CN111342464A - A system and method for checking the phase of a single bus system wiring mode unit - Google Patents
A system and method for checking the phase of a single bus system wiring mode unit Download PDFInfo
- Publication number
- CN111342464A CN111342464A CN202010318349.5A CN202010318349A CN111342464A CN 111342464 A CN111342464 A CN 111342464A CN 202010318349 A CN202010318349 A CN 202010318349A CN 111342464 A CN111342464 A CN 111342464A
- Authority
- CN
- China
- Prior art keywords
- circuit breaker
- unit
- voltage
- generator
- outlet circuit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R25/00—Arrangements for measuring phase angle between a voltage and a current or between voltages or currents
- G01R25/005—Circuits for comparing several input signals and for indicating the result of this comparison, e.g. equal, different, greater, smaller, or for passing one of the input signals as output signal
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/18—Indicating phase sequence; Indicating synchronism
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/28—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured for meshed systems
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种单母线系统接线方式机组核相的系统及方法,高压母线电压互感器安装于高压母线单元上,高压母线单元经主变间隔高压侧断路器单元及主变单元与厂变单元及发电机出口断路器单元的一端相连接,发电机出口断路器单元的另一侧与封闭母线相连接,发电机出口断路器机端电压互感器安装于封闭母线上,发电机单元与封闭母线之间软连接,励磁变与封闭母线之间软连接,主变单元的低压侧设置有主变低压侧电压互感器,该系统及方法能够实现单母线系统接线方式机组的核相,且安全性及操作性较高。
The invention discloses a system and method for unit phase core in a single bus system wiring mode. A high-voltage busbar voltage transformer is installed on a high-voltage busbar unit. The unit is connected to one end of the generator outlet circuit breaker unit, the other side of the generator outlet circuit breaker unit is connected to the closed bus, the generator outlet circuit breaker terminal voltage transformer is installed on the closed bus, and the generator unit is connected to the closed bus. The soft connection between the busbars, the soft connection between the excitation transformer and the closed busbar, the low voltage side of the main transformer unit is provided with a voltage transformer on the low voltage side of the main transformer. High performance and operability.
Description
技术领域technical field
本发明属于电力调试和电力试验技术领域,涉及一种单母线系统接线方式机组核相的系统及方法。The invention belongs to the technical field of electric power debugging and electric power testing, and relates to a system and a method for checking the phase of a unit in a single bus system wiring mode.
背景技术Background technique
单母线系统接线方式的接线特点是只有一组母线,所有电源及出线,均通过断路器和隔离开关连接在该母线上,其供电电源在发电厂是发电机或变压器,在变电站是变压器或高压进线回路。《火力发电建设工程机组调试技术规范》DL-T5294-2013明确要求整套启动过程中进行发电机同期系统定相试验,带母线零起升压试验,核查同期用TV极性,发电机变压器组与系统侧TV二次核相,从而避免机组非同期并网。但是由于单母线系统接线方式只有一条母线,造成机组在主变倒送电至厂用电以后无法再带母线进行零起升压试验,从而无法进行定相试验。The wiring feature of the single busbar system wiring method is that there is only one set of busbars, and all power sources and outgoing lines are connected to the busbar through circuit breakers and isolating switches. incoming circuit. "Technical Specifications for Commissioning of Thermal Power Generation Construction Engineering Units" DL-T5294-2013 clearly requires the phasing test of the generator synchronous system during the start-up process of the whole set, the zero-start boost test with the bus, the verification of the TV polarity used for the same period, the generator transformer set and the The system side TV secondary phase check, so as to avoid the asynchronous grid connection of the unit. However, since there is only one busbar in the single busbar system wiring mode, the unit cannot carry out the zero-start boost test with the busbar after the main transformer is reversed and sent to the factory, so the phasing test cannot be performed.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于克服上述现有技术的缺点,提供了一种单母线系统接线方式机组核相的系统及方法,该系统及方法能够实现单母线系统接线方式机组的核相,且安全性及操作性较高。The purpose of the present invention is to overcome the above-mentioned shortcomings of the prior art, and to provide a system and method for the nuclear phase of a single-bus system wiring unit, the system and method can realize the nuclear phase of a single-bus system wiring unit, and the safety and High operability.
为达到上述目的,本发明所述的单母线系统接线方式机组核相的系统包括高压母线电压互感器、高压母线单元、主变间隔高压侧断路器单元、主变单元、发电机出口断路器单元、厂变单元、封闭母线、励磁变、发电机单元及若干发电机出口断路器机端电压互感器;In order to achieve the above purpose, the single-bus system wiring mode unit core phase system of the present invention includes a high-voltage busbar voltage transformer, a high-voltage busbar unit, a main transformer bay high-voltage side circuit breaker unit, a main transformer unit, and a generator outlet circuit breaker unit. , Factory transformer unit, closed busbar, excitation transformer, generator unit and terminal voltage transformer of some generator outlet circuit breakers;
高压母线电压互感器安装于高压母线单元上,高压母线单元经主变间隔高压侧断路器单元及主变单元与厂变单元及发电机出口断路器单元的一端相连接,发电机出口断路器单元的另一侧与封闭母线相连接,发电机出口断路器机端电压互感器安装于封闭母线上,发电机单元与封闭母线之间软连接,励磁变与封闭母线之间软连接,主变单元的低压侧设置有主变低压侧电压互感器。The high-voltage busbar voltage transformer is installed on the high-voltage busbar unit. The high-voltage busbar unit is connected to the factory transformer unit and one end of the generator outlet circuit breaker unit through the main transformer bay high-voltage side circuit breaker unit and the main transformer unit. The generator outlet circuit breaker unit The other side is connected to the closed busbar, the generator outlet circuit breaker terminal voltage transformer is installed on the closed busbar, the generator unit and the closed busbar are softly connected, the excitation transformer and the closed busbar are softly connected, and the main transformer unit is softly connected. The low-voltage side of the main transformer is provided with a voltage transformer on the low-voltage side of the main transformer.
主变间隔高压侧断路器单元包括主变间隔断路器母线侧接地刀闸、主变间隔断路器母线侧隔离刀闸、主变间隔断路器主变侧接地刀闸、主变间隔断路器主变侧隔离刀闸及主变间隔断路器。The main transformer bay high voltage side circuit breaker unit includes the main transformer bay circuit breaker bus side grounding switch, the main transformer bay circuit breaker bus side isolating switch, the main transformer bay circuit breaker main transformer side grounding switch, the main transformer bay circuit breaker main transformer Side isolation knife switch and main transformer interval circuit breaker.
发电机出口断路器单元包括发电机出口断路器主变侧接地刀闸、发电机出口断路器发电机侧接地刀闸、发电机出口断路器隔离刀闸及发电机出口断路器。The generator outlet circuit breaker unit includes the main transformer side grounding switch of the generator outlet circuit breaker, the generator side grounding switch of the generator outlet circuit breaker, the generator outlet circuit breaker isolation switch and the generator outlet circuit breaker.
本发明所述的单母线系统接线方式机组核相的方法包括以下步骤:The method for checking the phase of a single-bus system wiring unit according to the present invention comprises the following steps:
1)高压母线单元受电,主变单元及厂变单元受电,检查高压母线电压互感器及主变低压侧电压互感器二次电压的幅值、相序、压差及相角差;1) The high-voltage busbar unit is powered, the main transformer unit and the factory transformer unit are powered, and the amplitude, phase sequence, pressure difference and phase angle difference of the secondary voltage of the high-voltage busbar voltage transformer and the voltage transformer on the low-voltage side of the main transformer are checked;
2)进行机组核相试验的准备工作;2) Preparations for the nuclear phase test of the unit;
3)断开发电机单元的引出线与封闭母线之间的软连接,并确保断开点存在设定的安全距离;3) Disconnect the soft connection between the lead wire of the generator unit and the closed bus, and ensure that the disconnection point has a set safety distance;
4)断开励磁变的高压侧与封闭母线的软连接,并确保断开点存在设定的安全距离;4) Disconnect the soft connection between the high voltage side of the excitation transformer and the closed bus, and ensure that the disconnection point has a set safety distance;
5)检查确认发电机出口断路器机端电压互感器的一次保险及二次保险并已推至运行位置;5) Check to confirm that the primary insurance and secondary insurance of the voltage transformer of the generator outlet circuit breaker have been pushed to the running position;
6)接通发电机出口断路器及储能电源,发电机出口断路器发电机侧接地刀闸,闭合发电机出口断路器隔离刀闸;6) Turn on the generator outlet circuit breaker and energy storage power supply, turn on the generator side grounding switch of the generator outlet circuit breaker, and close the generator outlet circuit breaker isolation switch;
7)投入机组同期装置的直流控制电源,在DCS同期控制面板中选择同期装置投入指令,观察同期装置的压差及频差是否指示为零,整步表是否指示在同步位置处,再发出同频增速信号,然后退出同期装置,测量发电机出口断路器机端电压互感器的二次电压值、相序及开口三角电压值;当同期装置的压差及频差检测指示正确,且发电机出口断路器机端电压互感器的二次电压值、相序及开口三角电压值均正确无误,则转至步骤9),否则,则转至步骤8);7) Turn on the DC control power of the synchronizing device of the unit, select the input command of the synchronizing device in the DCS synchronizing control panel, observe whether the pressure difference and frequency difference of the synchronizing device indicate zero, and whether the whole step table indicates the synchronous position, and then send out the synchronization device. Frequency increase signal, then exit the synchronization device, measure the secondary voltage value, phase sequence and open triangle voltage value of the voltage transformer of the generator outlet circuit breaker terminal; when the pressure difference and frequency difference detection indications of the synchronization device are correct, and the power generation If the secondary voltage value, phase sequence and open delta voltage value of the voltage transformer at the machine end of the circuit breaker at the machine outlet are all correct, go to step 9), otherwise, go to step 8);
8)断开发电机出口断路器隔离刀闸,断开发电机出口断路器及储能电源,闭合发电机出口断路器发电机侧接地刀闸,使得发电机出口断路器单元及发电机出口断路器机端电压互感器失电,再查找并消除异常缺陷后返回步骤3);8) Disconnect the isolation switch of the generator outlet circuit breaker, disconnect the generator outlet circuit breaker and the energy storage power supply, and close the generator side grounding switch of the generator outlet circuit breaker, so that the generator outlet circuit breaker unit and the generator outlet circuit breaker operate. The terminal voltage transformer is de-energized, and then return to step 3) after finding and eliminating abnormal defects;
9)断开发电机出口断路器隔离刀闸,断开发电机出口断路器及储能电源,闭合发电机出口断路器发电机侧接地刀闸;9) Disconnect the isolation switch of the generator outlet circuit breaker, disconnect the generator outlet circuit breaker and energy storage power supply, and close the generator side grounding switch of the generator outlet circuit breaker;
10)恢复发电机单元引出线与封闭母线的软连接,恢复励磁变与封闭母线的软连接;10) Restore the flexible connection between the lead wire of the generator unit and the closed bus, and restore the flexible connection between the excitation transformer and the closed bus;
11)单母线系统接线方式机组的核相结束。11) The nuclear phase of the unit in the single bus system wiring mode ends.
步骤2)的具体操作为:The specific operations of step 2) are:
检查确认发电机出口断路器处于分闸位置,发电机出口断路器隔离刀闸处于分闸位置,发电机出口断路器发电机侧接地刀闸处于合闸位置。Check and confirm that the generator outlet circuit breaker is in the open position, the isolation switch of the generator outlet circuit breaker is in the open position, and the generator side grounding switch of the generator outlet circuit breaker is in the closed position.
本发明具有以下有益效果:The present invention has the following beneficial effects:
本发明所述的单母线系统接线方式机组核相的系统及方法在具体操作时,先断开发电机单元及励磁变与封闭母线的软连接,确保发电机单元及励磁变不会返送电,再采用高压母线单元作为电压源,对主变低压侧电压互感器及发电机出口断路器机端电压互感器进行同源核相,解决了单母线接线系统方式机组在厂用受电后无法进行带母线零起升压试验和同期系统定相试验的问题,并且能够快速、准确识别出电压互感器接线缺陷、共箱母线安装缺陷和变压器接线方式缺陷,杜绝因非同期并网造成的发电机断轴事故,安全性及可靠性较高。In the specific operation of the system and method for the core phase of the unit in the single bus system wiring mode, the soft connection between the generator unit and the excitation transformer and the closed bus is first disconnected, so as to ensure that the generator unit and the excitation transformer will not return electricity, and then The high-voltage busbar unit is used as the voltage source, and the same source phase is performed on the voltage transformer on the low-voltage side of the main transformer and the voltage transformer at the generator end of the circuit breaker at the generator outlet. It can quickly and accurately identify the problems of voltage transformer wiring defects, common box bus installation defects and transformer wiring method defects, and prevent generator shaft breakage caused by asynchronous grid connection. Accident, safety and reliability are high.
附图说明Description of drawings
图1为本发明的结构示意图;Fig. 1 is the structural representation of the present invention;
图2为本发明的流程图。Figure 2 is a flow chart of the present invention.
其中,1为高压母线单元、2为高压母线电压互感器、3为主变间隔高压侧断路器单元、4为主变单元、5为主变低压侧电压互感器、6为发电机出口断路器单元、8为封闭母线、10为励磁变、7为发电机出口断路器机端电压互感器、9为发电机单元。Among them, 1 is the high-voltage busbar unit, 2 is the high-voltage busbar voltage transformer, 3 is the main transformer interval high-voltage side circuit breaker unit, 4 is the main transformer unit, 5 is the main transformer low-voltage side voltage transformer, and 6 is the generator outlet circuit breaker Unit, 8 is the closed bus, 10 is the excitation transformer, 7 is the generator outlet circuit breaker terminal voltage transformer, and 9 is the generator unit.
具体实施方式Detailed ways
下面结合附图对本发明做进一步详细描述:Below in conjunction with accompanying drawing, the present invention is described in further detail:
参考图1,本发明所述的单母线系统接线方式机组核相的系统包括高压母线电压互感器2、高压母线单元1、主变间隔高压侧断路器单元3、主变单元4、发电机出口断路器单元6、厂变单元、封闭母线8、励磁变10、发电机单元9及若干发电机出口断路器机端电压互感器7;高压母线电压互感器2安装于高压母线单元1上,高压母线单元1经主变间隔高压侧断路器单元3及主变单元4与厂变单元及发电机出口断路器单元6的一端相连接,发电机出口断路器单元6的另一侧与封闭母线8相连接,发电机出口断路器机端电压互感器7安装于封闭母线8上,发电机单元9与封闭母线8之间软连接,励磁变10与封闭母线8之间软连接,主变单元4的低压侧设置有主变低压侧电压互感器5。Referring to FIG. 1 , the single bus system wiring mode unit core phase system according to the present invention includes a high voltage
主变间隔高压侧断路器单元3包括主变间隔断路器母线侧接地刀闸、主变间隔断路器母线侧隔离刀闸、主变间隔断路器主变侧接地刀闸、主变间隔断路器主变侧隔离刀闸及主变间隔断路器;发电机出口断路器单元6包括发电机出口断路器主变侧接地刀闸、发电机出口断路器发电机侧接地刀闸、发电机出口断路器隔离刀闸及发电机出口断路器。The main transformer bay high-voltage side
参考图2,本发明所述的单母线系统接线方式机组核相的方法包括以下步骤:Referring to Fig. 2, the method for the core phase of the single bus system wiring mode unit according to the present invention comprises the following steps:
1)高压母线单元1受电,主变单元4及厂变单元受电,检查并确保高压母线电压互感器2及主变低压侧电压互感器5的二次电压的幅值、相序、压差及相角差均无误,再由外部线路对高压母线单元1供电,再经过主变单元4及厂变单元降压后倒送至厂用段,以提供机组启动时所需要的厂用负荷,将主变间隔高压侧断路器单元3中主变间隔断路器母线侧接地刀闸处于分位,将主变间隔断路器母线侧隔离刀闸处于合位,将主变间隔断路器主变侧接地刀闸处于分位,将主变间隔断路器主变侧隔离刀闸处于合位,将主变间隔断路器处于合位,将发电机出口断路器单元6的发电机出口断路器发电机侧接地刀闸处于分位。1) The high-voltage busbar unit 1 receives power, the
2)进行机组核相试验的准备工作;2) Preparations for the nuclear phase test of the unit;
3)接通发电机出口断路器单元6的发电机出口断路器及储能电源,启动发电机出口断路器单元6的发电机侧接地刀闸的控制电源,启动发电机出口断路器单元6的发电机出口断路器隔离刀闸的控制电源,分开发电机出口断路器单元6的发电机出口断路器发电机侧接地刀闸,闭合发电机出口断路器单元6的发电机出口断路器隔离刀闸,闭合发电机出口断路器单元6的发电机出口断路器,然后再断开发电机出口断路器单元6的发电机出口断路器发电机侧接地刀闸的控制电源,断开发电机出口断路器单元6,的发电机出口断路器隔离刀闸的控制电源;3) Turn on the generator outlet circuit breaker and the energy storage power supply of the generator outlet
4)投入机组同期装置的直流控制电源,在DCS同期控制面板中选择同期装置投入指令,待同期装置的压差及频差指示为零,整步表指示在同步位置后,发出同频增速信号,检查完毕,退出同期装置;4) Turn on the DC control power of the synchronous device of the unit, select the input command of the synchronous device in the DCS synchronous control panel, wait for the pressure difference and frequency difference of the synchronous device to indicate zero, and after the whole step table indicates the synchronization position, send out the same frequency speed increase Signal, after checking, exit the synchronization device;
使用相位表对同期装置的系统侧电压和发电机机端电压同时进行测试,确认二次电压频差是否为零,相角差是否小于3°,同相之间压差是否小于5V,使用相位表测量发电机出口断路器机端电压互感器7的二次电压值、相序及开口三角电压值,当同期装置的压差及频差检测指示正确,并且发电机出口断路器机端电压互感器7的二次电压值、相序及开口三角电压值均正确无误时,则转至步骤6),否则,则转至步骤5);Use the phase meter to test the system side voltage of the synchronization device and the generator terminal voltage at the same time to confirm whether the frequency difference of the secondary voltage is zero, whether the phase angle difference is less than 3°, and whether the voltage difference between the same phases is less than 5V. Use the phase meter Measure the secondary voltage value, phase sequence and open triangle voltage value of the
5)接通发电机出口断路器单元6的发电机出口断路器发电机侧接地刀闸的控制电源,接通发电机出口断路器单元6的发电机出口断路器隔离刀闸的控制电源,分开发电机出口断路器单元6的发电机出口断路器,分开发电机出口断路器单元6的发电机出口断路器隔离刀闸,闭合发电机出口断路器单元6的发电机出口断路器发电机侧接地刀闸,使得发电机出口断路器单元6的发电机出口断路器及发电机出口断路器机端电压互感器7失电,再查找并消除异常单元缺陷后返回步骤3);5) Turn on the control power supply of the generator side grounding switch of the generator outlet
6)合上发电机出口断路器单元6的发电机出口断路器发电机侧接地刀闸的控制电源,合上发电机出口断路器单元6的发电机出口断路器隔离刀闸的控制电源,拉开发电机出口断路器单元6的发电机出口断路器,拉开发电机出口断路器单元6的发电机出口断路器发电机侧接地刀闸,合上发电机出口断路器单元6的发电机出口断路器发电机侧接地刀闸,断开发电机出口断路器及储能电源,断开发电机出口断路器单元6的发电机出口断路器发电机侧接地刀闸的控制电源,断开发电机出口断路器单元6的发电机出口断路器隔离刀闸的控制电源。6) Close the control power supply of the generator side grounding switch of the generator outlet
7)恢复发电机单元9的引出线与封闭母线8的软连接,恢复励磁变10与封闭母线8的软连接。7) Restore the soft connection between the lead wire of the generator unit 9 and the
8)单母线系统接线方式机组的核相结束。8) The nuclear phase of the unit in the single bus system wiring mode ends.
步骤2)的具体操作过程为:The specific operation process of step 2) is:
201)检查确认发电机出口断路器单元6中发电机出口断路器处于分闸位置,发电机出口断路器隔离开关处于分闸位置,发电机出口断路器发电机侧接地刀闸处于合闸位置。201) Check and confirm that the generator outlet circuit breaker in the generator outlet
202将发电机单元9的引出线与封闭母线8的软连接断开,并且确保断开点有足够的安全距离。202 Disconnect the lead wire of the generator unit 9 from the soft connection of the
203)将励磁变10的高压侧与封闭母线8的软连接断开,并且确保断开点有足够的安全距离。203) Disconnect the soft connection between the high voltage side of the
204)检查确认发电机出口断路器机端电压互感器7的一次、二次保险完好并已推至运行位置。204) Check to confirm that the primary and secondary fuses of the
本发明以单母线系统接线方式机组的核相方法,也可以对其他类似系统接线方式机组的进行核相,例如四角形接线(无母线系统)。The present invention adopts the phase verification method of the unit in the single bus system wiring mode, and can also perform phase verification on the unit in the wiring mode of other similar systems, such as quadrangle wiring (without busbar system).
以上所述,仅是本发明的较佳实施例,并非对本发明作任何限制,凡是根据本发明技术实质对以上实施例所作的任何简单修改、变更以及等效结构变化,均仍属于本发明技术方案的保护范围内。The above are only preferred embodiments of the present invention and do not limit the present invention. Any simple modifications, changes and equivalent structural changes made to the above embodiments according to the technical essence of the present invention still belong to the technology of the present invention. within the scope of the program.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010318349.5A CN111342464B (en) | 2020-04-21 | 2020-04-21 | A system and method for checking the phase of a single bus system wiring mode unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010318349.5A CN111342464B (en) | 2020-04-21 | 2020-04-21 | A system and method for checking the phase of a single bus system wiring mode unit |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111342464A true CN111342464A (en) | 2020-06-26 |
CN111342464B CN111342464B (en) | 2021-12-10 |
Family
ID=71187796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010318349.5A Active CN111342464B (en) | 2020-04-21 | 2020-04-21 | A system and method for checking the phase of a single bus system wiring mode unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111342464B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111624488A (en) * | 2020-06-29 | 2020-09-04 | 西安热工研究院有限公司 | Generator-transformer unit differential protection polarity test system and method |
CN111934353A (en) * | 2020-07-03 | 2020-11-13 | 华电电力科学研究院有限公司 | Method for obtaining false synchronization grid-connected signals of unit and optimizing synchronization grid-connected signals based on different wiring modes |
CN112134278A (en) * | 2020-09-25 | 2020-12-25 | 龙滩水电开发有限公司龙滩水力发电厂 | Emergency operation method for restarting generator after fault of generator outlet circuit breaker |
CN113189411A (en) * | 2021-02-04 | 2021-07-30 | 华能(天津)煤气化发电有限公司 | Phase checking method for synchronous voltage loop of generator set with outlet circuit breaker |
CN113708414A (en) * | 2021-07-29 | 2021-11-26 | 中国能源建设集团华东电力试验研究院有限公司 | Automatic quasi-synchronization grid connection inspection system and inspection method for generator transformer bank |
CN114137328A (en) * | 2021-11-29 | 2022-03-04 | 西安热工研究院有限公司 | Synchronous phasing method based on three-half wiring system |
CN114252710A (en) * | 2021-09-18 | 2022-03-29 | 华电电力科学研究院有限公司 | Method for homologous nuclear phase of unit grid-connected synchronous system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2286636C1 (en) * | 2005-07-29 | 2006-10-27 | Государственное образовательное учреждение высшего профессионального образования Томский политехнический университет | Device for selective protection against ground faults in stator winding of generators operating in enlarged unit |
CN101776735A (en) * | 2009-12-10 | 2010-07-14 | 贵州电力试验研究院 | Generator-transformer unit high-voltage side PT reversed feeding test method |
CN108228976A (en) * | 2017-12-14 | 2018-06-29 | 山东电力工程咨询院有限公司 | The modeling method of typical power plant Allocation of Lightning Arrester and Insulation Coordination |
EP3487059A1 (en) * | 2017-11-20 | 2019-05-22 | Solaredge Technologies Ltd. | Providing positional awareness information and increasing power quality of parallel connected inverters |
CN110007229A (en) * | 2019-04-24 | 2019-07-12 | 南京泰润电力工程有限公司 | A kind of synchronous generator determines phase inspection method |
CN110504712A (en) * | 2019-08-21 | 2019-11-26 | 西安热工研究院有限公司 | A gas-fired power plant π-type homologous nuclear phase system and method |
CN110514911A (en) * | 2019-08-28 | 2019-11-29 | 西安热工研究院有限公司 | System and method for nuclear phase of high-voltage bus power supply in power plant |
CN110854924A (en) * | 2019-11-04 | 2020-02-28 | 中国能源建设集团华东电力试验研究院有限公司 | One-time voltage-on synchronous phase-checking linkage switching inspection system and inspection method for electrical system |
-
2020
- 2020-04-21 CN CN202010318349.5A patent/CN111342464B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2286636C1 (en) * | 2005-07-29 | 2006-10-27 | Государственное образовательное учреждение высшего профессионального образования Томский политехнический университет | Device for selective protection against ground faults in stator winding of generators operating in enlarged unit |
CN101776735A (en) * | 2009-12-10 | 2010-07-14 | 贵州电力试验研究院 | Generator-transformer unit high-voltage side PT reversed feeding test method |
EP3487059A1 (en) * | 2017-11-20 | 2019-05-22 | Solaredge Technologies Ltd. | Providing positional awareness information and increasing power quality of parallel connected inverters |
CN108228976A (en) * | 2017-12-14 | 2018-06-29 | 山东电力工程咨询院有限公司 | The modeling method of typical power plant Allocation of Lightning Arrester and Insulation Coordination |
CN110007229A (en) * | 2019-04-24 | 2019-07-12 | 南京泰润电力工程有限公司 | A kind of synchronous generator determines phase inspection method |
CN110504712A (en) * | 2019-08-21 | 2019-11-26 | 西安热工研究院有限公司 | A gas-fired power plant π-type homologous nuclear phase system and method |
CN110514911A (en) * | 2019-08-28 | 2019-11-29 | 西安热工研究院有限公司 | System and method for nuclear phase of high-voltage bus power supply in power plant |
CN110854924A (en) * | 2019-11-04 | 2020-02-28 | 中国能源建设集团华东电力试验研究院有限公司 | One-time voltage-on synchronous phase-checking linkage switching inspection system and inspection method for electrical system |
Non-Patent Citations (1)
Title |
---|
苏文博: "关于发电机组启动时核相方法的研究", 《电力建设》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111624488A (en) * | 2020-06-29 | 2020-09-04 | 西安热工研究院有限公司 | Generator-transformer unit differential protection polarity test system and method |
CN111934353A (en) * | 2020-07-03 | 2020-11-13 | 华电电力科学研究院有限公司 | Method for obtaining false synchronization grid-connected signals of unit and optimizing synchronization grid-connected signals based on different wiring modes |
CN111934353B (en) * | 2020-07-03 | 2022-07-05 | 华电电力科学研究院有限公司 | Method for obtaining false synchronization grid-connected signals of unit and optimizing synchronization grid-connected signals |
CN112134278A (en) * | 2020-09-25 | 2020-12-25 | 龙滩水电开发有限公司龙滩水力发电厂 | Emergency operation method for restarting generator after fault of generator outlet circuit breaker |
CN112134278B (en) * | 2020-09-25 | 2024-04-09 | 龙滩水电开发有限公司龙滩水力发电厂 | Emergency operation method for restarting motor based on fault of generator outlet breaker |
CN113189411A (en) * | 2021-02-04 | 2021-07-30 | 华能(天津)煤气化发电有限公司 | Phase checking method for synchronous voltage loop of generator set with outlet circuit breaker |
CN113708414A (en) * | 2021-07-29 | 2021-11-26 | 中国能源建设集团华东电力试验研究院有限公司 | Automatic quasi-synchronization grid connection inspection system and inspection method for generator transformer bank |
CN114252710A (en) * | 2021-09-18 | 2022-03-29 | 华电电力科学研究院有限公司 | Method for homologous nuclear phase of unit grid-connected synchronous system |
CN114252710B (en) * | 2021-09-18 | 2023-08-18 | 华电电力科学研究院有限公司 | Method for unit grid-connected synchronous system homologous nuclear phase |
CN114137328A (en) * | 2021-11-29 | 2022-03-04 | 西安热工研究院有限公司 | Synchronous phasing method based on three-half wiring system |
CN114137328B (en) * | 2021-11-29 | 2023-12-22 | 西安热工研究院有限公司 | Synchronous phasing method based on three-half wiring system |
Also Published As
Publication number | Publication date |
---|---|
CN111342464B (en) | 2021-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111342464A (en) | A system and method for checking the phase of a single bus system wiring mode unit | |
CN110854925B (en) | One-time voltage-on synchronous nuclear phase inspection system and inspection method for electrical system | |
CN110514911B (en) | A system and method for nuclear phase of high voltage busbar power supply in power plant | |
CN110504712A (en) | A gas-fired power plant π-type homologous nuclear phase system and method | |
CN110854924B (en) | One-time voltage-on synchronous phase-checking linkage switching inspection system and inspection method for electrical system | |
CN108092312B (en) | Temporary complete set of starting system under unfinished matched output engineering | |
CN207440195U (en) | A kind of multi-functional energizing test platform | |
CN113189411A (en) | Phase checking method for synchronous voltage loop of generator set with outlet circuit breaker | |
CN111913060B (en) | Verification system and method for checking differential protection polarity through main transformer inverted power transmission on load | |
CN109683106A (en) | Different capabilities surge generator is grid-connected to provide the short-circuit test system of power supply | |
CN108089144B (en) | Electronic Current Transformer Field Verification System and Method | |
CN113162040B (en) | A system and method for non-voltage nuclear phase of high-voltage utility power supply in power plant | |
CN111624426B (en) | System and method for verifying bus differential protection polarity in double-bus system wiring mode | |
CN109088444A (en) | A kind of optimization method of direct current receiving end phase modifier non-whole phase protection action performance | |
CN113708414A (en) | Automatic quasi-synchronization grid connection inspection system and inspection method for generator transformer bank | |
CN111641193A (en) | Self-adaptive double-bus failure protection method and device | |
CN110112788A (en) | A kind of power plant synchronization system adjustment method | |
CN114137328B (en) | Synchronous phasing method based on three-half wiring system | |
CN210898551U (en) | One-time pressure-on synchronous nuclear phase inspection system for electrical system | |
CN113156340A (en) | Calibration system and method for PT switching secondary circuit of double-bus wiring mode system | |
CN104198952A (en) | Reliability validation method of 6.6KV mobile emergency power source of nuclear power station | |
CN111521888B (en) | High-voltage station bus power supply phase checking system and method | |
CN209748180U (en) | Electric power system backup power supply bus protection transformation system | |
CN108279345B (en) | Power substation power transmission testing device | |
CN117031171B (en) | A method for testing relay protection equipment polarity without actual load simulation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |