CN110644943A - Packers and Strings - Google Patents
Packers and Strings Download PDFInfo
- Publication number
- CN110644943A CN110644943A CN201911103503.0A CN201911103503A CN110644943A CN 110644943 A CN110644943 A CN 110644943A CN 201911103503 A CN201911103503 A CN 201911103503A CN 110644943 A CN110644943 A CN 110644943A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- thrust
- wall
- stopper
- base pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/128—Packers; Plugs with a member expanded radially by axial pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/129—Packers; Plugs with mechanical slips for hooking into the casing
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
Abstract
本发明提供了一种封隔器及管柱,涉及封隔器技术领域,封隔器包括基管;基管外可滑动的套设有密封件和推力件;基管外壁设有螺纹部,螺纹部为外螺纹,推力件内壁开设有与外螺纹适配的内螺纹,推力件外壁设有与井筒内壁抵接的摩擦部;基管外壁设置有限位部,密封件的一端与限位部抵接,另一端与推力件抵接。管柱包括封隔器。达到了座封工作操作方便的技术效果。
The invention provides a packer and a pipe string, and relates to the technical field of packers. The packer includes a base pipe; a sealing member and a thrust member are slidably sleeved outside the base pipe; The threaded part is an external thread, the inner wall of the thrust piece is provided with an internal thread adapted to the external thread, the outer wall of the thrust piece is provided with a friction part abutting against the inner wall of the wellbore; the outer wall of the base pipe is provided with a limit part, and one end of the seal is connected to the limit part abutting, and the other end is in contact with the thrust piece. The tubing string includes packers. The technical effect of convenient operation of the seat seal is achieved.
Description
技术领域technical field
本发明涉及封隔器技术领域,具体而言,涉及封隔器及管柱。The present invention relates to the technical field of packers, in particular, to a packer and a pipe string.
背景技术Background technique
在油田热采井注蒸汽时,要求注入的蒸汽压力高、温度高,以减小蒸汽从井口到达地层时的热损失。为了达到减小热损失的目的,一般是在注入地层之上的注蒸汽管柱上安装耐高温高压的热采封隔器,使蒸汽不会流到井筒内,避免造成热损失。When injecting steam in thermal recovery wells in oilfields, the injected steam is required to have high pressure and temperature to reduce the heat loss when the steam reaches the formation from the wellhead. In order to achieve the purpose of reducing heat loss, a thermal recovery packer with high temperature and high pressure resistance is generally installed on the steam injection string above the injection formation, so that the steam will not flow into the wellbore and avoid heat loss.
现有的热采封隔器种类较多,例如:利用封隔器上的热敏片在300摄氏度以上受热后变形撑开封隔器,使封隔器上的耐高温的胶筒扩张至井筒内壁上分隔井筒,但是这样操作非常费时。There are many types of thermal recovery packers. For example, the heat-sensitive sheet on the packer is used to deform the packer after being heated above 300 degrees Celsius, so that the high temperature resistant rubber tube on the packer expands to the inner wall of the wellbore. The wellbore is divided up, but this operation is very time consuming.
因此,提供一种操作方便的封隔器及管柱成为本领域技术人员所要解决的重要技术问题。Therefore, providing an easy-to-operate packer and a pipe string has become an important technical problem to be solved by those skilled in the art.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种封隔器及管柱,以缓解现有技术中操作不便的技术问题。The purpose of the present invention is to provide a packer and a pipe string to alleviate the technical problem of inconvenient operation in the prior art.
第一方面,本发明实施例提供了一种封隔器,包括基管;In a first aspect, an embodiment of the present invention provides a packer, including a base pipe;
所述基管外可滑动的套设有密封件和推力件;A sealing member and a thrust member are slidably sleeved outside the base pipe;
所述基管外壁设有螺纹部,所述螺纹部为外螺纹,所述推力件内壁开设有与所述外螺纹适配的内螺纹,所述推力件外壁设有与井筒内壁抵接的摩擦部;The outer wall of the base pipe is provided with a threaded portion, the threaded portion is an external thread, the inner wall of the thrust piece is provided with an internal thread adapted to the external thread, and the outer wall of the thrust piece is provided with a frictional contact with the inner wall of the wellbore department;
所述基管外壁设置有限位部,所述密封件的一端与所述限位部抵接,另一端与所述推力件抵接。A limiting portion is provided on the outer wall of the base pipe, one end of the sealing member is in contact with the limiting portion, and the other end is abutted with the thrust member.
