CN111162547B - Energy storage multi-scene application switching control method - Google Patents

Energy storage multi-scene application switching control method Download PDF

Info

Publication number
CN111162547B
CN111162547B CN202010005642.6A CN202010005642A CN111162547B CN 111162547 B CN111162547 B CN 111162547B CN 202010005642 A CN202010005642 A CN 202010005642A CN 111162547 B CN111162547 B CN 111162547B
Authority
CN
China
Prior art keywords
energy storage
voltage regulation
regulation
voltage
frequency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010005642.6A
Other languages
Chinese (zh)
Other versions
CN111162547A (en
Inventor
郑军
王雪燕
朱优优
尹绍杰
林鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Institute of Zhejiang University
Original Assignee
Taizhou Institute of Zhejiang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Institute of Zhejiang University filed Critical Taizhou Institute of Zhejiang University
Priority to CN202010005642.6A priority Critical patent/CN111162547B/en
Priority to CN202110105911.0A priority patent/CN112952848B/en
Publication of CN111162547A publication Critical patent/CN111162547A/en
Application granted granted Critical
Publication of CN111162547B publication Critical patent/CN111162547B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/12Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by adjustment of reactive power
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种储能多场景应用切换控制方法,步骤如下:根据实际电网数据分析该电网需求场景;将所述的需求场景分为可预知规划的需求场景和不可预知规划的需求场景;通过历史数据及日前数据分析确定可预知规划的需求场景在该日的时段安排及规划;确定在每一个可预知规划的需求场景的时段中储能实际有功出力和无功出力的计算方法;建立识别指标完成不可预知规划的需求场景的识别;建立切换指标判断是否完成所述的不可预知规划的需求场景的切换。本发明基于目前储能接入电网的多个应用场景的控制策略,结合实际电网需求分析,提出多场景应用切换控制方法,旨在通过储能接入并对其进行契合不同电网的适应性改造达到充分满足不同电网需求的目的。

Figure 202010005642

The invention discloses a multi-scene application switching control method for energy storage. The steps are as follows: analyzing the power grid demand scene according to actual power grid data; dividing the demand scene into a predictable planned demand scene and an unpredictable planned demand scene; Determine the schedule and planning of predictable and planned demand scenarios on the day through historical data and data analysis in the day before; determine the calculation method for the actual active and reactive power output of energy storage in the time period of each predictable and planned demand scenario; establish The identification index completes the identification of the unpredictably planned demand scene; the establishment of the switching index determines whether the switching of the unpredictably planned demand scene is completed. The invention proposes a multi-scenario application switching control method based on the current control strategies of multiple application scenarios of energy storage access to the power grid, and combined with the actual power grid demand analysis, aiming at adapting it to different power grids through energy storage access and adaptability transformation. To fully meet the needs of different power grids.

Figure 202010005642

Description

Energy storage multi-scene application switching control method
Technical Field
The invention relates to an energy storage control method, in particular to an energy storage multi-scene application switching control method.
Background
The important means of energy transformation in China is to improve the proportion of clean energy in power generation, and the development of new energy is the basic direction of energy development in China.
The important functions of the energy storage technology in the aspects of improving the new energy accepting capacity of a power grid, adjusting the frequency of the power grid, cutting peaks and filling valleys, improving the power quality and the power reliability and the like are internationally agreed. In recent years, with continuous maturity of electrochemical energy storage technology and rapid reduction of cost, the electrochemical energy storage in China increases rapidly, and the total installed capacity increases from 105MW in 2015 to 1.034GW in 2018, which increases by 114% per year. The energy storage has a flexible energy carrying function in time, can enable renewable energy power generation to be more friendly and controllable to a power grid, participate in auxiliary services such as power grid peak regulation, frequency modulation and the like, provide support for safe operation of the power grid, and can be arranged on a user side to provide various requirements such as peak-valley regulation, power supply capacity improvement, power supply reliability improvement and the like for the user, so that the energy storage is rapidly applied in a large scale on the power generation side, the power grid side and the user side, and becomes an important component and a key support technology for energy clean transformation and energy internet development in China.
The important functions of the energy storage technology in the aspects of improving the new energy accepting capacity of a power grid, adjusting the frequency of the power grid, cutting peaks and filling valleys, improving the power quality and the power reliability and the like are internationally agreed. The flexibility, characteristics and application scenes of energy storage are very many, the difference is large, but the defects that the electricity is used immediately when the electricity is generated and used by a power system and the moment balance is inflexible are fundamentally solved through the time transfer storage of the energy, the energy balance from the second level to the minute level is classified as the frequency regulation requirement, and the energy balance from the hour level is classified as the peak-valley regulation requirement. On the other hand, with the large-scale rapid increase of new energy, due to the fact that the power generation rigidity or adjustability of the new energy is poor, the requirements for energy balance of different time scales of a power system are higher, and larger peak-load and frequency-modulation requirements are brought.
From the perspective of the whole society, the time transfer storage of energy, the power generation and the load curve are better matched through energy storage, the capability of a power system for consuming larger-scale clean energy is enhanced, the quality of electric energy is improved, the comprehensive investment of the power system is reduced, and the purposes of cleaner power supply and lower comprehensive social cost are achieved, so that the industrial competitiveness of China is enhanced, and the final goal of social development of green and low carbon is achieved.
Disclosure of Invention
At present, the requirements of a power grid in each period are possibly different, the invention takes the power grid requirements as guidance, the problem of the actual power grid is solved through single energy storage, and the provided specific scheme is as follows:
an energy storage multi-scene application switching control method comprises the following steps:
s1, analyzing the power grid demand scene according to actual power grid data;
s2, dividing the demand scene into a demand scene with predictable planning and a demand scene with unpredictable planning;
s3, analyzing and determining the arrangement and the planning of all foreseeable planning demand scenes in the time period of the day through historical data and day-ahead data;
s4, determining a calculation method of the actual active output and the reactive output of the stored energy in each predictable and planned time interval of the demand scene;
s5, establishing an identification index to finish identification of the unpredictable planning demand scene;
and S6, establishing a switching index to judge whether the switching of the unpredictable planning demand scene is completed or not.
Preferably, the demand scenario that can be predicted to be planned in S2 may specifically be: peak regulation, steady state voltage regulation and steady state frequency modulation; the unpredictable planning demand scenario may specifically be: transient voltage regulation and transient frequency modulation.
Preferably, S3 specifically includes dividing the day into a main peak regulation period and a main voltage regulation period on a time scale, where the daytime is the main peak regulation period, and the nighttime is the main voltage regulation period.
Preferably, S4 is specifically, wherein peak shaving is mainly performed in the main peak shaving period, the PCS capacity first meets the peak shaving, an energy storage active output curve is obtained after determining a peak shaving line and a valley filling line through a load prediction curve, and an energy storage reactive margin curve for voltage regulation is obtained through energy storage planned output; in the main voltage regulation period, voltage regulation is mainly performed, the PCS meets the voltage regulation firstly, in order to meet the electric quantity balance, energy storage constant low power charging is set firstly until the main voltage regulation period is finished, charging is finished just, and a constant reactive margin is obtained according to the PCS residual capacity. And determining the required reactive power output according to whether the bus voltage exceeds the dead zone, and determining whether the energy storage singly undertakes the voltage regulation task or the energy storage auxiliary capacitor carries out fine voltage regulation or the energy storage auxiliary capacitor singly undertakes the voltage regulation according to the comparison between the reactive power margin and the required reactive power output, so as to obtain the final reactive power output of the energy storage. When the required reactive power output is not greater than the reactive margin, the energy storage independently undertakes the task of voltage regulation; if the required reactive power is larger than the reactive margin, firstly, judging whether the ratio of the required reactive power to the surplus value of the unit capacitor capacity and the unit capacitor capacity exceeds a set threshold value, if so, indicating that the capacitor voltage regulation causes overshoot or overshoot due to the limitation of the unit capacitor capacity, and finely regulating the voltage by using the energy storage auxiliary capacitor, otherwise, indicating that the capacitor voltage regulation is enough to realize the voltage regulation accuracy, and carrying out the voltage regulation work by using the capacitor alone.
Preferably, the demand scenario according to the unpredictable planning in S5 is transient frequency modulation and transient voltage regulation, and when the identification index of the transient frequency modulation exceeds a certain threshold, the demand scenario is identified as transient frequency modulation, and when the identification index of the transient voltage regulation exceeds a certain threshold, the demand scenario is identified as transient voltage regulation; the identification index may specifically be:
the identification index of the transient frequency modulation comprises a comprehensive frequency modulation identification index delta Fl
Figure GDA0002440232010000031
Where Δ f is the frequency deviation, Δ fiThe frequency offset corresponding to the real-time power offset,
Figure GDA0002440232010000041
the frequency change rate is a per unit value; mu.s1,μ2,μ3Respectively, the weight, mu, between the three1231, determining the weight according to the simulation result of the system,
the frequency deviation delta f corresponding to the real-time power deviationiThe derivation formula is as follows:
Figure GDA0002440232010000042
wherein, KGAdjusting power for unit of the unit; kDAdjusting the effect coefficient for the frequency of the load; Δ p is the real-time power deviation;
the comprehensive frequency modulation identification index has the advantages that a series of misoperation such as frequency overshoot and reverse regulation of self-adaptive energy storage control is caused due to the fact that the time scale of frequency change of a conventional identification index is small and the system delay is large, real-time power deviation delta p is introduced into the comprehensive frequency modulation identification index so as to make up for the frequency deviation caused by power deviation outside a day-ahead plan, and misoperation including late action and over action during frequency modulation can be prevented;
the identification index of transient voltage regulation can be voltage deviation delta U in a conventional identification method or a comprehensive voltage regulation identification index delta Ut
Δu=u(t)-uPCCN
Δui=∫(uPCCN-u(t))dt
Figure GDA0002440232010000043
Wherein u (t) is a real-time voltage value of a grid connection point; u. ofPCCNIs a grid-connected voltage rating; Δ uiAccumulating the variation for the voltage;
Figure GDA0002440232010000044
is the rate of change of voltage; Δ u, Δ ui
Figure GDA0002440232010000045
Are per unit values.
The invention provides a multi-scene application switching control method based on a control strategy of a plurality of application scenes of the current energy storage access power grid and combined with the analysis of actual power grid requirements, aims to achieve the purpose of fully meeting the requirements of different power grids by accessing energy storage and performing adaptive transformation matched with different power grids, and can solve the problems of the current power grid as much as possible by accessing the energy storage and built-in control methods. Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
Fig. 1 is a flowchart illustrating steps of an energy storage multi-application scenario application switching control method according to an embodiment of the present invention;
FIG. 2 is a diagram illustrating the time period arrangement and schedule of the peak regulation and the steady-state voltage regulation performed on a typical day according to an embodiment of the present invention;
FIG. 3 is a flowchart illustrating details of S4 according to an embodiment of the present invention;
FIG. 4 is a flowchart illustrating details of S6 according to an embodiment of the present invention;
FIG. 5 is a flowchart illustrating details of S8 according to an embodiment of the present invention;
fig. 6 is a diagram of performing energy storage SOC calibration recovery at set time intervals according to an embodiment of the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are illustrative and intended to be illustrative of the invention and are not to be construed as limiting the invention.
As can be seen from fig. 1, the method for controlling switching of energy storage multi-scenario applications provided in the embodiment of the present invention includes the following steps:
s1, analyzing the power grid demand scene according to actual power grid data;
s2, dividing the demand scene into a demand scene with predictable planning and a demand scene with unpredictable planning;
s3, analyzing and determining the arrangement and the planning of all foreseeable planning demand scenes in the time period of the day through historical data and day-ahead data;
s4, determining a calculation method of the actual active output and the reactive output of the stored energy in each predictable and planned time interval of the demand scene;
s5, establishing an identification index to finish identification of the unpredictable planning demand scene;
and S6, establishing a switching index to judge whether the switching of the unpredictable planning demand scene is completed or not.
The demand scenario that can be predicted to be planned in S2 may specifically be: peak regulation, steady state voltage regulation and steady state frequency modulation; the unpredictable planning demand scenario may specifically be: transient voltage regulation and transient frequency modulation.
In the embodiment, the power grid demand scenarios determined by the actual power grid data in the preset S1 include: peak regulation, steady state voltage regulation, transient state voltage regulation and transient state frequency modulation. According to the S2, the peak regulation and steady state pressure regulation scene is a demand scene which can be predicted and planned, and the transient state pressure regulation and transient state frequency regulation are a demand scene which can not be predicted and planned.
Wherein, the S3 may specifically be:
as can be seen from fig. 2, a typical day data is selected to perform the time interval arrangement and planning of the peak regulation and the steady-state voltage regulation on the day, and the following conclusions are obtained by combining the change rule of the peak regulation target parameter, i.e., the load, and the steady-state voltage regulation target parameter, i.e., the voltage, on the typical day:
1. the change rule of the total load of the region is consistent with the change rule of the load of the transformer substation. The load basically tends to rise in the morning (6: 00-11: 00), tends to fall in the evening (20: 00-4: 00), has a large peak and a small peak respectively at noon (11: 00-12: 00) and evening (18: 00-20: 00), and has a large trough in the early morning (2: 00-5: 00). Therefore, the energy storage installed on the 10kV bus of the transformer substation has no essential difference between peak clipping and valley filling of the total regional load and peak clipping and valley filling of the transformer substation load, and the same effect can be achieved.
2. The change rule of the load is basically opposite to the change rule of the bus voltage. The voltage drops when the load increases in the morning (6: 00-11: 00) and rises when the load decreases in the evening (20: 00-4: 00). When the load is at a higher level, the voltage is basically at a lower level, but the load crosses the peak clipping line for a plurality of times when the load is at the higher level, the maximum value is higher than the peak clipping line by a certain distance, the voltage is basically not lower than the lower voltage limit when the load is at the lower level, and a distance is reserved between the real-time voltage and the lower voltage limit when the load is at the two peak clipping areas; the voltage is substantially at a higher level when the load is at a lower level, the voltage also exceeds the upper voltage limit when the load crosses the valley fill line, and the voltage substantially crosses the limit in the valley fill region. Therefore, the stored energy does not need to be considered in the peak clipping region, but needs to be considered in the valley filling region.
It can be concluded that the voltage is at a higher level at load dips and is out of limit for a long time due to the absence of reactors at a number of substations in the grid. Too high a voltage will result in: the transformer is over-excited, so that the loss of an iron core is greatly increased; secondly, the aging of the electrical equipment is accelerated, and the service life is reduced; and causing damage to industrial equipment and unqualified industrial products. And because the valley filling period of the peak regulation scene is to solve the problem of electric quantity balance of the stored energy and generate positive influence on the voltage, but according to the voltage regulation formula, the longitudinal component of the voltage is far smaller than the transverse component of the voltage, and the influence of the reactive output of the stored energy on the system voltage is far larger than the active output of the stored energy, so that the switching control plan of the energy storage plan peak regulation/plan voltage regulation is provided without installing a reactor.
According to the conclusion, the switching control plan of energy storage plan peak shaving/plan voltage regulation may specifically be:
dividing the day into a main peak regulation time interval and a main peak regulation time interval on a time scale, wherein the daytime is the main peak regulation time interval, the nighttime is the main peak regulation time interval, and the specific time node division is obtained according to the following data analysis, as shown in table 1, counting the voltage and the load value from 0 point to 12 points of a typical day, determining the time corresponding to the intersection point of the voltage back and the upper voltage limit of 10.5kV and the time corresponding to the intersection point of the load line rising and the peak clipping line, determining the area where the time node switched between the main peak regulation time interval and the main peak regulation time interval is located to be 9:00-10:15 according to the time, and selecting a corresponding proper point as the switched time node in the area.
TABLE 1 scene Change time points
Figure GDA0002440232010000081
As can be seen from fig. 3, the step S4 may specifically be:
the method comprises the steps that peak shaving is mainly performed in the main peak shaving period, the PCS capacity meets the peak shaving firstly, an energy storage active output curve is obtained after a peak shaving line and a valley filling line are determined through a load prediction curve, and an energy storage reactive margin curve for voltage regulation is obtained through energy storage planned output; in the main voltage regulation period, voltage regulation is mainly performed, the PCS meets the voltage regulation firstly, in order to meet the electric quantity balance, energy storage constant low power charging is set firstly until the main voltage regulation period is finished, charging is finished just, and a constant reactive margin is obtained according to the PCS residual capacity. And determining the required reactive power output according to whether the bus voltage exceeds the dead zone, and determining whether the energy storage singly undertakes the voltage regulation task or the energy storage auxiliary capacitor carries out fine voltage regulation or the energy storage auxiliary capacitor singly undertakes the voltage regulation according to the comparison between the reactive power margin and the required reactive power output, so as to obtain the final reactive power output of the energy storage. When the required reactive power output is not greater than the reactive margin, the energy storage independently undertakes the task of voltage regulation; if the required reactive power is larger than the reactive margin, firstly, judging whether the ratio of the required reactive power to the surplus value of the unit capacitor capacity and the unit capacitor capacity exceeds a set threshold value, if so, indicating that the capacitor voltage regulation causes overshoot or overshoot due to the limitation of the unit capacitor capacity, and therefore, the energy storage auxiliary capacitor is used for finely regulating the voltage, otherwise, indicating that the capacitor voltage regulation is enough to realize the voltage regulation accuracy, and therefore, the capacitor is used for independently carrying out the voltage regulation work.
The unpredictable demand scenario in S5 includes transient frequency modulation and transient voltage regulation, where the identification index of the transient frequency modulation exceeds a certain threshold, and the identification index of the transient voltage regulation is transient voltage regulation; the identification index may specifically be:
1. identification index of transient frequency modulation
The frequency modulation identification index can be frequency deviation delta F in a conventional identification method, and can also be a comprehensive frequency modulation identification index delta Ft
Figure GDA0002440232010000091
Where Δ f is the frequency deviation, Δ fiThe frequency offset corresponding to the real-time power offset,
Figure GDA0002440232010000092
the frequency change rate is a per unit value; mu.s1,μ2,μ3Respectively, the weight, mu, between the three123And (1) determining the weight according to the simulation result of the system.
The frequency deviation delta f corresponding to the real-time power deviationiThe derivation formula is as follows:
Figure GDA0002440232010000093
wherein, KGAdjusting power for unit of the unit; kDAdjusting the effect coefficient for the frequency of the load; Δ p is the real-time power offset.
The comprehensive frequency modulation identification index has the advantages that a series of misoperation such as frequency overshoot and reverse regulation of self-adaptive energy storage control is caused due to the fact that the time scale of frequency change of a conventional identification index is small and the system delay is large, real-time power deviation delta p is introduced into the comprehensive frequency modulation identification index so as to make up for the frequency deviation caused by power deviation outside a day-ahead plan, and misoperation including late action and over action during frequency modulation can be prevented.
2. Identification index of transient voltage regulation
The voltage regulation identification index can be voltage deviation delta U in a conventional identification method, and can also be a comprehensive voltage regulation identification index delta Ut
Δu=u(t)-uPCCN
Δui=∫(uPCCN-u(t))dt
Figure GDA0002440232010000094
Wherein u (t) is a real-time voltage value of a grid connection point; u. ofPCCNIs a grid-connected voltage rating; Δ uiAccumulating the variation for the voltage;
Figure GDA0002440232010000101
as a change in voltageRate; Δ u, Δ ui
Figure GDA0002440232010000102
Are per unit values.
The advantages of the comprehensive pressure regulating identification index are the same as the comprehensive frequency modulation identification index.
Since it is necessary to confirm the influence on other scenes (especially the previous scene) and the result of participating in the scene after the energy storage participates in the scene when the transient frequency modulation scene or the transient voltage regulation scene is identified in S5, the switching index in S6 is used to determine whether the switching is completed, and the switching index may include influence factors on other scenes and result factors of the energy storage participating in the scene.
The switching index may be specifically represented by the following formula:
Z=γ1Rfro-bac2Ifro-bac
Figure GDA0002440232010000103
Figure GDA0002440232010000104
wherein gamma is1And gamma2Weights for the result factor and the impact factor, respectively; rfro-bacAnd Ifro-bacResult silverson and influence factor respectively; Δ xbac-froThe method comprises the steps of obtaining the variable quantity of an original scene target parameter x before and after switching of an energy storage scene; Δ xfroDeviation of an original scene target parameter x before energy storage switching; Δ ybac-froThe variation of the target parameter y of the next scene before and after the energy storage scene is switched; Δ yfroAnd (4) the deviation of the next field through the target parameter y before the energy storage switching.
After the energy storage participates in the scene, the energy storage does not have great effect on other scenes except the previous scene and can be ignored, so that the influence factors are the exit of the previous scene and the addition of the sceneInfluence on the target parameters of the previous scene, namely the variation of the target parameters of the previous scene before and after switching; the result factor is the influence of the stored energy participating in the scene on the result of the scene target parameter, namely the variation of the scene target parameter before and after switching. And determining the relative weight of the parameters according to the priorities of the two parameters to obtain a switching index as follows, and determining whether scene switching is finished according to judgment of whether the switching index exceeds a set threshold value. If the previous application scene does not exist, namely the stored energy is not applied to the scene at present, the influence factor is 0, namely gamma2=0。
Wherein, γ1,γ2The determination of the weight may specifically be:
1. urgency index m
The urgency index is an index established for measuring the deviation degree of the scene target quantity, and is the severity reflecting the current scene.
2. Importance index n
The importance index is to measure the importance degree of pairwise comparison between scenes, for example, the known importance index of the frequency modulation scene is higher than that of the pressure regulating scene.
3. Comprehensive index
The composite index is defined as the product of the urgency index and the importance index.
λi=mi·ni
Determining gamma according to the composite index1,γ2The numerical value of (a) is as follows:
Figure GDA0002440232010000111
as can be seen from fig. 4, the specific step of S6 may be:
s7, identifying an unpredictable planning demand scene according to S5, if a single scene is identified, judging whether the output application of the predictable planning demand scene is currently carried out on stored energy, if not, directly entering the identified unpredictable planning demand scene, if so, calculating a switching index and comparing the switching index with a set threshold value to select whether to switch the scene;
and S8, if two demand scenes of transient voltage regulation and transient frequency modulation are identified, judging whether the output application of the demand scene which can be predicted and planned is carried out at present or not in the stored energy, if not, calculating the switching indexes of the two demand scenes of transient voltage regulation and transient frequency modulation and comparing the sizes of the two switching indexes, selecting one scene from the two demand scenes of transient voltage regulation and transient frequency modulation, if so, calculating the switching indexes of the two demand scenes of transient voltage regulation and transient frequency modulation and comparing the two switching indexes with the set threshold value, and selecting whether to switch to the transient voltage regulation scene or the transient frequency modulation scene or not.
As can be seen from fig. 5, the step of comparing the magnitudes of the switching indexes in S8 to select the entry scene may specifically be:
s9, calculating an influence factor and a result factor to obtain the size of a switching index;
s10, judging whether a transient voltage regulation scene and a transient frequency modulation scene are identified at the same time, if so, judging the numerical values of a transient voltage regulation/transient frequency modulation switching index and a set threshold, if the switching index of the transient voltage regulation is maximum, switching to the transient voltage regulation scene, if the switching index of the transient frequency modulation is maximum, switching to the transient frequency modulation scene, and if the set threshold is maximum, selecting not to switch; if not, judging the value between the switching index and the set threshold value, if the switching index is maximum, selecting to switch to the identified scene, and if the set threshold value is maximum, selecting not to switch.
Due to unpredictability and uncertainty of transient frequency modulation and steady frequency modulation scenes, energy storage electric quantity originally meeting a planned peak regulation scene is changed after participating in the frequency modulation scenes, the invention provides the following two methods for solving the problem of electric quantity conservation:
the method comprises the following steps: dividing the energy storage capacity into a virtual plan capacity and a virtual scheduling capacity, wherein the virtual plan capacity is used for determining the peak shaving plan output, and determining a peak shaving line and a valley filling line of a peak shaving scene according to the divided virtual plan capacity; the virtual scheduling capacity is used for additionally increasing or decreasing active power output of the frequency modulation scene, and if the virtual scheduling capacity is 0, the frequency modulation scene needs energy storage and discharge, the energy storage does not participate in the frequency modulation scene; and if the frequency modulation scene needs energy storage and charging when the virtual scheduling capacity is the maximum value, the energy storage does not participate in the frequency modulation scene.
The second method comprises the following steps: and setting a time interval to perform energy storage SOC (state of charge) return recovery. As shown in fig. 6, the following may be specifically mentioned:
if the primary frequency modulation consumes the electric quantity in the primary frequency modulation scene aiming at the condition of temporary frequency reduction, the stored energy is charged at the constant power in the electric quantity feedback area, as shown in the region I in the figure, the charging power is calculated as the following formula, and the charging time is t from t1At the beginning, at t1+ Δ t end; if the primary frequency modulation is aimed at the situation of sudden frequency increase, the primary frequency modulation scene stores electric quantity, the stored energy is discharged at constant power in the electric quantity feedback area, as shown in the region II in the figure, the discharge power is as follows, and the discharge time is t2At Δ t, starting at t2And (6) ending.
1. Region (power calculation)
(1) Objective function
max Δt
min Ppeak-P(t1+Δt)
(2) Constraint conditions
[Ppeak-P(t1+Δt)]Δt=Qre
0<Δt≤t2-t1
2. Region 2 power calculation
(1) Objective function
max Δt
min P(t2-Δt)-Pvalley
(2) Constraint conditions
[P(t2-Δt)-Pvalley]Δt=Qre
0<Δt≤t2-t1
Wherein, Δ t is the duration of the constant power electric quantity calibration; t is t1Starting time between main voltage regulating area and peak clipping area for energy storage inactive area;t2The end time of the energy storage non-action area between the main voltage regulating area and the peak clipping area; ppeakCutting a peak line for energy storage; pvalleyAnd filling valley lines for energy storage.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples and features of different embodiments or examples described in this specification can be combined and combined by one skilled in the art without contradiction.
Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art within the scope of the present invention.

Claims (2)

1.一种储能多场景应用切换控制方法,其特征在于,包括如下步骤:1. a kind of energy storage multi-scene application switching control method, is characterized in that, comprises the steps: s1.根据实际电网数据分析该电网需求场景;s1. Analyze the power grid demand scenario according to the actual power grid data; S2.将所述的需求场景分为可预知规划的需求场景和不可预知规划的需求场景,所述的可预知规划的的需求场景具体可以为:调峰、稳态调压、稳态调频;所述的不可预知规划的的需求场景具体可以为:暂态调压、暂态调频;S2. Divide the demand scenarios into predictable and planned demand scenarios and unpredictable planned demand scenarios. The predictable and planned demand scenarios may specifically include: peak regulation, steady-state voltage regulation, and steady-state frequency regulation; The unpredictably planned demand scenarios may specifically include: transient voltage regulation and transient frequency regulation; S3.通过历史数据及日前数据分析确定所有可预知规划的需求场景在该日的时段安排及规划,将该日由时间尺度上分为主调峰时段和主调压时段,白天为主调峰时段,夜间为主调压时段;S3. Determine the time period arrangement and planning of all predictable and planned demand scenarios on the day through historical data and previous data analysis, and divide the day into the main peak regulation period and the main voltage regulation period on the time scale, and the main peak regulation period during the day period, the main pressure regulation period at night; S4.确定在每一个可预知规划的需求场景的时段中储能实际有功出力和无功出力的计算方法;S4. Determine the calculation method of the actual active power output and reactive power output of energy storage in each period of predictable and planned demand scenarios; S5.建立识别指标完成不可预知规划的需求场景的识别;S5. Establish identification indicators to complete the identification of unpredictable planning demand scenarios; S6.建立切换指标判断是否完成所述的不可预知规划的需求场景的切换,S4具体为,其中,在主调峰时段以调峰为主,PCS容量首先满足调峰,通过负荷预测曲线确定削峰线和填谷线后得到储能有功出力曲线,并通过储能计划出力得到储能用于调压的无功裕度曲线;在主调压时段以调压为主,PCS首先满足调压,为了满足电量平衡,首先设置储能恒低功率充电至所述的主调压时段结束时刚好完成充电,根据PCS剩余容量求得恒定的无功裕度;根据母线电压是否超过死区来确定所需的无功出力,根据无功裕度与所需的无功出力的比较来决定由储能单独承担调压任务还是由储能辅助电容器进行精细化调压,或者由电容器单独承担,基于此得到储能最终的无功出力;当所需的无功出力不大于无功裕度时,由储能单独承担调压任务;若所需的无功出力大于无功裕度时,首先进行所需的无功出力对单位电容器容量取余的值与单位电容器容量的比值是否超过设定阈值的判断,若是则说明电容调压将由于单位电容容量的限制而导致过调或超调,由储能辅助电容器作精细化调压,若否则说明电容器调压足够实现调压精确度,由电容器单独承担调压工作。S6. Establish a switching index to judge whether the switching of the unpredictable planned demand scenario is completed. S4 is specifically, wherein, in the main peak shaving period, peak shaving is mainly used, the PCS capacity first meets the peak shaving, and the load forecast curve is used to determine the cut-off. The active power output curve of energy storage is obtained after the peak line and the filling valley line, and the reactive power margin curve of energy storage for voltage regulation is obtained through the output of the energy storage plan; in the main voltage regulation period, voltage regulation is the mainstay, and PCS first meets the pressure regulation requirements. , in order to meet the power balance, first set the energy storage constant low power charging to the end of the main voltage regulation period just to complete the charging, obtain a constant reactive power margin according to the remaining capacity of the PCS; determine the required power according to whether the bus voltage exceeds the dead zone. According to the comparison between the reactive power margin and the required reactive power output, it is determined whether the energy storage alone undertakes the voltage regulation task or the energy storage auxiliary capacitor for fine voltage regulation, or the capacitor alone undertakes, based on this The final reactive power output of the energy storage; when the required reactive power output is not greater than the reactive power margin, the energy storage alone undertakes the task of voltage regulation; if the required reactive power output is greater than the reactive power margin, the required Judging whether the ratio of the reactive power output to the unit capacitor capacity surplus and the unit capacitor capacity exceeds the set threshold value, if so, it means that the capacitor voltage regulation will cause overshoot or overshoot due to the limit of the unit capacitor capacity, and the energy storage The auxiliary capacitor is used for fine voltage regulation. Otherwise, the capacitor voltage regulation is sufficient to achieve the voltage regulation accuracy, and the capacitor is solely responsible for the voltage regulation work. 2.根据权利要求1所述的储能多场景应用切换控制方法,其特征在于,根据S5中所述的不可预知规划的需求场景为暂态调频和暂态调压,当暂态调频的识别指标超过一定阈值,则识别为暂态调频,当暂态调压的识别指标超过一定阈值,则识别为暂态调压;所述的识别指标具体可以为:2. The energy storage multi-scenario application switching control method according to claim 1, characterized in that, according to the unpredictable planning demand scenario described in S5, it is transient frequency regulation and transient voltage regulation, when the identification of the transient frequency regulation If the index exceeds a certain threshold, it is identified as transient frequency regulation, and when the identification index of transient voltage regulation exceeds a certain threshold, it is identified as transient voltage regulation; the identification index may specifically be: 暂态调频的识别指标,所述暂态调频的识别指标包括综合调频识别指标ΔFtThe identification index of the transient frequency modulation, the identification index of the transient frequency modulation includes the comprehensive frequency modulation identification index ΔF t :
Figure FDA0002891279070000021
Figure FDA0002891279070000021
其中,Δf为频率偏差,Δfi为实时功率偏差所对应的频率偏差,
Figure FDA0002891279070000022
为频率变化率,三者均为标幺值;μ1,μ2,μ3分别为三者之间的权重,μ123=1,根据系统的仿真结果确定权重大小,
Among them, Δf is the frequency deviation, Δf i is the frequency deviation corresponding to the real-time power deviation,
Figure FDA0002891279070000022
is the frequency change rate, and the three are per unit values; μ 1 , μ 2 , and μ 3 are the weights between the three, respectively, μ 1 + μ 2 + μ 3 =1, the weight is determined according to the simulation results of the system,
所述的实时功率偏差所对应的频率偏差Δfi推导公式如下:The derivation formula of the frequency deviation Δf i corresponding to the real-time power deviation is as follows:
Figure FDA0002891279070000023
Figure FDA0002891279070000023
其中,KG为机组的单位调节功率;KD为负荷的频率调节效应系数;Δp为实时功率偏差;Among them, K G is the unit adjustment power of the unit; K D is the frequency adjustment effect coefficient of the load; Δp is the real-time power deviation; 所述的综合调频识别指标优势在于常规识别指标由于频率变化的时间尺度较小以及系统延迟较大将导致自适应储能控制的频率超调、反调等一系列误操作,而所述的综合调频识别指标引入了实时功率偏差Δp以此弥补在日前计划之外的功率偏差所导致的频率偏差,可预防调频时的误动作,包括迟动作和过动作;The advantage of the comprehensive frequency modulation identification index is that the conventional identification index will cause a series of misoperations such as frequency overshoot and reverse modulation of the adaptive energy storage control due to the small time scale of frequency change and the large system delay. The indicator introduces the real-time power deviation Δp to compensate for the frequency deviation caused by the power deviation that is not planned before, which can prevent malfunction during frequency regulation, including late action and over-action; 暂态调压的识别指标,所述的调压识别指标可以为常规识别方法中的电压偏差Δu,也可以为如下的综合调压识别指标ΔUtThe identification index of transient voltage regulation, the voltage regulation identification index can be the voltage deviation Δu in the conventional identification method, or can be the following comprehensive voltage regulation identification index ΔU t : Δu=u(t)-uPCCN Δu=u(t)-u PCCN Δui=∫(uPCCN-u(t))dtΔu i =∫(u PCCN -u(t))dt
Figure FDA0002891279070000031
Figure FDA0002891279070000031
其中,u(t)为并网点实时电压值;uPCCN为并网电压额定值;Δui为电压累计变化量;
Figure FDA0002891279070000032
为电压变化率;Δu,Δui
Figure FDA0002891279070000033
均为标幺值。
Among them, u(t) is the real-time voltage value of the grid-connected point; u PCCN is the rated value of the grid-connected voltage; Δu i is the cumulative voltage change;
Figure FDA0002891279070000032
is the voltage change rate; Δu, Δu i ,
Figure FDA0002891279070000033
All are per-unit values.
CN202010005642.6A 2020-01-03 2020-01-03 Energy storage multi-scene application switching control method Active CN111162547B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202010005642.6A CN111162547B (en) 2020-01-03 2020-01-03 Energy storage multi-scene application switching control method
CN202110105911.0A CN112952848B (en) 2020-01-03 2020-01-03 A switching control method for energy storage multi-scenario applications based on comprehensive identification indicators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010005642.6A CN111162547B (en) 2020-01-03 2020-01-03 Energy storage multi-scene application switching control method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202110105911.0A Division CN112952848B (en) 2020-01-03 2020-01-03 A switching control method for energy storage multi-scenario applications based on comprehensive identification indicators

Publications (2)

Publication Number Publication Date
CN111162547A CN111162547A (en) 2020-05-15
CN111162547B true CN111162547B (en) 2021-03-23

Family

ID=70561104

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202110105911.0A Active CN112952848B (en) 2020-01-03 2020-01-03 A switching control method for energy storage multi-scenario applications based on comprehensive identification indicators
CN202010005642.6A Active CN111162547B (en) 2020-01-03 2020-01-03 Energy storage multi-scene application switching control method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202110105911.0A Active CN112952848B (en) 2020-01-03 2020-01-03 A switching control method for energy storage multi-scenario applications based on comprehensive identification indicators

Country Status (1)

Country Link
CN (2) CN112952848B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111711211B (en) * 2020-07-06 2023-05-02 国网湖南省电力有限公司 Scene switching method for battery energy storage power station
EP4061048A1 (en) 2021-01-22 2022-09-21 Shenzhen Consys Science&Technology Co., Ltd. Wireless intelligent decision-making communication method, apparatus, and system
CN112423324B (en) * 2021-01-22 2021-04-30 深圳市科思科技股份有限公司 Wireless intelligent decision communication method, device and system
CN114069663B (en) * 2021-10-28 2023-09-12 国网湖南省电力有限公司 Automatic voltage control method and system for energy storage power station for enhancing reactive power regulation capability
WO2023108384A1 (en) * 2021-12-14 2023-06-22 浙江大学台州研究院 Comprehensive identification index-based energy storage multi-scenario application switching control method
CN115115255A (en) * 2022-07-13 2022-09-27 国网浙江省电力有限公司台州供电公司 Dispatching control method of battery swap station participating in collaborative multi-scenario application

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109768554A (en) * 2019-03-01 2019-05-17 中国科学院电工研究所 Scenario control switching method of AC-DC hybrid distributed energy system test platform

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2992582B1 (en) * 2013-04-29 2018-01-31 Level Energy Ltd Apparatus and method for managing stored energy
CN104065095B (en) * 2014-05-26 2016-08-17 国家电网公司 A kind of battery energy storage system auxiliary primary frequency regulation optimal control method
CN104201670B (en) * 2014-08-28 2015-05-27 湖南大学 Coordinated control method and system for battery energy storage power supply to participate in power grid secondary frequency regulation
CN105226729B (en) * 2015-10-26 2017-08-29 国电南瑞科技股份有限公司 A kind of active control method for coordinating of new energy combined generating system containing energy storage
CN105449701B (en) * 2016-01-18 2018-02-16 华北电力科学研究院有限责任公司 A kind of energy-storage system participates in the method and device of mains frequency control
GB2565308B (en) * 2017-08-08 2020-06-24 British Gas Trading Ltd System for controlling energy supply across multiple generation sites
DE102018105483A1 (en) * 2018-03-09 2019-09-12 Sma Solar Technology Ag Method for operating a power generation plant and inverter for a power generation plant
CN109768626B (en) * 2018-07-16 2022-09-27 上海交通大学 A plug-and-play energy flow realization method for energy storage power station
CN110311397B (en) * 2019-07-26 2021-07-02 国网湖南省电力有限公司 Multi-scenario collaborative control method for energy storage power station based on adaptive identification
CN110401211B (en) * 2019-07-26 2021-07-27 国网湖南省电力有限公司 Recognition method of working scene of energy storage power station based on feature extraction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109768554A (en) * 2019-03-01 2019-05-17 中国科学院电工研究所 Scenario control switching method of AC-DC hybrid distributed energy system test platform

Also Published As

Publication number Publication date
CN111162547A (en) 2020-05-15
CN112952848B (en) 2022-07-08
CN112952848A (en) 2021-06-11

Similar Documents

Publication Publication Date Title
CN111162547B (en) Energy storage multi-scene application switching control method
CN111416367B (en) A collaborative control method for energy storage multi-scenario applications
Moghaddam et al. Predictive operation and optimal sizing of battery energy storage with high wind energy penetration
Papic Simulation model for discharging a lead-acid battery energy storage system for load leveling
CN102289566B (en) Multiple-time-scale optimized energy dispatching method for micro power grid under independent operation mode
CN105529793B (en) Control method for electromobile group-charging microgrid simultaneously serving as emergency power supply
JP2017163835A (en) Battery control system
CN102055217A (en) Electric vehicle orderly charging control method and system
JPWO2016084347A1 (en) Energy management apparatus, energy management method and program
Xu et al. Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation
WO2021212732A1 (en) Energy management system ems discharge control method for solving problem of transformer overcapacity
CN110994626B (en) 500-220kV regional power grid automatic voltage control method based on voltage trend prediction
US9948096B2 (en) Method for providing control power to stabilize an alternating current network, using an energy accumulator
CN113659623B (en) Optimization method and system of wind-storage combined system based on Boolean line theory
WO2023108384A1 (en) Comprehensive identification index-based energy storage multi-scenario application switching control method
CN110571838A (en) Energy storage battery early peak load reduction control method and device
US20140368039A1 (en) Method for providing control power, taking into account a variable target frequency
KR20200055554A (en) Hierarchical multi-time scale look-ahead CVR framework system for smart distribution system and apparatus therefor
Chua et al. Peak reduction for commercial buildings using energy storage
JP6108665B2 (en) Energy saving system
Pippi et al. Assessing the provision of ancillary services considering BES capacity degradation
KR102332937B1 (en) System for controlling energy storage system by regional group and method for managing energy using the same
CN117767389A (en) Energy storage battery control method based on micro-grid controller
CN111582599A (en) Energy storage equipment day active power scheduling method based on virtual power plant peak shaving
CN115693753A (en) Multi-region coordination control method based on load virtual energy storage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant