[go: up one dir, main page]

CN110715814B - An online comprehensive diagnosis system and method for an open cooling tower - Google Patents

An online comprehensive diagnosis system and method for an open cooling tower Download PDF

Info

Publication number
CN110715814B
CN110715814B CN201910934921.8A CN201910934921A CN110715814B CN 110715814 B CN110715814 B CN 110715814B CN 201910934921 A CN201910934921 A CN 201910934921A CN 110715814 B CN110715814 B CN 110715814B
Authority
CN
China
Prior art keywords
cooling tower
water
cooling
unit
diagnosis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910934921.8A
Other languages
Chinese (zh)
Other versions
CN110715814A (en
Inventor
吴浩海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huaxia Baoli Environmental Protection Technology Co ltd
Original Assignee
Jiangsu Huaxia Baoli Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huaxia Baoli Environmental Protection Technology Co ltd filed Critical Jiangsu Huaxia Baoli Environmental Protection Technology Co ltd
Priority to CN201910934921.8A priority Critical patent/CN110715814B/en
Publication of CN110715814A publication Critical patent/CN110715814A/en
Application granted granted Critical
Publication of CN110715814B publication Critical patent/CN110715814B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/008Subject matter not provided for in other groups of this subclass by doing functionality tests
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/34Testing dynamo-electric machines
    • G01R31/343Testing dynamo-electric machines in operation
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/30Services specially adapted for particular environments, situations or purposes
    • H04W4/38Services specially adapted for particular environments, situations or purposes for collecting sensor information

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

本发明提供一种开式冷却塔在线综合诊断方法,包括感知层、执行层、数据传输层及决策层,感知层,包括水温传感器、流量计、三相远传式智能电表、电流互感器、干湿球温度传感器、远传式水表以及脉冲计数单元;用于采集开式冷却塔及其设备的原始运行数据;执行层,包括诊断控制器,用于采集感知层的所有数据,并上传至数据传输层;数据传输层,包括4G工业物联网路由器,用于将诊断控制器采集的各项数据无线传输至决策层;决策层,用于将传输上来的各项数据进行运算及推理,并将结果以及各项数据显示至人机交互界面或移动终端APP;能够辅助判断开式冷却塔的运行异常状况、异常原因以及解决办法,极大的提高了设备的运行效率及人员工作效率。

Figure 201910934921

The invention provides an on-line comprehensive diagnosis method for an open cooling tower, which includes a perception layer, an execution layer, a data transmission layer and a decision-making layer. Wet and dry bulb temperature sensors, remote water meters and pulse counting units; used to collect raw operating data of open cooling towers and their equipment; execution layer, including diagnostic controller, used to collect all data from the sensing layer and upload to Data transmission layer; data transmission layer, including 4G industrial Internet of Things routers, is used to wirelessly transmit various data collected by the diagnostic controller to the decision-making layer; decision-making layer is used to calculate and reason the transmitted data, and Display the results and various data to the human-computer interaction interface or mobile terminal APP; it can assist in judging the abnormal operation of the open cooling tower, the cause of the abnormality and the solution, which greatly improves the operation efficiency of the equipment and the work efficiency of personnel.

Figure 201910934921

Description

Online comprehensive diagnosis system and method for open cooling tower
Technical Field
The invention belongs to the technical field of cooling towers, and particularly relates to an open type cooling tower online comprehensive diagnosis system and method.
Background
The large building central air conditioner mainly adopts a centralized water chilling unit as cold source supply equipment, wherein the large building central air conditioner comprises three large circulation systems, namely a refrigerant circulation system, a chilled water circulation system and a cooling water circulation system, wherein the refrigeration efficiency of the water chilling unit is closely related to the temperature of an evaporator side and the temperature of a condenser side of the water chilling unit, the efficiency of the water chilling unit is increased when the temperature of the evaporator side is increased, and the efficiency of the water chilling unit is increased when the temperature of the condenser side is decreased; the temperature of the evaporator side is directly related to the chilled water circulation system, and the temperature of the condenser side is directly related to the cooling water circulation system, so the operation condition of the cooling water circulation system is directly related to the operation energy consumption of the water chilling unit. The cooling water circulation system comprises accessories such as a condenser side heat exchanger, a cooling water circulating pump, a cooling tower (a multipurpose open cooling tower), a pipeline, a valve and the like. The cooling tower is used as a heat dissipation device of the system, the operation efficiency of the cooling tower directly influences the operation energy consumption of the water chilling unit, and the operation safety of the cooling tower directly influences the operation safety of the whole central air conditioning system, so sufficient attention needs to be paid.
The defects and shortcomings of the prior art are as follows:
1. at present, the cooling capacity of a cooling tower needs to be calculated by measuring the temperature of a dry-wet bulb, the atmospheric pressure value, the flow, the air speed of exhaust air, the heat dissipation and exhaust amount and the like, then a series of parameters such as the relative humidity of air entering the tower, the water vapor partial pressure of saturated air, the density of dry air entering the tower, the air-water ratio, the enthalpy value of air leaving the tower, the average enthalpy value of air in the tower, the enthalpy value of saturated air and the like are calculated, the calculation process is very complicated, and the heat dissipation efficiency of the cooling tower can be judged only by correcting the water inlet temperature of the cooling tower; manual recording and calculation are needed in the calculation process, the requirement on the specialty is high, real-time online monitoring cannot be realized, and the current operation effect of the cooling tower cannot be judged visually;
2. when the existing open cooling tower motor and a cooling fan (fan) operate for a long time, the equipment is in an outdoor high-temperature and high-humidity environment for a long time, and after the operation time is long, the motor and fan transmission part-belt is likely to loosen due to aging and abrasion, the transmission efficiency is not high, and the motor and fan transmission part-belt needs to be replaced in time when the conditions are met, so that the problem that the cooling effect is poor due to the reduction of the air exhaust amount is avoided, and the operation energy consumption of a water chilling unit;
3. the fan power consumption ratio in the energy efficiency limit value of the existing open cooling tower in operation can not be calculated, the fan power consumption ratio of the fan of the cooling tower can not be known at present because the open cooling tower used in each building seldom measures the power consumption of the fan of a single cooling tower and the circulating water quantity flowing through the cooling tower, and the fan power consumption ratio of the fan of the cooling tower can not be judged whether the fan power consumption ratio in the actual operation of the cooling tower is deviated from the design value or the test value or not and whether the energy waste exists or not in the later operation;
4. the drifting water rate of the cooling tower is an important mark for representing whether the cooling tower saves water or not, but at present, the actual engineering application does not calculate the drifting water rate and the drifting water quantity of the cooling tower in actual operation, and if the drifting water rate of the cooling tower is increased due to the factors of large lift of a cooling water pump, small water distribution direction of cooling water and small horizontal included angle and the like, the extreme waste of water resources is caused; a water meter is generally designed on a tap water replenishing pipe of the cooling tower, but is not included in the operation energy efficiency diagnosis of the cooling tower, and at the present stage, the water meter is only used for water replenishing amount metering after the cooling tower operates for a period of time, is not used as judgment data of the operation energy efficiency of the cooling tower, and is only used as data of subentry metering to perform energy consumption statistics;
5. the cooling tower fan is careless to maintain for long-term operation or the motor is unsmooth to operate due to other reasons, jamming exists, the operation current is increased, but the heat relay protection value of a general tower fan control box is rough and not high in precision, the heat relay protection current set value in many projects is large, and the rated current is far exceeded; when the motor is jammed, the running current of the motor is increased, and a motor coil is scalded, so that the running energy consumption is increased, and meanwhile, the temperature rise of equipment is overlarge due to long-term running, the coil is accelerated to age, and the service life of the equipment is damaged;
6. the existing cooling tower is generally installed on the top of an undaria or a main building of a building, in actual operation, operation management personnel can not learn real-time specific operation data of the equipment, and fault information and operation data of the equipment can be learned only by the operation management personnel through field inspection, so that great inconvenience is brought to later operation.
Therefore, in order to solve the above problems, there is a need for a fully functional open cooling tower online comprehensive diagnosis system and method.
Disclosure of Invention
The invention aims to provide an open cooling tower on-line comprehensive diagnosis method, which aims to solve the problems that the existing cooling tower is not paid enough attention, and the diagnosis method has a plurality of defects and deficiencies.
The invention provides the following technical scheme:
an open cooling tower on-line comprehensive diagnosis system comprises a sensing layer, an execution layer, a data transmission layer and a decision layer, wherein the sensing layer comprises a water temperature sensor, a flowmeter, a three-phase remote transmission type intelligent electric meter, a current transformer, a wet-dry bulb temperature sensor, a remote transmission type water meter and a pulse counting unit; the system is used for acquiring original operation data of the open cooling tower and equipment thereof; the execution layer comprises a diagnosis controller and is used for acquiring all data of the sensing layer and uploading the data to the data transmission layer; the data transmission layer comprises a 4G industrial Internet of things router and is used for wirelessly transmitting all data acquired by the diagnosis controller to the decision layer; and the decision layer is used for calculating and reasoning various transmitted data and displaying the result and various data to a human-computer interaction interface or a mobile terminal APP.
An open cooling tower on-line comprehensive diagnosis method comprises the following steps:
s1, receiving the data value of the wet and dry bulb temperature sensor through the diagnosis controller, diagnosing the cooling capacity of the cooling tower, and sending the diagnosis result to the decision layer through the data transmission layer;
s2, receiving the data value of the pulse counting unit through the diagnosis controller, diagnosing the motor rotating speed and the cooling fan rotating speed of the cooling tower, and sending the diagnosis result to a decision layer through a data transmission layer;
s3, receiving data values of the water temperature sensor, the flowmeter and the three-phase remote transmission type intelligent electric meter through the diagnosis controller, diagnosing the fan power consumption ratio of the cooling tower, and sending a diagnosis result to a decision layer through a data transmission layer;
s4, receiving the data value of the remote water meter through the diagnosis controller, diagnosing the drift rate of the cooling tower, and sending the diagnosis result to the decision layer through the data transmission layer;
s5, receiving the data value of the current transformer through the diagnosis controller, diagnosing the motor operation condition of the cooling tower, and sending the diagnosis result to the decision layer through the data transmission layer;
and S7, receiving the diagnosis result uploaded by the diagnosis controller through the decision layer, performing operation and reasoning, and displaying the final result and various data to a human-computer interaction interface or a mobile terminal APP.
Further, in S1, the diagnosing the cooling capacity of the cooling tower includes:
s101, measuring a wet bulb temperature value at an air inlet position as T1 and a water outlet temperature value at a water outlet pipe as T2 through a dry-wet bulb temperature sensor;
s102, calculating an approximation value TA (T2-T1) by the diagnosis controller;
s103, judging whether the approximation degree value is larger than a standard limit value TB of the approximation degree of the small and medium-sized open cooling tower or not through a diagnosis controller, if so, diagnosing that the cooling capacity of the cooling tower is abnormal through the diagnosis controller; if not, the diagnosis controller diagnoses that the cooling capacity of the cooling tower is normal.
Further, in S2, the diagnosing the motor speed and the radiator fan speed of the cooling tower includes:
s201, recording the pulse number DA of a motor and the pulse number DB of a cooling fan in a measuring time T through a pulse counting unit;
s202, calculating by the diagnosis controller:
the rotating speed of the motor is r1 ═ DA ÷ n ÷ T;
the rotating speed of the radiating fan is r2 ═ DB ÷ n ÷ T;
in the formula: r 1: the unit is the rotating speed of the motor and r/min; r 2: the rotating speed of a cooling fan of the cooling tower is r/min; DA: the number of pulses is collected in a detection period for a motor of the cooling tower, and the number is unit; DB: the number of pulses collected by the cooling fan in a detection period is unit; n: the number of the permanent magnetic pieces is unit; t: the detection period is unit of min;
s203, comparing r1 and r2 with rated values n1 and n2 of the motor and the heat dissipation fan respectively through a diagnosis controller;
if r1 is greater than or equal to 95% x n1 and less than or equal to 105% x n1, the diagnosis controller diagnoses that the rotating speed of the motor is normal;
if r1 is less than 95% n1 or greater than 105% n1, the diagnostic controller diagnoses the abnormal rotation speed of the motor;
if r2 is greater than or equal to 95% x n2 and less than or equal to 105% x n2, the diagnosis controller diagnoses that the rotation speed of the cooling fan is normal;
if r2 is greater than 95% n2 or less than 105% n2, the diagnostic controller diagnoses the abnormal rotation speed of the radiator fan.
Further, in S3, the diagnosing the power consumption ratio of the fan of the cooling tower includes:
s301, under the weather condition close to the standard working condition, measuring the water temperature T3 of the water inlet pipe through a water temperature sensor;
s302, calculating the cooling capacity of the cooling tower under the climate condition close to the standard working condition through the diagnosis controller:
η=(T3-T2)÷△t×100%;
in the formula: eta: cooling capacity, unit%; t3: the water inlet temperature of the cooling tower is unit ℃; t2: the temperature of the outlet water of the cooling tower is unit ℃; Δ t: designing temperature difference of inlet and outlet water of a cooling tower under standard working conditions, wherein the unit is;
s303, measuring the real-time power value P of the cooling tower through a three-phase remote transmission type intelligent electric meter;
s304, measuring the flow Q of the water inlet pipe of the cooling tower through a flowmeter;
s305, calculating the power consumption ratio a value of the fan through the diagnosis controller, wherein the calculation formula is as follows: α ═ P ÷ (η × Q);
in the formula: a: the power consumption ratio of a fan of the cooling tower is kW.h/m3(ii) a P: the active power of a motor of the cooling tower is kW; eta: cooling capacity of cooling tower, unit%; q: actually measuring the cooling water circulation volume in m3/h;
S306, judging whether the power consumption ratio a of the fan is lower than 95% by the diagnosis controller, if so, diagnosing the power consumption abnormality of the fan of the cooling tower by the diagnosis controller; if not, the diagnosis controller diagnoses that the power consumption of the fan of the cooling tower is normal.
Further, in S4, the diagnosing the drift rate of the cooling tower includes the following steps:
s401, measuring the water replenishing quantity L1 of a water replenishing pipe of the cooling tower and the sewage discharge quantity L2 of a sewage discharge pipe through a remote water meter;
s402, reading in S3 through a diagnosis controller, wherein a flow meter measures the flow Q1 of a water inlet pipe of the cooling tower, and a water temperature sensor measures the actually measured inlet and outlet water temperature difference delta T of the cooling tower;
s403, calculating the amount E of the evaporated water of the cooling tower through the diagnosis controller, wherein the calculation process is as follows: e ═ K × Δ T × Q1;
in the formula: e: amount of water evaporated in cooling tower in m3H; k: the evaporation coefficient; Δ t: actually measuring the temperature difference of inlet and outlet water in unit by a cooling tower; q1: actually measuring the cooling water circulation volume in m3/h;
S404, calculating the drifting water quantity Q2 of the cooling tower through the diagnosis controller, wherein the calculation process is as follows:
Q2=(L1÷T)-(L2÷T)-E;
in the formula: q2: amount of water flow in unit m in cooling tower3H; l1: water quantity of cooling tower in unit of m3(ii) a L2: discharge water quantity of cooling tower in unit of m3(ii) a T: detection period, unit h; e: detecting the evaporation water quantity of the cooling tower in unit m in a period3/h;
S405, calculating the drifting water rate beta of the cooling tower through the diagnosis controller, wherein the calculation process is as follows: β ═ Q2 ÷ Q1;
in the formula: beta: the water floating rate of the cooling tower is unit percent; q1: actually measuring the circulating water quantity in unit m of the cooling tower3H; q2: amount of water flow in unit m in cooling tower3/h;
S406, diagnosing the drifting water rate beta of the cooling tower through a diagnosis controller, wherein the circulating water amount is less than 1000m3The energy efficiency rating of the standard cooling tower/h is divided into the following limits: the water drift rate beta is less than or equal to 0.004%, the energy efficiency is 1 level, the water drift rate beta is less than or equal to 0.005%, the energy efficiency is 2 levels, the water drift rate beta is less than or equal to 0.006%, the energy efficiency is 3 levels, the energy efficiency is 4 levels, and the energy efficiency is 5 levels.
S407, judging whether the cooling tower drift water rate beta is larger than the energy efficiency grade calibrated by the cooling tower through the diagnosis controller, and dividing the numerical value of the limit by contrasting the energy efficiency grade, wherein if yes, the diagnosis controller diagnoses that the cooling tower drift water rate is abnormal; if not, the diagnosis controller diagnoses that the drifting rate of the cooling tower is normal.
Further, in S5, the diagnosing the motor operating condition of the cooling tower includes:
s501, reading the real-time power value P of the cooling tower by the diagnosis controller in S3 through the three-phase remote transmission type intelligent electric meter;
s502, calculating the rated current I of the cooling tower motor through the diagnosis controller, wherein the calculation process is as follows;
Figure BDA0002221305510000071
the evolution becomes:
Figure BDA0002221305510000072
in the formula: p: the motor input power of the cooling tower is kW; u: three-phase alternating current power supply voltage in units of V; eta: efficiency in units% when the motor is fully loaded;
Figure BDA0002221305510000073
power factor in unit% when the motor is fully loaded;
s503, measuring the actual working current value Ia of the cooling tower motor through a current transformer;
s504, judging whether the full load of the motor of the cooling tower is that the rated current value I is larger than the actual working current value Ia or not through the diagnosis controller; if yes, the diagnosis controller diagnoses that the motor of the cooling tower is normal; if not, the diagnosis controller diagnoses the abnormity of the cooling tower motor.
The invention has the beneficial effects that:
the invention discloses an open cooling tower on-line comprehensive diagnosis system and method, which simplify part of calculation process of cooling tower energy efficiency judgment, utilize a back-pushing method and a threshold value judgment method to carry out on-line operation diagnosis of an open cooling tower, complete all parameters and calculation processes originally measured by professionals on site by an on-line diagnosis system, collect and calculate all parameters influencing normal operation of the open cooling tower and all parameters with high operation efficiency of the open cooling tower, comprehensively analyze and reason the operation condition of the open cooling tower on line in real time, realize remote monitoring of all operation parameters of the open cooling tower and remote start-stop of the open cooling tower, greatly facilitate operation management and later operation and maintenance of a central air conditioner, timely react the operation condition of the open cooling tower on an on-line comprehensive diagnosis system platform, and can assist in judging the abnormal operation condition of the open cooling tower, Due to the abnormal reasons and the solution, the operation efficiency of the equipment and the working efficiency of personnel are greatly improved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic flow diagram of the process of the present invention;
FIG. 2 is a schematic diagram of the system architecture of the present invention;
FIG. 3 is a flow chart of a cooling capacity diagnostic for a cooling tower;
FIG. 4 is a flow chart of fan power consumption ratio for a cooling tower;
FIG. 5 is a flow chart illustrating motor speed and cooling fan speed diagnostics;
FIG. 6 is a flow chart of a cooling tower drift rate diagnostic;
fig. 7 is a flow chart of motor operating condition diagnosis of the cooling tower.
Detailed Description
As shown in FIG. 2, an open cooling tower on-line comprehensive diagnosis system comprises a sensing layer, an execution layer, a data transmission layer and a decision layer,
the sensing layer comprises a water temperature sensor, a flowmeter, a three-phase remote transmission type intelligent ammeter, a current transformer, a dry-wet ball temperature sensor, a remote transmission type water meter and a pulse counting unit; the system is used for acquiring original operation data of the open cooling tower and equipment thereof;
the execution layer comprises a diagnosis controller and is used for acquiring all data of the sensing layer and uploading the data to the data transmission layer; the diagnostic controller is installed nearby the open cooling tower and can be installed in a wall-mounted manner, and the installation environment is required to be a place where sunlight is prevented from being directly exposed to the sun, rain is prevented, wiring is convenient, electricity is convenient to get, and the like;
the data transmission layer comprises a 4G industrial Internet of things router and is used for wirelessly transmitting all data acquired by the diagnosis controller to the decision layer; the bottom layer supports communication protocols such as Modbus and BACnet, and the working power supply DC 4-36V. The equipment is arranged near a diagnosis controller, the installation environment comprises the installation environment of the diagnosis controller, and other strong electric signal interference and other places influencing the communication of the 4G industrial Internet of things router are not needed to be ensured around;
and the decision layer is used for calculating and reasoning various transmitted data and displaying the result and various data to a human-computer interaction interface or a mobile terminal APP.
As shown in fig. 1, an open cooling tower online comprehensive diagnosis method includes the following steps:
s1, receiving the data value of the wet and dry bulb temperature sensor through the diagnosis controller, diagnosing the cooling capacity of the cooling tower, and sending the diagnosis result to the decision layer through the data transmission layer;
s2, receiving the data value of the pulse counting unit through the diagnosis controller, diagnosing the motor rotating speed and the cooling fan rotating speed of the cooling tower, and sending the diagnosis result to a decision layer through a data transmission layer;
s3, receiving data values of the water temperature sensor, the flowmeter and the three-phase remote transmission type intelligent electric meter through the diagnosis controller, diagnosing the fan power consumption ratio of the cooling tower, and sending a diagnosis result to a decision layer through a data transmission layer;
s4, receiving the data value of the remote water meter through the diagnosis controller, diagnosing the drift rate of the cooling tower, and sending the diagnosis result to the decision layer through the data transmission layer;
s5, receiving the data value of the current transformer through the diagnosis controller, diagnosing the motor operation condition of the cooling tower, and sending the diagnosis result to the decision layer through the data transmission layer;
and S6, receiving the diagnosis result uploaded by the diagnosis controller through the decision layer, performing operation and reasoning, and displaying the final result and various data to a human-computer interaction interface or a mobile terminal APP.
As shown in fig. 3, the step S1 of diagnosing the cooling capacity of the cooling tower includes the steps of:
s101, measuring a wet bulb temperature value at an air inlet position as T1 and a water outlet temperature value at a water outlet pipe as T2 through a dry-wet bulb temperature sensor;
s102, calculating an approximation value TA (T2-T1) by the diagnosis controller;
s103, judging whether the approximation degree value is larger than the approximation degree specification limit value TB of the small and medium-sized open cooling tower through the diagnosis controller,
if yes, the diagnosis controller diagnoses that the cooling capacity of the cooling tower is abnormal;
if not, the diagnosis controller diagnoses that the cooling capacity of the cooling tower is normal.
For example: the method comprises the steps that a cooling water supply and return water temperature difference is designed to be calculated at 5 ℃ when a cooling tower is selected, when an approximation value is smaller than or equal to 4 ℃, the cooling tower is diagnosed to be normal in cooling and cooling capacity, when the approximation value exceeds 4 ℃, the cooling and cooling capacity of the cooling tower is insufficient, a diagnosis system sends out a diagnosis result prompt, the diagnosis result and maintenance contents are pushed to an operation manager, and the checking contents comprise whether air inlet of the cooling tower is smooth, whether water distribution holes are blocked when water distribution of the cooling tower is uniform, whether the water distribution flow rate of the cooling water is too high (the pressure head is too high), and whether the rotating speed of a fan of the cooling tower; the diagnosis result is combined with the judgment of the fan speed of the cooling tower fan of S2;
as shown in fig. 4, the step S2 of diagnosing the motor speed and the radiator fan speed of the cooling tower includes the steps of:
s201, recording the pulse number DA of a motor and the pulse number DB of a cooling fan in a measuring time T through a pulse counting unit;
s202, calculating by the diagnosis controller:
the rotating speed of the motor is r1 ═ DA ÷ n ÷ T;
the rotating speed of the radiating fan is r2 ═ DB ÷ n ÷ T;
in the formula: r 1: the unit is the rotating speed of the motor and r/min; r 2: the rotating speed of a cooling fan of the cooling tower is r/min; DA: the number of pulses is collected in a detection period for a motor of the cooling tower, and the number is unit; DB: the number of pulses collected by the cooling fan in a detection period is unit; n: the number of the permanent magnetic pieces is unit; t: the detection period is unit of min;
s203, comparing r1 and r2 with rated values n1 and n2 of the motor and the heat dissipation fan respectively through a diagnosis controller;
if r1 is greater than or equal to 95% x n1 and less than or equal to 105% x n1, the diagnosis controller diagnoses that the rotating speed of the motor is normal;
if r1 is less than 95% n1 or greater than 105% n1, the diagnostic controller diagnoses the abnormal rotation speed of the motor;
if r2 is greater than or equal to 95% x n2 and less than or equal to 105% x n2, the diagnosis controller diagnoses that the rotation speed of the cooling fan is normal;
if r2 is greater than 95% n2 or less than 105% n2, the diagnostic controller diagnoses the abnormal rotation speed of the radiator fan.
When the rotating speed of the motor is far lower than the rated rotating speed, the diagnosis system judges that the motor is jammed and needs to be maintained; when the rotating speed of the cooling fan is lower than the rated rotating speed, the diagnosis system judges that the fan is jammed, the rotation is not smooth or the belt is loosened and needs to be replaced (only suitable for belt transmission and not suitable for gear transmission); and (4) prompting the maintenance of the measuring unit and the cooling tower equipment for the sudden change of the pulse number in the online diagnosis process.
As shown in fig. 5, the step S3 of diagnosing the power consumption ratio of the fan of the cooling tower includes the steps of:
s301, under the weather condition close to the standard working condition, measuring the water temperature T3 of the water inlet pipe through a water temperature sensor;
s302, calculating the cooling capacity of the cooling tower under the climate condition close to the standard working condition through the diagnosis controller:
η=(T3-T2)÷△t×100%;
in the formula: eta: cooling capacity, unit%; t3: the water inlet temperature of the cooling tower is unit ℃; t2: the temperature of the outlet water of the cooling tower is unit ℃; Δ t: designing temperature difference of inlet and outlet water of a cooling tower under standard working conditions, wherein the unit is;
s303, measuring the real-time power value P of the cooling tower through a three-phase remote transmission type intelligent electric meter;
s304, measuring the flow Q of the water inlet pipe of the cooling tower through a flowmeter;
s305, calculating the power consumption ratio a value of the fan through the diagnosis controller, wherein the calculation formula is as follows:
а=P÷(η×Q);
in the formula: a: the power consumption ratio of a fan of the cooling tower is kW.h/m3(ii) a P: the active power of a motor of the cooling tower is kW; eta: cooling capacity of cooling tower, unit%; q: actually measuring the cooling water circulation volume in m3/h;
S306, judging whether the power consumption a of the fan is lower than 95 percent compared with the standard limit value through the diagnosis controller,
if so, the diagnosis controller diagnoses the power consumption abnormality of the cooling tower fan;
if not, the diagnosis controller diagnoses that the power consumption of the fan of the cooling tower is normal.
The system monitors the circulation volume of the cooling tower in real time, and prompts a central air-conditioning operation manager to check the number of the cooling water circulating pumps which are started and whether the cooling water circulating pumps are started corresponding to the host when the design flow is exceeded; and the power consumption diagnosis of the fan is realized by combining a diagnosis system with the rotating speed of the cooling tower motor to judge whether the cooling tower motor needs maintenance.
As shown in fig. 6, the step S4 of diagnosing the drift rate of the cooling tower includes the steps of:
s401, measuring the water replenishing quantity L1 of a water replenishing pipe of the cooling tower and the sewage discharge quantity L2 of a sewage discharge pipe through a remote water meter;
s402, reading in S3 through a diagnosis controller, wherein a flow meter measures the flow Q1 of a water inlet pipe of the cooling tower, and a water temperature sensor measures the actually measured inlet and outlet water temperature difference delta T of the cooling tower;
s403, calculating the amount E of the evaporated water of the cooling tower through the diagnosis controller, wherein the calculation process is as follows:
E=K×△T×Q1;
in the formula: e: cooling tower steamAmount of generated water in m3H; k: the evaporation coefficient; Δ t: actually measuring the temperature difference of inlet and outlet water in unit by a cooling tower; q1: actually measuring the cooling water circulation volume in m3H; substituting the actually measured difference value of the inlet and outlet water temperatures of the cooling tower, the actually measured circulating water quantity value of the cooling tower and an evaporation coefficient (the value can be obtained by pre-programming an evaporation coefficient table corresponding to each temperature, and the diagnosis system takes a corresponding evaporation coefficient value according to the actually measured dry-bulb temperature and the corresponding temperature in the evaporation coefficient table) for a formula (5), namely calculating the evaporation water quantity of the cooling tower;
s404, calculating the drifting water quantity Q2 of the cooling tower through the diagnosis controller, wherein the calculation process is as follows:
Q2=(L1÷T)-(L2÷T)-E;
in the formula: q2: amount of water flow in unit m in cooling tower3H; l1: water quantity of cooling tower in unit of m3(ii) a L2: discharge water quantity of cooling tower in unit of m3(ii) a T: detection period, unit h; e: detecting the evaporation water quantity of the cooling tower in unit m in a period3/h;
S405, calculating the drifting water rate beta of the cooling tower through the diagnosis controller, wherein the calculation process is as follows:
β=Q2÷Q1;
in the formula: beta: the water floating rate of the cooling tower is unit percent; q1: actually measuring the circulating water quantity in unit m of the cooling tower3H; q2: amount of water flow in unit m in cooling tower3/h;
S406, diagnosing the drifting water rate beta of the cooling tower through a diagnosis controller, wherein the circulating water amount is less than 1000m3The energy efficiency rating of the standard cooling tower/h is divided into the following limits:
the water drift rate beta is less than or equal to 0.004%, the energy efficiency is 1 level, the water drift rate beta is less than or equal to 0.005%, the energy efficiency is 2 levels, the water drift rate beta is less than or equal to 0.006%, the energy efficiency is 3 levels, the energy efficiency is 4 levels, and the energy efficiency is 5 levels.
S407, judging whether the drifting water rate beta of the cooling tower is larger than the energy efficiency grade calibrated by the cooling tower through the diagnosis controller, and dividing the numerical value of the limit by contrasting the energy efficiency grade,
if yes, the diagnosis controller diagnoses that the water drifting rate of the cooling tower is abnormal;
if not, the diagnosis controller diagnoses that the drifting rate of the cooling tower is normal.
The diagnostic system compares with the equipment calibration energy efficiency grade according to the calculated water drift rate value, when exceeding the calibration energy efficiency, the diagnostic system sends out early warning to prompt the air conditioner operation manager to overhaul the cooling tower and push various factors which may cause the water drift rate of the cooling tower to rise, such as: the cooling water pump has too large lift, so that the pressure head of a water distribution pipe of the cooling tower is too high, splashed water is too large during water distribution, and more water drops are taken away by a fan of the cooling tower during rotation and heat dissipation; and the water collector arranged at the air outlet of the cooling tower works abnormally, and the like.
As shown in fig. 7, the diagnosing the motor operation condition of the cooling tower in S5 includes the following steps:
s501, reading the real-time power value P of the cooling tower by the diagnosis controller in S3 through the three-phase remote transmission type intelligent electric meter;
s502, calculating the rated current I of the cooling tower motor through the diagnosis controller, wherein the calculation process is as follows;
Figure BDA0002221305510000141
the evolution becomes:
Figure BDA0002221305510000142
in the formula: p: the motor input power of the cooling tower is kW; u: three-phase alternating current power supply voltage in units of V; eta: efficiency in units% when the motor is fully loaded;
Figure BDA0002221305510000143
power factor in unit% when the motor is fully loaded;
s503, measuring the actual working current value Ia of the cooling tower motor through a current transformer;
s504, judging whether the full load of the motor of the cooling tower is that the rated current value I is larger than the actual working current value Ia or not through the diagnosis controller;
if yes, the diagnosis controller diagnoses that the motor of the cooling tower is normal;
if not, the diagnosis controller diagnoses the abnormity of the cooling tower motor.
The diagnosis system compares the calculated rated current (upper limit current) when the motor is fully loaded with the current value actually measured by the three-phase remote transmission type intelligent electric meter, and gives out early warning when the rated current value is exceeded, so as to remind an air conditioner operation manager to overhaul the motor, and push fault reasons possibly caused by screening, such as power supply phase loss (numerical value comparison and screening measured by the three-phase remote transmission type intelligent electric meter), motor winding faults, overhigh power supply voltage (numerical value comparison and screening measured by the three-phase remote transmission type intelligent electric meter), and unsmooth motor operation (motor rotating speed screening can be diagnosed).
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1.一种开式冷却塔在线综合诊断系统,其特征在于,包括感知层、执行层、数据传输层及决策层,1. an open cooling tower online comprehensive diagnosis system, is characterized in that, comprises perception layer, execution layer, data transmission layer and decision-making layer, 所述感知层,包括水温传感器、流量计、三相远传式智能电表、电流互感器、干湿球温度传感器、远传式水表以及脉冲计数单元;用于采集开式冷却塔及其设备的原始运行数据;The perception layer includes a water temperature sensor, a flow meter, a three-phase remote-transmission smart meter, a current transformer, a wet and dry bulb temperature sensor, a remote-transmission water meter, and a pulse counting unit; raw operating data; 所述执行层,包括诊断控制器,用于采集所述感知层的所有数据,并上传至数据传输层;所述诊断控制器用于诊断该冷却塔的飘水率,包括以下步骤:The execution layer includes a diagnosis controller, which is used to collect all the data of the perception layer and upload it to the data transmission layer; the diagnosis controller is used to diagnose the water drift rate of the cooling tower, including the following steps: S401、通过远传式水表测得该冷却塔补水管的补水水量L1,排污管的排污水量L2;S401. Measure the water supply volume L1 of the cooling tower's water supply pipe and the drain water volume L2 of the sewage pipe through a remote water meter; S402、通过诊断控制器读取S3中,流量计测得该冷却塔进水管的流量Q1,水温传感器测得冷却塔实测进出水温差△T;S402, read S3 through the diagnostic controller, the flow meter measures the flow rate Q1 of the water inlet pipe of the cooling tower, and the water temperature sensor measures the actual measured temperature difference ΔT between the inlet and outlet water of the cooling tower; S403、通过诊断控制器计算冷却塔蒸发水量E,计算过程如下:S403. Calculate the evaporative water amount E of the cooling tower through the diagnostic controller, and the calculation process is as follows: E=K×△T×Q1;E=K×△T×Q1; 式中:E:冷却塔蒸发水量,单位m3/h;K:蒸发系数;△T:冷却塔实测进出水温差,单位℃;Q1:实测冷却水循环量,单位m3/h;In the formula: E: Evaporation water volume of cooling tower, unit m 3 /h; K: Evaporation coefficient; △T: Measured temperature difference between inlet and outlet of cooling tower, unit ℃; Q1: Measured cooling water circulation volume, unit m 3 /h; S404、通过诊断控制器计算冷却塔飘水量Q2,计算过程如下:S404, the cooling tower floating water quantity Q2 is calculated by the diagnostic controller, and the calculation process is as follows: Q2=(L1÷T)-(L2÷T)-E;Q2=(L1÷T)-(L2÷T)-E; 式中:Q2:冷却塔飘水量,单位m3/h;L1:冷却塔补水水量,单位m3;L2:冷却塔排污水量,单位m3;T:检测周期,单位h;E:检测周期内冷却塔蒸发水量,单位m3/h;In the formula: Q2: cooling tower floating water volume, unit m 3 /h; L1: cooling tower make-up water volume, unit m 3 ; L2: cooling tower sewage volume, unit m 3 ; T: detection period, unit h; E: detection period Evaporation water volume of inner cooling tower, unit m 3 /h; S405、通过诊断控制器计算冷却塔飘水率β,计算过程如下:S405, the cooling tower floating water rate β is calculated by the diagnostic controller, and the calculation process is as follows: β=Q2÷Q1;β=Q2÷Q1; 式中:β:冷却塔飘水率,单位%;Q1:冷却塔实测循环水量,单位m3/h;Q2:冷却塔飘水量,单位m3/h;In the formula: β: cooling tower floating water rate, unit %; Q1: cooling tower measured circulating water volume, unit m 3 /h; Q2: cooling tower floating water volume, unit m 3 /h; S406、通过诊断控制器对冷却塔飘水率β进行诊断,其中循环水量小于1000m3/h的标准型冷却塔的能效等级划分界限为:S406. Diagnose the floating water rate β of the cooling tower through the diagnosis controller, wherein the energy efficiency grade division limit of a standard cooling tower with a circulating water volume less than 1000 m 3 /h is: 飘水率β≤0.004%为1级能效,飘水率β≤0.005%为2级能效,飘水率β≤0.006%为3级能效,飘水率β≤0.008%为4级能效,飘水率β≤0.010%为5级能效;The floating water rate β≤0.004% is the first-level energy efficiency, the floating water rate β≤0.005% is the 2-level energy efficiency, the floating water rate β≤0.006% is the 3-level energy efficiency, the floating water rate β≤0.008% is the 4-level energy efficiency, and the floating water rate β≤0.008% is the 4-level energy efficiency. Rate β≤0.010% is grade 5 energy efficiency; S407、通过诊断控制器判断冷却塔飘水率β是否大于该冷却塔标定的能效等级并对照能效等级划分界限的数值,S407. Determine whether the water drift rate β of the cooling tower is greater than the energy efficiency grade calibrated by the cooling tower through the diagnosis controller, and compare the value of the energy efficiency grade to divide the boundary value, 若是,则诊断控制器诊断冷却塔飘水率异常;If so, the diagnostic controller diagnoses the abnormal water drift rate of the cooling tower; 若否,则诊断控制器诊断冷却塔飘水率正常;If not, the diagnostic controller diagnoses that the cooling tower drift rate is normal; 所述数据传输层,包括4G工业物联网路由器,用于将所述诊断控制器采集的各项数据无线传输至所述决策层;The data transmission layer includes a 4G industrial Internet of Things router, which is used to wirelessly transmit various data collected by the diagnostic controller to the decision-making layer; 所述决策层,用于将传输上来的各项数据进行运算及推理,并将结果以及各项数据显示至人机交互界面或移动终端APP。The decision-making layer is used to perform operations and reasoning on the transmitted data, and display the results and various data to the human-computer interaction interface or the mobile terminal APP. 2.一种基于权利要求1所述的开式冷却塔在线综合诊断系统的一种开式冷却塔在线综合诊断方法,其特征在于,包括以下步骤:2. a kind of open cooling tower online comprehensive diagnosis method based on the described open cooling tower online comprehensive diagnosis system of claim 1, is characterized in that, comprises the following steps: S1、通过诊断控制器接收干湿球温度传感器的数据值,并用于诊断该冷却塔的冷却降温能力,并将诊断结果通过数据传输层发送至决策层;S1. Receive the data value of the wet and dry bulb temperature sensor through the diagnosis controller, and use it to diagnose the cooling and cooling capacity of the cooling tower, and send the diagnosis result to the decision-making layer through the data transmission layer; S2、通过诊断控制器接收脉冲计数单元的数据值,并用于诊断该冷却塔的电机转速以及散热风扇转速,并将诊断结果通过数据传输层发送至决策层;S2. Receive the data value of the pulse counting unit through the diagnosis controller, and use it to diagnose the motor speed and cooling fan speed of the cooling tower, and send the diagnosis result to the decision layer through the data transmission layer; S3、通过诊断控制器接收水温传感器、流量计、三相远传式智能电表的数据值,并用于诊断该冷却塔的风机耗电比,并将诊断结果通过数据传输层发送至决策层;S3. Receive the data values of the water temperature sensor, the flow meter, and the three-phase remote smart meter through the diagnosis controller, and use it to diagnose the fan power consumption ratio of the cooling tower, and send the diagnosis result to the decision-making layer through the data transmission layer; S4、通过诊断控制器接收远传式水表的数据值,并用于诊断该冷却塔的飘水率,并并将诊断结果通过数据传输层发送至决策层;S4. Receive the data value of the remote water meter through the diagnosis controller, and use it to diagnose the floating water rate of the cooling tower, and send the diagnosis result to the decision-making layer through the data transmission layer; S5、通过诊断控制器接收电流互感器的数据值,并用于诊断该冷却塔的电机运行状况,并并将诊断结果通过数据传输层发送至决策层;S5. Receive the data value of the current transformer through the diagnosis controller, and use it to diagnose the motor operation status of the cooling tower, and send the diagnosis result to the decision-making layer through the data transmission layer; S6、通过决策层接收诊断控制器上传的诊断结果,进行运算及推理,并将最终结果以及各项数据显示至人机交互界面或移动终端APP。S6. Receive the diagnosis result uploaded by the diagnosis controller through the decision-making layer, perform operation and reasoning, and display the final result and various data to the human-computer interaction interface or the mobile terminal APP. 3.根据权利要求2所述的一种开式冷却塔在线综合诊断方法,其特征在于,所述S1中,所述诊断该冷却塔的冷却降温能力,包括以下步骤:3. a kind of open-type cooling tower online comprehensive diagnosis method according to claim 2, is characterized in that, in described S1, described diagnosing the cooling cooling capacity of this cooling tower, comprises the following steps: S101、通过干湿球温度传感器测得的进风处的湿球温度值为T1,出水管处的出水温度值为T2;S101, the wet bulb temperature value at the air inlet measured by the dry and wet bulb temperature sensor is T1, and the outlet water temperature value at the water outlet pipe is T2; S102、通过诊断控制器计算逼近度值为TA=T2-T1;S102, the approximation value is calculated by the diagnostic controller as TA=T2-T1; S103、通过诊断控制器判断逼近度值是否大于中小型开式冷却塔的逼近度规范限定值TB,S103. Determine whether the approximation degree value is greater than the approximation degree specification limit value TB of the small and medium-sized open cooling tower through the diagnosis controller, 若是,则诊断控制器诊断该冷却塔的冷却降温能力异常;If so, the diagnostic controller diagnoses the cooling tower's cooling capacity to be abnormal; 若否,则诊断控制器诊断该冷却塔的冷却降温能力正常。If not, the diagnosis controller diagnoses that the cooling and cooling capacity of the cooling tower is normal. 4.根据权利要求2所述的一种开式冷却塔在线综合诊断方法,其特征在于,所述S2中,所述诊断该冷却塔的电机转速以及散热风扇转速,包括以下步骤:4. a kind of open-type cooling tower online comprehensive diagnosis method according to claim 2, is characterized in that, in described S2, described diagnosing the motor rotational speed and cooling fan rotational speed of this cooling tower, comprises the following steps: S201、通过脉冲计数单元,在测量时间T内,记录电机的脉冲数DA和散热风扇的脉冲数DB;S201, through the pulse counting unit, within the measurement time T, record the pulse number DA of the motor and the pulse number DB of the cooling fan; S202、通过诊断控制器计算:S202. Calculate through the diagnostic controller: 电机的转速为r1=(DA÷n)÷T;The speed of the motor is r1=(DA÷n)÷T; 散热风扇的转速为r2=(DB÷n)÷T;The speed of the cooling fan is r2=(DB÷n)÷T; 式中:r1:为电机转速,单位r/min;r2:为冷却塔散热风扇转速,单位r/min;DA:为冷却塔电机在检测周期内采集的脉冲数,单位个;DB:为散热风扇在检测周期内采集的脉冲数,单位个;n:为永磁件数量,单位个;T:为检测周期,单位min;In the formula: r1: motor speed, unit r/min; r2: cooling tower cooling fan speed, unit r/min; DA: the number of pulses collected by the cooling tower motor in the detection period, unit; DB: heat dissipation The number of pulses collected by the fan in the detection period, in units; n: the number of permanent magnets, in units; T: in the detection period, in min; S203、通过诊断控制器将r1与r2分别与电机和散热风扇的额定值n1与n2进行对比;S203, compare r1 and r2 with the rated values n1 and n2 of the motor and the cooling fan respectively through the diagnostic controller; 若r1大于等于95%*n1且小于等于105%*n1,则诊断控制器诊断该电机的转速正常;If r1 is greater than or equal to 95%*n1 and less than or equal to 105%*n1, the diagnostic controller diagnoses that the speed of the motor is normal; 若r1小于95%*n1或大于105%*n1,则诊断控制器诊断该电机的转速异常;If r1 is less than 95%*n1 or greater than 105%*n1, the diagnosis controller will diagnose the abnormal speed of the motor; 若r2大于等于95%*n2且小于等于105%*n2,则诊断控制器诊断该散热风扇的转速正常;If r2 is greater than or equal to 95%*n2 and less than or equal to 105%*n2, the diagnostic controller diagnoses that the speed of the cooling fan is normal; 若r2大于95%*n2或小于105%*n2,则诊断控制器诊断该散热风扇的转速异常。If r2 is greater than 95%*n2 or less than 105%*n2, the diagnostic controller diagnoses the abnormal rotation speed of the cooling fan. 5.根据权利要求2所述的一种开式冷却塔在线综合诊断方法,其特征在于,所述S3中,所述诊断该冷却塔的风机的耗电比,包括以下步骤:5. a kind of open cooling tower online comprehensive diagnosis method according to claim 2, is characterized in that, in described S3, described diagnosing the power consumption ratio of the fan of this cooling tower, comprises the following steps: S301、在接近标准工况的气候条件下,通过水温传感器测得进水管的水温T3;S301. Under the climatic conditions close to the standard operating conditions, measure the water temperature T3 of the water inlet pipe through a water temperature sensor; S302、通过诊断控制器计算在接近标准工况的气候条件下,该冷却塔的冷却能力:S302. Calculate the cooling capacity of the cooling tower under climatic conditions close to the standard operating conditions through the diagnosis controller: η=(T3-T2)÷△t×100%;η=(T3-T2)÷△t×100%; 式中:η:冷却能力,单位%;T3:冷却塔进水温度,单位℃;T2:冷却塔出水温度,单位℃;△t:标准工况冷却塔进出水设计温差,单位℃;In the formula: η: cooling capacity, unit %; T3: inlet water temperature of cooling tower, unit ℃; T2: cooling tower outlet water temperature, unit ℃; △t: design temperature difference between inlet and outlet water of cooling tower under standard operating conditions, unit ℃; S303、通过三相远传式智能电表测得该冷却塔实时功率值P;S303, measure the real-time power value P of the cooling tower through a three-phase remote transmission smart meter; S304、通过流量计测得该冷却塔进水管的流量Q;S304, measure the flow rate Q of the water inlet pipe of the cooling tower through a flow meter; S305、通过诊断控制器计算风机耗电比а值,计算公式如下:S305, calculate the fan power consumption ratio α value through the diagnosis controller, and the calculation formula is as follows: а=P÷(η×Q);а=P÷(η×Q); 式中:а:冷却塔风机耗电比,单位kW.h/m3;P:冷却塔电机有功功率,单位kW;η:冷却塔冷却能力,单位%;Q:实测冷却水循环量,单位m3/h;In the formula: а: cooling tower fan power consumption ratio, unit kW.h/m 3 ; P: cooling tower motor active power, unit kW; η: cooling tower cooling capacity, unit %; Q: measured cooling water circulation volume, unit m 3 /h; S306、通过诊断控制器判断风机耗电比а值与规范限定值对比是否低于95%,S306. Determine whether the comparison between the fan power consumption ratio α value and the specification limit value is lower than 95% through the diagnosis controller, 若是,则诊断控制器诊断该冷却塔风机功耗异常;If so, the diagnosis controller diagnoses the abnormal power consumption of the cooling tower fan; 若否,则诊断控制器诊断该冷却塔风机功耗正常。If not, the diagnosis controller diagnoses that the cooling tower fan power consumption is normal. 6.根据权利要求2所述的一种开式冷却塔在线综合诊断方法,其特征在于,所述S5中,所述诊断该冷却塔的电机运行状况,包括以下步骤:6. A kind of online comprehensive diagnosis method of open cooling tower according to claim 2, is characterized in that, in described S5, described diagnosing the motor operating condition of this cooling tower, comprises the following steps: S501、通过诊断控制器读取S3中,三相远传式智能电表测得该冷却塔实时功率值P;S501. Read the real-time power value P of the cooling tower by the three-phase remote transmission smart meter in S3 through the diagnostic controller; S502、通过诊断控制器计算冷却塔电机的额定电流I,计算过程如下;S502, the rated current I of the cooling tower motor is calculated by the diagnostic controller, and the calculation process is as follows;
Figure FDA0002970322750000051
演变为:
Figure FDA0002970322750000051
evolve into:
Figure FDA0002970322750000052
Figure FDA0002970322750000052
式中:P:冷却塔电机输入功率,单位kW;U:三相交流电电源电压,单位V;η:电机满载时效率,单位%;
Figure FDA0002970322750000053
电机满载时功率因素,单位%;
In the formula: P: input power of cooling tower motor, unit kW; U: three-phase AC power supply voltage, unit V; η: efficiency of motor at full load, unit %;
Figure FDA0002970322750000053
Power factor when the motor is fully loaded, in %;
S503、通过电流互感器测得冷却塔电机的实际工作电流值Ia;S503, measure the actual working current value Ia of the cooling tower motor through the current transformer; S504、通过诊断控制器判断冷却塔电机满载时额定电流值I是否大于实际工作电流值Ia;S504, judge whether the rated current value I of the cooling tower motor is greater than the actual working current value Ia when the cooling tower motor is fully loaded through the diagnosis controller; 若是,则诊断控制器诊断冷却塔电机正常;If so, the diagnostic controller diagnoses that the cooling tower motor is normal; 若否,则诊断控制器诊断冷却塔电机异常。If not, the diagnostic controller diagnoses an abnormality in the cooling tower motor.
CN201910934921.8A 2019-09-29 2019-09-29 An online comprehensive diagnosis system and method for an open cooling tower Active CN110715814B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910934921.8A CN110715814B (en) 2019-09-29 2019-09-29 An online comprehensive diagnosis system and method for an open cooling tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910934921.8A CN110715814B (en) 2019-09-29 2019-09-29 An online comprehensive diagnosis system and method for an open cooling tower

Publications (2)

Publication Number Publication Date
CN110715814A CN110715814A (en) 2020-01-21
CN110715814B true CN110715814B (en) 2021-05-11

Family

ID=69211134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910934921.8A Active CN110715814B (en) 2019-09-29 2019-09-29 An online comprehensive diagnosis system and method for an open cooling tower

Country Status (1)

Country Link
CN (1) CN110715814B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112700627B (en) * 2020-12-31 2022-11-04 新奥数能科技有限公司 Method and device for alarming abnormality of water supply of cooling tower and terminal equipment
CN112747626A (en) * 2020-12-31 2021-05-04 广州市昊铭机电科技有限公司 Variable parameter cooling tower set energy-saving automatic control system and control method
CN112798318B (en) * 2021-02-06 2023-04-25 济南蓝辰能源技术有限公司 Cold junction performance monitoring and intelligent diagnosis system of wet cooling unit
CN116579762B (en) * 2023-04-14 2023-10-20 广州林旺空调工程有限公司 Intelligent operation and maintenance platform for cooling tower

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1818987A (en) * 2006-03-08 2006-08-16 杭州电子科技大学 Wireless cooling tower performance tester and testing method
CN202710118U (en) * 2012-06-28 2013-01-30 上海理工大学 Device for measuring drifting rate of cooling tower
KR20130013278A (en) * 2011-07-28 2013-02-06 테스트코 주식회사 Cooling system for semiconductor device tester
WO2014088602A1 (en) * 2012-12-08 2014-06-12 Vtbnet, Inc. Industrial sensor system and method of use
CN104006980A (en) * 2014-05-21 2014-08-27 华南理工大学 Testing device capable of analyzing cooling tower performance in real time in online mode
CN107676923A (en) * 2017-09-14 2018-02-09 深圳达实智能股份有限公司 A kind of Air conditioning System for Hospitals cooling tower failure automatic judging method and device
CN109029556A (en) * 2018-06-25 2018-12-18 江苏梵坤环保科技发展股份有限公司 A kind of simulation cooling tower experimental system
CN208476300U (en) * 2018-07-05 2019-02-05 张玉微 A kind of electric locomotive cooling tower detection device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8093917B2 (en) * 2008-12-30 2012-01-10 Evapco, Inc. Sampling apparatus

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1818987A (en) * 2006-03-08 2006-08-16 杭州电子科技大学 Wireless cooling tower performance tester and testing method
KR20130013278A (en) * 2011-07-28 2013-02-06 테스트코 주식회사 Cooling system for semiconductor device tester
CN202710118U (en) * 2012-06-28 2013-01-30 上海理工大学 Device for measuring drifting rate of cooling tower
WO2014088602A1 (en) * 2012-12-08 2014-06-12 Vtbnet, Inc. Industrial sensor system and method of use
CN104006980A (en) * 2014-05-21 2014-08-27 华南理工大学 Testing device capable of analyzing cooling tower performance in real time in online mode
CN107676923A (en) * 2017-09-14 2018-02-09 深圳达实智能股份有限公司 A kind of Air conditioning System for Hospitals cooling tower failure automatic judging method and device
CN109029556A (en) * 2018-06-25 2018-12-18 江苏梵坤环保科技发展股份有限公司 A kind of simulation cooling tower experimental system
CN208476300U (en) * 2018-07-05 2019-02-05 张玉微 A kind of electric locomotive cooling tower detection device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
机械通风冷却塔第1部分:中小型开式冷却塔;国家市场监督管理总局;《中华人民共和国国家标准GB/T7190.1-2018》;20181228;第1-29页 *

Also Published As

Publication number Publication date
CN110715814A (en) 2020-01-21

Similar Documents

Publication Publication Date Title
CN110715814B (en) An online comprehensive diagnosis system and method for an open cooling tower
US20240344730A1 (en) Thermostat with integrated submetering and control
CN106461294B (en) Heat pump and air conditioning hierarchy system and method
EP3607251B1 (en) Air conditioning system and control method thereof
Zhou et al. A model‐based fault detection and diagnosis strategy for HVAC systems
CN112560339B (en) Method for predicting guide bearing bush temperature of hydroelectric generating set by utilizing machine learning
KR20080085733A (en) Remote performance monitoring device and remote performance monitoring method
CN106461252B (en) Heating, ventilation or the diagnosis of air handling system air filter and monitoring
KR100557672B1 (en) Intelligent Control Information Machine for Optimal Management and Energy Saving of Office Building Facilities
CN105956752A (en) Energy efficiency evaluation and diagnosis analysis method used for green public building operation phase
CN107676923A (en) A kind of Air conditioning System for Hospitals cooling tower failure automatic judging method and device
CN111306706B (en) Air conditioner linkage control method and system
WO2019097822A1 (en) Performance diagnosis device and performance diagnosis method for air conditioner
CN118816335B (en) Intelligent monitoring and analyzing system for abnormal running efficiency of central air conditioner
JP5811411B2 (en) Control system for energy conversion equipment
CN113123990B (en) Oil-immersed transformer fan air quantity abnormity monitoring method based on oil index identification
CN116519054A (en) Health state monitoring system and method for heat station equipment
CN112905947B (en) Real-time monitoring method for dirt degree of fin tube heat exchanger of indirect air cooling tower
CN111788598B (en) Energy efficiency analysis system using data of high-rise energy management system
CN114110939B (en) Comprehensive performance and health assessment device for portable central air conditioning system
CN113864999A (en) Air conditioning system energy consumption prediction method and device and air conditioning system
KR102431509B1 (en) Center control apparatus
CN211206660U (en) Online comprehensive diagnosis integrated device for open cooling tower
CN118030487B (en) Water pump motor control method and test system
CN110703016A (en) Online comprehensive diagnosis integrated device for open cooling tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An Online Comprehensive Diagnosis System and Method for Open Cooling Tower

Effective date of registration: 20231027

Granted publication date: 20210511

Pledgee: Chengdong Branch of Nanjing Bank Co.,Ltd.

Pledgor: JIANGSU HUAXIA BAOLI ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

Registration number: Y2023980062674

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20210511

Pledgee: Chengdong Branch of Nanjing Bank Co.,Ltd.

Pledgor: JIANGSU HUAXIA BAOLI ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

Registration number: Y2023980062674

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An online comprehensive diagnostic system and method for open cooling towers

Granted publication date: 20210511

Pledgee: Chengdong Branch of Nanjing Bank Co.,Ltd.

Pledgor: JIANGSU HUAXIA BAOLI ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

Registration number: Y2024980046403

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20210511

Pledgee: Chengdong Branch of Nanjing Bank Co.,Ltd.

Pledgor: JIANGSU HUAXIA BAOLI ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

Registration number: Y2024980046403

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An online comprehensive diagnostic system and method for open cooling towers

Granted publication date: 20210511

Pledgee: Chengdong Branch of Nanjing Bank Co.,Ltd.

Pledgor: JIANGSU HUAXIA BAOLI ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

Registration number: Y2025980015562

PE01 Entry into force of the registration of the contract for pledge of patent right