CN110449883B - 一种光纤接线端子的定位过料装置 - Google Patents
一种光纤接线端子的定位过料装置 Download PDFInfo
- Publication number
- CN110449883B CN110449883B CN201910717531.5A CN201910717531A CN110449883B CN 110449883 B CN110449883 B CN 110449883B CN 201910717531 A CN201910717531 A CN 201910717531A CN 110449883 B CN110449883 B CN 110449883B
- Authority
- CN
- China
- Prior art keywords
- positioning
- block
- cylinder
- material moving
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 title claims abstract description 115
- 239000013307 optical fiber Substances 0.000 title claims abstract description 38
- 238000003825 pressing Methods 0.000 claims abstract description 42
- 239000003292 glue Substances 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 2
- 239000000835 fiber Substances 0.000 claims 3
- 230000000712 assembly Effects 0.000 claims 1
- 238000000429 assembly Methods 0.000 claims 1
- 238000001514 detection method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 239000013308 plastic optical fiber Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P21/00—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q3/00—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
- B23Q3/02—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
- B23Q3/06—Work-clamping means
- B23Q3/08—Work-clamping means other than mechanically-actuated
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q7/00—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mechanical Coupling Of Light Guides (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910717531.5A CN110449883B (zh) | 2019-08-05 | 2019-08-05 | 一种光纤接线端子的定位过料装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910717531.5A CN110449883B (zh) | 2019-08-05 | 2019-08-05 | 一种光纤接线端子的定位过料装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110449883A CN110449883A (zh) | 2019-11-15 |
CN110449883B true CN110449883B (zh) | 2021-02-09 |
Family
ID=68484939
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910717531.5A Active CN110449883B (zh) | 2019-08-05 | 2019-08-05 | 一种光纤接线端子的定位过料装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110449883B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110918412B (zh) * | 2019-11-29 | 2020-12-25 | 武汉锐科光纤激光技术股份有限公司 | 光纤限位装置及点胶系统 |
CN111571209A (zh) * | 2020-06-10 | 2020-08-25 | 温州职业技术学院 | 一种新型测试探针自动装配设备 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4464817A (en) * | 1982-05-24 | 1984-08-14 | Amp Incorporated | Optical waveguide terminating apparatus |
JPH0741986B2 (ja) * | 1990-08-13 | 1995-05-10 | 正和産業株式会社 | チップ状ワークの自動供給装置 |
US5666719A (en) * | 1996-07-01 | 1997-09-16 | The Whitaker Corporation | Feed mechanism for a terminal applicator |
CN2673547Y (zh) * | 2003-10-28 | 2005-01-26 | 信利半导体有限公司 | 半自动电路金属引线剪切机 |
CN108899732B (zh) * | 2018-01-17 | 2024-06-25 | 上海大花自动化科技股份有限公司 | 一种全自动接线端子智能组装机 |
CN108247344A (zh) * | 2018-03-07 | 2018-07-06 | 东莞市鑫文自动化科技有限公司 | 一种接线端子组装机 |
CN208696739U (zh) * | 2018-07-04 | 2019-04-05 | 广州市赛特电子有限公司 | 一种电表接线端子金属片组装设备 |
-
2019
- 2019-08-05 CN CN201910717531.5A patent/CN110449883B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN110449883A (zh) | 2019-11-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110586516B (zh) | 一种光纤接线端子及其生产方法 | |
CN110449883B (zh) | 一种光纤接线端子的定位过料装置 | |
CN109866019B (zh) | 手机无线耳机充电盒组装设备及其操作方法 | |
CN111300034B (zh) | 一种导线连接头及其自动化生产设备和方法 | |
CN108274232B (zh) | 一种吸尘器马达组件自动组装机 | |
CN110802401A (zh) | 一种导线连接头生产设备的转盘治具装置 | |
CN108869485B (zh) | 用于屏幕组装的装置 | |
CN108723747B (zh) | 一种用于指尖陀螺的自动装配机构 | |
CN115338616A (zh) | 磁钢入铁芯装置 | |
CN102581789A (zh) | 用于接线开关装配生产线的定位机构 | |
CN216529796U (zh) | 连接器的滑块与弹簧组装装置 | |
CN216459790U (zh) | 一种基于ccd视觉定位的全自动点胶装置 | |
CN214849505U (zh) | 一种连接器端子快速插入设备 | |
CN221087707U (zh) | 焊接装置 | |
CN210514591U (zh) | 一种充电手机壳测试平台 | |
CN110864746B (zh) | 一种同步检测装置 | |
CN219677766U (zh) | 一种二极管装配调焦装置 | |
CN216981110U (zh) | 连接器组装设备 | |
CN113634709A (zh) | 一种销合链自动装配装置及其装配方法 | |
CN119057473B (zh) | 一种定位精确的耳机插座自动组装装置 | |
CN222327118U (zh) | 装配装置 | |
CN220498356U (zh) | 一种挡圈安装装置 | |
CN222359558U (zh) | 定位夹紧治具 | |
CN110976668A (zh) | 一种导线连接头生产设备的底夹片上料装置 | |
CN215469413U (zh) | 用于接线铜柱和端子外壳的组装装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210125 Address after: 325000 room 1130, 1st floor, building 7, No. 135, Yanxing Road, Yangyi street, Lucheng District, Wenzhou City, Zhejiang Province Applicant after: Wenzhou gaoweitong Industrial Design Co., Ltd Address before: 315301 no.1598, North Third Ring West Road, Zonghan street, Cixi City, Ningbo City, Zhejiang Province Applicant before: Sun Guangjing |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211207 Address after: 314500 room 431, 4th floor, building 5, No. 299, Hangfu Road, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province Patentee after: Jiaxing shunkailu Technology Co.,Ltd. Address before: 325000 room 1130, 1st floor, building 7, No. 135, Yanxing Road, Yangyi street, Lucheng District, Wenzhou City, Zhejiang Province Patentee before: Wenzhou gaoweitong Industrial Design Co., Ltd |
|
TR01 | Transfer of patent right |