CN111119815A - Method for determining production well production allocation ratio through balanced displacement - Google Patents
Method for determining production well production allocation ratio through balanced displacement Download PDFInfo
- Publication number
- CN111119815A CN111119815A CN202010008564.5A CN202010008564A CN111119815A CN 111119815 A CN111119815 A CN 111119815A CN 202010008564 A CN202010008564 A CN 202010008564A CN 111119815 A CN111119815 A CN 111119815A
- Authority
- CN
- China
- Prior art keywords
- injection
- production well
- production
- water
- range
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010008564.5A CN111119815B (en) | 2020-01-03 | 2020-01-03 | Method for determining production well production allocation ratio through balanced displacement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010008564.5A CN111119815B (en) | 2020-01-03 | 2020-01-03 | Method for determining production well production allocation ratio through balanced displacement |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111119815A true CN111119815A (en) | 2020-05-08 |
CN111119815B CN111119815B (en) | 2022-07-26 |
Family
ID=70487064
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010008564.5A Active CN111119815B (en) | 2020-01-03 | 2020-01-03 | Method for determining production well production allocation ratio through balanced displacement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111119815B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427397A (en) * | 2020-09-11 | 2022-05-03 | 中国石油化工股份有限公司 | A method for determining the injection and production volume of chemical flooding refined to small layers and well groups |
CN114575801A (en) * | 2020-12-01 | 2022-06-03 | 中国石油天然气集团有限公司 | Method and device for optimizing liquid quantity of water-drive injection and production well based on streamline simulation |
CN115961919A (en) * | 2021-10-08 | 2023-04-14 | 大庆油田有限责任公司 | Novel chemical flooding single-layer unidirectional production and injection allocation method and application thereof |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103939066A (en) * | 2014-04-04 | 2014-07-23 | 中国石油大学(华东) | Method for determining oil well liquid production capacities by determining water injection capacities of one-injection and multi-production well group |
CN104453834A (en) * | 2014-10-31 | 2015-03-25 | 中国石油化工股份有限公司 | Injection-production relation optimizing and adjusting method for well group |
CN104747180A (en) * | 2014-02-26 | 2015-07-01 | 中国石油化工股份有限公司 | Fracture-cavity type oil deposit analyzing method for water-flooding development and application thereof |
CN106150454A (en) * | 2015-03-27 | 2016-11-23 | 中国石油化工股份有限公司 | Offshore oilfield vector quantization production and injection proration method |
RU2616010C1 (en) * | 2016-06-19 | 2017-04-12 | Публичное акционерное общество "Татнефть" им. В.Д.Шашина | Recovery method of zone-heterogenetic oil reservoirs by impulse low-mineralized water flooding |
CN106600443A (en) * | 2016-12-09 | 2017-04-26 | 北京源博科技有限公司 | Water saturation-based dynamic oil well yield splitting method |
CN106777651A (en) * | 2016-12-09 | 2017-05-31 | 北京源博科技有限公司 | The oil-water well production split method of balanced flood principle |
CN106812508A (en) * | 2015-12-01 | 2017-06-09 | 中国石油化工股份有限公司 | Well concocting method based on multifactor raising offshore oilfield interlayer use rate |
CN107829718A (en) * | 2017-02-10 | 2018-03-23 | 中国石油化工股份有限公司 | Oil reservoir well pattern and injection-production program Optimization Design based on balanced water drive theory |
CN107869348A (en) * | 2017-10-27 | 2018-04-03 | 西北大学 | A kind of method of thick-layer sandstone oil reservoir producing well production split |
CN108457630A (en) * | 2017-02-21 | 2018-08-28 | 中国石油化工股份有限公司 | The method for improving oil recovery using polygamy point small pressure difference water filling |
-
2020
- 2020-01-03 CN CN202010008564.5A patent/CN111119815B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104747180A (en) * | 2014-02-26 | 2015-07-01 | 中国石油化工股份有限公司 | Fracture-cavity type oil deposit analyzing method for water-flooding development and application thereof |
CN103939066A (en) * | 2014-04-04 | 2014-07-23 | 中国石油大学(华东) | Method for determining oil well liquid production capacities by determining water injection capacities of one-injection and multi-production well group |
CN104453834A (en) * | 2014-10-31 | 2015-03-25 | 中国石油化工股份有限公司 | Injection-production relation optimizing and adjusting method for well group |
CN106150454A (en) * | 2015-03-27 | 2016-11-23 | 中国石油化工股份有限公司 | Offshore oilfield vector quantization production and injection proration method |
CN106812508A (en) * | 2015-12-01 | 2017-06-09 | 中国石油化工股份有限公司 | Well concocting method based on multifactor raising offshore oilfield interlayer use rate |
RU2616010C1 (en) * | 2016-06-19 | 2017-04-12 | Публичное акционерное общество "Татнефть" им. В.Д.Шашина | Recovery method of zone-heterogenetic oil reservoirs by impulse low-mineralized water flooding |
CN106600443A (en) * | 2016-12-09 | 2017-04-26 | 北京源博科技有限公司 | Water saturation-based dynamic oil well yield splitting method |
CN106777651A (en) * | 2016-12-09 | 2017-05-31 | 北京源博科技有限公司 | The oil-water well production split method of balanced flood principle |
CN107829718A (en) * | 2017-02-10 | 2018-03-23 | 中国石油化工股份有限公司 | Oil reservoir well pattern and injection-production program Optimization Design based on balanced water drive theory |
CN108457630A (en) * | 2017-02-21 | 2018-08-28 | 中国石油化工股份有限公司 | The method for improving oil recovery using polygamy point small pressure difference water filling |
CN107869348A (en) * | 2017-10-27 | 2018-04-03 | 西北大学 | A kind of method of thick-layer sandstone oil reservoir producing well production split |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427397A (en) * | 2020-09-11 | 2022-05-03 | 中国石油化工股份有限公司 | A method for determining the injection and production volume of chemical flooding refined to small layers and well groups |
CN114575801A (en) * | 2020-12-01 | 2022-06-03 | 中国石油天然气集团有限公司 | Method and device for optimizing liquid quantity of water-drive injection and production well based on streamline simulation |
CN114575801B (en) * | 2020-12-01 | 2024-03-01 | 中国石油天然气集团有限公司 | Method and device for optimizing liquid amount of water flooding injection and production well based on streamline simulation |
CN115961919A (en) * | 2021-10-08 | 2023-04-14 | 大庆油田有限责任公司 | Novel chemical flooding single-layer unidirectional production and injection allocation method and application thereof |
Also Published As
Publication number | Publication date |
---|---|
CN111119815B (en) | 2022-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114372352B (en) | Method for Predicting Peak Shaving Capability of Gas Storage in Complex Fault Block Reservoir by Numerical Simulation of Seepage-Temperature Dual Field Coupling | |
CN112561144B (en) | Method for evaluating main control factor of productivity of tight oil fracturing horizontal well and predicting productivity | |
CN106869896B (en) | A kind of Low permeable oil and gas reservoirs straight well volume fracturing reservoir reconstruction volume Forecasting Methodology | |
CN106894814B (en) | Rapid identification method for secondary enrichment of residual oil in high-water-content later period of complex fault block oil reservoir | |
CN111119815B (en) | Method for determining production well production allocation ratio through balanced displacement | |
CN108301825B (en) | High-temperature high-pressure reservoir pore pressure analysis method | |
US20220307356A1 (en) | Chemical flooding method for balanced displacement of heterogeneous oil reservoir | |
CN110454135B (en) | Shale oil well spacing method for long horizontal well with small well spacing, multiple strata series and close cutting | |
CN109614736B (en) | Method for determining production capacity factors of directional well and vertical well for steam huff and puff development of offshore thickened oil field | |
CN108894777A (en) | A kind of separate stratum fracfturing commingling production oil-gas reservoir reservoir properties and characteristic of crack determination method for parameter | |
CN103590824A (en) | Capacity calculation method for compact gas reservoir horizontal well after multi-section fracturing modification | |
CN107437127B (en) | Oil well blowout stop stratum pressure prediction method | |
CN105931125B (en) | Method for predicting yield of compact oil staged multi-cluster volume fracturing horizontal well | |
CN105443093B (en) | Well head combined measuring device and its method for injection well | |
CN113836695A (en) | Oil reservoir numerical simulation method based on non-grid connecting elements | |
CN108197421A (en) | A kind of tight gas and coal bed gas develop jointly Favorable Areas method for quantitatively evaluating | |
CN111485863A (en) | Method for calculating capacity multiple of steam huff-puff well of heavy oil field | |
CN110778313A (en) | Rare earth element tracer interwell monitoring technology | |
CN117930384B (en) | Inversion method of fracture parameters in oil and gas reservoirs based on ion analysis of fracturing flowback fluid | |
CN113445972A (en) | Method and system for determining zonal water injection testing and regulating period of tight oil reservoir | |
El-Khatib | The modification of the Dykstra-parsons method for inclined stratified reservoirs | |
CN108664678A (en) | A kind of shale gas well yield prediction technique | |
CN112746836B (en) | Production calculation method of each layer of oil well based on interlayer interference | |
CN112465218B (en) | Offshore thin interbed sandstone oilfield layer system division and perforation scheme optimization method | |
CN112464136B (en) | Method for predicting directional well production energy and development effect of offshore thin interbed sandstone oil field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Cao Xiaopeng Inventor after: Li Jiaxiang Inventor after: Chen Hui Inventor after: Zhang Shiming Inventor after: Ren Yunpeng Inventor after: Sun Du Inventor after: Jia Yanping Inventor after: Sun Xiuzhi Inventor after: Li Chao Inventor after: Liu Zupeng Inventor before: Chen Hui Inventor before: Li Jiaxiang Inventor before: Zhang Shiming Inventor before: Cao Xiaopeng Inventor before: Ren Yunpeng Inventor before: Sun Du Inventor before: Jia Yanping Inventor before: Sun Xiuzhi Inventor before: Li Chao Inventor before: Liu Zupeng |
|
GR01 | Patent grant | ||
GR01 | Patent grant |