CN110552356A - comprehensive treatment system for slope slag adhering under plateau area road and construction method thereof - Google Patents
comprehensive treatment system for slope slag adhering under plateau area road and construction method thereof Download PDFInfo
- Publication number
- CN110552356A CN110552356A CN201910908828.XA CN201910908828A CN110552356A CN 110552356 A CN110552356 A CN 110552356A CN 201910908828 A CN201910908828 A CN 201910908828A CN 110552356 A CN110552356 A CN 110552356A
- Authority
- CN
- China
- Prior art keywords
- slope
- slag
- hanging
- construction
- lattice
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000002893 slag Substances 0.000 title claims abstract description 108
- 238000010276 construction Methods 0.000 title claims abstract description 50
- 239000002689 soil Substances 0.000 claims abstract description 48
- 239000010410 layer Substances 0.000 claims abstract description 40
- 238000005507 spraying Methods 0.000 claims abstract description 39
- 235000016709 nutrition Nutrition 0.000 claims abstract description 34
- 230000035764 nutrition Effects 0.000 claims abstract description 32
- 230000008439 repair process Effects 0.000 claims abstract description 31
- 239000002344 surface layer Substances 0.000 claims abstract description 27
- 230000000903 blocking effect Effects 0.000 claims abstract description 22
- 235000015097 nutrients Nutrition 0.000 claims abstract description 17
- 238000000034 method Methods 0.000 claims abstract description 9
- 230000002787 reinforcement Effects 0.000 claims abstract description 8
- 238000010899 nucleation Methods 0.000 claims abstract description 7
- 244000025254 Cannabis sativa Species 0.000 claims description 25
- 238000009415 formwork Methods 0.000 claims description 25
- 239000004567 concrete Substances 0.000 claims description 24
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 15
- 241000196324 Embryophyta Species 0.000 claims description 13
- 238000009412 basement excavation Methods 0.000 claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 238000012423 maintenance Methods 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 239000010902 straw Substances 0.000 claims description 9
- 238000002360 preparation method Methods 0.000 claims description 8
- 238000009331 sowing Methods 0.000 claims description 8
- 239000007921 spray Substances 0.000 claims description 7
- 241000251468 Actinopterygii Species 0.000 claims description 6
- 238000005553 drilling Methods 0.000 claims description 6
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 5
- 239000003795 chemical substances by application Substances 0.000 claims description 4
- 239000004745 nonwoven fabric Substances 0.000 claims description 4
- 241001061906 Caragana Species 0.000 claims description 3
- 241000700189 Hystrix <Rodentia> Species 0.000 claims description 3
- 241000209504 Poaceae Species 0.000 claims description 3
- 241000219000 Populus Species 0.000 claims description 3
- 239000011398 Portland cement Substances 0.000 claims description 3
- 244000184734 Pyrus japonica Species 0.000 claims description 3
- 241000218998 Salicaceae Species 0.000 claims description 3
- 229920002522 Wood fibre Polymers 0.000 claims description 3
- 230000003712 anti-aging effect Effects 0.000 claims description 3
- 238000005422 blasting Methods 0.000 claims description 3
- 238000004891 communication Methods 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims description 3
- 210000003608 fece Anatomy 0.000 claims description 3
- 239000003337 fertilizer Substances 0.000 claims description 3
- 230000002262 irrigation Effects 0.000 claims description 3
- 238000003973 irrigation Methods 0.000 claims description 3
- 230000009191 jumping Effects 0.000 claims description 3
- 239000010871 livestock manure Substances 0.000 claims description 3
- 239000003895 organic fertilizer Substances 0.000 claims description 3
- 239000005416 organic matter Substances 0.000 claims description 3
- 238000009418 renovation Methods 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 239000002688 soil aggregate Substances 0.000 claims description 3
- 239000000126 substance Substances 0.000 claims description 3
- 230000037072 sun protection Effects 0.000 claims description 3
- 238000009423 ventilation Methods 0.000 claims description 3
- 239000002025 wood fiber Substances 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 2
- 241001148659 Panicum dichotomiflorum Species 0.000 claims 2
- 230000035508 accumulation Effects 0.000 abstract description 2
- 238000009825 accumulation Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 230000009897 systematic effect Effects 0.000 abstract description 2
- 244000152045 Themeda triandra Species 0.000 description 4
- 241000511730 Leymus chinensis Species 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 230000002045 lasting effect Effects 0.000 description 2
- 235000008935 nutritious Nutrition 0.000 description 2
- 241000209140 Triticum Species 0.000 description 1
- 235000021307 Triticum Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
- A01G9/029—Receptacles for seedlings
- A01G9/0293—Seed or shoot receptacles
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G17/00—Cultivation of hops, vines, fruit trees, or like trees
- A01G17/005—Cultivation methods
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G20/00—Cultivation of turf, lawn or the like; Apparatus or methods therefor
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
- A01G9/029—Receptacles for seedlings
- A01G9/0295—Units comprising two or more connected receptacles
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
- A01G9/033—Flat containers for turf, lawn or the like, e.g. for covering roofs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/18—Making embankments, e.g. dikes, dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
- E03F3/046—Open sewage channels
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Environmental Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Botany (AREA)
- Cultivation Of Plants (AREA)
- Revetment (AREA)
Abstract
本发明提供一种高原区道路下边坡挂渣综合治理系统及其施工方法,综合治理系统包括渣堆、拦渣设施、底部平台、格构护坡、修坡面层、顶面平台、客土喷播层、营养袋以及截排水沟,所述拦渣设施布置于堆渣的坡脚,起到拦挡渣体的作用;所述修坡面层的下端靠近底部平台的两级上布置有用以确保渣体稳定的格构护坡;所述渣堆的顶部设置有顶面平台,在顶面平台与道路之间的裸露坡面上开穴安装营养袋;所述客土喷播层喷播在营养袋周边的裸露坡面上。本发明治理方法系统全面,治理效果好。该治理措施简单,可广泛应用于公路下边坡挂渣处理和高边坡松散堆积体加固、处理,适用范围较广,可推广性强。
The invention provides a system for comprehensive treatment of slag hanging on lower slopes of roads in plateau areas and a construction method thereof. seeding layer, nutrient bag and cut-off drainage ditch, the slag-blocking facilities are arranged at the slope foot of the slag pile to play the role of blocking the slag body; the lower end of the slope repair surface layer is arranged on two levels close to the bottom platform to ensure Slag stable lattice slope protection; the top of the slag heap is provided with a top platform, and a hole is opened on the exposed slope between the top platform and the road to install a nutrition bag; the guest soil spraying layer is sprayed on the nutrient on the exposed slope around the bag. The treatment method of the invention is systematic and comprehensive, and has good treatment effect. The control measures are simple, and can be widely used in the treatment of hanging slag on the lower slope of highways and the reinforcement and treatment of loose accumulations in high slopes. The application range is wide and the generalization is strong.
Description
技术领域technical field
本发明涉及道路下边坡挂渣综合治理系统及方法,具体涉及一种高原区道路下边坡挂渣综合治理系统及其施工方法。The invention relates to a system and a method for comprehensively treating dregs on downside slopes of roads, in particular to a system and a construction method for comprehensively treating dregs on downside slopes of roads in plateau areas.
背景技术Background technique
高原地区修建的道路,一般蜿蜒于高山、峡谷之间。在道路修建过程中,开挖的渣料不可避免的会散落入道路下侧的冲沟和坡面,形成坡面挂渣,占压并破坏原有地表植被。同时,限于交通条件,运渣困难,导致挂渣难以及时运至指定弃渣场。Roads built in plateau areas generally meander between mountains and valleys. During the road construction process, the excavated slag will inevitably be scattered into the gullies and slopes on the lower side of the road, forming slag hanging on the slope, occupying and destroying the original surface vegetation. At the same time, due to limited traffic conditions, it is difficult to transport the slag, which makes it difficult to transport the hanging slag to the designated waste slag yard in time.
坡面挂渣高度一般高于20m,且松散的贴于坡面和沟道表面,汛期受山洪冲刷,部分挂渣从坡顶迅速进入坡脚甚至下侧的沟道、河流及农田,容易造成水土流失危害;大风季节,浮渣进入周边的区域,降低周边的空气环境质量,加剧破坏周边的生态(某公路边坡挂渣现状见图1)。The height of the dross on the slope is generally higher than 20m, and it is loosely attached to the surface of the slope and the ditch. During the flood season, it is washed by mountain torrents, and part of the dregs quickly enters the slope foot or even the lower side of the ditch, river and farmland from the top of the slope, which is easy to cause Water and soil loss hazards; in the windy season, scum enters the surrounding area, reducing the surrounding air environment quality and aggravating the damage to the surrounding ecology (see Figure 1 for the status of scum hanging on a road slope).
因此,急需研制出一种道路下边坡挂渣综合治理系统及其施工方法,原理简单,施工快速,满足边坡挂渣的持久稳定和快速恢复生态的要求。Therefore, there is an urgent need to develop a comprehensive control system and construction method for dregs on slopes under roads. The principle is simple, the construction is fast, and the requirements for the lasting stability of dregs on slopes and the rapid restoration of ecology are met.
发明内容Contents of the invention
本发明的目的在于提供一种高原区道路下边坡挂渣综合治理系统及其施工方法,满足道路下边坡挂渣持久稳定和快速恢复生态的要求,兼具为高边坡挂渣提供一种解决方案,为道路下边坡挂渣综合治理提供一种思路。The purpose of the present invention is to provide a comprehensive treatment system and construction method for dross hanging on road slopes in plateau areas, which can meet the requirements of long-term stability and rapid ecological restoration of dregs hanging on road slopes, and provide a solution for high slope dregs The plan provides a way of thinking for the comprehensive treatment of slag hanging on the slope of the road.
本发明的技术方案:Technical scheme of the present invention:
一种高原区道路下边坡挂渣综合治理系统,其特征在于,包括渣堆、拦渣设施、底部平台、格构护坡、修坡面层、顶面平台、客土喷播层、营养袋以及截排水沟。A system for comprehensive treatment of slag hanging on lower slopes of roads in plateau areas, characterized in that it includes slag piles, slag blocking facilities, bottom platforms, lattice slope protection, slope repair surface layers, top surface platforms, guest soil spraying layers, nutrition bags and Cut gutters.
所述拦渣设施布置于堆渣的坡脚,起到拦挡渣体的作用;The slag blocking facilities are arranged at the slope foot of the slag pile to play the role of blocking the slag body;
所述渣堆的坡脚与拦渣设施之间形成底部平台;A bottom platform is formed between the slope toe of the slag pile and the slag blocking facility;
所述修坡面层铺设在渣堆的表面,所述修坡面层从上到下设置有多级;The slope repair surface layer is laid on the surface of the slag pile, and the slope repair surface layer is arranged in multiple stages from top to bottom;
所述修坡面层的下端靠近底部平台的两级上布置有用以确保渣体稳定的格构护坡;The lower end of the slope repair surface layer is arranged on the two levels close to the bottom platform to ensure the stability of the slag body with lattice slope protection;
所述渣堆的顶部设置有顶面平台,在顶面平台与道路之间的裸露坡面上开穴安装营养袋;The top of the slag heap is provided with a top platform, and a hole is opened on the exposed slope between the top platform and the road to install a nutrition bag;
所述客土喷播层喷播在营养袋周边的裸露坡面上;The guest soil spraying layer is sprayed on the bare slope around the nutrition bag;
所述截排水沟设置道路下的边坡、马道和挂渣区周边,用于拦截和导排道路、渣堆坡面及周边坡面汇水,减少水流冲刷堆渣区。The cut-off drainage ditch is set on the side slope under the road, the horse track and the surrounding area of the slag hanging area, which is used to intercept and guide the road, the slag pile slope and the surrounding slope to collect water, and reduce the water flow to scour the slag pile area.
所述拦渣设施顶宽1.5m,墙高5.0m,其中拦渣设施的基础埋入原地面线以下深度1.5m,拦渣设施临渣侧坡比1:0.1,背渣侧坡比1:0.4。The top width of the slag blocking facility is 1.5m, and the wall height is 5.0m. The foundation of the slag blocking facility is buried at a depth of 1.5m below the original ground line. 0.4.
所述底部平台和顶面平台上栽植乔木和撒播草籽用以恢复植被。Arbors are planted and grass seeds are sown on the bottom platform and the top platform to restore vegetation.
所述修坡面层的边坡坡比为1:1.5~1:2.5,单级边坡高度10~15m。The slope slope ratio of the slope repair surface layer is 1:1.5-1:2.5, and the single-stage slope height is 10-15m.
所述格构护坡包括顶梁、底梁、格构梁以及节点插筋,所述顶梁修建在修坡面层最下面的两级边坡的顶部,底梁修建在修坡面层的坡脚,在顶梁和底梁之间浇筑格构梁,格构梁交叉布置,所述节点插筋设置在格构梁的交叉部位,所述节点插筋插入到渣堆内,所述格构梁交叉设置围成的空间内填充有营养土层,所述格构梁的间排距为3.0m×3.0m,截面面积为0.4m×0.4m。The lattice slope protection includes a top beam, a bottom beam, a lattice beam and joint bars, the top beam is built on the top of the two-level slope at the bottom of the slope repair surface, and the bottom beam is built on the slope of the slope repair surface. foot, pouring lattice beams between the top beam and the bottom beam, the lattice beams are arranged crosswise, the node inserting bars are arranged at the intersections of the lattice beams, the node inserting bars are inserted into the slag pile, and the lattice The space enclosed by the intersecting beams is filled with a nutrient soil layer, the row spacing of the lattice beams is 3.0m×3.0m, and the cross-sectional area is 0.4m×0.4m.
所述营养袋间距1.0m×1.0m,呈梅花型布置,所述客土喷播层喷播厚度10cm。The distance between the nutrition bags is 1.0m×1.0m, arranged in a plum blossom shape, and the spraying thickness of the guest soil spraying layer is 10cm.
一种高原区道路下边坡挂渣综合治理系统的施工方法,包括以下具体步骤:A construction method of a system for comprehensive treatment of slag hanging on slopes under roads in plateau areas, comprising the following specific steps:
S1.施工准备,整修现有或新建施工便道,满足施工机械和材料运输要求,达到通水、通电、通路、通气、通讯、平整场地要求,为工程开工创造条件;S1. Construction preparation, renovation of existing or new construction access roads, meeting the requirements for construction machinery and material transportation, meeting the requirements for water supply, electricity supply, access, ventilation, communication, and site leveling, and creating conditions for the start of the project;
S2.拦渣设施施工,先按照轴线进行放样,并采用挖掘机开挖基础;其次,混凝土跳仓施工,采用钢模板立模,并采用泵车直接泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S2. For the construction of slag-blocking facilities, first stake out according to the axis, and use excavators to excavate the foundation; secondly, for concrete jumping construction, use steel formwork to set up the formwork, and use pump trucks to directly pump concrete into the warehouse, vibrate and compact in layers ;Finally, take straw bag covering, watering and other maintenance measures until the concrete reaches 28 days of age, then remove the formwork;
S3.截排水沟施工,先按照轴线进行放样;对于周边排水沟采用人工开挖为准,局部岩石区采用人工钻爆施工;对于坡顶、马道排水沟,需在翻渣和修坡结束后,采取人工开挖,在开挖完工后,采用钢模板立模,采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S3. For the construction of intercepting drainage ditches, stake out according to the axis first; for the surrounding drainage ditches, manual excavation shall prevail, and for local rock areas, manual drilling and blasting shall be used; , manual excavation is adopted. After the excavation is completed, the steel formwork is used to form the formwork, and the concrete is pumped into the warehouse by means of pump truck + pipeline, and it is vibrated and compacted in layers; finally, maintenance measures such as straw bag covering and watering are taken until After the concrete reaches 28 days of age, remove the formwork;
S4.修坡面层的翻渣和修坡施工,根据现状坡面挂渣分布,按照自上而下进行翻渣施工,上中部以人工翻运为主,中下部以机械翻渣为主;在翻渣过程中,根据翻运后的挂渣现状将堆渣边坡平整成单级或多级边坡,修坡必须按照自上而下进行施工,尽量保证挖填平衡;S4. For the slag turning and slope repairing construction of the slope repair surface layer, according to the current distribution of hanging slag on the slope surface, the slag turning will be carried out from top to bottom. During the slag turning process, the slag slope is leveled into a single-level or multi-level slope according to the status of the slag hanging after dumping, and the slope repair must be carried out from top to bottom to ensure the balance of excavation and filling as much as possible;
S5.格构护坡施工,首先进行格构梁放样和人工开槽;其次槽内铺设格构钢筋笼,在格构梁节点预埋插筋,并将插筋端头和钢筋笼进行搭接绑扎;采用钢模板立模,并采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S5. For lattice slope protection construction, firstly carry out lattice beam lofting and manual slotting; secondly, lay lattice reinforcement cages in the grooves, pre-embed inserting bars at lattice beam nodes, and lap and bind the end of inserting bars and the reinforcement cage ; Use steel formwork to set up the formwork, and use pump truck + pipeline to pump concrete into the warehouse, vibrate and compact in layers; finally, take straw bag covering, watering and other maintenance measures until the concrete reaches 28 days of age, then remove the formwork ;
S6.营养袋施工,首先进行营养袋穴位放样和采用钻机挖穴,然后将装好的营养袋放入穴内,短锚杆固定和表面采用铅丝网保护;S6. For the construction of nutrition bags, first carry out stakeout of nutrition bag acupoints and dig holes with a drilling rig, then put the packed nutrition bags into the holes, fix the short anchor rods and protect the surface with lead wire mesh;
S7.客土喷播层施工,首先固定好客土喷播机,并将客土团粒结构的材料放入客土喷播机搅拌均匀;其次,在坡面铺一层铁丝网,并采用人工背负喷枪的方式依次将拌合均匀的客土浆液均匀喷播在营养袋周围;在喷播结束后,采用无纺布覆盖,并根据气候条件,适当采用雾化水滴喷洒养护;S7. For the construction of guest soil spraying layer, first fix the guest soil spraying machine, and put the material of guest soil aggregate structure into the guest soil spraying machine and mix evenly; secondly, lay a layer of barbed wire on the slope surface, and use artificial back spray gun Spray evenly mixed foreign soil slurry around the nutrition bag in turn; after spraying, cover with non-woven fabric, and properly use atomized water droplets to spray and maintain according to the weather conditions;
S8.植物措施施工,首先进行乔灌木穴位放样,并挖穴或鱼鳞坑;其次,在穴底铺一层10cm厚的农家肥,并将乔灌木树苗放入穴内,回覆营养土,表面人工夯实。根据气候条件,适当采用防晒、灌溉等苗木抚育措施。S8. For the construction of plant measures, first carry out stakeout of arbor and shrub acupoints, and dig holes or fish scale pits; secondly, spread a layer of 10cm thick farmyard manure on the bottom of the hole, put arbor and shrub saplings into the hole, cover with nutrient soil, and manually tamp the surface . According to the climatic conditions, the seedling tending measures such as sun protection and irrigation should be adopted appropriately.
所述步骤S6中营养袋采用抗老化的土工袋,规格为60cm×40cm×25cm,内部填塞营养土、灌草种籽和营养剂,其中每袋营养土0.05m3,灌木种籽0.6g,草籽2.4g,保水剂0.5g,有机肥0.005m3,化学肥料27g,营养袋采用挖穴埋设,穴间距1.0m×1.0m,呈梅花型布置,穴长径0.6m,短径0.4m,穴深0.1m,每个营养袋采用2根短锚杆固定,表面采用铅丝网保护。In the step S6, the nutritional bag is an anti-aging geotechnical bag with a size of 60cm×40cm×25cm, filled with nutrient soil, shrub seeds and nutrients, wherein each bag of nutrient soil is 0.05m 3 , shrub seeds 0.6g, Grass seeds 2.4g, water-retaining agent 0.5g, organic fertilizer 0.005m 3 , chemical fertilizer 27g, the nutrition bag is buried by digging holes, the hole spacing is 1.0m×1.0m, and it is arranged in a plum blossom shape, the long diameter of the hole is 0.6m, and the short diameter is 0.4m. , the depth of the hole is 0.1m, and each nutrition bag is fixed with 2 short anchor rods, and the surface is protected by lead wire mesh.
所述步骤S7中客土喷播层的喷播厚度为10cm,在每m2喷播面积中,普通硅酸盐水泥6kg,砂2kg,种植土0.006m3,有机质0.002m3,木质纤维200g,灌木种籽3g,草种9g,在客土喷播前,先在坡面铺一层铁丝网;在喷播结束后,需根据气候条件采取无纺布覆盖、雾化水滴喷洒等措施。In the step S7, the spraying thickness of the foreign soil spraying layer is 10cm, and in every m 2 spraying area, ordinary Portland cement is 6kg, sand is 2kg, planting soil is 0.006m3 , organic matter is 0.002m3 , and wood fiber is 200g , shrub seeds 3g, grass seeds 9g, spread a layer of barbed wire on the slope surface before spraying in guest soil;
所述步骤S8中,在修坡面层上和格构护坡内采取灌草结合恢复植被,其中灌木选择金露梅、鬼箭锦鸡儿,混交比例1:1,株行距1.0m×1.0m,采取鱼鳞坑整地,穴规格,长径×短径×穴深为0.6m×0.4m×0.5m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm2,在底部平台和顶面平台采取栽植乔木和撒播草籽恢复植被,其中乔木选择柳树、杨树,株间混交,株行距3.0m×3.0m,采取挖穴整地,穴规格,穴径×穴深为0.8m×0.8m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm2。In the step S8, the combination of shrubs and grasses is used to restore the vegetation on the slope repair surface layer and in the lattice slope protection, among which the shrubs choose Jinlumei and Caragana japonica, the mixing ratio is 1:1, the spacing between plants and rows is 1.0m×1.0m, and fish scales are used. Pit site preparation, hole specifications, long diameter x short diameter x hole depth: 0.6m x 0.4m x 0.5m; sow grass seeds under the forest, choose Elymus pachycarpa, bluegrass cold field, and old wheat awn, and the mixed sowing ratio is 2 :1:2, seeding rate 200kg/hm 2 , plant trees and sow grass seeds on the bottom platform and top platform to restore vegetation, among which trees choose willows and poplars, mixed between plants, and the distance between plants and rows is 3.0m×3.0m. Digging holes for soil preparation, hole specifications, hole diameter × hole depth is 0.8m×0.8m; grass seeds are sown under the forest, and the grass seeds are Elymus chinensis, bluegrass, and old awns, and the mixed sowing ratio is 2:1:2. The seeding rate is 200kg/hm 2 .
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
(1)治理方法系统全面,治理效果好。采用先稳固挂渣后恢复植被,工程、植物与生态护坡相结合的综合治理措施,可在全面防护坡面挂渣的基础上,快速恢复坡面的植被,极大减缓对周边生态环境的破坏;治理后,可实现边坡挂渣的持久稳定和快速恢复生态的要求。(1) The governance method is systematic and comprehensive, and the governance effect is good. The comprehensive management measures of engineering, plants and ecological slope protection can be used to stabilize the slag first and then restore the vegetation. On the basis of comprehensive protection of the slag on the slope, the vegetation on the slope can be quickly restored, and the damage to the surrounding ecological environment can be greatly slowed down. ; After treatment, it can achieve the requirements of lasting stability and rapid ecological restoration of the side slope hanging slag.
(2)适用范围广。该治理措施简单,可广泛应用于公路下边坡挂渣处理和高边坡松散堆积体加固、处理,适用范围较广,可推广性强。(2) The scope of application is wide. The control measures are simple, and can be widely used in the treatment of hanging slag on the lower slope of highways and the reinforcement and treatment of loose accumulations in high slopes. The application range is wide and the generalization is strong.
(3)施工简单快速。该综合治理措施所采用的混凝土、钢筋、土工袋、营养土、灌草种籽、乔灌木树苗均可直接采购;施工工艺简单,施工简单便捷。(3) The construction is simple and fast. Concrete, steel bars, geotechnical bags, nutrient soil, shrub and grass seeds, tree and shrub saplings used in this comprehensive treatment measure can all be directly purchased; the construction process is simple, and the construction is simple and convenient.
附图说明Description of drawings
图1是某公路下边坡挂渣现状图。Figure 1 is the current situation of slag hanging on the lower slope of a highway.
图2是本发明的一种高原地区道路下边坡挂渣综合治理系统的平面布置示意图。Fig. 2 is a schematic plan layout diagram of a system for comprehensive treatment of slag hanging on slopes of roads in plateau areas according to the present invention.
图3是本发明的一种高原地区道路下边坡挂渣综合治理系统的剖面示意图。Fig. 3 is a schematic cross-sectional view of a system for comprehensive treatment of slag hanging on slopes of roads in plateau areas according to the present invention.
图4是本发明的拦渣设施结构示意图。Fig. 4 is a structural schematic diagram of the slag blocking facility of the present invention.
图5是本发明的格构护坡里面布置示意图。Fig. 5 is a schematic diagram of the arrangement inside the lattice slope protection of the present invention.
图6是图5的A-A剖面示意图。FIG. 6 is a schematic cross-sectional view along line A-A of FIG. 5 .
图7是图5的B-B剖面示意图。FIG. 7 is a schematic cross-sectional view along B-B of FIG. 5 .
图8是图5的C-C剖面示意图。FIG. 8 is a schematic cross-sectional view of C-C in FIG. 5 .
图9是图5的D-D剖面示意图。FIG. 9 is a schematic cross-sectional view along D-D of FIG. 5 .
图10是本发明的营养袋和客土喷播层剖面示意图。Fig. 10 is a schematic cross-sectional view of the nutrition bag and guest soil spraying layer of the present invention.
图11是本发明的营养袋和客土喷播层平面示意图。Fig. 11 is a schematic plan view of the nutrition bag and guest soil spraying layer of the present invention.
图中标号分别表示,1-渣堆,2-拦渣设施,3-底部平台,4-格构护坡,5-修坡面层,6-顶面平台,7-客土喷播层,8-营养袋,9-截排水沟,10-道路。The numbers in the figure indicate respectively, 1-slag heap, 2-slag blocking facilities, 3-bottom platform, 4-lattice slope protection, 5-slope repair surface layer, 6-top platform, 7- guest soil spraying layer, 8 -Nutrition bag, 9-Cut drainage ditch, 10-Road.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
如图1至图11所示,本发明具体实施方式的一种高原区道路下边坡挂渣综合治理系统,包括渣堆1、拦渣设施2、底部平台3、格构护坡4、修坡面层5、顶面平台6、客土喷播层7、营养袋8、截排水沟9以及道路10。As shown in Figures 1 to 11, a system for comprehensive treatment of slag hanging on the lower slope of roads in plateau areas according to a specific embodiment of the present invention includes a slag pile 1, a slag blocking facility 2, a bottom platform 3, a lattice slope protection 4, and a slope repair surface Layer 5, top platform 6, foreign soil spraying layer 7, nutrition bag 8, intercepting drainage ditch 9 and road 10.
所述拦渣设施2布置于渣堆1的坡脚,起到拦挡渣体的作用;The slag blocking facility 2 is arranged at the foot of the slope of the slag pile 1 to play the role of blocking the slag body;
所述渣堆1的坡脚与拦渣设施2之间形成底部平台3;A bottom platform 3 is formed between the slope toe of the slag pile 1 and the slag blocking facility 2;
所述修坡面层5铺设在渣堆1的表面,所述修坡面层5从上到下设置有多级;The slope repair surface layer 5 is laid on the surface of the slag pile 1, and the slope repair surface layer 5 is arranged in multiple stages from top to bottom;
所述修坡面层5的下端靠近底部平台3的两级上布置有用以确保渣体稳定的格构护坡4;The lower end of the slope repair surface layer 5 is arranged on the two stages close to the bottom platform 3 to ensure the stability of the slag body with a lattice structure revetment 4;
所述渣堆1的顶部设置有顶面平台6,在顶面平台6与道路10之间的裸露坡面上开穴安装营养袋8;The top of the slag pile 1 is provided with a top platform 6, and a nutrition bag 8 is installed on the bare slope between the top platform 6 and the road 10;
所述客土喷播层7喷播在营养袋8周边的裸露坡面上;The guest soil spraying layer 7 is sprayed on the bare slope around the nutrition bag 8;
所述截排水沟9设置道路10下的边坡、马道和挂渣区周边,用于拦截和导排道路10、渣堆1坡面及周边坡面汇水,减少水流冲刷堆渣区。The cut-off drainage ditch 9 is set on the side slope under the road 10, the bridleway and the surrounding areas of the slag hanging area, and is used to intercept and guide the road 10, the slope of the slag pile 1 and the surrounding slopes to collect water, so as to reduce the flow of water to scour the slag pile area.
所述拦渣设施2顶宽1.5m,墙高5.0m,其中拦渣设施2的基础埋入原地面线以下深度1.5m,拦渣设施2临渣侧坡比1:0.1,背渣侧坡比1:0.4。The top width of the slag blocking facility 2 is 1.5m, and the wall height is 5.0m. The foundation of the slag blocking facility 2 is buried at a depth of 1.5m below the original ground line. The ratio is 1:0.4.
所述底部平台3和顶面平台6上栽植乔木和撒播草籽用以恢复植被。Arbors are planted and grass seeds are sown on the bottom platform 3 and the top platform 6 to restore vegetation.
所述修坡面层5的边坡坡比为1:1.5~1:2.5,单级边坡高度10~15m。The slope ratio of the slope repair surface layer 5 is 1:1.5-1:2.5, and the single-stage slope height is 10-15m.
所述格构护坡4包括顶梁41、底梁42、格构梁43以及节点插筋44,所述顶梁41修建在修坡面层5最下面的两级边坡的顶部,底梁42修建在修坡面层5的坡脚,在顶梁41和底梁42之间浇筑格构梁43,格构梁43交叉布置,所述节点插筋44设置在格构梁43的交叉部位,所述节点插筋44插入到渣堆1内,所述格构梁43交叉设置围成的空间内填充有营养土层45,所述格构梁43的间排距为3.0m×3.0m,截面面积为0.4m×0.4m。采用C25钢筋混凝土现浇,嵌入渣体内10cm;格构梁43一侧布置截水槽46,截水槽46的截面面积为0.1m×0.58m,采用C25钢筋混凝土现浇(与格构梁43连为一体),嵌入渣体内10cm;顶梁41截面面积为0.3m×0.4m,采用C25钢筋混凝土现浇(与格构梁43连为一体),嵌入渣体内10cm;底梁42为多边形,高度0.7m,宽度0.5~0.71m,采用C25钢筋混凝土现浇(与格构梁43连为一体);节点插筋44采用直径25mm、L=4.5m的HRB400级螺纹钢。Described lattice structure slope protection 4 comprises top beam 41, bottom beam 42, lattice beam 43 and node inserting rib 44, and described top beam 41 is built on the top of the two-stage side slope of repairing surface layer 5 bottom, and bottom beam 42 Build at the slope foot of the slope repair surface layer 5, pour lattice beams 43 between the top beam 41 and the bottom beam 42, the lattice beams 43 are arranged crosswise, and the node inserting ribs 44 are arranged at the intersections of the lattice beams 43, The node inserting bars 44 are inserted into the slag pile 1, and the space enclosed by the intersecting arrangement of the lattice beams 43 is filled with a nutrient soil layer 45, and the row spacing of the lattice beams 43 is 3.0m×3.0m. The cross-sectional area is 0.4m×0.4m. C25 reinforced concrete is used for cast-in-place, and 10cm is embedded in the slag body; a cut-off groove 46 is arranged on one side of the lattice beam 43, and the cross-sectional area of the cut-off groove 46 is 0.1m×0.58m. One body), embedded in the slag body 10cm; the cross-sectional area of the top beam 41 is 0.3m×0.4m, using C25 reinforced concrete cast-in-place (integrated with the lattice beam 43), embedded in the slag body 10cm; the bottom beam 42 is polygonal, with a height of 0.7 m, with a width of 0.5-0.71m, using C25 reinforced concrete cast-in-place (integrated with the lattice beam 43); the node insertion bar 44 adopts HRB400 grade rebar with a diameter of 25mm and L=4.5m.
所述营养袋8间距1.0m×1.0m,呈梅花型布置,所述客土喷播层7喷播厚度10cm。The nutrient bags 8 are arranged at a distance of 1.0m×1.0m in a plum blossom shape, and the spraying layer 7 of foreign soil is 10cm thick.
一种高原区道路下边坡挂渣综合治理系统的施工方法,包括以下具体步骤:A construction method of a system for comprehensive treatment of slag hanging on slopes under roads in plateau areas, comprising the following specific steps:
S1.施工准备,整修现有或新建施工便道,满足施工机械和材料运输要求,达到通水、通电、通路、通气、通讯、平整场地要求,为工程开工创造条件;S1. Construction preparation, renovation of existing or new construction access roads, meeting the requirements for construction machinery and material transportation, meeting the requirements for water supply, electricity supply, access, ventilation, communication, and site leveling, and creating conditions for the start of the project;
S2.拦渣设施2施工,先按照轴线进行放样,并采用挖掘机开挖基础;其次,混凝土跳仓施工,采用钢模板立模,并采用泵车直接泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S2. For the construction of the slag blocking facility 2, firstly carry out lofting according to the axis, and excavate the foundation with an excavator; secondly, for the concrete jumping construction, use steel formwork to set up the formwork, and use a pump truck to directly pump the concrete into the warehouse, and vibrate in layers Dense; finally, take straw bag covering, watering and other maintenance measures until the concrete reaches 28 days of age, then remove the formwork;
S3.截排水沟9施工,先按照轴线进行放样;对于周边排水沟采用人工开挖为准,局部岩石区采用人工钻爆施工;对于坡顶、马道排水沟,需在翻渣和修坡结束后,采取人工开挖,在开挖完工后,采用钢模板立模,采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S3. For the construction of cut-off drainage ditch 9, stake out according to the axis first; manual excavation shall be used for surrounding drainage ditches, and manual drilling and blasting shall be used for local rocky areas; Finally, manual excavation is adopted. After the excavation is completed, the steel formwork is used to set up the formwork, and the concrete is pumped into the warehouse by means of pump trucks and pipelines, and the concrete is vibrated and compacted in layers. Finally, maintenance measures such as straw bag covering and watering are taken. Remove the formwork until the concrete reaches 28 days of age;
S4.修坡面层5的翻渣和修坡施工,根据现状坡面挂渣分布,按照自上而下进行翻渣施工,上中部以人工翻运为主,中下部以机械翻渣为主;在翻渣过程中,根据翻运后的挂渣现状将堆渣边坡平整成单级或多级边坡,修坡必须按照自上而下进行施工,尽量保证挖填平衡;S4. For the slag turning and slope repairing construction of the slope repair surface layer 5, according to the current distribution of the hanging slag on the slope surface, the slag turning will be carried out from top to bottom. ;During the slag turning process, the slag slope is leveled into a single-level or multi-level slope according to the status of the slag hanging after the dumping, and the slope repair must be carried out from top to bottom to ensure the balance of excavation and filling as much as possible;
S5.格构护坡4施工,首先进行格构梁放样和人工开槽;其次槽内铺设格构钢筋笼,在格构梁节点预埋插筋,并将插筋端头和钢筋笼进行搭接绑扎;采用钢模板立模,并采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S5. For the construction of lattice slope protection 4, firstly carry out lattice beam lofting and manual slotting; secondly, lay lattice reinforcement cages in the grooves, pre-embed inserting bars at lattice beam nodes, and overlap the ends of inserting bars with the reinforcement cages Binding; steel formwork is used to set up the formwork, and the concrete is pumped into the warehouse by pump truck + pipeline, and it is vibrated and compacted in layers; finally, maintenance measures such as straw bag covering and watering are taken until the concrete reaches 28 days of age, and then demolished template;
S6.营养袋8施工,首先进行营养袋穴位放样和采用钻机挖穴,然后将装好的营养袋放入穴内,短锚杆固定和表面采用铅丝网保护;S6. For the construction of nutrition bag 8, first carry out stakeout of nutrition bag acupoints and dig holes with a drilling rig, then put the packed nutrition bag into the hole, fix the short anchor rods and protect the surface with lead wire mesh;
S7.客土喷播层7施工,首先固定好客土喷播机,并将客土团粒结构的材料放入客土喷播机搅拌均匀;其次,在坡面铺一层铁丝网,并采用人工背负喷枪的方式依次将拌合均匀的客土浆液均匀喷播在营养袋周围;在喷播结束后,采用无纺布覆盖,并根据气候条件,适当采用雾化水滴喷洒养护;S7. For the construction of guest soil spraying layer 7, first fix the guest soil spraying machine, and put the material of guest soil aggregate structure into the guest soil spraying machine to mix evenly; secondly, lay a layer of barbed wire on the slope surface, and use artificial back Spray the well-mixed foreign soil slurry evenly around the nutrition bag in turn by means of a spray gun; after the spraying is completed, cover it with non-woven fabrics, and properly use atomized water droplets to spray and maintain according to the weather conditions;
S8.植物措施施工,首先进行乔灌木穴位放样,并挖穴或鱼鳞坑;其次,在穴底铺一层10cm厚的农家肥,并将乔灌木树苗放入穴内,回覆营养土,表面人工夯实。根据气候条件,适当采用防晒、灌溉等苗木抚育措施。S8. For the construction of plant measures, first carry out stakeout of arbor and shrub acupoints, and dig holes or fish scale pits; secondly, spread a layer of 10cm thick farmyard manure on the bottom of the hole, put arbor and shrub saplings into the hole, cover with nutrient soil, and manually tamp the surface . According to the climatic conditions, the seedling tending measures such as sun protection and irrigation should be adopted appropriately.
所述步骤S6中营养袋8采用抗老化的土工袋,规格为60cm×40cm×25cm,内部填塞营养土、灌草种籽和营养剂,其中每袋营养土0.05m3,灌木种籽0.6g,草籽2.4g,保水剂0.5g,有机肥0.005m3,化学肥料27g,营养袋8采用挖穴埋设,穴间距1.0m×1.0m,呈梅花型布置,穴长径0.6m,短径0.4m,穴深0.1m,每个营养袋8采用2根短锚杆固定,表面采用铅丝网保护。In the step S6, the nutritional bag 8 is an anti-aging geotechnical bag with a size of 60cm×40cm×25cm, filled with nutritious soil, shrub seeds and nutrients, wherein each bag of nutritious soil is 0.05m 3 and shrub seeds are 0.6g , grass seeds 2.4g, water-retaining agent 0.5g, organic fertilizer 0.005m 3 , chemical fertilizer 27g, nutrition bags 8 are buried by digging holes, the hole spacing is 1.0m×1.0m, and it is arranged in a plum blossom shape. The long diameter of the holes is 0.6m, and the short diameter 0.4m, the hole depth is 0.1m, each nutrition bag 8 is fixed with 2 short anchor rods, and the surface is protected with lead wire mesh.
所述步骤S7中客土喷播层7的喷播厚度为10cm,在每m2喷播面积中,普通硅酸盐水泥6kg,砂2kg,种植土0.006m3,有机质0.002m3,木质纤维200g,灌木种籽3g,草种9g,在客土喷播前,先在坡面铺一层铁丝网;在喷播结束后,需根据气候条件采取无纺布覆盖、雾化水滴喷洒等措施。In the step S7, the spraying thickness of the guest soil spraying layer 7 is 10cm. In every m2 spraying area, ordinary Portland cement is 6kg, sand is 2kg , planting soil is 0.006m3 , organic matter is 0.002m3 , wood fiber 200g, 3g of shrub seeds, and 9g of grass seeds. Before spraying in guest soil, spread a layer of barbed wire on the slope;
所述步骤S8中,在修坡面层5上和格构护坡4内采取灌草结合恢复植被,其中灌木选择金露梅、鬼箭锦鸡儿,混交比例1:1,株行距1.0m×1.0m,采取鱼鳞坑整地,穴规格,长径×短径×穴深为0.6m×0.4m×0.5m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm2,在底部平台3和顶面平台6采取栽植乔木和撒播草籽恢复植被,其中乔木选择柳树、杨树,株间混交,株行距3.0m×3.0m,采取挖穴整地,穴规格,穴径×穴深为0.8m×0.8m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm2。In the step S8, a combination of shrubs and grasses is used to restore vegetation on the slope repair surface layer 5 and in the lattice slope protection 4, wherein the shrubs are Jinlumei and Caragana japonica, the mixing ratio is 1:1, and the spacing between plants and rows is 1.0m×1.0m. Use fish scale pits for land preparation, hole specifications, long diameter x short diameter x hole depth is 0.6m x 0.4m x 0.5m; sow grass seeds under the forest, choose Elymus chinensis, bluegrass cold field, old awn, mixed sowing The ratio is 2:1:2, the seeding rate is 200kg/hm 2 , plant trees and sow grass seeds on the bottom platform 3 and the top platform 6 to restore vegetation, among which trees choose willows and poplars, and the interplants are mixed, and the distance between plants and rows is 3.0m× 3.0m, digging holes for site preparation, hole size, hole diameter × hole depth is 0.8m×0.8m; grass seeds are sown under the forest, and the grass seeds are Elymus chinensis, bluegrass, and old awn, and the mixed sowing ratio is 2: 1:2, seeding rate 200kg/hm 2 .
尽管已经示出和描述了本发明的实例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although examples of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variants, the scope of the invention is defined by the appended claims and their equivalents.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910908828.XA CN110552356B (en) | 2019-09-25 | 2019-09-25 | Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910908828.XA CN110552356B (en) | 2019-09-25 | 2019-09-25 | Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110552356A true CN110552356A (en) | 2019-12-10 |
CN110552356B CN110552356B (en) | 2024-02-06 |
Family
ID=68741333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910908828.XA Active CN110552356B (en) | 2019-09-25 | 2019-09-25 | Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110552356B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111962459A (en) * | 2020-08-26 | 2020-11-20 | 长江勘测规划设计研究有限责任公司 | Urban debris flow channel type comprehensive treatment system for abandoned slag yard and construction method thereof |
CN113585295A (en) * | 2021-08-03 | 2021-11-02 | 中国电建集团华东勘测设计研究院有限公司 | Construction method of high-soil slope frame lattice beam combined planting groove |
CN114467609A (en) * | 2022-02-14 | 2022-05-13 | 中国水电顾问集团桂阳新能源有限公司 | Ecological restoration structure system and restoration method for high and steep rubble soil slope |
CN114703871A (en) * | 2022-01-18 | 2022-07-05 | 华东建筑设计研究院有限公司上海地下空间与工程设计研究院 | Rigid and flexible combined supporting structure of expansive soil excavation side slope and construction method |
CN115821953A (en) * | 2022-12-27 | 2023-03-21 | 重庆交通大学 | Ecological slope protection structure and construction method thereof |
CN116856437A (en) * | 2023-07-25 | 2023-10-10 | 中国电建集团重庆工程有限公司 | A mountain ecological restoration and management method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006063631A (en) * | 2004-08-26 | 2006-03-09 | Japan Railway Construction Transport & Technology Agency | Soil structure on the slope of water-impervious sheet and its construction method |
KR20080001582A (en) * | 2006-06-29 | 2008-01-03 | (주)덕산조경 | Slope greening and tree planting apparatus for him |
JP2009002083A (en) * | 2007-06-22 | 2009-01-08 | Chubu Electric Power Co Inc | Slope vegetation protection method and slope vegetation protection structure |
CN101818499A (en) * | 2010-03-05 | 2010-09-01 | 深圳市如茵生态环境建设有限公司 | Revegetation system on steep rocky slopes and implementing method thereof |
CN105113517A (en) * | 2015-08-13 | 2015-12-02 | 湖南中大园林环境科技有限公司 | Technology for treating construction dreg site and side slope accumulation with vetiver grass |
CN105484275A (en) * | 2016-01-12 | 2016-04-13 | 中国电建集团贵阳勘测设计研究院有限公司 | Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area |
CN110024628A (en) * | 2019-04-03 | 2019-07-19 | 青海生源园林绿化工程有限公司 | A kind of high altitude localities roadbed side slope Three-Dimensional Network Seeding construction method |
KR20190103772A (en) * | 2018-02-28 | 2019-09-05 | 정병현 | Waste stone chapter restoration construction method |
CN211037008U (en) * | 2019-09-25 | 2020-07-17 | 长江勘测规划设计研究有限责任公司 | Comprehensive treatment system for slope slag-adhering under plateau area road |
-
2019
- 2019-09-25 CN CN201910908828.XA patent/CN110552356B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006063631A (en) * | 2004-08-26 | 2006-03-09 | Japan Railway Construction Transport & Technology Agency | Soil structure on the slope of water-impervious sheet and its construction method |
KR20080001582A (en) * | 2006-06-29 | 2008-01-03 | (주)덕산조경 | Slope greening and tree planting apparatus for him |
JP2009002083A (en) * | 2007-06-22 | 2009-01-08 | Chubu Electric Power Co Inc | Slope vegetation protection method and slope vegetation protection structure |
CN101818499A (en) * | 2010-03-05 | 2010-09-01 | 深圳市如茵生态环境建设有限公司 | Revegetation system on steep rocky slopes and implementing method thereof |
CN105113517A (en) * | 2015-08-13 | 2015-12-02 | 湖南中大园林环境科技有限公司 | Technology for treating construction dreg site and side slope accumulation with vetiver grass |
CN105484275A (en) * | 2016-01-12 | 2016-04-13 | 中国电建集团贵阳勘测设计研究院有限公司 | Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area |
KR20190103772A (en) * | 2018-02-28 | 2019-09-05 | 정병현 | Waste stone chapter restoration construction method |
CN110024628A (en) * | 2019-04-03 | 2019-07-19 | 青海生源园林绿化工程有限公司 | A kind of high altitude localities roadbed side slope Three-Dimensional Network Seeding construction method |
CN211037008U (en) * | 2019-09-25 | 2020-07-17 | 长江勘测规划设计研究有限责任公司 | Comprehensive treatment system for slope slag-adhering under plateau area road |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111962459A (en) * | 2020-08-26 | 2020-11-20 | 长江勘测规划设计研究有限责任公司 | Urban debris flow channel type comprehensive treatment system for abandoned slag yard and construction method thereof |
CN113585295A (en) * | 2021-08-03 | 2021-11-02 | 中国电建集团华东勘测设计研究院有限公司 | Construction method of high-soil slope frame lattice beam combined planting groove |
CN114703871A (en) * | 2022-01-18 | 2022-07-05 | 华东建筑设计研究院有限公司上海地下空间与工程设计研究院 | Rigid and flexible combined supporting structure of expansive soil excavation side slope and construction method |
CN114467609A (en) * | 2022-02-14 | 2022-05-13 | 中国水电顾问集团桂阳新能源有限公司 | Ecological restoration structure system and restoration method for high and steep rubble soil slope |
CN115821953A (en) * | 2022-12-27 | 2023-03-21 | 重庆交通大学 | Ecological slope protection structure and construction method thereof |
CN116856437A (en) * | 2023-07-25 | 2023-10-10 | 中国电建集团重庆工程有限公司 | A mountain ecological restoration and management method |
Also Published As
Publication number | Publication date |
---|---|
CN110552356B (en) | 2024-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110552356B (en) | Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof | |
CN105484275B (en) | Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area | |
CN107893422B (en) | A kind of reinforcement type ecological slope protection structure and its construction method | |
CN105625443B (en) | High-steep soil nail grass planting slope protection structure system and construction method thereof | |
CN109723068B (en) | Steep concrete frame beam slope protection system and construction method conducive to the growth of slope vegetation | |
CN110984189A (en) | Slope ecological restoration system and method | |
CN111021375A (en) | Recovery and treatment method for mine geological environment | |
CN104805845A (en) | Flexible slope protection method for soft sandstone natural side slope | |
CN103548519A (en) | Vegetation restoration structure of discarded metal mine and vegetation restoration method of discarded metal mine | |
CN101622931B (en) | Greening sloping surface for rock side slope facing wall and construction method thereof | |
CN104186233A (en) | Frame beam slope greening method and frame beam slope greening facility | |
KR102226656B1 (en) | Trees Growing Slope Area Greening Method | |
CN113235623A (en) | Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof | |
CN108755592A (en) | In situ for hard slope formula shore protection plants raw formula ecology reconstruction structure and method | |
KR100830150B1 (en) | Inclined plane greening method and tree planting device for the method | |
CN111543233A (en) | Construction method for planting seedlings in muddy saline-alkali soil in coastal island region | |
CN110512628A (en) | A kind of slope ecological restoration method | |
CN110424420A (en) | Coarse granule composite soil high gradient slope control method | |
CN204014608U (en) | A kind of sash beam greening side slope facility | |
CN111962459A (en) | Urban debris flow channel type comprehensive treatment system for abandoned slag yard and construction method thereof | |
CN211037008U (en) | Comprehensive treatment system for slope slag-adhering under plateau area road | |
CN212896409U (en) | Three-dimensional geotechnique's net pad grass planting slope protection structure | |
CN209816870U (en) | Conducive to slope vegetation growth steep concrete frame beam slope protection system | |
CN116856437A (en) | A mountain ecological restoration and management method | |
CN207228135U (en) | Horizontal hedge blocks native ecological slope protection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |