CN110685738A CN201911138288.8A CN201911138288A CN110685738A CN 110685738 A CN110685738 A CN 110685738A CN 201911138288 A CN201911138288 A CN 201911138288A CN 110685738 A CN110685738 A CN 110685738A
Authority
CN
China
Prior art keywords
pressure
sleeve
pipeline
cavity
mandrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201911138288.8A
Other languages
Chinese (zh)
Inventor
张心峰
刘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUZHOU CUMT BACKFILL TECHNOLOGY Co Ltd
Original Assignee
XUZHOU CUMT BACKFILL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU CUMT BACKFILL TECHNOLOGY Co Ltd filed Critical XUZHOU CUMT BACKFILL TECHNOLOGY Co Ltd
Priority to CN201911138288.8A priority Critical patent/CN110685738A/en
Publication of CN110685738A publication Critical patent/CN110685738A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K3/00Gate valves or sliding valves, i.e. cut-off apparatus with closing members having a sliding movement along the seat for opening and closing
    • F16K3/22Gate valves or sliding valves, i.e. cut-off apparatus with closing members having a sliding movement along the seat for opening and closing with sealing faces shaped as surfaces of solids of revolution
    • F16K3/24Gate valves or sliding valves, i.e. cut-off apparatus with closing members having a sliding movement along the seat for opening and closing with sealing faces shaped as surfaces of solids of revolution with cylindrical valve members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K31/00Actuating devices; Operating means; Releasing devices
    • F16K31/12Actuating devices; Operating means; Releasing devices actuated by fluid
    • F16K31/122Actuating devices; Operating means; Releasing devices actuated by fluid the fluid acting on a piston
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L11/00Measuring steady or quasi-steady pressure of a fluid or a fluent solid material by means not provided for in group G01L7/00 or G01L9/00

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)

Abstract

一种监测膏体充填管路压力的泄压装置及控制方法,属于管路压力的泄压装置及控制方法。泄压装置包括:泄浆阀和压力监测器;泄浆阀和压力监测器均安装在主管道上。压力监测器套筒的一端固定连接在主管道上,另一端连接有堵头;在套筒有活塞,在活塞和堵头的侧壁上有密封,位于与套筒接触面之间;在堵头上有快速密封接头的接口,快速密封接头连接在堵头与三通之间,在三通的另两个端口,一个端口连接有耐震压力表,一个端口为压力传感器接口,在压力传感器接口上连接有压力传感器。优点:本发明结构紧凑,耐磨损,耐高压,密封性好,拆装和维修方便,且操作简单省力。不仅能够监测前部的管道压力,还能够启动泄压装置对管路进行保护。

Figure 201911138288

A pressure relief device and a control method for monitoring the pressure of a paste filling pipeline belong to a pressure relief device and a control method for the pipeline pressure. The pressure relief device includes: a slurry valve and a pressure monitor; both the slurry valve and the pressure monitor are installed on the main pipeline. One end of the pressure monitor sleeve is fixedly connected to the main pipeline, and the other end is connected with a plug; there is a piston in the sleeve, and a seal on the side wall of the piston and the plug, located between the contact surface with the sleeve; in the plug There is an interface of a quick-sealing joint, the quick-sealing joint is connected between the plug and the tee, in the other two ports of the tee, one port is connected with a shock-resistant pressure gauge, and the other port is a pressure sensor interface, which is on the pressure sensor interface. A pressure sensor is connected. Advantages: the invention has compact structure, wear resistance, high pressure resistance, good sealing performance, convenient disassembly and maintenance, and simple and labor-saving operation. It can not only monitor the pipeline pressure at the front, but also activate the pressure relief device to protect the pipeline.

Figure 201911138288

Description

一种监测膏体充填管路压力的泄压装置及控制方法A pressure relief device and control method for monitoring the pressure of paste filling pipeline

技术领域technical field

本发明涉及一种管路压力的泄压装置及控制方法,特别是一种监测膏体充填管路压力的泄压装置及控制方法。The invention relates to a pressure relief device and a control method for pipeline pressure, in particular to a pressure relief device and control method for monitoring the pressure of a paste filling pipeline.

背景技术Background technique

随着煤矿对回填需求的增加,在进行井下膏体充填的过程中,由于回填的工作面较多,管道较长,系统中有多种设备和工作面有多种阀体,因为设备或工作面状况等不确定的故障因素,管道压力可能会突然增加,为了保护充填系统的安全,就需要立即将管道中压力快速释放,并将管道中的膏体排到泄浆坑中,另外如果工作面的某一段管路出现故障,也可以将管路中的浆体排出,可以避免浆体在管道中停留时间过长而导致堵管,这就需要一种装置可以监测膏体充填管路压力及泄压的装置,而且由于充填管路压力可以达到10MPa,这就需要这种装置能承受高压,同时要求大口径、不怕磨损、结构紧凑、操作简便、拆卸和维修方便等。With the increasing demand for backfilling in coal mines, in the process of underground paste filling, due to the large number of backfilling faces and the long pipelines, there are various equipments in the system and various valve bodies on the working faces, because the equipment or work Due to uncertain failure factors such as surface conditions, the pressure of the pipeline may suddenly increase. In order to protect the safety of the filling system, it is necessary to immediately release the pressure in the pipeline and discharge the paste in the pipeline into the slurry pit. If a certain section of the pipeline on the surface fails, the slurry in the pipeline can also be discharged, which can avoid the slurry staying in the pipeline for too long and cause the pipeline to block. This requires a device that can monitor the pressure of the paste filling pipeline. And the pressure relief device, and because the filling pipeline pressure can reach 10MPa, this requires this device to withstand high pressure, and at the same time requires large diameter, not afraid of wear, compact structure, easy operation, easy disassembly and maintenance, etc.

目前市场上还没有能够满足煤矿井下监测膏体充填管路压力及泄压的装置,很多普通的监测膏体充填管路压力的装置也无法同时满足高压、体积小、结构简单、能适用煤矿井下膏体介质、耐磨损、操作和维修简单的要求。At present, there is no device on the market that can monitor the pressure and pressure relief of the paste filling pipeline in coal mines, and many ordinary devices for monitoring the pressure of paste filling pipelines cannot meet the requirements of high pressure, small size, simple structure, and suitable for underground coal mines. Requirements for paste media, wear resistance, simple operation and maintenance.

发明内容SUMMARY OF THE INVENTION

本发明的目的是要提供一种监测膏体充填管路压力的泄压装置及控制方法,能快速切换保证了管道安全和浆体排出管道,避免管道压力过大对管道的破坏和浆体在管道中停留时间过长而凝固堵管,从而保证了整个充填系统的安全。The purpose of the present invention is to provide a pressure relief device and control method for monitoring the pressure of the paste filling pipeline, which can quickly switch to ensure the safety of the pipeline and the discharge pipeline of the slurry, and avoid the damage to the pipeline caused by the excessive pressure of the pipeline and the leakage of the slurry in the pipeline. The residence time in the pipeline is too long to solidify and block the pipeline, thus ensuring the safety of the entire filling system.

本发明的目的是这样实现的:本发明包括:泄压装置以及采用泄压装置的控制方法。The purpose of the present invention is achieved as follows: the present invention includes a pressure relief device and a control method using the pressure relief device.

泄压装置包括:泄浆阀和压力监测器;泄浆阀和压力监测器均安装在主管道上。The pressure relief device includes: a slurry valve and a pressure monitor; both the slurry valve and the pressure monitor are installed on the main pipeline.

所述的压力监测器包括:活塞、套筒、堵头、耐震压力表、快速密封接头、三通和压力传感器接口;套筒的一端固定连接在主管道上,另一端连接有堵头;在套筒有活塞,在活塞和堵头的侧壁上有密封,位于与套筒接触面之间;在堵头上有快速密封接头的接口,快速密封接头连接在堵头与三通之间,在三通的另两个端口,一个端口连接有耐震压力表,一个端口为压力传感器接口,在压力传感器接口上连接有压力传感器。The pressure monitor includes: a piston, a sleeve, a plug, a shock-resistant pressure gauge, a quick-sealing joint, a tee and a pressure sensor interface; one end of the sleeve is fixedly connected to the main pipeline, and the other end is connected with a plug; The cylinder has a piston, and there is a seal on the side wall of the piston and the plug, which is located between the contact surface with the sleeve; on the plug, there is an interface for a quick-seal joint, which is connected between the plug and the tee, and is located between the plug and the tee. The other two ports of the tee, one port is connected with a shock-resistant pressure gauge, the other port is a pressure sensor interface, and a pressure sensor is connected on the pressure sensor interface.

所述的泄浆阀包括:阀体、密封头、套、内缸体、卡箍、一号进出油接头、连接筒、外缸体、端盖、芯轴、吊耳、第一腔体、第二腔体、第三腔体、二号进出油接头、泄浆口;在阀体的侧壁上有泄浆口;阀体的一端固定连接有主管道上,阀体的另一端通过卡箍与外缸体连接,在外缸体的后端连接有端盖,在端盖有通孔,在端盖通孔上连接有二号进出油接头,在端盖通孔内的外缸体内腔为第三腔体;在外缸体上有一号进出油接头,一号进出油接头位于第二腔体位置;The slurry valve includes: a valve body, a sealing head, a sleeve, an inner cylinder body, a clamp, a No. 1 oil inlet and outlet joint, a connecting cylinder, an outer cylinder body, an end cover, a mandrel, a lifting lug, a first cavity, The second cavity, the third cavity, the No. 2 oil inlet and outlet joints, and the slurry outlet; there is a slurry outlet on the side wall of the valve body; one end of the valve body is fixedly connected to the main pipeline, and the other end of the valve body passes through the clamp It is connected with the outer cylinder body, an end cover is connected to the rear end of the outer cylinder body, a through hole is arranged in the end cover, a No. It is the third cavity; there is a No. 1 oil inlet and outlet joint on the outer cylinder body, and the No. 1 oil inlet and outlet joint is located in the second cavity;

在阀体内有套和内缸体;在套内有密封头,在内缸体的后端连接有连接筒,连接筒的内端连接有内芯轴,连接筒和芯轴均位于内缸体内;在内缸体上有通油孔,通油孔的一端进出油口位于第二腔体位置,通油孔另一端进出油口位于第一腔体位置;第一腔体位于内缸体与芯轴之间的腔体;密封头在阀体和套内密封滑动;内缸体的后部在外缸体内密封滑动,前端位于阀体内;芯轴在内缸体密封滑动,芯轴前端推动密封头密封滑动。There is a sleeve and an inner cylinder in the valve body; there is a sealing head in the sleeve, a connecting cylinder is connected to the rear end of the inner cylinder, and an inner mandrel is connected to the inner end of the connecting cylinder, and both the connecting cylinder and the mandrel are located in the inner cylinder. Inside; there is an oil passage hole on the inner cylinder body, one end of the oil passage hole is located at the position of the second cavity, and the other end of the oil passage hole is located at the position of the first cavity; the first cavity is located in the inner cylinder body The cavity between the mandrel and the mandrel; the sealing head seals and slides in the valve body and the sleeve; the rear of the inner cylinder seals and slides in the outer cylinder, and the front end is located in the valve body; the mandrel seals and slides in the inner cylinder, and the front end of the mandrel Push the seal head to seal the slide.

采用泄压装置的控制方法:Control method using pressure relief device:

通过控制一号进出油接头、二号进出油接头的两个进出油口,实现泄浆阀的开或关,通过压力传感器实现了远程和现场的管道压力监测,泄浆阀远程和现场的双操作提高了充填管路系统的安全性;By controlling the two oil inlet and outlet ports of No. 1 oil inlet and outlet joint and No. 2 oil inlet and outlet joint, the opening or closing of the drain valve is realized. The remote and on-site pipeline pressure monitoring is realized through the pressure sensor, and the remote and on-site dual control of the drain valve is realized. Operation improves the safety of the filling piping system;

阀体与主管道连接,在外缸体方向与密封头采用U型密封圈密封,保证了整个管路的密封性;当主管道前方的截止阀处于截止状态或主管道的压力过大时,密封头被推向后方,泄浆口与主管道相通,主管道中的浆体沿着旁路的泄浆口排出;The valve body is connected with the main pipeline, and the sealing head is sealed with a U-shaped sealing ring in the direction of the outer cylinder body, which ensures the tightness of the whole pipeline; when the stop valve in front of the main pipeline is in the cut-off state or the pressure of the main pipeline is too large, the sealing head Pushed to the rear, the slurry outlet is communicated with the main pipeline, and the slurry in the main pipeline is discharged along the slurry outlet of the bypass;

芯轴与密封头采用螺纹连接,芯轴与内缸套采用U型和组合密封形式密封,当一号进出油接头进油时,液压油进入第一腔体,推动芯轴运动并带动密封头同时运动,密封头进入套内,由套对密封头的密封进行保护,然后随着内缸套一起运动,将泄浆口打开;The mandrel and the sealing head are threadedly connected, and the mandrel and the inner cylinder liner are sealed in the form of U-shaped and combined sealing. When the No. 1 oil inlet and outlet joints enter the oil, the hydraulic oil enters the first cavity, pushes the mandrel to move and drives the sealing head At the same time, the sealing head enters the sleeve, and the sealing of the sealing head is protected by the sleeve, and then moves together with the inner cylinder sleeve to open the slurry opening;

连接筒与内缸套采用螺纹连接,中部开有进出油口,使得第一腔体和第二腔体联通,当二号进出油接头进油时,推动内缸套整体移动,内缸套到位后第二腔体液压油会推动芯轴运动,从而将密封头推出套,将阀体密封。The connecting cylinder and the inner cylinder liner are connected by thread, and the oil inlet and outlet are opened in the middle, so that the first cavity and the second cavity are connected. The hydraulic oil in the rear second chamber will push the mandrel to move, thereby pushing the sealing head out of the sleeve and sealing the valve body.

有益效果,由于采用了上述方案,Beneficial effects, due to the adoption of the above scheme,

1、由于采用了上述监测膏体充填管路压力及泄压装置,可以实现充填管路压力的实时监测,在突发情况下实现管路的泄压,保证充填系统的安全。1. Due to the adoption of the above-mentioned monitoring paste filling pipeline pressure and pressure relief device, real-time monitoring of the filling pipeline pressure can be realized, and pipeline pressure relief can be realized in emergencies to ensure the safety of the filling system.

2、由于采用了上述监测膏体充填管路压力及泄压装置,可以实现因故停机时,将管路中的浆体排出,避免管路中浆体停留时间过长导致堵管,减少经济损失。2. Due to the use of the above monitoring paste filling pipeline pressure and pressure relief device, the slurry in the pipeline can be discharged when the machine is shut down for any reason, so as to avoid the slurry staying in the pipeline for too long and cause the pipeline to block, reducing the economical loss.

3、由于开发了上述监测膏体充填管路压力及泄压装置,在浆体长距离输送管路重要节点位置安装此阀,可以对管路中不同位置进行压力监测,也便于对事故的排查和检修。3. Due to the development of the above-mentioned monitoring paste filling pipeline pressure and pressure relief device, the valve is installed at the important node position of the slurry long-distance conveying pipeline, which can monitor the pressure at different positions in the pipeline and facilitate the investigation of accidents. and overhaul.

能快速切换保证了管道安全和浆体排出管道,避免管道压力过大对管道的破坏和浆体在管道中停留时间过长而凝固堵管,从而保证了整个充填系统的安全,达到了本发明的目的。It can quickly switch to ensure the safety of the pipeline and the discharge of the slurry, avoid the damage to the pipeline caused by the excessive pressure of the pipeline and the solidification and blockage of the slurry in the pipeline for a long time, thus ensuring the safety of the entire filling system and achieving the present invention. the goal of.

优点:本发明结构紧凑,耐磨损,耐高压,密封性好,拆装和维修方便,且操作简单省力。不仅能够监测前部的管道压力,还能够启动泄压装置对管路进行保护,该装置能作为膏体充填管路的安全阀使用,为膏体充填系统的安全和稳定起到了保驾护航的作用。Advantages: the invention has compact structure, wear resistance, high pressure resistance, good sealing, convenient disassembly and maintenance, and simple and labor-saving operation. It can not only monitor the pipeline pressure at the front, but also activate the pressure relief device to protect the pipeline. The device can be used as a safety valve for the paste filling pipeline, which plays an escort role for the safety and stability of the paste filling system. .

1、采用上述监测膏体充填管路压力及泄压装置,可以实现远程和现场的双控制,方便现场检修和集控室远程控制。1. The above-mentioned monitoring paste filling pipeline pressure and pressure relief device can realize dual control of remote and on-site, which is convenient for on-site maintenance and remote control in the centralized control room.

2、采用上述监测膏体充填管路压力及泄压装置,在高压的工况下也不会泄漏,同时实时掌握管道的压力,安全性大大提高。2. The above-mentioned monitoring paste filling pipeline pressure and pressure relief device will not leak under high pressure conditions, and at the same time, the pressure of the pipeline can be grasped in real time, and the safety is greatly improved.

3、采用上述监测膏体充填管路压力及泄压装置,结构简单,零件用量少,大大减少了故障率,拆卸和维修方便。3. The above-mentioned monitoring paste filling pipeline pressure and pressure relief device is adopted, which has a simple structure, a small amount of parts, greatly reduces the failure rate, and is convenient for disassembly and maintenance.

4、采用上述监测膏体充填管路压力及泄压装置,结构紧凑,在狭小的空间也可以使用和方便安装,远程操控可以实现无人值守。4. The above-mentioned monitoring paste filling pipeline pressure and pressure relief device is adopted, with a compact structure, which can also be used and installed in a small space, and the remote control can realize unattended operation.

附图说明Description of drawings

图1为本发明监测膏体充填管路压力及泄压装置的压力监测结构示意图。FIG. 1 is a schematic diagram of the pressure monitoring structure of the monitoring paste filling pipeline pressure and pressure relief device of the present invention.

图2为本发明中监测膏体充填管路压力及泄压装置完全关闭时示意图。Fig. 2 is a schematic diagram of monitoring the pressure of the paste filling pipeline and the pressure relief device when the pressure relief device is completely closed according to the present invention.

图3为图1压力监测器的局部放大结构示意图。FIG. 3 is a partial enlarged structural schematic diagram of the pressure monitor of FIG. 1 .

图4为本发明中监测膏体充填管路压力及泄压装置开启时密封头首先进入保护套示意图。4 is a schematic diagram of the sealing head first entering the protective sleeve when monitoring the pressure of the paste filling pipeline and opening the pressure relief device according to the present invention.

图5为本发明中监测膏体充填管路压力及泄压装置完全开启时示意图。FIG. 5 is a schematic diagram of monitoring the pressure of the paste filling pipeline and the pressure relief device when the pressure relief device is fully opened according to the present invention.

图中,1、阀体;2、密封头;3、套;4、内缸体;5、卡箍;6、一号进出油接头;7、连接筒;8、外缸体;9、端盖;10、芯轴;11、压力监测器;12、活塞;13、套筒;14、堵头;15、耐震压力表;16、快速密封接头;17、三通;18、压力传感器接口;19、吊耳;20、第一腔体;21、第二腔体;22、第三腔体;23、二号进出油接头;24、出浆口;25、主管道。In the figure, 1, valve body; 2, sealing head; 3, sleeve; 4, inner cylinder body; 5, clamp; 6, No. 1 oil inlet and outlet joint; 7, connecting cylinder; 8, outer cylinder body; 9, end Cover; 10, mandrel; 11, pressure monitor; 12, piston; 13, sleeve; 14, plug; 15, shock-resistant pressure gauge; 16, quick seal joint; 17, tee; 18, pressure sensor interface; 19. Lifting ear; 20. The first cavity; 21. The second cavity; 22. The third cavity; 23. The No. 2 oil inlet and outlet; 24, the slurry outlet;

具体实施方式Detailed ways

本发明包括:泄压装置以及采用泄压装置的控制方法。The invention includes: a pressure relief device and a control method using the pressure relief device.

泄压装置包括:泄浆阀和压力监测器11;泄浆阀和压力监测器11均安装在主管道25上。The pressure relief device includes: a slurry valve and a pressure monitor 11 ; both the slurry valve and the pressure monitor 11 are installed on the main pipeline 25 .

所述的压力监测器11包括:活塞12、套筒13、堵头14、耐震压力表15、快速密封接头16、三通17和压力传感器接口18;套筒13的一端固定连接在主管道25上,另一端连接有堵头14;在套筒13有活塞12,在活塞12和堵头14的侧壁上有密封,位于与套筒13接触面之间;在堵头14上有快速密封接头16的接口,快速密封接头16连接在堵头14与三通17之间,在三通17的另两个端口,一个端口连接有耐震压力表15,一个端口为压力传感器接口18,在压力传感器接口18上连接有压力传感器。The pressure monitor 11 includes: a piston 12, a sleeve 13, a plug 14, a shock-resistant pressure gauge 15, a quick-sealing joint 16, a tee 17 and a pressure sensor interface 18; one end of the sleeve 13 is fixedly connected to the main pipeline 25 The other end is connected with a plug 14; there is a piston 12 on the sleeve 13, and there is a seal on the side wall of the piston 12 and the plug 14, which is located between the contact surface with the sleeve 13; there is a quick seal on the plug 14 The interface of the joint 16, the quick seal joint 16 is connected between the plug 14 and the tee 17, and the other two ports of the tee 17, one port is connected with a shock-resistant pressure gauge 15, and the other port is a pressure sensor interface 18. A pressure sensor is connected to the sensor interface 18 .

所述的泄浆阀包括:阀体1、密封头2、套3、内缸体4、卡箍5、一号进出油接头6、连接筒7、外缸体8、端盖9、芯轴10、吊耳19、第一腔体20、第二腔体21、第三腔体22、二号进出油接头23、泄浆口24;The slurry valve includes: valve body 1, sealing head 2, sleeve 3, inner cylinder body 4, clamp 5, No. 1 oil inlet and outlet joint 6, connecting cylinder 7, outer cylinder body 8, end cover 9, mandrel 10. Lifting lugs 19, first cavity 20, second cavity 21, third cavity 22, No. 2 oil inlet and outlet joints 23, slurry outlet 24;

在阀体1的侧壁上有泄浆口24;阀体1的一端固定连接有主管道25上,阀体1的另一端通过卡箍5与外缸体8连接,在外缸体8的后端连接有端盖9,在端盖9有通孔,在端盖9通孔上连接有二号进出油接头23,在端盖9通孔内的外缸体8内腔为第三腔体22;在外缸体8上有一号进出油接头6,一号进出油接头6位于第二腔体21位置;There is a slurry outlet 24 on the side wall of the valve body 1; one end of the valve body 1 is fixedly connected to the main pipe 25, and the other end of the valve body 1 is connected with the outer cylinder block 8 through the clamp 5, and is behind the outer cylinder block 8. The end is connected with an end cover 9, there is a through hole in the end cover 9, a No. 2 oil inlet and outlet joint 23 is connected to the through hole of the end cover 9, and the inner cavity of the outer cylinder block 8 in the through hole of the end cover 9 is the third cavity 22; There is a No. 1 oil inlet and outlet joint 6 on the outer cylinder block 8, and the No. 1 oil inlet and outlet joint 6 is located at the position of the second cavity 21;

在阀体1内有套3和内缸体4;在套3内有密封头2,在内缸体4的后端连接有连接筒7,连接筒7的内端连接有内芯轴10,连接筒7和芯轴10均位于内缸体4内;在内缸体4上有通油孔,通油孔的一端进出油口位于第二腔体21位置,通油孔另一端进出油口位于第一腔体20位置;第一腔体20位于内缸体4与芯轴10之间的腔体;密封头2在阀体1和套3内密封滑动;内缸体4的后部在外缸体8内密封滑动,前端位于阀体1内;芯轴10在内缸体4密封滑动,芯轴10前端推动密封头2密封滑动。There is a sleeve 3 and an inner cylinder 4 in the valve body 1; a sealing head 2 is arranged in the sleeve 3, a connecting cylinder 7 is connected to the rear end of the inner cylinder 4, and an inner core shaft 10 is connected to the inner end of the connecting cylinder 7, Both the connecting cylinder 7 and the mandrel 10 are located in the inner cylinder block 4; the inner cylinder block 4 has an oil passage hole, one end of the oil passage hole is located at the position of the second cavity 21, and the other end of the oil passage hole is an oil inlet and outlet port It is located at the position of the first cavity 20; the first cavity 20 is located in the cavity between the inner cylinder 4 and the mandrel 10; the sealing head 2 is sealed and slid in the valve body 1 and the sleeve 3; the rear of the inner cylinder 4 is outside The inner cylinder body 8 is sealed and slid, and the front end is located in the valve body 1;

采用泄压装置的控制方法:Control method using pressure relief device:

通过控制一号进出油接头6、二号进出油接头23的两个进出油口,实现泄浆阀的开或关,通过压力传感器实现了远程和现场的管道压力监测,泄浆阀远程和现场的双操作提高了充填管路系统的安全性;By controlling the two oil inlet and outlet ports of No. 1 oil inlet and outlet joint 6 and No. 2 oil inlet and outlet joint 23, the opening or closing of the drain valve is realized, and the remote and on-site pipeline pressure monitoring is realized through the pressure sensor, and the remote and on-site drain valve is realized. The double operation improves the safety of the filling pipeline system;

阀体1与主管道25连接,在外缸体8方向与密封头2采用U型密封圈密封,保证了整个管路的密封性;当主管道25前方的截止阀处于截止状态或主管道25的压力过大时,密封头2被推向后方,泄浆口24与主管道25相通,主管道25中的浆体沿着旁路的泄浆口24排出;The valve body 1 is connected to the main pipeline 25, and is sealed with the sealing head 2 in the direction of the outer cylinder body 8 by a U-shaped sealing ring, which ensures the tightness of the entire pipeline; when the stop valve in front of the main pipeline 25 is in the cut-off state or the pressure When it is too large, the sealing head 2 is pushed to the rear, the slurry opening 24 communicates with the main pipeline 25, and the slurry in the main pipeline 25 is discharged along the bypass slurry opening 24;

芯轴10与密封头2采用螺纹连接,芯轴10与内缸套4采用U型和组合密封形式密封,当一号进出油接头6进油时,液压油进入第一腔体20,推动芯轴10运动并带动密封头2同时运动,密封头2进入套3内,由套3对密封头2的密封进行保护,然后随着内缸套4一起运动,将泄浆口24打开;The mandrel 10 and the sealing head 2 are threadedly connected, and the mandrel 10 and the inner cylinder liner 4 are sealed in the form of U-shaped and combined sealing. When the No. 1 oil inlet and outlet joint 6 enters oil, the hydraulic oil enters the first cavity 20 and pushes the core The shaft 10 moves and drives the sealing head 2 to move at the same time, the sealing head 2 enters the sleeve 3, and the sealing of the sealing head 2 is protected by the sleeve 3, and then moves together with the inner cylinder sleeve 4 to open the drain port 24;

连接筒7与内缸套4采用螺纹连接,中部开有进出油口,使得第一腔体20和第二腔体21联通,当二号进出油接头23进油时,推动内缸套4整体移动,内缸套4到位后第二腔体21液压油会推动芯轴10运动,从而将密封头2推出套3,将阀体1密封。The connecting cylinder 7 is connected with the inner cylinder liner 4 by threads, and the oil inlet and outlet are opened in the middle, so that the first cavity 20 and the second cavity 21 are communicated. When the inner cylinder liner 4 is in place, the hydraulic oil in the second cavity 21 will push the mandrel 10 to move, thereby pushing the sealing head 2 out of the sleeve 3 and sealing the valve body 1 .

为了更清楚地说明本发明或现有技术中的技术方案,下面将对本发明或现有技术描述中所需要使用的附图作简单地描述,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the present invention or the technical solutions in the prior art, the following will briefly describe the accompanying drawings used in the description of the present invention or the prior art. Obviously, the accompanying drawings in the following description are only the present invention. For some embodiments of the present invention, for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without any creative effort.

下面接合附图对本发明的实施方式做进一步的说明。The embodiments of the present invention will be further described below with reference to the accompanying drawings.

实施例1:如图1,在监测膏体充填管路压力及泄压装置主管路中设置压力表15和电控监测,采用多重密封避免高压泄漏,阀体1和外缸体8采用卡箍5连接,方便安装和现场检修维护,并在阀体1上设置吊耳19方便起吊。Example 1: As shown in Figure 1, a pressure gauge 15 and electronic control monitoring are set in the monitoring paste filling pipeline pressure and the main pipeline of the pressure relief device, multiple seals are used to avoid high pressure leakage, and the valve body 1 and the outer cylinder body 8 are clamped 5 is connected to facilitate installation and on-site inspection and maintenance, and the valve body 1 is provided with lifting lugs 19 to facilitate lifting.

图2示意了监测膏体充填管路压力及泄压装置完全关闭时的状态,可以看出密封头2采用多重密封,保证了密封效果,第三腔体22的较大端面积产生了足够的压力,保证了主管路25的长距离输送。Figure 2 shows the monitoring of the pressure of the paste filling pipeline and the state when the pressure relief device is completely closed. It can be seen that the sealing head 2 adopts multiple seals to ensure the sealing effect, and the larger end area of the third cavity 22 produces sufficient The pressure ensures the long-distance transportation of the main pipeline 25 .

图3示意了当一号进出油接头的油口进油时,使得密封头2退回到套3的状态,避免密封头2与浆体接触,对密封头2及密封起到了保护作用,提高了使用寿命和密封效果。Figure 3 shows that when the oil inlet of the No. 1 oil inlet and outlet joints is filled with oil, the sealing head 2 is returned to the state of the sleeve 3, which prevents the sealing head 2 from contacting the slurry, which protects the sealing head 2 and the seal, and improves the Service life and sealing effect.

图4示意了监测膏体充填管路压力及泄压装置完全打开时的状态,如果主管道25发生堵管,管道压力过大时,泄浆阀自动打开使得浆体通过出浆口24排出,保护整个管路的安全。如果管路畅通,因故需要立即停止充填时,可以和截止阀配合使用,将截止阀立即关闭,打开泄浆阀将管路中浆体排出。Figure 4 shows the monitoring of the pressure of the paste filling pipeline and the state when the pressure relief device is fully opened. If the main pipeline 25 is blocked and the pipeline pressure is too large, the slurry valve will automatically open so that the slurry is discharged through the slurry outlet 24. Protect the safety of the entire pipeline. If the pipeline is smooth and the filling needs to be stopped immediately for some reason, it can be used in conjunction with the stop valve, the stop valve is closed immediately, and the slurry valve is opened to discharge the slurry in the pipeline.

Claims (4)

1.一种监测膏体充填管路压力的泄压装置,其特征是:泄压装置包括:泄浆阀和压力监测器;泄浆阀和压力监测器均安装在主管道上。1. A pressure relief device for monitoring the pressure of a paste filling pipeline, characterized in that: the pressure relief device comprises: a slurry valve and a pressure monitor; both the slurry valve and the pressure monitor are installed on the main pipeline. 2.根据权利要求1所述的一种监测膏体充填管路压力的泄压装置,其特征是:所述的压力监测器包括:活塞、套筒、堵头、耐震压力表、快速密封接头、三通和压力传感器接口;套筒的一端固定连接在主管道上,另一端连接有堵头;在套筒有活塞,在活塞和堵头的侧壁上有密封,位于与套筒接触面之间;在堵头上有快速密封接头的接口,快速密封接头连接在堵头与三通之间,在三通的另两个端口,一个端口连接有耐震压力表,一个端口为压力传感器接口,在压力传感器接口上连接有压力传感器。2 . The pressure relief device for monitoring the pressure of the paste filling pipeline according to claim 1 , wherein the pressure monitor comprises: a piston, a sleeve, a plug, a shock-resistant pressure gauge, and a quick-seal joint. 3 . , tee and pressure sensor interface; one end of the sleeve is fixedly connected to the main pipeline, and the other end is connected with a plug; there is a piston in the sleeve, and there is a seal on the side wall of the piston and the plug, which is located between the contact surface of the sleeve and the sleeve. There is a quick-sealing joint interface on the plug, the quick-sealing joint is connected between the plug and the tee, and the other two ports of the tee, one port is connected with a shock-resistant pressure gauge, and the other port is a pressure sensor interface, A pressure sensor is connected to the pressure sensor interface. 3.根据权利要求1所述的一种监测膏体充填管路压力的泄压装置,其特征是:所述的泄浆阀包括:阀体、密封头、套、内缸体、卡箍、一号进出油接头、连接筒、外缸体、端盖、芯轴、吊耳、第一腔体、第二腔体、第三腔体、二号进出油接头、泄浆口;在阀体的侧壁上有泄浆口;阀体的一端固定连接有主管道上,阀体的另一端通过卡箍与外缸体连接,在外缸体的后端连接有端盖,在端盖有通孔,在端盖通孔上连接有二号进出油接头,在端盖通孔内的外缸体内腔为第三腔体;在外缸体上有一号进出油接头,一号进出油接头位于第二腔体位置;3. The pressure relief device for monitoring the pressure of the paste filling pipeline according to claim 1, wherein the slurry valve comprises: a valve body, a sealing head, a sleeve, an inner cylinder, a clamp, a No. 1 oil inlet and outlet joint, connecting cylinder, outer cylinder body, end cover, mandrel, lifting lug, first cavity, second cavity, third cavity, No. 2 oil inlet and outlet joint, drain port; in the valve body There is a slurry outlet on the side wall of the valve body; one end of the valve body is fixedly connected to the main pipeline, the other end of the valve body is connected to the outer cylinder body through a clamp, an end cover is connected to the rear end of the outer cylinder body, and there is a through hole in the end cover , the No. 2 oil inlet and outlet joints are connected to the through holes of the end cover, and the inner cavity of the outer cylinder in the through holes of the end cover is the third cavity; there is a No. 1 oil inlet and outlet joint on the outer cylinder body, and the No. Two-chamber position; 在阀体内有套和内缸体;在套内有密封头,在内缸体的后端连接有连接筒,连接筒的内端连接有内芯轴,连接筒和芯轴均位于内缸体内;在内缸体上有通油孔,通油孔的一端进出油口位于第二腔体位置,通油孔另一端进出油口位于第一腔体位置;第一腔体位于内缸体与芯轴之间的腔体;密封头在阀体和套内密封滑动;内缸体的后部在外缸体内密封滑动,前端位于阀体内;芯轴在内缸体密封滑动,芯轴前端推动密封头密封滑动。There is a sleeve and an inner cylinder in the valve body; there is a sealing head in the sleeve, a connecting cylinder is connected to the rear end of the inner cylinder, and an inner mandrel is connected to the inner end of the connecting cylinder, and both the connecting cylinder and the mandrel are located in the inner cylinder. Inside; there is an oil passage hole on the inner cylinder body, one end of the oil passage hole is located at the position of the second cavity, and the other end of the oil passage hole is located at the position of the first cavity; the first cavity is located in the inner cylinder body The cavity between the mandrel and the mandrel; the sealing head seals and slides in the valve body and the sleeve; the rear of the inner cylinder seals and slides in the outer cylinder, and the front end is located in the valve body; the mandrel seals and slides in the inner cylinder, and the front end of the mandrel Push the seal head to seal the slide. 4.采用权利要求1所述的一种监测膏体充填管路压力泄压装置的控制方法,其特征是:采用泄压装置的控制方法:4. adopt the control method of a kind of monitoring paste filling pipeline pressure pressure relief device according to claim 1, it is characterized in that: adopt the control method of the pressure relief device: 通过控制一号进出油接头、二号进出油接头的两个进出油口,实现泄浆阀的开或关,通过压力传感器实现了远程和现场的管道压力监测,泄浆阀远程和现场的双操作提高了充填管路系统的安全性;By controlling the two oil inlet and outlet ports of No. 1 oil inlet and outlet joint and No. 2 oil inlet and outlet joint, the opening or closing of the drain valve is realized. The remote and on-site pipeline pressure monitoring is realized through the pressure sensor, and the remote and on-site dual control of the drain valve is realized. Operation improves the safety of the filling piping system; 阀体与主管道连接,在外缸体方向与密封头采用U型密封圈密封,保证了整个管路的密封性;当主管道前方的截止阀处于截止状态或主管道的压力过大时,密封头被推向后方,泄浆口与主管道相通,主管道中的浆体沿着旁路的泄浆口排出;The valve body is connected with the main pipeline, and the sealing head is sealed with a U-shaped sealing ring in the direction of the outer cylinder body, which ensures the tightness of the whole pipeline; when the stop valve in front of the main pipeline is in the cut-off state or the pressure of the main pipeline is too large, the sealing head Pushed to the rear, the slurry outlet is communicated with the main pipeline, and the slurry in the main pipeline is discharged along the slurry outlet of the bypass; 芯轴与密封头采用螺纹连接,芯轴与内缸套采用U型和组合密封形式密封,当一号进出油接头进油时,液压油进入第一腔体,推动芯轴运动并带动密封头同时运动,密封头进入套内,由套对密封头的密封进行保护,然后随着内缸套一起运动,将泄浆口打开;The mandrel and the sealing head are threadedly connected, and the mandrel and the inner cylinder liner are sealed in the form of U-shaped and combined sealing. When the No. 1 oil inlet and outlet joints enter the oil, the hydraulic oil enters the first cavity, pushes the mandrel to move and drives the sealing head At the same time, the sealing head enters the sleeve, and the sealing of the sealing head is protected by the sleeve, and then moves together with the inner cylinder sleeve to open the slurry opening; 连接筒与内缸套采用螺纹连接,中部开有进出油口,使得第一腔体和第二腔体联通,当二号进出油接头进油时,推动内缸套整体移动,内缸套到位后第二腔体液压油会推动芯轴运动,从而将密封头推出套,将阀体密封。The connecting cylinder and the inner cylinder liner are connected by thread, and the oil inlet and outlet are opened in the middle, so that the first cavity and the second cavity are connected. The hydraulic oil in the rear second chamber will push the mandrel to move, thereby pushing the sealing head out of the sleeve and sealing the valve body.
CN201911138288.8A 2019-11-20 2019-11-20 A pressure relief device and control method for monitoring the pressure of paste filling pipeline Withdrawn CN110685738A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911138288.8A CN110685738A (en) 2019-11-20 2019-11-20 A pressure relief device and control method for monitoring the pressure of paste filling pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911138288.8A CN110685738A (en) 2019-11-20 2019-11-20 A pressure relief device and control method for monitoring the pressure of paste filling pipeline

Publications (1)

Publication Number Publication Date
CN110685738A true CN110685738A (en) 2020-01-14

Family

ID=69117040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911138288.8A Withdrawn CN110685738A (en) 2019-11-20 2019-11-20 A pressure relief device and control method for monitoring the pressure of paste filling pipeline

Country Status (1)

Country Link
CN (1) CN110685738A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111693204A (en) * 2020-06-19 2020-09-22 四川省天域航通科技有限公司 Make things convenient for unmanned aerial vehicle of pressure sensor installation
CN111965085A (en) * 2020-06-30 2020-11-20 南通市中京机械有限公司 Back pressure device for rock core detection
CN113673180A (en) * 2021-08-10 2021-11-19 北京科技大学 Fast calculation method for leakage position of long-distance horizontal conveying pipeline filled with paste
CN115143298A (en) * 2022-06-28 2022-10-04 中彩智诚(北京)科技发展有限公司 Cylindrical self-excited high pressure pneumatic quick opening valve

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121399A (en) * 2010-12-27 2011-07-13 淄博矿业集团有限责任公司 Paste filling blockage pipe discharging gate with pressure detection function
CN102121397A (en) * 2010-12-27 2011-07-13 淄博矿业集团有限责任公司 Paste filling pipeline system for coal mine
CN103216261A (en) * 2012-01-21 2013-07-24 飞翼股份有限公司 Automatic filling system for mining under villages, railways and water
CN108643963A (en) * 2018-04-25 2018-10-12 长沙矿山研究院有限责任公司 For the pressure relief device of underground filling plugging, method and back-filling system
CN210919146U (en) * 2019-11-20 2020-07-03 徐州中矿大贝克福尔科技股份有限公司 Pressure relief device for monitoring pressure of paste filling pipeline

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121399A (en) * 2010-12-27 2011-07-13 淄博矿业集团有限责任公司 Paste filling blockage pipe discharging gate with pressure detection function
CN102121397A (en) * 2010-12-27 2011-07-13 淄博矿业集团有限责任公司 Paste filling pipeline system for coal mine
CN103216261A (en) * 2012-01-21 2013-07-24 飞翼股份有限公司 Automatic filling system for mining under villages, railways and water
CN108643963A (en) * 2018-04-25 2018-10-12 长沙矿山研究院有限责任公司 For the pressure relief device of underground filling plugging, method and back-filling system
CN210919146U (en) * 2019-11-20 2020-07-03 徐州中矿大贝克福尔科技股份有限公司 Pressure relief device for monitoring pressure of paste filling pipeline

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张新国;郭惟嘉;王恒;李杨杨;曹忠;: "矸石膏体充填管道安全输送压力预警系统研制", 煤炭学报, no. 1, 15 June 2012 (2012-06-15), pages 229 - 233 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111693204A (en) * 2020-06-19 2020-09-22 四川省天域航通科技有限公司 Make things convenient for unmanned aerial vehicle of pressure sensor installation
CN111965085A (en) * 2020-06-30 2020-11-20 南通市中京机械有限公司 Back pressure device for rock core detection
CN113673180A (en) * 2021-08-10 2021-11-19 北京科技大学 Fast calculation method for leakage position of long-distance horizontal conveying pipeline filled with paste
CN115143298A (en) * 2022-06-28 2022-10-04 中彩智诚(北京)科技发展有限公司 Cylindrical self-excited high pressure pneumatic quick opening valve
CN115143298B (en) * 2022-06-28 2025-03-28 中彩智诚(北京)科技发展有限公司 Cylindrical self-actuated high pressure pneumatic quick opening valve

Similar Documents

Publication Publication Date Title
CN110685738A (en) A pressure relief device and control method for monitoring the pressure of paste filling pipeline
CN102561977B (en) High-pressure high-flow water burst hole drilling safety system, mounting process thereof and service process
CN205100930U (en) Multistage preventer pressure testing system of well head and pressure testing device thereof
US7766047B1 (en) Telescoping double blocking pipe plug
CN103672257B (en) A kind of underground fast hydraulic joint
CN206369048U (en) A kind of hydraulic pressure top-closed structure pipeline sealing device
CN102003591A (en) Construction method for rapid installation of branch pipelines in main pipeline
CN102817571A (en) A blowout prevention tool string for a pressurized energy storage workover rig
CN103148313A (en) Device and method for blocking connecting place between pipes of shield tunneling machine
EP2226546A1 (en) Hydraulic plugging machine for interventions of installation, repair, maintenance on pressure fluids supply piping
CN201627562U (en) Switch plugging blowout control device in wellhead
CN210919146U (en) Pressure relief device for monitoring pressure of paste filling pipeline
CN101520104A (en) Pipeline emergency cut-off valve
WO2019205355A1 (en) Multi-stage coal seam water injection borehole packing system and water injection borehole packing method
CN207453907U (en) The closed continuous sand flushing control device of well head
CN205225131U (en) Hole digger is prevented spouting by sleeve pipe
CN103712014B (en) A kind of deepwater multi-loop connects terminal
CN111577201A (en) Miniature liquid station in pit
CN206468975U (en) A kind of auto-pushing type metallic bellow expander
CN204083291U (en) A kind of lightweight plates gate valve
CN109611610B (en) Continuous pipe jacking construction device and construction method for fluid pipeline
CN103115191B (en) Non-glue-injection high-pressure leak point under-pressure plug device
CN202788722U (en) A blowout prevention tool string for a pressurized energy storage workover rig
CN207599062U (en) Safety valve with emulsion recycling function
CN102305028B (en) High-tightness high pressure-resistant double-guide faucet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200114