CN110886237B - 拱桥施工方法 - Google Patents
拱桥施工方法 Download PDFInfo
- Publication number
- CN110886237B CN110886237B CN201911360515.1A CN201911360515A CN110886237B CN 110886237 B CN110886237 B CN 110886237B CN 201911360515 A CN201911360515 A CN 201911360515A CN 110886237 B CN110886237 B CN 110886237B
- Authority
- CN
- China
- Prior art keywords
- span
- arch
- main
- arch rib
- mid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 113
- 238000000034 method Methods 0.000 claims abstract description 59
- 229910000831 Steel Inorganic materials 0.000 claims description 80
- 239000010959 steel Substances 0.000 claims description 80
- 238000012360 testing method Methods 0.000 claims description 14
- 230000003068 static effect Effects 0.000 claims description 12
- 238000003466 welding Methods 0.000 claims description 9
- 239000011248 coating agent Substances 0.000 claims description 8
- 238000000576 coating method Methods 0.000 claims description 8
- 238000005260 corrosion Methods 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 230000002829 reductive effect Effects 0.000 abstract description 5
- 239000004567 concrete Substances 0.000 description 10
- 238000013461 design Methods 0.000 description 7
- 238000012544 monitoring process Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 6
- 210000001503 joint Anatomy 0.000 description 6
- 238000011161 development Methods 0.000 description 3
- 238000009415 formwork Methods 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 238000007711 solidification Methods 0.000 description 3
- 230000008023 solidification Effects 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 239000010410 layer Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 239000004593 Epoxy Substances 0.000 description 1
- 239000004698 Polyethylene Substances 0.000 description 1
- 230000002378 acidificating effect Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 101150097977 arch-1 gene Proteins 0.000 description 1
- 239000010953 base metal Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 239000011247 coating layer Substances 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000004519 grease Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 229920000728 polyester Polymers 0.000 description 1
- -1 polyethylene Polymers 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 238000004381 surface treatment Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911360515.1A CN110886237B (zh) | 2019-12-25 | 2019-12-25 | 拱桥施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911360515.1A CN110886237B (zh) | 2019-12-25 | 2019-12-25 | 拱桥施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110886237A CN110886237A (zh) | 2020-03-17 |
CN110886237B true CN110886237B (zh) | 2021-02-12 |
Family
ID=69753160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911360515.1A Active CN110886237B (zh) | 2019-12-25 | 2019-12-25 | 拱桥施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110886237B (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111455871B (zh) * | 2020-05-19 | 2024-04-19 | 中交路桥建设有限公司 | 一种钢箱拱桥拱肋分节段竖转结构及施工方法 |
CN112342891B (zh) * | 2020-11-03 | 2021-11-19 | 中铁重工有限公司 | 一种斜拉索钢拱景观桥的施工方法 |
CN112982166A (zh) * | 2021-01-04 | 2021-06-18 | 中铁重工有限公司 | 一种用于异形薄壁壳体结构整体提升设备及方法 |
CN112878171A (zh) * | 2021-01-05 | 2021-06-01 | 中交路桥建设有限公司 | 一种大跨径钢结构拱桥及施工方法 |
CN113668399B (zh) * | 2021-08-23 | 2022-10-25 | 中交路桥建设有限公司 | 一种中承式系杆钢箱拱桥施工方法 |
CN113668398A (zh) * | 2021-08-23 | 2021-11-19 | 中交路桥建设有限公司 | 一种跨河钢结构拱桥施工方法 |
CN114214920B (zh) * | 2021-12-21 | 2024-04-30 | 安徽省公路桥梁工程有限公司 | 大跨度双层合建钢桁架拱桥及其施工方法 |
CN114277673B (zh) * | 2021-12-24 | 2023-07-04 | 中交三公局第三工程有限公司 | 大跨大倾角提篮式钢梁、拱节段拼装方法 |
CN114250710B (zh) * | 2021-12-30 | 2024-04-30 | 安徽省公路桥梁工程有限公司 | 钢箱系杆拱桥施工方法 |
CN115217035A (zh) * | 2022-07-18 | 2022-10-21 | 四川省交通建设集团股份有限公司 | 一种钢箱系杆拱桥的安装方法 |
CN117119402B (zh) * | 2023-10-11 | 2024-06-14 | 中铁八局集团第一工程有限公司 | 大跨度钢桁拱桥施工监控方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020060520A (ko) * | 2001-01-11 | 2002-07-18 | 신영균 | 아치교 분할 가설 공법 |
CN101672011A (zh) * | 2009-10-13 | 2010-03-17 | 中铁二局股份有限公司 | 钢管拱肋竖向提升方法 |
CN104404887A (zh) * | 2014-12-01 | 2015-03-11 | 中铁二十局集团第一工程有限公司 | 一种大跨度钢管拱桥无支架吊装工艺 |
JP2016023523A (ja) * | 2014-07-24 | 2016-02-08 | 株式会社Ihiインフラシステム | アーチ橋の架橋方法 |
CN107237262A (zh) * | 2017-06-09 | 2017-10-10 | 中交第二航务工程局有限公司 | 一种混凝土拱肋施工方法 |
CN108660903A (zh) * | 2018-06-20 | 2018-10-16 | 安徽省交通建设股份有限公司 | 钢管混凝土拱桥及施工方法 |
-
2019
- 2019-12-25 CN CN201911360515.1A patent/CN110886237B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020060520A (ko) * | 2001-01-11 | 2002-07-18 | 신영균 | 아치교 분할 가설 공법 |
CN101672011A (zh) * | 2009-10-13 | 2010-03-17 | 中铁二局股份有限公司 | 钢管拱肋竖向提升方法 |
JP2016023523A (ja) * | 2014-07-24 | 2016-02-08 | 株式会社Ihiインフラシステム | アーチ橋の架橋方法 |
CN104404887A (zh) * | 2014-12-01 | 2015-03-11 | 中铁二十局集团第一工程有限公司 | 一种大跨度钢管拱桥无支架吊装工艺 |
CN107237262A (zh) * | 2017-06-09 | 2017-10-10 | 中交第二航务工程局有限公司 | 一种混凝土拱肋施工方法 |
CN108660903A (zh) * | 2018-06-20 | 2018-10-16 | 安徽省交通建设股份有限公司 | 钢管混凝土拱桥及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN110886237A (zh) | 2020-03-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110886237B (zh) | 拱桥施工方法 | |
US7461427B2 (en) | Bridge construction system and method | |
CN110409304B (zh) | 一种节段预制盖梁悬臂拼装施工方法 | |
CN113638304B (zh) | 混凝土梁式桥隐盖梁结构体系及其施工方法 | |
CN111254836A (zh) | 山区大跨径钢混组合梁现场拼装及架桥机架设施工方法 | |
CN110468713B (zh) | 一种兼作墩柱模板及预应力支撑的两用装置及其施工方法 | |
CN110230397B (zh) | 一种建筑物空间错位悬挑露台的施工方法 | |
CN113605771A (zh) | 一种预应力装配式框架结构体系 | |
CN110904854B (zh) | 适应拆迁进度的拱桥施工方法 | |
CN112324131B (zh) | 一架两用大跨度劲性梁施工结构及其施工工法 | |
CN112609595A (zh) | 梁拱组合刚构桥合龙段施工方法 | |
CN110318342B (zh) | 一种节段预制盖梁悬臂拼装施工装置 | |
CN109972512A (zh) | 一种压型钢板-混凝土组合桥面板的现浇施工方法 | |
NL2034933B1 (en) | Construction method of lower cross beam of main tower of highway-railway dual-purpose and river-crossing A-type cable-stayed bridge | |
CN115075143B (zh) | 一种桥梁塔柱施工方法 | |
CN216108007U (zh) | 混凝土梁式桥及其现浇隐盖梁 | |
CN112538814A (zh) | 建桥用横向预制拼装波形钢腹板pc组合箱梁施工工艺 | |
CN115369749B (zh) | 墩柱-横梁-盖梁一体化公轨双层高架桥及施工方法 | |
CN213683191U (zh) | 一架两用大跨度劲性梁施工结构 | |
CN117738082A (zh) | 一种桥梁塔柱施工方法 | |
CN117626825A (zh) | 一种用于拱桥桥面单向架设的配重施工方法 | |
CN119352412A (zh) | 钢箱混合梁斜拉桥索塔钢锚梁与混凝土牛腿组合的施工方法 | |
Petrangeli et al. | The Chiani suspension bridge: a complete overhaul | |
CN119736855A (zh) | 可周转的贝雷梁侧模桁架式0#块牛腿托架及施工方法 | |
Pothecary et al. | TORRIDGE BRIDGE: ERECTION OF SUPERSTRUCTURE. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Yang Honglei Inventor after: Xiao Xiangrong Inventor after: Liu Huaigang Inventor after: Gao Shiqiang Inventor after: Chen Zhenyu Inventor after: Tang Daixin Inventor after: Han Chunpeng Inventor after: Chen Yongfeng Inventor after: Wu Jianfeng Inventor after: Xia Jiangnan Inventor after: Li Hongwen Inventor after: Lu Hong Inventor after: Yu Li Inventor after: Yang Jie Inventor after: Zhang Tao Inventor after: Liu Jie Inventor before: Wu Jianfeng Inventor before: Liu Huaigang Inventor before: Gao Shiqiang Inventor before: Chen Zhenyu Inventor before: Tang Daixin Inventor before: Han Chunpeng Inventor before: Chen Yongfeng Inventor before: Xia Jiangnan Inventor before: Li Hongwen Inventor before: Lu Hong Inventor before: Yu Li Inventor before: Yang Jie Inventor before: Zhang Tao Inventor before: Liu Jie Inventor before: Xiao Xiangrong |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |