[go: up one dir, main page]

CN110593562B - Steel frame shaping building template system - Google Patents

Steel frame shaping building template system Download PDF

Info

Publication number
CN110593562B
CN110593562B CN201910990934.7A CN201910990934A CN110593562B CN 110593562 B CN110593562 B CN 110593562B CN 201910990934 A CN201910990934 A CN 201910990934A CN 110593562 B CN110593562 B CN 110593562B
Authority
CN
China
Prior art keywords
frame
clamping
template
square tube
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910990934.7A
Other languages
Chinese (zh)
Other versions
CN110593562A (en
Inventor
钱卫东
姜磊
庞娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Dongxin New Material Technology Co ltd
Original Assignee
Tianjin Dongxin New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Dongxin New Material Technology Co ltd filed Critical Tianjin Dongxin New Material Technology Co ltd
Priority to CN201910990934.7A priority Critical patent/CN110593562B/en
Publication of CN110593562A publication Critical patent/CN110593562A/en
Application granted granted Critical
Publication of CN110593562B publication Critical patent/CN110593562B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/001Corner fastening or connecting means for forming or stiffening elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
    • E04G17/047Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements simultaneously tying two facing forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a steel frame shaping building template system which comprises a plurality of frames, a plurality of templates and a plurality of clamps which are matched with each other. The invention has strong adaptability, and can be assembled into a plurality of independent basic frames and template units through a plurality of standard frames, templates and clamps, thereby completing the template system assembly of the whole engineering; the turnover times are multiple, the assembly and disassembly of the template, the frame and the frame are convenient, and the assembly and disassembly of the frame, the frame and the clamp are convenient, so that the turnover use of the template, the frame and the clamp is quickened, and the cost is reduced; the screw type clamping device is good in tightness, the connecting square tube, the first clamping mechanism and the second clamping mechanism are respectively pre-fixed through the screws, the relative positions of the clamping device and the frame are adjusted to clamp the frame, and then the fixing connection process is further fastened from the side face through the fastening screw and the fastening nut, so that the tightness is good, and the construction quality is guaranteed.

Description

Steel frame shaping building template system
Technical Field
The invention belongs to the technical field of building template construction systems, and particularly relates to a steel frame shaping building template system.
Background
The building form is a temporary supporting structure, which is manufactured according to the design requirement, so that the concrete structure and the components are formed according to the specified position and geometric dimension, the correct position of the concrete structure and the components is kept, and the self weight of the building form and the external load acted on the building form are borne. The early-dismantling technology of the formwork refers to that after concrete is poured, when the strength of the building body does not reach the formwork dismantling strength specified by the construction specification, part of the formwork and the formwork support beam are dismantled in advance to accelerate the turnover of the formwork, so that the disposable investment is reduced, the construction cost is reduced, and better economic benefit is obtained.
The present building template system comprises a template and a frame fixed on the template, wherein the frame is formed by surrounding a plurality of frames, and the present building template system also comprises a plurality of connecting fittings. The adjacent templates and frames of the existing building template system are connected through U-shaped clamping devices or pin-shaped clamping devices, so that the connection tightness is poor, the disassembly is inconvenient, the working strength and the disassembly difficulty of the template during assembly are increased, the turnover times are small, and the utilization rate of the template is low.
In order to solve the problems in the prior art, a steel frame shaping building template system is provided.
Disclosure of Invention
The invention aims to provide a steel frame shaping building template system with strong applicability, more turnover times and less fastening tools.
In order to achieve the above purpose, the present invention provides the following technical solutions: the steel frame shaping building template system comprises a plurality of frames, a plurality of templates and a plurality of clamps which are matched with each other for use; the frame comprises two main keels which are longitudinally arranged, the upper ends of the two main keels are fixedly connected through an upper frame, the lower ends of the two main keels are fixedly connected through a lower frame, and the two main keels, the upper frame and the lower frame surround to form a closed rectangular frame structure; at least one secondary keel is fixedly arranged between the two main keels, and the secondary keels are parallel to the main keels; the front of the main keel is provided with a plurality of first template connecting holes, the side wall of the main keel is symmetrically provided with a plurality of first opposite-pull positioning holes, and the side wall of the outer side of the main keel is also provided with a frame clamping groove for embedding a clamp; the frame is of a tubular structure with a special-shaped rectangular cross section and comprises a flat wall, and a pipe wall opposite to the flat wall is inwards recessed to form an arc concave surface; one side wall of the frame is inwards bent to form an arc-shaped side wall, and a frame clamping groove for embedding the clamping apparatus is formed in the other side wall opposite to the arc-shaped side wall along the length direction of the frame; the flat wall is provided with a plurality of second template connecting holes for connecting with the templates, and the side walls of the frame opposite to the side walls are symmetrically provided with a plurality of second opposite-pull positioning holes; the template is provided with a plurality of template connecting holes corresponding to the first template connecting holes and the second template connecting holes; the clamp can be matched and clamped with the frame clamping groove and the frame clamping groove.
Preferably, the clamping device comprises a connecting square tube, and a first clamping mechanism and a second clamping mechanism which are oppositely arranged at two ends of the connecting square tube; the connecting square tube comprises a connecting square tube body, one end of the connecting square tube body is fixedly provided with a fastening mechanism, and three groups of connecting holes are formed in the opposite tube wall of the other end of the connecting square tube body at equal intervals; the first clamping mechanism comprises a square pipe-shaped first connecting end, the first connecting end can be sleeved outside the connecting square pipe body, a group of first mounting holes matched with the connecting holes are formed in the pipe wall opposite to the first connecting end, a first clamping part is fixedly arranged at the bottom of the first connecting end, the inner side of the first clamping part is inwards bent to be arc-shaped, the tail end of the arc-shaped end inwards protrudes to form a first flange, and the first flange can be embedded into the frame clamping groove and the frame clamping groove; the second clamping mechanism comprises a square tube-shaped second connecting end, the second connecting end can be sleeved outside the connecting square tube body, the length of the second connecting end is larger than that of the first connecting end, a group of second mounting holes matched with the connecting holes are formed in the opposite tube wall close to the outer end of the second connecting end, second clamping portions are fixedly arranged at positions, corresponding to the second mounting holes, of the bottoms of the second connecting ends, the inner sides of the second clamping portions are inwards bent to be arc-shaped, second flanges are formed by inwards protruding the tail ends of the arc-shaped portions, and the second flanges can be embedded into the frame clamping grooves and the frame clamping grooves.
Preferably, the fastening mechanism comprises a fastening screw fixedly arranged at one end of the connecting square tube body, and a corresponding fastening nut is arranged on the fastening screw.
Preferably, a first clamping block is arranged in the middle of the outer side of the first clamping part, and a second clamping block is arranged in the middle of the outer side of the second clamping part.
Preferably, edges of the first clamping block and the second clamping block are of a sawtooth-shaped structure.
Preferably, at least one transverse rib is fixedly arranged between the two main keels, and the transverse rib is mutually perpendicular to the main keels.
Preferably, at least one handle is fixedly arranged between the two main keels, and the handle is mutually perpendicular to the main keels.
Preferably, a plurality of strip-shaped connecting holes are formed in the secondary joist.
Preferably, the handles are welded on the back surfaces of the main keels and the secondary keels.
Preferably, the main keel is made of the frame.
Compared with the prior art, the invention has the beneficial effects that: (1) The adaptability is strong, a plurality of independent basic frames and template units can be assembled through a plurality of standard frames, templates and clamps, and then the template system assembly of the whole engineering is completed; (2) The turnover times are multiple, the assembly and disassembly of the template, the frame and the frame are convenient, the assembly and disassembly of the frame, the frame and the clamp are convenient, the turnover use of the template, the frame and the clamp is quickened, and the cost is reduced; (3) The screw type clamping device is good in tightness, the connecting square tube, the first clamping mechanism and the second clamping mechanism are respectively pre-fixed through the screws, the relative positions of the clamping device and the frame are adjusted to clamp the frame, and then the fixing connection process is further fastened from the side face through the fastening screw and the fastening nut, so that the tightness is good, and the construction quality is guaranteed; (4) The number of fastening tools used for each square meter of the template is small, and the installer is easy to operate; (5) Because of using the high-strength steel and high-quality plastic composite template, the tool template of standard model can be reused for times more than 200 times.
Drawings
FIG. 1 is a front view of a frame in a preferred embodiment of a steel framed modular building template system according to the invention;
FIG. 2 is a side view of a frame in a preferred embodiment of a steel framed modular building template system according to the invention;
FIG. 3 is a schematic view of the construction of a frame in a preferred embodiment of a steel frame modular building template system according to the present invention;
FIG. 4 is a cross-sectional view of FIG. 3;
FIG. 5 is a schematic view of the structure of a fixture in a preferred embodiment of a steel frame modular building template system according to the present invention;
FIG. 6 is a schematic view of a structure of a clamp and frame in cooperation with one another in a preferred embodiment of a steel frame modular building template system according to the present invention;
fig. 7 is a schematic structural view showing an assembled state of building form units in a preferred embodiment of the steel frame-shaped building form system according to the present invention.
In the figure: 1. an upper frame; 2. a cross rib; 3. a main keel; 4. a secondary keel; 5. a handle; 6. a lower frame; 7. a first template connecting hole; 8. a bar-shaped connection hole; 9. a first pair of pull positioning holes; 10. a template; 11. an arc-shaped concave surface; 12. an arcuate sidewall; 13. a frame clamping groove; 14. a flat wall; 15. a second pair of pull positioning holes; 16. the square tube body is connected; 17. a connection hole; 18. fastening a screw; 19. a first connection end; 20. a first mounting hole; 21. a first clamping part; 22. a first flange; 23. a first clamping block; 24. a second connection end; 25. a second mounting hole; 26. a second clamping part; 27. a second clamping block; 28. a second flange; 29. and fastening the screw cap.
Detailed Description
A preferred embodiment of the present invention will be described with reference to the accompanying drawings, in which technical solutions of the preferred embodiment of the present invention are clearly and completely described.
Referring to fig. 1-6, the present invention includes a plurality of frames, a plurality of rims, a plurality of templates 10, and a plurality of fixtures that are used in cooperation with each other.
The frame comprises two main keels 3 which are longitudinally arranged, the upper ends of the two main keels 3 are fixedly connected through an upper frame 1, the lower ends of the two main keels 3 are fixedly connected through a lower frame 6, and the two main keels 3, the upper frame 1 and the lower frame 6 are surrounded to form a closed rectangular frame structure; at least one secondary keel 4 is fixedly arranged between the two main keels 3, and the secondary keels 4 are parallel to the main keels 3; the front of main joist 3 has offered a plurality of first template connecting holes 7, a plurality of first pairs of locating holes 9 that draw are offered to the symmetry on the lateral wall of main joist 3, still be provided with the frame draw-in groove (not shown in the figure) that supplies the fixture to imbed on the lateral wall of the outside of main joist 3.
The frame is of a tubular structure with a special-shaped rectangular cross section and comprises a flat wall 14, and a pipe wall opposite to the flat wall 14 is inwards recessed to form an arc concave surface 11; one side wall of the frame is inwards bent to form an arc-shaped side wall 12, and a frame clamping groove 13 for embedding the clamp is formed in the other side wall opposite to the arc-shaped side wall 12 along the length direction of the frame; the flat wall 14 is provided with a plurality of second template connecting holes (not shown in the figure) for connecting with the templates, and the opposite side walls of the frame are symmetrically provided with a plurality of second opposite-pull positioning holes 15;
the template 10 is provided with a plurality of template connecting holes (not shown in the figure) corresponding to the first template connecting holes 7 and the second template connecting holes (not shown in the figure);
the clamping device can be matched and clamped with the frame clamping groove (not shown in the figure) and the frame clamping groove 13.
In this embodiment, the fixture includes a connecting square tube, and a first clamping mechanism and a second clamping mechanism which are relatively installed at two ends of the connecting square tube; the connecting square tube comprises a connecting square tube body 16, one end of the connecting square tube body 16 is fixedly provided with a fastening mechanism, and three groups of connecting holes 17 are formed in the opposite tube wall of the other end of the connecting square tube body 16 at equal intervals; the first clamping mechanism comprises a square pipe-shaped first connecting end 19, the first connecting end 19 can be sleeved outside the connecting square pipe body 16, a group of first mounting holes 20 matched with the connecting holes 17 are formed in the pipe wall opposite to the first connecting end 19, a first clamping part 21 is fixedly arranged at the bottom of the first connecting end 19, the inner side of the first clamping part 21 is inwards bent to be arc-shaped, the tail end of the arc-shaped part inwards protrudes to form a first flange 22, and the first flange 22 can be embedded into the frame clamping groove (not shown in the figure) and the frame clamping groove 13; the second clamping mechanism comprises a square tube-shaped second connecting end 24, the second connecting end 24 can be sleeved outside the connecting square tube body 16, the length of the second connecting end 24 is larger than that of the first connecting end 19, a group of second mounting holes 25 matched with the connecting holes 17 are formed in the opposite tube wall close to the outer end of the second connecting end 24, a second clamping part 26 is fixedly arranged at the bottom of the second connecting end 24 and corresponding to the second mounting holes 25, the inner side of the second clamping part 26 is inwards bent into an arc shape, the tail end of the arc-shaped tail end inwards protrudes to form a second flange 28, and the second flange 28 can be embedded into the frame clamping groove (not shown in the figure) and the frame clamping groove 13.
In this embodiment, the fastening mechanism includes a fastening screw 18 fixedly disposed at one end of the square tube body 16, and a corresponding fastening nut 29 is disposed on the fastening screw 18.
In this embodiment, a first clamping block 23 is disposed in the middle of the outer side of the first clamping portion 21, and a second clamping block 27 is disposed in the middle of the outer side of the second clamping portion 26.
In this embodiment, edges of the first clamping block 23 and the second clamping block 27 are in a saw-tooth structure.
The installation method of the fixture comprises the following steps: the first connecting end 19 and the second connecting end 24 are respectively sleeved on the connecting square pipe body 16 for pre-fixing; then install this fixture on a set of steel frame that sets up relatively, first flange 22 and second flange 28 block respectively in the draw-in groove of steel frame both sides, adjust the fixture and make first chucking portion 21 and second chucking portion 26 with steel frame chucking fixed, then fix through the internal rotation screw in first mounting hole 20, second mounting hole 25 and connecting hole 17, the rethread fastening screw 18 and fastening nut 29 carry out further fastening from the side, accomplish fixed connection process. The fixture is fixed in advance with connecting square pipe and first chucking mechanism and second chucking mechanism respectively through the screw at first, then adjusts the relative position of fixture and frame and carries out further fastening from the side and accomplish fixed connection process through fastening screw and fastening nut after with the frame chucking, and the tightness is good, demolishs simultaneously also very conveniently.
In this embodiment, at least one transverse rib 2 is fixedly arranged between the two main keels 3, and the transverse rib 2 is perpendicular to the main keels 3.
In this embodiment, at least one handle 5 is fixedly disposed between the two main keels 3, and the handle 5 is perpendicular to the main keels 3.
In this embodiment, the secondary joist 4 is provided with a plurality of bar-shaped connection holes 8.
In this embodiment, the handle 5 is welded to the back surfaces of the main runners 3 and the secondary runners 4.
In this embodiment, the main keel 3 is made of the frame.
The working principle of the frame of the invention is as follows: the GMT templates for building are respectively and fixedly arranged on the front face of the frame through template connecting holes; the frames on which the GMT templates are installed are fixed through the clamps, frame clamping grooves (not shown in the figure) into which the clamps are embedded are formed in the outer side walls of the main keels 3 of the frames along the length direction, and the adjacent two main keels 3 can be clamped through the clamps to finish the fixed connection between the adjacent frames; however, along with the connection of a plurality of frames, a step and a certain dislocation are inevitably formed between the frames, and the flatness of the GMT templates is hardly ensured, so that locks such as pins, bolts and the like are penetrated into a plurality of opposite-pull positioning holes of the adjacent main keels 3 to be further tensioned and fixed, the frames are kept flush and stable, the flatness between the GMT templates arranged on the frames is ensured, and the engineering quality of building construction is ensured.
The construction method of the steel frame shaping building template system comprises the following steps: measuring, paying off, positioning, binding steel bars of a wall body beam column, installing a steel frame wallboard template (paying attention to supporting inclined support, firstly using a rotary lock to locate through a positioning hole and then using a frame lock), installing the steel frame beam column template (paying attention to vertical support), installing a steel frame top plate (firstly installing a top plate keel and a jacking part and paying attention to locating and supporting the early dismantling keel part), binding the steel bars of the top plate, installing a back edge system of the wall plate, adjusting the horizontal perpendicularity (supplementing and adding fasteners and locking fasteners at all parts), and specifically comprising the following steps:
1. and (3) assembling and fixing the frame:
(1) According to the assembly requirements of the drawing, the GMT templates 10 for the building are respectively and fixedly arranged on the front surfaces of the frames through the first template connecting holes 7, a plurality of frames on which the GMT templates 10 are arranged are firstly fixed through clamps, the side walls of the outer sides of the main keels 3 of the frames are provided with frame clamping grooves, and the adjacent two main keels 3 can be clamped through the clamps to finish the fixed connection between the adjacent frames;
(2) Penetrating pins, split bolts and other locks into a plurality of first split locating holes 9 of the adjacent main keels 3 for further tensioning and fixing, so that the frames are kept flush and stable, and the flatness between the GMT templates 10 arranged on the frames is ensured; and the frames are connected in pairs to complete the construction of the foundation frame.
2. And (3) assembling and fixing the frame: (please see FIG. 7)
(1) The templates 10 (including wall templates, column templates, beam templates, top templates and the like) with different specifications are connected and fastened with corresponding frames through screws, and after the templates 10 with different specifications are connected and fastened with the frames, a plurality of independent building template monomers A, B, C … … are formed;
(2) The connection between the adjacent templates 10 is realized by clamping the frames on the two adjacent templates 10 through a clamp; according to the method, the assembly of the building template monomers A, B, C … … is sequentially completed according to the drawing requirements.
3. The foundation framework and the building template monomers are assembled and fixed:
the side wall of the frame is provided with a frame clamping groove 13, the main frame keel 3 is provided with a frame clamping groove, and according to the drawing assembly requirement, the assembly and the fixation between the foundation frame and the building template monomer can be completed through the clamp, so that the template system assembly of the whole engineering is completed.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. A steel frame shaping building template system is characterized in that: comprises a plurality of frames, a plurality of templates (10) and a plurality of clamps which are matched with each other for use;
the frame comprises two main keels (3) which are longitudinally arranged, the upper ends of the two main keels (3) are fixedly connected through an upper frame (1), the lower ends of the two main keels (3) are fixedly connected through a lower frame (6), and the two main keels (3), the upper frame (1) and the lower frame (6) are surrounded to form a closed rectangular frame structure; at least one secondary keel (4) is fixedly arranged between the two main keels (3), and the secondary keels (4) are parallel to the main keels (3); a plurality of first template connecting holes (7) are formed in the front face of the main keel (3), a plurality of first opposite-pulling positioning holes (9) are symmetrically formed in the side wall of the main keel (3), and a frame clamping groove for clamping devices to be embedded in is further formed in the outer side wall of the main keel (3);
the frame is of a tubular structure with a special-shaped rectangular cross section and comprises a flat wall (14), and a pipe wall opposite to the flat wall (14) is inwards recessed to form an arc-shaped concave surface (11); one side wall of the frame is inwards bent to form an arc-shaped side wall (12), and a frame clamping groove (13) for embedding the clamp is formed in the other side wall opposite to the arc-shaped side wall (12) along the length direction of the frame; a plurality of second template connecting holes for connecting with the templates are formed in the straight wall (14), and a plurality of second opposite-pull positioning holes (15) are symmetrically formed in the side walls of the frame opposite to each other;
a plurality of template connecting holes corresponding to the first template connecting holes (7) and the second template connecting holes are formed in the template (10);
the clamping device can be matched and clamped with the frame clamping groove and the frame clamping groove (13);
the clamping device comprises a connecting square tube, a first clamping mechanism and a second clamping mechanism which are oppositely arranged at two ends of the connecting square tube; the connecting square tube comprises a connecting square tube body (16), one end of the connecting square tube body (16) is fixedly provided with a fastening mechanism, and three groups of connecting holes (17) are formed in the opposite tube wall of the other end of the connecting square tube body (16) at equal intervals; the first clamping mechanism comprises a square pipe-shaped first connecting end (19), the first connecting end (19) can be sleeved outside the connecting square pipe body (16), a group of first mounting holes (20) matched with the connecting holes (17) are formed in the pipe wall opposite to the first connecting end (19), a first clamping part (21) is fixedly arranged at the bottom of the first connecting end (19), the inner side of the first clamping part (21) is inwards bent into an arc shape, the tail end of the arc shape inwards protrudes to form a first flange (22), and the first flange (22) can be embedded into the frame clamping groove and the frame clamping groove (13); the second clamping mechanism comprises a square tube-shaped second connecting end (24), the second connecting end (24) can be sleeved outside the connecting square tube body (16), the length of the second connecting end (24) is larger than that of the first connecting end (19), a group of second mounting holes (25) matched with the connecting holes (17) are formed in the opposite tube wall close to the outer end of the second connecting end (24), a second clamping part (26) is fixedly arranged at the position, corresponding to the second mounting holes (25), of the bottom of the second connecting end (24), the inner side of the second clamping part (26) is inwards bent into an arc shape, the tail end of the arc shape inwards protrudes to form a second flange (28), and the second flange (28) can be embedded into the frame clamping groove and the frame clamping groove (13);
at least one transverse rib (2) is fixedly arranged between the two main keels (3), and the transverse rib (2) is mutually perpendicular to the main keels (3).
2. The steel frame modular building template system according to claim 1, wherein: the fastening mechanism comprises a fastening screw rod (18) fixedly arranged at one end of the connecting square tube body (16), and a corresponding fastening nut (29) is arranged on the fastening screw rod (18).
3. The steel frame modular building template system according to claim 2, characterized in that: the middle part in the outer side of first chucking portion (21) is provided with first fixture block (23), the middle part in the outer side of second chucking portion (26) is provided with second fixture block (27).
4. A steel frame modular building template system according to claim 3, characterized in that: the edges of the first clamping block (23) and the second clamping block (27) are of a saw-tooth structure.
5. The steel frame modular building template system according to claim 1, wherein: at least one handle (5) is fixedly arranged between the two main keels (3), and the handle (5) is mutually perpendicular to the main keels (3).
6. The steel frame modular building template system according to claim 5, wherein: a plurality of strip-shaped connecting holes (8) are formed in the secondary joist (4).
7. The steel frame modular building template system according to claim 6, wherein: the handle (5) is welded on the back surfaces of the main joist (3) and the secondary joist (4).
8. The steel frame modular building template system according to claim 7, wherein: the main keel (3) is made of the frame.
CN201910990934.7A 2019-10-18 2019-10-18 Steel frame shaping building template system Active CN110593562B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910990934.7A CN110593562B (en) 2019-10-18 2019-10-18 Steel frame shaping building template system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910990934.7A CN110593562B (en) 2019-10-18 2019-10-18 Steel frame shaping building template system

Publications (2)

Publication Number Publication Date
CN110593562A CN110593562A (en) 2019-12-20
CN110593562B true CN110593562B (en) 2024-03-22

Family

ID=68850769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910990934.7A Active CN110593562B (en) 2019-10-18 2019-10-18 Steel frame shaping building template system

Country Status (1)

Country Link
CN (1) CN110593562B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677272A (en) * 2020-07-07 2020-09-18 湖南五新建筑科技有限公司 Construction method of cast-in-place beam-slab cover
CN115233985B (en) * 2022-09-03 2024-03-19 中国建筑第五工程局有限公司 Aluminum alloy template for green building construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090047922A (en) * 2007-11-09 2009-05-13 김상석 Size-adjustable gang form
CN102031865A (en) * 2010-12-03 2011-04-27 蓟县新兴模板技术服务部 Steel frame template and assembly method thereof
CN102926530A (en) * 2012-11-15 2013-02-13 福建安厦新型建筑模板制造有限公司 Steel frame formwork assembly
CN109441098A (en) * 2018-11-30 2019-03-08 中建局集团建设发展有限公司 A kind of early-dismantling formwork system and its construction method
CN211058317U (en) * 2019-10-18 2020-07-21 天津市东鑫新材料科技有限公司 Steel frame shaping building template system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090047922A (en) * 2007-11-09 2009-05-13 김상석 Size-adjustable gang form
CN102031865A (en) * 2010-12-03 2011-04-27 蓟县新兴模板技术服务部 Steel frame template and assembly method thereof
CN102926530A (en) * 2012-11-15 2013-02-13 福建安厦新型建筑模板制造有限公司 Steel frame formwork assembly
CN109441098A (en) * 2018-11-30 2019-03-08 中建局集团建设发展有限公司 A kind of early-dismantling formwork system and its construction method
CN211058317U (en) * 2019-10-18 2020-07-21 天津市东鑫新材料科技有限公司 Steel frame shaping building template system

Also Published As

Publication number Publication date
CN110593562A (en) 2019-12-20

Similar Documents

Publication Publication Date Title
CN110593562B (en) Steel frame shaping building template system
CN211058317U (en) Steel frame shaping building template system
CN106320701A (en) Method of high formwork support construction
CN219569575U (en) Adjustable anchor ear structure for reinforcing vertical member template
CN217053764U (en) Foundation frame component of prefabricated building
CN114197756B (en) Construction method of assembly type construction conversion layer steel bar positioning clamp
CN211229531U (en) Screw type fixture for steel frame template
CN215212312U (en) Fixing clamp for concrete guide wall or beam mould
CN212506409U (en) A extension built-in fitting fixed knot constructs for utility tunnel lateral wall
CN111140004B (en) Strain packaging structure mold and template system thereof
CN214090989U (en) Adjustable beam template fixing device
CN222376044U (en) Beam adjusting device
CN219528400U (en) Cast-in-situ upright post template reinforcing structure
CN219219808U (en) Connecting piece between high formwork steel pipe rack and aluminum mould
CN219931604U (en) Arc-circle combined special-shaped concrete member template reinforcing device
CN222295307U (en) Combined embedded bolt structure
CN222297167U (en) An adjustable assembly structure for a pipe support crossbeam
CN111395843A (en) Template for pouring large pool wall and mounting method of template
CN217949353U (en) Steel square tube connection is with frock of convenient regulation
CN216664740U (en) Fixing clamp for reinforcing steel bars of prefabricated shear wall component conversion layer
CN215291491U (en) Quick mounting fixture of both sides wood
CN221277311U (en) Adjustable precast column reinforcing bar positioner
CN222009613U (en) Aluminum alloy formwork connection bracket for construction engineering
CN211058316U (en) Frame for building template system
CN216892855U (en) Side column end part node of steel frame side column reinforced concrete wallboard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant