CN110924433A - Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum - Google Patents

Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum Download PDF

Info

Publication number
CN110924433A
CN110924433A CN201911249509.9A CN201911249509A CN110924433A CN 110924433 A CN110924433 A CN 110924433A CN 201911249509 A CN201911249509 A CN 201911249509A CN 110924433 A CN110924433 A CN 110924433A
Authority
CN
China
Prior art keywords
foundation pit
pile
rock stratum
steel pipe
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911249509.9A
Other languages
Chinese (zh)
Inventor
宋成辉
蒋富强
周东琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Railway Consultants Group Co Ltd
Original Assignee
CCCC Railway Consultants Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Railway Consultants Group Co Ltd filed Critical CCCC Railway Consultants Group Co Ltd
Priority to CN201911249509.9A priority Critical patent/CN110924433A/en
Publication of CN110924433A publication Critical patent/CN110924433A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/04Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Sustainable Development (AREA)
  • Environmental & Geological Engineering (AREA)
  • Foundations (AREA)

Abstract

A design method of a subway foundation pit foot-hanging pile enclosure structure in a rock stratum with soft upper part and hard lower part. The invention relates to the technical field of underground construction engineering construction; in particular to a method for adopting the design of a foundation pit enclosure structure in excavating and constructing an underground subway station in a soft upper weathered rock stratum and a hard lower weathered rock stratum. The invention adopts the large-diameter bored pile with large rigidity to enclose in the weak rock stratum at the upper part, and the slightly weathered flow pattern rock stratum with large hard strength at the lower part has small deformation and difficult large-diameter drilling construction, so the invention adopts the steel pipe pile with small diameter and easy construction, and the two piles form effective connection. The method solves the problem that the construction of the fender post in the weathered rock stratum with soft top and hard bottom is difficult; the problem of effective connection of two discontinuous pile types up and down the foundation pit is solved; the problem of upper portion drilling bored concrete pile topple over unstability is solved to upper portion drilling bored concrete pile and lower part steel-pipe pile be connected, adopts the anchor rope to lock the pile foot.

Description

Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum
Technical Field
The invention relates to the technical field of underground construction engineering construction; in particular to a method for adopting the design of a foundation pit enclosure structure in excavating and constructing an underground subway station in a soft upper weathered rock stratum and a hard lower weathered rock stratum.
Background
With the development of cities and the construction of rail transit, more and more cities build subways. For cities where underground rock formations develop, such as Qingdao, Shenzhen, mansion door, Chongqing and the like, because the upper part of the underground rock formations is influenced by weathering, the rock formations have low strength, and the slightly weathered rock formations with small influence of weathering on the lower part of the underground rock formations have high strength, so that the underground rock formations are soft at the upper part and hard at the lower part. A subway foundation pit is excavated in a weathered rock stratum which is soft at the top and hard at the bottom, and if a bored pile is adopted to reach the bottom, holes are difficult to form in a weathered and slightly weathered flow pattern rock stratum, the construction is slow, the construction cost is huge, and the construction period is delayed. However, if one steel pipe pile easy to construct is adopted, the strength of the strongly weathered flow pattern rock stratum at the upper part is low, the deformation is large, the rigidity of the steel pipe pile is small, the capability of resisting the deformation of the foundation pit is poor, and the risk of excavating the foundation pit is large. Under the condition that the strength of the upper strongly weathered flow pattern rock stratum is low, the deformation is large, and a bored pile with large rigidity is required to be used for enclosing, and the construction of the bored pile with large diameter in the strongly weathered flow pattern rock stratum is very easy, so that the bored pile with large rigidity is adopted in the strongly weathered flow pattern rock stratum with low strength at the upper part; the strength of the weathered and slightly weathered flow pattern rock stratum in the lower part is high, the deformation of the foundation pit is small, the hole forming by adopting the large-diameter cast-in-situ bored pile is difficult, unnecessary waste is caused, the construction by adopting the small-diameter steel pipe pile with small rigidity is easy, the rigidity requirement of the foundation pit enclosure structure can be met, and the cost is saved. However, two types of piles are adopted in the vertical direction of the foundation pit, the upper pile and the lower pile are vertically discontinuous, when the foundation pit is excavated to the bottom of the upper bored pile, the upper pile can be toppled and destabilized, so that the two types of piles must be effectively connected, and the upper bored pile cannot topple and destabilize when the foundation pit is excavated to the bottom of the upper pile, so that a leg locking waist beam is poured at a position 2m away from the bottom of the steel pipe pile top and the bored pile, the 2m pile leg is inserted into the middle-stroke fluidized bed rock stratum anchoring section, an anchor cable is arranged at the leg locking waist beam, the pile leg of the upper bored pile and the pile leg of the steel pipe pile are locked, and the upper bored pile and the lower steel pipe pile are effectively connected to form the hanging foot pile.
The information disclosed in this background section is only for enhancement of understanding of the general background of the invention and should not be taken as an acknowledgement or any form of suggestion that this information forms the prior art already known to a person skilled in the art.
Disclosure of Invention
The invention aims to provide a design method of a subway foundation pit foot-hanging pile enclosure structure in a rock stratum with soft upper part and hard lower part, and solves the technical problems in the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme:
the invention provides a design method of a subway foundation pit foot-hanging pile enclosure structure in a soft-up and hard-down rock stratum, which comprises the following steps:
1) leveling a field, constructing cast-in-situ bored piles in the circumferential direction of a foundation pit, wherein the cast-in-situ bored piles penetrate through a miscellaneous fill layer and a strongly weathered flow pattern rock layer and are driven into the moderately weathered flow pattern rock layer for at least 2m to serve as an embedded end;
2) constructing a crown beam, a retaining wall and a sump, excavating a foundation pit to be below a first steel support, and erecting the first steel support;
3) continuously excavating the foundation pit to a position below the medium-stroke fluidized bed rock stratum, constructing a steel pipe pile, and driving the steel pipe pile into a position 2.5m below the bottom of a station foundation pit to be embedded and fixed; then, a leg locking waist beam is poured, the steel pipe pile and the cast-in-situ bored pile are connected and anchored together through the leg locking waist beam, a leg locking pre-stressed anchor cable is arranged, and the pile leg of the cast-in-situ bored pile and the pile top of the steel pipe pile are locked through the pre-stressed anchor cable;
4) continuously blasting and excavating the foundation pit to be below a first anchor rod, arranging the first anchor rod, hanging a net and performing anchor spraying on the side wall of the foundation pit, and circularly excavating the foundation pit, arranging the anchor rod and performing anchor spraying in sequence until the bottom of the blasting and excavating foundation pit is below the position of a station bottom plate;
5) laying a station bottom plate and a side wall waterproof layer, pouring the station bottom plate, and then sequentially pouring a main body side wall, a structural column, a floor slab and a top plate of the station;
6) laying a waterproof layer of a top plate of the station, backfilling a foundation pit, removing the first support, recovering the road surface, and finally pouring the secondary structure platform in the station to finish the structure construction.
As a further technical scheme, in the step 1), the diameter of the bored pile is 0.8mm, and the horizontal distance is 1.4m, the diameter of the bored pile is at least more than 2m in the weathered rhyolite layer during driving of the bored pile.
As a further technical scheme, the foundation pit is excavated in the step 2) to be 0.5m below the first steel support, the diameter of the first steel support is 0.609m, and the horizontal distance is 6 m.
As a further technical scheme, in the step 3), excavation of the foundation pit is continued at least to below 2m of the weathered flow stratum, and then the steel pipe pile is constructed; the diameter of the steel pipe piles is 146mm, and the distance between the steel pipe piles is 1 m; the steel pipe pile enters a slightly weathered flow pattern rock stratum by at least 2.5 m; and then pouring the lock leg waist beam.
As a further technical scheme, in the step 3), the prestressed anchor cable is a 7 Φ s15.2 prestressed steel strand, that is, a 7-strand cable, the diameter of the 7.2 mm prestressed anchor cable is provided with a bonded steel strand, the standard tensile strength of the prestressed anchor cable is fpk-1860 MPa, and the prestressed anchor cable is arranged between piles, that is, two piles and one anchor.
As a further technical scheme, the anchor rods in the step 4) adopt twisted steel bars with the diameter of 25mm, and the distance between the anchor rods is 2 m; the thickness of the side wall of the net hanging anchor spraying foundation pit is 100 mm.
By adopting the technical scheme, the invention has the following beneficial effects:
1. the design problem of excavation foundation pit enclosure structures in weathered rock strata, upper soft and lower hard weathered rock strata is solved. If a single cast-in-situ bored pile is adopted to reach the bottom, the construction speed of the medium weathered flow pattern rock stratum is slow, and the pile forming of the slightly weathered flow pattern rock stratum is difficult;
2. weathered rock area subway station foundation ditch rock stratum is soft down hard, and two kinds of different grade type fender piles are discontinuous on the foundation ditch degree of depth, have solved the effective connection and the anchor problem of two kinds of stake types, are about to lock the stake foot and the steel-pipe pile top of upper portion bored concrete pile for upper portion bored concrete pile and lower part steel-pipe pile carry out effective connection and form and hang the foot stake, prevent that upper portion bored concrete pile from empting the unstable problem.
3. The combination of the large-diameter cast-in-situ bored pile and the small-diameter steel pipe pile is adopted in the upper soft and lower hard rock strata, so that the construction is easy, the construction period is shortened, the investment cost is saved, and the wide economic benefit and social benefit are achieved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic view of a construction structure in step 1 of the embodiment of the present invention;
FIG. 2 is a schematic diagram of a construction structure in step 2 of the embodiment of the present invention;
FIG. 3 is a schematic diagram of a construction structure in step 3 of the embodiment of the present invention;
FIG. 4 is a schematic diagram of a construction structure in step 4 of the embodiment of the present invention;
FIG. 5 is a schematic diagram of a construction structure in step 5 of the embodiment of the present invention;
FIG. 6 is a schematic view of a construction structure in step 6 of the embodiment of the present invention;
icon: 1-miscellaneous fill; 2-strongly weathered flow-textured rock formations; 3-stroke formation of a fluid-textured formation; 4-slightly weathered flow-textured rock formations; 5-field; 6-drilling a cast-in-place pile; 7-a crown beam; 8, foundation pit; 9-a first steel support; 10, a foundation pit; 11-steel pipe piles; 12-locking the leg waist rail; 13-prestressed anchorage cable; 14-anchor rod; 15-anchor spraying the side wall of the foundation pit; 16-pit bottom; 17-station floor; 18-side wall of main body of station; 19-structural pillars; 20-a floor slab; 21-a top plate; 22-waterproof layer of station roof; 23-backfilling; 24-station platform structure.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
The following detailed description of embodiments of the invention refers to the accompanying drawings. It should be understood that the detailed description and specific examples, while indicating the present invention, are given by way of illustration and explanation only, not limitation.
With reference to fig. 1 to 6, the present embodiment provides a method for designing a support structure of a foundation pit footing pile of a subway in a rock stratum with a soft upper part and a hard lower part, including the following steps:
step 1: leveling a field 5, constructing bored piles 6 at the periphery of a foundation pit by adopting a rotary drilling rig, wherein the bored piles 6 penetrate through a miscellaneous fill layer 1 and a strongly weathered flow pattern rock layer 2 and are driven into the moderately weathered flow pattern rock layer 3 for at least more than 2m, the diameter of each bored pile 6 is 0.8mm, and the horizontal distance between every two bored piles 6 is 1.4 m;
step 2: constructing a crown beam 7, a retaining wall and a water collecting pit, excavating a foundation pit 8 to be 0.5m below a first steel support 9, erecting the first steel support 9, wherein the diameter of the first steel support 9 is 0.609m, and the horizontal distance is 6 m;
and step 3: continuously excavating the foundation pit 10 at least until the weathered flow pattern rock stratum 3 is at least below 2m, constructing the steel pipe pile 11, wherein the diameter of the steel pipe pile 11 is 146mm, the distance is 1m, the steel pipe pile 11 is driven into the bottom 16 of the station foundation pit and enters the weathered flow pattern rock stratum 4 at least below 2.5 m; then a foot locking waist beam 12 is poured, the steel pipe pile 11 and the cast-in-situ bored pile 6 are connected and anchored together through the foot locking waist beam 12, a foot locking prestressed anchor cable 13 is arranged in a driving mode, the prestressed anchor cable 13 is used for locking the pile foot of the cast-in-situ bored pile 6 and the pile top of the steel pipe pile 11, a prestressed steel strand (7 phi s15.2) is adopted for the prestressed anchor cable 13, namely a bundle of 7 wires is formed, a bonded steel strand is arranged at the diameter of 15.2mm, the standard tensile strength is fpk which is 1860MPa, the prestressed anchor cable is arranged among piles (two piles and one anchor), the standard spacing is 2.0m, and the length and the bundle number of the anchor cable are determined according to foundation pit;
and 4, step 4: continuously blasting and excavating the foundation pit to be below the first anchor rod, arranging anchor rods 14, wherein the anchor rods are made of twisted steel with the diameter of 25mm, the distance is 2m, the anchor rods are arranged in a quincunx shape, the thickness of the side wall of the net-hanging anchor-shotcreting foundation pit is 15 mm, and the foundation pit is circularly excavated, the anchor rods and the anchor shotcreting are arranged in sequence until the bottom 16 of the blasting and excavating foundation pit is positioned below a station bottom plate 17;
and 5: laying a station bottom plate and a side wall waterproof layer, pouring a station bottom plate 17, and then sequentially pouring a station main body side wall 18, a structural column 19, a floor slab 20 and a top plate 21;
step 6: laying a station roof waterproof layer 22, backfilling a foundation pit 23, removing the first support 9, recovering the field 5, and finally pouring a station internal secondary structure platform 24 to complete the structure construction.
In a subway foundation pit in a rock stratum with soft upper part and hard lower part, because the strength of a weathered rock stratum at the upper part is low and the excavation deformation of the foundation pit is large, a large-diameter cast-in-situ bored pile with high rigidity is required to be adopted for enclosing, so that the large deformation of the foundation pit is prevented, and because the strength of rocks is low, the large-diameter bored construction is easy; the slightly weathered flow pattern rock stratum at the lower part has high hardness and small deformation, and large-diameter drilling is difficult to construct, so that the construction is easy by adopting a steel pipe pile with a small diameter.
Because the upper part of the foundation pit support structure is a cast-in-place pile, the lower part of the foundation pit support structure is a steel pipe pile, the upper pile and the lower pile are vertically discontinuous, if the foundation pit is excavated to the bottom of the cast-in-place pile at the upper part, the pile at the upper part can overturn and be unstable, in order to solve the problem, the two piles are effectively connected, a leg locking waist beam is poured at the position of an embedded section, which is met by the top of the steel pipe pile and the bottom of the cast-in-place pile, in a stroke flow pattern rock stratum generally, the pile leg 2m below the pile leg is used as an anchoring section inserted into the rock stratum, the size of the waist beam is determined according to foundation pit calculation, the pile leg of the cast-in-place pile leg and the top of the steel pipe are connected, an anchor rope is arranged at the leg locking waist beam, the length and the distance of the anchor rope are determined according to calculation and.
In conclusion, the design problem of excavation of the enclosure structure of the foundation pit in the weathered rock stratum with the soft upper part and the hard lower part is solved; the problem of effective connection of two discontinuous pile types up and down the foundation pit is solved; the problem of upper portion drilling bored concrete pile topple over unstability is solved to upper portion drilling bored concrete pile and lower part steel-pipe pile be connected, adopts the anchor rope to lock the pile foot.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.

Claims (6)

1. The design method of the enclosure structure of the foundation pit foot-hanging pile of the subway in the upper soft and lower hard rock stratum is characterized by comprising the following steps of:
1) leveling a field, constructing cast-in-situ bored piles around a foundation pit, wherein the cast-in-situ bored piles penetrate through a miscellaneous fill layer and a strongly weathered flow pattern rock layer and are driven into the middle weathered flow pattern rock layer for at least 2m to serve as embedded ends;
2) constructing a crown beam, a retaining wall and a sump, excavating a foundation pit to be below a first steel support, and erecting the first steel support;
3) continuously excavating the foundation pit to a position below the medium-stroke fluidized bed rock stratum, and constructing a steel pipe pile, wherein the steel pipe pile is driven into the position below the bottom of the station foundation pit by at least 2.5 m; then, a leg locking waist beam is poured, the steel pipe pile and the cast-in-situ bored pile are connected and anchored together through the leg locking waist beam, a leg locking pre-stressed anchor cable is arranged, and the pile leg of the cast-in-situ bored pile and the pile top of the steel pipe pile are locked through the pre-stressed anchor cable;
4) continuously blasting and excavating the foundation pit to be below a first anchor rod, arranging the first anchor rod, hanging a net and performing anchor spraying on the side wall of the foundation pit, and circularly excavating the foundation pit, arranging the anchor rod and performing anchor spraying in sequence until the bottom of the foundation pit under the bottom plate of the station is blasted and excavated;
5) laying a station bottom plate and a side wall waterproof layer, pouring the station bottom plate, and then sequentially pouring a main body side wall, a structural column, a floor slab and a top plate of the station;
6) laying a waterproof layer of a top plate of the station, backfilling a foundation pit, removing the first support, recovering the road surface, and finally pouring the secondary structure platform in the station to finish the structure construction.
2. The method for designing a foundation pit foot pile enclosure for a subway as claimed in claim 1, wherein said bored pile in step 1) has a diameter of 0.8mm and a horizontal pitch of 1.4 m.
3. A design method of a foundation pit foot pile enclosure structure for a subway in a soft upper and hard lower rock stratum as claimed in claim 1, wherein the excavation foundation pit in step 2) is 0.5m below the first steel support, the diameter of the first steel support is 0.609m, and the horizontal spacing is 6m to 9 m.
4. The design method of the enclosure structure of the footing piles of the subway foundation pit in the upper soft and lower hard rock stratum according to claim 1, wherein in the step 3), the foundation pit is continuously excavated at least below 2m of the middle weathered flow pattern rock stratum, and then the steel pipe pile is constructed; the diameter of the steel pipe piles is 146mm, and the distance between the steel pipe piles is 1 m; the steel pipe pile enters a slightly weathered flow pattern rock stratum by at least 2.5 m; and then pouring the lock leg waist beam.
5. The method for designing a foundation pit foot-hanging pile enclosure structure for a subway in an upper soft and lower hard rock stratum as claimed in claim 1, wherein said prestressed anchor cable in step 3) is a 7 Φ s15.2 prestressed steel strand, i.e. a 7-strand, 15.2mm in diameter with a bonded steel strand, with a standard tensile strength of fpk-1860 MPa, and is arranged between piles, i.e. two piles and one anchor.
6. The method for designing a foundation pit foot pile enclosure structure for a subway according to claim 1, wherein the anchor rods in step 4) are twisted steel bars with a diameter of 25mm, and the distance between the anchor rods is 2 m; the thickness of the side wall of the net hanging anchor spraying foundation pit is 100 mm.
CN201911249509.9A 2019-12-09 2019-12-09 Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum Pending CN110924433A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911249509.9A CN110924433A (en) 2019-12-09 2019-12-09 Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911249509.9A CN110924433A (en) 2019-12-09 2019-12-09 Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum

Publications (1)

Publication Number Publication Date
CN110924433A true CN110924433A (en) 2020-03-27

Family

ID=69857609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911249509.9A Pending CN110924433A (en) 2019-12-09 2019-12-09 Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum

Country Status (1)

Country Link
CN (1) CN110924433A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877358A (en) * 2020-07-21 2020-11-03 成都市建筑设计研究院 Supporting structure, building and construction method of soft rock foundation pit at lower part of upper soil layer
CN112252331A (en) * 2020-08-28 2021-01-22 河海大学 A kind of deep foundation pit oblique support support structure and construction method
CN112323815A (en) * 2020-11-11 2021-02-05 中国电建集团华东勘测设计研究院有限公司 Soil rock combines stratum deep basal pit suspension foot stake supporting construction
CN112627199A (en) * 2020-12-02 2021-04-09 中国十九冶集团有限公司 Construction method for foundation pit support of cyclone well
CN113026760A (en) * 2021-03-04 2021-06-25 青岛业高建设工程有限公司市北分公司 Combined type supporting pile for double-element foundation pit of soil and rock and construction method thereof
CN113653068A (en) * 2021-09-08 2021-11-16 中建八局第二建设有限公司 Construction method of deep foundation pit support based on upper soft and lower hard rock stratum
CN113700000A (en) * 2021-08-26 2021-11-26 中建八局第二建设有限公司 Supporting construction of binary geology hitching leg stake
CN114991204A (en) * 2022-05-11 2022-09-02 中铁第六勘察设计院集团有限公司 Rapid combination construction method for arch shell of pillarless hall station
CN115478542A (en) * 2022-09-21 2022-12-16 张军舰 Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile
CN118531809A (en) * 2024-07-01 2024-08-23 北京城建设计发展集团股份有限公司 Detachable locking beam structure for open excavation of soil-rock combined stratum and its construction method
CN118704529A (en) * 2024-08-29 2024-09-27 山东建筑大学 Energy dissipation and vibration reduction structure and construction method of subway station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008057184A (en) * 2006-08-30 2008-03-13 Ps Mitsubishi Construction Co Ltd Method of constructing underground wall by using h-shaped pc pile
CN202969392U (en) * 2012-12-06 2013-06-05 中铁四局集团有限公司 Combined support for complex geological deep foundation pit
CN108661056A (en) * 2018-05-22 2018-10-16 中铁六局集团有限公司工程设计院 A kind of peg board combined retaining structure and construction technology up and down
CN208023591U (en) * 2018-03-19 2018-10-30 南京市测绘勘察研究院股份有限公司 A kind of foundation pit supporting construction of steel sheet pile combined deposited pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008057184A (en) * 2006-08-30 2008-03-13 Ps Mitsubishi Construction Co Ltd Method of constructing underground wall by using h-shaped pc pile
CN202969392U (en) * 2012-12-06 2013-06-05 中铁四局集团有限公司 Combined support for complex geological deep foundation pit
CN208023591U (en) * 2018-03-19 2018-10-30 南京市测绘勘察研究院股份有限公司 A kind of foundation pit supporting construction of steel sheet pile combined deposited pile
CN108661056A (en) * 2018-05-22 2018-10-16 中铁六局集团有限公司工程设计院 A kind of peg board combined retaining structure and construction technology up and down

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘卫丰: "《隧道工程》", 31 October 2012, 北京交通大学出版社 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877358B (en) * 2020-07-21 2024-12-24 成都市建筑设计研究院有限公司 A support structure, building and construction method for a foundation pit with upper soil layer and lower soft rock
CN111877358A (en) * 2020-07-21 2020-11-03 成都市建筑设计研究院 Supporting structure, building and construction method of soft rock foundation pit at lower part of upper soil layer
CN112252331B (en) * 2020-08-28 2022-05-17 杭州京杭运河二通道建设投资有限公司 A kind of deep foundation pit oblique support support structure and construction method
CN112252331A (en) * 2020-08-28 2021-01-22 河海大学 A kind of deep foundation pit oblique support support structure and construction method
CN112323815A (en) * 2020-11-11 2021-02-05 中国电建集团华东勘测设计研究院有限公司 Soil rock combines stratum deep basal pit suspension foot stake supporting construction
CN112627199A (en) * 2020-12-02 2021-04-09 中国十九冶集团有限公司 Construction method for foundation pit support of cyclone well
CN113026760A (en) * 2021-03-04 2021-06-25 青岛业高建设工程有限公司市北分公司 Combined type supporting pile for double-element foundation pit of soil and rock and construction method thereof
CN113700000A (en) * 2021-08-26 2021-11-26 中建八局第二建设有限公司 Supporting construction of binary geology hitching leg stake
CN113653068A (en) * 2021-09-08 2021-11-16 中建八局第二建设有限公司 Construction method of deep foundation pit support based on upper soft and lower hard rock stratum
CN114991204A (en) * 2022-05-11 2022-09-02 中铁第六勘察设计院集团有限公司 Rapid combination construction method for arch shell of pillarless hall station
CN115478542A (en) * 2022-09-21 2022-12-16 张军舰 Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile
CN118531809A (en) * 2024-07-01 2024-08-23 北京城建设计发展集团股份有限公司 Detachable locking beam structure for open excavation of soil-rock combined stratum and its construction method
CN118704529A (en) * 2024-08-29 2024-09-27 山东建筑大学 Energy dissipation and vibration reduction structure and construction method of subway station
CN118704529B (en) * 2024-08-29 2024-12-06 山东建筑大学 Energy consumption vibration reduction structure of subway station and construction method

Similar Documents

Publication Publication Date Title
CN110924433A (en) Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum
CN202969392U (en) Combined support for complex geological deep foundation pit
CN103898916B (en) Mini stake Composite Braced Retaining Structure and construction method
CN109339029B (en) Construction method for resisting uplift deformation in excavation of foundation pit above existing tunnel
CN206034454U (en) Supporting construction
CN107700498A (en) Multi-thread crossings on different level abnormal shape deep foundation pit supporting structure and its construction method
CN207260183U (en) A kind of external hanging type baffle prestress anchorage cable peg board retaining wall
CN111560962A (en) Backfill area foundation pit supporting structure and construction method thereof
KR100831332B1 (en) Underground wall for civil engineering and construction method
CN110616740A (en) Structure for expanding subway section in subway mine method construction interval and construction method thereof
CN110777806A (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
CN207452911U (en) A kind of multi-thread crossings on different level abnormal shape deep foundation pit supporting structure
CN210421152U (en) Anchor road shoulder retaining wall
CN112982433A (en) Foundation pit supporting system supported by foot hanging piles and main body structure and construction method
CN210369069U (en) Joint anti structure of floating of karst area foundation ditch
CN117646437A (en) Side slope and foundation pit double-row pile supporting structure and construction method
CN216809983U (en) A roadbed retaining wall structure
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN214530693U (en) Earth-rock combined ground layer combined pile foundation pit supporting system
CN216640647U (en) Mountain area is faced river steep bank slope pile foundation platform
CN111877358B (en) A support structure, building and construction method for a foundation pit with upper soil layer and lower soft rock
CN215292504U (en) Tunnel structure penetrating through large karst cavity top plate
CN112049117B (en) Earth-rock binary foundation pit supporting structure system
CN108149691A (en) Face the method for excavation of deep foundation pit of inner city under complicated geological
CN211395688U (en) Double row pile supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200327