CN110424617A - A kind of assembled ceiling structure and its installation method - Google Patents
A kind of assembled ceiling structure and its installation method Download PDFInfo
- Publication number
- CN110424617A CN110424617A CN201910697522.4A CN201910697522A CN110424617A CN 110424617 A CN110424617 A CN 110424617A CN 201910697522 A CN201910697522 A CN 201910697522A CN 110424617 A CN110424617 A CN 110424617A
- Authority
- CN
- China
- Prior art keywords
- side plate
- keel
- plate
- bottom plate
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
- E04B9/065—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members comprising supporting beams having a folded cross-section
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
本发明公开一种装配式吊顶结构及其安装方法,涉及建筑技术领域,解决现有吊装方式对于吊顶板的内在强度要求高,和施工过程中易将吊顶板插裂的问题,包括吊顶装饰板、插接件、卡挂件、龙骨和吊杆;吊顶装饰板包括装饰面板和背板,背板固定于装饰面板的背面,相邻背板之间形成第一吊装空隙,在第一吊装空隙两侧形成第二吊装空隙,第一吊装空隙与第二吊装空隙连通构成吊装插槽;卡挂件包括第一底板,第一底板上设有第一侧板和第二侧板,且围成安装槽,第二侧板的长度大于第一侧板,第二侧板上有挂接结构;吊杆与房顶连接,龙骨安装在吊杆上,卡挂件卡合在龙骨上,插接件一端与挂接结构挂接,另一端配合插接于吊装插槽内。本发明用于吊顶装饰。
The invention discloses an assembled suspended ceiling structure and an installation method thereof, relates to the field of building technology, and solves the problems that the existing hoisting methods have high requirements on the intrinsic strength of suspended ceiling panels and the problems that the suspended ceiling panels are easily cracked during construction, including suspended ceiling decorative panels , connectors, hangers, keels and suspenders; the ceiling decorative panel includes a decorative panel and a back panel, the back panel is fixed on the back of the decorative panel, the first hoisting gap is formed between adjacent back panels, and the first hoisting gap is two The second hoisting gap is formed on the side, and the first hoisting gap is connected with the second hoisting gap to form a hoisting slot; the hanging part includes a first bottom plate, and the first bottom plate is provided with a first side plate and a second side plate, and encloses a mounting groove , the length of the second side plate is greater than that of the first side plate, and there is a hook structure on the second side plate; The hook structure is hooked, and the other end is mated and plugged into the hoisting slot. The invention is used for ceiling decoration.
Description
技术领域technical field
本发明涉及建筑技术领域,尤其涉及一种装配式吊顶结构及其安装方法。The invention relates to the technical field of architecture, in particular to an assembled suspended ceiling structure and an installation method thereof.
背景技术Background technique
吊顶是室内装修中常见的环节。现有吊顶方式多采用将吊顶板搭接在带有倒“T”型结构的相邻龙骨上,相邻的两块吊顶板搭接在同一倒“T”型结构两侧。这样,在施工过程中,相邻的吊顶板之间容易相互影响,给施工带来不便,影响施工效率。而且,由于相邻的吊顶板之间存在空隙,这就使得,吊顶板的下表面裸露出倒“T”型结构,影响美观度。尤其关键的是,当吊顶板的搭接量比较多时,相邻吊顶板之间容易错位,甚至会导致吊顶板掉落,存在一定的安全隐患。Suspended ceiling is a common link in interior decoration. The existing ceiling method mostly adopts that the ceiling board is lapped on the adjacent keel with an inverted "T" structure, and two adjacent ceiling boards are lapped on both sides of the same inverted "T" structure. In this way, during the construction process, adjacent ceiling panels are likely to interact with each other, which brings inconvenience to the construction and affects the construction efficiency. Moreover, since there are gaps between adjacent ceiling panels, the lower surface of the ceiling panels exposes an inverted "T" structure, which affects the aesthetics. What is especially critical is that when there are a lot of overlapping ceiling panels, adjacent ceiling panels are easily misaligned, and even cause the ceiling panels to fall, which poses a certain safety hazard.
为解决上述问题,现有技术提供了一种吊顶方式,该方式通过将倒“T”型结构插入吊顶板中间,利用吊顶板的厚度方向上的上半部份承重,下半部分遮盖倒“T”型结构。对于这种吊顶方式,由于吊顶板的厚度方向上的上半部份,负荷了整个吊顶板的重量,因此对于吊顶板的内在强度要求较高。而且,施工过程中,现场将倒“T”型结构插入吊顶板中间,这样的操作方式相对不便且容易将吊顶板插裂,尤其是,对于石膏板等内在材质较酥脆的吊顶板基本无法施工。In order to solve the above problems, the prior art provides a ceiling method. In this method, an inverted "T" structure is inserted into the middle of the ceiling board, and the upper half of the ceiling board in the thickness direction is used to bear the load, and the lower part covers the inverted "T". T" structure. For this ceiling method, since the upper half of the ceiling plate in the thickness direction bears the weight of the entire ceiling plate, the requirements for the intrinsic strength of the ceiling plate are relatively high. Moreover, during the construction process, the inverted "T" structure is inserted into the middle of the ceiling board, which is relatively inconvenient and easy to crack the ceiling board, especially for ceiling boards with relatively brittle inner materials such as gypsum board, it is basically impossible to construct .
发明内容Contents of the invention
本发明实施例提供了一种装配式吊顶结构及其安装方法,解决了现有吊装方式对于吊顶板的内在强度要求较高,和施工过程中容易将吊顶板插裂的问题。The embodiment of the present invention provides an assembled suspended ceiling structure and an installation method thereof, which solves the problems that the existing hoisting methods have high requirements on the intrinsic strength of the ceiling board and the ceiling board is easy to be cracked during the construction process.
为达到上述目的,第一方面,本发明的实施例提供了一种装配式吊顶结构,包括吊顶装饰板、插接件、卡挂件、龙骨和吊杆;所述吊顶装饰板包括装饰面板和多块背板,所述背板平行固定设置于所述装饰面板的背面,相邻两块所述背板之间形成第一吊装空隙,在所述第一吊装空隙两侧,所述装饰面板与所述背板之间形成第二吊装空隙,所述第一吊装空隙与所述第二吊装空隙连通构成吊装插槽;所述卡挂件包括第一底板,所述第一底板的相对两侧的边缘处均设有第一侧板和第二侧板,所述第一底板、所述第一侧板与所述第二侧板围成安装槽,所述第二侧板的长度大于所述第一侧板的长度,所述第二侧板远离所述第一底板的一端相对两侧形成挂接结构;所述吊杆与房顶连接,所述龙骨固定安装在所述吊杆上,所述卡挂件通过所述安装槽卡合在所述龙骨上,所述插接件一端与所述挂接结构挂接,另一端配合插接于所述吊装插槽内。In order to achieve the above object, in the first aspect, an embodiment of the present invention provides an assembled suspended ceiling structure, including a suspended ceiling decorative panel, an insert, a hanging piece, a keel and a suspender; the suspended ceiling decorative panel includes a decorative panel and multiple a backboard, the backboard is fixedly arranged on the back side of the decorative panel in parallel, a first hoisting gap is formed between two adjacent backboards, and on both sides of the first hoisting gap, the decorative panel and A second hoisting gap is formed between the backboards, and the first hoisting gap communicates with the second hoisting gap to form a hoisting slot; The edge is provided with a first side plate and a second side plate, the first bottom plate, the first side plate and the second side plate enclose an installation groove, and the length of the second side plate is longer than the The length of the first side plate, the opposite sides of the second side plate away from the end of the first bottom plate form a hook structure; the suspender is connected to the roof, and the keel is fixedly installed on the suspender, The hanging piece is engaged on the keel through the installation slot, one end of the plug-in piece is hooked to the hooking structure, and the other end is matched and inserted into the lifting slot.
可选的,所述挂接结构包括所述第二侧板远离所述第一底板的一端相对两侧形成的挂勾,且所述挂勾由所述第二侧板的侧壁开具凹槽形成。Optionally, the hooking structure includes hooks formed on opposite sides of the second side plate away from the end of the first bottom plate, and the hooks are provided with grooves on the side walls of the second side plate form.
可选的,所述第一底板上设有内螺纹孔,在所述内螺纹孔内设有螺栓,所述螺栓的端部与所述龙骨抵靠,所述螺栓通过在所述内螺纹孔内旋进和旋出,以使所述吊顶装饰板调整至预定高度。Optionally, the first bottom plate is provided with an internally threaded hole, and a bolt is provided in the internally threaded hole, the end of the bolt abuts against the keel, and the bolt passes through the internally threaded hole Screw in and out to adjust the ceiling trim to a predetermined height.
可选的,所述龙骨的延伸方向与所述吊装插槽的延伸方向垂直;所述卡挂件可沿所述龙骨的延伸方向移动;所述插接件可在所述吊装插槽内滑动。Optionally, the extension direction of the keel is perpendicular to the extension direction of the hoisting slot; the hanging member can move along the extension direction of the keel; and the plug-in piece can slide in the hoisting slot.
可选的,所述插接件包括第二底板,所述第二底板的相对两侧的边缘处均设有第三侧板,且所述第二底板与两个所述第三侧板相接呈U型,两个所述第三侧板远离所述第二底板的一侧边缘均形成有翼板,两个所述第三侧板插接于所述第一吊装空隙内,两个所述翼板分别插接于两个所述第二吊装空隙内;所述第二底板上形成有第一挂孔,两个所述第三侧板上均形成有第二挂孔;所述第二侧板插入所述第一挂孔,所述挂接结构与两个所述第二挂孔挂接。Optionally, the connector includes a second bottom plate, third side plates are provided at the edges of opposite sides of the second bottom plate, and the second bottom plate is adjacent to the two third side plates. The two third side plates are connected in a U shape, and the edges of the two third side plates away from the second bottom plate are formed with wing plates, and the two third side plates are plugged into the first lifting gap, and the two The wing plates are respectively plugged into the two second hoisting gaps; first hanging holes are formed on the second bottom plate, and second hanging holes are formed on the two third side plates; The second side plate is inserted into the first hanging hole, and the hooking structure is hooked to the two second hanging holes.
第二方面,本发明实施例提供一种装配式吊顶结构的安装方法,用于如第一方面所述的装配式吊顶结构的安装,包括:将所述龙骨通过所述吊杆固定连接于所述房顶;将所述插接件的一端插接于所述吊顶装饰板的所述吊装插槽内;将所述卡挂件的所述挂接结构与所述插接件的另一端挂接;将所述卡挂件的所述第一侧板越过所述龙骨,并使所述安装槽卡合在所述龙骨上。In a second aspect, an embodiment of the present invention provides an installation method for a prefabricated suspended ceiling structure, which is used for the installation of the prefabricated suspended ceiling structure described in the first aspect, including: fixing the keel to the the roof; insert one end of the connector into the hoisting slot of the ceiling decorative board; connect the hooking structure of the hanging member to the other end of the connector ; Pass the first side plate of the clip over the keel, and engage the installation groove on the keel.
可选的,所述挂接结构包括所述第二侧板远离所述第一底板的一端相对两侧形成的挂勾,且所述挂勾由所述第二侧板的侧壁开具凹槽形成;所述插接件包括第二底板,所述第二底板的相对两侧的边缘处均设有第三侧板,且所述第二底板与两个所述第三侧板相接呈U型,所述第二底板上形成有第一挂孔,两个所述第三侧板上均形成有第二挂孔;所述将所述卡挂件的所述挂接结构与所述插接件的另一端挂接包括:将所述第二侧板插入所述第一挂孔,且所述第二侧板与所述第三侧板平行;调整所述第二侧板的角度,以使两个所述挂勾分别与两个所述第二挂孔挂接。Optionally, the hooking structure includes hooks formed on opposite sides of the second side plate away from the end of the first bottom plate, and the hooks are provided with grooves on the side walls of the second side plate Formed; the connector includes a second bottom plate, third side plates are provided at the edges of opposite sides of the second bottom plate, and the second bottom plate connects with the two third side plates to form a U-shaped, first hanging holes are formed on the second bottom plate, and second hanging holes are formed on the two third side plates; The hooking of the other end of the connector includes: inserting the second side plate into the first hanging hole, and the second side plate is parallel to the third side plate; adjusting the angle of the second side plate, So that the two hooks are hooked with the two second hanging holes respectively.
可选的,所述将插接件的一端插接于所述吊顶装饰板的吊装插槽内,包括:将所述插接件的一端插接于所述吊装插槽内,且所述插接件可在所述吊装插槽内滑动;所述将所述卡挂件的所述第一侧板越过所述龙骨,并使所述安装槽卡合在所述龙骨上,包括将所述卡挂件的所述第一侧板越过所述龙骨,使所述安装槽可沿所述龙骨的延伸方向移动的卡合在所述龙骨上,且使所述吊装插槽的延伸方向与所述龙骨的延伸方向垂直;所述将所述卡挂件的所述第一侧板越过所述龙骨,并使所述安装槽卡合在所述龙骨上之后,还包括:将所述吊顶装饰板沿所述龙骨的延伸方向和/或沿所述吊装插槽的延伸方向调整至预定位置。Optionally, the inserting one end of the connector into the hoisting slot of the ceiling decoration board includes: inserting one end of the connector into the hoisting slot, and the plugging The connecting piece can slide in the lifting slot; the said first side plate of the hanging piece is passed over the keel, and the installation groove is engaged on the keel, including The first side plate of the pendant passes over the keel, so that the installation slot can move along the extension direction of the keel and engage with the keel, and the extension direction of the lifting slot is in line with the keel The extension direction is vertical; after the first side plate of the hanging member is crossed over the keel, and the installation groove is engaged on the keel, it also includes: placing the ceiling decoration board along the keel The extension direction of the keel and/or the extension direction of the lifting slot can be adjusted to a predetermined position.
可选的,所述第一底板上设有内螺纹孔,在所述内螺纹孔内设有螺栓,所述螺栓与所述龙骨抵靠;将所述吊顶装饰板沿所述龙骨的延伸方向和/或沿所述吊装插槽的延伸方向调整至预定位置之后,还包括:将所述螺栓在所述内螺纹孔内旋进和旋出,以使所述吊顶装饰板调整至预定高度。Optionally, internally threaded holes are provided on the first bottom plate, bolts are provided in the internally threaded holes, and the bolts abut against the keel; And/or after adjusting to a predetermined position along the extension direction of the lifting slot, the method further includes: screwing the bolt in and out of the internal threaded hole, so as to adjust the ceiling decoration board to a predetermined height.
可选的,所述插接件包括第二底板,所述第二底板的相对两侧的边缘处均设有第三侧板,且所述第二底板与两个所述第三侧板相接呈U型,两个所述第三侧板远离所述第二底板的一侧边缘均形成有翼板;所述将插接件的一端插接于所述吊顶装饰板的吊装插槽内包括:将两个所述第三侧板插接于所述第一吊装空隙内,两个所述翼板分别插接于两个所述第二吊装空隙内。Optionally, the connector includes a second bottom plate, third side plates are provided at the edges of opposite sides of the second bottom plate, and the second bottom plate is adjacent to the two third side plates. The connection is U-shaped, and the two third side plates are formed with wing plates on the side edge away from the second bottom plate; one end of the connector is plugged into the lifting slot of the ceiling decorative plate The method includes: inserting the two third side plates into the first hoisting gap, and inserting the two wing plates into the two second hoisting gaps respectively.
基于此,本发明实施例提供的装配式吊顶结构,包括吊顶装饰板、插接件、卡挂件、龙骨和吊杆。其中,吊顶装饰板包括装饰面板和多块背板,背板平行固定设置于装饰面板的背面,相邻两块背板之间形成第一吊装空隙,在第一吊装空隙两侧,装饰面板与背板之间形成第二吊装空隙,第一吊装空隙与第二吊装空隙连通构成吊装插槽。由此,在进行施工安装时,通过吊杆将龙骨吊挂在房顶,卡挂件固定安装在龙骨上;可以将插接件的一端配合插接在吊顶装饰板的吊装插槽内;将插接件的另一端挂接在卡挂件上。与背景技术中提到的吊顶方式相比,首先,负荷整个吊顶装饰板重量的对象由装饰面板的厚度方向上的上半部份变成了背板,这样则不需要再对装饰面板的内在强度有较高的要求。其次,施工过程中,不再需要将插接件插入装饰面板中间,只需将插接件插接在吊装插槽内,工序简单,操作简捷方便,很大程度的减小了施工的繁琐程度,从而加快施工进度。而且也不存在,操作过程中容易将装饰面板插裂的问题。尤其是,对于石膏板等内在材质较酥脆的这一类装饰面板,可以通过将其制成吊顶装饰板,然后通过插接件和卡挂件将其吊装在龙骨上,进而通过龙骨吊装在房顶,也就是说该吊顶方式也适用于内在材质较酥脆的装饰面板。因此,本发明实施例提供的装配式吊顶结构,能够解决了现有吊装方式对于吊顶板的内在强度要求较高,和施工过程中容易将吊顶板插裂的问题。因此,本发明实施例提供的装配式吊顶结构,能够解决了现有吊装方式对于吊顶板的内在强度要求较高,和施工过程中容易将吊顶板插裂的问题。Based on this, the prefabricated suspended ceiling structure provided by the embodiment of the present invention includes a suspended ceiling decorative board, a plug connector, a hanging piece, a keel and a suspension rod. Wherein, the suspended ceiling decorative board includes a decorative panel and a plurality of backboards, the backboards are fixedly arranged on the back of the decorative panel in parallel, a first hoisting gap is formed between two adjacent backboards, and on both sides of the first hoisting gap, the decorative panel and the A second hoisting gap is formed between the backboards, and the first hoisting gap communicates with the second hoisting gap to form a hoisting slot. Therefore, during construction and installation, the keel is hung on the roof through the suspender rod, and the hanging piece is fixedly installed on the keel; one end of the connector can be mated and plugged into the hoisting slot of the ceiling decorative board; The other end of the connecting piece is hooked on the card hanging piece. Compared with the suspended ceiling method mentioned in the background technology, firstly, the object that bears the weight of the entire suspended ceiling decorative panel is changed from the upper half of the decorative panel in the thickness direction to the back panel, so that there is no need to modify the inner surface of the decorative panel. There are higher requirements for strength. Secondly, during the construction process, it is no longer necessary to insert the connector into the middle of the decorative panel, just insert the connector into the hoisting slot, the process is simple, the operation is simple and convenient, and the cumbersomeness of construction is greatly reduced , so as to speed up the construction progress. Moreover, there is no problem that the decorative panel is easily cracked during the operation. Especially, for gypsum board and other decorative panels with relatively crisp inner materials, it can be made into ceiling decorative panels, and then hoisted on the keel through connectors and hangers, and then hoisted on the roof through the keel , that is to say, this ceiling method is also suitable for decorative panels with crisp inner materials. Therefore, the prefabricated suspended ceiling structure provided by the embodiment of the present invention can solve the problems that the existing hoisting methods have high requirements on the intrinsic strength of the ceiling board and the problem that the ceiling board is easy to be cracked during the construction process. Therefore, the prefabricated suspended ceiling structure provided by the embodiment of the present invention can solve the problems that the existing hoisting methods have high requirements on the intrinsic strength of the ceiling board and the problem that the ceiling board is easy to be cracked during the construction process.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1为本发明实施例提供的一种装配式吊顶结构的结构示意图;Fig. 1 is a structural schematic diagram of a prefabricated suspended ceiling structure provided by an embodiment of the present invention;
图2为本发明实施例提供的一种吊顶装饰板中的一种装饰面板和一种背板的结构示意图;Fig. 2 is a structural schematic diagram of a decorative panel and a backboard in a suspended ceiling decorative panel provided by an embodiment of the present invention;
图3为本发明实施例提供的一种吊顶装饰板的结构示意图;Fig. 3 is a structural schematic diagram of a suspended ceiling decorative panel provided by an embodiment of the present invention;
图4为图3中A-A向视图;Fig. 4 is A-A direction view among Fig. 3;
图5a为一种本发明实施例提供的插接件的结构示意图;Fig. 5a is a schematic structural diagram of a connector provided by an embodiment of the present invention;
图5b为图5a中的A-A向视图;Fig. 5b is A-A direction view in Fig. 5a;
图5c为图5a中的B-B向视图;Fig. 5c is the B-B direction view in Fig. 5a;
图6为本发明实施例提供的吊顶装饰板与插接件配合插接在一起的结构示意图;Fig. 6 is a schematic structural view of the ceiling decoration panel and the connector provided by the embodiment of the present invention;
图7为图6中的俯视图;Fig. 7 is a top view in Fig. 6;
图8为图6中的A-A向视图;Fig. 8 is A-A direction view among Fig. 6;
图9为本发明实施例提供的一种卡挂件的结构示意图;Fig. 9 is a schematic structural diagram of a hanging part provided by an embodiment of the present invention;
图10为本发明实施例提供的另一种插接件的结构示意图;Fig. 10 is a schematic structural diagram of another connector provided by an embodiment of the present invention;
图11为图9中的卡挂件和图10中的卡挂件与插接件挂接在一起的结构示意图;Fig. 11 is a structural schematic diagram of the hanger in Fig. 9 and the hanger and the connector in Fig. 10;
图12为一种卡挂件与龙骨、插接件卡接装配在一起的结构示意图;Fig. 12 is a schematic diagram of the structure of a clip-hanging part, a keel, and a plug-in part snap-fitted together;
图13为另一种卡挂件与龙骨、插接件卡接装配在一起的结构示意图;Fig. 13 is a structural schematic diagram of another kind of clip-hanging part, keel, and plug-in part snap-fitted together;
图14为本发明实施例提供的另一种装配式吊顶结构示意图;Fig. 14 is a schematic structural diagram of another fabricated suspended ceiling provided by an embodiment of the present invention;
图15为本发明实施例提供的又一种装配式吊顶结构示意图。Fig. 15 is a structural schematic diagram of another fabricated suspended ceiling provided by an embodiment of the present invention.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
在本发明的描述中,需要理解的是,术语“中心”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In describing the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", The orientations or positional relationships indicated by "top", "bottom", "inner", "outer", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying References to devices or elements must have a particular orientation, be constructed, and operate in a particular orientation and therefore should not be construed as limiting the invention.
术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上。The terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present invention, unless otherwise specified, "plurality" means two or more.
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connected, or integrally connected; For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.
第一方面,如图1所示,本发明实施例提供了一种装配式吊顶结构,包括吊顶装饰板100、插接件200、卡挂件300、龙骨400和吊杆500。如图2、图3和图4所示,吊顶装饰板100,包括装饰面板1和多块背板2(图3和图4中仅以包括三块背板2为例进行示意),背板2平行固定设置于装饰面板2的背面,相邻两块背板2之间形成第一吊装空隙31,在第一吊装空隙31两侧,装饰面板1与背板2之间形成第二吊装空隙32,第一吊装空隙31与第二吊装空隙32连通构成吊装插槽3。如图9和图10所示,卡挂件300包括第一底板310,第一底板310的相对两侧的边缘处均设有第一侧板320和第二侧板330,第一底板310、第一侧板320与第二侧板330围成安装槽340,第二侧板330的长度(图9中标注为L2)大于第一侧板320的长度(图9中标注为L1),第二侧板330远离第一底板310的一端相对两侧形成挂接结构350;参考图1所示,吊杆500与房顶连接,龙骨400固定安装在吊杆500上,以使龙骨400吊挂在房顶,参考图1和图12所示,卡挂件300通过安装槽340卡合在龙骨400上。参考图1和图12所示,插接件200一端与挂接结构350挂接,参考图1、图3、图5a、图6和图7所示,插接件200另一端配合插接于吊装插槽3内。In the first aspect, as shown in FIG. 1 , an embodiment of the present invention provides an assembled suspended ceiling structure, including a suspended ceiling decorative panel 100 , an insert 200 , a clip 300 , a keel 400 and a suspender 500 . As shown in Fig. 2, Fig. 3 and Fig. 4, the suspended ceiling decorative panel 100 includes a decorative panel 1 and a plurality of backboards 2 (in Fig. 3 and Fig. 4, only three backboards 2 are included as an example), and the backboard 2. Fixed and installed on the back of the decorative panel 2 in parallel, a first hoisting gap 31 is formed between two adjacent back panels 2, and a second hoisting gap is formed between the decorative panel 1 and the back panel 2 on both sides of the first hoisting gap 31 32 , the first hoisting gap 31 communicates with the second hoisting gap 32 to form a hoisting slot 3 . As shown in FIGS. 9 and 10 , the clip 300 includes a first bottom plate 310, first side plates 320 and second side plates 330 are provided at the edges of opposite sides of the first bottom plate 310, the first bottom plate 310, the second side plate 330 One side plate 320 and the second side plate 330 enclose the installation groove 340, the length of the second side plate 330 (marked as L 2 in FIG. 9 ) is greater than the length of the first side plate 320 (marked as L 1 in FIG. 9 ), The second side plate 330 is away from the end of the first bottom plate 310 to form the hook structure 350 on the opposite side; as shown in Fig. Hanging on the roof, as shown in FIG. 1 and FIG. 12 , the clip 300 is clipped on the keel 400 through the installation slot 340 . Referring to Figure 1 and Figure 12, one end of the connector 200 is hooked to the hook structure 350, referring to Figure 1, Figure 3, Figure 5a, Figure 6 and Figure 7, the other end of the connector 200 is mated and inserted into the Inside the lifting slot 3.
基于此,如图1所示,本发明实施例提供的装配式吊顶结构,包括吊顶装饰板100、插接件200、卡挂件300、龙骨400和吊杆500。其中,如图2、图3和图4所示,吊顶装饰板100,包括装饰面板1和多块背板2,背板2平行固定设置于装饰面板2的背面,相邻两块背板2之间形成第一吊装空隙31,在第一吊装空隙31两侧,装饰面板1与背板2之间形成第二吊装空隙32,第一吊装空隙31与第二吊装空隙32连通构成吊装插槽3;如图9和图10所示,卡挂件300包括第一底板310,第一底板310的相对两侧的边缘处均设有第一侧板320和第二侧板330,第一底板310、第一侧板320与第二侧板330围成安装槽340,第二侧板330的长度(图9中标注为L2)大于第一侧板320的长度(图9中标注为L1),第二侧板330远离第一底板310的一端相对两侧形成挂接结构350;由此,在进行施工安装时,参考图1所示,通过吊杆500将龙骨400吊挂在房顶,卡挂件300安装在龙骨400上;参考图1、图3、图5a和图8所示,可以将插接件200的一端配合插接在吊顶装饰板100的吊装插槽3内;参考图1和图13所示,将插接件200的另一端挂接在卡挂件300上。与背景技术中提到的吊顶方式相比,首先,负荷整个吊顶装饰板重量的对象由装饰面板1的厚度方向上的上半部份变成了背板2,这样则不需要再对装饰面板1的内在强度有较高的要求。其次,施工过程中,不再需要将插接件200插入装饰面板1中间,只需将插接件200插接在吊装插槽3内,工序简单,操作简捷方便,很大程度的减小了施工的繁琐程度,从而加快施工进度。而且也不存在,操作过程中容易将装饰面板1插裂的问题。尤其是,对于石膏板等内在材质较酥脆的这一类装饰面板,可以通过将其制成吊顶装饰板100,然后通过插接件200和卡挂件300将其吊装在龙骨400上,进而通过龙骨400吊装在房顶,也就是说该吊顶方式也适用于内在材质较酥脆的装饰面板。因此,本发明实施例提供的装配式吊顶结构,能够解决了现有吊装方式对于吊顶板的内在强度要求较高,和施工过程中容易将吊顶板插裂的问题。Based on this, as shown in FIG. 1 , the fabricated suspended ceiling structure provided by the embodiment of the present invention includes a suspended ceiling decorative panel 100 , an insert 200 , a clip 300 , a keel 400 and a suspender 500 . Wherein, as shown in Fig. 2, Fig. 3 and Fig. 4, the suspended ceiling decorative panel 100 includes a decorative panel 1 and a plurality of backboards 2, and the backboards 2 are fixedly arranged on the back side of the decorative panel 2 in parallel, and two adjacent backboards 2 A first hoisting gap 31 is formed between them. On both sides of the first hoisting gap 31, a second hoisting gap 32 is formed between the decorative panel 1 and the back panel 2. The first hoisting gap 31 communicates with the second hoisting gap 32 to form a hoisting slot. 3. As shown in FIG. 9 and FIG. 10 , the clip 300 includes a first bottom plate 310, and the edges of the opposite sides of the first bottom plate 310 are provided with a first side plate 320 and a second side plate 330, and the first bottom plate 310 1. The first side plate 320 and the second side plate 330 encircle the installation groove 340, and the length of the second side plate 330 (marked as L 2 in FIG. 9 ) is greater than the length of the first side plate 320 (marked as L 1 in FIG. 9 ), the second side plate 330 is away from the end of the first bottom plate 310 to form the hooking structure 350 on opposite sides; thus, during construction and installation, as shown in FIG. , the hanging part 300 is installed on the keel 400; as shown in Fig. 1, Fig. 3, Fig. 5a and Fig. 8, one end of the plug-in part 200 can be inserted into the hoisting slot 3 of the ceiling decorative panel 100; refer to Fig. 1 and FIG. 13, the other end of the connector 200 is hooked on the hook 300. Compared with the suspended ceiling method mentioned in the background technology, firstly, the object that loads the weight of the entire suspended ceiling decorative panel is changed from the upper half of the decorative panel 1 in the thickness direction to the back panel 2, so that there is no need to adjust the decorative panel again. The intrinsic strength of 1 has higher requirements. Secondly, during the construction process, it is no longer necessary to insert the connector 200 into the middle of the decorative panel 1, and only need to insert the connector 200 into the hoisting slot 3, the process is simple, the operation is simple and convenient, and the The cumbersome degree of construction, thus speeding up the construction progress. Moreover, there is no problem that the decorative panel 1 is easily cracked during the operation. In particular, for such decorative panels with brittle inner materials such as gypsum boards, it can be made into a suspended ceiling decorative panel 100, then hoisted on the keel 400 through the connector 200 and the hanging piece 300, and then passed through the keel. 400 is hoisted on the roof, which means that this ceiling method is also suitable for decorative panels with crisp inner materials. Therefore, the prefabricated suspended ceiling structure provided by the embodiment of the present invention can solve the problems that the existing hoisting methods have high requirements on the intrinsic strength of the ceiling board and the problem that the ceiling board is easy to be cracked during the construction process.
另外,本发明实施例提供的装配式吊顶结构,其吊顶装饰板便于拆卸更换,只需向上举起吊顶装饰板让第一侧板320越过龙骨400,摘下卡挂件300即可。In addition, in the fabricated suspended ceiling structure provided by the embodiment of the present invention, the ceiling decorative panel is easy to disassemble and replace, only need to lift the ceiling decorative panel upward so that the first side panel 320 passes over the keel 400, and remove the hanging member 300.
需要说明的是,吊顶装饰板100的吊装插槽3的结构整体所呈形状并不唯一,在图3和图4中示意出的吊装插槽3的结构仅是本发明实施例的一种具体情况,此处对于吊装插槽3的结构不作具体限定,只要能够满足与插接件200配合插接即可。It should be noted that the shape of the overall structure of the hoisting slot 3 of the suspended ceiling decorative panel 100 is not unique, and the structure of the hoisting slot 3 schematically shown in FIG. 3 and FIG. 4 is only a specific example of the embodiment of the present invention. In some cases, the structure of the lifting slot 3 is not specifically limited here, as long as it can meet the requirements of mating and plugging with the connector 200 .
具体的,在本发明的一些实施例中,例如,参考图3和图4所示,吊装插槽3包括第一吊装空隙31与两个第二吊装空隙32,其结构整体呈倒“T”字型,其中,第一吊装空隙31构成“T”字型的竖向边,第二吊装空隙32构成“T”字型的横向边。另外,吊装插槽3的结构也可以设置成“L”字型,也就是说,吊装插槽3包括第一吊装空隙31与一个第二吊装空隙32,其中,第一吊装空隙31构成倒“L”字型的竖向边,第二吊装空隙32构成倒“L”字型的横向边。相比倒“L”字型,将吊装插槽3设置成倒“T”字型,可以增大吊顶装饰板100与插接件200的接触面积,当吊顶装饰板吊装在房顶时,使得背板2的单位面积受力减少,从而降低了背板2变形的可能性。Specifically, in some embodiments of the present invention, for example, as shown in FIG. 3 and FIG. 4 , the hoisting slot 3 includes a first hoisting gap 31 and two second hoisting gaps 32 , and its overall structure is an inverted "T" font, wherein the first hoisting gap 31 constitutes the vertical side of the "T" shape, and the second hoisting gap 32 constitutes the lateral side of the "T" shape. In addition, the structure of the hoisting slot 3 can also be set in an "L" shape, that is to say, the hoisting slot 3 includes a first hoisting gap 31 and a second hoisting gap 32, wherein the first hoisting gap 31 forms an inverted "L" shape. The vertical side of the "L" shape, the second hoisting gap 32 constitutes the horizontal side of the inverted "L" shape. Compared with the inverted "L" shape, setting the hoisting slot 3 into an inverted "T" shape can increase the contact area between the ceiling decoration board 100 and the connector 200, and when the ceiling decoration board is hoisted on the roof, the The force per unit area of the backplane 2 is reduced, thereby reducing the possibility of deformation of the backplane 2 .
参考图3所示,背板2平行固定设置于装饰面板2的背面,其中,固定方式有多种。例如可以是卡接,螺接等。可选的,在本发明的一些实施例中,采用粘接的方式,例如图4所示,装饰面板1和背板2通过粘料层5粘接在一起。这样则可以在装饰面板1与背板2之间靠近第一吊装空隙31的位置不设置粘料层,使得装饰面板1与背板2之间靠近第一吊装空隙31的位置留有一定的间隙,以形成第二吊装空隙32。可以理解的是,粘料层5具有一定的厚度,第二吊装空隙32的宽度(图4中标注为h1)等于粘料层5的厚度。相对于卡接,螺接等固定方式,采用粘结的方式不用在装饰面板1和背板2上开槽或打孔,可以有效降低吊顶装饰板制作过程中装饰面板1和背板2的损坏率。而且,只需在装饰面板1与背板2之间靠近第一吊装空隙31的位置不设置粘料层就可以形成第二吊装空隙32,不需要再在装饰面板1或背板2之间开具凹槽,从而减少制作工序,使得制作过程更加简洁方便,省时省工。Referring to FIG. 3 , the backboard 2 is fixed and arranged on the back of the decorative panel 2 in parallel, and there are various ways of fixing. For example, it can be snap-in, screw-in, etc. Optionally, in some embodiments of the present invention, a bonding method is adopted, for example, as shown in FIG. 4 , the decorative panel 1 and the back plate 2 are bonded together through an adhesive layer 5 . In this way, no adhesive layer can be provided between the decorative panel 1 and the backboard 2 near the first hoisting gap 31, so that a certain gap is left between the decorative panel 1 and the backboard 2 near the first hoisting gap 31. , to form the second hoisting gap 32 . It can be understood that the adhesive material layer 5 has a certain thickness, and the width of the second lifting gap 32 (marked as h 1 in FIG. 4 ) is equal to the thickness of the adhesive material layer 5 . Compared with clamping, screwing and other fixing methods, the adhesive method does not need to slot or punch holes on the decorative panel 1 and the back panel 2, which can effectively reduce the damage of the decorative panel 1 and the back panel 2 during the production process of the ceiling decorative panel Rate. Moreover, the second hoisting gap 32 can be formed without setting an adhesive layer near the first hoisting gap 31 between the decorative panel 1 and the backboard 2 , and there is no need to open a tool between the decorative panel 1 or the backboard 2 . Grooves, thereby reducing the production process, making the production process more concise and convenient, saving time and labor.
具体的,装饰面板1为带有装饰面的多层板,其包括石膏板、硅酸钙板、玻镁板、玻璃棉板、陶板、炭毡板、水泥板、木塑装饰板、金属板中的一种或几种。另外,背板2也可包括石膏板、硅酸钙板、玻镁板、玻璃棉板、陶板、炭毡板、水泥板、木塑装饰板、金属板中的一种或几种。当然装饰面板1和背板2还包括除了上述之外的其他板材,此处不再一一列举。具体的,粘料层5所用粘料包括石膏粘料、水泥砂粘料、石材粘结剂、瓷砖粘结剂、有机水性粘料中的一种或几种。当然粘料层5所用粘料还包括除了上述之外的其他粘料,此处也不再一一列举。Specifically, the decorative panel 1 is a multi-layer board with a decorative surface, which includes gypsum board, calcium silicate board, glass magnesium board, glass wool board, ceramic board, carbon felt board, cement board, wood-plastic decorative board, metal board one or more of them. In addition, the backboard 2 may also include one or more of gypsum boards, calcium silicate boards, glass magnesium boards, glass wool boards, ceramic boards, carbon felt boards, cement boards, wood-plastic decorative boards, and metal boards. Of course, the decorative panel 1 and the backboard 2 also include other boards besides the above, which will not be listed here. Specifically, the adhesive used in the adhesive layer 5 includes one or more of gypsum adhesive, cement sand adhesive, stone adhesive, tile adhesive, and organic water-based adhesive. Of course, the adhesive material used in the adhesive material layer 5 also includes other adhesive materials other than those mentioned above, which will not be listed one by one here.
进一步地,为了使本发明实施例提供的装配式吊顶结构在安装时更加简洁方便,省时省工,如图9所示,挂接结构350包括第二侧板330远离第一底板310的一端相对两侧形成的挂勾351,且挂勾351由第二侧板330的侧壁开具凹槽331形成。这样使得,在进行卡挂件300与如图5a所示的插接件300的组装时,参考图11所示,只需将第二侧板330插入第一挂孔211,且第二侧板330与第三侧板230平行;然后调整第二侧板330的角度,例如旋转90度,以使两个挂勾351分别与两个第二挂孔231挂接,这样即可完成卡挂件300与插接件200的卡入装配。这样的操作过程简单、方便、易实现,使的本发明实施例提供的装配式吊顶结构在安装时更加简洁方便,省时省工。Further, in order to make the assembled suspended ceiling structure provided by the embodiment of the present invention more concise and convenient during installation, saving time and labor, as shown in FIG. The hooks 351 are formed on opposite sides, and the hooks 351 are formed by the grooves 331 formed on the side walls of the second side plate 330 . In this way, when assembling the hanging part 300 and the plug connector 300 shown in FIG. 5a, as shown in FIG. Parallel to the third side plate 230; then adjust the angle of the second side plate 330, for example, rotate 90 degrees, so that the two hooks 351 are respectively connected with the two second hanging holes 231, so that the hanging part 300 and the second hanging hole 231 can be completed. Snap-in assembly of the plug connector 200 . Such an operation process is simple, convenient and easy to realize, which makes the assembly type suspended ceiling structure provided by the embodiment of the present invention more concise and convenient during installation, saving time and labor.
进一步地,为了能够在竖直方向上调整吊顶装饰板100的高度,参考图9所示,卡挂件300的第一底板310上设有内螺纹孔311,参考图14所示,在内螺纹孔311内设有螺栓312,螺栓312的端部与龙骨400抵靠,螺栓312通过在内螺纹孔311内旋进和旋出,使吊顶装饰板100调整至预定高度。这样,进而使得,在进行施工安装时,当将吊顶装饰板100吊装在房顶后,可以在竖直方向上,调整吊顶装饰板100,以使吊顶装饰板100被调整至预定高度。Further, in order to be able to adjust the height of the ceiling decoration board 100 in the vertical direction, as shown in FIG. Bolt 312 is arranged in 311, the end of bolt 312 abuts against the keel 400, and the bolt 312 is screwed in and out through the internal thread hole 311 to adjust the ceiling decoration board 100 to a predetermined height. In this way, during construction and installation, after the suspended ceiling decorative panel 100 is hoisted on the roof, the suspended ceiling decorative panel 100 can be adjusted in the vertical direction so that the suspended ceiling decorative panel 100 is adjusted to a predetermined height.
进一步地,为了使本发明实施例提供的装配式吊顶结构在安装时更加简洁方便,省时省工,如图1所示,龙骨400的延伸方向(在图1中表示为A方向)与吊装插槽3的延伸方向(在图1中表示为B方向)垂直;卡挂件300可沿龙骨400的延伸方向移动,这样使得吊顶装饰板100可沿A方向移动;插接件200可在吊装插槽内3滑动,这样使得吊顶装饰板100可沿B方向移动。进而使得,在进行施工安装时,当将吊顶装饰板100吊装在房顶后,在A方向和/或B方向移动吊顶装饰板100,以使吊顶装饰板100被调整至预定位置。Further, in order to make the assembled suspended ceiling structure provided by the embodiment of the present invention more concise and convenient during installation, saving time and labor, as shown in Figure 1, the extension direction of the keel 400 (indicated as the A direction in Figure 1) and the hoisting direction The extension direction of the slot 3 (represented as B direction in FIG. 1 ) is vertical; the hanging part 300 can move along the extension direction of the keel 400, so that the suspended ceiling decorative panel 100 can move along the A direction; The groove 3 slides, so that the ceiling decoration board 100 can move along the B direction. Furthermore, during construction and installation, after the suspended ceiling decorative panel 100 is hoisted on the roof, the suspended ceiling decorative panel 100 is moved in the A direction and/or the B direction, so that the suspended ceiling decorative panel 100 is adjusted to a predetermined position.
另外,采用这种结构,可以避免在进行施工安装过程中相邻吊顶装饰板100之间的相互影响,例如在图15中,其中一块吊顶装饰板100标记为a,与a相邻的一块吊顶装饰板100标记为b,将a安装在预定位置(图15中a所处位置)后,在离a的一定距离处将b吊装在房顶,然后将b调整至预定位置(图15中b所处位置),这样则在安装b的过程中不受a的影响,使得安装时更加简洁方便,省时省工。In addition, with this structure, the mutual influence between adjacent ceiling decorative panels 100 can be avoided during construction and installation. For example, in FIG. The decorative panel 100 is marked as b. After a is installed at a predetermined position (the position of a in FIG. 15), b is hoisted on the roof at a certain distance from a, and then b is adjusted to the predetermined position (b in FIG. 15). location), so that it will not be affected by a during the installation of b, making the installation more concise and convenient, saving time and labor.
本发明实施例提供的装配式吊顶结构,如图5a、图5b和图5c所示,其插接件200包括第二底板210,第二底板210的相对两侧的边缘处均设有第三侧板230,且第二底板210与两个第三侧板230相接呈U型,两个第三侧板230远离第二底板210的一侧边缘处均形成有翼板220,两个第三侧板230插接于第一吊装空隙31内,两个翼板220分别插接于两个第二吊装空隙32内;第二底板210上形成有第一挂孔211,两个第三侧板230上均形成有第二挂孔231;在进行卡挂件300与该插接件200的组装时,参考图11所示,只需将第二侧板330插入第一挂孔211,且第二侧板330与第三侧板230平行;然后调整第二侧板330的角度,例如旋转90度,以使两个挂勾351分别与两个第二挂孔231挂接,这样即可完成卡挂件300与插接件200的卡入装配。这样的操作过程简单、方便、易实现,使的本发明实施例提供的装配式吊顶结构在安装时更加简洁方便,省时省工。As shown in Fig. 5a, Fig. 5b and Fig. 5c, the prefabricated suspended ceiling structure provided by the embodiment of the present invention has a connector 200 comprising a second bottom plate 210, and third The side plate 230, and the second bottom plate 210 is connected with the two third side plates 230 to form a U shape, and the two third side plates 230 are formed with wing plates 220 at the edge of the side away from the second bottom plate 210, and the two third side plates 230 are formed with wing plates 220. The three side plates 230 are plugged into the first hoisting gap 31, and the two wing plates 220 are respectively plugged into the two second hoisting gaps 32; the second bottom plate 210 is formed with a first hanging hole 211, two third side The second hanging holes 231 are formed on the boards 230; when assembling the hanging part 300 and the connector 200, as shown in FIG. The second side plate 330 is parallel to the third side plate 230; then adjust the angle of the second side plate 330, for example, rotate 90 degrees, so that the two hooks 351 are respectively connected with the two second hanging holes 231, so that it can be completed The snap-in assembly of the clip-hanging part 300 and the plug-in part 200 . Such an operation process is simple, convenient and easy to realize, which makes the assembly type suspended ceiling structure provided by the embodiment of the present invention more concise and convenient during installation, saving time and labor.
具体的,插接件200插接于吊装插槽3内的那一端,被配置为与吊装插槽3相适应。其中,相适应指的以下两点:Specifically, the end of the connector 200 plugged into the lifting slot 3 is configured to be compatible with the lifting slot 3 . Among them, adaptation refers to the following two points:
第一,在结构上,插接件200插接于吊装插槽3内的那一端与吊装插槽3相适应。例如参考图8所示,当吊装插槽3设置成倒“T”字型时,插接件200插接于吊装插槽3内的那一端也被配置为倒“T”字型。具体的,如图5b所示,两个第三侧板230构成倒“T”字型的竖向边,两侧的翼板220构成倒“T”字型的横向边。参考图6和图8所示,两个第三侧板230插接于第一吊装空隙31内,两个翼板220分别插接于两个第二吊装空隙32内。具体安装时,可以将插接件200由吊装插槽3的一端插入吊装插槽3内。First, structurally, the end of the connector 200 inserted into the lifting slot 3 is compatible with the lifting slot 3 . For example, as shown in FIG. 8 , when the lifting slot 3 is configured in an inverted "T" shape, the end of the connector 200 inserted into the lifting slot 3 is also configured in an inverted "T" shape. Specifically, as shown in FIG. 5 b , the two third side plates 230 form vertical sides of an inverted "T" shape, and the wing plates 220 on both sides form lateral sides of an inverted "T" shape. Referring to FIG. 6 and FIG. 8 , the two third side plates 230 are plugged into the first hoisting gap 31 , and the two wing plates 220 are plugged into the two second hoisting gaps 32 respectively. During specific installation, the plug connector 200 can be inserted into the lifting slot 3 from one end of the lifting slot 3 .
第二,在大小上,插接件200插接于吊装插槽3内的那一端与吊装插槽3相适应。具体的,两个第三侧板230之间的宽度(图5b中标注为d2)与吊装插槽3的第一吊装空隙31的宽度(图4中标注为d1)相等或相近;插接件200的翼板220的厚度(图5b中标注为h2)与吊装插槽3的第二吊装空隙32的厚度(图4中标注为h1)相等或相近;插接件200的翼板220的宽度(图5b中标注为d4)与吊装插槽3的第二吊装空隙32的宽度(图4中标注为d3)相等或相近。Second, in terms of size, the end of the connector 200 inserted into the lifting slot 3 is compatible with the lifting slot 3 . Specifically, the width between the two third side plates 230 (marked as d 2 in FIG. 5 b ) is equal to or similar to the width of the first hoisting gap 31 of the hoisting slot 3 (marked as d 1 in FIG. 4 ); The thickness of the wing plate 220 of the connector 200 (marked as h 2 in FIG. 5 b ) is equal to or similar to the thickness of the second hoisting gap 32 of the lifting slot 3 (marked as h 1 in FIG. 4 ); the wings of the connector 200 The width of the board 220 (marked as d 4 in FIG. 5 b ) is equal to or similar to the width of the second lifting gap 32 of the lifting slot 3 (marked as d 3 in FIG. 4 ).
在本发明的一些实施例中,吊顶装饰板100的吊装插槽3的大小设置成如下规格:In some embodiments of the present invention, the size of the hoisting slot 3 of the suspended ceiling decoration board 100 is set to the following specification:
将第一吊装空隙31的宽度(图4中标为d1)设置为10mm~30mm。对于第二吊装空隙32的厚度(图4中标为h1),当将其设置的过大时,插接件200容易从其中滑出,当将其设置的过小时,插接件200不容易插入,h1的优选范围为1mm~10mm。对于第二吊装空隙32的宽度(图4中标为d3),当将其设置的过大时,装饰面板1和背板2之间的粘料层5面积较小,不利于装饰面板1和背板2之间的固定粘结,当将其设置的过小时,插接件容易从其中滑出,d3的优选范围为15mm~50mm。The width of the first lifting gap 31 (marked as d 1 in FIG. 4 ) is set to be 10mm˜30mm. Regarding the thickness of the second hoisting gap 32 (marked as h 1 in FIG. 4 ), when it is set too large, the connector 200 will easily slip out of it, and when it is set too small, the connector 200 will not easily Insertion, the preferred range of h 1 is 1 mm to 10 mm. For the width of the second hoisting gap 32 (marked as d 3 in Fig. 4), when it is set too large, the area of the adhesive material layer 5 between the decorative panel 1 and the back plate 2 is small, which is not conducive to the decorative panel 1 and the When the fixed bonding between the backplanes 2 is set too small, the connectors will easily slip out of it, and the preferred range of d3 is 15 mm to 50 mm.
插接件200的大小可以根据吊装插槽3的大小设置,即将插接件200的大小设置成与吊装插槽3的大小相等或相近。The size of the connector 200 can be set according to the size of the lifting slot 3 , that is, the size of the connector 200 is set to be equal to or similar to the size of the lifting slot 3 .
第二方面,本发明实施例还提供了一种装配式吊顶结构的安装方法,用于第一方面的装配式吊顶结构,包括步骤S1~S4:In the second aspect, the embodiment of the present invention also provides a method for installing a prefabricated suspended ceiling structure, which is used in the prefabricated suspended ceiling structure of the first aspect, including steps S1-S4:
S1、将龙骨400通过吊杆500固定连接于房顶;S1, the keel 400 is fixedly connected to the roof through the suspender 500;
S2、将插接件200的一端插接于吊顶装饰板100的吊装插槽3内;S2. Insert one end of the connector 200 into the hoisting slot 3 of the ceiling decoration board 100;
S3、将卡挂件300的挂接结构350与插接件200的另一端挂接;S3. Hook up the hooking structure 350 of the card hanger 300 with the other end of the plug connector 200;
S4、将卡挂件300的第一侧板320越过龙骨400,并且使安装槽340卡合在龙骨400上。S4 . Put the first side plate 320 of the hanging member 300 over the keel 400 , and make the installation groove 340 engage on the keel 400 .
本发明实施例提供的装配式吊顶结构的安装方法,首先,参考图1所示,将龙骨400通过吊杆500固定连接于房顶;其次,将插接件200的一端插接于吊顶装饰板100的吊装插槽3内;再次,将卡挂件300的挂接结构350与插接件200的另一端挂接;最后,将卡挂件300的第一侧板320越过龙骨400,并且使安装槽340卡合在龙骨400上。与背景技术中提到的吊顶方式相比,首先,负荷整个吊顶装饰板重量的对象由装饰面板1的厚度方向上的上半部份变成了背板2,这样则不需要再对装饰面板1的内在强度有较高的要求。其次,施工过程中,不再需要将插接件200插入装饰面板1中间,只需将插接件200插接在吊装插槽3内,工序简单,操作简捷方便,很大程度的减小了施工的繁琐程度,从而加快施工进度。而且也不存在,操作过程中容易将装饰面板1插裂的问题。因此,本发明实施例提供的装配式吊顶结构的安装方法,能够解决了现有吊装方式对于吊顶板的内在强度要求较高,和施工过程中容易将吊顶板插裂的问题。The installation method of the assembled suspended ceiling structure provided by the embodiment of the present invention, firstly, as shown in Fig. 1, the keel 400 is fixedly connected to the roof through the suspender 500; secondly, one end of the connector 200 is plugged into the decorative ceiling panel 100 in the hoisting slot 3; again, hook the hook structure 350 of the hanging piece 300 to the other end of the plug-in piece 200; finally, cross the first side plate 320 of the hanging piece 300 over the keel 400, and make the installation groove 340 snaps on the keel 400 . Compared with the suspended ceiling method mentioned in the background technology, firstly, the object that loads the weight of the entire suspended ceiling decorative panel is changed from the upper half of the decorative panel 1 in the thickness direction to the back panel 2, so that there is no need to adjust the decorative panel again. The intrinsic strength of 1 has higher requirements. Secondly, during the construction process, it is no longer necessary to insert the connector 200 into the middle of the decorative panel 1, and only need to insert the connector 200 into the hoisting slot 3, the process is simple, the operation is simple and convenient, and the The cumbersome degree of construction, thus speeding up the construction progress. Moreover, there is no problem that the decorative panel 1 is easily cracked during the operation. Therefore, the installation method of the prefabricated suspended ceiling structure provided by the embodiment of the present invention can solve the problems that the existing hoisting methods have higher requirements on the inherent strength of the ceiling board and the problem that the ceiling board is easy to be cracked during the construction process.
具体的,在本发明的一些实施例中,参考图9所示,卡挂件300的挂接结构350包括第二侧板330远离第一底板310的一端相对两侧形成的挂勾351,且挂勾351由第二侧板330的侧壁开具凹槽331形成;参考图5a所示,插接件200包括第二底板210,第二底板210的相对两侧的边缘处均设有第三侧板230,且第二底板210与两个第三侧板230相接呈U型,第二底板210上形成有第一挂孔211,两个第三侧板230上均形成有第二挂孔231;Specifically, in some embodiments of the present invention, as shown in FIG. The hook 351 is formed by opening a groove 331 on the side wall of the second side plate 330; as shown in FIG. plate 230, and the second bottom plate 210 is connected with the two third side plates 230 to form a U shape, the second bottom plate 210 is formed with a first hanging hole 211, and the two third side plates 230 are formed with a second hanging hole 231;
步骤S3具体包括:Step S3 specifically includes:
S31、将卡挂件300的第二侧板330插入第一挂孔211,且第二侧板330与第三侧板230平行;S31. Insert the second side plate 330 of the hanging member 300 into the first hanging hole 211, and the second side plate 330 is parallel to the third side plate 230;
S32、调整第二侧板230的角度,以使两个挂勾351分别与两个第二挂孔231挂接。S32 , adjusting the angle of the second side plate 230 so that the two hooks 351 are hooked to the two second hanging holes 231 respectively.
具体的,在本发明的一些实施例中,步骤S2包括:将插接件200的一端插接于吊装插槽3内,且插接件200可在吊装插槽3内滑动;Specifically, in some embodiments of the present invention, step S2 includes: inserting one end of the connector 200 into the lifting slot 3, and the connector 200 can slide in the lifting slot 3;
步骤S4包括:将卡挂件300的第一侧板320越过龙骨400,并且使安装槽340可沿龙骨400的延伸方向移动卡合在龙骨400上,且使吊装插槽3的延伸方向(即图1中的A方向)与龙骨400的延伸方向(即图1中的B方向)垂直。这样使得吊顶装饰板100可沿A方向和B方向移动。Step S4 includes: passing the first side plate 320 of the hanging member 300 over the keel 400, and enabling the installation groove 340 to move along the extension direction of the keel 400 to engage on the keel 400, and making the extension direction of the lifting slot 3 (that is, A direction in 1) is perpendicular to the extending direction of the keel 400 (ie, direction B in FIG. 1 ). This allows the ceiling trim panel 100 to move in the A direction and the B direction.
基于此,进一步的,本发明实施例提供的装配式吊顶结构的安装方法,在步骤S4之后还包括:Based on this, further, the installation method of the prefabricated suspended ceiling structure provided by the embodiment of the present invention also includes after step S4:
步骤S5、将吊顶装饰板100沿龙骨400的延伸方向和/或沿吊装插槽3的延伸方向调整至预定位置。Step S5 , adjusting the ceiling decorative panel 100 to a predetermined position along the extension direction of the keel 400 and/or along the extension direction of the hoisting slot 3 .
进一步地,第一底板310上设有内螺纹孔311,在内螺纹孔311内设有螺栓312,螺栓312与龙骨400抵靠;Further, the first bottom plate 310 is provided with an internally threaded hole 311, and a bolt 312 is provided in the internally threaded hole 311, and the bolt 312 abuts against the keel 400;
基于此,进一步的,本发明实施例提供的装配式吊顶结构的安装方法,在步骤S5之后还包括:Based on this, further, the installation method of the prefabricated suspended ceiling structure provided by the embodiment of the present invention also includes after step S5:
步骤S6、将螺栓312在内螺纹孔311内旋进和旋出,以使吊顶装饰板100调整至预定高度。Step S6 , screw the bolt 312 in and out of the internally threaded hole 311 , so as to adjust the ceiling decoration board 100 to a predetermined height.
具体的,在本发明的一些实施例中,参考图5a所示,插接件200包括第二底板210,第二底板210的相对两侧的边缘处均设有第三侧板230,且第二底板210与两个第三侧板230相接呈U型,两个第三侧板230远离第二底板210的一侧边缘均形成有翼板220;Specifically, in some embodiments of the present invention, as shown in FIG. The second bottom plate 210 is connected with the two third side plates 230 to form a U shape, and the edge of the side of the two third side plates 230 away from the second bottom plate 210 is formed with a wing plate 220;
步骤S2包括:将两个第三侧板230插接于第一吊装空隙31内,两个翼板220分别插接于两个第二吊装空隙32内。Step S2 includes: inserting the two third side plates 230 into the first lifting gap 31 , and inserting the two wing plates 220 into the two second lifting gaps 32 respectively.
这样的安装工序简单,操作方便,很大程度的减小了施工的繁琐程度,从而加快施工进度。This kind of installation process is simple and easy to operate, which greatly reduces the cumbersome degree of construction, thereby speeding up the construction progress.
以上,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应以权利要求的保护范围为准。The above is only a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Anyone familiar with the technical field can easily think of changes or replacements within the technical scope disclosed in the present invention, and should cover all Within the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910697522.4A CN110424617A (en) | 2019-07-30 | 2019-07-30 | A kind of assembled ceiling structure and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910697522.4A CN110424617A (en) | 2019-07-30 | 2019-07-30 | A kind of assembled ceiling structure and its installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110424617A true CN110424617A (en) | 2019-11-08 |
Family
ID=68413228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910697522.4A Pending CN110424617A (en) | 2019-07-30 | 2019-07-30 | A kind of assembled ceiling structure and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110424617A (en) |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112031253A (en) * | 2020-09-29 | 2020-12-04 | 浙江亚厦装饰股份有限公司 | Keel structure convenient to hang and fix and installation method thereof |
CN112049316A (en) * | 2020-09-29 | 2020-12-08 | 浙江亚厦装饰股份有限公司 | Connecting member suitable for single block quick installation and installation method |
CN112064859A (en) * | 2020-09-23 | 2020-12-11 | 浙江亚厦装饰股份有限公司 | Ceiling and installation structure |
CN112443069A (en) * | 2020-12-01 | 2021-03-05 | 浙江亚厦装饰股份有限公司 | Assembly type ceiling mounting component and mounting method |
CN112962856A (en) * | 2021-04-07 | 2021-06-15 | 浙江亚厦装饰股份有限公司 | Suspended ceiling mounting structure |
CN113293914A (en) * | 2021-06-15 | 2021-08-24 | 浙江亚厦装饰股份有限公司 | Assembly type ceiling with rear bearing structure and mounting method |
CN113323249A (en) * | 2021-06-30 | 2021-08-31 | 浙江亚厦装饰股份有限公司 | Mounting structure of furred ceiling |
CN113356460A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Clip assembly and ceiling assembly method |
CN113356454A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Hanging component of ceiling, ceiling structure and mounting method of ceiling structure |
CN113356458A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Ceiling member and ceiling board mounting method |
CN113356456A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Ceiling decorative plate assembling assembly, ceiling structure and ceiling assembling method |
CN113356459A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Clamping type ceiling mounting assembly, ceiling structure and mounting method of ceiling structure |
CN113374157A (en) * | 2021-06-21 | 2021-09-10 | 北新集团建材股份有限公司 | Clamping groove component, machining method of clamping groove component, ceiling decorative plate mounting structure and mounting method |
CN113431249A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Slot component of bearing type ceiling, ceiling structure and mounting method of ceiling structure |
CN113431251A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Machining method of suspended ceiling assembly and clamping groove component |
CN113431250A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Independent dismounting ceiling assembly, ceiling structure and mounting method thereof |
CN113431244A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Adjustable ceiling mounting assembly, ceiling structure and mounting method of ceiling structure |
CN113431247A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Keel, hanging structure, ceiling board hanging component and ceiling assembling method |
CN113445657A (en) * | 2021-06-21 | 2021-09-28 | 北新集团建材股份有限公司 | Suspended ceiling installation assembly and processing method thereof, suspended ceiling structure and installation method thereof |
CN114197724A (en) * | 2021-11-25 | 2022-03-18 | 浙江亚厦装饰股份有限公司 | A kind of hanging installation ceiling and installation method thereof |
CN114277999A (en) * | 2022-01-12 | 2022-04-05 | 浙江亚厦装饰股份有限公司 | A prefabricated zigzag keel ceiling structure and installation method thereof |
Citations (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2081332A (en) * | 1980-07-18 | 1982-02-17 | Fortelite Ltd | Clamp for supports for a suspended ceiling |
EP0340133A1 (en) * | 1988-04-25 | 1989-11-02 | Eberhardt Freres Katorex, S.A. | Disposition of a suspended ceiling |
JPH09217459A (en) * | 1996-02-14 | 1997-08-19 | Taisei Corp | Ceiling stone fittings and ceiling stone construction method |
CN204152053U (en) * | 2014-09-02 | 2015-02-11 | 汤溪蔚 | A kind of extension takes formula combination ceiling system |
KR20150146022A (en) * | 2014-06-20 | 2015-12-31 | 주식회사 조은데코 | Apparatus for finishing a ceilng |
CN105464277A (en) * | 2016-01-13 | 2016-04-06 | 沈阳建筑大学 | Fastener for light steel keel suspended ceiling |
CN205276655U (en) * | 2016-01-06 | 2016-06-01 | 浙江解放装饰工程有限公司 | Easy dismouting furred ceiling |
CN105649255A (en) * | 2016-01-06 | 2016-06-08 | 浙江解放装饰工程有限公司 | Suspended ceiling installation structure |
CN205577220U (en) * | 2016-03-03 | 2016-09-14 | 北新集团建材股份有限公司 | Stabilizing member |
CN106013584A (en) * | 2016-06-29 | 2016-10-12 | 浙江亚厦装饰股份有限公司 | Modular ceiling cascade device and mounting method |
US20170044767A1 (en) * | 2014-04-23 | 2017-02-16 | Locking Key Pty Ltd As Trustee For Locking Key Unit Trust | A Suspended Ceiling Clip |
CN206000069U (en) * | 2016-06-29 | 2017-03-08 | 浙江亚厦装饰股份有限公司 | The horizontal hanging device of rotating hanging formula and hitch assembly |
CN206053093U (en) * | 2016-09-14 | 2017-03-29 | 芝加哥金属制品(深圳)有限公司 | Furred ceiling component |
CN107109844A (en) * | 2014-11-14 | 2017-08-29 | 阿姆斯特郎世界工业公司 | Ceiling system |
CN206737246U (en) * | 2016-11-07 | 2017-12-12 | 广州五羊美特建材科技有限公司 | A kind of concealed installation ceiling |
CN107542206A (en) * | 2016-06-29 | 2018-01-05 | 上海志豪实业有限公司 | Technology for Mineral Cotton Plate Ceiling with Lightweight Steel Frame |
CN207092350U (en) * | 2017-06-26 | 2018-03-13 | 浙江亚厦装饰股份有限公司 | A kind of modularization falls a grade suspended ceiling device |
CN108005294A (en) * | 2017-12-13 | 2018-05-08 | 郑州默尔电子信息技术有限公司 | A kind of the ceiling plate mounting and fixing support |
CN108049551A (en) * | 2017-12-30 | 2018-05-18 | 浙江亚厦装饰股份有限公司 | Pendant, ceiling joist component and assembly method |
CN207829272U (en) * | 2018-01-17 | 2018-09-07 | 深圳韦高成建筑装饰设计有限公司 | A kind of furred ceiling |
CN207974324U (en) * | 2017-12-30 | 2018-10-16 | 浙江亚厦装饰股份有限公司 | Plane reserves process seam connection structure |
CN108868139A (en) * | 2018-08-11 | 2018-11-23 | 天津市盛世基建岩土工程有限公司 | A kind of method of furred ceiling |
CN208235780U (en) * | 2018-04-28 | 2018-12-14 | 青岛集好建筑科技有限公司 | A kind of suspender member |
CN109779120A (en) * | 2018-12-29 | 2019-05-21 | 广州金霸建材股份有限公司 | A kind of ceiling mounting system and an mounting method thereof that light and shade combines |
CN109811951A (en) * | 2019-03-27 | 2019-05-28 | 中建八局装饰工程有限公司 | Modularization weaves plate furred ceiling component and its furred ceiling and installation method |
CN209114695U (en) * | 2018-11-20 | 2019-07-16 | 中建材创新科技研究院有限公司 | A kind of ceiling system |
CN110424618A (en) * | 2019-07-30 | 2019-11-08 | 北新集团建材股份有限公司 | A kind of assembled ceiling structure and its installation method |
CN210597834U (en) * | 2019-07-30 | 2020-05-22 | 北新集团建材股份有限公司 | Assembled furred ceiling structure |
-
2019
- 2019-07-30 CN CN201910697522.4A patent/CN110424617A/en active Pending
Patent Citations (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2081332A (en) * | 1980-07-18 | 1982-02-17 | Fortelite Ltd | Clamp for supports for a suspended ceiling |
EP0340133A1 (en) * | 1988-04-25 | 1989-11-02 | Eberhardt Freres Katorex, S.A. | Disposition of a suspended ceiling |
JPH09217459A (en) * | 1996-02-14 | 1997-08-19 | Taisei Corp | Ceiling stone fittings and ceiling stone construction method |
US20170044767A1 (en) * | 2014-04-23 | 2017-02-16 | Locking Key Pty Ltd As Trustee For Locking Key Unit Trust | A Suspended Ceiling Clip |
KR20150146022A (en) * | 2014-06-20 | 2015-12-31 | 주식회사 조은데코 | Apparatus for finishing a ceilng |
CN204152053U (en) * | 2014-09-02 | 2015-02-11 | 汤溪蔚 | A kind of extension takes formula combination ceiling system |
CN107109844A (en) * | 2014-11-14 | 2017-08-29 | 阿姆斯特郎世界工业公司 | Ceiling system |
CN205276655U (en) * | 2016-01-06 | 2016-06-01 | 浙江解放装饰工程有限公司 | Easy dismouting furred ceiling |
CN105649255A (en) * | 2016-01-06 | 2016-06-08 | 浙江解放装饰工程有限公司 | Suspended ceiling installation structure |
CN105464277A (en) * | 2016-01-13 | 2016-04-06 | 沈阳建筑大学 | Fastener for light steel keel suspended ceiling |
CN205577220U (en) * | 2016-03-03 | 2016-09-14 | 北新集团建材股份有限公司 | Stabilizing member |
CN106013584A (en) * | 2016-06-29 | 2016-10-12 | 浙江亚厦装饰股份有限公司 | Modular ceiling cascade device and mounting method |
CN206000069U (en) * | 2016-06-29 | 2017-03-08 | 浙江亚厦装饰股份有限公司 | The horizontal hanging device of rotating hanging formula and hitch assembly |
CN107542206A (en) * | 2016-06-29 | 2018-01-05 | 上海志豪实业有限公司 | Technology for Mineral Cotton Plate Ceiling with Lightweight Steel Frame |
CN206053093U (en) * | 2016-09-14 | 2017-03-29 | 芝加哥金属制品(深圳)有限公司 | Furred ceiling component |
CN206737246U (en) * | 2016-11-07 | 2017-12-12 | 广州五羊美特建材科技有限公司 | A kind of concealed installation ceiling |
CN207092350U (en) * | 2017-06-26 | 2018-03-13 | 浙江亚厦装饰股份有限公司 | A kind of modularization falls a grade suspended ceiling device |
CN108005294A (en) * | 2017-12-13 | 2018-05-08 | 郑州默尔电子信息技术有限公司 | A kind of the ceiling plate mounting and fixing support |
CN108049551A (en) * | 2017-12-30 | 2018-05-18 | 浙江亚厦装饰股份有限公司 | Pendant, ceiling joist component and assembly method |
CN207974324U (en) * | 2017-12-30 | 2018-10-16 | 浙江亚厦装饰股份有限公司 | Plane reserves process seam connection structure |
CN207829272U (en) * | 2018-01-17 | 2018-09-07 | 深圳韦高成建筑装饰设计有限公司 | A kind of furred ceiling |
CN208235780U (en) * | 2018-04-28 | 2018-12-14 | 青岛集好建筑科技有限公司 | A kind of suspender member |
CN108868139A (en) * | 2018-08-11 | 2018-11-23 | 天津市盛世基建岩土工程有限公司 | A kind of method of furred ceiling |
CN209114695U (en) * | 2018-11-20 | 2019-07-16 | 中建材创新科技研究院有限公司 | A kind of ceiling system |
CN109779120A (en) * | 2018-12-29 | 2019-05-21 | 广州金霸建材股份有限公司 | A kind of ceiling mounting system and an mounting method thereof that light and shade combines |
CN109811951A (en) * | 2019-03-27 | 2019-05-28 | 中建八局装饰工程有限公司 | Modularization weaves plate furred ceiling component and its furred ceiling and installation method |
CN110424618A (en) * | 2019-07-30 | 2019-11-08 | 北新集团建材股份有限公司 | A kind of assembled ceiling structure and its installation method |
CN210597834U (en) * | 2019-07-30 | 2020-05-22 | 北新集团建材股份有限公司 | Assembled furred ceiling structure |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112064859A (en) * | 2020-09-23 | 2020-12-11 | 浙江亚厦装饰股份有限公司 | Ceiling and installation structure |
CN112031253A (en) * | 2020-09-29 | 2020-12-04 | 浙江亚厦装饰股份有限公司 | Keel structure convenient to hang and fix and installation method thereof |
CN112049316A (en) * | 2020-09-29 | 2020-12-08 | 浙江亚厦装饰股份有限公司 | Connecting member suitable for single block quick installation and installation method |
CN112443069A (en) * | 2020-12-01 | 2021-03-05 | 浙江亚厦装饰股份有限公司 | Assembly type ceiling mounting component and mounting method |
CN112962856A (en) * | 2021-04-07 | 2021-06-15 | 浙江亚厦装饰股份有限公司 | Suspended ceiling mounting structure |
CN113293914A (en) * | 2021-06-15 | 2021-08-24 | 浙江亚厦装饰股份有限公司 | Assembly type ceiling with rear bearing structure and mounting method |
CN113356456A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Ceiling decorative plate assembling assembly, ceiling structure and ceiling assembling method |
CN113431244A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Adjustable ceiling mounting assembly, ceiling structure and mounting method of ceiling structure |
CN113356454A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Hanging component of ceiling, ceiling structure and mounting method of ceiling structure |
CN113356458A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Ceiling member and ceiling board mounting method |
CN113445657A (en) * | 2021-06-21 | 2021-09-28 | 北新集团建材股份有限公司 | Suspended ceiling installation assembly and processing method thereof, suspended ceiling structure and installation method thereof |
CN113356459A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Clamping type ceiling mounting assembly, ceiling structure and mounting method of ceiling structure |
CN113374157A (en) * | 2021-06-21 | 2021-09-10 | 北新集团建材股份有限公司 | Clamping groove component, machining method of clamping groove component, ceiling decorative plate mounting structure and mounting method |
CN113431249A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Slot component of bearing type ceiling, ceiling structure and mounting method of ceiling structure |
CN113431251A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Machining method of suspended ceiling assembly and clamping groove component |
CN113431250A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Independent dismounting ceiling assembly, ceiling structure and mounting method thereof |
CN113356460A (en) * | 2021-06-21 | 2021-09-07 | 北新集团建材股份有限公司 | Clip assembly and ceiling assembly method |
CN113431247A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Keel, hanging structure, ceiling board hanging component and ceiling assembling method |
CN113323249A (en) * | 2021-06-30 | 2021-08-31 | 浙江亚厦装饰股份有限公司 | Mounting structure of furred ceiling |
CN114197724A (en) * | 2021-11-25 | 2022-03-18 | 浙江亚厦装饰股份有限公司 | A kind of hanging installation ceiling and installation method thereof |
CN114277999A (en) * | 2022-01-12 | 2022-04-05 | 浙江亚厦装饰股份有限公司 | A prefabricated zigzag keel ceiling structure and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110424617A (en) | A kind of assembled ceiling structure and its installation method | |
CN210597834U (en) | Assembled furred ceiling structure | |
CN110424618A (en) | A kind of assembled ceiling structure and its installation method | |
CN110424616B (en) | Vertical installation assembly and installation method for suspended ceiling decorative plate | |
CN110424615A (en) | A kind of assembled ceiling structure and its installation method | |
CN109736504B (en) | Detachable suspended ceiling edge keel system and construction method thereof | |
CN110424614A (en) | A kind of suspended ceiling decorative plate mounting assembly and its installation method | |
CN102493622B (en) | Wallboard installing component | |
CN210597835U (en) | Vertical installation component of furred ceiling decorative board | |
CN104929297B (en) | A kind of decoration panel installation of ceiling technique | |
CN105178495B (en) | A kind of suspended ceiling keel system and its construction method | |
CN113356454A (en) | Hanging component of ceiling, ceiling structure and mounting method of ceiling structure | |
CN108086571A (en) | Receive side drop level furred ceiling | |
CN110469037A (en) | A kind of veneer suspended ceiling member and its installation method | |
CN210342403U (en) | Assembled aluminum plate ceiling structure | |
CN103291043B (en) | The installation suspension assembly of finishing material | |
CN200985580Y (en) | Panel horizontal inserted type suspended ceiling | |
CN210597832U (en) | Ceiling decorative panel installation assembly | |
CN102900193A (en) | Cellular board ceiling system | |
CN110424665A (en) | A kind of wall decorating veneer component and wall body decoration method of plate installation | |
CN205314449U (en) | Building decorative board dogging formula connecting device | |
CN208473060U (en) | A kind of metal curtain wall | |
CN215888873U (en) | Keel for mounting suspended ceiling plate | |
CN111962791B (en) | Wall surface hanging external corner system | |
CN204850208U (en) | Modular furred ceiling pendant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191108 |
|
RJ01 | Rejection of invention patent application after publication |