CN110464239A - A kind of shower column - Google Patents
A kind of shower column Download PDFInfo
- Publication number
- CN110464239A CN110464239A CN201910778989.1A CN201910778989A CN110464239A CN 110464239 A CN110464239 A CN 110464239A CN 201910778989 A CN201910778989 A CN 201910778989A CN 110464239 A CN110464239 A CN 110464239A
- Authority
- CN
- China
- Prior art keywords
- tube body
- pipe group
- shower
- water
- waterway switching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47K—SANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
- A47K3/00—Baths; Douches; Appurtenances therefor
- A47K3/28—Showers or bathing douches
Landscapes
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Epidemiology (AREA)
- General Health & Medical Sciences (AREA)
- Domestic Plumbing Installations (AREA)
Abstract
The present invention provides a kind of shower columns, comprising: shower faucet is installed on metope, and shower faucet is applied to connect external source to waterway switching, and waterway switching includes the first waterway switching;One end of tube body, tube body connects shower faucet, and tube body is up extended a distance into from shower faucet, and the first waterway switching extends in tube body;Shoulder neck water unit, it is arranged on tube body, shoulder neck water unit includes shell, the one side of shell upward has placement surface, shell is directed downwardly to be provided with out the water surface on one side, the water surface is connected to the first waterway switching out, and the level configurations on tube body of shoulder neck water unit are at the flushable shoulder of water flow or neck sprayed from the water surface out;Tube body includes determining pipe group and dynamic pipe group, determines pipe group connection shower faucet, and dynamic Guan Zuke determines the axial movement of pipe group relatively, and shoulder neck water unit is fixed in dynamic pipe group.The flushable shoulder neck of shower column can be realized using the technical program and puts shower products.
Description
Technical field
The present invention relates to a kind of field of bathroom, in particular to a kind of shower columns.
Background technique
Existing shower column is generally only provided with head gondola water faucet and Portable rose, during shower, can not hydro-peening to people
Shoulder and neck, using being also difficult to clean shoulder neck position when Portable rose.And in shower column use process, use
When family is needed using shower products, need to take elsewhere, it is not very convenient.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art described above, a kind of flushable shoulder neck is provided and puts leaching
The shower column of bath article.
In order to solve the above-mentioned technical problems, the present invention provides a kind of shower columns, comprising:
Shower faucet is installed on metope, the shower faucet be applied to connect external source to waterway switching, it is described to cut
Changing water route includes the first waterway switching;
One end of tube body, the tube body connects the shower faucet, and the tube body up extends one from the shower faucet
Section distance, first waterway switching extend in the tube body;
Shoulder neck water unit is arranged on the tube body, and the shoulder neck water unit includes shell, the one side of the shell upward
With placement surface, the shell is directed downwardly to be provided with out the water surface on one side, and the water surface out is connected to first waterway switching, described
The level configurations on the tube body of shoulder neck water unit are at the flushable shoulder of water flow or neck from the ejection of the water surface out;
The tube body includes determining pipe group and dynamic pipe group, described to determine the pipe group connection shower faucet, the dynamic Guan Zuke phase
To the axial movement for determining pipe group, the shoulder neck water unit is fixed in the dynamic pipe group.
Preferably, described to determine to be provided with positioning component between pipe group and the dynamic tube assembly, the positioning component is configured to
So that the dynamic Guan Zuke is relatively described to determine pipe group adjustment relative position and fixation.
Preferably, described to determine pipe group and be socketed in outside the dynamic pipe group.
Preferably, the positioning component includes control knob and the pressure pipe part affixed with the control knob, and the control knob is set
It sets and determines in pipe group described, the control knob can control the pressure pipe part to compress the dynamic pipe group and limit the dynamic Guan Zuyi
It is dynamic.
Preferably, described to determine pipe group include the first tube body that one end connects the shower faucet, described to determine pipe group and further include
One is installed in the fixing seat on metope, and the other end of first tube body is connected to the fixing seat.
Preferably, the fixing seat includes the pedestal affixed with metope and the sleeve that connect with the pedestal, the sleeve
It is extended with the first mounting hole and the second mounting hole from top to bottom, is also set up between first mounting hole and the second mounting hole limited
Position step, second mounting hole can be socketed in outside first tube body, and the other end of first tube body abuts the limit
Step.
Preferably, the dynamic pipe group is pluggable and slides in first mounting hole, and one end of the dynamic pipe group is also set
It is equipped with cooperation step, when the cooperation step abuts the limited step, the dynamic pipe group upward sliding to extreme position.
Preferably, the dynamic pipe group includes the second tube body and third tube body, and one end of second tube body is plugged to described
Fixing seat, the other end connect one end of the third tube body, and the shoulder neck water unit setting is in second tube body and described the
The junction of three tube bodies.
Preferably, the shower column further includes the head gondola water faucet for being connected to the third tube body other end, the switching water
Road further includes third waterway switching, and the third waterway switching is connected to the head gondola water faucet, and third waterway switching extends in described
In tube body.
Preferably, the tube body further includes the interconnecting piece that the junction of second tube body and the third tube body is arranged in
Part, the shoulder neck water unit are clipped between first tube body and the connecting component.
Preferably, first tube body includes outer tube and the inner tube for extending in the outer tube, and said inner tube extends to
It is connected to the third tube body, the outer tube connection water surface out.
Preferably, the connecting component can be set in outside said inner tube and there are water space out, institutes between said inner tube
It states out water space and is connected to second tube body, the ditch through-hole that the ring wall of the connecting component also extends through, the ditch through-hole is connected to institute
State out water space, the connection of the water space out water surface out.
Preferably, the connecting component is additionally provided with fixed part in the upper end of the ring wall, and said inner tube is from the connection
Component passes through to the top of the fixed part and is connected to the third pipe fitting, the third pipe fitting and the fixed company of the fixed part
It connects.
Preferably, the shower column further includes Portable rose, the waterway switching include the second waterway switching, described second
Waterway switching is connected to the Portable rose.
Preferably, the shell is additionally provided with the spliced eye for the Portable rose grafting.
Compared to the prior art, technical solution of the present invention have it is following the utility model has the advantages that
1. the level configurations of shoulder neck water unit at can the shoulder neck to user be rinsed, improve user experience;
2. shoulder neck water unit integrates function of placing articles, it can be convenient user and take shower products;
3. shoulder neck water unit integrated shower function of socket, user can place Portable rose on spliced eye, user's body is improved
It tests;
4. the waterway switching of shoulder neck water unit extends in tube body, beautiful effect is played;
5. shoulder neck water unit can be mobile relative to pipe group is determined together with dynamic pipe group, shoulder neck water and head can be adjusted together in this way
The height of portion's shower, it is very convenient.
Detailed description of the invention
Fig. 1 is the exploded perspective figure of shower column in the preferred embodiment of the present invention;
Fig. 2 is the perspective view that pipe group and shoulder neck water unit are moved in the preferred embodiment of the present invention;
Fig. 3 is the perspective view of shoulder neck water unit in the preferred embodiment of the present invention;
Fig. 4 is the perspective view of another angle of shoulder neck water unit in the preferred embodiment of the present invention;
Fig. 5 is the sectional view of fixing seat when moving pipe group in the preferred embodiment of the present invention to reach upward extreme position;
Fig. 6 is the sectional view of shoulder neck water unit when moving pipe group in the preferred embodiment of the present invention to reach upward extreme position;
Fig. 7 is the partial cutaway view of shower faucet in the preferred embodiment of the present invention.,
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention will be further described.
Hereinafter be used to describe certain directional terminologies of attached drawing, for example, "inner", "outside", " top ", " lower section " and
Other directional terminologies, it will accordingly be understood that for its normal meaning and criticize often see attached drawing when related those directions.It removes
Otherwise indicated, directional terminology described in this specification is substantially according to conventional direction understood by one of ordinary skill in the art.
Term " first " used in the present invention, " first ", " second ", " second " and its similar terms, at this
Any sequence, quantity or importance are not offered as in invention, but for distinguishing a component with other components.
- Fig. 7 refering to fig. 1, a kind of shower column 100, including shower faucet 1, tube body, shoulder neck water unit 4,5 and of head gondola water faucet
Portable rose 6, the shower faucet 1 are installed on metope, and the tool of shower faucet 1 is respectively turned on there are two water inlet 11 to be come from
Extraneous cold and hot water source, the shower faucet 1 also have a thermostatic valve 12 for receiving the hot water from two water inlet 11
And cold water, and hot water and cold water are mixed, the thermostatic valve 12 is configured to can be according to user from the mixing water that it is flowed out
Need to keep constant temperature.
First passage 14, second channel 15 and third channel 16 that isolation is opened, institute are disposed in the shower faucet 1
It states shower faucet 1 and is additionally provided with the alternative switching valve for connecting the first passage 14 or second channel 15 or third channel 16
13, the switching valve 13 receives the mixing water from the thermostatic valve 12 and is connected to the first passage 14 or second channel 15
Or one of third channel 16.First outlet 17 is also convexly equipped with outside the shower faucet 1, the first outlet 17 is vertical
Upward, the first outlet 17 is connected to the first passage 14, and the first outlet 17 is additionally provided with outer spiral shell along its periphery
Line structure is additionally provided with the communication port 19 of connection, the communication port 19 between the second channel 15 and the first passage 14
Axis be overlapped with the axis of the first outlet 17, the diameter of the communication port 19 is less than the diameter of the first outlet 17,
The effect of the communication port 19 illustrates hereinafter.Second outlet 18 is also convexly equipped with outside the shower faucet 1, the second outlet 18 is perpendicular
Directly downward, the second outlet 18 is connected to the third channel 16.
The shower faucet 1 is used to external source being switched to the first outlet 17, second outlet 18 or the company
Port 19, the shower column 100 further include the switching water for connecting the first outlet 17, second outlet 18 or communication port 19
Road, the water are distinguished after the outflow of the first outlet 17, second outlet 18 or communication port 19 and through the waterway switching
It is flow to the shoulder neck water unit 4, Portable rose 6 and head gondola water faucet 5, the waterway switching includes connecting with the shoulder neck water unit 4
Logical the first waterway switching, the second waterway switching being connected to the head gondola water faucet 5 and the third being connected to the Portable rose 6
Waterway switching, the shower faucet 1 are applied to connect external source to waterway switching, can illustrate hereinafter.
The tube body of the shower column 100 is connected to the first outlet 17, and one end of the tube body is provided with and institute
The internal thread structure of the adaptation installation of first outlet 17 is stated, the tube body is upwardly extended from the first outlet 17 of the shower faucet 1
The end of the tube body is arranged in a distance, the head gondola water faucet 5, and second waterway switching extends in the tube body,
Water flows through second waterway switching from the communication port 19s and sprays from the head gondola water faucet 5, and the head gondola water faucet 5 sprays
Downwards, user may stand in the spray for receiving water in the spraying range of the head gondola water faucet 5 to water flow out.
The shoulder neck water unit 4 is arranged on the tube body, and the shoulder neck water unit 4 is located at the head gondola water faucet 5 and leaching
Between bath faucet 1.The shoulder neck water unit 4 includes shell 41, and the shell 41 is square, the mask of the shell 41 upward
There is placement surface 411, the placement surface 411 is parallel to the horizontal plane, and in some simple replacements, the placement surface 411 can also be with
Horizontal plane tilts at an angle, and the placement surface 411 is used to accept some shower products, such as soap, shampoo, bath oil
Deng.The shell 41 is directed downwardly to be provided with out the water surface 412 on one side, and first waterway switching is connected to the water surface 412 out, In
Go out the water surface 412 described in the present embodiment and horizontal plane forms an angle and is directed away from the side of the tube body, in the present embodiment
Described in go out the water surface 412 and horizontal plane in angle of 45 degrees.A plurality of apopores or extension has can be set in the water surface 412 out
Water outlet seam, the level configurations of the shoulder neck water unit 4 at from it is described go out the water surface 412 flushable shoulder of water flow and neck that spray
Portion.
The Portable rose 6 of the shower column 100 holds for user and is applicable in the position for spraying some difficult sprays, institute
Stating Portable rose 6 further includes a shower connecting tube 61, and the third waterway switching extends in the shower connecting tube 61, described
One end of shower connecting tube 61 connects the second outlet 18, and the other end of the shower connecting tube 61 connects the Portable rose
6.The shell 41 is additionally provided with the spliced eye 418 for 6 grafting of Portable rose, when user does not need using the hand-held flower
When spilling 6, the spliced eye 418 can be placed into.
The tube body includes determining pipe group 22 and dynamic pipe group 21, described to determine pipe group 22 and connect the shower faucet 1, the dynamic pipe
Group 21 can the relatively described axial movement for determining pipe group 22, the shoulder neck water unit 4 is fixed in the dynamic pipe group 21, therefore the shoulder
Neck water unit 4 can be moved together with the dynamic pipe group 21.
The shower column 100 it is described determine pipe group 22 and it is dynamic pipe group 21 described between be provided with positioning component 3, it is described fixed
Hyte part 3 is arranged so that the dynamic pipe group 21 relatively described can determine pipe group 22 and adjust relative position and fixation, described to determine pipe group
22 are socketed in outside the dynamic pipe group 21, and the positioning component 3 includes control knob 31 and the pressure pipe part affixed with the control knob 31
32, the setting of control knob 31 is determined in pipe group 22 described, and it is described dynamic that the control knob 31 can control the pressure pipe part 32 to compress
Pipe group 21 simultaneously limits the dynamic movement of pipe group 21.
The slide construction between the tube body and the shoulder neck water unit 4 and mutual installation relation is detailed below.
Described to determine pipe group 22 include the first tube body 221 connecting with the first outlet 17, and first tube body 221 includes
Outer tube 2211 and the inner tube 2212 in the outer tube 2211 is extended in, one end of the outer tube 2211 is provided with to be gone out with described first
The internal thread structure of 17 adaptation installation of mouth, the outer tube 2211 upwardly extend one section from the first outlet 17 of the shower faucet 1
Distance.The communication port 19 is inserted into one end of said inner tube 2212, and upwardly extends a distance from the communication port 19, described
The extended distance of inner tube 2212 is greater than the development length of the outer tube 2211, in the present embodiment, the extension of said inner tube 2212
Length is 1.25 times of 2212 development length of said inner tube.
Described to determine pipe group 22 further include the fixing seat 222 being installed on metope, the fixing seat 222 and the affixed seat of metope
Body 2222 and the sleeve 2221 connecting with the pedestal 2222, the sleeve 2221 are socketed in the other end of the outer tube 2211,
The axis of the sleeve 2221 is overlapped with the axis of the outer tube 2211.The sleeve 2221 is extended with the first installation from top to bottom
Hole 2223 and the second mounting hole 2224, are additionally provided with limited step between first mounting hole 2223 and the second mounting hole 2224
2225, the diameter of second mounting hole 2224 matches with the diameter of the outer tube 2211 and can be socketed in the outer tube 2211
Outside, the other end of the outer tube 2211 abuts the limited step 2225.
First mounting hole 2223 includes the first vertical section up extended a distance into from the limited step 2225
2227, the diameter of first vertical section 2227 is less than the diameter of second mounting hole 2224.First mounting hole 2223
It further include expanding section 2226, first installation from the end of the vertical section toward the diameter that the axis diameter far from the sleeve 2221 expands
Hole 2223 further includes the second vertical section 2228 for expanding the end of section 2226 from the diameter and continuing up to extend.
The dynamic pipe group 21 includes the second tube body 211, the diameter of second tube body 211 and first vertical section 2227
Diameter be adapted, described second tube body, 211 one end can be inserted into first vertical section 2227, second tube body 211
The internal perisporium of one end is installed with first set to ring 2111, and the diameter that the first set supports the inner ring surface of ring 2111 is greater than said inner tube
2212 diameter, said inner tube 2212 may pass through the inner ring surface that the first set supports ring 2111, and the first set supports ring 2111
There are the gap that water supply is flowed through between inner ring surface and said inner tube 2212, the first set supports ring 2111 and protrudes second tube body
211 one end is simultaneously circumferentially provided with external thread structure, and second tube body 211 is additionally provided with cyclization 2112, described to match
Internal thread structure is arranged in the inner ring surface of cyclization 2112, and the internal thread structure with cyclization 2112 can support ring with the first set
2111 external thread structure is adapted to connection.
The diameter of the outer ring surface with cyclization 2112 is greater than the diameter of first vertical plane, therefore described with cyclization 2112
Inner ring surface and outer ring surface between be additionally provided with cooperation step 2113, the cooperation step 2113 can be with the limited step 2225
It abuts.In second tube body 211 installation, the first set is first supported into ring 2111 and one end of second tube body 211 is consolidated
It connects, then second tube body 211 is inserted into the first vertical section 2227 of the sleeve 2221, second tube body 211 can
Occur to slide relatively with first vertical section 2227, matches cyclization 2112 from second mounting hole 2224 for described again later
Entrance is packed into, and the internal thread structure with cyclization 2112 is adapted to company with the external thread structure that the first set supports ring 2111
It connects.The second tube body 211 described in this way can occur between the sleeve 2221 it is opposite slide, the cooperation step 2113 can be with
The limited step 2225 abuts and limits second tube body 211 skids off the sleeve 2221 upwards.
It is described with cyclization 2112 in insertion first tube body 221 that the outer ring surface with cyclization 2112 can be adapted to
Outer ring surface is circumferentially additionally provided with sealing ring, and the sealing ring abuts the inner wall of first tube body 221.
Second tube body 211 is up extended a distance into from first vertical section 2227, second tube body 211
The other end is additionally provided with second set and supports ring 2114, and the described second set inner ring surface to ring 2114 is outer with second tube body 211
Diameter adaptation, second tube body 211 can be inserted into described second set and support on the inner ring surface of ring 2114, second tube body 211 and institute
Stating the inner ring surface that second set is supported ring 2114 can be fixed together by modes such as welding.The described second set inner ring surface to ring 2114
It is additionally provided with internal thread structure, extended meeting explanation after specific effect.
The shell 41 further include from the shell 41 upward be through to down the shell 41 it is directed downwardly while
Connecting hole, the shell 41 further includes that the periphery that intersects from the connecting hole with the shell 41 one side directed downwardly continues down
The installation peripheral wall 414 of extension, the connecting hole extend in the positioning peripheral wall.
The connecting hole includes the first connecting hole 415 extended down from the one side of the shell 41 upward and from described
The second connecting hole 416 that the continuation of one connecting hole 415 extends down, first connecting hole 415 connect with the water surface 412 out
Logical, the diameter of first connecting hole 415 is less than the diameter of second connecting hole 416, the diameter of second connecting hole 416
The outer diameter for the outer ring surface for supporting ring 2114 with described second set is adapted to and can be set in described second set and supports outside the outer ring surface of ring 2114,
Because the diameter of first connecting hole 415 is less than the diameter of second connecting hole 416, therefore 415 He of the first connecting hole
Also have between second connecting hole 416 and abut step 417, the abuttings step 417 can contact at described second set to ring
On 2114, so that the shoulder neck water unit 4 does not continue to slide down.
The dynamic pipe group 21 further includes third tube body 212, one end of the third tube body 212 and first connecting hole
415 entrance corresponds to affixed, and the other end of the third tube body 212 is connect with the head gondola water faucet 5.Said inner tube 2212 extends
To the third tube body 212 is connected to, water can flow to said inner tube 2212 from the second channel 15 and then flow to the third pipe
In body 212, finally flowed out from the head gondola water faucet 5.
The dynamic pipe group 21 further includes connecting the connecting component 23 of second tube body 211 and the third tube body 212, institute
Stating connecting component 23 is perforative tubular structure, and the connecting component 23 can be set in outside said inner tube 2212 and and said inner tube
There are water space 237 out between 2212, it is described go out water space 237 be connected to second tube body 211, under the connecting component 23
End is provided with the external thread structure that the internal thread structure for supporting ring 2114 with described second set is adapted to, when the connecting component 2323 fills
When being connected to described second set to ring 2114, water can be flow in the water space 237 out from second tube body 211, the connection
The ring wall 232 of component 23 also has perforative ditch through-hole 231, and the ditch through-hole 231 is connected to the water space 237 out, the company
Diameter of the diameter of the ring wall 232 of relay part 23 less than the first connecting hole 415.
First waterway switching further include extend connection it is described go out between the water surface 412 and first connecting hole 415
Exhalant canal 413.The connecting component 23 further includes circumferentially being arranged on the ring wall 232 and being higher than the ditch through-hole
231 with the first sealing ring 234 of the junction of first connecting hole 415, the connecting component 23 further includes circumferentially setting
It sets on the ring wall 232 and lower than the second sealing ring of the exhalant canal 413 and the junction of first connecting hole 415
235, water will not leak out after entering first connecting hole 415 from the ditch through-hole 231, and water flow passes to the water surface 412 out.
The connecting component 23 is additionally provided with fixed part 233 in the upper end of the ring wall 232, the fixed part 233 it is straight
Diameter is less than the diameter of first connecting hole 415, and the fixed part 233 is provided with external thread structure along periphery, and described the
One end of three tube bodies 212 is installed with third set and supports ring 2121, and the inner ring surface that the third set supports ring 2121 is provided with internal screw thread knot
The internal thread structure that structure, the external thread structure of the fixed part 233 and third set support ring 2121 is adapted to installation, described in this way
One end of third tube body 212 is just corresponding affixed with the entrance of first connecting hole 415.
The connecting component 23 is circumferentially additionally provided with sealing ring in the position that its internal perisporium is higher than the ditch through-hole 231
Group 236, the sealing ring group 236 abut the outer wall of said inner tube 2212, in this way can be in said inner tube 2212 relatively described the
When two tube bodies 211 and the third tube body 212 slide, prevent water from entering the third tube body 212 from the water space 237 out.
In this way, the dynamic pipe group 21, head gondola water faucet 5 and shoulder neck water unit 4 can be used as, an entirety is relatively described to determine pipe group
22 occur opposite sliding, and when the cooperation step 2113 abuts the limited step 2225, the dynamic pipe group 21 is reached upwards
The extreme position of sliding.It is noted that the length of said inner tube 2212 should be adapted to dynamic 21 upward sliding of pipe group
When extreme position, said inner tube 2212 does not still skid off the third tube body 212.
The structure of positioning component 3 is detailed below.
The positioning component 3 can position and limit the sliding of second tube body 211, and user can be sliding in the second tube body 211
When moving to ideal height, using the positioning component 3, and the sliding of second tube body 211 is limited.
The control knob 31 is set in outside second pipe fitting, and the control knob 31 is circumferentially additionally provided with guide part
311, the second vertical section 2228 of the sleeve 2221 is additionally provided with the guiding matching piece that connection is adapted to the guide part 311
2229, the guide part 311 and the matching piece 2229 that is oriented to may make the axis of the relatively described fixing seat 222 of the control knob 31
Mobile and fixed to occurring, in the present embodiment, the guide part 311 is external thread structure, and the guiding matching piece 2229 is
Internal thread structure, it is of course also possible to use using other modes.
It is outer and affixed with the control knob 31 that the pressure pipe part 32 is set in second tube body 211.The pressure pipe part 32
It can be moved with the control knob 31.The setting of pressure pipe part 32 expands section 2226 and second tube body 211 in the diameter
Between space in, the pressure pipe part 32 be additionally provided with the first bearing surface abutted with the outer wall of second tube body 211 and with
The diameter expands the second bearing surface that section 2226 abuts, and second bearing surface is adapted with the shape that the diameter expands section 2226, institute
Stating pressure pipe part 32 is rubber or silica gel material, naturally it is also possible to use other materials, be not limited thereto.
When the control knob 31 rotation, the control knob 31 drives the pressure pipe part 32 to expand section 2226 towards the diameter and moves
Dynamic, until supporting the diameter expands section 2226, the diameter expands section 2226 and becomes larger for the pressure of second bearing surface at this time, and described the
Since the pressure being subject to becomes larger, the frictional force of the second tube body 211 and the pressure pipe part 32 also becomes larger one bearing surface.When frictional force reaches
To when making no longer to occur between the second tube body 211 and the pressure pipe part 32 opposite sliding, second tube body 211 is fixed.
First waterway switching extends in first tube body 221, the second tube body 211 and exhalant canal 413, described
Second waterway switching extends in first tube body 221, the second tube body 211 and third tube body 212, that is to say, that described first
Waterway switching extends in the tube body and connects the water surface 412, second waterway switching out and extends in the tube body
And connect the head gondola water faucet 5.User is optionally connected to first waterway switching, the second waterway switching or third switching
Water route.
When user needs to adjust the height of the shoulder neck water unit 4 and the head gondola water faucet 5, the control knob is controlled
31, make second tube body 211 can the relatively described fixing seat 222 occur it is opposite slide, when adjusting to user the height wanted, control
The control knob 31 is made, the relatively described fixing seat 222 of second tube body 211 is fixed.
The foregoing is only a preferred embodiment of the present invention, but the design concept of the present invention is not limited to this,
Anyone skilled in the art in the technical scope disclosed by the present invention, using this design carries out the present invention non-
Substantive change belongs to the behavior for invading the scope of the present invention.
Claims (15)
1. a kind of shower column characterized by comprising
Shower faucet is installed on metope, and the shower faucet is applied to connect external source to waterway switching, the switching water
Road includes the first waterway switching;
Tube body, one end of the tube body connect the shower faucet, the tube body from the shower faucet up extend one section away from
From first waterway switching extends in the tube body;
Shoulder neck water unit is arranged on the tube body, and the shoulder neck water unit includes shell, and the one side of the shell upward has
Placement surface, the shell is directed downwardly to be provided with out the water surface on one side, and the water surface out is connected to first waterway switching, the shoulder neck
The level configurations on the tube body of water unit are at the flushable shoulder of water flow or neck from the ejection of the water surface out;
The tube body includes determining pipe group and dynamic pipe group, and described to determine the pipe group connection shower faucet, the dynamic Guan Zuke is with respect to institute
The axial movement for determining pipe group is stated, the shoulder neck water unit is fixed in the dynamic pipe group.
2. shower column as described in claim 1, it is characterised in that: described to determine to be provided between pipe group and the dynamic tube assembly calmly
Hyte part, the positioning component are arranged so that the dynamic Guan Zuke is relatively described and determine pipe group adjustment relative position and fixation.
3. shower column as claimed in claim 2, it is characterised in that: described to determine pipe group and be socketed in outside the dynamic pipe group.
4. shower column as claimed in claim 3, it is characterised in that: the positioning component include control knob and with the control knob
Affixed pressure pipe part, the control knob setting are determined in pipe group described, and it is described that the control knob can control the pressure pipe part to compress
Dynamic pipe group simultaneously limits the dynamic pipe group movement.
5. such as shower column of any of claims 1-4, it is characterised in that: described determine pipe group include described in one end connects
First tube body of shower faucet, described to determine pipe group further include a fixing seat being installed on metope, first tube body it is another
End is connected to the fixing seat.
6. shower column as claimed in claim 5, it is characterised in that: the fixing seat include the pedestal affixed with metope and with institute
The sleeve of pedestal connection is stated, the sleeve is extended with the first mounting hole and the second mounting hole, first mounting hole from top to bottom
And second be additionally provided with limited step between mounting hole, and second mounting hole can be socketed in outside first tube body, and described
The other end of one tube body abuts the limited step.
7. shower column as claimed in claim 6, it is characterised in that: the dynamic pipe group is pluggable and slides in first installation
In hole, one end of the dynamic pipe group is additionally provided with cooperation step, when the cooperation step abuts the limited step, the dynamic pipe
Upward sliding is organized to extreme position.
8. shower column as claimed in claim 5, it is characterised in that: the dynamic pipe group includes the second tube body and third tube body, institute
The one end for stating the second tube body is plugged to the fixing seat, and the other end connects one end of the third tube body, the shoulder neck water unit
The junction of second tube body and the third tube body is set.
9. shower column as claimed in claim 8, it is characterised in that: the shower column further includes that be connected to the third tube body another
The head gondola water faucet of one end, the waterway switching further include the second waterway switching, and second waterway switching is connected to the head flower
It spills, the second waterway switching extends in the tube body.
10. shower column as claimed in claim 9, it is characterised in that: the tube body further include setting in second tube body and
The connecting component of the junction of the third tube body, the shoulder neck water unit are clipped in first tube body and the interconnecting piece
Between part.
11. shower column as claimed in claim 10, it is characterised in that: first tube body includes outer tube and extends in described outer
Inner tube inside pipe, said inner tube extend to the connection third tube body, the outer tube connection water surface out.
12. shower column as claimed in claim 11, it is characterised in that: the connecting component can be set in said inner tube it is outer and with
There are water space out between said inner tube, the water space out is connected to second tube body, and the ring wall of the connecting component also passes through
The ditch through-hole worn, the ditch through-hole are connected to the water space out, go out the water surface described in the connection of water space out.
13. shower column as claimed in claim 12, it is characterised in that: the connecting component is also set up in the upper end of the ring wall
There is fixed part, said inner tube passes through to the top of the fixed part from the connecting component and is connected to the third pipe fitting, described
Third pipe fitting is fixedly connected with the fixed part.
14. the shower column as described in any one of claim 1-4 or 6-13, it is characterised in that: the shower column further includes hand
Shower is held, the waterway switching includes third waterway switching, and the third waterway switching is connected to the Portable rose.
15. shower column as claimed in claim 14, it is characterised in that: the shell is additionally provided with for the Portable rose grafting
Spliced eye.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910778989.1A CN110464239B (en) | 2019-08-22 | 2019-08-22 | Shower column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910778989.1A CN110464239B (en) | 2019-08-22 | 2019-08-22 | Shower column |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110464239A true CN110464239A (en) | 2019-11-19 |
CN110464239B CN110464239B (en) | 2024-04-02 |
Family
ID=68512856
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910778989.1A Active CN110464239B (en) | 2019-08-22 | 2019-08-22 | Shower column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110464239B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110464238A (en) * | 2019-08-22 | 2019-11-19 | 路达(厦门)工业有限公司 | It is a kind of to be mountable to the water outlet mould group on the cylinder of shower column and the shower column using the water outlet mould group |
CN110477787A (en) * | 2019-08-22 | 2019-11-22 | 路达(厦门)工业有限公司 | A kind of shower bath with shoulder neck water unit |
CN110584516A (en) * | 2019-08-22 | 2019-12-20 | 路达(厦门)工业有限公司 | Shower device |
Citations (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002112912A (en) * | 2000-10-05 | 2002-04-16 | Inax Corp | Shower apparatus |
JP2003052785A (en) * | 2001-08-21 | 2003-02-25 | Matsushita Electric Ind Co Ltd | Shower device |
TWM317840U (en) * | 2007-01-30 | 2007-09-01 | Jian Wei Copper Co Ltd | Structure of shower water dispenser |
CN201469123U (en) * | 2009-06-04 | 2010-05-19 | 厦门市易洁卫浴有限公司 | Upper elbow pipe switching shower |
CN101843456A (en) * | 2009-03-25 | 2010-09-29 | 陈洛甄 | Exposed shower system |
CN201672093U (en) * | 2010-05-12 | 2010-12-15 | 温州市海霸洁具有限公司 | Water separator |
WO2011100893A1 (en) * | 2010-02-22 | 2011-08-25 | 厦门松霖科技有限公司 | Sliding switching showerhead |
WO2011110080A1 (en) * | 2010-03-09 | 2011-09-15 | 厦门松霖科技有限公司 | Lever button switching shower head |
CN203042044U (en) * | 2013-01-25 | 2013-07-10 | 余新文 | Combined shower with faucet installed in article placement platform in concealed mode |
CN203124140U (en) * | 2013-03-25 | 2013-08-14 | 李建树 | Shower head provided with toilet table |
CN203354420U (en) * | 2013-05-24 | 2013-12-25 | 厦门松霖卫厨有限公司 | Shower capable of accommodating articles and provided with switching device |
CN204356847U (en) * | 2014-10-16 | 2015-05-27 | 孙子茹 | Adjustable top-spraying gondola |
CN204483961U (en) * | 2015-02-10 | 2015-07-22 | 福建西河卫浴科技有限公司 | A kind of shower pasting wall and install |
CN205053941U (en) * | 2015-09-21 | 2016-03-02 | 开平法兰多卫浴有限公司 | Take shower tap of supporter |
CN205234373U (en) * | 2015-11-17 | 2016-05-18 | 上海东涞五金有限公司 | Rotatable shower post of top shower |
CN105852708A (en) * | 2016-06-09 | 2016-08-17 | 陈菊芳 | Water spray type shower device |
CN206215436U (en) * | 2016-08-24 | 2017-06-06 | 浙江凯越塑胶工业有限公司 | A kind of shower column |
CN206612729U (en) * | 2016-11-24 | 2017-11-07 | 厦门建霖工业有限公司 | A kind of bathing column structure |
CN206861114U (en) * | 2017-03-27 | 2018-01-09 | 卢健 | A kind of fall way to take a shower with pipe middle sleeve |
CN206929474U (en) * | 2017-06-13 | 2018-01-26 | 厦门英仕卫浴有限公司 | A kind of double water channel shower rods quick connection structures |
CN107847087A (en) * | 2015-06-23 | 2018-03-27 | 聚焦现实有限责任公司 | Adjustment height shower bath with multiple shower nozzles |
CN207261720U (en) * | 2017-08-02 | 2018-04-20 | 厦门建霖健康家居股份有限公司 | One kind lifting switching bathing column structure |
CN207506495U (en) * | 2017-05-10 | 2018-06-19 | 厦门金诚霖建材有限公司 | A kind of band is unleaded to cross the energy-saving and environment-friendly supporter shower bath of water part |
CN207582580U (en) * | 2017-08-02 | 2018-07-06 | 厦门建霖健康家居股份有限公司 | A kind of bathing column structure |
CN108443530A (en) * | 2016-09-18 | 2018-08-24 | 薛令斌 | Water mixing valve with built-in threeway |
CN207878572U (en) * | 2017-12-25 | 2018-09-18 | 鹤山泰林卫浴实业有限公司 | It is a kind of that there is the shower bath for being switched fast switch |
CN108654876A (en) * | 2018-06-22 | 2018-10-16 | 厦门英仕卫浴有限公司 | A kind of hommization switching device being applied to healthy shower |
CN208379692U (en) * | 2018-06-05 | 2019-01-15 | 厦门格霖卫浴有限公司 | A kind of shower lever fixing apparatus |
CN208734935U (en) * | 2018-09-20 | 2019-04-12 | 瑞安市瑞诚五金制品有限公司 | A kind of multifunctional shower pipe |
CN209074386U (en) * | 2018-08-27 | 2019-07-09 | 中山市港华卫浴有限公司 | A thermostatic three-function large shower head |
CN211381020U (en) * | 2019-08-22 | 2020-09-01 | 路达(厦门)工业有限公司 | Shower column |
-
2019
- 2019-08-22 CN CN201910778989.1A patent/CN110464239B/en active Active
Patent Citations (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002112912A (en) * | 2000-10-05 | 2002-04-16 | Inax Corp | Shower apparatus |
JP2003052785A (en) * | 2001-08-21 | 2003-02-25 | Matsushita Electric Ind Co Ltd | Shower device |
TWM317840U (en) * | 2007-01-30 | 2007-09-01 | Jian Wei Copper Co Ltd | Structure of shower water dispenser |
CN101843456A (en) * | 2009-03-25 | 2010-09-29 | 陈洛甄 | Exposed shower system |
CN201469123U (en) * | 2009-06-04 | 2010-05-19 | 厦门市易洁卫浴有限公司 | Upper elbow pipe switching shower |
WO2011100893A1 (en) * | 2010-02-22 | 2011-08-25 | 厦门松霖科技有限公司 | Sliding switching showerhead |
WO2011110080A1 (en) * | 2010-03-09 | 2011-09-15 | 厦门松霖科技有限公司 | Lever button switching shower head |
CN201672093U (en) * | 2010-05-12 | 2010-12-15 | 温州市海霸洁具有限公司 | Water separator |
CN203042044U (en) * | 2013-01-25 | 2013-07-10 | 余新文 | Combined shower with faucet installed in article placement platform in concealed mode |
CN203124140U (en) * | 2013-03-25 | 2013-08-14 | 李建树 | Shower head provided with toilet table |
CN203354420U (en) * | 2013-05-24 | 2013-12-25 | 厦门松霖卫厨有限公司 | Shower capable of accommodating articles and provided with switching device |
CN204356847U (en) * | 2014-10-16 | 2015-05-27 | 孙子茹 | Adjustable top-spraying gondola |
CN204483961U (en) * | 2015-02-10 | 2015-07-22 | 福建西河卫浴科技有限公司 | A kind of shower pasting wall and install |
CN107847087A (en) * | 2015-06-23 | 2018-03-27 | 聚焦现实有限责任公司 | Adjustment height shower bath with multiple shower nozzles |
CN205053941U (en) * | 2015-09-21 | 2016-03-02 | 开平法兰多卫浴有限公司 | Take shower tap of supporter |
CN205234373U (en) * | 2015-11-17 | 2016-05-18 | 上海东涞五金有限公司 | Rotatable shower post of top shower |
CN105852708A (en) * | 2016-06-09 | 2016-08-17 | 陈菊芳 | Water spray type shower device |
CN206215436U (en) * | 2016-08-24 | 2017-06-06 | 浙江凯越塑胶工业有限公司 | A kind of shower column |
CN108443530A (en) * | 2016-09-18 | 2018-08-24 | 薛令斌 | Water mixing valve with built-in threeway |
CN206612729U (en) * | 2016-11-24 | 2017-11-07 | 厦门建霖工业有限公司 | A kind of bathing column structure |
CN206861114U (en) * | 2017-03-27 | 2018-01-09 | 卢健 | A kind of fall way to take a shower with pipe middle sleeve |
CN207506495U (en) * | 2017-05-10 | 2018-06-19 | 厦门金诚霖建材有限公司 | A kind of band is unleaded to cross the energy-saving and environment-friendly supporter shower bath of water part |
CN206929474U (en) * | 2017-06-13 | 2018-01-26 | 厦门英仕卫浴有限公司 | A kind of double water channel shower rods quick connection structures |
CN207582580U (en) * | 2017-08-02 | 2018-07-06 | 厦门建霖健康家居股份有限公司 | A kind of bathing column structure |
CN207261720U (en) * | 2017-08-02 | 2018-04-20 | 厦门建霖健康家居股份有限公司 | One kind lifting switching bathing column structure |
CN207878572U (en) * | 2017-12-25 | 2018-09-18 | 鹤山泰林卫浴实业有限公司 | It is a kind of that there is the shower bath for being switched fast switch |
CN208379692U (en) * | 2018-06-05 | 2019-01-15 | 厦门格霖卫浴有限公司 | A kind of shower lever fixing apparatus |
CN108654876A (en) * | 2018-06-22 | 2018-10-16 | 厦门英仕卫浴有限公司 | A kind of hommization switching device being applied to healthy shower |
CN209074386U (en) * | 2018-08-27 | 2019-07-09 | 中山市港华卫浴有限公司 | A thermostatic three-function large shower head |
CN208734935U (en) * | 2018-09-20 | 2019-04-12 | 瑞安市瑞诚五金制品有限公司 | A kind of multifunctional shower pipe |
CN211381020U (en) * | 2019-08-22 | 2020-09-01 | 路达(厦门)工业有限公司 | Shower column |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110464238A (en) * | 2019-08-22 | 2019-11-19 | 路达(厦门)工业有限公司 | It is a kind of to be mountable to the water outlet mould group on the cylinder of shower column and the shower column using the water outlet mould group |
CN110477787A (en) * | 2019-08-22 | 2019-11-22 | 路达(厦门)工业有限公司 | A kind of shower bath with shoulder neck water unit |
CN110584516A (en) * | 2019-08-22 | 2019-12-20 | 路达(厦门)工业有限公司 | Shower device |
Also Published As
Publication number | Publication date |
---|---|
CN110464239B (en) | 2024-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110464239A (en) | A kind of shower column | |
CN211381020U (en) | Shower column | |
US5758690A (en) | Hose-type pull-out faucet | |
US12138217B2 (en) | Combination emergency wash and faucet unit | |
US7581685B2 (en) | Faucet end piece | |
CN101970121B (en) | Handshower assembly | |
US10561281B1 (en) | Convenient control device applied to energy-saving shower device | |
US2609232A (en) | Shower | |
CN211037158U (en) | Shower column with shoulder and neck water unit | |
CN211704385U (en) | Shower device | |
CN211270384U (en) | Shower device with shoulder and neck water unit | |
US3779467A (en) | Ablutionary appliances | |
US5960486A (en) | Faucet-like bidet attachment | |
CN209285292U (en) | A kind of bathroom cabinet with showerhead function | |
CN110584516A (en) | Shower device | |
US20240003125A1 (en) | Tube support assembly capable of arbitrary adjustment | |
US20060201561A1 (en) | Spout for providing tranquil fluid flow | |
CN110593360B (en) | Multi-freedom-degree adjustable water faucet | |
CN218264124U (en) | Height-adjustable shower head | |
RU136027U1 (en) | MINERAL WATER SPRAY COVER AND MULTIFUNCTION MINERAL WATER SPRAY BOTTLE WITH SUCH COVER | |
CN207878572U (en) | It is a kind of that there is the shower bath for being switched fast switch | |
EP4279668A1 (en) | Shower column with liftable showerhead | |
JPH03158531A (en) | Faucet with body shower | |
US20230374762A1 (en) | Shower column with liftable showerhead | |
CN210857385U (en) | Dual-function bubbler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |