CN110738334B - Multi-platform information interaction electric power safety production management system - Google Patents
Multi-platform information interaction electric power safety production management system Download PDFInfo
- Publication number
- CN110738334B CN110738334B CN201910999191.XA CN201910999191A CN110738334B CN 110738334 B CN110738334 B CN 110738334B CN 201910999191 A CN201910999191 A CN 201910999191A CN 110738334 B CN110738334 B CN 110738334B
- Authority
- CN
- China
- Prior art keywords
- fault
- platform
- early warning
- frequency
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003993 interaction Effects 0.000 title claims abstract description 27
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 27
- 238000012544 monitoring process Methods 0.000 claims abstract description 20
- 238000012545 processing Methods 0.000 claims abstract description 18
- 238000004458 analytical method Methods 0.000 claims description 15
- 230000009467 reduction Effects 0.000 claims description 10
- 230000002159 abnormal effect Effects 0.000 claims description 7
- 238000012423 maintenance Methods 0.000 claims description 7
- 238000004891 communication Methods 0.000 claims description 6
- 239000000284 extract Substances 0.000 claims description 6
- 238000001914 filtration Methods 0.000 claims description 6
- 230000002452 interceptive effect Effects 0.000 claims description 6
- 238000002955 isolation Methods 0.000 claims description 3
- 238000011084 recovery Methods 0.000 claims description 3
- 230000008439 repair process Effects 0.000 claims description 3
- 238000005192 partition Methods 0.000 claims 1
- 238000007726 management method Methods 0.000 description 18
- 238000007689 inspection Methods 0.000 description 3
- 239000012535 impurity Substances 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention provides a multi-platform information interaction electric power safety production management system which is characterized by comprising a central control platform, an active early warning platform, a fault monitoring platform, a grading management platform, an information interaction platform, a work section fault processing platform and a fault processing center platform.
Description
Technical Field
The invention belongs to the field of electric power safety production, and particularly relates to a multi-platform information interaction electric power safety production management system.
Background
The fifteenth item in the electric power safety production supervision and management method instructed by the national development and reform committee of the people's republic of China includes: the power enterprises should strengthen the safety management and technical management of power generation equipment facilities and power transmission and transformation and distribution equipment facilities, strengthen the professional management of a power monitoring system (or equipment), perfect the performances of frequency modulation, peak regulation, voltage regulation, phase modulation, emergency standby and the like of a power system, and meet the requirement of safe and stable operation of the power system.
The power production is a complex system project, the guarantee of the safe and stable operation of a power system is an important work, power equipment often breaks down in the production process, the equipment failure is an important factor influencing the power safety, and the safety guarantee of the power production is only the guarantee of the normal operation of the equipment.
In the prior art, the fault judgment and maintenance are carried out on the power equipment only in a manual inspection mode, because inspection personnel can only carry out periodic inspection and cannot observe the fault judgment from time to time, the hysteresis caused by the fault judgment exists, and the missed judgment or the misjudgment can also occur due to the personal capability difference, so that the power equipment runs in an abnormal state in the production process, and in the serious condition, the power production safety can be influenced.
Disclosure of Invention
In order to solve the problems, the invention provides a multi-platform information interaction electric power safety production management system which is characterized by comprising a central control platform, an active early warning platform, a fault monitoring platform, a hierarchical management platform, an information interaction platform, a work section fault processing platform and a fault processing center platform;
the active early warning platform and the central control platform are in interactive communication to obtain operation data of the central control platform in a rated working period, a data layer module of the active early warning platform extracts an abnormal sequence in the operation data, fault early warning analysis is carried out based on the abnormal sequence, the whole workshop section of power production is divided into a high-level early warning workshop section, a middle-level early warning workshop section and a low-level early warning workshop section according to the fault early warning grades from high to low, and an early warning cruise module of the active early warning platform respectively carries out high-frequency early warning cruise, medium-frequency early warning cruise and low-frequency early warning cruise according to different early warning grades of the workshop sections; the early warning cruising module extracts sound wave information of a cruising working section, and feeds back and stores the sound wave information to the information layer module of the active early warning platform;
the fault monitoring platform and the active early warning platform are in interactive communication to obtain sound wave information of an information layer module of the active early warning platform, a noise reduction layer module of the fault monitoring platform is used for reducing noise and filtering impurities of the sound wave information, an analysis layer module of the fault monitoring platform is used for analyzing the sound wave information subjected to noise reduction and filtering by the noise reduction layer module and outputting a oscillogram, a threshold value analysis layer module of the fault monitoring platform is used for analyzing frequency parameters and amplitude parameters of the oscillogram, and when the frequency parameters or the amplitude parameters deviate from a rated threshold value range, working condition faults of the workshop section are judged and the fault information is fed back to the hierarchical management platform;
the data backup layer module of the hierarchical management platform backs up fault data of the whole power production working section in a rated working period, and the faults are divided into three levels of a primary fault, a secondary fault and a tertiary fault according to different fault types; after receiving the fault information, the hierarchical management platform checks faults of corresponding working sections, determines fault classification, sends the fault information to the fault processing platform of the work division section through the information interaction platform if the fault belongs to a primary fault or a secondary fault, and repairs the fault information by the fault processing platform of the work division section; and after the fault processing platform of the sub-workshop section or the fault processing center platform finishes repairing, the data backup layer module backs up the fault data and the repairing information so as to facilitate subsequent fault analysis and repairing.
Preferably, the parameters for determining the fault early warning level comprise fault frequency parameters and fault classification parameters, the fault frequency is divided into three levels, namely high, medium and low, and a section with a high fault frequency is set as a high-level early warning section when a fault with three levels occurs; setting a section with low fault frequency and only one-stage fault as a low-stage early warning section; and setting other sections except the high-grade early warning section and the low-grade early warning section as middle-grade early warning sections.
Preferably, the primary fault is a fault that the data backup layer module is backed up and can be repaired through remote control of the work segment fault processing platform or system self-recovery; the secondary fault is a fault which is backed up by the data backup layer module and is repaired through the field operation of a maintenance worker of the fault handling platform of the division section; the third-level fault is a fault which is backed up by the data backup layer module and is repaired through the field operation of a maintenance worker of the fault processing center platform or a fault type which is not backed up by the data backup layer module.
Preferably, the size of the rated threshold range of the fault monitoring platform threshold analysis layer module is set differently according to different time parameters, and the rated threshold range of 8:00-20:00 is larger than the rated threshold range of other time periods; the nominal threshold range of months 4-9 is greater than the nominal threshold range of other months.
Preferably, the information interaction platform encrypts the information interaction data in a hierarchical manner, the encryption level of the fault information data sent to the fault processing platform in the work division is one level, the encryption level of the fault information data sent to the fault processing center platform by the information interaction platform is two levels, and the encryption level of the second level is higher than that of the first level.
Preferably, the primary encryption is network flow data encryption, and the secondary encryption is hardware-based channel isolation encryption.
The power equipment belongs to consumables, can break down certainly in the production process, can find out the trouble in time and be a protection to power equipment, just can not influence power production's normal operating through in time overhauing. The invention adopts the multi-platform information interaction system to monitor the electric power equipment, replaces the traditional mode of only polling by workers, can timely and effectively find and solve problems, improves the working quality and efficiency of production management of electric power enterprises, saves labor cost and working time, and provides important guarantee for electric power safety production.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings needed for the description of the embodiment or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a structural diagram of a multi-platform information interaction power safety production management system of the present invention.
Fig. 2 is a rule chart of the fault early warning level section division of the invention.
Detailed Description
The present invention is further described in detail below with reference to fig. 1 and 2 so that those skilled in the art can practice the invention with reference to the description.
Referring to the attached figure 1, the multi-platform information interaction electric power safety production management system comprises a central control platform, an active early warning platform, a fault monitoring platform, a hierarchical management platform, an information interaction platform, a work division fault processing platform and a fault processing center platform;
the active early warning platform and the central control platform are in interactive communication to obtain operation data of the central control platform in a rated working period, a data layer module of the active early warning platform extracts an abnormal sequence in the operation data, fault early warning analysis is carried out based on the abnormal sequence, the whole workshop section of power production is divided into a high-level early warning workshop section, a middle-level early warning workshop section and a low-level early warning workshop section according to the fault early warning grades from high to low, and an early warning cruise module of the active early warning platform respectively carries out high-frequency early warning cruise, medium-frequency early warning cruise and low-frequency early warning cruise according to different early warning grades of the workshop sections; the early warning cruising module extracts sound wave information of a cruising working section, and feeds back and stores the sound wave information to the information layer module of the active early warning platform;
the fault monitoring platform and the active early warning platform are in interactive communication to obtain sound wave information of an information layer module of the active early warning platform, a noise reduction layer module of the fault monitoring platform is used for reducing noise and filtering impurities of the sound wave information, an analysis layer module of the fault monitoring platform is used for analyzing the sound wave information subjected to noise reduction and filtering by the noise reduction layer module and outputting a oscillogram, a threshold value analysis layer module of the fault monitoring platform is used for analyzing frequency parameters and amplitude parameters of the oscillogram, and when the frequency parameters or the amplitude parameters deviate from a rated threshold value range, working condition faults of the workshop section are judged and the fault information is fed back to the hierarchical management platform;
the data backup layer module of the hierarchical management platform backs up fault data of the whole power production workshop section in a rated working period, the rated working period of the central control platform is divided differently according to different production workshop section devices, for example, the rated working period can be 1 month, 1 quarter or half a year, and the faults are divided into three levels of a first-level fault, a second-level fault and a third-level fault according to different fault types; after receiving the fault information, the hierarchical management platform checks faults of corresponding working sections, determines fault classification, sends the fault information to the fault processing platform of the work division section through the information interaction platform if the fault belongs to a primary fault or a secondary fault, and repairs the fault information by the fault processing platform of the work division section; and after the fault processing platform of the sub-workshop section or the fault processing center platform finishes repairing, the data backup layer module backs up the fault data and the repairing information so as to facilitate subsequent fault analysis and repairing.
Referring to fig. 2, the high-level pre-warning section, the middle-level pre-warning section and the low-level pre-warning section are distinguished mainly by the fault frequency parameter and the fault classification parameter. The specific division rule is as follows:
dividing the fault frequency into a high level, a medium level and a low level, wherein the fault frequency is the number of times of faults occurring in the rated working period of the rated central control platform, and the fault frequency of the working section with the number of times of faults being in the first 20% is defined as high; defining the fault frequency of the working section with the fault frequency positioned in the last 20% as low; the failure frequency of the working section is defined as middle.
The fault is divided into a first-stage fault, a second-stage fault and a third-stage fault, wherein the first-stage fault is a fault which is backed up by the data backup layer module and can be repaired through remote control or system self-recovery of the fault handling platform of the work division section; the secondary fault is a fault which is backed up by the data backup layer module and is repaired through the field operation of a maintenance worker of the fault handling platform of the division section; the third-level fault is a fault which is backed up by the data backup layer module and is repaired through the field operation of a maintenance worker of the fault processing center platform or a fault type which is not backed up by the data backup layer module.
And setting the section with the occurrence of the three-level fault and high fault frequency as a high-level early warning section. Specifically, the method comprises the steps of generating a primary fault and a tertiary fault with high fault frequency, generating a secondary fault and a tertiary fault with high fault frequency, and generating a primary fault, a secondary fault and a tertiary fault with high fault frequency, wherein the high-frequency fault working sections are set as high-grade early warning working sections. Namely, no matter whether primary fault and secondary fault occur, the high-level early warning section is set as long as the third-level fault occurs and the fault frequency is high.
And setting the section with only one-stage fault and low fault frequency as a low-stage early warning section.
And setting other sections except the high-grade early warning section and the low-grade early warning section as middle-grade early warning sections. Specifically, the working sections with high fault frequency, working sections with medium fault frequency, working sections with low fault frequency and medium fault frequency, and working sections with medium fault frequency, working sections with medium fault frequency and medium fault frequency are all intermediate-level early warning working sections.
The size of a rated threshold range of the fault monitoring platform threshold analysis layer module is set differently according to different time parameters, and the rated threshold range of 8:00-20:00 is larger than the rated threshold ranges of other time periods; the nominal threshold range of months 4-9 is greater than the nominal threshold range of other months.
The information interaction platform carries out hierarchical encryption on information interaction data, the encryption level of fault information data sent to the fault processing platform of the division section by the information interaction platform is one level, the encryption level of fault information data sent to the fault processing center platform by the information interaction platform is two levels, and the second encryption level is higher than the first encryption level.
The first-level encryption is network stream data encryption, and the second-level encryption is hardware-based channel isolation encryption.
Finally, it should be noted that: the above-mentioned embodiments are only specific embodiments of the present invention, which are used for illustrating the technical solutions of the present invention and not for limiting the same, and the protection scope of the present invention is not limited thereto, although the present invention is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: any person skilled in the art can modify or easily conceive the technical solutions described in the foregoing embodiments or equivalent substitutes for some technical features within the technical scope of the present disclosure; such modifications, changes or substitutions do not depart from the spirit and scope of the embodiments of the present invention, and they should be construed as being included therein. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (2)
1. A multi-platform information interaction electric power safety production management system is characterized by comprising a central control platform, an active early warning platform, a fault monitoring platform, a hierarchical management platform, an information interaction platform, a work division fault processing platform and a fault processing center platform;
the active early warning platform and the central control platform are in interactive communication to obtain operation data of the central control platform in a rated working period, a data layer module of the active early warning platform extracts an abnormal sequence in the operation data, fault early warning analysis is carried out based on the abnormal sequence, the whole working section of power production is divided into a high-level early warning working section, a middle-level early warning working section and a low-level early warning working section according to the fault early warning grade from high to low, and an early warning cruising module of the active early warning platform respectively carries out high-frequency early warning cruising, medium-frequency early warning cruising and low-frequency early warning cruising according to different early warning grades of the working section; the early warning cruising module extracts sound wave information of a cruising working section, and feeds back and stores the sound wave information to the information layer module of the active early warning platform;
the fault monitoring platform and the active early warning platform are in interactive communication to obtain sound wave information of an information layer module of the active early warning platform, a noise reduction layer module of the fault monitoring platform is used for carrying out noise reduction and filtering on the sound wave information, an analysis layer module of the fault monitoring platform is used for analyzing the sound wave information subjected to noise reduction and filtering by the noise reduction layer module and outputting a oscillogram, a threshold value analysis layer module of the fault monitoring platform is used for analyzing frequency parameters and amplitude parameters of the oscillogram, and when the frequency parameters or the amplitude parameters deviate from a rated threshold value range, working condition faults of the workshop section are judged and the fault information is fed back to the hierarchical management platform;
the data backup layer module of the hierarchical management platform backs up fault data of the whole working section of the power production in a rated working period, and the faults are divided into three levels of primary faults, secondary faults and tertiary faults according to different fault types; after receiving the fault information, the hierarchical management platform checks faults of corresponding working sections, determines fault classification, sends the fault information to the fault processing platform of the work division section through the information interaction platform if the fault belongs to a primary fault or a secondary fault, and repairs the fault information by the fault processing platform of the work division section; after the fault processing platform of the sub-workshop section or the fault processing center platform finishes repairing, the data backup layer module backs up the fault data and the repairing information so as to facilitate the subsequent fault analysis and repairing;
the parameters for determining the fault early warning level comprise fault frequency parameters and fault classification parameters, and the fault frequency is divided into three levels, namely high level, medium level and low level;
setting the work sections with high fault frequency and high tertiary fault frequency as high-grade early warning work sections, wherein the work sections with high fault frequency, high secondary fault frequency, high tertiary fault frequency, high primary fault frequency, high secondary fault frequency and high tertiary fault frequency are set as the high-grade early warning work sections, and the work sections with high fault frequency are set as the high-grade early warning work sections as long as the work sections with high tertiary fault frequency and high tertiary fault frequency are set whether the primary fault and the secondary fault occur or not;
setting a section with low fault frequency and only one-stage fault as a low-stage early warning section;
setting other working sections except the high-level early warning working section and the low-level early warning working section as middle-level early warning working sections, wherein the working sections with the medium fault frequency and the middle-level early warning working sections are the working sections with the medium fault frequency and the low fault frequency and the working sections with the medium fault frequency and the low fault frequency and the working sections with the medium fault frequency and the middle fault frequency;
the primary fault is a fault which is backed up by the data backup layer module and can be repaired through remote control of the partition fault processing platform or system self-recovery; the secondary fault is a fault which is backed up by the data backup layer module and is repaired through the field operation of a maintenance worker of the fault handling platform of the division section; the third-level fault is a fault which is backed up by the data backup layer module and is repaired through the field operation of a maintenance worker of the fault processing center platform or a fault type which is not backed up by the data backup layer module;
the size of a rated threshold range of the fault monitoring platform threshold analysis layer module is set differently according to different time parameters, and the rated threshold range of 8:00-20:00 is larger than the rated threshold ranges of other time periods; the rated threshold range of the month 4-9 is larger than that of other months;
the information interaction platform carries out hierarchical encryption on information interaction data, the encryption level of fault information data sent to the fault processing platform of the division section by the information interaction platform is one level, the encryption level of fault information data sent to the fault processing center platform by the information interaction platform is two levels, and the second encryption level is higher than the first encryption level.
2. The multi-platform information-interactive power safety production management system according to claim 1, wherein the primary encryption is network flow data encryption and the secondary encryption is hardware-based channel isolation encryption.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910999191.XA CN110738334B (en) | 2019-10-21 | 2019-10-21 | Multi-platform information interaction electric power safety production management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910999191.XA CN110738334B (en) | 2019-10-21 | 2019-10-21 | Multi-platform information interaction electric power safety production management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110738334A CN110738334A (en) | 2020-01-31 |
CN110738334B true CN110738334B (en) | 2020-11-17 |
Family
ID=69270198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910999191.XA Active CN110738334B (en) | 2019-10-21 | 2019-10-21 | Multi-platform information interaction electric power safety production management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110738334B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118596139B (en) * | 2024-05-28 | 2024-11-05 | 国网青海省电力公司海东供电公司 | Substation inspection robot and operation method thereof |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101093239A (en) * | 2007-04-05 | 2007-12-26 | 泰豪科技股份有限公司 | Online detection and remote diagnosis system for automated power station |
CN101802735A (en) * | 2007-09-19 | 2010-08-11 | 布里格斯斯特拉顿公司 | Electric power monitoring system |
CN201909667U (en) * | 2010-12-07 | 2011-07-27 | 鞍钢集团矿业公司 | Running status voice and local electro-discharge online monitoring and analyzing device of transformer |
CN202066932U (en) * | 2011-05-20 | 2011-12-07 | 华南理工大学 | Potable partial-discharge ultrasonic cloud detection device |
CN102497025B (en) * | 2011-12-20 | 2013-09-11 | 昆明电器科学研究所 | Remote state monitoring method for automatic sectionalizer |
CN102541013B (en) * | 2012-01-10 | 2014-04-02 | 天华化工机械及自动化研究设计院有限公司 | Remote monitoring, early warning and fault-diagnosing system and method for anodic protection device |
CN103558505B (en) * | 2013-10-23 | 2016-01-20 | 国家电网公司 | Line flashover fault detection method is with Installed puts |
CN103793601A (en) * | 2014-01-20 | 2014-05-14 | 广东电网公司电力科学研究院 | Turbine set online fault early warning method based on abnormality searching and combination forecasting |
FI20150241A7 (en) * | 2014-08-19 | 2016-02-20 | Domax Oy | Method and apparatus for locating a fault in an electrical network |
CN105021925B (en) * | 2015-07-15 | 2018-06-29 | 深圳市双合电气股份有限公司 | Power monitoring system and method based on cement industry |
US20180025458A1 (en) * | 2016-07-25 | 2018-01-25 | Bossanova Systems, Inc. | Self-customizing, multi-tenanted mobile system and method for digitally gathering and disseminating real-time visual intelligence on utility asset damage enabling automated priority analysis and enhanced utility outage response |
GB201616027D0 (en) * | 2016-09-21 | 2016-11-02 | Rolls-Royce Ltd | Electrical fault detection method |
CN107341617A (en) * | 2017-07-13 | 2017-11-10 | 国网山东省电力公司威海供电公司 | A kind of electric network fault information processing scheduling system and its dispatching method |
CN107748314A (en) * | 2017-10-18 | 2018-03-02 | 国网重庆市电力公司北碚供电分公司 | Transformer Faults Analysis system based on sound wave shock detection |
CN109342906B (en) * | 2018-12-05 | 2020-07-07 | 山东大学 | Multifunctional partial discharge detection system and method |
CN110275094B (en) * | 2019-05-05 | 2021-06-08 | 电子科技大学 | High-voltage cable partial discharge acousto-optic combined detection method and system |
-
2019
- 2019-10-21 CN CN201910999191.XA patent/CN110738334B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN110738334A (en) | 2020-01-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bao et al. | Impact analysis of human factors on power system operation reliability | |
CN105678467A (en) | Regulation and control integrated data analysis and aid decision making system and method under ultrahigh-voltage alternating current and direct current networking | |
CN104020754A (en) | Method for enabling state monitoring information of transformer station primary main equipment to access to regulation and control system | |
CN102530027B (en) | High-speed rail risk analysis and control method and high-speed rail risk analysis and control system | |
CN102231521A (en) | Power grid operation state identification method in distribution network self-healing control | |
CN110738334B (en) | Multi-platform information interaction electric power safety production management system | |
CN118278749B (en) | Emergency management system for electric power accident early warning | |
Arno et al. | What is RCM and How could it be applied to the critical loads? | |
CN113436420A (en) | Intelligent alarm system of integration control is transferred to water and electricity | |
CN112581021B (en) | Method for automatically evaluating superiority and inferiority of operation scheme based on analytic hierarchy process | |
CN115526351A (en) | Equipment inspection method and device applied to transformer substation and electronic equipment | |
Bai et al. | Risk assessment of hoisting aboard and installation for offshore wind turbine | |
Castro et al. | Comparison of different screening techniques for the contingency selection function | |
Liu et al. | Intelligent alarm management through suppressing nuisance alarms and providing operator advice | |
LU504183B1 (en) | Internet-based engine production line operation and maintenance management system | |
CN105245000A (en) | Parallel processing method for state early-warning information of transformer | |
Skog et al. | Southern California Edison’s business case for transformer online monitoring | |
CN204493159U (en) | A kind of compressor remote fault diagnosis system | |
Gao | Machine Learning Models for Equipment Preventive Maintenance and Predictive Analytics | |
Lu et al. | Research on substation intelligent monitoring scheme under big data environment | |
Xiong et al. | A new method of state maintenance decision of relay protection system based on state probability assessment | |
CN109599848A (en) | The defect handling method and defect processing system of electric grid secondary equipment | |
CN107316135B (en) | Risk quantitative evaluation method for switch and disconnecting link operation process | |
CN108183816A (en) | A kind of electric power communication device repair schedule quantifies aid decision-making method | |
Lu et al. | Research on standardization of power grid operation safety management based on set theory |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201028 Address after: Room 202, No.1 Meihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510600 Applicant after: GUANGZHOU ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd. Applicant after: NINGBO JIUZONG INTELLIGENT TECHNOLOGY Co.,Ltd. Address before: 362012 Shuangyang overseas Chinese Economic Development Zone, Luojiang District, Fujian, Quanzhou Applicant before: Zou Wei |
|
GR01 | Patent grant | ||
GR01 | Patent grant |