built
program
preset
debugging
destructive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911110167.2A
Other languages
Chinese (zh)
Other versions
CN110865630B (en
Inventor
牛犇
崔鹏辉
林立财
李晓波
廉敏
伍国兴
宋文伟
林海
王力
徐振华
吴恒伟
张磊磊
许新超
林龙福
杨小兵
陈国宝
戴岸珏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201911110167.2A priority Critical patent/CN110865630B/en
Publication of CN110865630A publication Critical patent/CN110865630A/en
Application granted granted Critical
Publication of CN110865630B publication Critical patent/CN110865630B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24065Real time diagnostics
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Debugging And Monitoring (AREA)

Abstract

本发明涉及一种智能变电站内置程序的验收方法,所述方法包括:S1:对待测智能变电站内置程序进行顺控调试,当所述内置程序通过所述顺控调试,则执行S2。S2:对所述内置程序进行破坏性试验并获取试验结果。S3:根据所述试验结果确定所述内置程序的验收结果。本申请提供的技术方案,可以保证程序化流程在故障或异常的情况下能够正常中断,减少了误操作的风险。同时还能及时发现故障,防止故障设备投入运行,避免了产生的衍生危害。大大提高了程序化操作的可靠性和稳定性。

Figure 201911110167

The present invention relates to an acceptance method for a built-in program of a smart substation, the method comprising: S1: perform sequential control debugging of the built-in program of the intelligent substation to be tested, and execute S2 when the built-in program passes the sequential control debugging. S2: Perform a destructive test on the built-in program and obtain the test result. S3: Determine the acceptance result of the built-in program according to the test result. The technical solution provided by the present application can ensure that the programmed process can be interrupted normally in case of failure or abnormality, thereby reducing the risk of misoperation. At the same time, it can detect faults in time, prevent the faulty equipment from being put into operation, and avoid the derived hazards. Greatly improve the reliability and stability of programmed operation.

Figure 201911110167

Description

智能变电站内置程序的验收方法和系统Acceptance method and system for built-in program of smart substation

技术领域technical field

本发明涉及变电站领域,特别是涉及一种智能变电站内置程序的验收方法和系统。The invention relates to the field of substations, in particular to a method and a system for acceptance of built-in programs in intelligent substations.

背景技术Background technique

当前的电力系统中,在变电站综自系统和数字化变电站上加载程序是常用的手段。通过电气操作程序化,运行人员可以根据操作要求选择一条程序化操作命令。操作票的选择、执行和操作过程的校验由变电站操作系统自动完成,实现了“一键操作”。程序化操作的过程中每一步骤在执行之前都必须满足相应的执行条件,才能允许执行该操作步骤,执行条件不满足则禁止执行该操作步骤。In the current power system, it is a common method to load programs on the substation integrated self-system and digital substation. Through the electrical operation programming, the operator can select a programmed operation command according to the operation requirements. The selection and execution of the operation ticket and the verification of the operation process are automatically completed by the substation operating system, realizing "one-key operation". In the process of programmatic operation, each step must satisfy the corresponding execution condition before execution, so that the execution of the operation step is allowed. If the execution condition is not satisfied, the execution of the operation step is prohibited.

常规的程序化变电站的调试验收方法为顺控调试的方法。顺控调试指的是在无故障、无异常的条件下对操作对象执行相应设备状态转换的程序化操作。但是,目前顺控调试的方法无法保证在程序出现故障或异常的情况下,操作流程能够及时中断。进而导致了次生故障的发生的风险。The conventional debugging and acceptance method of programmed substation is the method of sequential control debugging. Sequence control debugging refers to the programmed operation of performing corresponding equipment state transitions on the operation object under the condition of no fault and no abnormality. However, the current sequential control debugging method cannot guarantee that the operation flow can be interrupted in time in the event of a program failure or abnormality. This in turn leads to the risk of secondary failures.

发明内容SUMMARY OF THE INVENTION

基于此,有必要针对不能保证智能变电站的内置程序在出现故障或异常时能够正常中断的问题,提供一种智能变电站内置程序的验收方法和系统。Based on this, it is necessary to provide an acceptance method and system for the built-in program of the smart substation, aiming at the problem that the built-in program of the smart substation cannot be guaranteed to be interrupted normally when a fault or abnormality occurs.

一种智能变电站内置程序的验收方法,包括:An acceptance method for a built-in program of a smart substation, comprising:

S1:对待测智能变电站内置程序进行顺控调试,当所述内置程序通过所述顺控调试,则执行S2;S1: perform sequential control debugging on the built-in program of the intelligent substation to be tested, and execute S2 when the built-in program passes the sequential control debugging;

S2:对所述内置程序进行破坏性试验并获取试验结果;S2: perform a destructive test on the built-in program and obtain the test result;

S3:根据所述试验结果确定所述内置程序的验收结果。S3: Determine the acceptance result of the built-in program according to the test result.

在其中一个实施例中,所述S1包括:In one embodiment, the S1 includes:

基于所述待测智能变电站的预设初始态和预设目标态,获取所述待测智能变电站内置程序相应的操作票,并执行所述操作票的调试步骤;Based on the preset initial state and the preset target state of the smart substation to be tested, obtain an operation ticket corresponding to the built-in program of the intelligent substation to be tested, and execute the debugging steps of the operation ticket;

若所述操作票的调试步骤执行完毕,且所述待测智能变电站从预设初始态转为预设目标态,则所述内置程序通过所述顺控调试。If the debugging steps of the operation ticket are completed, and the intelligent substation to be tested changes from a preset initial state to a preset target state, the built-in program is debugged through the sequence control.

在其中一个实施例中,所述S2包括:In one embodiment, the S2 includes:

S20:初始化N=1;S20: Initialize N=1;

S21:若在第N个预设破坏性条件下,所述内置程序中断且中断的位置为所述第N个预设破坏性条件对应的初始调试条件处,则所述初始调试条件处的内置程序通过验收,并执行S22;S21: If under the Nth preset destructive condition, the built-in program is interrupted and the interrupted position is at the initial debugging condition corresponding to the Nth preset destructive condition, then the built-in program at the initial debugging condition is The program passes the acceptance and executes S22;

S22:将所述内置程序的第N个预设破坏性条件恢复为所述初始调试条件,并令N=N+1,返回S21,直到N>Z;S22: Restore the Nth preset destructive condition of the built-in program to the initial debugging condition, and set N=N+1, and return to S21 until N>Z;

其中,N∈[1,Z],Z为所述预设破坏性条件的总数量。Among them, N∈[1,Z], Z is the total number of the preset destructive conditions.

在其中一个实施例中,所述S3包括:In one embodiment, the S3 includes:

若所述内置程序在各预设破坏性条件下均中断且中断位置为相应的所述各预设破坏性条件对应的初始调试条件处,则所述内置程序的验收的结果为合格。If the built-in program is interrupted under each preset destructive condition and the interruption position is at the initial debugging condition corresponding to each of the preset destructive conditions, the acceptance result of the built-in program is qualified.

在其中一个实施例中,若所述内置程序在第N个预设破坏性条件下未中断和/或中断位置不是第N个预设破坏性条件对应的初始调试条件处,则所述内置程序的验收的结果为不合格;In one embodiment, if the built-in program is not interrupted under the Nth preset destructive condition and/or the interruption position is not at the initial debugging condition corresponding to the Nth preset destructive condition, the built-in program is The result of acceptance is unqualified;

其中,N∈[1,Z],Z为所述预设破坏性条件的总数量。Among them, N∈[1,Z], Z is the total number of the preset destructive conditions.

在其中一个实施例中,所述预设破坏性条件的获取过程包括:In one embodiment, the acquisition process of the preset destructive condition includes:

将所述顺控调试中的调试条件取反,获得所述预设破坏性条件。Reverse the debugging conditions in the sequential control debugging to obtain the preset destructive conditions.

一种智能变电站内置程序的验收系统,包括:An acceptance system for a built-in program of an intelligent substation, comprising:

调试模块,用于对待测智能变电站内置程序进行顺控调试;The debugging module is used for sequential control debugging of the built-in program of the intelligent substation to be tested;

试验模块,用于当所述内置程序通过所述顺控调试,对所述内置程序进行破坏性试验并获取试验结果;a test module, used to perform a destructive test on the built-in program and obtain the test result when the built-in program is debugged through the sequence control;

确定模块,用于根据所述试验结果确定所述内置程序的验收结果。A determination module, configured to determine the acceptance result of the built-in program according to the test result.

在其中一个实施例中,所述调试模块包括:In one embodiment, the debugging module includes:

调试单元,用于基于所述待测智能变电站的预设初始态和预设目标态,获取所述待测智能变电站内置程序相应的操作票,并执行所述操作票的调试步骤;a debugging unit, configured to obtain an operation ticket corresponding to the built-in program of the intelligent substation to be tested based on the preset initial state and the preset target state of the intelligent substation to be tested, and to perform the debugging steps of the operation ticket;

判断单元,用于若所述操作票的调试步骤执行完毕,且所述待测智能变电站从预设初始态转为预设目标态,则所述内置程序通过所述顺控调试。A judging unit, configured to debug the built-in program through the sequence control if the debugging steps of the operation ticket are completed and the intelligent substation to be tested changes from a preset initial state to a preset target state.

在其中一个实施例中,所述试验模块包括:In one embodiment, the test module includes:

初始化单元,用于初始化N=1;an initialization unit for initializing N=1;

试验单元,用于若在第N个预设破坏性条件下,所述内置程序中断且中断的位置为所述第N个预设破坏性条件对应的初始调试条件处,则所述初始调试条件处的内置程序通过验收,并转至恢复单元;A test unit, used for if under the Nth preset destructive condition, the built-in program is interrupted and the interrupted position is the initial debugging condition corresponding to the Nth preset destructive condition, then the initial debugging condition The built-in program at the site is accepted and transferred to the recovery unit;

恢复单元,用于将所述内置程序的第N个预设破坏性条件恢复为所述初始调试条件,并令N=N+1,返回试验模块,直到N>Z;a restoration unit, configured to restore the Nth preset destructive condition of the built-in program to the initial debugging condition, and set N=N+1, and return to the test module until N>Z;

其中,N∈[1,Z],Z为所述预设破坏性条件的总数量。Among them, N∈[1,Z], Z is the total number of the preset destructive conditions.

在其中一个实施例中,所述判断模块具体用于:In one embodiment, the judging module is specifically used for:

若所述内置程序在各预设破坏性条件下均中断且中断位置为相应的所述各预设破坏性条件对应的初始调试条件处,则所述内置程序的验收的结果为合格。If the built-in program is interrupted under each preset destructive condition and the interruption position is at the initial debugging condition corresponding to each of the preset destructive conditions, the acceptance result of the built-in program is qualified.

在其中一个实施例中,所述判断模块还用于:In one embodiment, the judging module is further used for:

若所述内置程序在第N个预设破坏性条件下未中断和/或中断位置不是第N个预设破坏性条件对应的初始调试条件处,则所述内置程序的验收的结果为不合格;If the built-in program is not interrupted under the Nth preset destructive condition and/or the interruption position is not at the initial debugging condition corresponding to the Nth preset destructive condition, the acceptance result of the built-in program is unqualified ;

其中,N∈[1,Z],Z为所述预设破坏性条件的总数量。Among them, N∈[1,Z], Z is the total number of the preset destructive conditions.

本申请实施例提供一种智能变电站内置程序的验收方法。所述方法包括:对待测智能变电站内置程序进行顺控调试。当所述内置程序通过所述顺控调试,对所述内置程序进行破坏性试验并获取试验结果。根据所述试验结果确定所述内置程序的验收结果。基于本申请实施例提供的技术方案,通过在顺控调试结束后增加破坏性试验,可以确保程序化流程在故障或异常的情况下能够正常中断,减少了误操作的风险。同时还能及时发现故障,防止故障设备投入运行,避免了产生的衍生危害。大大提高了程序化操作的可靠性和稳定性。The embodiment of the present application provides an acceptance method for a built-in program of a smart substation. The method includes: performing sequential control debugging on the built-in program of the intelligent substation to be tested. When the built-in program is debugged through the sequence control, a destructive test is performed on the built-in program and a test result is obtained. The acceptance result of the built-in program is determined according to the test result. Based on the technical solutions provided by the embodiments of the present application, by adding a destructive test after the sequence control debugging is completed, it can be ensured that the programmed flow can be interrupted normally in case of failure or abnormality, and the risk of misoperation can be reduced. At the same time, it can detect faults in time, prevent the faulty equipment from being put into operation, and avoid the derived hazards. Greatly improve the reliability and stability of programmed operation.

附图说明Description of drawings

图1为本申请实施例提供的一种智能变电站内置程序的验收方法的流程图;FIG. 1 is a flowchart of an acceptance method for a built-in program of a smart substation according to an embodiment of the present application;

图2为本申请实施例提供的一种智能变电站内置程序验收方法的详细流程图;FIG. 2 is a detailed flowchart of a method for accepting a built-in program in a smart substation provided by an embodiment of the present application;

图3为本申请实施例提供的一种智能变电站内置程序验收系统结构示意图。FIG. 3 is a schematic structural diagram of a built-in program acceptance system of a smart substation according to an embodiment of the present application.

具体实施方式Detailed ways

为了便于理解本申请,下面将参照相关附图对本申请进行更全面的描述。附图中给出了本申请的首选实施例。但是,本申请可以以许多不同的形式来实现,并不局限于本文所描述的实施例。相反地,提供这些实施例的目的是使本申请的公开内容更加透彻全面。In order to facilitate understanding of the present application, the present application will be described more fully below with reference to the related drawings. Preferred embodiments of the present application are shown in the accompanying drawings. However, the application may be implemented in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.

除非另有定义,本文所使用的所有的技术和科学术语与属于本申请的技术领域的技术人员通常理解的含义相同。本文中在本申请的说明书中使用的术语只是为了描述具体的实施例的目的,不是旨在限制本申请。本文所使用的术语“和/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field to which this application belongs. The terms used herein in the specification of the application are for the purpose of describing specific embodiments only, and are not intended to limit the application. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.

如图1所示,为了提高程序化操作的可靠性和稳定性,确保程序化操作流程在故障或异常下能够正常中断,减少误操作的风险,本申请的一个实施例提供一种智能变电站内置程序的验收方法,所述方法包括:As shown in FIG. 1 , in order to improve the reliability and stability of the programmed operation, ensure that the programmed operation process can be interrupted normally in the event of a fault or abnormality, and reduce the risk of misoperation, an embodiment of the present application provides a built-in smart substation A method of acceptance of a program, the method comprising:

S1:对待测智能变电站内置程序进行顺控调试,当所述内置程序通过所述顺控调试,则执行S2;S1: perform sequential control debugging on the built-in program of the intelligent substation to be tested, and execute S2 when the built-in program passes the sequential control debugging;

S2:对所述内置程序进行破坏性试验并获取试验结果;S2: perform a destructive test on the built-in program and obtain the test result;

S3:根据所述试验结果确定所述内置程序的验收结果。S3: Determine the acceptance result of the built-in program according to the test result.

在其中的一个实施例中,所述S1:对待测智能变电站内置程序进行顺控调试,当所述内置程序通过所述顺控调试,则执行S2。In one embodiment, the S1: perform sequential control debugging on the built-in program of the intelligent substation to be tested, and execute S2 when the built-in program passes the sequential control debugging.

其中,所述顺控调试为根据待测智能变电站的初始状态和预设目标状态,利用相应的操作票进行调试的过程。Wherein, the sequential control debugging is a process of debugging using corresponding operation tickets according to the initial state and preset target state of the intelligent substation to be tested.

具体的,根据待测智能变电站的初始状态和预设目标状态,利用相应的操作票对所述待测智能变电站内置程序进行调试,如果待测智能变电站的内置程序通过所述调试,则执行S2。通过本实施例对所述内置程序进行顺控调试,可以保证所述内置程序在不出现故障或异常时正常执行。Specifically, according to the initial state and the preset target state of the smart substation to be tested, use the corresponding operation ticket to debug the built-in program of the smart substation to be tested, and if the built-in program of the smart substation to be tested passes the debugging, execute S2 . By performing sequential control debugging on the built-in program in this embodiment, it can be ensured that the built-in program is normally executed when no fault or abnormality occurs.

在其中的一个实施例中,所述S2:对所述内置程序进行破坏性试验并获取试验结果。In one of the embodiments, the S2: perform a destructive test on the built-in program and obtain a test result.

其中,所述破坏性试验是指在程序化操作前,可以通过人为或者其它的方式对程序化操作过程中的控制条件和/或确认条件取反,得到相应的破坏性控制条件和/或相应的破坏性确认条件。在所述相应的破坏性控制条件和/或相应的破坏性确认条件下进行程序化操作的过程。例如:开关分闸后的确认条件在顺控调试时为断开断路器时一次电流消失。在破坏性试验中,开关分闸后的确定条件则为断开断路器但一次电流未消失。再例如:合上线路地刀前的控制条件在顺控调试时为合上线路地刀前线路无电压。在破坏性实验中,合上线路地刀前的控制条件则为合上线路地刀前线路有电压。另外,还可以对待测智能变电站内置程序发“事故总”信号等。Wherein, the destructive test refers to that, before the programmed operation, the control conditions and/or confirmation conditions in the programmed operation process can be reversed manually or by other means to obtain the corresponding destructive control conditions and/or corresponding destructive confirmation conditions. The process of performing programmed operations under said corresponding destructive control conditions and/or corresponding destructive confirmation conditions. For example: the confirmation condition after the switch is opened is that the primary current disappears when the circuit breaker is opened during the sequence control debugging. In the destructive test, the determined condition after the switch is opened is to open the circuit breaker but the primary current does not disappear. Another example: the control condition before closing the ground knife of the line is that there is no voltage on the line before the ground knife is closed during the sequence control debugging. In the destructive experiment, the control condition before closing the ground knife is that there is voltage on the line before closing the ground knife. In addition, the built-in program of the intelligent substation to be tested can also send a "total accident" signal, etc.

具体的,对所述内置程序中的控制条件和/或确认条件取反,使所述内置程序工作在取反后的控制条件和/或确认条件下,并获取试验结果。通过本实施例对所述内置程序进行的破坏性试验,可以确保程序化流程在故障或异常的情况下能够正常中断,减少了误操作的风险。同时还能及时发现故障,防止故障设备投入运行,避免了产生的衍生危害。大大提高了程序化操作的可靠性和稳定性。Specifically, the control conditions and/or confirmation conditions in the built-in program are reversed, so that the built-in program works under the reversed control conditions and/or confirmation conditions, and the test results are obtained. Through the destructive test performed on the built-in program in this embodiment, it can be ensured that the programmed flow can be interrupted normally in case of failure or abnormality, thereby reducing the risk of misoperation. At the same time, it can detect faults in time, prevent the faulty equipment from being put into operation, and avoid the derived hazards. Greatly improve the reliability and stability of programmed operation.

在其中的一个实施例中,所述S3:根据所述试验结果确定所述内置程序的验收结果。In one embodiment, the S3: determine the acceptance result of the built-in program according to the test result.

具体的,在对待测智能变电站执行从初始态到目标态转换的程序化操作过程中,程序化操作流程应当中断在破坏性试验的破坏性控制条件和/或相应的确认条件下,则该项破坏性试验通过。否则,该项破坏性试验不通过。此时,需通知供应商处理相关问题,直到相关问题被解决。根据本实施例的验收结果,可以对所述内置程序是否合格进行合理评价,能够为所述内置程序的优化提供参考。Specifically, during the programmed operation process of the smart substation under test performing the transition from the initial state to the target state, the programmed operation process should be interrupted under the destructive control conditions of the destructive test and/or the corresponding confirmation conditions, then this item Destructive test passed. Otherwise, the destructive test fails. At this time, the supplier needs to be notified to deal with the relevant issues until the relevant issues are resolved. According to the acceptance result of this embodiment, it is possible to reasonably evaluate whether the built-in program is qualified, which can provide a reference for the optimization of the built-in program.

在其中的一个实施例中,所述S1包括:基于所述待测智能变电站的预设初始态和预设目标态,获取所述待测智能变电站内置程序相应的操作票,并执行所述操作票的调试步骤。若所述操作票的调试步骤执行完毕,且所述待测智能变电站从预设初始态转为预设目标态,则所述内置程序通过所述顺控调试。否则,所述内置程序未通过所述顺控调试。此时,需要通知供应商处理相关问题,直到所述相关问题被解决,重新执行S1对所述内置程序进行检验。In one embodiment, the S1 includes: based on a preset initial state and a preset target state of the smart substation to be tested, acquiring an operation ticket corresponding to the built-in program of the smart substation to be tested, and executing the operation Debug steps for the ticket. If the debugging steps of the operation ticket are completed, and the intelligent substation to be tested changes from a preset initial state to a preset target state, the built-in program is debugged through the sequence control. Otherwise, the built-in program fails the sequence control debugging. At this time, it is necessary to notify the supplier to deal with the relevant problems, and until the relevant problems are solved, S1 is re-executed to check the built-in program.

在其中的一个实施例中,所述S2包括:In one of the embodiments, the S2 includes:

S20:初始化N=1。S20: Initialize N=1.

S21:若在第N个预设破坏性条件下,所述内置程序中断且中断的位置为所述第N个预设破坏性条件对应的初始调试条件处,则所述初始调试条件处的内置程序通过验收,并执行S22。S21: If under the Nth preset destructive condition, the built-in program is interrupted and the interrupted position is at the initial debugging condition corresponding to the Nth preset destructive condition, then the built-in program at the initial debugging condition is The program passes the acceptance and S22 is executed.

S22:将所述内置程序的第N个预设破坏性条件恢复为所述初始调试条件,并令N=N+1,返回S21,直到N>Z。S22: Restore the Nth preset destructive condition of the built-in program to the initial debugging condition, and set N=N+1, and return to S21 until N>Z.

上式中,N∈[1,Z],Z为所述预设破坏性条件的总数量。In the above formula, N∈[1,Z], Z is the total number of the preset destructive conditions.

其中,所述预设破坏性条件可以分为五类,第一类为预设的信号类破坏性条件。例如:后台未发出“GOOSE总告警”信号、“SV总告警”信号、“事故总”信号、“保护装置闭锁”信号、“控制回路断线”信号等。第二类为预设的控制方式选择类破坏性条件。例如:测控屏控制方式选择切换至“远方”,机构控制方式选择切换至“远方”等。第三类为预设的压板类破坏性条件。例如:投入差动保护压板,投入检修压板等。第四类为预设的电流类破坏性条件。例如:断开开关后检查三相一次电流不超过2A等。第五类为预设的开关量类破坏性条件。例如:开关、刀闸、地刀的位置等。The preset destructive conditions can be divided into five categories, and the first category is the preset signal-type destructive conditions. For example, the background does not send out "GOOSE general alarm" signal, "SV general alarm" signal, "accident general" signal, "protection device blocking" signal, "control loop disconnection" signal, etc. The second category is the destructive condition selected by the preset control method. For example, the control mode selection of the measurement and control screen is switched to "remote", the mechanism control mode is selected to be switched to "distant", etc. The third category is the preset pressure plate-like destructive conditions. For example: put into differential protection pressure plate, put into maintenance pressure plate and so on. The fourth category is the preset current-type destructive conditions. For example: after disconnecting the switch, check that the three-phase primary current does not exceed 2A, etc. The fifth category is the preset digital destructive condition. For example: switch, knife switch, position of ground knife, etc.

具体的,按照所述内置程序中预设的破坏性条件的顺序进行破坏性试验操作,当所述内置程序通过所述第N个预设破坏性条件下的破坏性试验,则恢复第N个预设破坏性条件对应的初始顺控调试的调试条件,并进行在下一项预设破坏性条件下的破坏性试验,直到所有预设破坏性条件执行完毕,则获取破坏性试验的试验结果。通过此步骤的操作,可以保证所有的预设破坏性条件均被检测,以免出现遗漏。Specifically, the destructive test operation is performed according to the order of the preset destructive conditions in the built-in program, and when the built-in program passes the destructive test under the Nth preset destructive condition, the Nth destructive test is restored. The debugging conditions of the initial sequence control corresponding to the preset destructive conditions are set, and a destructive test under the next preset destructive condition is performed until all the preset destructive conditions are executed, and the test results of the destructive test are obtained. Through the operation of this step, it can be ensured that all preset destructive conditions are detected to avoid omission.

在其中的一个实施例中,所述S3包括:若所述内置程序在各预设破坏性条件下均中断且中断位置为相应的所述各预设破坏性条件对应的初始调试条件处,则所述内置程序的验收的结果为合格。若所述内置程序在预设破坏性条件下不中断和/或中断位置并不是相应的所述各预设破坏性条件对应的初始调试条件处,则所述内置程序验收的结果为不合格。此时,需要通知供应商处理相关问题,直到所述相关问题被解决,重新进行该项破坏性试验。In one embodiment, the step S3 includes: if the built-in program is interrupted under each preset destructive condition and the interrupt position is the initial debugging condition corresponding to the corresponding preset destructive condition, then The result of acceptance of the built-in program is qualified. If the built-in program is not interrupted under the preset destructive conditions and/or the interruption position is not at the initial debugging condition corresponding to each of the corresponding preset destructive conditions, the result of acceptance of the built-in program is unqualified. At this time, it is necessary to notify the supplier to deal with the relevant problems, until the relevant problems are solved, and the destructive test shall be carried out again.

在其中的一个实施例中,所述预设破坏性条件的获取过程包括:将所述顺控调试中的调试条件取反,获得所述预设破坏性条件。In one embodiment, the process of acquiring the preset destructive condition includes: inverting the debugging condition in the sequential control debugging to obtain the preset destructive condition.

在其中的一个实施例中,如图2所示,为智能变电站内置程序验收方法的详细流程图。例如:按照此流程图,要完成对110KV母线电压互感器从检修态切换到运行态的内置程序的验收。第一步为对所述110KV母线电压互感器从检修态切换到运行态的内置程序进行顺控调试。此过程包括:在站端操作后台机的界面,将所述110KV母线电压互感器的预设初始态设为检修态,将所述110KV母线电压互感器的预设目标态设为运行态,获取该操作相应的操作票,当执行完该操作票的步骤后,若所述110KV母线电压互感器从检修态切换到了运行态,则第一步顺控调试完成。其中,此过程中的操作票为:In one of the embodiments, as shown in FIG. 2 , it is a detailed flow chart of the acceptance method of the built-in program of the smart substation. For example: According to this flow chart, the acceptance of the built-in program for switching the 110KV busbar voltage transformer from the maintenance state to the running state is to be completed. The first step is to perform sequential control debugging on the built-in program that switches the 110KV bus voltage transformer from the maintenance state to the running state. This process includes: operating the interface of the background machine at the station side, setting the preset initial state of the 110KV bus voltage transformer as the maintenance state, setting the preset target state of the 110KV bus voltage transformer as the running state, and obtaining The operation ticket corresponding to this operation, after the steps of the operation ticket are executed, if the 110KV busbar voltage transformer is switched from the maintenance state to the running state, the first step of sequential control debugging is completed. Among them, the operation tickets in this process are:

1.1,检查110KV母线电压互感器的间隔控制方式为在“远方”;该步骤的确定条件为:a.测控屏控制方式为在“远方”;b.机构控制方式为在“远方”。1.1. Check that the interval control mode of the 110KV bus voltage transformer is "remote"; the determination conditions for this step are: a. The control mode of the measurement and control screen is "remote"; b. The mechanism control mode is "remote".

1.2,检查110KV母线电压互感器间隔无异常测控信号;该步骤的确认条件为:无下述异常信号;c.GOOSE总告警;d.SV总告警;e.110kV母线电压互感器其他气室补气报警;f.110kV母线电压互感器刀闸控制电源故障;g.110kV母线电压互感器刀闸电机电源故障。1.2. Check that there is no abnormal measurement and control signal at the interval of 110KV bus voltage transformer; the confirmation conditions of this step are: no abnormal signal as follows; c. GOOSE general alarm; d. SV general alarm; e. 110kV bus voltage transformer other gas chamber compensation Gas alarm; f.110kV busbar voltage transformer knife gate control power failure; g.110kV busbar voltage transformer knife gate motor power failure.

1.3,使110kV1M母线电压互感器111PT0地刀在拉开位置;该步骤的确认条件为:h.111PT0位置=0。1.3, make the 110kV1M busbar voltage transformer 111PT0 ground knife in the open position; the confirmation condition of this step is: h.111PT0 position=0.

1.4,使110kV1M母线电压互感器111PT刀闸在合上位置;该步骤的控制条件为:i.111甲00位置=0;j.111PT位置=1。1.4, make the 111PT knife switch of the 110kV1M busbar voltage transformer in the closed position; the control conditions of this step are: i.111A00 position=0; j.111PT position=1.

在该实施例中,第二步为对所述110KV母线电压互感器的内置程序进行破坏性试验并获取试验结果。该步骤包括下述过程:In this embodiment, the second step is to perform a destructive test on the built-in program of the 110KV busbar voltage transformer and obtain the test result. This step includes the following processes:

2.1,将测控屏控制方式切换为“就地”,在操作台机界面人工取反,将110KV母线电压互感器的初始态选为检修态,目标态选为运行态。在执行2.1的过程中,内置程序应中断在1.1的a操作项并提醒。2.1, switch the control mode of the measurement and control screen to "local", manually invert on the console interface, select the initial state of the 110KV bus voltage transformer as the maintenance state, and the target state as the running state. In the process of executing 2.1, the built-in program should interrupt the a operation item in 1.1 and remind.

2.2,恢复1.1中a的条件,将机构箱的控制方式切换为“就地”,在操作台机界面人工取反,将110KV母线电压互感器的初始态选为检修态,目标态选为运行态。在执行2.2的过程中,内置程序应中断在1.1的b操作项并提醒。2.2, restore the condition of a in 1.1, switch the control mode of the mechanism box to "local", manually invert it on the console interface, select the initial state of the 110KV bus voltage transformer as the maintenance state, and the target state as the running state state. In the process of executing 2.2, the built-in program should interrupt the b operation item in 1.1 and remind.

2.3,恢复1.1中b的条件,使后台发出GOOSE总告警,在操作台机界面人工取反,将110KV母线电压互感器的初始态选为检修态,目标态选为运行态。在执行2.3的过程中,内置程序应中断在1.2的c操作项并提醒。2.3, restore the condition of b in 1.1, make the GOOSE general alarm in the background, manually invert on the console interface, select the initial state of the 110KV bus voltage transformer as the maintenance state, and the target state as the running state. In the process of executing 2.3, the built-in program should interrupt the c operation item in 1.2 and remind.

2.4,恢复1.2中c的条件,使后台发出SV总告警,在操作台机界面人工取反,将110KV母线电压互感器的初始态选为检修态,目标态选为运行态。在执行2.4的过程中,内置程序应中断在1.2的d操作项并提醒。2.4, restore the condition of c in 1.2, so that the SV total alarm is issued in the background, manually invert on the console interface, and select the initial state of the 110KV busbar voltage transformer as the maintenance state, and the target state as the running state. In the process of executing 2.4, the built-in program should interrupt the d operation item in 1.2 and remind.

2.5,恢复1.2中d的条件,使后台发出110kV母线电压互感器其他气室补气报警信号,在操作台机界面人工取反,将110KV母线电压互感器的初始态选为检修态,目标态选为运行态。在执行2.5的过程中,内置程序应中断在1.2的e操作项并提醒。2.5, restore the condition of d in 1.2, so that the background will send out the alarm signal of other air chambers of the 110kV busbar voltage transformer, and manually reverse it on the operation console interface, and select the initial state of the 110KV busbar voltage transformer as the maintenance state and the target state Select as running state. In the process of executing 2.5, the built-in program should interrupt the e operation item in 1.2 and remind.

2.6,恢复1.2中e的条件,断开110kV母线电压互感器刀闸控制电源空开,使后台发出110kV母线电压互感器刀闸控制电源故障信号,在操作台机界面人工取反,将110KV母线电压互感器的初始态选为检修态,目标态选为运行态。在执行2.6的过程中,内置程序应中断在1.2的f操作项并提醒。2.6, restore the condition of e in 1.2, disconnect the 110kV busbar voltage transformer knife gate control power supply air switch, so that the background sends out the 110kV busbar voltage transformer knife gate control power supply failure signal, manually invert the 110KV busbar The initial state of the voltage transformer is selected as the maintenance state, and the target state is selected as the running state. In the process of executing 2.6, the built-in program should interrupt the f operation item in 1.2 and remind.

2.7,恢复1.2中f的条件,断开110kV母线电压互感器刀闸电机电源空开,使后台发出110kV母线电压互感器刀闸电机电源故障信号,,在操作台机界面人工取反,将110KV母线电压互感器的初始态选为检修态,目标态选为运行态。在执行2.7的过程中,内置程序应中断在1.2的g操作项并提醒。2.7, restore the condition of f in 1.2, disconnect the power supply of the 110kV busbar voltage transformer knife gate motor power supply, so that the background sends out the 110kV busbar voltage transformer knife gate motor power failure signal, manually invert the 110KV The initial state of the busbar voltage transformer is selected as the maintenance state, and the target state is selected as the running state. In the process of executing 2.7, the built-in program should interrupt the g operation item in 1.2 and remind.

在上述1.3和1.4的操作项中,条件h、i、j为设备状态指示,不能参与破坏性试验。In the operation items of 1.3 and 1.4 above, the conditions h, i, and j are equipment status indications and cannot participate in destructive tests.

在该实施例中,第三步为根据第二步的试验结果确定所述内置程序的验收结果。如果通过所述第二步中所有项目的测试,则所述110KV母线电压互感器从检修态切换到运行态的内置程序的验收合格,否则,所述110KV母线电压互感器从检修态切换到运行态的内置程序的验收不合格。In this embodiment, the third step is to determine the acceptance result of the built-in program according to the test result of the second step. If the tests of all items in the second step are passed, the acceptance of the built-in program for switching the 110KV bus voltage transformer from the maintenance state to the running state is qualified; otherwise, the 110KV bus voltage transformer is switched from the maintenance state to the running state The acceptance of the state of the built-in program failed.

在其中的一个实施例中,如图3所示,本申请还提供一种智能变电站内置程序的验收系统,所述系统包括:调试模块,用于对待测智能变电站内置程序进行顺控调试。试验模块,用于当所述内置程序通过所述顺控调试,对所述内置程序进行破坏性试验并获取试验结果。确定模块,用于根据所述试验结果确定所述内置程序的验收结果。In one embodiment, as shown in FIG. 3 , the present application further provides an acceptance system for the built-in program of a smart substation. The system includes: a debugging module for performing sequential control debugging of the built-in program of the smart substation to be tested. The test module is used to perform a destructive test on the built-in program and obtain a test result when the built-in program is debugged through the sequence control. A determination module, configured to determine the acceptance result of the built-in program according to the test result.

在其中的一个实施例中,所述调试模块包括:调试单元,用于基于所述待测智能变电站的预设初始态和预设目标态,获取所述待测智能变电站内置程序相应的操作票,并执行所述操作票的调试步骤。判断单元,用于若所述操作票的调试步骤执行完毕,且所述待测智能变电站从预设初始态转为预设目标态,则所述内置程序通过所述顺控调试。In one embodiment, the debugging module includes: a debugging unit, configured to obtain an operation ticket corresponding to the built-in program of the smart substation to be tested based on a preset initial state and a preset target state of the smart substation to be tested , and perform the debug steps for the described action ticket. A judging unit, configured to debug the built-in program through the sequence control if the debugging steps of the operation ticket are completed and the intelligent substation to be tested changes from a preset initial state to a preset target state.

在其中的一个实施例中,所述试验模块包括:初始化单元,用于初始化N=1。试验单元,用于若在第N个预设破坏性条件下,所述内置程序中断且中断的位置为所述第N个预设破坏性条件对应的初始调试条件处,则所述初始调试条件处的内置程序通过验收,并转至恢复单元。恢复单元,用于将所述内置程序的第N个预设破坏性条件恢复为所述初始调试条件,并令N=N+1,返回试验模块,直到N>Z。其中,N∈[1,Z],Z为所述预设破坏性条件的总数量。In one of the embodiments, the test module includes: an initialization unit for initializing N=1. A test unit, used for if under the Nth preset destructive condition, the built-in program is interrupted and the interrupted position is the initial debugging condition corresponding to the Nth preset destructive condition, then the initial debugging condition The built-in program at the site passes acceptance and goes to the recovery unit. The restoring unit is configured to restore the Nth preset destructive condition of the built-in program to the initial debugging condition, and set N=N+1, and return to the test module until N>Z. Among them, N∈[1,Z], Z is the total number of the preset destructive conditions.

在其中的一个实施例中,所述判断模块具体用于:若所述内置程序在各预设破坏性条件下均中断且中断位置为相应的所述各预设破坏性条件对应的初始调试条件处,则所述内置程序的验收的结果为合格。In one embodiment, the judging module is specifically configured to: if the built-in program is interrupted under each preset destructive condition and the interrupt position is the initial debugging condition corresponding to the corresponding preset destructive condition , the acceptance result of the built-in program is qualified.

以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above-described embodiments can be combined arbitrarily. For the sake of brevity, all possible combinations of the technical features in the above-described embodiments are not described. However, as long as there is no contradiction between the combinations of these technical features, All should be regarded as the scope described in this specification.

以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only represent several embodiments of the present invention, and the descriptions thereof are specific and detailed, but should not be construed as a limitation on the scope of the invention patent. It should be pointed out that for those of ordinary skill in the art, without departing from the concept of the present invention, several modifications and improvements can also be made, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention should be subject to the appended claims.

Claims (11)

1. The method for checking and accepting the built-in program of the intelligent substation is characterized by comprising the following steps:
s1: carrying out sequence control debugging on a built-in program of the intelligent substation to be tested, and executing S2 when the built-in program passes the sequence control debugging;
s2: carrying out destructive test on the built-in program and obtaining a test result;
s3: and determining the acceptance result of the built-in program according to the test result.
2. The method of claim 1, wherein the S1 includes:
acquiring an operation ticket corresponding to a built-in program of the intelligent substation to be tested based on a preset initial state and a preset target state of the intelligent substation to be tested, and executing a debugging step of the operation ticket;
and if the debugging step of the operation order is finished and the intelligent substation to be tested is changed from a preset initial state to a preset target state, the built-in program is debugged through the sequential control.
3. The method of claim 1, wherein the S2 includes:
s20: initializing N to 1;
s21: if the built-in program is interrupted and the interrupted position is the initial debugging condition corresponding to the nth preset destructive condition under the nth preset destructive condition, the built-in program at the initial debugging condition passes acceptance and executes S22;
s22: restoring the Nth preset destructive condition of the built-in program to the initial debugging condition, enabling N to be N +1, and returning to S21 until N is greater than Z;
wherein N is the [1, Z ], and Z is the total number of the preset destructive conditions.
4. The method of claim 3, wherein the S3 includes:
and if the built-in program is interrupted under each preset destructive condition and the interruption position is the initial debugging condition corresponding to each preset destructive condition, the acceptance result of the built-in program is qualified.
5. The method of claim 4, wherein if the built-in program is not interrupted under the Nth preset destructive condition and/or the interruption position is not at the initial debugging condition corresponding to the Nth preset destructive condition, the result of acceptance of the built-in program is unqualified;
wherein N is the [1, Z ], and Z is the total number of the preset destructive conditions.
6. The method of claim 3, wherein the obtaining of the predetermined destructive condition comprises:
and negating the debugging conditions in the sequence control debugging to obtain the preset destructive conditions.
7. An acceptance system of built-in programs of an intelligent substation is characterized by comprising:
the debugging module is used for carrying out sequence control debugging on the built-in program of the intelligent substation to be tested;
the test module is used for carrying out destructive test on the built-in program and obtaining a test result when the built-in program passes the sequence control debugging;
and the determining module is used for determining the acceptance result of the built-in program according to the test result.
8. The system of claim 7, wherein the debugging module comprises:
the debugging unit is used for acquiring an operation ticket corresponding to a built-in program of the intelligent substation to be tested based on a preset initial state and a preset target state of the intelligent substation to be tested and executing the debugging step of the operation ticket;
and the judging unit is used for debugging the built-in program through the sequential control if the debugging step of the operation ticket is finished and the intelligent substation to be tested is converted from a preset initial state to a preset target state.
9. The system of claim 7, wherein the testing module comprises:
an initialization unit, configured to initialize N ═ 1;
the test unit is used for checking and accepting the built-in program at the initial debugging condition and transferring the built-in program to the recovery unit if the built-in program is interrupted under the Nth preset destructive condition and the interrupted position is the initial debugging condition corresponding to the Nth preset destructive condition;
a restoring unit, configured to restore the nth preset destructive condition of the built-in program to the initial debugging condition, and make N equal to N +1, and return to the test module until N is greater than Z;
wherein N is the [1, Z ], and Z is the total number of the preset destructive conditions.
10. The system of claim 9, wherein the determination module is specifically configured to:
and if the built-in program is interrupted under each preset destructive condition and the interruption position is the initial debugging condition corresponding to each preset destructive condition, the acceptance result of the built-in program is qualified.
11. The system of claim 10, wherein the determination module is further configured to:
if the built-in program is not interrupted under the Nth preset destructive condition and/or the interruption position is not the initial debugging condition corresponding to the Nth preset destructive condition, the acceptance result of the built-in program is unqualified;
wherein N is the [1, Z ], and Z is the total number of the preset destructive conditions.
CN201911110167.2A 2019-11-14 2019-11-14 Acceptance method and system for built-in program of smart substation Active CN110865630B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911110167.2A CN110865630B (en) 2019-11-14 2019-11-14 Acceptance method and system for built-in program of smart substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911110167.2A CN110865630B (en) 2019-11-14 2019-11-14 Acceptance method and system for built-in program of smart substation

Publications (2)

Publication Number Publication Date
CN110865630A true CN110865630A (en) 2020-03-06
CN110865630B CN110865630B (en) 2022-07-05

Family

ID=69654232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911110167.2A Active CN110865630B (en) 2019-11-14 2019-11-14 Acceptance method and system for built-in program of smart substation

Country Status (1)

Country Link
CN (1) CN110865630B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1487415A (en) * 2002-08-26 2004-04-07 国际商业机器公司 Method and system for debugging computer program utilizing breakpoint based on time
CN1936911A (en) * 2005-11-16 2007-03-28 白杰 Method for recovering data damaged by virus programe, apparatus and virus clearing method
CN101308473A (en) * 2008-06-27 2008-11-19 浙江大学 A Program-Level Operating System Debugging Method Based on Sequential Pattern Mining
CN101354676A (en) * 2008-09-10 2009-01-28 浪潮齐鲁软件产业有限公司 Method for debugging embedded type program
EP2153325A1 (en) * 2007-05-24 2010-02-17 Palo Alto Research Center Incorporated Diagnosing intermittent faults
CN101776910A (en) * 2010-01-19 2010-07-14 华北电网有限公司 Integrated five-prevention operation ticket system-based substation programmed control system
CN103441570A (en) * 2013-06-18 2013-12-11 国家电网公司 One-button type sequential control operation control method based on integrated information platform
CN103593292A (en) * 2013-11-19 2014-02-19 北京深思数盾科技有限公司 System and method for program debugging
CN105653908A (en) * 2015-12-31 2016-06-08 西北大学 Implicit anti-debugging protection method
CN105843217A (en) * 2016-04-29 2016-08-10 国网浙江省电力公司绍兴供电公司 Associate locking logic offline verification system and method of intelligent transformer station measuring and control device
CN107885650A (en) * 2016-09-30 2018-04-06 联芯科技有限公司 A kind of program debugging method and system
CN108132658A (en) * 2017-12-26 2018-06-08 安徽瑞祥工业有限公司 A kind of car body welding producing line virtually produces system and method as a trial
CN109617241A (en) * 2018-12-29 2019-04-12 北京四方继保自动化股份有限公司 A kind of intelligent successive control system and method based on panoramic view data in substation
CN109800159A (en) * 2018-12-27 2019-05-24 百富计算机技术(深圳)有限公司 Program debugging method, program debugging device, terminal device and storage medium

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1487415A (en) * 2002-08-26 2004-04-07 国际商业机器公司 Method and system for debugging computer program utilizing breakpoint based on time
CN1936911A (en) * 2005-11-16 2007-03-28 白杰 Method for recovering data damaged by virus programe, apparatus and virus clearing method
EP2153325A1 (en) * 2007-05-24 2010-02-17 Palo Alto Research Center Incorporated Diagnosing intermittent faults
CN101308473A (en) * 2008-06-27 2008-11-19 浙江大学 A Program-Level Operating System Debugging Method Based on Sequential Pattern Mining
CN101354676A (en) * 2008-09-10 2009-01-28 浪潮齐鲁软件产业有限公司 Method for debugging embedded type program
CN101776910A (en) * 2010-01-19 2010-07-14 华北电网有限公司 Integrated five-prevention operation ticket system-based substation programmed control system
CN103441570A (en) * 2013-06-18 2013-12-11 国家电网公司 One-button type sequential control operation control method based on integrated information platform
CN103593292A (en) * 2013-11-19 2014-02-19 北京深思数盾科技有限公司 System and method for program debugging
CN105653908A (en) * 2015-12-31 2016-06-08 西北大学 Implicit anti-debugging protection method
CN105843217A (en) * 2016-04-29 2016-08-10 国网浙江省电力公司绍兴供电公司 Associate locking logic offline verification system and method of intelligent transformer station measuring and control device
CN107885650A (en) * 2016-09-30 2018-04-06 联芯科技有限公司 A kind of program debugging method and system
CN108132658A (en) * 2017-12-26 2018-06-08 安徽瑞祥工业有限公司 A kind of car body welding producing line virtually produces system and method as a trial
CN109800159A (en) * 2018-12-27 2019-05-24 百富计算机技术(深圳)有限公司 Program debugging method, program debugging device, terminal device and storage medium
CN109617241A (en) * 2018-12-29 2019-04-12 北京四方继保自动化股份有限公司 A kind of intelligent successive control system and method based on panoramic view data in substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋晓珍,林爱冰: "智能变电站运行维护及顺控验收的效果分析", 《数字通信世界》 *

Also Published As

Publication number Publication date
CN110865630B (en) 2022-07-05

Similar Documents

Publication Publication Date Title
KR100843130B1 (en) On-line IC failure diagnosis device and method in IC61850 based substation automation system
CN105388370B (en) A kind of substation's wall connection latching logic automated closed-loop test method
CN102089667B (en) Method and device for supervising secondary circuit of instrument transformer in power system
CN107843800B (en) Power supply network monitoring method, device and system
CN111007439A (en) Transformer substation bus protection secondary circuit commissioning on-load test method
CN110601129A (en) On-site calibration system and method for zero sequence protection setting value of power grid transmission line
CN112054493A (en) A method for mode operation of in-situ feeder automation function of distribution lines
CN106774237A (en) A kind of observing and controlling remote control sluggish detection method and its system
CN109802355A (en) A kind of fool proof method and apparatus of relay protection soft pressing plate
CN110865630B (en) Acceptance method and system for built-in program of smart substation
Ashraf et al. Formal performance analysis of optimal relays-based protection scheme for automated distribution networks
CN102520303A (en) Detector and detection method for alternating-current loops of wind generation set
CN111521860A (en) A system and method for checking the polarity of bus differential protection using transformer excitation inrush current
Abadi et al. Formal verification of fault location, isolation and service restoration in distribution automation using UPPAAL
CN105515166B (en) 110 kilovolts of system busbar combining units of intelligent substation double bus scheme mode can back brake maintenance voltage allocation plan
CN109742722B (en) constant value modification detection method, device, equipment and medium
CN103545923B (en) A kind of guard method for repair apparatus
CN112710952A (en) Intelligent switch debugging system and testing method thereof
Altaher et al. Reliability investigation of digital substation networks design using fmea technique
CN111722151A (en) Relay protection tester and method based on station control layer information to control state switching
CN115113030B (en) 3/2 Wiring breaker protection screen replacement inspection method
He et al. Analyzing protective relay misoperation data and enhancing its correct operation rate
CN114520499B (en) Method for online replacement of faulty components and transmission inspection protection of bus differential protection device
Min et al. Status evaluation of smart substation measurement and control device
CN212111633U (en) A protection device logic test device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant