[go: up one dir, main page]

CN110552356A - comprehensive treatment system for slope slag adhering under plateau area road and construction method thereof - Google Patents

comprehensive treatment system for slope slag adhering under plateau area road and construction method thereof Download PDF

Info

Publication number
CN110552356A
CN110552356A CN201910908828.XA CN201910908828A CN110552356A CN 110552356 A CN110552356 A CN 110552356A CN 201910908828 A CN201910908828 A CN 201910908828A CN 110552356 A CN110552356 A CN 110552356A
Authority
CN
China
Prior art keywords
slope
slag
hanging
construction
lattice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910908828.XA
Other languages
Chinese (zh)
Other versions
CN110552356B (en
Inventor
马力
黄斌
刘晖
乔锋
田红卫
王旭东
方舒
张雪
王志刚
尹元银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seabuckthorn Development And Management Center Of Ministry Of Water Resources (water And Soil Conservation Plant Development And Management Center Of Ministry Of Water Resources)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Seabuckthorn Development And Management Center Of Ministry Of Water Resources (water And Soil Conservation Plant Development And Management Center Of Ministry Of Water Resources)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seabuckthorn Development And Management Center Of Ministry Of Water Resources (water And Soil Conservation Plant Development And Management Center Of Ministry Of Water Resources), Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Seabuckthorn Development And Management Center Of Ministry Of Water Resources (water And Soil Conservation Plant Development And Management Center Of Ministry Of Water Resources)
Priority to CN201910908828.XA priority Critical patent/CN110552356B/en
Publication of CN110552356A publication Critical patent/CN110552356A/en
Application granted granted Critical
Publication of CN110552356B publication Critical patent/CN110552356B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/029Receptacles for seedlings
    • A01G9/0293Seed or shoot receptacles
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/029Receptacles for seedlings
    • A01G9/0295Units comprising two or more connected receptacles
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/033Flat containers for turf, lawn or the like, e.g. for covering roofs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Botany (AREA)
  • Cultivation Of Plants (AREA)
  • Revetment (AREA)

Abstract

本发明提供一种高原区道路下边坡挂渣综合治理系统及其施工方法,综合治理系统包括渣堆、拦渣设施、底部平台、格构护坡、修坡面层、顶面平台、客土喷播层、营养袋以及截排水沟,所述拦渣设施布置于堆渣的坡脚,起到拦挡渣体的作用;所述修坡面层的下端靠近底部平台的两级上布置有用以确保渣体稳定的格构护坡;所述渣堆的顶部设置有顶面平台,在顶面平台与道路之间的裸露坡面上开穴安装营养袋;所述客土喷播层喷播在营养袋周边的裸露坡面上。本发明治理方法系统全面,治理效果好。该治理措施简单,可广泛应用于公路下边坡挂渣处理和高边坡松散堆积体加固、处理,适用范围较广,可推广性强。

The invention provides a system for comprehensive treatment of slag hanging on lower slopes of roads in plateau areas and a construction method thereof. seeding layer, nutrient bag and cut-off drainage ditch, the slag-blocking facilities are arranged at the slope foot of the slag pile to play the role of blocking the slag body; the lower end of the slope repair surface layer is arranged on two levels close to the bottom platform to ensure Slag stable lattice slope protection; the top of the slag heap is provided with a top platform, and a hole is opened on the exposed slope between the top platform and the road to install a nutrition bag; the guest soil spraying layer is sprayed on the nutrient on the exposed slope around the bag. The treatment method of the invention is systematic and comprehensive, and has good treatment effect. The control measures are simple, and can be widely used in the treatment of hanging slag on the lower slope of highways and the reinforcement and treatment of loose accumulations in high slopes. The application range is wide and the generalization is strong.

Description

一种高原区道路下边坡挂渣综合治理系统及其施工方法A comprehensive treatment system and construction method for hanging slag on the slope of the road in the plateau area

技术领域technical field

本发明涉及道路下边坡挂渣综合治理系统及方法,具体涉及一种高原区道路下边坡挂渣综合治理系统及其施工方法。The invention relates to a system and a method for comprehensively treating dregs on downside slopes of roads, in particular to a system and a construction method for comprehensively treating dregs on downside slopes of roads in plateau areas.

背景技术Background technique

高原地区修建的道路,一般蜿蜒于高山、峡谷之间。在道路修建过程中,开挖的渣料不可避免的会散落入道路下侧的冲沟和坡面,形成坡面挂渣,占压并破坏原有地表植被。同时,限于交通条件,运渣困难,导致挂渣难以及时运至指定弃渣场。Roads built in plateau areas generally meander between mountains and valleys. During the road construction process, the excavated slag will inevitably be scattered into the gullies and slopes on the lower side of the road, forming slag hanging on the slope, occupying and destroying the original surface vegetation. At the same time, due to limited traffic conditions, it is difficult to transport the slag, which makes it difficult to transport the hanging slag to the designated waste slag yard in time.

坡面挂渣高度一般高于20m,且松散的贴于坡面和沟道表面,汛期受山洪冲刷,部分挂渣从坡顶迅速进入坡脚甚至下侧的沟道、河流及农田,容易造成水土流失危害;大风季节,浮渣进入周边的区域,降低周边的空气环境质量,加剧破坏周边的生态(某公路边坡挂渣现状见图1)。The height of the dross on the slope is generally higher than 20m, and it is loosely attached to the surface of the slope and the ditch. During the flood season, it is washed by mountain torrents, and part of the dregs quickly enters the slope foot or even the lower side of the ditch, river and farmland from the top of the slope, which is easy to cause Water and soil loss hazards; in the windy season, scum enters the surrounding area, reducing the surrounding air environment quality and aggravating the damage to the surrounding ecology (see Figure 1 for the status of scum hanging on a road slope).

因此,急需研制出一种道路下边坡挂渣综合治理系统及其施工方法,原理简单,施工快速,满足边坡挂渣的持久稳定和快速恢复生态的要求。Therefore, there is an urgent need to develop a comprehensive control system and construction method for dregs on slopes under roads. The principle is simple, the construction is fast, and the requirements for the lasting stability of dregs on slopes and the rapid restoration of ecology are met.

发明内容Contents of the invention

本发明的目的在于提供一种高原区道路下边坡挂渣综合治理系统及其施工方法,满足道路下边坡挂渣持久稳定和快速恢复生态的要求,兼具为高边坡挂渣提供一种解决方案,为道路下边坡挂渣综合治理提供一种思路。The purpose of the present invention is to provide a comprehensive treatment system and construction method for dross hanging on road slopes in plateau areas, which can meet the requirements of long-term stability and rapid ecological restoration of dregs hanging on road slopes, and provide a solution for high slope dregs The plan provides a way of thinking for the comprehensive treatment of slag hanging on the slope of the road.

本发明的技术方案:Technical scheme of the present invention:

一种高原区道路下边坡挂渣综合治理系统,其特征在于,包括渣堆、拦渣设施、底部平台、格构护坡、修坡面层、顶面平台、客土喷播层、营养袋以及截排水沟。A system for comprehensive treatment of slag hanging on lower slopes of roads in plateau areas, characterized in that it includes slag piles, slag blocking facilities, bottom platforms, lattice slope protection, slope repair surface layers, top surface platforms, guest soil spraying layers, nutrition bags and Cut gutters.

所述拦渣设施布置于堆渣的坡脚,起到拦挡渣体的作用;The slag blocking facilities are arranged at the slope foot of the slag pile to play the role of blocking the slag body;

所述渣堆的坡脚与拦渣设施之间形成底部平台;A bottom platform is formed between the slope toe of the slag pile and the slag blocking facility;

所述修坡面层铺设在渣堆的表面,所述修坡面层从上到下设置有多级;The slope repair surface layer is laid on the surface of the slag pile, and the slope repair surface layer is arranged in multiple stages from top to bottom;

所述修坡面层的下端靠近底部平台的两级上布置有用以确保渣体稳定的格构护坡;The lower end of the slope repair surface layer is arranged on the two levels close to the bottom platform to ensure the stability of the slag body with lattice slope protection;

所述渣堆的顶部设置有顶面平台,在顶面平台与道路之间的裸露坡面上开穴安装营养袋;The top of the slag heap is provided with a top platform, and a hole is opened on the exposed slope between the top platform and the road to install a nutrition bag;

所述客土喷播层喷播在营养袋周边的裸露坡面上;The guest soil spraying layer is sprayed on the bare slope around the nutrition bag;

所述截排水沟设置道路下的边坡、马道和挂渣区周边,用于拦截和导排道路、渣堆坡面及周边坡面汇水,减少水流冲刷堆渣区。The cut-off drainage ditch is set on the side slope under the road, the horse track and the surrounding area of the slag hanging area, which is used to intercept and guide the road, the slag pile slope and the surrounding slope to collect water, and reduce the water flow to scour the slag pile area.

所述拦渣设施顶宽1.5m,墙高5.0m,其中拦渣设施的基础埋入原地面线以下深度1.5m,拦渣设施临渣侧坡比1:0.1,背渣侧坡比1:0.4。The top width of the slag blocking facility is 1.5m, and the wall height is 5.0m. The foundation of the slag blocking facility is buried at a depth of 1.5m below the original ground line. 0.4.

所述底部平台和顶面平台上栽植乔木和撒播草籽用以恢复植被。Arbors are planted and grass seeds are sown on the bottom platform and the top platform to restore vegetation.

所述修坡面层的边坡坡比为1:1.5~1:2.5,单级边坡高度10~15m。The slope slope ratio of the slope repair surface layer is 1:1.5-1:2.5, and the single-stage slope height is 10-15m.

所述格构护坡包括顶梁、底梁、格构梁以及节点插筋,所述顶梁修建在修坡面层最下面的两级边坡的顶部,底梁修建在修坡面层的坡脚,在顶梁和底梁之间浇筑格构梁,格构梁交叉布置,所述节点插筋设置在格构梁的交叉部位,所述节点插筋插入到渣堆内,所述格构梁交叉设置围成的空间内填充有营养土层,所述格构梁的间排距为3.0m×3.0m,截面面积为0.4m×0.4m。The lattice slope protection includes a top beam, a bottom beam, a lattice beam and joint bars, the top beam is built on the top of the two-level slope at the bottom of the slope repair surface, and the bottom beam is built on the slope of the slope repair surface. foot, pouring lattice beams between the top beam and the bottom beam, the lattice beams are arranged crosswise, the node inserting bars are arranged at the intersections of the lattice beams, the node inserting bars are inserted into the slag pile, and the lattice The space enclosed by the intersecting beams is filled with a nutrient soil layer, the row spacing of the lattice beams is 3.0m×3.0m, and the cross-sectional area is 0.4m×0.4m.

所述营养袋间距1.0m×1.0m,呈梅花型布置,所述客土喷播层喷播厚度10cm。The distance between the nutrition bags is 1.0m×1.0m, arranged in a plum blossom shape, and the spraying thickness of the guest soil spraying layer is 10cm.

一种高原区道路下边坡挂渣综合治理系统的施工方法,包括以下具体步骤:A construction method of a system for comprehensive treatment of slag hanging on slopes under roads in plateau areas, comprising the following specific steps:

S1.施工准备,整修现有或新建施工便道,满足施工机械和材料运输要求,达到通水、通电、通路、通气、通讯、平整场地要求,为工程开工创造条件;S1. Construction preparation, renovation of existing or new construction access roads, meeting the requirements for construction machinery and material transportation, meeting the requirements for water supply, electricity supply, access, ventilation, communication, and site leveling, and creating conditions for the start of the project;

S2.拦渣设施施工,先按照轴线进行放样,并采用挖掘机开挖基础;其次,混凝土跳仓施工,采用钢模板立模,并采用泵车直接泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S2. For the construction of slag-blocking facilities, first stake out according to the axis, and use excavators to excavate the foundation; secondly, for concrete jumping construction, use steel formwork to set up the formwork, and use pump trucks to directly pump concrete into the warehouse, vibrate and compact in layers ;Finally, take straw bag covering, watering and other maintenance measures until the concrete reaches 28 days of age, then remove the formwork;

S3.截排水沟施工,先按照轴线进行放样;对于周边排水沟采用人工开挖为准,局部岩石区采用人工钻爆施工;对于坡顶、马道排水沟,需在翻渣和修坡结束后,采取人工开挖,在开挖完工后,采用钢模板立模,采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S3. For the construction of intercepting drainage ditches, stake out according to the axis first; for the surrounding drainage ditches, manual excavation shall prevail, and for local rock areas, manual drilling and blasting shall be used; , manual excavation is adopted. After the excavation is completed, the steel formwork is used to form the formwork, and the concrete is pumped into the warehouse by means of pump truck + pipeline, and it is vibrated and compacted in layers; finally, maintenance measures such as straw bag covering and watering are taken until After the concrete reaches 28 days of age, remove the formwork;

S4.修坡面层的翻渣和修坡施工,根据现状坡面挂渣分布,按照自上而下进行翻渣施工,上中部以人工翻运为主,中下部以机械翻渣为主;在翻渣过程中,根据翻运后的挂渣现状将堆渣边坡平整成单级或多级边坡,修坡必须按照自上而下进行施工,尽量保证挖填平衡;S4. For the slag turning and slope repairing construction of the slope repair surface layer, according to the current distribution of hanging slag on the slope surface, the slag turning will be carried out from top to bottom. During the slag turning process, the slag slope is leveled into a single-level or multi-level slope according to the status of the slag hanging after dumping, and the slope repair must be carried out from top to bottom to ensure the balance of excavation and filling as much as possible;

S5.格构护坡施工,首先进行格构梁放样和人工开槽;其次槽内铺设格构钢筋笼,在格构梁节点预埋插筋,并将插筋端头和钢筋笼进行搭接绑扎;采用钢模板立模,并采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S5. For lattice slope protection construction, firstly carry out lattice beam lofting and manual slotting; secondly, lay lattice reinforcement cages in the grooves, pre-embed inserting bars at lattice beam nodes, and lap and bind the end of inserting bars and the reinforcement cage ; Use steel formwork to set up the formwork, and use pump truck + pipeline to pump concrete into the warehouse, vibrate and compact in layers; finally, take straw bag covering, watering and other maintenance measures until the concrete reaches 28 days of age, then remove the formwork ;

S6.营养袋施工,首先进行营养袋穴位放样和采用钻机挖穴,然后将装好的营养袋放入穴内,短锚杆固定和表面采用铅丝网保护;S6. For the construction of nutrition bags, first carry out stakeout of nutrition bag acupoints and dig holes with a drilling rig, then put the packed nutrition bags into the holes, fix the short anchor rods and protect the surface with lead wire mesh;

S7.客土喷播层施工,首先固定好客土喷播机,并将客土团粒结构的材料放入客土喷播机搅拌均匀;其次,在坡面铺一层铁丝网,并采用人工背负喷枪的方式依次将拌合均匀的客土浆液均匀喷播在营养袋周围;在喷播结束后,采用无纺布覆盖,并根据气候条件,适当采用雾化水滴喷洒养护;S7. For the construction of guest soil spraying layer, first fix the guest soil spraying machine, and put the material of guest soil aggregate structure into the guest soil spraying machine and mix evenly; secondly, lay a layer of barbed wire on the slope surface, and use artificial back spray gun Spray evenly mixed foreign soil slurry around the nutrition bag in turn; after spraying, cover with non-woven fabric, and properly use atomized water droplets to spray and maintain according to the weather conditions;

S8.植物措施施工,首先进行乔灌木穴位放样,并挖穴或鱼鳞坑;其次,在穴底铺一层10cm厚的农家肥,并将乔灌木树苗放入穴内,回覆营养土,表面人工夯实。根据气候条件,适当采用防晒、灌溉等苗木抚育措施。S8. For the construction of plant measures, first carry out stakeout of arbor and shrub acupoints, and dig holes or fish scale pits; secondly, spread a layer of 10cm thick farmyard manure on the bottom of the hole, put arbor and shrub saplings into the hole, cover with nutrient soil, and manually tamp the surface . According to the climatic conditions, the seedling tending measures such as sun protection and irrigation should be adopted appropriately.

所述步骤S6中营养袋采用抗老化的土工袋,规格为60cm×40cm×25cm,内部填塞营养土、灌草种籽和营养剂,其中每袋营养土0.05m3,灌木种籽0.6g,草籽2.4g,保水剂0.5g,有机肥0.005m3,化学肥料27g,营养袋采用挖穴埋设,穴间距1.0m×1.0m,呈梅花型布置,穴长径0.6m,短径0.4m,穴深0.1m,每个营养袋采用2根短锚杆固定,表面采用铅丝网保护。In the step S6, the nutritional bag is an anti-aging geotechnical bag with a size of 60cm×40cm×25cm, filled with nutrient soil, shrub seeds and nutrients, wherein each bag of nutrient soil is 0.05m 3 , shrub seeds 0.6g, Grass seeds 2.4g, water-retaining agent 0.5g, organic fertilizer 0.005m 3 , chemical fertilizer 27g, the nutrition bag is buried by digging holes, the hole spacing is 1.0m×1.0m, and it is arranged in a plum blossom shape, the long diameter of the hole is 0.6m, and the short diameter is 0.4m. , the depth of the hole is 0.1m, and each nutrition bag is fixed with 2 short anchor rods, and the surface is protected by lead wire mesh.

所述步骤S7中客土喷播层的喷播厚度为10cm,在每m2喷播面积中,普通硅酸盐水泥6kg,砂2kg,种植土0.006m3,有机质0.002m3,木质纤维200g,灌木种籽3g,草种9g,在客土喷播前,先在坡面铺一层铁丝网;在喷播结束后,需根据气候条件采取无纺布覆盖、雾化水滴喷洒等措施。In the step S7, the spraying thickness of the foreign soil spraying layer is 10cm, and in every m 2 spraying area, ordinary Portland cement is 6kg, sand is 2kg, planting soil is 0.006m3 , organic matter is 0.002m3 , and wood fiber is 200g , shrub seeds 3g, grass seeds 9g, spread a layer of barbed wire on the slope surface before spraying in guest soil;

所述步骤S8中,在修坡面层上和格构护坡内采取灌草结合恢复植被,其中灌木选择金露梅、鬼箭锦鸡儿,混交比例1:1,株行距1.0m×1.0m,采取鱼鳞坑整地,穴规格,长径×短径×穴深为0.6m×0.4m×0.5m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm2,在底部平台和顶面平台采取栽植乔木和撒播草籽恢复植被,其中乔木选择柳树、杨树,株间混交,株行距3.0m×3.0m,采取挖穴整地,穴规格,穴径×穴深为0.8m×0.8m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm2In the step S8, the combination of shrubs and grasses is used to restore the vegetation on the slope repair surface layer and in the lattice slope protection, among which the shrubs choose Jinlumei and Caragana japonica, the mixing ratio is 1:1, the spacing between plants and rows is 1.0m×1.0m, and fish scales are used. Pit site preparation, hole specifications, long diameter x short diameter x hole depth: 0.6m x 0.4m x 0.5m; sow grass seeds under the forest, choose Elymus pachycarpa, bluegrass cold field, and old wheat awn, and the mixed sowing ratio is 2 :1:2, seeding rate 200kg/hm 2 , plant trees and sow grass seeds on the bottom platform and top platform to restore vegetation, among which trees choose willows and poplars, mixed between plants, and the distance between plants and rows is 3.0m×3.0m. Digging holes for soil preparation, hole specifications, hole diameter × hole depth is 0.8m×0.8m; grass seeds are sown under the forest, and the grass seeds are Elymus chinensis, bluegrass, and old awns, and the mixed sowing ratio is 2:1:2. The seeding rate is 200kg/hm 2 .

与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:

(1)治理方法系统全面,治理效果好。采用先稳固挂渣后恢复植被,工程、植物与生态护坡相结合的综合治理措施,可在全面防护坡面挂渣的基础上,快速恢复坡面的植被,极大减缓对周边生态环境的破坏;治理后,可实现边坡挂渣的持久稳定和快速恢复生态的要求。(1) The governance method is systematic and comprehensive, and the governance effect is good. The comprehensive management measures of engineering, plants and ecological slope protection can be used to stabilize the slag first and then restore the vegetation. On the basis of comprehensive protection of the slag on the slope, the vegetation on the slope can be quickly restored, and the damage to the surrounding ecological environment can be greatly slowed down. ; After treatment, it can achieve the requirements of lasting stability and rapid ecological restoration of the side slope hanging slag.

(2)适用范围广。该治理措施简单,可广泛应用于公路下边坡挂渣处理和高边坡松散堆积体加固、处理,适用范围较广,可推广性强。(2) The scope of application is wide. The control measures are simple, and can be widely used in the treatment of hanging slag on the lower slope of highways and the reinforcement and treatment of loose accumulations in high slopes. The application range is wide and the generalization is strong.

(3)施工简单快速。该综合治理措施所采用的混凝土、钢筋、土工袋、营养土、灌草种籽、乔灌木树苗均可直接采购;施工工艺简单,施工简单便捷。(3) The construction is simple and fast. Concrete, steel bars, geotechnical bags, nutrient soil, shrub and grass seeds, tree and shrub saplings used in this comprehensive treatment measure can all be directly purchased; the construction process is simple, and the construction is simple and convenient.

附图说明Description of drawings

图1是某公路下边坡挂渣现状图。Figure 1 is the current situation of slag hanging on the lower slope of a highway.

图2是本发明的一种高原地区道路下边坡挂渣综合治理系统的平面布置示意图。Fig. 2 is a schematic plan layout diagram of a system for comprehensive treatment of slag hanging on slopes of roads in plateau areas according to the present invention.

图3是本发明的一种高原地区道路下边坡挂渣综合治理系统的剖面示意图。Fig. 3 is a schematic cross-sectional view of a system for comprehensive treatment of slag hanging on slopes of roads in plateau areas according to the present invention.

图4是本发明的拦渣设施结构示意图。Fig. 4 is a structural schematic diagram of the slag blocking facility of the present invention.

图5是本发明的格构护坡里面布置示意图。Fig. 5 is a schematic diagram of the arrangement inside the lattice slope protection of the present invention.

图6是图5的A-A剖面示意图。FIG. 6 is a schematic cross-sectional view along line A-A of FIG. 5 .

图7是图5的B-B剖面示意图。FIG. 7 is a schematic cross-sectional view along B-B of FIG. 5 .

图8是图5的C-C剖面示意图。FIG. 8 is a schematic cross-sectional view of C-C in FIG. 5 .

图9是图5的D-D剖面示意图。FIG. 9 is a schematic cross-sectional view along D-D of FIG. 5 .

图10是本发明的营养袋和客土喷播层剖面示意图。Fig. 10 is a schematic cross-sectional view of the nutrition bag and guest soil spraying layer of the present invention.

图11是本发明的营养袋和客土喷播层平面示意图。Fig. 11 is a schematic plan view of the nutrition bag and guest soil spraying layer of the present invention.

图中标号分别表示,1-渣堆,2-拦渣设施,3-底部平台,4-格构护坡,5-修坡面层,6-顶面平台,7-客土喷播层,8-营养袋,9-截排水沟,10-道路。The numbers in the figure indicate respectively, 1-slag heap, 2-slag blocking facilities, 3-bottom platform, 4-lattice slope protection, 5-slope repair surface layer, 6-top platform, 7- guest soil spraying layer, 8 -Nutrition bag, 9-Cut drainage ditch, 10-Road.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

如图1至图11所示,本发明具体实施方式的一种高原区道路下边坡挂渣综合治理系统,包括渣堆1、拦渣设施2、底部平台3、格构护坡4、修坡面层5、顶面平台6、客土喷播层7、营养袋8、截排水沟9以及道路10。As shown in Figures 1 to 11, a system for comprehensive treatment of slag hanging on the lower slope of roads in plateau areas according to a specific embodiment of the present invention includes a slag pile 1, a slag blocking facility 2, a bottom platform 3, a lattice slope protection 4, and a slope repair surface Layer 5, top platform 6, foreign soil spraying layer 7, nutrition bag 8, intercepting drainage ditch 9 and road 10.

所述拦渣设施2布置于渣堆1的坡脚,起到拦挡渣体的作用;The slag blocking facility 2 is arranged at the foot of the slope of the slag pile 1 to play the role of blocking the slag body;

所述渣堆1的坡脚与拦渣设施2之间形成底部平台3;A bottom platform 3 is formed between the slope toe of the slag pile 1 and the slag blocking facility 2;

所述修坡面层5铺设在渣堆1的表面,所述修坡面层5从上到下设置有多级;The slope repair surface layer 5 is laid on the surface of the slag pile 1, and the slope repair surface layer 5 is arranged in multiple stages from top to bottom;

所述修坡面层5的下端靠近底部平台3的两级上布置有用以确保渣体稳定的格构护坡4;The lower end of the slope repair surface layer 5 is arranged on the two stages close to the bottom platform 3 to ensure the stability of the slag body with a lattice structure revetment 4;

所述渣堆1的顶部设置有顶面平台6,在顶面平台6与道路10之间的裸露坡面上开穴安装营养袋8;The top of the slag pile 1 is provided with a top platform 6, and a nutrition bag 8 is installed on the bare slope between the top platform 6 and the road 10;

所述客土喷播层7喷播在营养袋8周边的裸露坡面上;The guest soil spraying layer 7 is sprayed on the bare slope around the nutrition bag 8;

所述截排水沟9设置道路10下的边坡、马道和挂渣区周边,用于拦截和导排道路10、渣堆1坡面及周边坡面汇水,减少水流冲刷堆渣区。The cut-off drainage ditch 9 is set on the side slope under the road 10, the bridleway and the surrounding areas of the slag hanging area, and is used to intercept and guide the road 10, the slope of the slag pile 1 and the surrounding slopes to collect water, so as to reduce the flow of water to scour the slag pile area.

所述拦渣设施2顶宽1.5m,墙高5.0m,其中拦渣设施2的基础埋入原地面线以下深度1.5m,拦渣设施2临渣侧坡比1:0.1,背渣侧坡比1:0.4。The top width of the slag blocking facility 2 is 1.5m, and the wall height is 5.0m. The foundation of the slag blocking facility 2 is buried at a depth of 1.5m below the original ground line. The ratio is 1:0.4.

所述底部平台3和顶面平台6上栽植乔木和撒播草籽用以恢复植被。Arbors are planted and grass seeds are sown on the bottom platform 3 and the top platform 6 to restore vegetation.

所述修坡面层5的边坡坡比为1:1.5~1:2.5,单级边坡高度10~15m。The slope ratio of the slope repair surface layer 5 is 1:1.5-1:2.5, and the single-stage slope height is 10-15m.

所述格构护坡4包括顶梁41、底梁42、格构梁43以及节点插筋44,所述顶梁41修建在修坡面层5最下面的两级边坡的顶部,底梁42修建在修坡面层5的坡脚,在顶梁41和底梁42之间浇筑格构梁43,格构梁43交叉布置,所述节点插筋44设置在格构梁43的交叉部位,所述节点插筋44插入到渣堆1内,所述格构梁43交叉设置围成的空间内填充有营养土层45,所述格构梁43的间排距为3.0m×3.0m,截面面积为0.4m×0.4m。采用C25钢筋混凝土现浇,嵌入渣体内10cm;格构梁43一侧布置截水槽46,截水槽46的截面面积为0.1m×0.58m,采用C25钢筋混凝土现浇(与格构梁43连为一体),嵌入渣体内10cm;顶梁41截面面积为0.3m×0.4m,采用C25钢筋混凝土现浇(与格构梁43连为一体),嵌入渣体内10cm;底梁42为多边形,高度0.7m,宽度0.5~0.71m,采用C25钢筋混凝土现浇(与格构梁43连为一体);节点插筋44采用直径25mm、L=4.5m的HRB400级螺纹钢。Described lattice structure slope protection 4 comprises top beam 41, bottom beam 42, lattice beam 43 and node inserting rib 44, and described top beam 41 is built on the top of the two-stage side slope of repairing surface layer 5 bottom, and bottom beam 42 Build at the slope foot of the slope repair surface layer 5, pour lattice beams 43 between the top beam 41 and the bottom beam 42, the lattice beams 43 are arranged crosswise, and the node inserting ribs 44 are arranged at the intersections of the lattice beams 43, The node inserting bars 44 are inserted into the slag pile 1, and the space enclosed by the intersecting arrangement of the lattice beams 43 is filled with a nutrient soil layer 45, and the row spacing of the lattice beams 43 is 3.0m×3.0m. The cross-sectional area is 0.4m×0.4m. C25 reinforced concrete is used for cast-in-place, and 10cm is embedded in the slag body; a cut-off groove 46 is arranged on one side of the lattice beam 43, and the cross-sectional area of the cut-off groove 46 is 0.1m×0.58m. One body), embedded in the slag body 10cm; the cross-sectional area of the top beam 41 is 0.3m×0.4m, using C25 reinforced concrete cast-in-place (integrated with the lattice beam 43), embedded in the slag body 10cm; the bottom beam 42 is polygonal, with a height of 0.7 m, with a width of 0.5-0.71m, using C25 reinforced concrete cast-in-place (integrated with the lattice beam 43); the node insertion bar 44 adopts HRB400 grade rebar with a diameter of 25mm and L=4.5m.

所述营养袋8间距1.0m×1.0m,呈梅花型布置,所述客土喷播层7喷播厚度10cm。The nutrient bags 8 are arranged at a distance of 1.0m×1.0m in a plum blossom shape, and the spraying layer 7 of foreign soil is 10cm thick.

一种高原区道路下边坡挂渣综合治理系统的施工方法,包括以下具体步骤:A construction method of a system for comprehensive treatment of slag hanging on slopes under roads in plateau areas, comprising the following specific steps:

S1.施工准备,整修现有或新建施工便道,满足施工机械和材料运输要求,达到通水、通电、通路、通气、通讯、平整场地要求,为工程开工创造条件;S1. Construction preparation, renovation of existing or new construction access roads, meeting the requirements for construction machinery and material transportation, meeting the requirements for water supply, electricity supply, access, ventilation, communication, and site leveling, and creating conditions for the start of the project;

S2.拦渣设施2施工,先按照轴线进行放样,并采用挖掘机开挖基础;其次,混凝土跳仓施工,采用钢模板立模,并采用泵车直接泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S2. For the construction of the slag blocking facility 2, firstly carry out lofting according to the axis, and excavate the foundation with an excavator; secondly, for the concrete jumping construction, use steel formwork to set up the formwork, and use a pump truck to directly pump the concrete into the warehouse, and vibrate in layers Dense; finally, take straw bag covering, watering and other maintenance measures until the concrete reaches 28 days of age, then remove the formwork;

S3.截排水沟9施工,先按照轴线进行放样;对于周边排水沟采用人工开挖为准,局部岩石区采用人工钻爆施工;对于坡顶、马道排水沟,需在翻渣和修坡结束后,采取人工开挖,在开挖完工后,采用钢模板立模,采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S3. For the construction of cut-off drainage ditch 9, stake out according to the axis first; manual excavation shall be used for surrounding drainage ditches, and manual drilling and blasting shall be used for local rocky areas; Finally, manual excavation is adopted. After the excavation is completed, the steel formwork is used to set up the formwork, and the concrete is pumped into the warehouse by means of pump trucks and pipelines, and the concrete is vibrated and compacted in layers. Finally, maintenance measures such as straw bag covering and watering are taken. Remove the formwork until the concrete reaches 28 days of age;

S4.修坡面层5的翻渣和修坡施工,根据现状坡面挂渣分布,按照自上而下进行翻渣施工,上中部以人工翻运为主,中下部以机械翻渣为主;在翻渣过程中,根据翻运后的挂渣现状将堆渣边坡平整成单级或多级边坡,修坡必须按照自上而下进行施工,尽量保证挖填平衡;S4. For the slag turning and slope repairing construction of the slope repair surface layer 5, according to the current distribution of the hanging slag on the slope surface, the slag turning will be carried out from top to bottom. ;During the slag turning process, the slag slope is leveled into a single-level or multi-level slope according to the status of the slag hanging after the dumping, and the slope repair must be carried out from top to bottom to ensure the balance of excavation and filling as much as possible;

S5.格构护坡4施工,首先进行格构梁放样和人工开槽;其次槽内铺设格构钢筋笼,在格构梁节点预埋插筋,并将插筋端头和钢筋笼进行搭接绑扎;采用钢模板立模,并采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S5. For the construction of lattice slope protection 4, firstly carry out lattice beam lofting and manual slotting; secondly, lay lattice reinforcement cages in the grooves, pre-embed inserting bars at lattice beam nodes, and overlap the ends of inserting bars with the reinforcement cages Binding; steel formwork is used to set up the formwork, and the concrete is pumped into the warehouse by pump truck + pipeline, and it is vibrated and compacted in layers; finally, maintenance measures such as straw bag covering and watering are taken until the concrete reaches 28 days of age, and then demolished template;

S6.营养袋8施工,首先进行营养袋穴位放样和采用钻机挖穴,然后将装好的营养袋放入穴内,短锚杆固定和表面采用铅丝网保护;S6. For the construction of nutrition bag 8, first carry out stakeout of nutrition bag acupoints and dig holes with a drilling rig, then put the packed nutrition bag into the hole, fix the short anchor rods and protect the surface with lead wire mesh;

S7.客土喷播层7施工,首先固定好客土喷播机,并将客土团粒结构的材料放入客土喷播机搅拌均匀;其次,在坡面铺一层铁丝网,并采用人工背负喷枪的方式依次将拌合均匀的客土浆液均匀喷播在营养袋周围;在喷播结束后,采用无纺布覆盖,并根据气候条件,适当采用雾化水滴喷洒养护;S7. For the construction of guest soil spraying layer 7, first fix the guest soil spraying machine, and put the material of guest soil aggregate structure into the guest soil spraying machine to mix evenly; secondly, lay a layer of barbed wire on the slope surface, and use artificial back Spray the well-mixed foreign soil slurry evenly around the nutrition bag in turn by means of a spray gun; after the spraying is completed, cover it with non-woven fabrics, and properly use atomized water droplets to spray and maintain according to the weather conditions;

S8.植物措施施工,首先进行乔灌木穴位放样,并挖穴或鱼鳞坑;其次,在穴底铺一层10cm厚的农家肥,并将乔灌木树苗放入穴内,回覆营养土,表面人工夯实。根据气候条件,适当采用防晒、灌溉等苗木抚育措施。S8. For the construction of plant measures, first carry out stakeout of arbor and shrub acupoints, and dig holes or fish scale pits; secondly, spread a layer of 10cm thick farmyard manure on the bottom of the hole, put arbor and shrub saplings into the hole, cover with nutrient soil, and manually tamp the surface . According to the climatic conditions, the seedling tending measures such as sun protection and irrigation should be adopted appropriately.

所述步骤S6中营养袋8采用抗老化的土工袋,规格为60cm×40cm×25cm,内部填塞营养土、灌草种籽和营养剂,其中每袋营养土0.05m3,灌木种籽0.6g,草籽2.4g,保水剂0.5g,有机肥0.005m3,化学肥料27g,营养袋8采用挖穴埋设,穴间距1.0m×1.0m,呈梅花型布置,穴长径0.6m,短径0.4m,穴深0.1m,每个营养袋8采用2根短锚杆固定,表面采用铅丝网保护。In the step S6, the nutritional bag 8 is an anti-aging geotechnical bag with a size of 60cm×40cm×25cm, filled with nutritious soil, shrub seeds and nutrients, wherein each bag of nutritious soil is 0.05m 3 and shrub seeds are 0.6g , grass seeds 2.4g, water-retaining agent 0.5g, organic fertilizer 0.005m 3 , chemical fertilizer 27g, nutrition bags 8 are buried by digging holes, the hole spacing is 1.0m×1.0m, and it is arranged in a plum blossom shape. The long diameter of the holes is 0.6m, and the short diameter 0.4m, the hole depth is 0.1m, each nutrition bag 8 is fixed with 2 short anchor rods, and the surface is protected with lead wire mesh.

所述步骤S7中客土喷播层7的喷播厚度为10cm,在每m2喷播面积中,普通硅酸盐水泥6kg,砂2kg,种植土0.006m3,有机质0.002m3,木质纤维200g,灌木种籽3g,草种9g,在客土喷播前,先在坡面铺一层铁丝网;在喷播结束后,需根据气候条件采取无纺布覆盖、雾化水滴喷洒等措施。In the step S7, the spraying thickness of the guest soil spraying layer 7 is 10cm. In every m2 spraying area, ordinary Portland cement is 6kg, sand is 2kg , planting soil is 0.006m3 , organic matter is 0.002m3 , wood fiber 200g, 3g of shrub seeds, and 9g of grass seeds. Before spraying in guest soil, spread a layer of barbed wire on the slope;

所述步骤S8中,在修坡面层5上和格构护坡4内采取灌草结合恢复植被,其中灌木选择金露梅、鬼箭锦鸡儿,混交比例1:1,株行距1.0m×1.0m,采取鱼鳞坑整地,穴规格,长径×短径×穴深为0.6m×0.4m×0.5m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm2,在底部平台3和顶面平台6采取栽植乔木和撒播草籽恢复植被,其中乔木选择柳树、杨树,株间混交,株行距3.0m×3.0m,采取挖穴整地,穴规格,穴径×穴深为0.8m×0.8m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm2In the step S8, a combination of shrubs and grasses is used to restore vegetation on the slope repair surface layer 5 and in the lattice slope protection 4, wherein the shrubs are Jinlumei and Caragana japonica, the mixing ratio is 1:1, and the spacing between plants and rows is 1.0m×1.0m. Use fish scale pits for land preparation, hole specifications, long diameter x short diameter x hole depth is 0.6m x 0.4m x 0.5m; sow grass seeds under the forest, choose Elymus chinensis, bluegrass cold field, old awn, mixed sowing The ratio is 2:1:2, the seeding rate is 200kg/hm 2 , plant trees and sow grass seeds on the bottom platform 3 and the top platform 6 to restore vegetation, among which trees choose willows and poplars, and the interplants are mixed, and the distance between plants and rows is 3.0m× 3.0m, digging holes for site preparation, hole size, hole diameter × hole depth is 0.8m×0.8m; grass seeds are sown under the forest, and the grass seeds are Elymus chinensis, bluegrass, and old awn, and the mixed sowing ratio is 2: 1:2, seeding rate 200kg/hm 2 .

尽管已经示出和描述了本发明的实例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although examples of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variants, the scope of the invention is defined by the appended claims and their equivalents.

Claims (10)

1.一种高原区道路下边坡挂渣综合治理系统,其特征在于,包括渣堆(1)、拦渣设施(2)、底部平台(3)、格构护坡(4)、修坡面层(5)、顶面平台(6)、客土喷播层(7)、营养袋(8)、截排水沟(9)以及道路(10),1. A comprehensive treatment system for slag hanging on slopes of roads in plateau areas, characterized in that it includes slag piles (1), slag blocking facilities (2), bottom platforms (3), lattice slope protection (4), and slope repair surface layers (5), top platform (6), foreign soil spraying layer (7), nutrition bag (8), intercepting drainage ditch (9) and road (10), 所述拦渣设施(2)布置于渣堆(1)的坡脚,起到拦挡渣体的作用;The slag blocking facility (2) is arranged at the slope foot of the slag pile (1) to play the role of blocking the slag body; 所述渣堆(1)的坡脚与拦渣设施(2)之间形成底部平台(3);A bottom platform (3) is formed between the slope toe of the slag pile (1) and the slag blocking facility (2); 所述修坡面层(5)铺设在渣堆(1)的表面,所述修坡面层(5)从上到下设置有多级;The slope repair surface layer (5) is laid on the surface of the slag pile (1), and the slope repair surface layer (5) is arranged in multiple stages from top to bottom; 所述修坡面层(5)的下端靠近底部平台(3)的两级上布置有用以确保渣体稳定的格构护坡(4);The lower end of the slope repair surface layer (5) is arranged on the two stages close to the bottom platform (3) to ensure the stability of the slag body with a lattice revetment (4); 所述渣堆(1)的顶部设置有顶面平台(6),在顶面平台(6)与道路(10)之间的裸露坡面上开穴安装营养袋(8);The top of the slag pile (1) is provided with a top platform (6), and a nutrition bag (8) is installed on the exposed slope between the top platform (6) and the road (10); 所述客土喷播层(7)喷播在营养袋(8)周边的裸露坡面上;The guest soil spraying layer (7) is sprayed on the bare slope around the nutrition bag (8); 所述截排水沟(9)设置道路(10)下的边坡、马道和挂渣区周边,用于拦截和导排道路(10)、渣堆(1)坡面及周边坡面汇水,减少水流冲刷堆渣区。The intercepting drainage ditch (9) is set on the side slope under the road (10), the horse road and the surrounding areas of the slag hanging area, and is used for intercepting and guiding the road (10), the slope of the slag pile (1) and the surrounding slope to catch water, Reduce water flow to scour the slag dump area. 2.根据权利要求1所述的一种高原区道路下边坡挂渣综合治理系统,其特征在于,所述拦渣设施(2)顶宽1.5m,墙高5.0m,其中拦渣设施(2)的基础埋入原地面线以下深度1.5m,拦渣设施(2)临渣侧坡比1:0.1,背渣侧坡比1:0.4。2. A kind of system for comprehensive treatment of slag hanging on slopes of roads in plateau areas according to claim 1, characterized in that the slag blocking facility (2) has a top width of 1.5m and a wall height of 5.0m, wherein the slag blocking facility (2) ) foundation is buried at a depth of 1.5m below the original ground line, and the slag-stopping facility (2) has a side slope ratio of 1:0.1 to the slag and a side slope ratio of 1:0.4 to the slag. 3.根据权利要求1所述的一种高原区道路下边坡挂渣综合治理系统,其特征在于,所述底部平台(3)和顶面平台(6)上栽植乔木和撒播草籽用以恢复植被。3. The system for comprehensive treatment of slag hanging on the lower slope of roads in plateau areas according to claim 1, characterized in that, on the bottom platform (3) and the top platform (6), trees are planted and grass seeds are sowed in order to restore vegetation. 4.根据权利要求1所述的一种高原区道路下边坡挂渣综合治理系统,其特征在于,所述修坡面层(5)的边坡坡比为1:1.5~1:2.5,单级边坡高度10~15m。4. A system for comprehensive treatment of slag hanging on slopes of roads in plateau areas according to claim 1, characterized in that, the slope slope ratio of the slope repair surface layer (5) is 1:1.5 to 1:2.5, and the single The grade slope height is 10~15m. 5.根据权利要求4所述的一种高原区道路下边坡挂渣综合治理系统,其特征在于,所述格构护坡(4)包括顶梁(41)、底梁(42)、格构梁(43)以及节点插筋(44),所述顶梁(41)修建在修坡面层(5)最下面的两级边坡的顶部,底梁(42)修建在修坡面层(5)的坡脚,在顶梁(41)和底梁(42)之间浇筑格构梁(43),格构梁(43)交叉布置,所述节点插筋(44)设置在格构梁(43)的交叉部位,所述节点插筋(44)插入到渣堆(1)内,所述格构梁(43)交叉设置围成的空间内填充有营养土层(45),所述格构梁(43)的间排距为3.0m×3.0m,截面面积为0.4m×0.4m。5. A kind of plateau area road downside slope hanging slag comprehensive control system according to claim 4, is characterized in that, described lattice structure slope protection (4) comprises top beam (41), bottom beam (42), lattice beam (43) and node inserting ribs (44), described top beam (41) is built on the top of the two-level slope at the bottom of the slope repair surface layer (5), and the bottom beam (42) is built on the slope repair surface layer (5) ), pour lattice beams (43) between the top beam (41) and the bottom beam (42), the lattice beams (43) are arranged crosswise, and the node inserting bars (44) are arranged on the lattice beams ( 43), the node inserting bars (44) are inserted into the slag pile (1), and the space enclosed by the intersecting arrangement of the lattice beams (43) is filled with a nutrient soil layer (45). The spacing between the beams (43) is 3.0m * 3.0m, and the cross-sectional area is 0.4m * 0.4m. 6.根据权利要求5所述的一种高原区道路下边坡挂渣综合治理系统,其特征在于,所述营养袋(8)间距1.0m×1.0m,呈梅花型布置,所述客土喷播层(7)喷播厚度10cm。6. A system for comprehensive treatment of slag hanging on slopes of roads in plateau areas according to claim 5, characterized in that, the nutrition bags (8) are arranged in a plum blossom pattern at a distance of 1.0m×1.0m, and the guest soil spraying The sowing layer (7) is sprayed with a thickness of 10cm. 7.一种高原区道路下边坡挂渣综合治理系统的施工方法,其特征在于,包括以下具体步骤:7. A construction method for a comprehensive management system of slag hanging on slopes of roads in plateau areas, characterized in that it comprises the following specific steps: S1.施工准备,整修现有或新建施工便道,满足施工机械和材料运输要求,达到通水、通电、通路、通气、通讯、平整场地要求,为工程开工创造条件;S1. Construction preparation, renovation of existing or new construction access roads, meeting the requirements for construction machinery and material transportation, meeting the requirements for water supply, electricity supply, access, ventilation, communication, and site leveling, and creating conditions for the start of the project; S2.拦渣设施(2)施工,先按照轴线进行放样,并采用挖掘机开挖基础;其次,混凝土跳仓施工,采用钢模板立模,并采用泵车直接泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S2. For the construction of slag-blocking facilities (2), first stake out according to the axis, and use excavators to excavate the foundation; secondly, for concrete jumping construction, use steel formwork to set up formwork, and use pump trucks to directly pump concrete into the warehouse, layering Vibrate and compact; finally, take maintenance measures such as covering with straw bags and watering until the concrete reaches 28 days of age, and then remove the formwork; S3.截排水沟(9)施工,先按照轴线进行放样;对于周边排水沟采用人工开挖为准,局部岩石区采用人工钻爆施工;对于坡顶、马道排水沟,需在翻渣和修坡结束后,采取人工开挖,在开挖完工后,采用钢模板立模,采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S3. For the construction of the intercepting drainage ditch (9), first carry out lofting according to the axis; manual excavation shall be used for surrounding drainage ditches, and manual drilling and blasting construction shall be used for local rocky areas; After the slope is completed, manual excavation is adopted. After the excavation is completed, the steel formwork is used to set up the formwork, and the concrete is pumped into the warehouse by means of pump trucks and pipelines, and the concrete is vibrated and compacted in layers; finally, maintenance such as straw bag covering and watering are adopted Measures, until the concrete reaches 28 days of age, remove the formwork; S4.修坡面层(5)的翻渣和修坡施工,根据现状坡面挂渣分布,按照自上而下进行翻渣施工,上中部以人工翻运为主,中下部以机械翻渣为主;在翻渣过程中,根据翻运后的挂渣现状将堆渣边坡平整成单级或多级边坡,修坡必须按照自上而下进行施工,尽量保证挖填平衡;S4. For the slag turning and slope repairing construction of the slope repair surface layer (5), according to the current distribution of hanging slag on the slope surface, the slag turning will be carried out from top to bottom. Mainly; in the process of slag dumping, according to the status of slag hanging after dumping, the slag slope is leveled into a single-level or multi-level slope, and the slope repair must be carried out from top to bottom to ensure the balance of excavation and filling as much as possible; S5.格构护坡(4)施工,首先进行格构梁放样和人工开槽;其次槽内铺设格构钢筋笼,在格构梁节点预埋插筋,并将插筋端头和钢筋笼进行搭接绑扎;采用钢模板立模,并采用泵车+管道的方式泵送混凝土入仓,分层振捣密实;最后,采取草袋覆盖、洒水等养护措施,直至混凝土达到28天龄期后,拆除模板;S5. For the construction of lattice slope protection (4), first carry out lattice beam lofting and manual slotting; secondly, lay lattice reinforcement cages in the grooves, pre-embed inserting bars at lattice beam nodes, and place the end of inserting bars and the reinforcement cage Lap joint binding; steel formwork is used to set up the formwork, and the concrete is pumped into the warehouse by means of pump truck + pipeline, and it is vibrated and compacted in layers; finally, maintenance measures such as straw bag covering and watering are taken until the concrete reaches 28 days of age , remove the template; S6.营养袋(8)施工,首先进行营养袋穴位放样和采用钻机挖穴,然后将装好的营养袋放入穴内,短锚杆固定和表面采用铅丝网保护;S6. The nutrition bag (8) construction, first carry out the nutrition bag acupoint stakeout and adopt the drilling rig to dig the hole, then put the packed nutrition bag into the hole, fix the short anchor rod and protect the surface with lead wire mesh; S7.客土喷播层(7)施工,首先固定好客土喷播机,并将客土团粒结构的材料放入客土喷播机搅拌均匀;其次,在坡面铺一层铁丝网,并采用人工背负喷枪的方式依次将拌合均匀的客土浆液均匀喷播在营养袋周围;在喷播结束后,采用无纺布覆盖,并根据气候条件,适当采用雾化水滴喷洒养护;S7. The guest soil spraying layer (7) construction, first fix the guest soil spraying machine, put the material of guest soil aggregate structure into the guest soil spraying machine and mix evenly; secondly, lay a layer of barbed wire on the slope surface, and use The uniformly mixed foreign soil slurry is evenly sprayed around the nutrition bag in turn by artificially carrying the spray gun; after the spraying is completed, it is covered with non-woven fabrics, and according to the weather conditions, it is properly sprayed with atomized water droplets for maintenance; S8.植物措施施工,首先进行乔灌木穴位放样,并挖穴或鱼鳞坑;其次,在穴底铺一层10cm厚的农家肥,并将乔灌木树苗放入穴内,回覆营养土,表面人工夯实。根据气候条件,适当采用防晒、灌溉等苗木抚育措施。S8. For the construction of plant measures, first carry out stakeout of arbor and shrub acupoints, and dig holes or fish scale pits; secondly, spread a layer of 10cm thick farmyard manure on the bottom of the hole, put arbor and shrub saplings into the hole, cover with nutrient soil, and manually tamp the surface . According to the climatic conditions, the seedling tending measures such as sun protection and irrigation should be adopted appropriately. 8.根据权利要求7所述的一种高原区道路下边坡挂渣综合治理系统的施工方法,其特征在于,所述步骤S6中营养袋(8)采用抗老化的土工袋,规格为60cm×40cm×25cm,内部填塞营养土、灌草种籽和营养剂,其中每袋营养土0.05m3,灌木种籽0.6g,草籽2.4g,保水剂0.5g,有机肥0.005m3,化学肥料27g,营养袋(8)采用挖穴埋设,穴间距1.0m×1.0m,呈梅花型布置,穴长径0.6m,短径0.4m,穴深0.1m,每个营养袋(8)采用2根短锚杆固定,表面采用铅丝网保护。8. The construction method of a comprehensive control system for slag hanging on slopes of roads in plateau areas according to claim 7, characterized in that, in the step S6, the nutrition bag (8) adopts an anti-aging geotechnical bag with a specification of 60cm× 40cm×25cm, filled with nutrient soil, shrub and grass seeds and nutrient agents, of which 0.05m 3 of nutrient soil per bag, 0.6g of shrub seeds, 2.4g of grass seeds, 0.5g of water retaining agent, 0.005m 3 of organic fertilizer, chemical fertilizer 27g, the nutrition bag (8) is buried by digging holes, the hole spacing is 1.0m×1.0m, and it is arranged in a plum blossom shape. The long diameter of the hole is 0.6m, the short diameter is 0.4m, and the depth of the hole is 0.1m. A short anchor rod is used for fixing, and the surface is protected by lead wire mesh. 9.根据权利要求8所述的一种高原区道路下边坡挂渣综合治理系统的施工方法,其特征在于,所述步骤S7中客土喷播层(7)的喷播厚度为10cm,在每m2喷播面积中,普通硅酸盐水泥6kg,砂2kg,种植土0.006m3,有机质0.002m3,木质纤维200g,灌木种籽3g,草种9g,在客土喷播前,先在坡面铺一层铁丝网;在喷播结束后,需根据气候条件采取无纺布覆盖、雾化水滴喷洒等措施。9. The construction method of a kind of plateau area road downside slope hanging slag comprehensive treatment system according to claim 8, is characterized in that, the spraying thickness of foreign soil spraying layer (7) is 10cm in the described step S7, in For every m 2 spraying area, 6kg of ordinary Portland cement, 2kg of sand, 0.006m 3 of planting soil, 0.002m 3 of organic matter, 200g of wood fiber, 3g of shrub seeds, and 9g of grass seeds. Spread a layer of barbed wire on the slope; after spraying, it is necessary to take measures such as covering with non-woven fabrics and spraying atomized water droplets according to the weather conditions. 10.根据权利要求8所述的一种高原区道路下边坡挂渣综合治理系统的施工方法,其特征在于,所述步骤S8中,在修坡面层(5)上和格构护坡(4)内采取灌草结合恢复植被,其中灌木选择金露梅、鬼箭锦鸡儿,混交比例1:1,株行距1.0m×1.0m,采取鱼鳞坑整地,穴规格,长径×短径×穴深为0.6m×0.4m×0.5m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm2,在底部平台(3)和顶面平台(6)采取栽植乔木和撒播草籽恢复植被,其中乔木选择柳树、杨树,株间混交,株行距3.0m×3.0m,采取挖穴整地,穴规格,穴径×穴深为0.8m×0.8m;林下撒播草籽,草种选择垂穗披碱草、冷地早熟禾、老麦芒,混播比例2:1:2,播种量200kg/hm210. The construction method of a comprehensive treatment system for side slopes hanging on roads in plateau areas according to claim 8, characterized in that, in the step S8, on the slope repair surface layer (5) and the lattice slope protection (4 ) combined with shrubs and grasses to restore vegetation, among which the shrubs are Jinlumei and Caragana japonica, the mixed ratio is 1:1, the spacing between plants and rows is 1.0m×1.0m, and fish scale pits are used for site preparation. The size of the hole is long diameter×short diameter×depth. 0.6m×0.4m×0.5m; sow grass seeds in the undergrowth. The grass seeds are Elymus fringa, Bluegrass cold field and Grass awn. The mixed sowing ratio is 2:1:2, and the seeding rate is 200kg/hm2. 3) and the top platform (6) to restore vegetation by planting trees and sowing grass seeds, among which trees are selected from willows and poplars, and the trees are mixed with each other. The row spacing between plants is 3.0m×3.0m. The depth of the hole is 0.8m×0.8m; sow grass seeds under the forest, and the grass species are Elymus fringa, Bluegrass cold field, and Awn Grass. The mixed sowing ratio is 2:1:2, and the seeding rate is 200kg/hm 2 .
CN201910908828.XA 2019-09-25 2019-09-25 Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof Active CN110552356B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910908828.XA CN110552356B (en) 2019-09-25 2019-09-25 Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910908828.XA CN110552356B (en) 2019-09-25 2019-09-25 Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof

Publications (2)

Publication Number Publication Date
CN110552356A true CN110552356A (en) 2019-12-10
CN110552356B CN110552356B (en) 2024-02-06

Family

ID=68741333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910908828.XA Active CN110552356B (en) 2019-09-25 2019-09-25 Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof

Country Status (1)

Country Link
CN (1) CN110552356B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962459A (en) * 2020-08-26 2020-11-20 长江勘测规划设计研究有限责任公司 Urban debris flow channel type comprehensive treatment system for abandoned slag yard and construction method thereof
CN113585295A (en) * 2021-08-03 2021-11-02 中国电建集团华东勘测设计研究院有限公司 Construction method of high-soil slope frame lattice beam combined planting groove
CN114467609A (en) * 2022-02-14 2022-05-13 中国水电顾问集团桂阳新能源有限公司 Ecological restoration structure system and restoration method for high and steep rubble soil slope
CN114703871A (en) * 2022-01-18 2022-07-05 华东建筑设计研究院有限公司上海地下空间与工程设计研究院 Rigid and flexible combined supporting structure of expansive soil excavation side slope and construction method
CN115821953A (en) * 2022-12-27 2023-03-21 重庆交通大学 Ecological slope protection structure and construction method thereof
CN116856437A (en) * 2023-07-25 2023-10-10 中国电建集团重庆工程有限公司 A mountain ecological restoration and management method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006063631A (en) * 2004-08-26 2006-03-09 Japan Railway Construction Transport & Technology Agency Soil structure on the slope of water-impervious sheet and its construction method
KR20080001582A (en) * 2006-06-29 2008-01-03 (주)덕산조경 Slope greening and tree planting apparatus for him
JP2009002083A (en) * 2007-06-22 2009-01-08 Chubu Electric Power Co Inc Slope vegetation protection method and slope vegetation protection structure
CN101818499A (en) * 2010-03-05 2010-09-01 深圳市如茵生态环境建设有限公司 Revegetation system on steep rocky slopes and implementing method thereof
CN105113517A (en) * 2015-08-13 2015-12-02 湖南中大园林环境科技有限公司 Technology for treating construction dreg site and side slope accumulation with vetiver grass
CN105484275A (en) * 2016-01-12 2016-04-13 中国电建集团贵阳勘测设计研究院有限公司 Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area
CN110024628A (en) * 2019-04-03 2019-07-19 青海生源园林绿化工程有限公司 A kind of high altitude localities roadbed side slope Three-Dimensional Network Seeding construction method
KR20190103772A (en) * 2018-02-28 2019-09-05 정병현 Waste stone chapter restoration construction method
CN211037008U (en) * 2019-09-25 2020-07-17 长江勘测规划设计研究有限责任公司 Comprehensive treatment system for slope slag-adhering under plateau area road

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006063631A (en) * 2004-08-26 2006-03-09 Japan Railway Construction Transport & Technology Agency Soil structure on the slope of water-impervious sheet and its construction method
KR20080001582A (en) * 2006-06-29 2008-01-03 (주)덕산조경 Slope greening and tree planting apparatus for him
JP2009002083A (en) * 2007-06-22 2009-01-08 Chubu Electric Power Co Inc Slope vegetation protection method and slope vegetation protection structure
CN101818499A (en) * 2010-03-05 2010-09-01 深圳市如茵生态环境建设有限公司 Revegetation system on steep rocky slopes and implementing method thereof
CN105113517A (en) * 2015-08-13 2015-12-02 湖南中大园林环境科技有限公司 Technology for treating construction dreg site and side slope accumulation with vetiver grass
CN105484275A (en) * 2016-01-12 2016-04-13 中国电建集团贵阳勘测设计研究院有限公司 Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area
KR20190103772A (en) * 2018-02-28 2019-09-05 정병현 Waste stone chapter restoration construction method
CN110024628A (en) * 2019-04-03 2019-07-19 青海生源园林绿化工程有限公司 A kind of high altitude localities roadbed side slope Three-Dimensional Network Seeding construction method
CN211037008U (en) * 2019-09-25 2020-07-17 长江勘测规划设计研究有限责任公司 Comprehensive treatment system for slope slag-adhering under plateau area road

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962459A (en) * 2020-08-26 2020-11-20 长江勘测规划设计研究有限责任公司 Urban debris flow channel type comprehensive treatment system for abandoned slag yard and construction method thereof
CN113585295A (en) * 2021-08-03 2021-11-02 中国电建集团华东勘测设计研究院有限公司 Construction method of high-soil slope frame lattice beam combined planting groove
CN114703871A (en) * 2022-01-18 2022-07-05 华东建筑设计研究院有限公司上海地下空间与工程设计研究院 Rigid and flexible combined supporting structure of expansive soil excavation side slope and construction method
CN114467609A (en) * 2022-02-14 2022-05-13 中国水电顾问集团桂阳新能源有限公司 Ecological restoration structure system and restoration method for high and steep rubble soil slope
CN115821953A (en) * 2022-12-27 2023-03-21 重庆交通大学 Ecological slope protection structure and construction method thereof
CN116856437A (en) * 2023-07-25 2023-10-10 中国电建集团重庆工程有限公司 A mountain ecological restoration and management method

Also Published As

Publication number Publication date
CN110552356B (en) 2024-02-06

Similar Documents

Publication Publication Date Title
CN110552356B (en) Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof
CN105484275B (en) Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN105625443B (en) High-steep soil nail grass planting slope protection structure system and construction method thereof
CN109723068B (en) Steep concrete frame beam slope protection system and construction method conducive to the growth of slope vegetation
CN110984189A (en) Slope ecological restoration system and method
CN111021375A (en) Recovery and treatment method for mine geological environment
CN104805845A (en) Flexible slope protection method for soft sandstone natural side slope
CN103548519A (en) Vegetation restoration structure of discarded metal mine and vegetation restoration method of discarded metal mine
CN101622931B (en) Greening sloping surface for rock side slope facing wall and construction method thereof
CN104186233A (en) Frame beam slope greening method and frame beam slope greening facility
KR102226656B1 (en) Trees Growing Slope Area Greening Method
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN108755592A (en) In situ for hard slope formula shore protection plants raw formula ecology reconstruction structure and method
KR100830150B1 (en) Inclined plane greening method and tree planting device for the method
CN111543233A (en) Construction method for planting seedlings in muddy saline-alkali soil in coastal island region
CN110512628A (en) A kind of slope ecological restoration method
CN110424420A (en) Coarse granule composite soil high gradient slope control method
CN204014608U (en) A kind of sash beam greening side slope facility
CN111962459A (en) Urban debris flow channel type comprehensive treatment system for abandoned slag yard and construction method thereof
CN211037008U (en) Comprehensive treatment system for slope slag-adhering under plateau area road
CN212896409U (en) Three-dimensional geotechnique's net pad grass planting slope protection structure
CN209816870U (en) Conducive to slope vegetation growth steep concrete frame beam slope protection system
CN116856437A (en) A mountain ecological restoration and management method
CN207228135U (en) Horizontal hedge blocks native ecological slope protection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant