CN111245090A - 一种配电网用柱上开关控制方法 - Google Patents
一种配电网用柱上开关控制方法 Download PDFInfo
- Publication number
- CN111245090A CN111245090A CN201811430328.1A CN201811430328A CN111245090A CN 111245090 A CN111245090 A CN 111245090A CN 201811430328 A CN201811430328 A CN 201811430328A CN 111245090 A CN111245090 A CN 111245090A
- Authority
- CN
- China
- Prior art keywords
- signals
- microcontroller
- sending
- upper computer
- control method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/261—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/261—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
- H02H7/262—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations involving transmissions of switching or blocking orders
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/261—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
- H02H7/263—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations involving transmissions of measured values
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/20—Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/126—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本发明涉及一种配电网用柱上开关控制方法。包括以下步骤:第一步,采集电杆上架空线路的信号,然后将采集到的信号进行调理,在将调理后的信号送入到微控制器;第二步,微控制器对调理后的信号进行处理;第三步,微控制器将处理后的信号通过无线通信单元发送给上位机;第四步,判断是否发生故障,若发生故障,则由上位机发出控制指令,微控制器接收到上位机发送的控制指令后,将控制指令发送给控制输出单元,由控制输出单元通过继电器电路的动作控制柱上开关进行相应的分合闸操作;若未发生故障,则返回第一步。本发明的控制方法简单,操作方便,通过采用本发明的控制方法,无需现场进行检修维护,降低了工人的劳动强度,提高了工作效率。
Description
技术领域
本发明涉及一种配电网用柱上开关控制方法。
背景技术
随着城市建设、农网建设的发展智能配电终端广泛应用于配电网中柱上开关、环网柜、开关柜、配电变压器、箱式变、电缆分接箱等一次设备的监控,这些设备的接入性、安全性、操作方便等特点在智能电网的建设中起着重要作用,新的无线通信技术、移动PDA也得到了广泛应用。配电网作为智能电网中的一部分,要实施智能化监控管理是其重要的内容,在户外柱上开关的日常运行与维护中,还存在着某些不足如登杆操作强度大,操作方式较繁琐、整定设置不直观、故障追溯分析困难,远程通信功能缺乏等。
发明内容
针对上述缺陷,本发明的目的在于提供一种操作方便,控制方法简单,无需现场检修维护,降低工人劳动强度的一种配电网用柱上开关控制方法。
为此本发明所采用的技术方案是:
包括以下步骤:
第一步,采集电杆上架空线路的信号,然后将采集到的信号进行调理,在将调理后的信号送入到微控制器;
第二步,微控制器对调理后的信号进行处理;
第三步,微控制器将处理后的信号通过无线通信单元发送给上位机;
第四步,判断是否发生故障,若发生故障,则由上位机发出控制指令,微控制器接收到上位机发送的控制指令后,将控制指令发送给控制输出单元,由控制输出单元通过继电器电路的动作控制柱上开关进行相应的分合闸操作;若未发生故障,则返回第一步。
本发明的优点是:
本发明的控制方法简单,操作方便,通过采用本发明的控制方法,无需现场进行检修维护,降低了工人的劳动强度,提高了工作效率。
具体实施方式
一种配电网用柱上开关控制方法,包括以下步骤:
第一步,采集电杆上架空线路的信号,然后将采集到的信号进行调理,在将调理后的信号送入到微控制器;
第二步,微控制器对调理后的信号进行处理;
第三步,微控制器将处理后的信号通过无线通信单元发送给上位机;
第四步,判断是否发生故障,若发生故障,则由上位机发出控制指令,微控制器接收到上位机发送的控制指令后,将控制指令发送给控制输出单元,由控制输出单元通过继电器电路的动作控制柱上开关进行相应的分合闸操作;若未发生故障,则返回第一步。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,当可利用上述揭示的技术内容作出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (1)
1.一种配电网用柱上开关控制方法,其特征在于,包括以下步骤:
第一步,采集电杆上架空线路的信号,然后将采集到的信号进行调理,在将调理后的信号送入到微控制器;
第二步,微控制器对调理后的信号进行处理;
第三步,微控制器将处理后的信号通过无线通信单元发送给上位机;
第四步,判断是否发生故障,若发生故障,则由上位机发出控制指令,微控制器接收到上位机发送的控制指令后,将控制指令发送给控制输出单元,由控制输出单元通过继电器电路的动作控制柱上开关进行相应的分合闸操作;若未发生故障,则返回第一步。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811430328.1A CN111245090A (zh) | 2018-11-28 | 2018-11-28 | 一种配电网用柱上开关控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811430328.1A CN111245090A (zh) | 2018-11-28 | 2018-11-28 | 一种配电网用柱上开关控制方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111245090A true CN111245090A (zh) | 2020-06-05 |
Family
ID=70879195
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811430328.1A Pending CN111245090A (zh) | 2018-11-28 | 2018-11-28 | 一种配电网用柱上开关控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111245090A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117578739A (zh) * | 2024-01-15 | 2024-02-20 | 希格玛电气(珠海)有限公司 | 一种柱上开关控制系统 |
-
2018
- 2018-11-28 CN CN201811430328.1A patent/CN111245090A/zh active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117578739A (zh) * | 2024-01-15 | 2024-02-20 | 希格玛电气(珠海)有限公司 | 一种柱上开关控制系统 |
CN117578739B (zh) * | 2024-01-15 | 2024-06-04 | 希格玛电气(珠海)有限公司 | 一种柱上开关控制系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104410169A (zh) | 一种台区智能在线监控系统及其实现方法 | |
CN103336220A (zh) | 对配电网故障进行监测和定位的方法和装置 | |
CN104052015B (zh) | 继电保护装置定值区远方切换方法 | |
CN110086251A (zh) | 一种提高电网操作安全的监控方法及系统 | |
CN103746451A (zh) | 基于plc的一体化电源的监控系统及监控方法 | |
CN110707825A (zh) | 一种环网柜程序化控制系统及方法 | |
CN111245090A (zh) | 一种配电网用柱上开关控制方法 | |
CN107171235A (zh) | 箱式变电站 | |
CN104124077A (zh) | 电动合闸器及电力设备倒闸系统 | |
CN104009549A (zh) | 一种用于低压智能断路器中的智能控制器 | |
CN201699339U (zh) | 塔机用可移动变电站 | |
CN103532232B (zh) | 一种配网的就地保护系统 | |
CN117591899A (zh) | 一种变电站告警信号与设备点位自动匹配方法及系统 | |
CN107071591A (zh) | 一种配电自动化终端接入时避免对点调试的方法 | |
CN216351883U (zh) | 一种远程控制设备及一种扬尘喷淋系统 | |
CN104297679A (zh) | 断路器跳闸消息预警方法 | |
CN208489574U (zh) | 一种带有应急电源插头的低压综合配电箱 | |
CN107887983B (zh) | 一种特高压变电站和换流站合建监控系统及合建方法 | |
CN204732728U (zh) | 智能综合配电箱 | |
CN209962941U (zh) | 一种可实现隔离和接地的三工位弹簧操作机构 | |
CN206627574U (zh) | 一种多数据的变电站在线监测装置 | |
CN102646994B (zh) | 智能控制220kV三绕组变压器并联运行自动投切装置 | |
CN106710188B (zh) | 一种开关柜开合按钮就地控制遥控装置的使用方法 | |
CN203481924U (zh) | 一种配网的就地保护系统 | |
CN207304625U (zh) | 一种电力巡检机器人远程控制系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20200605 |
|
WD01 | Invention patent application deemed withdrawn after publication |