A prefabricated heat-insulating steel bar processing plant and its construction method Download PDFInfo
- Publication number
- CN111335679A CN111335679A CN202010314322.9A CN202010314322A CN111335679A CN 111335679 A CN111335679 A CN 111335679A CN 202010314322 A CN202010314322 A CN 202010314322A CN 111335679 A CN111335679 A CN 111335679A
- Authority
- CN
- China
- Prior art keywords
- tarpaulin
- layer
- column
- steel bar
- bar processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/58—Connections for building structures in general of bar-shaped building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Electromagnetism (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Tents Or Canopies (AREA)
Abstract
Description
技术领域technical field
本发明属于建筑工程技术领域,特别涉及一种装配式隔热型钢筋加工厂及其建造方法。The invention belongs to the technical field of construction engineering, and particularly relates to a prefabricated heat-insulating steel bar processing plant and a construction method thereof.
背景技术Background technique
钢筋是一种硬度比较大,而且有一定韧性的钢材,钢筋是现在建筑行业几乎必用到的材料;在大型建设项目中经常需要大量不同长度的钢筋,为了在规定的期限内完成工程,加快工程进度,工程人员会在现场建设一个钢筋加工厂,用于钢筋的集中加工。Steel bar is a kind of steel with relatively high hardness and certain toughness. Steel bar is almost a must-use material in the construction industry now; a large number of steel bars of different lengths are often required in large-scale construction projects. In order to complete the project within the specified time limit, speed up the project As the progress progresses, engineers will build a steel bar processing plant on site for centralized processing of steel bars.
钢筋加工厂提供了钢筋从原材料存放到钢筋成品和配送的一体化封闭式功能空间。传统的钢筋加工厂大多采用门式钢架、三角屋架等钢结构焊接而成,部分采用螺栓连接,屋面为单层压型钢板屋面。The rebar processing plant provides an integrated closed functional space for rebar from raw material storage to rebar finished product and distribution. Most of the traditional steel bar processing plants are welded with steel structures such as portal steel frames and triangular roof trusses, some of which are connected by bolts, and the roof is a single-laminated steel plate roof.
由于工程施工项目需要频繁转场,自建的钢筋加工厂一般仅使用2-3年,采用焊接现浇等方式建成的固定建筑,其施工工艺不适合自建钢筋加工厂的频繁流动性;每次拆除后,单层压型钢板屋面成为建筑垃圾。而且,传统的钢筋加工厂采用单层压型钢板屋顶,室内闭气、闷气、温度高,严重影响操作人员的生命安全。Due to the frequent transfer of construction projects, the self-built steel bar processing plant is generally only used for 2-3 years, and the construction process of fixed buildings built by welding and cast-in-place is not suitable for the frequent fluidity of self-built steel bar processing plants; After the first demolition, the single-laminated steel plate roof became construction waste. Moreover, the traditional steel bar processing plant uses a single-laminated steel plate roof, and the indoor air is closed, stuffy, and high temperature, which seriously affects the life safety of operators.
如申请号为201820160242.0的专利申请中,公开了一种可拆卸式钢筋加工棚,包括立柱阵列、屋架、檩条和棚顶钢板,立柱上固定有上安装板和下安装板;立柱排中相邻两个立柱之间设置有连系梁和斜撑,立柱上固定有第一L形板和第二L形板;屋架包括横梁、梁架杆、支撑和槽型板,槽型板固定在梁架杆上,檩条固定在槽型板上;檩条上通过螺栓铺设有棚顶钢板。For example, in the patent application with the application number of 201820160242.0, a detachable steel bar processing shed is disclosed, which includes a column array, a roof truss, a purlin and a roof steel plate, and an upper mounting plate and a lower mounting plate are fixed on the columns; A connecting beam and a diagonal brace are arranged between the two columns, and the first L-shaped plate and the second L-shaped plate are fixed on the column. On the frame rod, the purlins are fixed on the grooved plate; the purlins are laid with roof steel plates through bolts.
以上专利所实现的可拆卸式钢筋加工棚,棚顶采用的是单层钢板,拆除后无法重复利用,产生建筑垃圾,并且会导致室内闭气、闷气、温度高,严重影响操作人员的生命安全。The detachable steel bar processing shed realized by the above patent uses a single-layer steel plate for the roof, which cannot be reused after dismantling, resulting in construction waste, and will lead to indoor air-locking, stuffy air, and high temperature, which seriously affects the life safety of operators.
发明内容SUMMARY OF THE INVENTION
为解决上述问题,本发明的首要目的在于提供一种装配式隔热型钢筋加工厂及其建造方法,该加工厂的屋面采用双层围护,中间形成空气夹层与室外相通,能够有效隔离室内外的空气热传导,降低室内温度,增加建筑舒适度。In order to solve the above-mentioned problems, the primary purpose of the present invention is to provide a prefabricated heat-insulating steel bar processing plant and a construction method thereof. The roof of the processing plant adopts double-layer enclosures, and an air interlayer is formed in the middle to communicate with the outdoors, which can effectively isolate the indoors. External air heat conduction, reducing indoor temperature and increasing building comfort.
本发明的另一个目的在于提供一种装配式隔热型钢筋加工厂及其建造方法,方便装配以及拆卸,一次性完成后可反复利用,成本低,而且不会产生大量的建筑垃圾及工业废料,绿色环保,适用于各类钢筋加工厂的厂区建设。Another object of the present invention is to provide a prefabricated heat-insulating steel bar processing plant and a construction method thereof, which is convenient for assembly and disassembly, can be reused after one-time completion, has low cost, and does not generate a large amount of construction waste and industrial waste. , green and environmental protection, suitable for the construction of various types of steel processing plants.
为实现上述目的,本发明的技术方案如下:For achieving the above object, technical scheme of the present invention is as follows:
一种装配式隔热型钢筋加工厂,包括有底座和顶部支架,所述底座固定于地面起到支撑作用,所述顶部支架装配于底座上形成钢筋加工厂的屋面框架,所述顶部支架上安装有双层围护结构,所述双层围护结构铺设于顶部支架的上表面,且双层围护结构的中间形成空气夹层,与室外相通,能够有效隔离室内外的空气热传导,降低室内温度,增加建筑舒适度。A prefabricated heat-insulating steel bar processing plant includes a base and a top bracket, the base is fixed on the ground to play a supporting role, the top bracket is assembled on the base to form a roof frame of the steel bar processing plant, and the top bracket is mounted on the roof frame of the steel bar processing plant. A double-layered enclosure structure is installed. The double-layered enclosure is laid on the upper surface of the top bracket, and an air interlayer is formed in the middle of the double-layered enclosure. temperature, increasing building comfort.
进一步地,所述底座包括有若干立柱,所述顶部支架包括有若干斜梁,若干立柱支撑于地面上,所述立柱与斜梁之间采用连接结构进行连接,每个斜梁的两端分别通过连接结构与两个立柱进行连接。在本发明中,通过连接结构对将斜梁安装于立柱上,方便安装与拆卸。Further, the base includes a number of uprights, the top bracket includes a number of inclined beams, and the several uprights are supported on the ground, the uprights and the inclined beams are connected by a connection structure, and the two ends of each inclined beam are respectively It is connected with the two uprights through the connecting structure. In the present invention, the inclined beams are installed on the upright columns through the pair of connecting structures, which facilitates installation and disassembly.
进一步地,所述连接结构包括有柱头封板和弓字托板,所述斜梁的两端为倾斜设置,所述立柱与斜梁连接的顶部端口为斜口,且其倾斜角度与斜梁的倾斜角度相同,所述柱头封板固定设置于立柱的端口处,所述弓字托板与柱头封板相适配,且所述弓字托板的一端与柱头封板可拆卸式连接,所述弓字托板的另一端与斜梁的底部可拆卸式连接。在本发明中,斜梁为现有的标准件,其横截面为矩形,其底部为短边;事先预制立柱端口的倾斜度与斜梁的倾斜度相同,将柱头封板固定设置在立柱的端口处,此时柱头封板的倾斜度也与斜梁的倾斜度一致,利用弓字托板将立柱与斜梁的短边可拆卸式连接,受力合理,节省空间。Further, the connection structure includes a column head sealing plate and a bow-shaped support plate, the two ends of the oblique beam are inclined, and the top port connecting the column and the oblique beam is an oblique port, and its inclination angle is the same as that of the oblique beam. The inclination angle of the column head is the same, the column head sealing plate is fixedly arranged at the port of the column, the bow-shaped support plate is adapted to the column head sealing plate, and one end of the bow-shaped support plate is detachably connected with the column head sealing plate, The other end of the bow bracket is detachably connected with the bottom of the inclined beam. In the present invention, the inclined beam is an existing standard part, its cross section is rectangular, and its bottom is a short side; the inclination of the prefabricated column port is the same as the inclination of the inclined beam, and the column head sealing plate is fixedly arranged on the side of the column. At the port, the inclination of the column head sealing plate is also the same as the inclination of the inclined beam, and the short side of the column and the inclined beam is detachably connected by the bow bracket, which has a reasonable force and saves space.
进一步地,所述弓字托板包括第一连接部、第二连接部和第三连接部,所述第一连接部、第二连接部和第三连接部依次呈阶梯状相衔接,且所述第二连接部高于第一连接部和第三连接部,所述第一连接部和第三连接部的高度相同,所述第一连接部、第二连接部和第三连接部上均设置有若干个螺栓孔,所述第二连接部与斜梁的底部相连接,所述第一连接部和第三连接部均与柱头封板相连接。通过弓字托板的设置,将斜梁底部的单排螺栓排布通过第二连接部的螺栓孔与第二连接部相连接,再通过第一连接部和第三连接部与立柱的柱头封板相连接,转换为双排螺栓排布,受力合理,使得斜梁和立柱之间的连接更加稳定。Further, the bow bracket includes a first connection part, a second connection part and a third connection part, and the first connection part, the second connection part and the third connection part are connected in a step shape in sequence, and all the The second connecting part is higher than the first connecting part and the third connecting part, the heights of the first connecting part and the third connecting part are the same, and the first connecting part, the second connecting part and the third connecting part are all at the same height. Several bolt holes are provided, the second connecting part is connected with the bottom of the inclined beam, and both the first connecting part and the third connecting part are connected with the column head sealing plate. Through the setting of the bow bracket, the single row of bolts at the bottom of the inclined beam are connected to the second connecting part through the bolt holes of the second connecting part, and then the first connecting part and the third connecting part are sealed with the column head of the column. The plates are connected and converted into a double row bolt arrangement, with reasonable force, which makes the connection between the inclined beam and the column more stable.
进一步,所述斜梁内设置有焊板,所述焊板上设置有复数个螺栓头,且所述螺栓头的末端从斜梁的底部伸出,所述螺栓头与第二连接部的螺栓孔相适配。斜梁与弓字托板通过螺栓与螺母的配合可拆卸式连接。Further, a welding plate is arranged in the inclined beam, a plurality of bolt heads are arranged on the welding plate, and the end of the bolt head protrudes from the bottom of the inclined beam, and the bolt head is connected to the bolt of the second connecting part. holes to fit. The inclined beam and the bow bracket are detachably connected through the cooperation of bolts and nuts.
进一步,所述柱头封板上设置有若干个与第一连接部及第三连接部上的螺栓孔相对应的连接孔。柱头封板与弓字托板通过螺栓与螺母的配合可拆卸式连接。Further, a plurality of connecting holes corresponding to the bolt holes on the first connecting part and the third connecting part are provided on the cover plate of the column head. The column head sealing plate and the bow bracket are detachably connected through the cooperation of bolts and nuts.
进一步地,所述斜梁内还设置有斜梁套插件,且所述斜梁套插件设置的位置与弓字托板的位置相对应。所述斜梁套插件属于现有技术,将其套设在铝合金斜梁内,可增加铝合金斜梁与弓字托板的连接强度,受力合理,结构安全。Further, the oblique beam is also provided with an oblique beam sleeve insert, and the position of the oblique beam sleeve insert corresponds to the position of the bow-shaped support plate. The inclined beam sleeve insert belongs to the prior art, and is sleeved in the aluminum alloy inclined beam, which can increase the connection strength between the aluminum alloy inclined beam and the bow-shaped support plate, and has a reasonable force and a safe structure.
进一步地,所述底座还包括有数量与立柱对应的若干混凝土基础,若干混凝土基础间隔均匀的围成方形固定于地面上,若干立柱的下端分别与若干混凝土基础固定连接,从而间隔均匀的围成方形支撑于地面上;围合成方形的若干立柱包括有间隔均匀的前、后两排立柱和左、右两列立柱,前、后两排的立柱中,每两个前、后相对的立柱均固定连接有一个斜梁。在本发明中,通过上述方式固定立柱与斜梁,整体结构稳固。Further, the base also includes a number of concrete foundations corresponding to the columns, the concrete foundations are evenly spaced to form a square and fixed on the ground, and the lower ends of the columns are respectively fixedly connected to the concrete foundations, so as to be evenly spaced to form a square. The square is supported on the ground; a number of columns enclosing a square include two rows of columns at the front and the rear and two columns on the left and right with uniform spacing. The fixed connection has a diagonal beam. In the present invention, the upright column and the inclined beam are fixed in the above manner, and the overall structure is stable.
进一步地,每个斜梁上均设置有用于安装双层围护结构的安装结构,所述安装结构的上部和下部的侧边均设置有装配槽,所述双层围护结构包括有若干个两层篷布,每两个相邻的斜梁之间形成安装两层篷布的安装位,两层篷布之间形成空气夹层;两层篷布的左右两侧边缘处均设置有与装配槽相适配的卡条,位于上层的篷布通过其边缘处的卡条插入安装结构上部的装配槽中,位于下层的篷布通过其边缘处的卡条插入安装结构下部的装配槽中。在本发明中,每两个相邻的斜梁之间的安装位均铺设有两层蓬布,通过卡条将篷布的边缘处固定于装配槽内,方便安装与拆卸。Further, each inclined beam is provided with an installation structure for installing the double-layered enclosure structure, the upper and lower sides of the installation structure are provided with assembly grooves, and the double-layered enclosure structure includes several two-layer enclosures. For the tarpaulin, an installation position for installing two layers of tarpaulin is formed between every two adjacent inclined beams, and an air interlayer is formed between the two layers of tarpaulin; the left and right edges of the two layers of tarpaulin are provided with installation grooves. The tarpaulin on the upper layer is inserted into the fitting slot on the upper part of the installation structure through the clip on the edge, and the tarpaulin on the lower layer is inserted into the fitting slot on the lower part of the installation structure through the clip on the edge. In the present invention, two layers of tarpaulins are laid at the installation positions between each two adjacent inclined beams, and the edges of the tarpaulins are fixed in the assembling grooves by clips, which facilitates installation and disassembly.
进一步地,每个两层篷布的前、后两端位置均连接有调节机构,两层篷布通过其左、右两侧的卡条卡入装配槽后,通过其前后两端的调节机构调节两层篷布的松紧并固定。Further, the front and rear ends of each two-layer tarpaulin are connected with an adjustment mechanism. After the two-layer tarpaulin is clipped into the assembly groove through the clips on the left and right sides, it is adjusted by the adjustment mechanisms at the front and rear ends of the two-layer tarpaulin. The two-layer tarpaulin is elastic and fixed.
进一步地,所述调节机构包括有第一调节组件和第二调节组件,所述第一调节组件包括有第一调节螺母、第一调节螺杆、第一拉升杆和第一短杆,两层篷布中位于上层的篷布的前或后端部与第一拉升杆固定连接,第一拉升杆通过第一短杆与第一调节螺杆的下部固定连接,所述第一调节螺母固定连接于斜梁的前或后端部,所述第一调节螺杆伸入第一调节螺母中与第一调节螺母螺纹连接,通过旋钮第一调节螺杆能够通过第一短杆带动第一拉升杆上下移动,从而带动上层的篷布的前或后端部上下移动,实现调节上层篷布的松紧;Further, the adjustment mechanism includes a first adjustment assembly and a second adjustment assembly, and the first adjustment assembly includes a first adjustment nut, a first adjustment screw, a first pull rod and a first short rod. In the tarpaulin, the front or rear end of the tarpaulin located on the upper layer is fixedly connected with the first pull-up rod, the first pull-up rod is fixedly connected with the lower part of the first adjustment screw through the first short rod, and the first adjustment nut is fixed Connected to the front or rear end of the inclined beam, the first adjusting screw rod extends into the first adjusting nut and is threadedly connected with the first adjusting nut, and the first adjusting screw rod can drive the first pulling rod through the first short rod through the knob Move up and down, so as to drive the front or rear end of the upper tarpaulin to move up and down to adjust the tightness of the upper tarpaulin;
所述第二调节组件包括有第二调节螺母、第二调节螺杆、第二拉升杆和第二短杆,两层篷布中位于下层的篷布的前或后端部与第二拉升杆固定连接,第二拉升杆通过第二短杆与第二调节螺杆的下部固定连接,所述第二调节螺母固定连接于立柱的前或后端部,所述第二调节螺杆伸入第二调节螺母中与第二调节螺母螺纹连接,通过旋钮第二调节螺杆能够通过第二短杆带动第二拉升杆上下移动,从而带动下层的篷布的前或后端部上下移动,实现调节下层篷布的松紧。在本发明中,通过第一调节组件和第二调节组件的具体结构设置实现调节两层篷布的松紧并固定。The second adjusting assembly includes a second adjusting nut, a second adjusting screw, a second pulling rod and a second short rod. The front or rear end of the tarpaulin located on the lower layer of the two-layer tarpaulin is connected to the second lifting rod. The rod is fixedly connected, the second pulling rod is fixedly connected to the lower part of the second adjusting screw through the second short rod, the second adjusting nut is fixedly connected to the front or rear end of the column, and the second adjusting screw extends into the The second adjusting nut is threadedly connected with the second adjusting nut, and the second adjusting screw through the knob can drive the second pulling rod to move up and down through the second short rod, thereby driving the front or rear end of the lower tarpaulin to move up and down to realize the adjustment Elasticity of the lower tarpaulin. In the present invention, the tightness and fixation of the two-layer tarpaulin can be adjusted and fixed through the specific structural arrangement of the first adjustment assembly and the second adjustment assembly.
进一步地,所述底座还包括有檩托、檩条,通过螺栓将檩托固定于立柱上,通过螺栓将檩条固定于檩托上,用于加强底座的稳定性;所述底座外围还安装有压型钢板围护结构,所述压型钢板围护结构通过自攻钉固定于檩条上。在本发明中,通过檩托和檩条的设置能够加强底座的稳定性,通过压型钢板围护结构能够加强底座的稳定性的同时能够保证该钢筋加工厂的封闭性。Further, the base also includes purlins and purlins, the purlins are fixed on the column by bolts, and the purlins are fixed on the purlins by bolts, so as to strengthen the stability of the base; The profiled steel plate enclosure structure is fixed on the purlin by self-tapping screws. In the present invention, the stability of the base can be enhanced by the arrangement of the purlin support and the purlin, and the stability of the base can be enhanced through the profiled steel plate enclosure structure while ensuring the closedness of the steel bar processing plant.
进一步地,前、后两排的立柱中,部分相邻的两个立柱之间安装有柱间双角钢。通过柱间双角钢的设置对立柱进行支撑固定,能够加强底座的稳定性。Further, in the columns in the front row and the rear row, inter-column double angle steels are installed between some of the two adjacent columns. The column is supported and fixed by the arrangement of double angle steel between the columns, which can strengthen the stability of the base.
进一步地,所述底座上还设置有出入口,所述底座的上部还设置有吊车梁,所述吊车梁设置于前排或后排的立柱的上部。在本发明中,通过出入口方便进出该钢筋加工厂,通过吊车梁能够方便该钢筋加工厂的装配。Further, the base is also provided with an entrance and exit, and the upper part of the base is further provided with a crane beam, and the crane beam is arranged on the upper part of the column in the front row or the rear row. In the present invention, it is convenient to enter and exit the steel bar processing plant through the entrance and exit, and the assembly of the steel bar processing plant can be facilitated through the crane beam.
进一步地,所述斜梁为铝合金的人字形斜梁,若干个人字形斜梁组合形成两个斜面,所述顶部支架还连接有方管和悬挂管,每个斜梁上还设置有若干间隔均匀的连接件,所述悬挂管通过每个斜梁中部的连接件横向安装于顶部支架的中部,即两个斜面之间的衔接处,所述方管为若干个,若干个方管分别通过斜梁的若干连接件横向安装于两个斜面上,所述悬挂管与若干方管均与斜梁垂直设置。在本发明中,连接件为固定悬挂管和方管的标准件,可以是通过挂钩固定,为现有技术,通过上述设置能够加强顶部支架的稳定性,两个斜面的设置能够更好的将雨水引流,配合两层蓬布实现防水效果好。Further, the oblique beam is an aluminum alloy herringbone oblique beam, and several herringbone oblique beams are combined to form two inclined surfaces, the top bracket is also connected with a square tube and a hanging tube, and each oblique beam is also provided with a number of intervals. Uniform connecting piece, the hanging pipe is laterally installed in the middle of the top bracket through the connecting piece in the middle of each inclined beam, that is, the joint between the two inclined surfaces, there are several square pipes, and several square pipes pass through respectively. Several connecting pieces of the inclined beam are laterally installed on the two inclined surfaces, and the suspension pipes and the several square pipes are arranged vertically to the inclined beam. In the present invention, the connecting piece is a standard piece for fixing the hanging pipe and the square pipe, which can be fixed by hooks, which is the prior art. The above arrangement can enhance the stability of the top bracket, and the arrangement of the two inclined surfaces can better connect the Rainwater drainage, with two layers of tarpaulin to achieve good waterproof effect.
进一步地,所述立柱为H形钢立柱,两层篷布均为PVC篷布,两层篷布之间的空气夹层为20cm以上。在本发明中,H形钢立柱更为方便实用,PVC 材质的篷布防水效果好,而且防腐蚀;20cm以上的空气夹层的设置能够更好的助于空气流通。Further, the column is an H-shaped steel column, the two layers of tarpaulin are PVC tarpaulins, and the air interlayer between the two layers of tarpaulins is more than 20cm. In the present invention, the H-shaped steel column is more convenient and practical, the PVC material tarpaulin has good waterproof effect and anti-corrosion; the setting of the air interlayer above 20cm can better facilitate air circulation.
一种装配式隔热型钢筋加工厂的建造方法,该方法包括有以下步骤:A construction method of a prefabricated heat-insulating steel bar processing plant, the method comprising the following steps:
步骤S1,基础开挖,预埋锚栓及现浇混凝土基础;具体为预埋M45锚栓长度60cm,锚栓中心距5m,继而现浇C25混凝土,待混凝土强度达到标准后,保证锚栓露出基础面≥15cm;Step S1, foundation excavation, pre-embedded anchor bolts and cast-in-place concrete foundation; specifically, the length of pre-embedded M45 anchor bolts is 60cm, the anchor bolt center distance is 5m, and then C25 concrete is poured in place. After the concrete strength reaches the standard, ensure that the anchor bolts are exposed. Base surface≥15cm;
步骤S2,将檩托装配到立柱上,然后将立柱固定于混凝土基础的锚栓上,通过锚栓调平立柱标高;具体地,通过锚栓双螺母调平H型钢立柱底板标高,高差±5mm;Step S2, assemble the purlin support on the column, then fix the column on the anchor bolt of the concrete foundation, and level the column elevation through the anchor bolt; 5mm;
步骤S3,将柱间双角钢通过螺栓固定在立柱上;具体地,可以站在脚手架上进行柱间双角钢的固定;Step S3, the double angle steel between the columns is fixed on the upright column by bolts; specifically, the double angle steel between the columns can be fixed by standing on the scaffold;
步骤S4,在地面拼接好人字形斜梁,按榀起吊人字形斜梁至立柱顶部,通过螺栓拧紧连接固定;Step S4, splicing the herringbone oblique beam on the ground, lifting the herringbone oblique beam to the top of the column, and tightening the connection and fixing by bolts;
步骤S5,将悬挂管、方管通过撑杆悬挂于斜梁预制的连接件上;具体地,撑杆为现有的工具,可以站在脚手架上进行悬挂管、方管的固定。In step S5, the suspension pipe and the square pipe are suspended on the prefabricated connecting piece of the inclined beam through the brace; specifically, the brace is an existing tool, and the suspension pipe and the square pipe can be fixed by standing on the scaffold.
步骤S6,将两层篷布沿斜梁的装配槽穿入后,将两层篷布的端部用拉绳拉起,再通过第一调节组件将上层的篷布固定于斜梁上,通过第二调节组件将下层的篷布固定于立柱上;Step S6, after the two-layer tarpaulin is inserted along the assembly groove of the inclined beam, the ends of the two-layer tarpaulin are pulled up with a pull rope, and then the upper-layer tarpaulin is fixed on the inclined beam through the first adjustment component, and the The second adjustment component fixes the tarpaulin of the lower layer on the upright column;
步骤S7,将檩条放置于檩托上,采用螺栓拧紧固定;具体地,可以站在脚手架上进行檩条的固定;Step S7, placing the purlin on the purlin support, and tightening and fixing with bolts; specifically, the purlin can be fixed by standing on the scaffold;
步骤S8,从地面将吊车梁起吊至立柱上,采用螺栓拧紧固定;具体地,可以站在脚手架上将吊车梁固定于H型钢立柱的牛腿位置;Step S8, lifting the crane beam from the ground to the column, and tightening and fixing with bolts; specifically, the crane beam can be fixed on the corbel position of the H-shaped steel column while standing on the scaffold;
步骤S9,安装压型钢板围护结构,通过自攻钉将压型钢板围护结构固定于檩条上。In step S9, the profiled steel plate enclosure structure is installed, and the profiled steel plate enclosure structure is fixed on the purlin through self-tapping screws.
在本发明中,在预埋锚栓及现浇混凝土基础之前,需要平整场地,清洗地面杂物和积水,做好临时排水工作;然后进行基础放样,由测量人员放出基础位置及标高,用石灰粉洒出基础平面形状。通过上述方法步骤对该装配式隔热型钢筋加工厂完成建造,混凝土基础与H型钢立柱装配式螺栓连接,梁与梁、梁与柱等结构构件全采用栓接、钩接等易于拆装的连接方式,顶部双层PVC围护与斜梁通过卡条于装配槽的配合套插,再通过调节机构进行固定,四周压型钢板围护结构与立柱栓接,工厂整体拆装损耗为零,不产生建筑垃圾,更加绿色环保,配合工程施工项目频繁转场,优势明显。In the present invention, before the pre-embedded anchor bolts and the cast-in-place concrete foundation, the site needs to be leveled, the ground debris and accumulated water need to be cleaned, and temporary drainage work is done; Lime powder is sprinkled over the base flat shape. Through the above method steps, the prefabricated heat-insulating steel bar processing plant is constructed, the concrete foundation is connected with the H-shaped steel column by prefabricated bolts, and the beam-to-beam, beam-to-column and other structural components are all bolted, hooked, etc., which are easy to disassemble and assemble. The connection method, the top double-layer PVC enclosure and the inclined beam are inserted into the fitting groove by the clips, and then fixed by the adjustment mechanism. The surrounding profiled steel enclosure structure is bolted to the column, and the overall disassembly and assembly loss of the factory is zero. No construction waste is generated, it is more green and environmentally friendly, and it cooperates with the frequent transfer of construction projects, which has obvious advantages.
本发明的有益效果在于:相比于现有技术,在本发明中,采用双层围护结构铺设于顶部支架的上表面,且双层围护结构的中间形成空气夹层,与室外相通,能够有效隔离室内外的空气热传导,降低室内温度,增加建筑舒适度;而且相比于现有技术更加方便装配以及拆卸,一次性完成后可反复利用,成本低,而且不会产生大量的建筑垃圾及工业废料,绿色环保,适用于各类钢筋加工厂的厂区建设。The beneficial effects of the present invention are: compared with the prior art, in the present invention, a double-layered enclosure structure is used to lay on the upper surface of the top support, and an air interlayer is formed in the middle of the double-layered enclosure structure, which is communicated with the outdoor and can It can effectively isolate indoor and outdoor air heat conduction, reduce indoor temperature, and increase building comfort; and compared with the existing technology, it is more convenient to assemble and disassemble, can be reused after one-time completion, low cost, and will not generate a large amount of construction waste and Industrial waste, green and environmentally friendly, suitable for the construction of various steel bar processing plants.
附图说明Description of drawings
图1是本发明所实施的装配式隔热型钢筋加工厂的结构示意图。FIG. 1 is a schematic structural diagram of a prefabricated heat-insulating steel bar processing plant implemented by the present invention.
图2是本发明所实施的装配式隔热型钢筋加工厂的侧面剖视图。Fig. 2 is a side sectional view of a prefabricated heat-insulating steel bar processing plant implemented by the present invention.
图3是图2中的B的放大示意图。FIG. 3 is an enlarged schematic view of B in FIG. 2 .
图4是图2中的C的放大示意图。FIG. 4 is an enlarged schematic view of C in FIG. 2 .
图5是本发明所实施的装配式隔热型钢筋加工厂的底座的正面示意图。5 is a schematic front view of the base of the prefabricated heat-insulating steel bar processing plant implemented by the present invention.
图6是本发明所实施的两层篷布、斜梁与立柱之间的连接关系示意图。FIG. 6 is a schematic diagram of the connection relationship between the two-layer tarpaulin, the inclined beam and the upright column implemented by the present invention.
图7是图6中的斜梁与立柱部分的第一视角的剖面图。FIG. 7 is a cross-sectional view of the inclined beam and column portion of FIG. 6 from a first perspective.
图8是图6中的斜梁与立柱部分的第二视角的剖面图。FIG. 8 is a cross-sectional view of the inclined beam and column portion of FIG. 6 from a second perspective.
图9是本发明所实施的弓字托板的结构示意图。FIG. 9 is a schematic view of the structure of the bow bracket implemented by the present invention.
图10是本发明所实施的两层篷布的卡条与装配槽之间的连接关系示意图。10 is a schematic diagram of the connection relationship between the clips and the assembling grooves of the two-layer tarpaulin implemented in the present invention.
具体实施方式Detailed ways
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention.
参见图1-10所示,一种装配式隔热型钢筋加工厂,包括有底座1和顶部支架2,底座1固定于地面起到支撑作用,顶部支架2装配于底座1上形成钢筋加工厂的屋面框架,顶部支架2上安装有双层围护结构3,双层围护结构3铺设于顶部支架2的上表面,且双层围护结构3的中间形成空气夹层,与室外相通,能够有效隔离室内外的空气热传导,降低室内温度,增加建筑舒适度。Referring to Figure 1-10, a prefabricated heat-insulating steel bar processing plant includes a base 1 and a
其中,底座1包括有若干立柱11,顶部支架2包括有若干斜梁21,若干立柱11支撑于地面上,立柱11与斜梁21之间采用连接结构4进行连接,每个斜梁21的两端分别通过连接结构4与两个立柱11进行连接。在本发明中,通过连接结构4对将斜梁21安装于立柱11上,方便安装与拆卸。Among them, the base 1 includes a number of
其中,连接结构4包括有柱头封板41和弓字托板42,斜梁21的两端为倾斜设置,立柱11与斜梁21连接的顶部端口为斜口,且其倾斜角度与斜梁21 的倾斜角度相同,柱头封板41固定设置于立柱11的端口处,弓字托板42与柱头封板41相适配,且弓字托板42的一端与柱头封板41可拆卸式连接,弓字托板42的另一端与斜梁21的底部可拆卸式连接。在本发明中,斜梁21为现有的标准件,其横截面为矩形,其底部为短边;事先预制立柱11端口的倾斜度与斜梁21的倾斜度相同,将柱头封板41固定设置在立柱11的端口处,此时柱头封板41的倾斜度也与斜梁21的倾斜度一致,利用弓字托板42将立柱11与斜梁 21的短边可拆卸式连接,受力合理,节省空间。Wherein, the
其中,弓字托板42包括第一连接部421、第二连接部422和第三连接部423,第一连接部421、第二连接部422和第三连接部423依次呈阶梯状相衔接,且第二连接部422高于第一连接部421和第三连接部423,第一连接部421和第三连接部423的高度相同,第一连接部421、第二连接部422和第三连接部423 上均设置有若干个螺栓孔,第二连接部422与斜梁21的底部相连接,第一连接部421和第三连接部423均与柱头封板41相连接。通过弓字托板42的设置,将斜梁21底部的单排螺栓排布通过第二连接部422的螺栓孔与第二连接部422 相连接,再通过第一连接部421和第三连接部423与立柱11的柱头封板41相连接,转换为双排螺栓排布,受力合理,使得斜梁21和立柱11之间的连接更加稳定。The
其中,斜梁21内设置有焊板211,焊板211上设置有复数个螺栓头212,且螺栓头212的末端从斜梁21的底部伸出,螺栓头212与第二连接部422的螺栓孔相适配。斜梁21与弓字托板42通过螺栓与螺母的配合可拆卸式连接。Wherein, the
其中,柱头封板41上设置有若干个与第一连接部421及第三连接部423 上的螺栓孔相对应的连接孔。柱头封板41与弓字托板42通过螺栓与螺母的配合可拆卸式连接。A plurality of connecting holes corresponding to the bolt holes on the first connecting
其中,斜梁21内还设置有斜梁套插件213,且斜梁套插件213设置的位置与弓字托板42的位置相对应。斜梁套插件213属于现有技术,将其套设在斜梁21内,可增加斜梁21与弓字托板42的连接强度,受力合理,结构安全。The
该连接结构4的装配方式可为:The assembly method of the
1、在工厂提前预制立柱11的倾斜端口及柱头封板41、斜梁21的焊板211 及螺栓头212、弓字托板42;1. Prefabricate the inclined port of the
2、在装配现场,用螺栓螺母将弓字托板42固定到斜梁21上;2. On the assembly site, use bolts and nuts to fix the
3、起吊安装有弓字托板42的斜梁21到立柱11上;3. Lift the
4、用螺栓固定弓字托板42和立柱11即可完成装配。4. Fix the
与现有技术对比,其有益效果体现在:斜梁21、弓字托板42、立柱11全采用螺栓连接,节点为装配式,拆装损耗为零,不产生建筑垃圾,更加绿色环保;斜梁21螺栓埋置与弓字托板42的内部,节点设计造型美观;斜梁套插件 213增加斜梁21与弓字托板42的连接强度,受力合理,结构安全。Compared with the prior art, the beneficial effects are as follows: the
其中,底座1还包括有数量与立柱11对应的若干混凝土基础12,若干混凝土基础12间隔均匀的围成方形固定于地面上,若干立柱11的下端分别与若干混凝土基础12固定连接,从而间隔均匀的围成方形支撑于地面上;围合成方形的若干立柱11包括有间隔均匀的前、后两排立柱11和左、右两列立柱11,前、后两排的立柱11中,每两个前、后相对的立柱11均固定连接有一个斜梁 21。在本发明中,通过上述方式固定立柱11与斜梁21,整体结构稳固。The base 1 also includes a number of
其中,每个斜梁21上均设置有用于安装双层围护结构3的安装结构,安装结构的上部和下部的侧边均设置有装配槽214,双层围护结构3包括有若干个两层篷布,每两个相邻的斜梁21之间形成安装两层篷布的安装位,两层篷布之间形成空气夹层;两层篷布的左右两侧边缘处均设置有与装配槽214相适配的卡条33,位于上层的篷布31通过其边缘处的卡条33插入安装结构上部的装配槽214中,位于下层的篷布32通过其边缘处的卡条33插入安装结构下部的装配槽214中。在本发明中,每两个相邻的斜梁21之间的安装位均铺设有两层蓬布,通过卡条33将篷布的边缘处固定于装配槽214内,方便安装与拆卸。Wherein, each
其中,每个两层篷布的前、后两端位置均连接有调节机构5,两层篷布通过其左、右两侧的卡条33卡入装配槽214后,通过其前后两端的调节机构5 调节两层篷布的松紧并固定。Among them, the front and rear ends of each two-layer tarpaulin are connected with an
其中,调节机构5包括有第一调节组件和第二调节组件,第一调节组件包括有第一调节螺母51、第一调节螺杆52、第一拉升杆53和第一短杆54,两层篷布中位于上层的篷布31的前或后端部与第一拉升杆53固定连接,第一拉升杆53通过第一短杆54与第一调节螺杆52的下部固定连接,第一调节螺母51 固定连接于斜梁21的前或后端部,第一调节螺杆52伸入第一调节螺母51中与第一调节螺母51螺纹连接,通过旋钮第一调节螺杆52能够通过第一短杆54 带动第一拉升杆53上下移动,从而带动上层的篷布31的前或后端部上下移动,实现调节上层的篷布31的松紧;The
第二调节组件包括有第二调节螺母55、第二调节螺杆56、第二拉升杆57 和第二短杆58,两层篷布中位于下层的篷布32的前或后端部与第二拉升杆57 固定连接,第二拉升杆57通过第二短杆58与第二调节螺杆56的下部固定连接,第二调节螺母55固定连接于立柱11的前或后端部,第二调节螺杆56伸入第二调节螺母55中与第二调节螺母55螺纹连接,通过旋钮第二调节螺杆56能够通过第二短杆58带动第二拉升杆57上下移动,从而带动下层的篷布32的前或后端部上下移动,实现调节下层的篷布32的松紧。在本发明中,通过第一调节组件和第二调节组件的具体结构设置实现调节两层篷布的松紧并固定。The second adjusting assembly includes a
其中,底座1还包括有檩托13、檩条14,通过螺栓将檩托13固定于立柱 11上,通过螺栓将檩条14固定于檩托13上,用于加强底座1的稳定性;底座 1外围还安装有压型钢板围护结构15,压型钢板围护结构15通过自攻钉固定于檩条14上。在本发明中,通过檩托13和檩条14的设置能够加强底座1的稳定性,通过压型钢板围护结构15能够加强底座1的稳定性的同时能够保证该钢筋加工厂的封闭性。Wherein, the base 1 also includes a
其中,前、后两排的立柱11中,部分相邻的两个立柱11之间安装有柱间双角钢16。通过柱间双角钢16的设置对立柱11进行支撑固定,能够加强底座 1的稳定性。Among the
其中,底座1上还设置有出入口,底座1的上部还设置有吊车梁17,吊车梁17设置于前排或后排的立柱11的上部。在本发明中,通过出入口方便进出该钢筋加工厂,吊车梁17为现有的功能件,通过吊车梁17能够方便该钢筋加工厂的装配。The base 1 is also provided with an entrance and exit, and the upper part of the base 1 is further provided with a
其中,斜梁21为铝合金的人字形斜梁21,若干个人字形斜梁21组合形成两个斜面,顶部支架2还连接有方管22和悬挂管23,每个斜梁21上还设置有若干间隔均匀的连接件,悬挂管23通过每个斜梁21中部的连接件横向安装于顶部支架2的中部,即两个斜面之间的衔接处,方管22为若干个,若干个方管 22分别通过斜梁21的若干连接件横向安装于两个斜面上,悬挂管23与若干方管22均与斜梁21垂直设置。在本发明中,连接件为固定悬挂管23和方管22 的标准件,可以是通过挂钩固定,为现有技术,通过上述设置能够加强顶部支架2的稳定性,两个斜面的设置能够更好的将雨水引流,配合两层蓬布实现防水效果好。Wherein, the
其中,立柱11为H形钢立柱,两层篷布均为PVC篷布,两层篷布之间的空气夹层为20cm以上。在本发明中,H形钢立柱更为方便实用,PVC材质的篷布防水效果好,而且防腐蚀;20cm以上的空气夹层的设置能够更好的助于空气流通。Among them, the
在本发明中,每个立柱11上均设置有装配节点,立柱11上的装配节点可以是托板、螺栓孔、牛腿等结构,通过装配节点固定檩托13、柱间双角钢16 等部件。In the present invention, each
一种装配式隔热型钢筋加工厂的建造方法,该方法包括有以下步骤:A construction method of a prefabricated heat-insulating steel bar processing plant, the method comprising the following steps:
步骤S1,基础开挖,预埋锚栓及现浇混凝土基础12;具体为预埋M45锚栓长度60cm,锚栓中心距5m,继而现浇C25混凝土,待混凝土强度达到标准后,保证锚栓露出基础面≥15cm;Step S1, foundation excavation, pre-embedded anchor bolts and cast-in-
步骤S2,将檩托13装配到立柱11上,然后将立柱11固定于混凝土基础 12的锚栓上,通过锚栓调平立柱11标高;具体地,通过锚栓双螺母调平H型钢立柱11底板标高,高差±5mm;Step S2, assembling the
步骤S3,将柱间双角钢16通过螺栓固定在立柱11上;具体地,可以站在脚手架上进行柱间双角钢16的固定;Step S3, the double angle steel between the
步骤S4,在地面拼接好人字形斜梁21,按榀起吊人字形斜梁21至立柱11 顶部,通过螺栓拧紧连接固定;Step S4, splicing the
步骤S5,将悬挂管23、方管22通过撑杆悬挂于斜梁21预制的连接件上;具体地,撑杆为现有的工具,可以站在脚手架上进行悬挂管23、方管22的固定,顶部支架上还设置有钢缆24,交叉固定于斜梁上。In step S5, the
步骤S6,将两层篷布沿斜梁21的装配槽214穿入后,将两层篷布的端部用拉绳拉起,再通过第一调节组件将上层的篷布31固定于斜梁21上,通过第二调节组件将下层的篷布32固定于立柱11上;Step S6, after the two-layer tarpaulin is inserted along the
步骤S7,将檩条14放置于檩托13上,采用螺栓拧紧固定;具体地,可以站在脚手架上进行檩条14的固定;Step S7, placing the
步骤S8,从地面将吊车梁17起吊至立柱11上,采用螺栓拧紧固定;具体地,可以站在脚手架上将吊车梁17固定于H型钢立柱11的牛腿位置;In step S8, the
步骤S9,安装压型钢板围护结构15,通过自攻钉将压型钢板围护结构15 固定于檩条14上。In step S9, the profiled steel
在本发明中,在预埋锚栓及现浇混凝土基础之前,需要平整场地,清洗地面杂物和积水,做好临时排水工作;然后进行基础放样,由测量人员放出基础位置及标高,用石灰粉洒出基础平面形状。通过上述方法步骤对该装配式隔热型钢筋加工厂完成建造,混凝土基础与H型钢立柱装配式螺栓连接,梁与梁、梁与柱等结构构件全采用栓接、钩接等易于拆装的连接方式,顶部双层PVC围护与斜梁通过卡条与装配槽的配合套插,再通过调节机构进行固定,四周压型钢板围护结构与立柱栓接,工厂整体拆装损耗为零,不产生建筑垃圾,更加绿色环保,配合工程施工项目频繁转场,优势明显。In the present invention, before the pre-embedded anchor bolts and the cast-in-place concrete foundation, the site needs to be leveled, the ground debris and accumulated water need to be cleaned, and temporary drainage work is done; Lime powder is sprinkled over the base flat shape. Through the above method steps, the prefabricated heat-insulating steel bar processing plant is constructed, the concrete foundation is connected with the H-beam column by prefabricated bolts, and the structural components such as beams and beams, beams and columns are all bolted, hooked, etc., which are easy to disassemble and assemble. The connection method, the top double-layer PVC enclosure and the inclined beam are inserted through the matching sleeve of the clip and the assembly slot, and then fixed by the adjustment mechanism. The surrounding profiled steel enclosure structure is bolted to the column, and the overall disassembly and assembly loss of the factory is zero. No construction waste is generated, it is more green and environmentally friendly, and it has obvious advantages to cooperate with the frequent transfer of construction projects.
本发明所实施的装配式隔热型钢筋加工厂,屋顶采用铝结构膜材(铝合金斜梁与两层PCV篷布)屋盖系统,双层PVC围护拆装仅需松动斜梁端部的调节机构,沿斜梁的装配槽一拉即完成一个单元的两层篷布的拆装,相较压型钢板屋面的螺栓打钉形式,双层围护结构无需人员在屋面操作施工,减小施工难度及危险系数,增加施工安全性、便捷性;同时,双层PVC篷布具有中间20cm 以上空气夹层与室外相通,有效隔离室内外空气热传导,降低室内温度,增加建筑舒适度;双层PVC围护屋面为完全装配式屋面,相较于螺栓连接省时省力,安装周期随之缩短,大大加快了钢筋加工厂的投产时间。In the prefabricated heat-insulating steel bar processing plant implemented by the present invention, the roof adopts aluminum structural membrane material (aluminum alloy inclined beam and two-layer PCV tarpaulin) roof system, and the disassembly and assembly of the double-layer PVC enclosure only needs to loosen the end of the inclined beam The adjustment mechanism, which can be pulled along the assembly groove of the inclined beam, can complete the disassembly and assembly of the two-layer tarpaulin of a unit. Compared with the bolt-and-nail form of the profiled steel plate roof, the double-layer envelope structure does not require personnel to operate and construct on the roof. Small construction difficulty and risk factor increase construction safety and convenience; at the same time, the double-layer PVC tarpaulin has an air interlayer of more than 20cm in the middle that is connected to the outside, effectively isolating indoor and outdoor air heat conduction, reducing indoor temperature and increasing building comfort; double-layered tarpaulin The PVC-enclosed roof is a fully assembled roof, which saves time and effort compared to bolted connection, and shortens the installation period, which greatly speeds up the production time of the steel bar processing plant.
本发明所实施的装配式隔热型钢筋加工厂,依结构强柱弱梁的设计理念,采用钢柱铝梁,立柱采用柱间双角钢交叉支撑固定,斜梁采用高强度6系铝合金,强度高,质量高,坚固耐用,安全系数高;屋盖阳极氧化铝合金+双层PVC 篷布屋面的组合形式,抗腐蚀性较钢结构屋面大大增加,对雨水侵蚀有更好的耐久性。The prefabricated heat-insulating steel bar processing plant implemented by the present invention adopts steel column aluminum beams according to the design concept of strong columns and weak beams, the vertical columns are fixed with double-angle steel cross-bracing between columns, and the inclined beams are made of high-strength 6-series aluminum alloy. High strength, high quality, sturdy and durable, and high safety factor; the combination of anodized aluminum alloy roof + double-layer PVC tarpaulin roof has greatly increased corrosion resistance compared with steel structure roof, and has better durability to rainwater erosion.
本发明的有益效果在于:相比于现有技术,在本发明中,采用双层围护结构铺设于顶部支架的上表面,且双层围护结构的中间形成空气夹层,与室外相通,能够有效隔离室内外的空气热传导,降低室内温度,增加建筑舒适度;而且相比于现有技术更加方便装配以及拆卸,一次性完成后可反复利用,具有高效、安全、舒适、易操作、低成本、抗腐蚀等特点,而且不会产生大量的建筑垃圾及工业废料,绿色环保,适用于各类钢筋加工厂的厂区建设。The beneficial effects of the present invention are: compared with the prior art, in the present invention, a double-layered enclosure structure is used to lay on the upper surface of the top support, and an air interlayer is formed in the middle of the double-layered enclosure structure, which is communicated with the outdoor and can Effectively isolate indoor and outdoor air heat conduction, reduce indoor temperature, and increase building comfort; and compared with the existing technology, it is more convenient to assemble and disassemble, and can be reused after one-time completion, with high efficiency, safety, comfort, easy operation and low cost. , anti-corrosion and other characteristics, and will not produce a large amount of construction waste and industrial waste, green and environmental protection, suitable for the construction of various types of steel processing plants.
以上仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention shall be included in the protection scope of the present invention. Inside.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010314322.9A CN111335679B (en) | 2020-04-20 | 2020-04-20 | An assembled heat-insulating steel bar processing plant and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010314322.9A CN111335679B (en) | 2020-04-20 | 2020-04-20 | An assembled heat-insulating steel bar processing plant and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111335679A true CN111335679A (en) | 2020-06-26 |
CN111335679B CN111335679B (en) | 2024-12-27 |
Family
ID=71178870
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010314322.9A Active CN111335679B (en) | 2020-04-20 | 2020-04-20 | An assembled heat-insulating steel bar processing plant and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111335679B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112696065A (en) * | 2020-12-22 | 2021-04-23 | 中国电建集团江西省水电工程局有限公司 | Construction process of overlong profiled steel sheet enclosure structure of tall and large factory building |
CN112900636A (en) * | 2021-03-30 | 2021-06-04 | 山西宏厚装配式建筑科技发展有限公司 | Outer wall structure of prefabricated building |
CN113338683A (en) * | 2021-06-29 | 2021-09-03 | 江苏省子午建筑设计有限公司 | Design method of assembly type factory building |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2002301430B2 (en) * | 2002-01-11 | 2005-06-02 | Perumahan Satelit Jaya Sdn Bhd | A building construction |
CN103061533A (en) * | 2013-01-18 | 2013-04-24 | 四川大学 | Environment-friendly anti-seismic eco-house system suitable for mountainous areas |
CN204571463U (en) * | 2015-04-28 | 2015-08-19 | 深圳市舒特帐篷有限公司 | A kind of both wings with double-deck tarpaulin connect paulin |
CN204781333U (en) * | 2015-07-13 | 2015-11-18 | 珠海丽日帐篷有限公司 | Double -deck covering or awning on a car, boat, etc. room |
CN205875887U (en) * | 2016-07-29 | 2017-01-11 | 中南大学 | From tent that adjusts temperature based on phase change energy storage technique |
CN207846666U (en) * | 2018-01-30 | 2018-09-11 | 陕西建工第九建设集团有限公司 | A kind of detachable reinforcing steel processing shed |
CN110259237A (en) * | 2019-06-13 | 2019-09-20 | 刘全义 | Assembling frame posture horizontal warehouse, prefabricated panel mold and horizontal warehouse method of construction |
CN212201451U (en) * | 2020-04-20 | 2020-12-22 | 青藤绿色建筑(广东)有限公司 | Assembled heat-insulation type steel bar processing factory |
-
2020
- 2020-04-20 CN CN202010314322.9A patent/CN111335679B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2002301430B2 (en) * | 2002-01-11 | 2005-06-02 | Perumahan Satelit Jaya Sdn Bhd | A building construction |
CN103061533A (en) * | 2013-01-18 | 2013-04-24 | 四川大学 | Environment-friendly anti-seismic eco-house system suitable for mountainous areas |
CN204571463U (en) * | 2015-04-28 | 2015-08-19 | 深圳市舒特帐篷有限公司 | A kind of both wings with double-deck tarpaulin connect paulin |
CN204781333U (en) * | 2015-07-13 | 2015-11-18 | 珠海丽日帐篷有限公司 | Double -deck covering or awning on a car, boat, etc. room |
CN205875887U (en) * | 2016-07-29 | 2017-01-11 | 中南大学 | From tent that adjusts temperature based on phase change energy storage technique |
CN207846666U (en) * | 2018-01-30 | 2018-09-11 | 陕西建工第九建设集团有限公司 | A kind of detachable reinforcing steel processing shed |
CN110259237A (en) * | 2019-06-13 | 2019-09-20 | 刘全义 | Assembling frame posture horizontal warehouse, prefabricated panel mold and horizontal warehouse method of construction |
CN212201451U (en) * | 2020-04-20 | 2020-12-22 | 青藤绿色建筑(广东)有限公司 | Assembled heat-insulation type steel bar processing factory |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112696065A (en) * | 2020-12-22 | 2021-04-23 | 中国电建集团江西省水电工程局有限公司 | Construction process of overlong profiled steel sheet enclosure structure of tall and large factory building |
CN112900636A (en) * | 2021-03-30 | 2021-06-04 | 山西宏厚装配式建筑科技发展有限公司 | Outer wall structure of prefabricated building |
CN113338683A (en) * | 2021-06-29 | 2021-09-03 | 江苏省子午建筑设计有限公司 | Design method of assembly type factory building |
Also Published As
Publication number | Publication date |
---|---|
CN111335679B (en) | 2024-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111335679A (en) | A prefabricated heat-insulating steel bar processing plant and its construction method | |
CN110735525B (en) | Prefabricated assembled self-supporting steel pipe scaffold system | |
CN111441622B (en) | Assembled greenhouse and construction method thereof | |
CN211396814U (en) | Steel frame factory building with stable connection of supporting beams and supporting columns | |
CN212201451U (en) | Assembled heat-insulation type steel bar processing factory | |
CN106930571B (en) | Assembled three-dimensional structure farm and construction method thereof | |
CN215564819U (en) | Novel steel construction factory building | |
CN212295806U (en) | Assembled big-arch shelter | |
CN108412231A (en) | Assembled is bolted reinforcing steel processing shed and its assemble method entirely | |
CN207905389U (en) | Assembled is bolted reinforcing steel processing shed entirely | |
CN111364828A (en) | Assembled concrete mixing station stock bin and mounting mode thereof | |
CN211775227U (en) | Light steel awning structure | |
CN111472536B (en) | Template support, steel template and spliced single-side vertical die structure | |
CN215594693U (en) | Steel pipe pull rod hollow ceramic archaized brick combined wall | |
CN215167057U (en) | Large-span huge underground workshop arch-type steel-concrete combined ceiling structure | |
CN211646721U (en) | Steel construction dysmorphism post frame bearing structure | |
CN210395626U (en) | Skeleton device for building with steel structure | |
CN211341132U (en) | Precast concrete frame structure | |
CN110424533B (en) | Down-warping-preventing construction method for high-altitude overhanging installation of large-area net rack | |
CN210685313U (en) | Safe convenient house steel connection structure | |
CN210086476U (en) | A prefabricated steel frame structure supporting node and its connecting device | |
CN217175259U (en) | Combined building wall | |
CN212201531U (en) | Assembled push-and-pull type steel bar shed | |
CN222295313U (en) | Suspended ceiling conversion layer steel skeleton system | |
CN222414234U (en) | A quick-install safety shed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |