[go: up one dir, main page]

CN110748081A - Exposed aggregate decorative prestress SP wallboard and production process thereof - Google Patents

Exposed aggregate decorative prestress SP wallboard and production process thereof Download PDF

Info

Publication number
CN110748081A
CN110748081A CN201911075540.5A CN201911075540A CN110748081A CN 110748081 A CN110748081 A CN 110748081A CN 201911075540 A CN201911075540 A CN 201911075540A CN 110748081 A CN110748081 A CN 110748081A
Authority
CN
China
Prior art keywords
wallboard
plate body
prestressed
plate
decorative
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911075540.5A
Other languages
Chinese (zh)
Inventor
高雅静
刘昊
吴永杰
马爱燕
张亮
蒋勤俭
赵礼明
陈占超
刘聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING PREFABRICATED BUILDING ENGINEERING RESEARCH INSTITUTE CO LTD
Beijing Yugou Co Ltd
Hebei Yugou Building Materials Co Ltd
Original Assignee
BEIJING PREFABRICATED BUILDING ENGINEERING RESEARCH INSTITUTE CO LTD
Beijing Yugou Co Ltd
Hebei Yugou Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING PREFABRICATED BUILDING ENGINEERING RESEARCH INSTITUTE CO LTD, Beijing Yugou Co Ltd, Hebei Yugou Building Materials Co Ltd filed Critical BEIJING PREFABRICATED BUILDING ENGINEERING RESEARCH INSTITUTE CO LTD
Priority to CN201911075540.5A priority Critical patent/CN110748081A/en
Publication of CN110748081A publication Critical patent/CN110748081A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/043Wire anchoring or tensioning means for the reinforcements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Panels For Use In Building Construction (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

一种露骨料装饰预应力SP墙板及其生产工艺,墙板包括板体,该板体内设有通孔;该通孔上下两侧分别设有上层钢绞线和下层钢绞线,该通孔、上层钢绞线和下层钢绞线的长度方向均与该板体的长度方向平行;该板体的四个端角内侧各设有一个埋件,该埋件包括截面呈U型的槽钢,该槽钢包括两个竖向的侧板,二者底部之间通过横向的底板固定连接;该侧板外侧面顶部焊接有水平的绑杆,该绑杆的长度方向与该槽钢的长度方向及该板体的长度方向均平行;该底板设有圆孔,该底板顶面固定设有螺母,该螺母的螺孔与该圆孔对应连接;两个绑杆分别与相邻的两个下层钢绞线通过绑绳绑扎连接在一起,且该底板的底面与该板体的底面齐平;该板体的顶面露出混凝土骨料。

Figure 201911075540

An exposed aggregate decorative prestressed SP wallboard and a production process thereof. The wallboard comprises a board body, and the board body is provided with a through hole; upper and lower steel strands are respectively provided on the upper and lower sides of the through hole. The length direction of the hole, the upper layer steel strand and the lower layer steel strand are all parallel to the length direction of the plate body; an embedded part is arranged inside each of the four end corners of the plate body, and the embedded part includes a U-shaped groove in section. Steel, the channel steel includes two vertical side plates, and the bottoms of the two are fixedly connected by a horizontal bottom plate; a horizontal binding rod is welded on the top of the outer side of the side plate, and the length direction of the binding rod is the same as that of the channel steel. The length direction and the length direction of the plate body are parallel; the bottom plate is provided with a circular hole, a nut is fixed on the top surface of the bottom plate, and the screw hole of the nut is correspondingly connected with the circular hole; the two binding rods are respectively connected with the adjacent two. The steel strands of the lower layers are connected together by binding ropes, and the bottom surface of the bottom plate is flush with the bottom surface of the plate body; the concrete aggregate is exposed on the top surface of the plate body.

Figure 201911075540

Description

一种露骨料装饰预应力SP墙板及其生产工艺A kind of exposed aggregate decorative prestressed SP wallboard and its production process

技术领域technical field

本发明属于装配式建筑技术领域,特别是一种露骨料装饰预应力SP墙板及其生产工艺。The invention belongs to the technical field of prefabricated buildings, in particular to an exposed aggregate decorative prestressed SP wall panel and a production process thereof.

背景技术Background technique

SP预应力混凝土空心板是引进美国SPANCRETE公司专用设备和技术生产的预应力混凝土空心板,简称SP板。与传统的混凝土空心板相比,SP板具有施工速度快、产品质量稳定、跨度大、板跨不受模数限制、几何尺寸偏差小等优点。SP板多使用在大型工业厂房、超市等公共建筑。SP板作为楼面板、屋面板技术较成熟,但是作为墙板使用的很少。露骨料装饰效果具有一次生产达到最终装饰效果、节约装饰成本、本色装饰美观质朴、自然与美的有机结合、节能环保、耐久性好、无需后期维护等优点。然而,目前还未有过SP墙板结合露骨料装饰效果的产品出现,其为市场上的一大空白。究其原因,是SP板结合露骨料装饰效果需要从设计入手,结合施工、安装要求,提前设计好连接埋件,并确定生产工艺,露骨料装饰效果也需要通过试验,结合装饰效果要求,确定使用材料和生产工艺,最终确定整套的这种露骨料装饰预应力SP墙板的生产工艺,其过程复杂,工作量极大,且需要解决多种工艺难题。SP prestressed concrete hollow slab is a prestressed concrete hollow slab produced by the introduction of special equipment and technology from SPANCRETE company in the United States, referred to as SP slab. Compared with traditional concrete hollow slabs, SP slabs have the advantages of fast construction speed, stable product quality, large span, slab span not limited by modulus, and small deviation of geometric dimensions. SP boards are mostly used in public buildings such as large industrial plants and supermarkets. SP panels are more mature as floor panels and roof panels, but are rarely used as wall panels. The decorative effect of exposed aggregate has the advantages of one-time production to achieve the final decorative effect, saving decorative costs, beautiful and simple natural decoration, organic combination of nature and beauty, energy saving and environmental protection, good durability, and no need for post-maintenance. However, there is no product that combines the decorative effect of SP wallboard with exposed aggregate, which is a big gap in the market. The reason is that the decorative effect of the SP board combined with the exposed aggregate needs to start with the design, combined with the construction and installation requirements, design the connection and embedded parts in advance, and determine the production process. The decorative effect of the exposed aggregate also needs to pass the test and combine the decorative effect requirements. Using materials and production processes, the production process of the complete set of decorative prestressed SP wall panels with exposed aggregates is finally determined. The process is complicated, the workload is enormous, and various process problems need to be solved.

发明内容SUMMARY OF THE INVENTION

鉴于上述问题,本发明的目的是提供一种露骨料装饰预应力SP墙板,其结构稳定,露骨料饰面效果好,节能环保。In view of the above problems, the purpose of the present invention is to provide a decorative prestressed SP wallboard with exposed aggregate, which has stable structure, good effect of exposed aggregate finish, energy saving and environmental protection.

本发明的另一目的是提供一种露骨料装饰预应力SP墙板的生产工艺,其工艺稳定,标准化程度高,产品质量可靠。Another object of the present invention is to provide a production process for decorative prestressed SP wallboard with exposed aggregate, which has stable process, high standardization and reliable product quality.

为实现上述目的,本发明采取以下技术方案:To achieve the above object, the present invention adopts the following technical solutions:

一种露骨料装饰预应力SP墙板,包括截面呈矩形的混凝土板体,该板体内设有若干平行的通孔;该通孔上下两侧分别设有多个上层钢绞线和多个下层钢绞线,该通孔、上层钢绞线和下层钢绞线的长度方向均与该板体的长度方向平行;该板体的四个端角内侧各设有一个埋件,该埋件包括截面呈U型的槽钢,该槽钢包括两个竖向的侧板,二者底部之间通过横向的底板固定连接;该侧板外侧面顶部焊接有水平的绑杆,该绑杆的长度方向与该槽钢的长度方向及该板体的长度方向均平行;该底板设有圆孔,该底板顶面固定设有螺母,该螺母的螺孔与该圆孔对应连接;两个绑杆分别与相邻的两个下层钢绞线通过绑绳绑扎连接在一起,且该底板的底面与该板体的底面齐平;该板体的顶面露出混凝土骨料。An exposed aggregate decorative prestressed SP wall panel, comprising a concrete panel body with a rectangular cross-section, the panel body is provided with a plurality of parallel through holes; the upper and lower sides of the through holes are respectively provided with a plurality of upper-layer steel strands and a plurality of lower-layer steel strands Steel strand, the length direction of the through hole, the upper layer steel strand and the lower layer steel strand are all parallel to the length direction of the plate body; the inner side of the four end corners of the plate body is each provided with an embedded piece, and the embedded piece includes A channel steel with a U-shaped section, the channel steel includes two vertical side plates, and the bottoms of the two are fixedly connected by a horizontal bottom plate; a horizontal binding rod is welded on the top of the outer side of the side plate, and the length of the binding rod is The direction is parallel to the length direction of the channel steel and the length direction of the plate body; the bottom plate is provided with a circular hole, the top surface of the bottom plate is fixed with a nut, and the screw hole of the nut is correspondingly connected with the circular hole; two binding rods The two adjacent lower-layer steel strands are respectively connected together by binding ropes, and the bottom surface of the bottom plate is flush with the bottom surface of the plate body; the concrete aggregate is exposed on the top surface of the plate body.

在一个实施例中,所述两个绑杆之间的距离小于相邻下层钢绞线之间的距离;所述下层钢绞线均与至少两个横向筋通过绑绳绑扎连接在一起,各横向筋均垂直于该下层钢绞线;两个绑杆分别与各横向筋通过绑绳绑扎连接在一起。In one embodiment, the distance between the two tie rods is smaller than the distance between the adjacent lower-layer steel strands; the lower-layer steel strands are all connected with at least two transverse bars by tying ropes, each The transverse ribs are all perpendicular to the lower steel strand; the two binding rods are respectively connected with the transverse ribs by binding ropes.

在一个实施例中,所述板体的四个边缘均设有倒角。In one embodiment, the four edges of the plate body are provided with chamfers.

在一个实施例中,所述上层钢绞线和下层钢绞线一一对应,且在所述板体底面上的投影重合。In one embodiment, the upper-layer steel strands and the lower-layer steel strands are in one-to-one correspondence, and the projections on the bottom surface of the plate body are coincident.

一种露骨料装饰预应力SP墙板的生产工艺,包括下列步骤:A production process for decorative prestressed SP wall panels with exposed aggregates, comprising the following steps:

A.根据要生产SP墙板的板长、板型,将一条生产线的矩形基板进行排版,将该基板划分为多个对应各板体的矩形区域,然后在该基板上对应相邻区域之间边界的位置画切割线;A. According to the board length and shape of the SP wallboard to be produced, the rectangular substrate of a production line is typeset, the substrate is divided into a plurality of rectangular areas corresponding to each board body, and then the corresponding adjacent areas on the substrate are arranged. Draw a cutting line at the position of the border;

B.切割线画好以后,根据埋件距离各板体边缘的距离以及埋件的数量,在基板上画出各埋件的位置点;B. After the cutting line is drawn, draw the position of each embedded part on the substrate according to the distance between the embedded part and the edge of each plate body and the number of embedded parts;

C.埋件的位置点画好以后,在基板上方进行上层钢绞线和下层钢绞线的放线和张拉;然后在各埋件的位置点,将埋件两侧的绑杆与下层钢绞线进行绑扎固定;C. After the position of the embedded parts is drawn, the upper and lower steel strands are laid out and tensioned above the base plate; Stranded wire for binding and fixing;

D.以干硬性混凝土为原料,利用SP墙板浇筑设备,从该基板的一端开始向另一端边行走边进行浇筑生产;SP墙板浇筑设备在行走的同时,在已经成型的板体的顶面喷洒缓凝剂,使混凝土板体顶面形成露骨料饰面;D. Using dry and hard concrete as raw material, using SP wallboard pouring equipment, start pouring production from one end of the substrate to the other end while walking; while the SP wallboard pouring equipment is walking, it is placed on the top of the formed plate body. The surface is sprayed with retarder, so that the top surface of the concrete slab forms an exposed aggregate finish;

E.浇筑生产完毕后,将基板上各切割线的位置标注在生产好的板体上,等到混凝土的强度上到设计强度的75-90%时,对上层钢绞线和下层钢绞线进行放张;放张完以后,按照板体上标注的切割线进行切割。E. After the pouring is completed, mark the position of each cutting line on the base plate on the produced plate body. When the strength of the concrete reaches 75-90% of the design strength, the upper and lower steel strands are Release the sheet; after the sheet is finished, cut according to the cutting line marked on the board.

在一个实施例中,所述步骤C中,在所述基板上设有若干梳子状的横向定位板,各横向定位板底部设有若干与所述上层钢绞线和下层钢绞线对应的倒U型槽孔,上下对应的上层钢绞线和下层钢绞线穿设于该槽孔内;所述步骤D中,当SP墙板浇筑设备行走到接近该横向定位板的时候,将该横向定位板移除。In one embodiment, in the step C, a plurality of comb-shaped lateral positioning plates are arranged on the base plate, and a plurality of inverted plates corresponding to the upper and lower steel strands are arranged at the bottom of each lateral positioning plate. U-shaped slotted hole, the upper and lower steel strands corresponding to the upper and lower layers are passed through the slotted hole; in the step D, when the SP wall panel casting equipment walks close to the horizontal positioning plate, the horizontal The positioning plate is removed.

在一个实施例中,所述步骤C中,在所述下层钢绞线上绑扎至少两个与下层钢绞线垂直的横向筋,并将所述埋件的绑杆通过绑绳与各横向筋绑扎固定在一起。In one embodiment, in the step C, at least two transverse ribs perpendicular to the lower layer steel strand are bound on the lower layer steel strand, and the binding rod of the embedded part is connected to each transverse bar through a binding rope Tie together to hold together.

在一个实施例中,所述步骤E中,混凝土的强度上到设计强度的75%时,对上层钢绞线和下层钢绞线进行放张。In one embodiment, in the step E, when the strength of the concrete reaches 75% of the design strength, the upper steel strand and the lower steel strand are stretched.

在一个实施例中,所述缓凝剂的各组分的重量比为:葡萄糖酸钠:水=1:5~1:2;所述混凝土中每立方米含有:水泥450kg,粗粒机制砂715kg,细粒机制砂409kg,石子711kg,水162kg。In one embodiment, the weight ratio of each component of the retarder is: sodium gluconate: water=1:5~1:2; each cubic meter of the concrete contains: cement 450kg, coarse-grained machine-made sand 715kg, fine-grain machine-made sand 409kg, stone 711kg, water 162kg.

在一个实施例中,所述缓凝剂的各组分的重量比为:葡萄糖酸钠:水=2:5。In one embodiment, the weight ratio of each component of the retarder is: sodium gluconate: water=2:5.

本发明的有益效果是:本发明露骨料装饰预应力SP墙板及其生产工艺,工艺稳定,标准化程度高,产品质量可靠,结构稳定,露骨料饰面效果好,节能环保。The beneficial effects of the invention are as follows: the exposed aggregate decorative prestressed SP wallboard and its production process have stable process, high standardization degree, reliable product quality, stable structure, good exposed aggregate finishing effect, energy saving and environmental protection.

附图说明Description of drawings

图1是本发明露骨料装饰预应力SP墙板的仰视图。Figure 1 is a bottom view of the exposed aggregate decorative prestressed SP wallboard of the present invention.

图2是图1中A-A方向的剖视图。FIG. 2 is a cross-sectional view taken along the line A-A in FIG. 1 .

图3是本发明露骨料装饰预应力SP墙板的埋件的俯视图。3 is a top view of the embedded part of the exposed aggregate decorative prestressed SP wallboard of the present invention.

图4是本发明露骨料装饰预应力SP墙板的埋件的剖视图。4 is a cross-sectional view of the embedded part of the exposed aggregate decorative prestressed SP wallboard of the present invention.

图5是本发明露骨料装饰预应力SP墙板的生产工艺中的基板的俯视图。FIG. 5 is a top view of the base plate in the production process of the exposed aggregate decorative prestressed SP wallboard of the present invention.

图6是本发明露骨料装饰预应力SP墙板的生产工艺中的横向定位板的主视图。FIG. 6 is a front view of the lateral positioning plate in the production process of the exposed aggregate decorative prestressed SP wallboard of the present invention.

图7是本发明露骨料装饰预应力SP墙板的生产工艺中的横向定位板的侧视图。Fig. 7 is a side view of the lateral positioning plate in the production process of the exposed aggregate decorative prestressed SP wallboard of the present invention.

具体实施方式Detailed ways

以下结合实施例与附图,对本发明进行进一步详细说明。The present invention will be further described in detail below with reference to the embodiments and the accompanying drawings.

如图1-图4所示,本发明提供一种露骨料装饰预应力SP墙板,包括截面呈矩形的混凝土板体1,该板体1的四个边缘均设有倒角,该板体1内设有若干平行的通孔11。该通孔11上下两侧分别设有多个上层钢绞线2和多个下层钢绞线3,该通孔11、上层钢绞线2和下层钢绞线3的长度方向均与该板体1的长度方向平行。优选的,该上层钢绞线2和下层钢绞线3一一对应,且在该板体1底面上的投影重合。该板体1的四个端角内侧各设有一个埋件4,该埋件4包括截面呈U型的槽钢41,该槽钢41包括两个竖向的侧板411,二者底部之间通过横向的底板412固定连接。该侧板411外侧面顶部焊接有水平的绑杆42,该绑杆42的长度方向与该槽钢41的长度方向及该板体1的长度方向均平行。该底板412设有圆孔413,该底板412顶面固定设有螺母43,该螺母43的螺孔与该圆孔413对应连接。两个绑杆32分别与相邻的两个下层钢绞线3通过绑绳绑扎连接在一起,且该底板412的底面与该板体1的底面齐平。通过表面喷涂缓凝剂,在构件强度达到一定程度时冲刷表面,露出均匀美观的混凝土内部的骨料,在该板体1的顶面露出混凝土骨料,形成露骨料饰面。As shown in FIGS. 1-4 , the present invention provides an exposed aggregate decorative prestressed SP wall panel, comprising a concrete panel body 1 with a rectangular cross-section, the four edges of the panel body 1 are provided with chamfers, and the panel body 1 is provided with several parallel through holes 11 . A plurality of upper-layer steel strands 2 and a plurality of lower-layer steel strands 3 are respectively provided on the upper and lower sides of the through hole 11 , and the length directions of the through-hole 11 , the upper-layer steel strand 2 and the lower-layer steel strand 3 are all the same as the plate body. 1's length direction is parallel. Preferably, the upper-layer steel strands 2 and the lower-layer steel strands 3 are in one-to-one correspondence, and the projections on the bottom surface of the plate body 1 overlap. The inner side of the four end corners of the plate body 1 is provided with an embedded piece 4, the embedded piece 4 includes a channel steel 41 with a U-shaped cross section, the channel steel 41 includes two vertical side plates 411, the bottom of the two is They are fixedly connected by the horizontal bottom plate 412 . A horizontal tie rod 42 is welded on the top of the outer side of the side plate 411 , and the length direction of the tie rod 42 is parallel to the length direction of the channel steel 41 and the length direction of the plate body 1 . The bottom plate 412 is provided with a circular hole 413 , a nut 43 is fixed on the top surface of the bottom plate 412 , and the screw hole of the nut 43 is correspondingly connected with the circular hole 413 . The two binding rods 32 are respectively connected with the two adjacent lower-layer steel strands 3 through binding ropes, and the bottom surface of the bottom plate 412 is flush with the bottom surface of the plate body 1 . By spraying the retarder on the surface, when the strength of the component reaches a certain level, the surface is washed, and the aggregate inside the concrete is uniform and beautiful, and the concrete aggregate is exposed on the top surface of the plate body 1 to form an exposed aggregate finish.

当两个绑杆42之间的距离小于相邻下层钢绞线3之间的距离时,该下层钢绞线3均与至少两个横向筋5通过绑绳绑扎连接在一起,各横向筋5均垂直于该下层钢绞线3。两个绑杆42分别与各横向筋5通过绑绳绑扎连接在一起。When the distance between the two binding rods 42 is smaller than the distance between the adjacent lower-layer steel strands 3, the lower-layer steel strands 3 are connected with at least two transverse bars 5 by tying ropes, and each transverse bar 5 All are perpendicular to the lower steel strand 3 . The two binding rods 42 are respectively connected with each transverse rib 5 by binding ropes.

如图5所示,本发明还提供一种露骨料装饰预应力SP墙板的生产工艺,包括下列步骤:As shown in FIG. 5 , the present invention also provides a production process for decorative prestressed SP wallboard with exposed aggregates, comprising the following steps:

A.根据要生产SP墙板的板长、板型,将一条生产线的矩形基板6进行排版,将该基板6划分为多个对应各板体1的矩形区域61,然后在该基板6上对应相邻区域之间边界的位置画切割线62;A. According to the board length and shape of the SP wallboard to be produced, the rectangular substrate 6 of a production line is typeset, and the substrate 6 is divided into a plurality of rectangular areas 61 corresponding to each board body 1, and then corresponding to the substrate 6. Draw a cutting line 62 at the position of the boundary between adjacent areas;

B.切割线62画好以后,根据埋件4距离各板体边缘的距离以及埋件4的数量,在基板6上画出各埋件的位置点63;B. After the cutting line 62 is drawn, according to the distance of the embedded part 4 from the edge of each plate body and the number of the embedded parts 4, draw the position point 63 of each embedded part on the substrate 6;

C.埋件4的位置点63画好以后,在基板6上方进行上层钢绞线和下层钢绞线3的放线和张拉;然后在各埋件4的位置点63,将埋件4两侧的绑杆42与下层钢绞线3进行绑扎固定;C. After the position points 63 of the embedded parts 4 are drawn, the upper and lower steel strands 3 are laid out and stretched above the base plate 6; The binding rods 42 on both sides are bound and fixed with the lower steel strand 3;

D.以干硬性混凝土为原料,在一个实施例中,该混凝土中每立方米含有:水泥450kg,粗粒机制砂715kg,细粒机制砂409kg,石子711kg,水162kg;利用SP墙板浇筑设备7,从该基板6的一端开始向另一端边行走边进行浇筑生产;SP墙板浇筑设备7在行走的同时,在已经成型的板体的顶面喷洒缓凝剂,使混凝土板体顶面形成露骨料饰面;该缓凝剂的各组分的重量比为:葡萄糖酸钠:水=1:5~1:2,优选,葡萄糖酸钠:水=2:5;D. take dry hard concrete as raw material, in one embodiment, in this concrete, every cubic meter contains: cement 450kg, coarse-grain machine-made sand 715kg, fine-grain machine-made sand 409kg, stone 711kg, water 162kg; Utilize SP wallboard pouring equipment 7, start pouring production from one end of the base plate 6 to the other end while walking; SP wallboard pouring equipment 7 sprays retarder on the top surface of the formed plate body while walking, so that the top surface of the concrete plate body is sprayed with retarder. Forming an exposed aggregate finish; the weight ratio of each component of the retarder is: sodium gluconate:water=1:5~1:2, preferably, sodium gluconate:water=2:5;

E.浇筑生产完毕后,将基板6上各切割线62的位置标注在生产好的板体上,等到混凝土的强度上到设计强度的75-90%时,优选75%,对上层钢绞线2和下层钢绞线3进行放张;放张完以后,按照板体上标注的切割线进行切割。E. After the pouring production is completed, mark the position of each cutting line 62 on the base plate 6 on the produced plate body, and wait until the strength of the concrete reaches 75-90% of the design strength, preferably 75%, for the upper steel strands 2 and the lower layer of steel strand 3 are stretched; after the stretch is completed, cut according to the cutting line marked on the board body.

如图6、图7所示,该步骤C中,在该基板6上设有若干梳子状的横向定位板8,各横向定位板8底部设有若干与该上层钢绞线2和下层钢绞线3对应的倒U型槽孔81,上下对应的上层钢绞线2和下层钢绞线3穿设于该槽孔81内;该步骤D中,当SP墙板浇筑设备7行走到接近该横向定位板8的时候,将该横向定位板8移除。As shown in Fig. 6 and Fig. 7, in this step C, a plurality of comb-shaped lateral positioning plates 8 are arranged on the base plate 6, and the bottom of each lateral positioning plate 8 is provided with a plurality of the upper steel strands 2 and the lower steel strands The inverted U-shaped slot hole 81 corresponding to the line 3, the upper layer steel strand 2 and the lower layer steel strand 3 corresponding to the upper and lower layers are penetrated in the slot hole 81; When the lateral positioning plate 8 is positioned, the lateral positioning plate 8 is removed.

当埋件4两侧绑杆42之间的距离小于相邻下层钢绞线3之间的距离时,该步骤C中,在该下层钢绞线3上绑扎至少两个与下层钢绞线垂直的横向筋5,并将该埋件4的绑杆42通过绑绳与各横向筋5绑扎固定在一起。When the distance between the binding rods 42 on both sides of the embedded part 4 is smaller than the distance between the adjacent lower-layer steel strands 3, in this step C, at least two are bound on the lower-layer steel strands 3 perpendicular to the lower-layer steel strands The transverse rib 5 is attached, and the binding rod 42 of the embedded part 4 is tied and fixed with each transverse rib 5 through a tying rope.

本发明露骨料装饰预应力SP墙板及其生产工艺,工艺稳定,标准化程度高,产品质量可靠,结构稳定,露骨料饰面效果好,节能环保。The exposed aggregate decorative prestressed SP wallboard and the production process thereof of the present invention have the advantages of stable process, high standardization degree, reliable product quality, stable structure, good effect of exposed aggregate decoration, energy saving and environmental protection.

以上所述,仅是本发明的较佳实施例而已,并非对本发明的结构作任何形式上的限制。凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明的技术方案的范围内。The above descriptions are only preferred embodiments of the present invention, and do not limit the structure of the present invention in any form. Any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention still fall within the scope of the technical solutions of the present invention.

Claims (10)

1.一种露骨料装饰预应力SP墙板,其特征在于,包括截面呈矩形的混凝土板体,该板体内设有若干平行的通孔;该通孔上下两侧分别设有多个上层钢绞线和多个下层钢绞线,该通孔、上层钢绞线和下层钢绞线的长度方向均与该板体的长度方向平行;该板体的四个端角内侧各设有一个埋件,该埋件包括截面呈U型的槽钢,该槽钢包括两个竖向的侧板,二者底部之间通过横向的底板固定连接;该侧板外侧面顶部焊接有水平的绑杆,该绑杆的长度方向与该槽钢的长度方向及该板体的长度方向均平行;该底板设有圆孔,该底板顶面固定设有螺母,该螺母的螺孔与该圆孔对应连接;两个绑杆分别与相邻的两个下层钢绞线通过绑绳绑扎连接在一起,且该底板的底面与该板体的底面齐平;该板体的顶面露出混凝土骨料。1. An exposed aggregate decorative prestressed SP wall panel is characterized in that, it comprises a concrete plate body with a rectangular cross section, and the plate body is provided with several parallel through holes; the upper and lower sides of the through hole are respectively provided with a plurality of upper-layer steel plates Stranded wire and a plurality of lower layer steel strands, the length direction of the through hole, the upper layer steel wire and the lower layer steel strand are all parallel to the length direction of the plate body; the inner sides of the four end corners of the plate body are each provided with a buried The embedded part includes a channel steel with a U-shaped section, the channel steel includes two vertical side plates, and the bottoms of the two are fixedly connected by a horizontal bottom plate; the top of the outer side of the side plate is welded with a horizontal binding rod , the length direction of the binding rod is parallel to the length direction of the channel steel and the length direction of the plate body; the bottom plate is provided with a circular hole, the top surface of the bottom plate is fixed with a nut, and the screw hole of the nut corresponds to the circular hole connection; two tie rods are respectively connected with two adjacent lower steel strands through tie ropes, and the bottom surface of the bottom plate is flush with the bottom surface of the plate body; the top surface of the plate body exposes the concrete aggregate. 2.根据权利要求1所述的露骨料装饰预应力SP墙板,其特征在于:所述两个绑杆之间的距离小于相邻下层钢绞线之间的距离;所述下层钢绞线均与至少两个横向筋通过绑绳绑扎连接在一起,各横向筋均垂直于该下层钢绞线;两个绑杆分别与各横向筋通过绑绳绑扎连接在一起。2. The exposed aggregate decorative prestressed SP wall panel according to claim 1, characterized in that: the distance between the two binding rods is smaller than the distance between adjacent lower steel strands; the lower steel strands They are all connected with at least two transverse ribs by tying ropes, and each transverse rib is perpendicular to the lower steel strand; the two binding rods are respectively connected with each transverse rib by tying ropes. 3.根据权利要求1或2所述的露骨料装饰预应力SP墙板,其特征在于:所述板体的四个边缘均设有倒角。3. The exposed aggregate decorative prestressed SP wall panel according to claim 1 or 2, wherein the four edges of the panel body are provided with chamfers. 4.根据权利要求1或2所述的露骨料装饰预应力SP墙板,其特征在于:所述上层钢绞线和下层钢绞线一一对应,且在所述板体底面上的投影重合。4. The exposed aggregate decorative prestressed SP wall panel according to claim 1 or 2, characterized in that: the upper-layer steel strands and the lower-layer steel strands are in one-to-one correspondence, and the projections on the bottom surface of the board are coincident . 5.一种露骨料装饰预应力SP墙板的生产工艺,其特征在于:包括下列步骤:5. a production technology of exposed aggregate decorative prestressed SP wallboard, is characterized in that: comprise the following steps: A.根据要生产SP墙板的板长、板型,将一条生产线的矩形基板进行排版,将该基板划分为多个对应各板体的矩形区域,然后在该基板上对应相邻区域之间边界的位置画切割线;A. According to the board length and shape of the SP wallboard to be produced, the rectangular substrate of a production line is typeset, the substrate is divided into a plurality of rectangular areas corresponding to each board body, and then the corresponding adjacent areas on the substrate are arranged. Draw a cutting line at the position of the border; B.切割线画好以后,根据埋件距离各板体边缘的距离以及埋件的数量,在基板上画出各埋件的位置点;B. After the cutting line is drawn, draw the position of each embedded part on the substrate according to the distance between the embedded part and the edge of each plate body and the number of embedded parts; C.埋件的位置点画好以后,在基板上方进行上层钢绞线和下层钢绞线的放线和张拉;然后在各埋件的位置点,将埋件两侧的绑杆与下层钢绞线进行绑扎固定;C. After the position of the embedded parts is drawn, the upper and lower steel strands are laid out and tensioned above the base plate; Stranded wire for binding and fixing; D.以干硬性混凝土为原料,利用SP墙板浇筑设备,从该基板的一端开始向另一端边行走边进行浇筑生产;SP墙板浇筑设备在行走的同时,在已经成型的板体的顶面喷洒缓凝剂,使混凝土板体顶面形成露骨料饰面;D. Using dry and hard concrete as raw material, using SP wallboard pouring equipment, start pouring production from one end of the substrate to the other end while walking; while the SP wallboard pouring equipment is walking, it is placed on the top of the formed plate body. The surface is sprayed with retarder, so that the top surface of the concrete slab forms an exposed aggregate finish; E.浇筑生产完毕后,将基板上各切割线的位置标注在生产好的板体上,等到混凝土的强度上到设计强度的75-90%时,对上层钢绞线和下层钢绞线进行放张;放张完以后,按照板体上标注的切割线进行切割。E. After the pouring is completed, mark the position of each cutting line on the base plate on the produced plate body. When the strength of the concrete reaches 75-90% of the design strength, the upper and lower steel strands are Release the sheet; after the sheet is finished, cut according to the cutting line marked on the board. 6.根据权利要求5所述的露骨料装饰预应力SP墙板的生产工艺,其特征在于:所述步骤C中,在所述基板上设有若干梳子状的横向定位板,各横向定位板底部设有若干与所述上层钢绞线和下层钢绞线对应的倒U型槽孔,上下对应的上层钢绞线和下层钢绞线穿设于该槽孔内;所述步骤D中,当SP墙板浇筑设备行走到接近该横向定位板的时候,将该横向定位板移除。6 . The production process for decorative prestressed SP wall panels with exposed aggregates according to claim 5 , wherein in the step C, a plurality of comb-shaped lateral positioning plates are arranged on the base plate, and each lateral positioning plate is The bottom is provided with a plurality of inverted U-shaped slot holes corresponding to the upper layer steel strand and the lower layer steel strand, and the upper layer steel strand and the lower layer steel strand corresponding to the upper and lower layers are passed through the slot holes; in the step D, When the SP wallboard casting equipment travels to approach the lateral positioning plate, the lateral positioning plate is removed. 7.根据权利要求5或6所述的露骨料装饰预应力SP墙板的生产工艺,其特征在于:所述步骤C中,在所述下层钢绞线上绑扎至少两个与下层钢绞线垂直的横向筋,并将所述埋件的绑杆通过绑绳与各横向筋绑扎固定在一起。7. The production process of the exposed aggregate decorative prestressed SP wallboard according to claim 5 or 6, characterized in that: in the step C, at least two and the lower steel strand are bound on the lower steel strand vertical transverse ribs, and the tie rods of the embedded part are tied and fixed with each transverse rib by tying ropes. 8.根据权利要求5所述的露骨料装饰预应力SP墙板的生产工艺,其特征在于:所述步骤E中,混凝土的强度上到设计强度的75%时,对上层钢绞线和下层钢绞线进行放张。8. The production process of the exposed aggregate decorative prestressed SP wallboard according to claim 5, wherein in the step E, when the strength of the concrete reaches 75% of the design strength, The steel strand is stretched. 9.根据权利要求5所述的露骨料装饰预应力SP墙板的生产工艺,其特征在于:所述缓凝剂的各组分的重量比为:葡萄糖酸钠:水=1:5~1:2;所述混凝土中每立方米含有:水泥450kg,粗粒机制砂715kg,细粒机制砂409kg,石子711kg,水162kg。9 . The production process for decorative prestressed SP wallboard with exposed aggregates according to claim 5 , wherein the weight ratio of each component of the retarder is: sodium gluconate: water=1:5~1 : 2; each cubic meter in the concrete contains: cement 450kg, coarse-grained machine-made sand 715kg, fine-grain machine-made sand 409kg, pebbles 711kg, and water 162kg. 10.根据权利要求5所述的露骨料装饰预应力SP墙板的生产工艺,其特征在于:所述缓凝剂的各组分的重量比为:葡萄糖酸钠:水=2:5。10 . The production process for decorative prestressed SP wallboard with exposed aggregates according to claim 5 , wherein the weight ratio of each component of the retarder is: sodium gluconate: water=2:5. 11 .
CN201911075540.5A 2019-11-06 2019-11-06 Exposed aggregate decorative prestress SP wallboard and production process thereof Pending CN110748081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911075540.5A CN110748081A (en) 2019-11-06 2019-11-06 Exposed aggregate decorative prestress SP wallboard and production process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911075540.5A CN110748081A (en) 2019-11-06 2019-11-06 Exposed aggregate decorative prestress SP wallboard and production process thereof

Publications (1)

Publication Number Publication Date
CN110748081A true CN110748081A (en) 2020-02-04

Family

ID=69282329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911075540.5A Pending CN110748081A (en) 2019-11-06 2019-11-06 Exposed aggregate decorative prestress SP wallboard and production process thereof

Country Status (1)

Country Link
CN (1) CN110748081A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113387639A (en) * 2021-05-26 2021-09-14 浙江中清大建筑产业化有限公司 Prestressed hollow slab made of hard concrete

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060002104A (en) * 2004-07-01 2006-01-09 삼성물산 주식회사 Post-tensioned Precast Concrete Structures and Constructed Structures and Construction Methods Using Them
CN104196163A (en) * 2014-08-26 2014-12-10 北京金地沃克城市交通咨询有限公司 Two-direction pre-stressed prefabricated hollow concrete slab and manufacturing method thereof
CN104563384A (en) * 2014-12-12 2015-04-29 中国建筑股份有限公司 A large-scale prefabricated external wall panel with structural insulation and decoration integration and its manufacturing method
CN107914332A (en) * 2016-10-10 2018-04-17 北京市建筑工程研究院有限责任公司 A kind of prefabricated exposed aggregate finish wallboard and preparation method thereof
CN110344535A (en) * 2019-06-29 2019-10-18 河南强耐新材股份有限公司 A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork
CN209523302U (en) * 2019-01-16 2019-10-22 浙江中清大建筑产业化有限公司 A kind of prefabricated panel of stable connection and girder steel connection hanging piece
CN211396256U (en) * 2019-11-06 2020-09-01 河北榆构建材有限公司 Exposed aggregate decorative prestress SP wallboard

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060002104A (en) * 2004-07-01 2006-01-09 삼성물산 주식회사 Post-tensioned Precast Concrete Structures and Constructed Structures and Construction Methods Using Them
CN104196163A (en) * 2014-08-26 2014-12-10 北京金地沃克城市交通咨询有限公司 Two-direction pre-stressed prefabricated hollow concrete slab and manufacturing method thereof
CN104563384A (en) * 2014-12-12 2015-04-29 中国建筑股份有限公司 A large-scale prefabricated external wall panel with structural insulation and decoration integration and its manufacturing method
CN107914332A (en) * 2016-10-10 2018-04-17 北京市建筑工程研究院有限责任公司 A kind of prefabricated exposed aggregate finish wallboard and preparation method thereof
CN209523302U (en) * 2019-01-16 2019-10-22 浙江中清大建筑产业化有限公司 A kind of prefabricated panel of stable connection and girder steel connection hanging piece
CN110344535A (en) * 2019-06-29 2019-10-18 河南强耐新材股份有限公司 A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork
CN211396256U (en) * 2019-11-06 2020-09-01 河北榆构建材有限公司 Exposed aggregate decorative prestress SP wallboard

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘崇杰: "钢筋混凝土工", 31 January 1995, 山东科学技术出版社, pages: 173 - 174 *
胡纪祥主编,鄞州区建设志编纂委员会编: "鄞州区建设志 鄞州区住房和城乡建设局", 31 October 2014, 鄞州区住房和城乡建设局, pages: 278 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113387639A (en) * 2021-05-26 2021-09-14 浙江中清大建筑产业化有限公司 Prestressed hollow slab made of hard concrete
CN113387639B (en) * 2021-05-26 2022-05-03 浙江中清大建筑产业化有限公司 Prestressed hollow slab made of hard concrete

Similar Documents

Publication Publication Date Title
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN101041980A (en) Lightweight plaster wall and integral pouring procedure thereof
CN106939663A (en) A kind of concrete hollow double-storied floor and its construction method
CN206957042U (en) Light composite heat insulation outer wall plate and particular manufacturing craft
CN110005104A (en) A kind of fabricated heat preservation decoration integrative laminated floor slab and its construction method
CN211396256U (en) Exposed aggregate decorative prestress SP wallboard
CN202265926U (en) Archy floorslab built by building blocks
CN106284653B (en) A kind of construction method that balcony construct capital interspaces in advance
CN110748081A (en) Exposed aggregate decorative prestress SP wallboard and production process thereof
CN205818107U (en) A kind of quick process units of non-light tight concrete modularity
CN105735518A (en) Laminboard thermal-insulating wall component
CN205444514U (en) Bearing light insulation intergral template
CN106988183A (en) A kind of concrete road of High anti bending strength
CN203716343U (en) Plastic sheet internal mold cement mortar wall body
CN104652280B (en) Overlength, after water fish ridge wall one-time continuous moulding irrigation method and overlength fish ridge wall thereof
CN206873731U (en) A kind of concrete hollow double-storied floor
CN105442715A (en) Load-bearing light-weight heat preservation integrated plate
KR101148413B1 (en) Water discharge improve prop beam structures
CN201050128Y (en) Cast in-situ light aggregate reinforcing steel concrete composite floor slab
CN104831850B (en) Orthogonal-diagonal lattice U-shaped steel, concrete combined hollow superstructure and production method
CN208934250U (en) A kind of assembled exempts to tear round beam column concrete blinding open
CN203320691U (en) Light steel and concrete house building system
CN1188832A (en) Assembly reinforced concretre box structure and making method
CN108590162A (en) It is molded complete slab column(Wall)PC exempts from form removal shell and its production method and site construction technology
CN106760189B (en) Tall building structure transfer beam construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination