独立使用的独立的医护和患者平疫结合相互转换使用的专用电梯220、独立的医护和患者相互转换使用的专用电梯的前室240转换为专供患者使用,以便于将传染病患者隔离的通过污染区外侧走廊140运送至各个病房120进行安置,避免传染病患者使用普通电梯进行运送时可能产生的交叉感染,实现电梯的平疫结合的使用目的和效果。In a conventional hospital, a prefabricated dressing buffer room 230 is installed in the middle of the pre-set inner corridor 130, and the prefabricated dressing buffer room 230 is respectively connected to a prefabricated buffer 190 and the inner corridor clean area 131; medical staff work First, enter the prefabricated changing buffer room 230 from the clean area 131 of the inner corridor next to the medical office area 110 to wear work clothes and protective clothing, and then enter the semi-clean area 132 of the inner corridor through the prefabricated buffer area 190, and carry out treatment for the patients in each ward 120. Diagnosis and treatment. Finally, the medical staff are transferred from each ward 120 to the outer corridor 140 of the polluted area, and then enter the prefabricated cleaning and dressing room 170, and return to the medical and nursing office area 110 after performing air shower, shower disinfection and changing clothes in the prefabricated cleaning and changing room 170. ; When the epidemic occurs, the special elevator 220 used for the independent use of medical staff and patients during epidemic prevention in the conventional hospital, and the front room 240 of the special elevator for independent medical care and patients is converted into a special elevator for patients. It is used to facilitate the transportation of patients with infectious diseases to each ward 120 through the outer corridor 140 of the contaminated area for placement, to avoid cross-infection that may occur when patients with infectious diseases are transported by ordinary elevators, and to achieve the purpose of combining the use of elevators with epidemic prevention and control. Effect.

当疫情结束,转入平常时期提供常规医护服务时,需要拆除各个装配式隔离墙180、两个装配式缓冲区190、两个装配式隔离门210;在污染区外侧走廊140中再安装装配式横向隔断墙150,形成小包间病房160,每个装配式横向隔断墙150设置了氧气输送管道、呼叫装置、插座、灯具及对应的开关装置,将传染病医院的污染区外侧走廊140再高效转换为常规医院的小包间病房160;将装配式消洗更衣室170拆除再转换为原病房120或治疗室;将装配式缓冲区190和装配式隔离门210拆除再转换为原内侧走廊130;将装配式更衣缓冲室230拆除再转换为原办公室;将独立的医护和患者平疫结合相互转换使用的专用电梯220专供医护人员单独使用,以便于医护人员快速到达各个楼层进行工作;病房120和对应的小包间病房160之间通过可拆卸的带门连窗的纵向隔断墙200隔离,成为一个整体的大病房。When the epidemic is over and routine medical care services are provided in normal times, it is necessary to dismantle each prefabricated partition wall 180, two prefabricated buffer zones 190, and two prefabricated isolation doors 210; install prefabricated partition walls 140 in the outer corridor 140 of the polluted area. The horizontal partition wall 150 forms a small private room ward 160. Each assembled horizontal partition wall 150 is provided with oxygen delivery pipes, call devices, sockets, lamps and corresponding switch devices to efficiently convert the outer corridor 140 of the contaminated area of the infectious disease hospital. It is a small private room 160 of a conventional hospital; the prefabricated washing and dressing room 170 is removed and converted into the original ward 120 or treatment room; the prefabricated buffer zone 190 and the prefabricated isolation door 210 are removed and converted into the original inner corridor 130; The prefabricated dressing buffer room 230 is dismantled and converted into the original office; the special elevator 220, which is used in combination with independent medical care and patient epidemic prevention, is specially used by medical staff alone, so that medical staff can quickly reach each floor for work; ward 120 and Corresponding small private room wards 160 are separated by detachable longitudinal partition walls 200 with doors and windows, and become a whole large ward.

综上所述,本实施例提供的常规医院与传染病医院平疫结合医院及其建造方法能够在平时提供大量的床位供医院进行常规的病患收治工作,并在常规医院中预先统筹设计和建造了可高效转换为传染病医院的技术工艺、装配式横向隔断墙、小包间病房、带门连窗的纵向隔断墙、独立的医护和患者平疫结合相互转换使用的专用电梯、独立的医护和患者平疫结合相互转换使用的专用电梯的前室;在常规医院预先设计和建造好可高效安装装配式消洗更衣室和装配式更衣缓冲室的房间等;并在传染病爆发时通过拆除装配式横向隔断墙150和安装装配式隔离墙180,并将山墙端部的病房改造成污染区外侧走廊140的一部分,形成供患者和医护人员使用的污染区外侧走廊140;将装配式成品风淋、淋浴消毒房等安装在装配式消洗更衣室170、安装装配式隔离墙180作为装配式缓冲区190与装配式隔离门210配合形成内侧走廊洁净区131、内侧走廊半洁净区132;设置独立的医护和患者平疫结合相互转换使用的专用电梯220、独立的医护和患者平疫结合相互转换使用的专用电梯的前室240、装配式缓冲区,从而将收治的患者和医护人员进行有效的隔离,以便于对病患进行收治的同时保护医护人员的健康和生命,并为收治的病患提供污染区外侧走廊140作为活动空间活动。在传染病爆发时,上述技术方案便于对现有的常规医院设施进行高效改造,以满足传染病患者爆发式增长对快速及时收治的要求,可高效实现“病床等人”的目标。在常规医院建造时,已提前进行了平疫结合医院的技术策划、总体设计和布局、建造安排等,为高效实现常规医院向传染病医院的转换奠定了技术基础,成本低、效果好。To sum up, the conventional hospital and the infectious disease hospital combined with epidemic prevention and epidemic prevention provided by this embodiment and the construction method thereof can provide a large number of beds for the hospital to carry out routine patient admission and treatment, and pre-coordinated design and construction in the conventional hospital. Constructed technical processes that can be efficiently converted into infectious disease hospitals, prefabricated horizontal partition walls, small private wards, longitudinal partition walls with doors and windows, dedicated elevators for independent medical care and patient epidemics, and independent medical care. The front room of the special elevator used in combination with the patient's epidemic situation; the pre-designed and built room in the conventional hospital that can efficiently install the prefabricated cleaning changing room and the prefabricated changing buffer room, etc.; The prefabricated horizontal partition wall 150 and the installed prefabricated partition wall 180, and the ward at the end of the gable is transformed into a part of the outer corridor 140 of the polluted area to form the outer corridor 140 of the polluted area for patients and medical staff; The shower, shower disinfection room, etc. are installed in the prefabricated washing and dressing room 170, and the prefabricated partition wall 180 is used as the prefabricated buffer zone 190 to cooperate with the prefabricated partition door 210 to form the inner corridor clean area 131 and the inner corridor semi-clean area 132; The dedicated elevator 220 used in combination with independent medical care and patient epidemics, the front room 240 of the dedicated elevators used in combination with independent medical care and patient epidemics, and the prefabricated buffer zone, so as to effectively transport the admitted patients and medical staff. In order to protect the health and life of medical staff while admitting and treating patients, and provide the outside corridor 140 of the polluted area as an activity space for the admitted patients. In the event of an outbreak of infectious diseases, the above technical solutions facilitate the efficient transformation of existing conventional hospital facilities to meet the requirements for rapid and timely admission of infectious disease patients due to the explosive growth, and can efficiently achieve the goal of "patient beds and others". During the construction of the conventional hospital, the technical planning, overall design and layout, construction arrangement, etc. of the hospital combined with epidemic prevention and control have been carried out in advance, laying a technical foundation for the efficient realization of the conversion from conventional hospital to infectious disease hospital, with low cost and good effect.

在其他可选的实施例中,医院的层数还可以为二层~一百层,每层楼面结构100还可以包括两个或两个以上的医护办公区110,且每个医护办公区110均可以设于内侧走廊130的任意一端和任意一侧;在其他可选的实施例中,每层楼面结构100还可以包括两个或两个以上的装配式消洗更衣室170,每个装配式消洗更衣室170均可以分别与内侧走廊130、医护办公区110和污染区外侧走廊140连通。In other optional embodiments, the number of floors of the hospital may range from two to one hundred floors, and each floor structure 100 may further include two or more medical office areas 110, and each medical office area 110 can be arranged at any end and any side of the inner corridor 130; in other optional embodiments, each floor structure 100 may also include two or more prefabricated cleaning and dressing rooms 170, each Each of the prefabricated cleaning and dressing rooms 170 can be respectively communicated with the inner corridor 130 , the medical and nursing office area 110 and the outer corridor 140 in the polluted area.

实施例2Example 2

本实施例提供一种常规医院与传染病医院平疫结合医院,其包括二十五层楼面结构100;The present embodiment provides a combined conventional hospital and an infectious disease hospital, which includes a twenty-five-story floor structure 100;

图5是可高效转换为传染病医院的常规医院,其每层楼面结构100均包括两个内侧走廊130、被内侧走廊130环绕的医护办公区110、二十一个病房120、可高效转换为装配式消洗更衣室170的房间、可高效转换为装配式更衣缓冲室230的房间、独立的医护和患者平疫结合相互转换使用的专用电梯220、独立的医护和患者相互转换使用的专用电梯的前室240。在平常时期,独立的医护和患者平疫结合相互转换使用的专用电梯220、独立的医护和患者相互转换使用的专用电梯的前室240供医护人员单独使用。二十一个病房120和医护办公区110均与内侧走廊130连通,二十一个病房120分别设置于内侧走廊130的一端两侧及另一端一侧;其中二十个病房120远离内侧走廊130的一侧分别连通有对应的小包间病房160,病房120与对应的小包间病房160之间通过带门连窗的纵向隔断墙200分隔,相邻的小包间病房160之间通过可拆卸的装配式横向隔断墙150分隔,如图3和图4所示,在装配式横向隔断墙150两边的竖向柱151和上部水平梁152上安装角钢153,且将互相垂直的角钢153的阴角相对设置,将装配式横向隔断墙150嵌入三个角钢153中,并使装配式横向隔断墙150与三个角钢153连接固定,每个装配式横向隔断墙150均设有氧气输送管道、呼叫装置、插座、灯具及对应的开关装置。FIG. 5 is a conventional hospital that can be efficiently converted into an infectious disease hospital. Each floor structure 100 includes two inner corridors 130, a medical office area 110 surrounded by the inner corridors 130, and twenty-one wards 120, which can be efficiently converted. It is the room of the prefabricated cleaning changing room 170, the room that can be efficiently converted into the prefabricated changing buffer room 230, the special elevator 220 used for the mutual conversion of independent medical care and patient epidemic prevention, and the special elevator 220 used for the mutual conversion of independent medical care and patients. Front room 240 of the elevator. In normal times, the dedicated elevator 220 used by the independent medical staff and patients in combination with the epidemic, and the front room 240 of the dedicated elevator used by the independent medical staff and the patients are interchanged for the medical staff to use alone. The twenty-one wards 120 and the medical office area 110 are both connected to the inner corridor 130 , and the twenty-one wards 120 are respectively arranged on one side of one end and one side of the other end of the inner corridor 130 ; the twenty wards 120 are far away from the inner corridor 130 . One side of the ward is respectively connected with the corresponding small private room ward 160, the ward 120 and the corresponding small private room ward 160 are separated by a longitudinal partition wall 200 with a door and a window, and the adjacent small private room wards 160 are separated by detachable assembly The horizontal partition wall 150 is separated, as shown in Figures 3 and 4, the angle steel 153 is installed on the vertical columns 151 and the upper horizontal beam 152 on both sides of the assembled horizontal partition wall 150, and the inner corners of the angle steel 153 that are perpendicular to each other are opposite each other. Setting, the prefabricated transverse partition wall 150 is embedded in the three angle steels 153, and the prefabricated transverse partition wall 150 is connected and fixed with the three angle steels 153. Sockets, lamps and corresponding switchgear.

图6是由常规医院高效转换成的传染病医院。将常规医院的内侧走廊130的中部预先设定好的位置通过可拆卸的装配式隔离墙180分隔形成装配式缓冲区190,装配式缓冲区190将内侧走廊130的中部分隔形成与医护办公区110连通的内侧走廊洁净区131,并将内侧走廊130的其余部分分隔形成与病房120连通的内侧走廊半洁净区132,内侧走廊130的两端分别通过可拆卸的装配式隔离门210与污染区外侧走廊140连通;在常规医院预先设计和建造好的房间的楼面上安装装配式消洗更衣室170,装配式消洗更衣室170同时具有污水收集功能,污水不直接排入医院的排水系统,直接收集回收送往医疗污物处理站;装配式消洗更衣室170分别与内侧走廊洁净区131、医护办公区110和污染区外侧走廊140连通;在内侧走廊130的中部预先设定好的房间中还设有可拆卸的装配式更衣缓冲室230,装配式更衣缓冲室230分别与一个装配式缓冲区190、内侧走廊洁净区131连通;独立的医护和患者平疫结合相互转换使用的专用电梯220设于楼面结构100的一端,且通过独立的医护和患者平疫结合相互转换使用的专用电梯的前室240与污染区外侧走廊140连通;当疫情发生时,该独立的医护和患者平疫结合相互转换使用的专用电梯220和独立的医护和患者平疫结合相互转换使用的专用电梯的前室240供患者单独使用;将常规医院中预先设计和建造好的各个装配式横向隔断墙150拆除后,使各个小包间病房160和两个病房120相互连通形成围绕各个病房120布置的污染区外侧走廊140,以便于运送患者、患者活动,且便于医护人员通过污染区外侧走廊140和装配式消洗更衣室170回到医护办公区110。其中,安装带门连窗的纵向隔断墙200的方法,也参照装配式横向隔断墙150的安装方法,即将带门连窗的纵向隔断墙200的两端和顶部分别用对应的角钢固定,既便于安装又便于后续拆除。Figure 6 is an infectious disease hospital efficiently converted from a conventional hospital. The pre-set position of the middle of the inner corridor 130 of a conventional hospital is separated by a detachable assembled partition wall 180 to form a prefabricated buffer area 190, and the prefabricated buffer area 190 separates the middle of the inner corridor 130 from the medical office area 110. The clean area 131 of the inner corridor is connected, and the rest of the inner corridor 130 is separated to form a semi-clean area 132 of the inner corridor that communicates with the ward 120. The corridor 140 is connected; the prefabricated washing and dressing room 170 is installed on the floor of the pre-designed and constructed room of the conventional hospital. The prefabricated washing and dressing room 170 also has the function of collecting sewage, and the sewage is not directly discharged into the drainage system of the hospital. Directly collect and recycle and send it to the medical waste treatment station; the prefabricated washing and dressing room 170 is respectively connected with the clean area 131 of the inner corridor, the medical office area 110 and the outer corridor 140 of the polluted area; the pre-set room in the middle of the inner corridor 130 There is also a detachable prefabricated dressing buffer room 230, which is respectively connected with a prefabricated buffer room 190 and the clean area 131 of the inner corridor; a special elevator for independent medical care and patient epidemic control. 220 is located at one end of the floor structure 100, and is connected to the outer corridor 140 of the polluted area through the front room 240 of the special elevator used in combination with independent medical care and patient epidemic control; when an epidemic occurs, the independent medical care and patient peace The front room 240 of the special elevator 220 used in combination with epidemic prevention and the special elevator used in independent medical care and patient control and epidemic prevention is used by patients alone; the pre-designed and constructed prefabricated horizontal partition walls 150 in conventional hospitals are used in the front room 240 After dismantling, each small private room ward 160 and the two wards 120 are connected to each other to form the outer corridor 140 of the contaminated area arranged around each ward 120, so as to facilitate the transportation of patients and patient activities, and facilitate the passage of medical staff through the outer corridor 140 of the contaminated area and the assembly type. Clean the dressing room 170 and return to the medical office area 110 . Among them, the method of installing the longitudinal partition wall 200 with doors and windows also refers to the installation method of the prefabricated transverse partition wall 150, that is, the two ends and the top of the longitudinal partition wall 200 with doors and windows are respectively fixed with corresponding angle steel, not only Easy to install and easy to dismantle later.

本实施例提供的常规医院与传染病医院平疫结合医院在每层楼面结构100均设有双内廊的内侧走廊130及位于内侧走廊130的两侧的二十一个病房120,每个病房120远离内侧走廊130的一侧均连通有一个小包间病房160,相邻的小包间病房160之间通过可拆卸的装配式横向隔断墙150分隔。The conventional hospital and the infectious disease hospital provided by the present embodiment are provided with an inner corridor 130 with double inner corridors and twenty-one wards 120 located on both sides of the inner corridor 130 on each floor structure 100 . One side of the ward 120 away from the inner corridor 130 is connected with a small private room 160 , and the adjacent small private rooms 160 are separated by a detachable assembled transverse partition wall 150 .

在传染病流行期需要提供传染病防控服务时,拆除常规医院中已事先已安设好的各个装配式横向隔断墙150,使各个小包间病房160连通形成污染区外侧走廊140,安装两个装配式隔离门210,并安装装配式隔离墙180隔离形成装配式缓冲区190,将装配式成品风淋、淋浴消毒房等安装在装配式消洗更衣室170内,装配式消洗更衣室170安装在既有医院预先安排好的房间楼面上,同时具有污水收集功能,不直接排入医院的排水系统,直接收集回收送往医疗污物处理站,并使每层楼面结构100中的十八个病房120满足收治传染病病患者的隔离要求,在内侧走廊130的中部安装装配式更衣缓冲室230,装配式更衣缓冲室230分别与一个装配式缓冲区190、内侧走廊洁净区131连通;医护人员工作时首先从医护办公区110外的内侧走廊洁净区131进入装配式更衣缓冲室230穿着工作服、防护服,随后通过装配式缓冲区190进入内侧走廊半洁净区132对各个病房120内的患者进行诊断和治疗,最后医护人员从病房120转入污染区外侧走廊140后进入装配式消洗更衣室170,在装配式消洗更衣室170进行喷淋消毒和更衣后返回医护办公区110;疫情发生时,独立的医护和患者平疫结合相互转换使用的专用电梯220和独立的医护和患者平疫结合相互转换使用的专用电梯的前室240用于供传染病患者单独使用,以便于将传染病患者隔离的通过污染区外侧走廊140运送至各个病房120进行安置,避免传染病患者使用普通电梯进行运送时可能产生的交叉感染。When it is necessary to provide infectious disease prevention and control services during the epidemic period of infectious diseases, each prefabricated horizontal partition wall 150 installed in the conventional hospital is removed, so that each small private room 160 is connected to form the outer corridor 140 of the polluted area, and two The prefabricated isolation door 210 is installed, and the prefabricated partition wall 180 is installed to isolate the prefabricated buffer area 190. The prefabricated finished air shower, shower disinfection room, etc. are installed in the prefabricated cleaning and dressing room 170. The prefabricated cleaning and dressing room 170 It is installed on the pre-arranged room floor of the existing hospital, and has the function of collecting sewage. It is not directly discharged into the drainage system of the hospital, but is directly collected and recycled and sent to the medical sewage treatment station. Eighteen wards 120 meet the isolation requirements for the admission and treatment of patients with infectious diseases. A prefabricated dressing buffer room 230 is installed in the middle of the inner corridor 130, and the prefabricated dressing buffer room 230 is connected with a prefabricated buffer 190 and the inner corridor clean area 131 respectively. When working, the medical staff first enter the prefabricated changing buffer room 230 from the clean area 131 of the inner corridor outside the medical office area 110, wearing work clothes and protective clothing, and then enter the semi-clean area 132 of the inner corridor through the prefabricated buffer area 190 to each ward 120. Finally, the medical staff are transferred from the ward 120 to the outer corridor 140 of the polluted area, and then enter the prefabricated cleaning and changing room 170. After spraying disinfection and changing clothes in the prefabricated cleaning and changing room 170, they return to the medical and nursing office area 110. ; When an epidemic occurs, the special elevator 220 used by the independent medical care and the patient epidemic in combination with each other and the front room 240 of the special elevator used by the independent medical care and the patient epidemic are used for the exclusive use of infectious disease patients, so as to facilitate the use of the elevator. The isolated patients with infectious diseases are transported to each ward 120 through the outer corridor 140 of the contaminated area for placement, so as to avoid possible cross-infection when the patients with infectious diseases are transported by ordinary elevators.

当疫情结束,转入平常时期提供常规医护服务时,拆除各个装配式隔离墙180、两个装配式缓冲区190、两个装配式隔离门210,在污染区外侧走廊140中再安装装配式横向隔断墙150形成小包间病房160,从而使用二十一个病房120和对应小包间病房160收容病患进行治疗,将装配式消洗更衣室170拆除再转换为原病房120或治疗室;将装配式缓冲区190和装配式隔离门210拆除再转换为原内侧走廊130;将装配式更衣缓冲室230拆除再转换为原办公室;独立的医护和患者平疫结合相互转换使用的专用电梯220用于供医护人员单独使用,以便于医护人员快速到达各个楼层进行工作。When the epidemic is over and the routine medical care services are provided in the normal period, the prefabricated isolation walls 180, the two prefabricated buffer zones 190, and the two prefabricated isolation doors 210 are removed, and the prefabricated horizontal walls 140 are installed in the outer corridor 140 of the contaminated area. The partition wall 150 forms a small private room ward 160, so that the twenty-one wards 120 and the corresponding small private room ward 160 are used to accommodate patients for treatment, and the prefabricated washing and dressing room 170 is dismantled and converted into the original ward 120 or treatment room; The prefabricated buffer room 190 and the prefabricated isolation door 210 are removed and converted into the original inner corridor 130; the prefabricated changing buffer room 230 is removed and converted into the original office; the dedicated elevator 220 used in combination with independent medical care and patient epidemics is used for For medical staff to use alone, so that medical staff can quickly reach each floor for work.

在其他可选的实施例中,医院的层数还可以为二层~一百层,每层楼面结构100还可以包括两个或两个以上的医护办公区110,且每个医护办公区110均可以设于内侧走廊130的任意一端和任意一侧;在其他可选的实施例中,每层楼面结构100还可以包括两个或两个以上的装配式消洗更衣室170,每个装配式消洗更衣室170均可以分别与内侧走廊130、医护办公区110和污染区外侧走廊140连通。In other optional embodiments, the number of floors of the hospital may range from two to one hundred floors, and each floor structure 100 may further include two or more medical office areas 110, and each medical office area 110 can be arranged at any end and any side of the inner corridor 130; in other optional embodiments, each floor structure 100 may also include two or more prefabricated cleaning and dressing rooms 170, each Each of the prefabricated cleaning and dressing rooms 170 can be respectively communicated with the inner corridor 130 , the medical and nursing office area 110 and the outer corridor 140 in the polluted area.

实施例3Example 3

本申请提供了一种常规医院与传染病医院平疫结合医院及其建造方法,其与实施例1提供的常规医院与传染病医院平疫结合医院及其建造方法大致相同,区别在于,本实施例中,如图7所示,在常规医院中沿常规医院的外纵向墙并不设置小包间病房160,不设置带门连窗的纵向隔断墙200,而是将病房120作为一个整体大病房,病房120远离内侧走廊130一边的两侧横向墙采用预制的装配式横向隔断墙150,在装配式横向隔断墙150两边的竖向柱151和上部水平梁152上安装角钢153,且将互相垂直的角钢153的阴角相对设置,将装配式横向隔断墙150嵌入三个角钢153中,并使装配式横向隔断墙150与三个角钢153连接固定,并在装配式横向隔断墙150上事先设置了氧气输送管道、呼叫系统、开关、插座、灯具等,装配式横向隔断墙150远离内侧走廊130的一端为窗台和窗户即医院的外纵向墙;当疫情发生时,如图2所示,在常规医院中的每个病房120内均安装带门连窗的纵向隔断墙200,同时拆除各个装配式横向隔断墙150,即可以将各个病房120的一端相互连通形成污染区外侧走廊140,并使各个病房120通过带门连窗的纵向隔断墙200与污染区外侧走廊140相连并分隔。The present application provides a combined conventional hospital and an infectious disease hospital and a construction method thereof, which is substantially the same as the conventional hospital and an infectious disease hospital combined with a pandemic and a construction method provided in Example 1. The difference is that this implementation In an example, as shown in FIG. 7 , in a conventional hospital, the small private room 160 is not provided along the outer longitudinal wall of the conventional hospital, and the longitudinal partition wall 200 with doors and windows is not provided, but the ward 120 is regarded as a whole large ward. , the lateral walls on both sides of the ward 120 away from the inner corridor 130 are prefabricated horizontal partition walls 150, and angle steel 153 is installed on the vertical columns 151 and the upper horizontal beams 152 on both sides of the prefabricated horizontal partition wall 150, and will be perpendicular to each other. The inner corners of the angle steels 153 are set opposite to each other, the prefabricated transverse partition wall 150 is embedded in the three angle steels 153, and the prefabricated transverse partition wall 150 is connected and fixed with the three angle steels 153, and the prefabricated transverse partition wall 150 is set in advance Oxygen delivery pipelines, call systems, switches, sockets, lamps, etc. are installed, and the end of the fabricated horizontal partition wall 150 away from the inner corridor 130 is the window sill and the window, that is, the outer longitudinal wall of the hospital; when an epidemic occurs, as shown in Figure 2, in the A longitudinal partition wall 200 with doors and windows is installed in each ward 120 in a conventional hospital, and each prefabricated horizontal partition wall 150 is removed at the same time, that is, one end of each ward 120 can be connected to each other to form the outer corridor 140 of the polluted area, and make the Each ward 120 is connected to and separated from the outer corridor 140 of the polluted area through a longitudinal partition wall 200 with doors and windows.

此外,本实施例1、实施例2和实施例3提供的常规医院与传染病医院平疫结合医院中,每层楼面结构100还分别设有与内侧走廊连通的至少一个办公室,至少一个休息室、至少一个卫生间、至少一个公共电梯、至少一个楼梯及其他常规医院的建筑结构,由于其均是本领域的公知常识且并不是本申请相对于现有技术的改进,因此在上述实施例1、实施例2和实施例3中并未赘述。In addition, in the combined conventional hospital and infectious disease hospital provided by the present embodiment 1, embodiment 2 and embodiment 3, each floor structure 100 is further provided with at least one office communicating with the inner corridor, at least one resting room, at least one toilet, at least one public elevator, at least one staircase and other building structures of conventional hospitals, since they are all common knowledge in the field and are not improvements of the present application relative to the prior art, therefore in the above-mentioned embodiment 1 , Embodiment 2 and Embodiment 3 are not repeated.

以上所描述的实施例是本申请一部分实施例,而不是全部的实施例。本申请的实施例的详细描述并非旨在限制要求保护的本申请的范围,而是仅仅表示本申请的选定实施例。基于本申请中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。The above-described embodiments are some, but not all, embodiments of the present application. The detailed descriptions of the embodiments of the application are not intended to limit the scope of the application as claimed, but are merely representative of selected embodiments of the application. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present application.

Claims (10)

1. A level epidemic combined hospital of routine hospital and infectious disease hospital, it includes at least one floor structure, each floor structure includes at least one medical care office area, multiple wards and at least one inboard corridor, at least one said inboard corridor is used for connecting said medical care office area and each said ward, characterized by that, each said ward communicates with the ward of small package, said ward and said small package ward of corresponding are separated by the longitudinal partition wall with door link window, separate through the horizontal partition wall of detachable assembled type between each said small package ward, mount the angle steel on vertical column and upper horizontal beam on both sides of the horizontal partition wall of said assembled type, and set up the reentrant corner of the angle steel that is perpendicular to each other relatively, imbed the horizontal partition wall of said assembled type into three said angle steels and connect and fix; after the assembled transverse partition walls are disassembled, the small inter-small-room wards and at least one ward are mutually communicated to form a corridor outside a pollution area.
2. The hospital according to claim 1, wherein said assembled transverse partition walls are provided with oxygen delivery pipes, calling devices, sockets, lamps and corresponding switch devices.
3. The hospital for the tie-epidemic of the conventional hospital and infectious disease hospital according to claim 1, wherein the floor structure is further provided with at least one fabricated type washing and changing room modified with a specific ward or office designed and built in advance, having a sewage collecting function, and communicating with the outside corridor and at least one of the inside corridors of the contaminated area, respectively.
4. The general hospital and infectious disease hospital tie hospital according to claim 3, wherein said healthcare office is in communication with at least one of said fitted-type disinfection and changing rooms.
5. The general hospital and infectious disease hospital combined with epidemic disease according to claim 1, wherein said internal corridor is pre-designed and constructed in a specific location or room, and is further partitioned by a detachable fabricated partition wall to form at least one fabricated buffer area, said fabricated buffer area is used to partition at least one of said internal corridor into an internal corridor clean area and an internal corridor semi-clean area and isolate said medical office area from said patient room, both ends of said internal corridor clean area are respectively communicated with said medical office area and said fabricated buffer area, and both ends of said internal corridor semi-clean area are respectively communicated with said fabricated buffer area and at least one of said patient rooms.
6. The hospital for the tie-epidemic of the conventional hospital and infectious disease hospital according to claim 5, wherein at least one fabricated changing buffer room is further provided in the specific room where the floor structure is pre-designed and built, and the fabricated changing buffer room is respectively communicated with the clean area of the inside corridor and the semi-clean area of the inside corridor.
7. The hospital for peace and epidemic prevention of general hospital and infectious disease hospital according to claim 1, wherein said floor structure is further provided with at least one front room for a dedicated elevator for independent medical care and patient peace and epidemic prevention combined use and a dedicated elevator for independent medical care and patient peace and epidemic prevention combined use, said dedicated elevator for independent medical care and patient peace and epidemic prevention combined use communicating with said corridor outside said contaminated area.
8. A level epidemic combined hospital for a conventional hospital and an infectious disease hospital is characterized by comprising at least one floor structure, wherein each floor structure comprises at least one medical office area, a plurality of wards and at least one inner corridor, the at least one inner corridor is used for communicating the medical office areas and the wards, and the level epidemic combined hospital is characterized in that two sides of one end, far away from the inner corridor, of each ward are separated from the adjacent wards by independently detachable assembled transverse partition walls, and after the assembled transverse partition walls are detached, a part of each ward is mutually communicated to form a pollution area outer corridor; and a longitudinal partition wall with a door and a window is respectively arranged in each ward, so that each ward is respectively connected with and separated from a corridor outside the pollution area.
9. A construction method of a general hospital and infectious disease hospital tie epidemic combined hospital, which is based on the general hospital and infectious disease hospital tie epidemic combined hospital provided by claim 1, is characterized in that:
under normal conditions, small-compartment wards are arranged on one side, far away from an inner side corridor, of the ward of a conventional hospital, and the ward and the corresponding small-compartment wards are separated by a longitudinal partition wall with doors and windows; the small-compartment wards are separated by a detachable assembly type transverse partition wall, angle steels are arranged on vertical columns and upper horizontal beams on two sides of the assembly type transverse partition wall, internal corners of the angle steels which are perpendicular to each other are oppositely arranged, and the assembly type transverse partition wall is embedded into the three angle steels and is fixedly connected with the three angle steels; an oxygen conveying pipeline, a calling device, a socket, a lamp and a corresponding switch device are arranged on the assembled transverse partition wall in advance;
in the infectious disease epidemic situation, each assembled transverse partition wall of a conventional hospital is dismantled, and each small inter-small-room ward and at least one ward are mutually communicated to form a corridor outside a pollution area serving as the pollution area;
after the epidemic situation of infectious diseases is over, install horizontal partition wall of assembled again in contaminated area outside corridor, set up oxygen delivery conduit, calling device, socket, lamps and lanterns and the switching device who corresponds on the horizontal partition wall of assembled in advance, reform routine hospital each the ward between the parcel, it is a plurality of that routine hospital is converted into again high-efficiently to pass through contaminated area outside corridor of infectious disease hospital ward between the parcel.
10. The construction method of the general hospital and infectious disease hospital combined with epidemic disease according to claim 9, wherein at least one of the special elevator for the independent medical care and patient interconversion and the front room of the special elevator for the independent medical care and patient interconversion is normally provided in the general hospital, and the special elevator for the independent medical care and patient interconversion and the front room of the special elevator for the independent medical care and patient interconversion are provided for the medical care personnel;
during the epidemic situation of the infectious disease, the front rooms of the special elevator and the special elevator are used for the patient; the front chamber of the special elevator which is used by the independent medical care and the patient in a mutual conversion way and the front chamber of the special elevator which is used by the independent medical care and the patient in a mutual conversion way are communicated with the corridor outside the polluted area;
transforming at least one of said pre-designed and built special ward or office into a modular washing and changing room having a sewage collection function during an epidemic of infectious disease, said modular washing and changing room being in communication with said outside corridor and at least one of said inside corridors of said contaminated area, respectively; at least one fabricated buffer area is formed in a specific position or room designed and built in advance in an inner corridor of the floor structure through a detachable fabricated partition wall, the fabricated buffer area is used for partitioning at least one inner corridor into an inner corridor clean area and an inner corridor semi-clean area, two ends of the inner corridor clean area are respectively communicated with the medical office area and the fabricated buffer area, and two ends of the inner corridor semi-clean area are respectively communicated with the fabricated buffer area and at least one ward; installing at least one fitted changing buffer in a specific location or room where said floor structure is pre-designed and built, such that said fitted changing buffer is in communication with said inboard corridor clean zone and said inboard corridor semi-clean zone, respectively; installing a fabricated isolation door separating the inside corridor from the outside corridor of the contamination zone;
after the epidemic situation of the infectious diseases is over, the assembled washing and changing room is dismantled and then is converted into the ward or the office of the original conventional hospital; dismantling the assembly type isolation wall to remove the assembly type buffer area, dismantling the assembly type isolation door, and converting the assembly type isolation door into an inner side corridor of the original conventional hospital; and the assembled dressing buffer room is dismantled and then converted into a ward or an office of the conventional hospital.
CN202010206587.7A 2020-03-23 2020-03-23 Conventional Hospital and Infectious Disease Hospital, Combination Hospital with Pandemic and Epidemic and Construction Method Pending CN111395813A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010206587.7A CN111395813A (en) 2020-03-23 2020-03-23 Conventional Hospital and Infectious Disease Hospital, Combination Hospital with Pandemic and Epidemic and Construction Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010206587.7A CN111395813A (en) 2020-03-23 2020-03-23 Conventional Hospital and Infectious Disease Hospital, Combination Hospital with Pandemic and Epidemic and Construction Method

Publications (1)

Publication Number Publication Date
CN111395813A true CN111395813A (en) 2020-07-10

Family

ID=71427414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010206587.7A Pending CN111395813A (en) 2020-03-23 2020-03-23 Conventional Hospital and Infectious Disease Hospital, Combination Hospital with Pandemic and Epidemic and Construction Method

Country Status (1)

Country Link
CN (1) CN111395813A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523359A (en) * 2020-10-23 2021-03-19 中国人民解放军总医院第三医学中心 A extensible ward for disaster relief
CN113585825A (en) * 2021-08-04 2021-11-02 中国医科大学附属第一医院 Emergency call pre-examination triage and isolation rescue shelter
WO2022062150A1 (en) * 2020-09-27 2022-03-31 浙江大学 Ward layout quickly convertible into isolation ward
CN114482642A (en) * 2022-03-24 2022-05-13 深圳市建筑设计研究总院有限公司 Novel hospital
CN115822331A (en) * 2022-11-18 2023-03-21 中国建筑西北设计研究院有限公司 Convertible ward space organization method for epidemic prevention
CN115898094A (en) * 2022-10-11 2023-04-04 广东省建工设计院有限公司 Fixed-point hospital hospitalization medical care unit structure and zero-dismantling-modification rapid epidemic-leveling conversion method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1268614A (en) * 1999-03-25 2000-10-04 石永利 Industrialized house suitable for Chinese population structure
AU2006274914A1 (en) * 2005-07-27 2007-02-08 A. Smith Gt. Bentley Ltd. Transportable medical facility
CN103015754A (en) * 2012-12-28 2013-04-03 上海建筑设计研究院有限公司 Outpatient service module
CN103669915A (en) * 2013-12-26 2014-03-26 无锡汉佳半导体科技有限公司 Modularized isolation ward
CN203905541U (en) * 2014-05-22 2014-10-29 扬州润扬物流装备有限公司 Modular building for medical field
CN104389349A (en) * 2014-11-29 2015-03-04 山东双得利建设科技有限公司 Novel house capable of being fast disassembled and assembled and assembling method thereof
CN205046706U (en) * 2015-08-07 2016-02-24 上海通璞建筑科技有限公司 Can dismantle partition wall
US20160128886A1 (en) * 2014-11-07 2016-05-12 AMoHS, Inc. Mobile Isolation and Containment Unit

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1268614A (en) * 1999-03-25 2000-10-04 石永利 Industrialized house suitable for Chinese population structure
AU2006274914A1 (en) * 2005-07-27 2007-02-08 A. Smith Gt. Bentley Ltd. Transportable medical facility
CN103015754A (en) * 2012-12-28 2013-04-03 上海建筑设计研究院有限公司 Outpatient service module
CN103669915A (en) * 2013-12-26 2014-03-26 无锡汉佳半导体科技有限公司 Modularized isolation ward
CN203905541U (en) * 2014-05-22 2014-10-29 扬州润扬物流装备有限公司 Modular building for medical field
US20160128886A1 (en) * 2014-11-07 2016-05-12 AMoHS, Inc. Mobile Isolation and Containment Unit
CN104389349A (en) * 2014-11-29 2015-03-04 山东双得利建设科技有限公司 Novel house capable of being fast disassembled and assembled and assembling method thereof
CN205046706U (en) * 2015-08-07 2016-02-24 上海通璞建筑科技有限公司 Can dismantle partition wall

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
梁维智 等: ""平战结合"医院项目设计初探—广东省第二人民医院应急备用病区的设计实践与思考", 《城市建筑》 *
王煜 等: "《感染性疾病诊断与治疗》", 31 August 2015 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022062150A1 (en) * 2020-09-27 2022-03-31 浙江大学 Ward layout quickly convertible into isolation ward
CN112523359A (en) * 2020-10-23 2021-03-19 中国人民解放军总医院第三医学中心 A extensible ward for disaster relief
CN113585825A (en) * 2021-08-04 2021-11-02 中国医科大学附属第一医院 Emergency call pre-examination triage and isolation rescue shelter
CN114482642A (en) * 2022-03-24 2022-05-13 深圳市建筑设计研究总院有限公司 Novel hospital
CN115898094A (en) * 2022-10-11 2023-04-04 广东省建工设计院有限公司 Fixed-point hospital hospitalization medical care unit structure and zero-dismantling-modification rapid epidemic-leveling conversion method thereof
CN115898094B (en) * 2022-10-11 2024-03-19 广东省建工设计院有限公司 Fixed-point hospital hospitalization medical unit structure and zero disassembly and modification quick epidemic conversion method thereof
CN115822331A (en) * 2022-11-18 2023-03-21 中国建筑西北设计研究院有限公司 Convertible ward space organization method for epidemic prevention

Similar Documents

Publication Publication Date Title
CN111395813A (en) Conventional Hospital and Infectious Disease Hospital, Combination Hospital with Pandemic and Epidemic and Construction Method
CN111395814A (en) Hospital combining peacetime and war time of conventional hospital and infectious disease hospital and construction method thereof
KR102172044B1 (en) Modular booth using modular construction method and manufacturing method thereof
JP5320902B2 (en) Infectious disease-response facility
US20190136553A1 (en) Building, in particular a hospital
Sacchetto et al. COVID-19 surge capacity solutions: our experience of converting a concert hall into a temporary hospital for mild and moderate COVID-19 patients
WO2022080589A1 (en) Field-type modular negative pressure isolation ward system, and construction method of field-type modular negative pressure isolation ward system
KR102236364B1 (en) Field type negative pressure isolation room with modulation structure and constructure method thereof
KR20220064853A (en) negative pressure isolation ward container system
CN110469162B (en) Clean factory building integral structure for medicine production and factory building operation method
JP7355552B2 (en) ward
CN215055775U (en) a modular hospital
JP4996506B2 (en) Ward compartment system in ward
JP3659580B2 (en) Buildings such as nursing care facilities
CN115822331A (en) Convertible ward space organization method for epidemic prevention
JP2896697B2 (en) Ward
JP7390829B2 (en) ward
CN114482642A (en) Novel hospital
CN212201464U (en) A CCN integral modular negative pressure isolation ward
RU2834876C1 (en) Modular intensive care unit for treating patients with infectious diseases, including covid-19
JP2003119886A (en) Barrier-free building
CN222184290U (en) An outpatient building structure for conversion from peacetime to epidemic
HK40064105A (en) Single-channel splicable modular integrated negative pressure isolation ward
JP2007177394A (en) Reconstruction method of apartment house of direct access of plurality of buildings and building reconstructed by this method
HK40043428B (en) Assembled negative pressure isolation ward

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200710

RJ01 Rejection of invention patent application after publication