结合第一方面,本发明实施例提供了第一方面的一种可能的实施方式,其中,上述基管包括中心管和密封套设于所述中心管外的套管;In conjunction with the first aspect, an embodiment of the present invention provides a possible implementation of the first aspect, wherein the base pipe includes a central pipe and a sleeve sealingly sleeved outside the central pipe;
所述套管通过第一连接件与所述中心管连接,在所述第一连接件被剪断后,所述套管能够与所述中心管相对滑动;The sleeve is connected with the central pipe through a first connecting piece, and after the first connecting piece is cut off, the sleeve can slide relative to the central pipe;
所述密封件和所述推力件均套设于所述套管,所述螺纹部设于所述套管外。Both the sealing member and the thrust member are sleeved on the sleeve, and the threaded portion is disposed outside the sleeve.
结合第一方面,本发明实施例提供了第一方面的一种可能的实施方式,其中,上述推力件包括连接部和推力部;In conjunction with the first aspect, an embodiment of the present invention provides a possible implementation of the first aspect, wherein the thrust member includes a connecting portion and a thrust portion;
所述内螺纹开设于所述连接部内壁,所述推力部一端与所述连接部连接,另一端与所述密封件抵接。The inner thread is opened on the inner wall of the connecting portion, one end of the thrust portion is connected with the connecting portion, and the other end is in contact with the sealing member.
结合第一方面,本发明实施例提供了第一方面的一种可能的实施方式,其中,上述推力件还包括卡瓦和卡瓦座;In conjunction with the first aspect, an embodiment of the present invention provides a possible implementation of the first aspect, wherein the thrust member further includes a slip and a slip seat;
所述卡瓦通过卡瓦弹簧设置在所述卡瓦座内,且所述卡瓦座上开设第一通孔;The slips are arranged in the slip seat through a slip spring, and a first through hole is opened on the slip seat;
所述卡瓦位于所述连接部与所述推力部之间,在所述连接部和所述推力部的推动下,所述卡瓦能够凸出所述第一通孔。The slips are located between the connecting portion and the thrust portion, and under the pushing of the connecting portion and the thrust portion, the slips can protrude from the first through hole.
结合第一方面,本发明实施例提供了第一方面的一种可能的实施方式,其中,上述连接部和所述推力部朝向所述卡瓦的一端均设置有用于推动所述卡瓦的楔形台。In combination with the first aspect, an embodiment of the present invention provides a possible implementation of the first aspect, wherein the connecting portion and the end of the thrust portion facing the slip are both provided with a wedge-shaped wedge for pushing the slip. tower.
结合第一方面,本发明实施例提供了第一方面的一种可能的实施方式,其中,上述卡瓦座通过可传递扭力的第二连接件与所述连接部连接,所述摩擦部设于所述卡瓦座。In conjunction with the first aspect, an embodiment of the present invention provides a possible implementation of the first aspect, wherein the slip seat is connected to the connecting portion through a second connecting member that can transmit torque, and the friction portion is provided on the The slip seat.
结合第一方面,本发明实施例提供了第一方面的一种可能的实施方式,其中,上述套管上设置有螺纹件,所述螺纹件形成所述螺纹部,所述套管上开设有安装孔,所述安装孔内设置有用于与所述螺纹件连接的止动件,以使所述螺纹件无法沿所述基管轴线运动;In combination with the first aspect, an embodiment of the present invention provides a possible implementation of the first aspect, wherein a threaded member is provided on the sleeve, the threaded member forms the threaded portion, and the sleeve is provided with a threaded member. an installation hole, wherein a stopper for connecting with the threaded member is arranged in the installation hole, so that the threaded member cannot move along the axis of the base pipe;
所述止动件上设有用于传递扭矩的第一限位块,所述第一限位块能够与所述螺纹件抵接;The stopper is provided with a first limit block for transmitting torque, and the first limit block can abut with the threaded member;
或,所述螺纹件上设有用于传递扭矩的第二限位块,所述第二限位块能够与所述止动件抵接。Or, the screw member is provided with a second limit block for transmitting torque, and the second limit block can abut with the stopper.
结合第一方面,本发明实施例提供了第一方面的一种可能的实施方式,其中,上述套管内部的底部套设有解封套,所述解封套通过第三连接件与所述套管连接;In conjunction with the first aspect, an embodiment of the present invention provides a possible implementation of the first aspect, wherein an unencapsulated sleeve is sleeved at the bottom inside the sleeve, and the unencapsulated sleeve is connected to the sleeve through a third connecting piece connect;
所述安装孔为第二通孔,所述解封套的顶部能够封堵所述第二通孔,且所述解封套外壁开设有能够容纳所述止动件的凹槽;The mounting hole is a second through hole, the top of the unpacking sleeve can block the second through hole, and the outer wall of the unpacking sleeve is provided with a groove capable of accommodating the stopper;
在所述第三连接件被剪断后,所述凹槽能够与所述第二通孔对应,所述螺纹件能够将所述止动件推入所述凹槽内,以使所述螺纹件能够相对所述止动件沿所述基管轴线滑动;After the third connecting piece is cut off, the groove can correspond to the second through hole, and the threaded member can push the stopper into the groove, so that the threaded member can be pushed into the groove. capable of sliding relative to the stop along the base pipe axis;
所述中心管外壁设置有能够与所述解封套抵接的限位件,所述限位件位于所述解封套下方。The outer wall of the central tube is provided with a limiting member capable of abutting with the unsealing sleeve, and the limiting member is located below the unsealing sleeve.
结合第一方面,本发明实施例提供了第一方面的一种可能的实施方式,其中,上述止动件上设有倾斜面,所述螺纹件能够与所述倾斜面抵接。In combination with the first aspect, the embodiment of the present invention provides a possible implementation of the first aspect, wherein the above-mentioned stopper is provided with an inclined surface, and the threaded member can abut against the inclined surface.
第二方面,本发明实施例提供了一种管柱,包括所述封隔器。In a second aspect, an embodiment of the present invention provides a pipe string including the packer.
有益效果:Beneficial effects:
本发明提供的一种封隔器,包括基管;基管外可滑动的套设有密封件和推力件;基管外壁设有螺纹部,螺纹部为外螺纹,推力件内壁开设有与外螺纹适配的内螺纹,推力件外壁设有与井筒内壁抵接的摩擦部;基管外壁设置有限位部,密封件的一端与限位部抵接,另一端与推力件抵接。A packer provided by the invention comprises a base pipe; a seal and a thrust piece are slidably sleeved on the outside of the base pipe; the outer wall of the base pipe is provided with a threaded part, the threaded part is an external thread, and the inner wall of the thrust piece is provided with a threaded part with an external thread. The outer wall of the thrust piece is provided with a friction part abutting against the inner wall of the wellbore; the outer wall of the base pipe is provided with a limiting part, one end of the sealing piece is in contact with the limiting part, and the other end is in contact with the thrust piece.
在使用时,工作人员转动基管,通过设置在基管外的螺纹部,能够带动与螺纹部适配的推力件产生转动的趋势,通过设置在推力件外壁的摩擦部与井筒的摩擦,使得推力件的转动趋势转换成上升趋势,从而使得推力件能够推动挤压密封件,使得密封件完成基管与井筒内壁之间的密封,操作方便,无需等待热敏片升温撑开密封件。When in use, the staff rotates the base pipe, and the threaded portion arranged outside the base pipe can drive the thrust piece that fits with the threaded portion to generate a tendency to rotate. The rotation trend of the thrust member is converted into an upward trend, so that the thrust member can push the extruded seal, so that the seal completes the sealing between the base pipe and the inner wall of the wellbore.
本发明提供的一种管柱,包括封隔器。管柱与现有技术相比具有上述的优势,此处不再赘述。A pipe string provided by the present invention includes a packer. Compared with the prior art, the pipe string has the above advantages, which will not be repeated here.
附图说明Description of drawings
为了更清楚地说明本发明具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the specific embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the specific embodiments or the prior art. Obviously, the accompanying drawings in the following description The drawings are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without creative efforts.
图1为本发明实施例提供的封隔器的半剖示意图;Fig. 1 is a half-section schematic diagram of a packer provided by an embodiment of the present invention;
图2为图1中A处的局部放大图;Fig. 2 is the partial enlarged view of A place in Fig. 1;
图3为本发明实施例提供的封隔器中套管的剖视图;3 is a cross-sectional view of a casing in a packer provided by an embodiment of the present invention;
图4为本发明实施例提供的封隔器中套管、推力件以及密封件的连接示意图;4 is a schematic diagram of the connection of a casing, a thrust member and a sealing member in a packer according to an embodiment of the present invention;
图5为本发明实施例提供的封隔器中套管上开设安装孔的结构示意图;FIG. 5 is a schematic structural diagram of opening a mounting hole on a casing in a packer according to an embodiment of the present invention;
图6为本发明实施例提供的封隔器中套管上安装孔中安装螺纹部和止动件的结构示意图;6 is a schematic structural diagram of a threaded portion and a stopper installed in an installation hole on a casing in a packer according to an embodiment of the present invention;
图7为本发明实施例提供的封隔器中螺纹部的结构示意图;7 is a schematic structural diagram of a threaded portion in a packer according to an embodiment of the present invention;
图8为本发明实施例提供的封隔器中止动件的结构示意图;8 is a schematic structural diagram of a stopper in a packer according to an embodiment of the present invention;
图9为本发明实施例提供的封隔器中设有第二限位块的螺纹部与止动件的连接示意图;9 is a schematic diagram of the connection between a threaded portion provided with a second limit block and a stopper in the packer provided by an embodiment of the present invention;
图10为本发明实施例提供的封隔器中卡瓦座的结构示意图;10 is a schematic structural diagram of a slip seat in a packer provided by an embodiment of the present invention;
图11为本发明实施例提供的封隔器中卡瓦及卡瓦弹簧的结构示意图;11 is a schematic structural diagram of slips and slip springs in the packer provided by an embodiment of the present invention;
图12为本发明实施例提供的封隔器中解封套的结构示意图;12 is a schematic structural diagram of unpacking in a packer according to an embodiment of the present invention;
图13为本发明实施例提供的封隔器中解封套上凹槽与安装孔对应时的结构示意图;FIG. 13 is a schematic structural diagram of a packer provided by an embodiment of the present invention when the grooves on the unpacking sleeve correspond to the mounting holes;
图14为本发明实施例提供的封隔器中上提中心管时,螺纹部将止动件压入凹槽内的过程示意图。14 is a schematic diagram of a process in which the threaded portion presses the stopper into the groove when the center pipe is lifted up in the packer provided by the embodiment of the present invention.
图标:icon:
110-中心管;111-限位件;120-套管;121-螺纹件;122-第一连接件;123-安装孔;124-止动件;125-第二限位块;126-倾斜面;127-扭力销钉;110-center pipe; 111-limiting piece; 120-sleeve; 121-threaded piece; 122-first connecting piece; 123-installation hole; 124-stop piece; 125-second limit block; face; 127 - torque pin;
200-密封件;210-内密封圈;200-seal; 210-inner seal;
300-推力件;301-内螺纹;302-摩擦部;310-连接部;320-推力部;330-卡瓦;340-卡瓦座;341-第一通孔;342-第二连接件;343-槽孔;350-楔形台;360-卡瓦弹簧;300-thrust part; 301-internal thread; 302-friction part; 310-connection part; 320-thrust part; 330-slip; 340-slip seat; 341-first through hole; 342-second connecting part; 343 - slotted hole; 350 - wedge table; 360 - slip spring;
400-解封套;410-第三连接件;420-凹槽。400-unencapsulated; 410-third connector; 420-groove.
具体实施方式Detailed ways
下面将结合附图对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
在本发明的描述中,需要理解的是,术语“中心”、“长度”、“上”、“下”、“顶”、“底”、“内”、“外”、“轴向”、“周向”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be understood that the terms "center", "length", "upper", "lower", "top", "bottom", "inner", "outer", "axial", The orientation or positional relationship indicated by "circumferential direction" and the like is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation , constructed and operated in a specific orientation, and therefore should not be construed as limiting the invention.
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first" or "second" may expressly or implicitly include one or more of that feature. In the description of the present invention, "plurality" means two or more, unless otherwise expressly and specifically defined.
在本发明中,除非另有明确的规定和限定,术语“安装”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the present invention, unless otherwise expressly specified and limited, terms such as "installation", "connection" and "fixing" should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection, or an integrated ; It can be a mechanical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.
下面通过具体的实施例并结合附图对本发明做进一步的详细描述。The present invention will be further described in detail below through specific embodiments and in conjunction with the accompanying drawings.
参见图1和图2所示,本发明实施例提供了一种封隔器,包括基管;基管外可滑动的套设有密封件200和推力件300;基管外壁设有螺纹部,螺纹部为外螺纹,推力件300内壁开设有与外螺纹适配的内螺纹301,推力件300外壁设有与井筒内壁抵接的摩擦部302;基管外壁设置有限位部,密封件200的一端与限位部抵接,另一端与推力件300抵接。Referring to FIG. 1 and FIG. 2 , an embodiment of the present invention provides a packer, including a base pipe; a sealing
在使用时,工作人员转动基管,通过设置在基管外的螺纹部,能够带动与螺纹部适配的推力件300产生转动的趋势,通过设置在推力件300外壁的摩擦部302与井筒的摩擦,使得推力件300的转动趋势转换成上升趋势,从而使得推力件300能够推动挤压密封件200,使得密封件200完成基管与井筒内壁之间的密封,操作方便,无需等待热敏片升温撑开密封件200。When in use, the worker rotates the base pipe, and the threaded portion arranged outside the base pipe can drive the
其中,套管120上设置有螺纹件121,螺纹件121形成螺纹部,螺纹件121呈环状。The
具体的,螺纹件121固定套设在基管外壁,当工作人员转动基管时,基管会带动螺纹件121转动,螺纹件121的外螺纹会驱动推力件300的内螺纹301,使得推力件300具有转动的趋势,推力件300在摩擦部302的作用下无法形成转动,因此推力件300会在螺纹件121的驱动下向密封件200移动,推力件300会对密封件200造成压迫,使得密封件200与井筒内壁紧紧抵接,完成基管与井筒内壁之间的密封。Specifically, the threaded
需要说明的是,当基管转动时,基管的转动方向使得基管与其他管柱的连接处于旋紧状态,不会因为基管转动带动推力件300压迫密封件200而出现倒扣的现象。It should be noted that when the base pipe is rotated, the rotation direction of the base pipe makes the connection between the base pipe and other pipe strings in a tightened state, and the phenomenon of undercutting will not occur due to the rotation of the base pipe driving the
其中,设置在推力件300外壁的摩擦部302始终保持与井筒的抵接,即,在推力件300随基管进入到井筒内时,摩擦部302开始与井筒抵接。The
具体的,基管外壁设置有限位部,当推力件300挤压密封件200时,密封件200受到限位部的限制,使得密封件200无法随推力件300同步滑动,因此推力件300能够对密封件200完成挤压,使得密封件200隆起与井筒内壁抵接完成密封。Specifically, the outer wall of the base pipe is provided with a limiting portion. When the
参见图1所示,本实施例的可选方案中,基管包括中心管110和密封套设于中心管110外的套管120;套管120通过第一连接件122与中心管110连接,在第一连接件122被剪断后,套管120能够与中心管110相对滑动;密封件200和推力件300均套设于套管120,螺纹件121设于套管120外。Referring to FIG. 1 , in the optional solution of this embodiment, the base pipe includes a
具体的,套管120套设于中心管110外,且两者通过第一连接件122连接,工作人员转动中心管110时,可以带动套管120一起转动,从而带动固定设置在套管120外壁的螺纹件121转动。Specifically, the
其中,套管120上设置有可传递扭矩的扭力销钉127,扭力销钉127能够与中心管110抵接,从而在中心管110转动时,可以带动套管120转动,并且在转动过程中减小对第一连接件122的冲击,避免第一连接件122意外剪断。The
需要指出的是,套管120内设置有内密封圈210,套管120通过内密封圈210与中心管110滑动密封。It should be pointed out that the
参见图1和图4所示,本实施例的可选方案中,推力件300包括连接部310和推力部320;内螺纹301开设于连接部310内壁,推力部320一端与连接部310连接,另一端与密封件200抵接。Referring to FIG. 1 and FIG. 4 , in the optional solution of this embodiment, the
具体的,连接部310内的内螺纹301与螺纹件121的外螺纹连接,当螺纹件121转动时,会推动连接部310朝向密封件200移动,连接部310会推动推力部320,使得推力部320能够对密封件200进行施压。Specifically, the
参见图1、图4、图10和图11所示,本实施例的可选方案中,推力件300还包括卡瓦330和卡瓦座340;卡瓦330通过卡瓦弹簧360设置在卡瓦座340内,且卡瓦座340上开设第一通孔341;卡瓦330位于连接部310与推力部320之间,在连接部310和推力部320的推动下,卡瓦330能够凸出第一通孔341。Referring to FIG. 1 , FIG. 4 , FIG. 10 and FIG. 11 , in an optional solution of this embodiment, the
卡瓦座340位于连接部310与推力部320之间,当连接部310被螺纹件121驱动时,连接部310会挤压卡瓦座340内的卡瓦330,卡瓦330受到挤压会从第一通孔341凸出,并且,随着连接部310的继续上移,连接部310能够使卡瓦330与推力部320抵接,此时连接部310持续上移施压,卡瓦330在连接部310和推力部320的作用下会凸出第一通孔341与井筒内部抵接,通过卡瓦330能够将封隔器悬挂住,避免封隔器上下随意滑动。The
并且,在卡瓦330凸出的过程中,推力部320也会挤压密封件200,使密封件200完成密封工作。In addition, during the protruding process of the
需要指出的是,卡瓦座340挂在推力部320上,卡瓦座340随推力部320上移,并且在卡瓦座340上移的过程中卡瓦330能够被推出。It should be noted that the
其中,卡瓦座340内设置有多个卡瓦330,多个卡瓦330沿卡瓦座340周向均匀分布。Wherein, a plurality of
需要指出的是,卡瓦330呈U形,第一通孔341中间设置有限位板,卡瓦330的凹陷区与限位板之间设置有卡瓦弹簧360,卡瓦330在连接部310和推力部320的作用下克服卡瓦弹簧360的作用力凸出第一通孔341,在连接部310和推力部320不再作用于卡瓦330时,卡瓦330能够在卡瓦弹簧360的作用下缩回第一通孔341内。It should be pointed out that the
参见图1和图4所示,本实施例的可选方案中,连接部310和推力部320朝向卡瓦330的一端均设置有用于推动卡瓦330的楔形台350。Referring to FIG. 1 and FIG. 4 , in the optional solution of this embodiment, both ends of the connecting
具体的,通过楔形台350能够方便推动卡瓦330,使卡瓦330能够凸出第一通孔341。同时,通过楔形台350的设置,使得卡瓦330能够顺畅的凸出第一通孔341,不会出现卡死的现象。Specifically, the
参见图1和图10所示,本实施例的可选方案中,卡瓦座340通过可传递扭力的第二连接件342与连接部310连接,摩擦部302设于卡瓦座340。Referring to FIG. 1 and FIG. 10 , in an optional solution of this embodiment, the
具体的,摩擦部302固定设于卡瓦座340上,因此当封隔器进入井筒内后,摩擦部302能够限制卡瓦座340发生转动,通过第二连接件342,卡瓦座340能够限制连接部310的转动。Specifically, the
其中,第二连接件342固定设置在连接部310上,卡瓦座340上开设有用于安装第二连接件342的第三通孔,且第三通孔为槽孔343,槽孔343的长度沿卡瓦座340的轴向延伸。在连接件被螺纹件121驱动上移时,连接部310能够带动第二连接件342在槽孔343内移动,从而连接部310不会影响卡瓦座340的移动。The second connecting
参见图3、图5、图6、图7、图8和图9所示,本实施例的可选方案中,套管120上开设有安装孔123,安装孔123内设置有用于与螺纹件121连接的止动件124,以使螺纹件121无法沿基管轴线运动;止动件124上设有用于传递扭矩的第一限位块,第一限位块能够与螺纹件121抵接。Referring to FIGS. 3 , 5 , 6 , 7 , 8 and 9 , in the optional solution of this embodiment, the
螺纹件121通过止动件124固定安装在套管120上,具体为,止动件124安装在安装孔123内,螺纹件121卡接在止动件124上,止动件124能够限制螺纹件121的向下移动。The
并且,止动件124上设置有第一限位块,当止动件124与螺纹件121连接后,第一限位块能够限制螺纹件121的自转,在套管120转动时,止动件124能够带动螺纹件121转动。In addition, the
螺纹件121上设有用于传递扭矩的第二限位块125,第二限位块125能够与止动件124抵接。The
其中,螺纹件121上设置有第二限位块125,当止动件124与螺纹件121连接后,第二限位块125能够限制螺纹件121的自转,第二限位块125与止动件124抵接,在套管120转动时,止动件124能够带动螺纹件121转动。The
具体的,螺纹件121设置在止动件124上后,螺纹件121无法向下移动(远离推力部320),因此在止动件124正常工作时,螺纹件121不会解除对连接部310的支撑,即卡瓦330能够完成正常悬挂工作以及密封件200能够正常完成密封工作。Specifically, after the
参见图1、图12、图13和图14所示,本实施例的可选方案中,套管120内部的底部套设有解封套400,解封套400通过第三连接件410与套管120连接;安装孔123为第二通孔,解封套400的顶部能够封堵第二通孔,且解封套400外壁开设有能够容纳止动件124的凹槽420;在第三连接件410被剪断后,凹槽420能够与第二通孔对应,螺纹件121能够将止动件124推入凹槽420内,以使螺纹件121能够相对止动件124沿基管轴线滑动;中心管110外壁设置有能够与解封套400抵接的限位件111,限位件111位于解封套400下方。Referring to FIG. 1 , FIG. 12 , FIG. 13 , and FIG. 14 , in the optional solution of this embodiment, the bottom of the
具体的,在需要解除封隔器的座封时,只需要上提中心管110,中心管110会带动限位件111上移,限位件111会上移与解封套400抵接,并且随着中心管110的持续上移,限位件111会驱动解封套400上移,解封套400在剪断第三连接件410后会随限位件111上移,套管120内设置有限位台,当解封套400与限位台抵接后,中心管110会带动套管120上移,并且解封套400上的凹槽420会与第二通孔对应,中心管110在带动套管120上移时,因为设置在套管120外的密封件200和卡瓦330都处于固定状态,因此卡瓦330和密封件200在摩擦力的作用下会给螺纹件121一个向下(与套管120的移动方向相反)的作用力,此时,螺纹件121会与止动件124抵接,螺纹件121会压迫止动件124,此时止动件124的一部分会落入凹槽420内,以使止动件124凸出第二通孔的部分压入第二通孔内,之后止动件124不再对螺纹件121形成限制,螺纹件121能够随连接部310下移,解除卡瓦330和密封件200的锁紧状态,然后套管120能够带动推力件300和密封件200随中心管110一起上移。Specifically, when it is necessary to release the seat seal of the packer, it is only necessary to lift the
本实施例的可选方案中,止动件124上设有倾斜面126,螺纹件121能够与倾斜面126抵接。In an optional solution of this embodiment, the
具体的,当螺纹件121与止动件124抵接时,倾斜面126的设置能够使止动件124受到向下(远离推力部320)的分力和向内(进入第二通孔内)的分力,因此当解封套400的凹槽420与第二通孔对应后,在中心管110向上移动的作用下,螺纹件121能够将止动件124压入第二通孔内。Specifically, when the
需要指出的是,倾斜面126设置在止动件124凸出第二通孔的部分上,因此螺纹件与止动件124的接触面均为倾斜面126,能够分解出两个方向的分力,从而能够驱动止动件124。It should be pointed out that the
本发明实施例提供了一种管柱,包括封隔器。An embodiment of the present invention provides a pipe string including a packer.
管柱与现有技术相比具有上述的优势,此处不再赘述。Compared with the prior art, the pipe string has the above advantages, which will not be repeated here.
最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明实施例技术方案的范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, but not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that it can still be The technical solutions described in the foregoing embodiments are modified, or some or all of the technical features thereof are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911103503.0A CN110644943A (en) | 2019-11-11 | 2019-11-11 | Packers and Strings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911103503.0A CN110644943A (en) | 2019-11-11 | 2019-11-11 | Packers and Strings |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110644943A true CN110644943A (en) | 2020-01-03 |
Family
ID=69014545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911103503.0A Pending CN110644943A (en) | 2019-11-11 | 2019-11-11 | Packers and Strings |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110644943A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3279544A (en) * | 1963-12-19 | 1966-10-18 | Camco Inc | Well packer |
US4548264A (en) * | 1984-04-10 | 1985-10-22 | Hughes Tool Company | High temperature well packer |
CN2616667Y (en) * | 2003-04-04 | 2004-05-19 | 华北石油管理局油气井测试公司 | Screw-locking packer |
CN203420666U (en) * | 2012-12-21 | 2014-02-05 | 大庆红祥寓科技有限公司 | Lifting-lowering blowout-control release packer after perforation |
CN211230371U (en) * | 2019-11-11 | 2020-08-11 | 东营市瑞丰石油技术发展有限责任公司 | Mechanical anchoring thermal recovery compensation integrated device and tubular column |
-
2019
- 2019-11-11 CN CN201911103503.0A patent/CN110644943A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3279544A (en) * | 1963-12-19 | 1966-10-18 | Camco Inc | Well packer |
US4548264A (en) * | 1984-04-10 | 1985-10-22 | Hughes Tool Company | High temperature well packer |
CN2616667Y (en) * | 2003-04-04 | 2004-05-19 | 华北石油管理局油气井测试公司 | Screw-locking packer |
CN203420666U (en) * | 2012-12-21 | 2014-02-05 | 大庆红祥寓科技有限公司 | Lifting-lowering blowout-control release packer after perforation |
CN211230371U (en) * | 2019-11-11 | 2020-08-11 | 东营市瑞丰石油技术发展有限责任公司 | Mechanical anchoring thermal recovery compensation integrated device and tubular column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10753173B2 (en) | Retrievable packer | |
US4573537A (en) | Casing packer | |
US3548936A (en) | Well tools and gripping members therefor | |
US20200018135A1 (en) | Dissolvable bridge plug | |
CN201908615U (en) | Layered steam injection packer | |
EP3170964A1 (en) | Underground opening self-locking well casing pipe centering device | |
CN111734366A (en) | A coupling type downhole throttling device that automatically adjusts the opening of the gas nozzle | |
US9845651B2 (en) | Retrievable downhole tool system | |
WO2024017231A1 (en) | Packer and unsealing method thereof | |
CN110644943A (en) | Packers and Strings | |
US2496546A (en) | Pump anchoring device | |
WO2023197948A1 (en) | Positioning and orientating apparatus for branch well, and positioning and orientating method | |
CN209892147U (en) | Lifting-resistant device for casing head slip hanger | |
CN211230371U (en) | Mechanical anchoring thermal recovery compensation integrated device and tubular column | |
WO2024146535A1 (en) | Liner hanger | |
CN110259408A (en) | A kind of oil/gas well packing completion system | |
WO2020215728A1 (en) | Packer capable of preventing unexpected release | |
CN114635665B (en) | An oil drilling plugging device | |
CN206376815U (en) | Tail pipe suspension packer | |
CN215718610U (en) | Packer with concentric bypass mechanism | |
US2390112A (en) | Well packer | |
CN216950310U (en) | Self-service deblocking safety joint of RTTS packer | |
CN205689159U (en) | A kind of packer | |
CN220248053U (en) | Anti-reverse bridge plug | |
CN116658116B (en) | Packer for positioning perforations and method of use |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |