CN110375294A - A kind of boiler return feeder - Google Patents
A kind of boiler return feeder Download PDFInfo
- Publication number
- CN110375294A CN110375294A CN201910731979.2A CN201910731979A CN110375294A CN 110375294 A CN110375294 A CN 110375294A CN 201910731979 A CN201910731979 A CN 201910731979A CN 110375294 A CN110375294 A CN 110375294A
- Authority
- CN
- China
- Prior art keywords
- air
- pipe
- cone
- horizontal
- cannons
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000463 material Substances 0.000 claims abstract description 19
- 238000010438 heat treatment Methods 0.000 claims abstract description 5
- 230000000007 visual effect Effects 0.000 claims description 7
- 239000002893 slag Substances 0.000 abstract description 15
- 230000000903 blocking effect Effects 0.000 abstract description 2
- HYBBIBNJHNGZAN-UHFFFAOYSA-N furfural Chemical group O=CC1=CC=CO1 HYBBIBNJHNGZAN-UHFFFAOYSA-N 0.000 description 30
- 238000000034 method Methods 0.000 description 5
- 239000000446 fuel Substances 0.000 description 3
- 239000002028 Biomass Substances 0.000 description 2
- 240000008042 Zea mays Species 0.000 description 2
- 235000005824 Zea mays ssp. parviglumis Nutrition 0.000 description 2
- 235000002017 Zea mays subsp mays Nutrition 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 235000005822 corn Nutrition 0.000 description 2
- 239000010903 husk Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 235000012343 cottonseed oil Nutrition 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000007062 hydrolysis Effects 0.000 description 1
- 238000006460 hydrolysis reaction Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23C—METHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN A CARRIER GAS OR AIR
- F23C10/00—Fluidised bed combustion apparatus
- F23C10/18—Details; Accessories
- F23C10/24—Devices for removal of material from the bed
- F23C10/26—Devices for removal of material from the bed combined with devices for partial reintroduction of material into the bed, e.g. after separation of agglomerated parts
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Accessories For Mixers (AREA)
Abstract
本发明公开了一种锅炉返料器,包括锥体、立管、水平管和回料斜管,锥体固定在立管的顶端,立管的底端侧面与水平管的一端固定连接,水平管的另一端底部固定有回料斜管,锥体的侧面上水平固定插入有锥体空气炮,立管的侧面上固定插入有立管空气炮,水平管的顶部固定插入有水平空气炮,回料斜管的侧面上固定插入有斜管空气炮,水平管的内部底端固定有安装架,安装架上安装有加热丝。本发明通过设置锥体空气炮、立管空气炮、水平空气炮、斜管空气炮、支压力表、流量计、控制阀和第二支风管,解决了传统的锅炉返料器渣灰容易在返料器内粘结,堵塞返料器造成锅炉熄灭的问题。
The invention discloses a boiler returner, which comprises a cone, a vertical pipe, a horizontal pipe and a material return inclined pipe. The cone is fixed on the top of the vertical pipe, and the side surface of the bottom end of the vertical pipe is fixedly connected with one end of the horizontal pipe. The other end of the pipe is fixed with a return material inclined pipe, a cone air cannon is fixed horizontally inserted on the side of the cone, a riser air cannon is fixed on the side of the riser, and a horizontal air cannon is fixed on the top of the horizontal pipe. The inclined tube air cannon is fixedly inserted on the side of the return inclined tube, the inner bottom end of the horizontal tube is fixed with a mounting frame, and the mounting frame is mounted with a heating wire. The invention solves the problem that the traditional boiler returner is easy to slag and ash by arranging a cone air cannon, a vertical air cannon, a horizontal air cannon, an inclined tube air cannon, a pressure gauge, a flow meter, a control valve and a second air duct. Adhesion in the returner, blocking the returner and causing the boiler to go out.
Description
技术领域technical field
本发明涉及返料器技术领域,具体为一种锅炉返料器。The invention relates to the technical field of return feeders, in particular to a boiler return feeder.
背景技术Background technique
糠醛渣是生物质类物质如玉米芯、玉米秆、稻壳、棉籽壳以及农副产品加工下脚料中的聚戊糖成分水解生产糠醛产生的生物质类废弃物,现有的返料器当糠醛渣燃烧时在经过返料器回锅炉时存在以下缺点:Furfural residues are biomass wastes produced by hydrolysis of biomass substances such as corn cob, corn stalk, rice husks, cottonseed husks and agricultural and sideline products processing waste to produce furfural. When the slag is burned, it has the following disadvantages when it is returned to the boiler through the return feeder:
1、锅炉燃料糠醛渣粘结性较大,容易在返料器内粘结,堵塞返料器造成锅炉熄灭;1. The furfural slag of boiler fuel is relatively sticky, and it is easy to stick in the returner, blocking the returner and causing the boiler to go out;
2、锅炉返料系统的返料风是两个支管平均送风的,未考虑到所处位置的不同,未做到合理的分布返料风量;2. The return air of the boiler return system is the average supply of air from the two branch pipes, without considering the difference of the location, and the return air volume has not been reasonably distributed;
3、返料器回料管坡度较小,糠醛渣易在此处粘结,但无法及时处理导致返料中止,锅炉熄火,且此处堵塞频次占总频次的56.6%;3. The return pipe of the return feeder has a small slope, and the furfural slag is easy to stick here, but the failure to deal with it in time leads to the suspension of the return material and the flameout of the boiler, and the frequency of blockage here accounts for 56.6% of the total frequency;
4、糠醛渣粘结堵塞后清洗处理困难,需要1-2天才可恢复生产。4. After the furfural residue is stuck and blocked, it is difficult to clean and handle, and it takes 1-2 days to resume production.
锅炉因返料器堵塞造成频繁的锅炉点炉,无法保证长周期稳定运行,增加柴油用量,每月增加约18万生产成本,故本发明设计一种锅炉返料器来解决上述问题。The boiler is frequently fired due to the clogging of the returner, which cannot guarantee long-term stable operation, increases the diesel consumption, and increases the production cost by about 180,000 per month. Therefore, the present invention designs a boiler returner to solve the above problems.
发明内容SUMMARY OF THE INVENTION
(一)解决的技术问题(1) Technical problems solved
针对现有技术的不足,本发明提供了一种锅炉返料器,解决了传统的锅炉返料器渣灰容易在返料器内粘结,堵塞返料器造成锅炉熄灭的问题。Aiming at the deficiencies of the prior art, the present invention provides a boiler returner, which solves the problem that the slag ash of the traditional boiler returner is easy to stick in the returner, and the boiler is extinguished due to clogging of the returner.
(二)技术方案(2) Technical solutions
为实现上述目的,本发明提供如下技术方案:一种锅炉返料器,包括锥体、立管、水平管和回料斜管,锥体固定在立管的顶端,立管的底端侧面与水平管的一端固定连接,水平管的另一端底部固定有回料斜管,锥体的侧面上水平固定插入有锥体空气炮,立管的侧面上固定插入有立管空气炮,水平管的顶部固定插入有水平空气炮,回料斜管的侧面上固定插入有斜管空气炮,水平管的内部底端固定有安装架,安装架上安装有加热丝,安装架的下方设置有第一支风管,第一支风管上分别设置有支压力表、流量计和控制阀,第一支风管通过三通与主风管固定连接,主风管上设置有总压力表,主风管与返料风机的出风口固定连接。In order to achieve the above purpose, the present invention provides the following technical solutions: a boiler returner, comprising a cone, a riser, a horizontal pipe and a return material inclined pipe, the cone is fixed on the top of the riser, and the bottom side of the riser is connected to the One end of the horizontal pipe is fixedly connected, the bottom of the other end of the horizontal pipe is fixed with a return material inclined pipe, a cone air cannon is fixed horizontally inserted on the side of the cone, and a riser air cannon is fixedly inserted on the side of the riser. A horizontal air cannon is fixedly inserted at the top, an inclined tube air cannon is fixedly inserted on the side of the return inclined tube, a mounting bracket is fixed at the inner bottom end of the horizontal tube, a heating wire is installed on the mounting bracket, and a first The branch air duct is provided with a branch pressure gauge, a flow meter and a control valve respectively. The first air duct is fixedly connected to the main air duct through a three-way connection. The pipe is fixedly connected with the air outlet of the return fan.
优选的,主风管的侧面中部与第二支风管的一端相连通,第二支风管的另一端插入回料斜管的中部,第二支风管上亦设置有控制阀。Preferably, the middle part of the side surface of the main air duct is communicated with one end of the second air duct, the other end of the second air duct is inserted into the middle part of the return material inclined pipe, and the second air duct is also provided with a control valve.
优选的,第一支风管设置有两个,两个第一支风管对称设置在主风管的两侧,且左侧第一支风管上设置有下灰管,下灰管上亦设置有控制阀。Preferably, there are two first air ducts, the two first air ducts are symmetrically arranged on both sides of the main air duct, and the first air duct on the left side is provided with a lower ash pipe, and the lower ash duct is also arranged on the lower ash pipe. A control valve is provided.
优选的,回料斜管的中部侧面上设置有可视透镜。Preferably, a visual lens is provided on the side surface of the middle part of the material return inclined tube.
优选的,锥体空气炮设置有七个,七个锥体空气炮设置为两层,上层设置有四个,下层设置有三个,且上层锥体空气炮与下层锥体空气炮交叉排列。Preferably, there are seven cone air cannons, the seven cone air cannons are arranged in two layers, the upper layer is arranged with four, and the lower layer is arranged with three, and the upper layer cone air cannons and the lower layer cone air cannons are arranged crosswise.
优选的,立管空气炮设置有四个,四个立管空气炮等间距设置在立管的侧面,且上方三个立管空气炮向下倾斜设置,最下方的立管空气炮水平设置。Preferably, there are four standpipe air cannons, the four standpipe air cannons are arranged on the side of the standpipe at equal intervals, and the upper three standpipe air cannons are arranged obliquely downward, and the lowermost standpipe air cannon is horizontally arranged.
优选的,水平空气炮设置有两个,两个水平空气炮竖直插入水平管内。Preferably, there are two horizontal air cannons, and the two horizontal air cannons are vertically inserted into the horizontal pipe.
(三)有益效果(3) Beneficial effects
本发明提供了一种锅炉返料器,具备以下有益效果:The invention provides a boiler returner, which has the following beneficial effects:
(1)本发明通过设置锥体空气炮、立管空气炮、水平空气炮和斜管空气炮,通过在返料系统不同部位增加空气炮使糠醛渣在返料器内燃烧,避免温度的降低而黏附。(1) In the present invention, by setting cone air cannons, vertical air cannons, horizontal air cannons and inclined tube air cannons, and by adding air cannons in different parts of the return system, the furfural slag is burned in the return device to avoid temperature reduction. and adhesion.
(2)本发明通过设置第二支风管,在糠醛渣回料斜管增加一次风的输送,给燃料更充足的氧气,同时加快燃料灰的循环速度,减少接触管内壁的时间,降低灰的黏附。(2) In the present invention, by setting up a second air duct, the transport of primary air is increased in the furfural slag return sloping pipe, providing more oxygen to the fuel, and at the same time accelerating the circulation speed of the fuel ash, reducing the time of contacting the inner wall of the pipe, and reducing the amount of ash. adhesion.
(3)本发明通过设置第一支风管、支压力表、流量计和控制阀,通过对返料风流量压力进行控制,进而控制返料灰的速度,减少返料器内部的粘结。(3) In the present invention, by setting the first air pipe, the pressure gauge, the flow meter and the control valve, by controlling the air flow pressure of the returning material, the speed of the returning ash is controlled, and the adhesion inside the returning device is reduced.
附图说明Description of drawings
图1为本发明正视图;Fig. 1 is the front view of the present invention;
图2为本发明正剖图;Fig. 2 is the front sectional view of the present invention;
图3为本发明返料器锥体俯视图。Figure 3 is a top view of the cone of the reverter of the present invention.
图中附图标记为:1、锥体;2、立管;3、水平管;4、回料斜管;5、锥体空气炮;6、立管空气炮;7、水平空气炮;8、斜管空气炮;9、加热丝;10、安装架;11、第一支风管;12、支压力表;13、流量计;14、控制阀;15、主风管;16、总压力表;17、返料风机;18、第二支风管;19、可视透镜;20、下灰管。The reference signs in the figure are: 1, cone; 2, riser; 3, horizontal pipe; 4, inclined pipe for return material; 5, cone air cannon; 6, riser air cannon; , inclined tube air gun; 9, heating wire; 10, mounting frame; 11, the first air pipe; 12, pressure gauge; 13, flow meter; 14, control valve; 15, main air pipe; 16, total pressure Table; 17, material return fan; 18, second air duct; 19, visual lens; 20, lower ash pipe.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
如图1-3所示,本发明提供一种技术方案:一种锅炉返料器,包括锥体1、立管2、水平管3和回料斜管4,锥体1固定在立管2的顶端,立管2的底端侧面与水平管3的一端固定连接,水平管3的另一端底部固定有回料斜管4,回料斜管4的中部侧面上设置有可视透镜19,增加可视透镜19可及时观察回料斜管4粘结情况,根据返灰速度了解返料器冲洗的时间,锥体1的侧面上水平固定插入有锥体空气炮5,锥体空气炮5设置有七个,七个锥体空气炮5设置为两层,上层设置有四个,下层设置有三个,且上层锥体空气炮5与下层锥体空气炮5交叉排列,通过在锥体1处分两层增加七个锥体空气炮5,增加返料器进口风量,辅助糠醛渣灰在返料器内燃烧,减少粘结,立管2的侧面上固定插入有立管空气炮6,立管空气炮6设置有四个,四个立管空气炮6等间距设置在立管2的侧面,且上方三个立管空气炮6向下倾斜设置,最下方的立管空气炮6水平设置,通过在立管2处增加四个立管空气炮6,保证返料器立管部分的风量,鼓动返料器内壁,增加振动减少糠醛渣在立体部分附着,水平管3的顶部固定插入有水平空气炮7,水平空气炮7设置有两个,两个水平空气炮7竖直插入水平管3内,通过在水平管3处增加两个水平空气炮7,促进及加快挡板处糠醛渣灰分的流动,避免挡板处灰分的积累粘结,回料斜管4的侧面上固定插入有斜管空气炮8,通过在回料斜管4处增加斜管空气炮8,避免糠醛渣灰在回料斜管4处粘结,水平管3的内部底端固定有安装架10,安装架10上安装有加热丝9,安装架10的下方设置有第一支风管11,第一支风管11上分别设置有支压力表12、流量计13和控制阀14,控制阀14采用电动调节阀,第一支风管11通过三通与主风管15固定连接,主风管15上设置有总压力表16,主风管15与返料风机17的出风口固定连接,第一支风管11设置有两个,两个第一支风管11对称设置在主风管15的两侧,且左侧第一支风管11上设置有下灰管20,下灰管20上亦设置有控制阀14,主风管15的侧面中部与第二支风管18的一端相连通,第二支风管18的另一端插入回料斜管4的中部,第二支风管18上亦设置有控制阀14。As shown in Figures 1-3, the present invention provides a technical solution: a boiler returner, comprising a cone 1, a riser 2, a horizontal pipe 3 and an inclined return pipe 4, and the cone 1 is fixed on the riser 2 The top of the vertical pipe 2 is fixedly connected with one end of the horizontal pipe 3, the bottom of the other end of the horizontal pipe 3 is fixed with a return material inclined pipe 4, and the middle side of the return material inclined pipe 4 is provided with a visual lens 19, The addition of the visual lens 19 can observe the bonding of the return material inclined pipe 4 in time, and the washing time of the return material can be known according to the ash return speed. On the side of the cone 1, a cone air cannon 5 and a cone air cannon 5 are horizontally fixed and inserted. There are seven, the seven cone air cannons 5 are arranged in two layers, the upper layer is provided with four, and the lower layer is provided with three, and the upper layer cone air cannon 5 and the lower layer cone air cannon 5 are arranged crosswise, through the cone 1 Dispose of two layers and add seven cone air cannons 5, increase the inlet air volume of the returner, assist the burning of furfural slag in the returner, and reduce adhesion. The tube air cannons 6 are provided with four, and the four riser air cannons 6 are arranged on the side of the riser 2 at equal intervals, and the three upper riser air cannons 6 are arranged inclined downward, and the lowermost riser air cannons 6 are arranged horizontally. , by adding four standpipe air cannons 6 at the standpipe 2, to ensure the air volume of the standpipe part of the returner, agitate the inner wall of the returner, increase vibration and reduce the attachment of furfural slag in the three-dimensional part, the top of the horizontal pipe 3 is fixedly inserted with a Horizontal air cannon 7, there are two horizontal air cannons 7, the two horizontal air cannons 7 are vertically inserted into the horizontal pipe 3, and by adding two horizontal air cannons 7 at the horizontal pipe 3, the furfural residue at the baffle is promoted and accelerated. The flow of ash can avoid the accumulation and adhesion of ash at the baffle. The inclined tube air cannon 8 is fixedly inserted on the side of the return inclined tube 4. By adding the inclined tube air cannon 8 at the return inclined tube 4, the furfural ash can be avoided. Bonding at the material return inclined pipe 4, a mounting frame 10 is fixed at the inner bottom end of the horizontal pipe 3, the heating wire 9 is mounted on the mounting frame 10, and a first air duct 11 is arranged below the mounting frame 10. The air duct 11 is respectively provided with a pressure gauge 12, a flow meter 13 and a control valve 14. The control valve 14 adopts an electric regulating valve. The first air duct 11 is fixedly connected to the main air duct 15 through a A total pressure gauge 16 is provided, the main air duct 15 is fixedly connected with the air outlet of the return fan 17, and there are two first air ducts 11, and the two first air ducts 11 are symmetrically arranged on two sides of the main air duct 15. The first air duct 11 on the left side is provided with a lower ash pipe 20, and the lower ash pipe 20 is also provided with a control valve 14. The other end of the second air pipe 18 is inserted into the middle of the material return inclined pipe 4 , and the second air pipe 18 is also provided with a control valve 14 .
工作原理:通过在锥体1处分两层增加七个锥体空气炮5,增加返料器进口风量,辅助糠醛渣灰在返料器内燃烧,减少粘结,通过在立管2处增加四个立管空气炮6,保证返料器立管部分的风量,鼓动返料器内壁,增加振动减少糠醛渣在立体部分附着,通过在水平管3处增加两个水平空气炮7,促进及加快挡板处糠醛渣灰分的流动,避免挡板处灰分的积累粘结,通过在回料斜管4处增加斜管空气炮8,避免糠醛渣灰在回料斜管4处粘结,通过在返料系统不同部位增加空气炮使糠醛渣在返料器内燃烧,避免温度的降低而黏附,通过在返料风机17的两个第一支风管11处添加控制阀14、流量计13和支压力表12,控制阀14采用电动调节阀,支压力表12、流量计13运用远程显示,直接在中控室显示实时参数,根据总风量调节控制阀14,保证左压力表与右压力表的压力比波动在1:1.5-1:2,通过控制风压,驱动返料器内灰份的流动速度,减少灰分的粘结性,通过设置第二支风管18和可视透镜19,加快回料斜管4处糠醛渣灰的返灰速度及循环速度,避免因坡度不够导致返灰速度下降而粘结,增加可视透镜19可及时观察回料斜管4粘结情况,根据返灰速度了解返料器冲洗的时间。Working principle: by adding seven cone air cannons 5 in two layers at the cone 1, increasing the inlet air volume of the returner, assisting the combustion of the furfural slag in the returner, reducing the adhesion, by adding four air cannons at the standpipe 2 A standpipe air cannon 6 ensures the air volume of the standpipe part of the reverter, agitates the inner wall of the reverter, increases vibration and reduces the attachment of furfural slag to the three-dimensional part, and by adding two horizontal air cannons 7 at the horizontal pipe 3, promotes and accelerates The flow of furfural slag ash at the baffle avoids the accumulation and adhesion of ash at the baffle. By adding an inclined tube air gun 8 at the return inclined pipe 4, the adhesion of furfural slag ash at the return inclined pipe 4 is avoided. Air cannons are added in different parts of the return system to make the furfural residue burn in the return device to avoid the temperature drop and adhesion. By adding the control valve 14, flow meter 13 and The branch pressure gauge 12 and the control valve 14 are electric control valves, the branch pressure gauge 12 and the flow meter 13 are displayed remotely, and the real-time parameters are directly displayed in the central control room. The pressure ratio fluctuates between 1:1.5-1:2. By controlling the air pressure, the flow speed of the ash in the returner is driven to reduce the cohesiveness of the ash. By setting the second air duct 18 and the visual lens 19, the The ash return speed and circulation speed of furfural slag ash at the 4 places of the return inclined pipe can avoid the adhesion due to the drop of the ash return speed due to insufficient slope. Adding a visual lens 19 can observe the adhesion of the return inclined pipe 4 in time. Speed Know when the refeeder flushes.
综上可得,本发明通过设置锥体空气炮5、立管空气炮6、水平空气炮7、斜管空气炮8、支压力表12、流量计13、控制阀14和第二支风管18,解决了传统的锅炉返料器渣灰容易在返料器内粘结,堵塞返料器造成锅炉熄灭的问题。To sum up, the present invention provides a cone air cannon 5, a riser air cannon 6, a horizontal air cannon 7, an inclined tube air cannon 8, a pressure gauge 12, a flow meter 13, a control valve 14 and a second air duct 18. Solve the problem that the slag ash of the traditional boiler returner is easy to stick in the returner, and the clogging of the returner causes the boiler to go out.
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus.
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910731979.2A CN110375294A (en) | 2019-08-09 | 2019-08-09 | A kind of boiler return feeder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910731979.2A CN110375294A (en) | 2019-08-09 | 2019-08-09 | A kind of boiler return feeder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110375294A true CN110375294A (en) | 2019-10-25 |
Family
ID=68258627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910731979.2A Pending CN110375294A (en) | 2019-08-09 | 2019-08-09 | A kind of boiler return feeder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110375294A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111121010A (en) * | 2020-01-22 | 2020-05-08 | 杭州国祯伊泰克工程技术有限公司 | A feed back device for living beings fluidized bed boiler |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2593064Y (en) * | 2002-12-17 | 2003-12-17 | 重庆市节能技术服务中心 | Boiler primary air pressurized dense-phase zone charge returning apparatus |
CN1563791A (en) * | 2004-04-06 | 2005-01-12 | 无锡华光锅炉股份有限公司 | High pressure air clearing method for treating fault of feedback appts. of circulation fluidized bed boiler |
CN203478232U (en) * | 2013-09-12 | 2014-03-12 | 无锡华光工业锅炉有限公司 | U type material returning device for circulating fluidized bed boilers |
CN103982894A (en) * | 2014-06-09 | 2014-08-13 | 哈尔滨工业大学 | Combustion device of gasified carbocoal type nonflammable fine-grained fuel and combustion method with same |
CN105509039A (en) * | 2016-01-27 | 2016-04-20 | 北京热华能源科技有限公司 | Ash removing mechanism of first-grade material returning system of multi-process circulating fluidized bed boiler |
KR101631483B1 (en) * | 2016-01-08 | 2016-06-20 | (주)원프랜트 | Boiler Bottom Ash Hopper Being Easy To Shock Absorption and Maintenance |
WO2016161821A1 (en) * | 2015-04-08 | 2016-10-13 | 东方电气集团东方锅炉股份有限公司 | Circulating fluidized bed oxygen-enriched combustion apparatus and operation method therefor |
CN106196035A (en) * | 2016-09-23 | 2016-12-07 | 杭州锅炉集团股份有限公司 | For separator and the anti-block apparatus of material returning device in biomass recirculating fluidized bed boiler |
CN206160109U (en) * | 2016-11-15 | 2017-05-10 | 济南市琦泉热电有限责任公司 | Novel U type returning charge ware air supply structure |
CN210601598U (en) * | 2019-08-09 | 2020-05-22 | 新乡市汇能玉源发电有限公司 | Boiler returning charge ware |
-
2019
- 2019-08-09 CN CN201910731979.2A patent/CN110375294A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2593064Y (en) * | 2002-12-17 | 2003-12-17 | 重庆市节能技术服务中心 | Boiler primary air pressurized dense-phase zone charge returning apparatus |
CN1563791A (en) * | 2004-04-06 | 2005-01-12 | 无锡华光锅炉股份有限公司 | High pressure air clearing method for treating fault of feedback appts. of circulation fluidized bed boiler |
CN203478232U (en) * | 2013-09-12 | 2014-03-12 | 无锡华光工业锅炉有限公司 | U type material returning device for circulating fluidized bed boilers |
CN103982894A (en) * | 2014-06-09 | 2014-08-13 | 哈尔滨工业大学 | Combustion device of gasified carbocoal type nonflammable fine-grained fuel and combustion method with same |
WO2016161821A1 (en) * | 2015-04-08 | 2016-10-13 | 东方电气集团东方锅炉股份有限公司 | Circulating fluidized bed oxygen-enriched combustion apparatus and operation method therefor |
KR101631483B1 (en) * | 2016-01-08 | 2016-06-20 | (주)원프랜트 | Boiler Bottom Ash Hopper Being Easy To Shock Absorption and Maintenance |
CN105509039A (en) * | 2016-01-27 | 2016-04-20 | 北京热华能源科技有限公司 | Ash removing mechanism of first-grade material returning system of multi-process circulating fluidized bed boiler |
CN106196035A (en) * | 2016-09-23 | 2016-12-07 | 杭州锅炉集团股份有限公司 | For separator and the anti-block apparatus of material returning device in biomass recirculating fluidized bed boiler |
CN206160109U (en) * | 2016-11-15 | 2017-05-10 | 济南市琦泉热电有限责任公司 | Novel U type returning charge ware air supply structure |
CN210601598U (en) * | 2019-08-09 | 2020-05-22 | 新乡市汇能玉源发电有限公司 | Boiler returning charge ware |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111121010A (en) * | 2020-01-22 | 2020-05-08 | 杭州国祯伊泰克工程技术有限公司 | A feed back device for living beings fluidized bed boiler |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203907587U (en) | Semi-gasification biomass burning furnace | |
CN110375294A (en) | A kind of boiler return feeder | |
CN112728530B (en) | Anti-blocking system for coal dropping pipe of circulating fluidized bed boiler | |
CN207247218U (en) | A kind of anti-clogging incinerator easy to remove | |
CN210601598U (en) | Boiler returning charge ware | |
CN201724208U (en) | Novel spray-type biomass pellet burner | |
CN205137425U (en) | Biomass fuel boiler | |
CN106561471A (en) | Trough achieving automatic feeding and cleaning | |
CN103146430B (en) | Dynamic biomass gasifier | |
CN206310720U (en) | A kind of biomass thermal wind furnace | |
CN205284971U (en) | Automatic roast room of deashing type firing equipment | |
CN209445405U (en) | A kind of biological particles direct combustion stove | |
CN2046586U (en) | Chaff fired two phase boiler | |
CN207527567U (en) | A kind of biomass particle burning machine | |
CN2750195Y (en) | Centrally sealed air-transmitting-coal apparatus | |
CN222417440U (en) | A biomass gas boiler combustion stabilizing device | |
CN201697119U (en) | Coal Slime Feeding Device for Fluidized Bed Boiler | |
CN212565751U (en) | Biomass powder spraying combustion device | |
CN208474678U (en) | A kind of extruder waste pipe | |
CN209693431U (en) | Side deep fertilizing device between a kind of regeneration rice field | |
CN202281214U (en) | A direct-fired biofuel burner | |
CN113108464A (en) | Particle furnace with high-temperature alarm function | |
CN201451032U (en) | Heat insulation device for poultry cultivation | |
CN110500576A (en) | A kind of biomass granule gasifying combustion boiler | |
CN209605143U (en) | A kind of biomass energy burner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191025 |