[go: up one dir, main page]

CN110329924B - Air conditioner outdoor unit hoisting device - Google Patents

Air conditioner outdoor unit hoisting device Download PDF

Info

Publication number
CN110329924B
CN110329924B CN201910753856.9A CN201910753856A CN110329924B CN 110329924 B CN110329924 B CN 110329924B CN 201910753856 A CN201910753856 A CN 201910753856A CN 110329924 B CN110329924 B CN 110329924B
Authority
CN
China
Prior art keywords
fixed
boom
pulley
suspension arm
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910753856.9A
Other languages
Chinese (zh)
Other versions
CN110329924A (en
Inventor
高志坚
王琳
赵海
杨兰
姜海军
庞雨花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Vocational Institute of Mechatronic Technology
Original Assignee
Changzhou Vocational Institute of Mechatronic Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Vocational Institute of Mechatronic Technology filed Critical Changzhou Vocational Institute of Mechatronic Technology
Priority to CN201910753856.9A priority Critical patent/CN110329924B/en
Publication of CN110329924A publication Critical patent/CN110329924A/en
Application granted granted Critical
Publication of CN110329924B publication Critical patent/CN110329924B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/68Jibs foldable or otherwise adjustable in configuration
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • B66C23/78Supports, e.g. outriggers, for mobile cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

一种空调室外机吊装装置,包括支承吊臂单元、吊索单元和吊索卷拉单元。支承吊臂单元包括适于穿过墙体穿孔的固定吊臂,以及与固定吊臂适于穿过墙体穿孔后伸出在墙体外侧的端部铰接相连的活动吊臂;吊索单元包括设于活动吊臂的内腔中且位于固定吊臂和活动吊臂铰接处的第三滑轮、设于活动吊臂的内腔中且位于该活动吊臂远离固定吊臂的端部的第一滑轮和第二滑轮,以及适于同时绕设在第三滑轮、第一滑轮和第二滑轮的外圆周面的吊索;吊索卷拉单元包括设于固定吊臂位于墙体内侧的且适于缠绕吊索的卷索筒、与卷索筒固连以驱动该卷索筒转动的传动轴,以及驱动传动轴旋转的动力结构。本发明可以从室内进行室外机的吊装,降低了空调室外机的吊装难度。

Figure 201910753856

A hoisting device for an outdoor unit of an air conditioner comprises a supporting boom unit, a sling unit and a sling winding and pulling unit. The supporting boom unit includes a fixed boom adapted to pass through the perforation of the wall, and a movable boom hingedly connected with the end of the fixed boom which is adapted to pass through the perforation of the wall and protrude outside the wall; the sling unit includes A third pulley located in the inner cavity of the movable boom and located at the hinge of the fixed boom and the movable boom, and a first pulley located in the inner cavity of the movable boom and located at the end of the movable boom away from the fixed boom A pulley and a second pulley, and a sling suitable for winding on the outer circumferential surfaces of the third pulley, the first pulley and the second pulley at the same time; A cable reel for winding the sling, a transmission shaft for driving the cable reel to rotate, and a power structure for driving the transmission shaft to rotate. The invention can hoist the outdoor unit from indoors, thereby reducing the hoisting difficulty of the outdoor unit of the air conditioner.

Figure 201910753856

Description

空调室外机吊装装置Air conditioner outdoor unit hoisting device

技术领域technical field

本发明涉及空调安装领域,具体涉及一种空调室外机吊装装置。The invention relates to the field of air conditioner installation, in particular to a hoisting device for an outdoor unit of an air conditioner.

背景技术Background technique

现在的空调室外机的安装,大多是依靠安装人员在高空用手搬动空调室外机使其就位于托架上,手工搬动安装空调室外机不仅消耗体力很大,而且危险性很大,容易发生意外,造成安装人员人身伤害。应此,安装空调室外机急需一种安全实用、操作简单的空调室外机吊装装置。The installation of the current air conditioner outdoor unit mostly relies on the installer to manually move the air conditioner outdoor unit on the bracket at high altitude. Manually moving and installing the air conditioner outdoor unit not only consumes a lot of physical strength, but also is very dangerous and easy to install. An accident occurs, causing personal injury to the installer. Accordingly, there is an urgent need for a safe, practical and simple-to-operate hoisting device for the outdoor unit of the air conditioner.

专利公开号为CN208103802U的实用新型公开了一种空调吊装设备。该实用新型的技术方案是:包括吊装管、伸缩支架、吊篮和两个固定螺帽,所述的吊装管的一端设有安装螺纹,所述的两个固定螺帽可配合安装在所述的安装螺纹上,所述的吊装管设有安装螺纹的一端贯穿墙体设置,所述的吊装管设有安装螺纹的一端设置在室内,所述的吊装管未设安装螺纹的端部设置在室外,所述的墙体设有墙壁孔,所述的墙壁孔内设有安装套管,所述的吊装管的室内端安装在所述的安装套管内,所述的两个固定螺帽相对于所述的墙体对称设置,所述的两个固定螺帽与安装套管配合完成吊装管在墙体上安装固定,所述的伸缩支架设置在所述的墙体和所述吊装管的室外端之间,所述的吊装管室外端远离所述墙体的端部设有从动轮,所述的吊装管的室内端远离所述墙体的端部设有主动轮,所述的主动轮上设有动力装置,所述的从动轮与所述的主动轮之间依靠传动绳索传动连接,所述的传动绳索贯穿于所述的吊装管内部。The utility model with the patent publication number CN208103802U discloses an air conditioner hoisting device. The technical scheme of the utility model is that it comprises a hoisting pipe, a telescopic bracket, a hanging basket and two fixing nuts, one end of the hoisting pipe is provided with a mounting thread, and the two fixing nuts can be installed on the On the installation thread of the hoisting pipe, the end of the hoisting pipe with the installation thread is arranged through the wall, the end of the hoisting pipe with the installation thread is arranged in the room, and the end of the hoisting pipe without the installation thread is arranged in the room. Outdoor, the wall body is provided with a wall hole, the wall hole is provided with an installation sleeve, the indoor end of the hoisting pipe is installed in the installation sleeve, and the two fixing nuts are opposite to each other. Symmetrically arranged on the wall, the two fixing nuts cooperate with the installation sleeve to complete the installation and fixation of the hoisting pipe on the wall, and the telescopic bracket is arranged between the wall and the hoisting pipe. Between the outdoor ends, the outer end of the hoisting pipe is provided with a driven wheel at the end away from the wall, and the end of the indoor end of the hoisting pipe away from the wall is provided with a driving wheel. A power device is provided on the wheel, and the driven wheel and the driving wheel are connected by means of a transmission rope, and the transmission rope runs through the inside of the hoisting pipe.

专利公开号为CN208103802U的实用新型公开的一种空调吊装设备存在的缺点是:①吊装管室外端远离墙体的端部不能沿墙体的水平方向移动,导致设于传动绳索的位于室外的端部的吊篮环仅能在吊装管室外端远离墙体的端部的正下方做上下移动,即只能将空调室外机吊装到位于吊装管室外端的正下方的安装位置,如果被吊装的空调室外机的安装位置水平偏离吊装管室外端的正下方较远,这种空调吊装设备就很难发挥作用;②因为伸缩支架、挂人吊环都位于室外侧,固定螺帽也有一个位于室外侧,所以在安装及拆卸这种空调吊装设备时,安装人员无法在室内完成伸缩支架、挂人吊环、室外侧的固定螺帽的安装及拆卸,只能在室外侧进行安装及拆卸,故安装及拆卸时危险性很大,容易发生意外。The disadvantages of a kind of air-conditioning hoisting equipment disclosed by the utility model with the patent publication number CN208103802U are: 1. The end of the hoisting pipe outdoor end away from the wall body cannot move along the horizontal direction of the wall body, resulting in the end located at the outdoor end of the transmission rope. The hanging basket ring at the top of the hoisting tube can only be moved up and down just below the end of the hoisting tube room that is far away from the wall, that is, the outdoor unit of the air conditioner can only be hoisted to the installation position directly below the end of the hoisting tube room. If the hoisted air conditioner If the installation position of the outdoor unit deviates far below the outdoor end of the hoisting pipe, it is difficult for this kind of air-conditioning hoisting equipment to function; ② Because the telescopic bracket and the hanging ring are located on the outdoor side, and there is also a fixed nut on the outdoor side, so When installing and disassembling this kind of air-conditioning hoisting equipment, the installer cannot complete the installation and disassembly of the telescopic bracket, the hanging ring, and the fixing nut on the outdoor side, and can only install and remove it on the outdoor side. Dangerous and prone to accidents.

发明内容SUMMARY OF THE INVENTION

本发明的目的是提供一种空调室外机吊装装置,以解决便于从室内进行空调室外机的吊装的技术问题。The purpose of the present invention is to provide an air conditioner outdoor unit hoisting device to solve the technical problem of facilitating the hoisting of the air conditioner outdoor unit from indoors.

本发明的空调室外机吊装装置是这样实现的:The air conditioner outdoor unit hoisting device of the present invention is realized as follows:

一种空调室外机吊装装置,包括:支承吊臂单元、吊索单元和吊索卷拉单元;A hoisting device for an outdoor unit of an air conditioner, comprising: a supporting boom unit, a sling unit and a sling winding and pulling unit;

所述支承吊臂单元包括适于穿过墙体穿孔的固定吊臂,以及与所述固定吊臂适于穿过所述墙体穿孔后伸出在墙体外侧的端部铰接相连的活动吊臂;所述固定吊臂和活动吊臂均为中空的管状体结构;The supporting boom unit includes a fixed boom adapted to pass through the perforation of the wall, and a movable boom hingedly connected to the end of the fixed boom which is adapted to pass through the perforation of the wall and protrude outside the wall. arm; both the fixed boom and the movable boom are hollow tubular structures;

所述吊索单元包括设于所述活动吊臂的内腔中且位于固定吊臂和活动吊臂铰接处的第三滑轮、设于所述活动吊臂的内腔中且位于该活动吊臂远离固定吊臂的端部的第一滑轮和第二滑轮,以及适于同时绕设在所述第三滑轮、第一滑轮和第二滑轮的外圆周面的吊索;The sling unit includes a third pulley arranged in the inner cavity of the movable jib and located at the hinge of the fixed jib and the movable jib, arranged in the inner cavity of the movable jib and located in the movable jib a first pulley and a second pulley away from the end of the fixed boom, and a sling adapted to be wound around the outer circumferential surfaces of the third pulley, the first pulley and the second pulley at the same time;

所述吊索卷拉单元包括设于所述固定吊臂位于墙体内侧部分的且适于缠绕吊索的卷索筒、与所述卷索筒固连以驱动该卷索筒转动的传动轴,以及驱动所述传动轴旋转的动力结构。The sling winding and pulling unit includes a sling drum, which is arranged on the inner part of the fixed boom and is suitable for winding slings, and a transmission shaft that is fixedly connected with the sling drum to drive the sling drum to rotate. , and a power structure that drives the transmission shaft to rotate.

在本发明较佳的实施例中,所述固定吊臂为截面为圆形的管状体;In a preferred embodiment of the present invention, the fixed boom is a tubular body with a circular cross-section;

所述活动吊臂为截面为矩形的管状体。The movable boom is a tubular body with a rectangular section.

在本发明较佳的实施例中,所述传动轴的两端分别转动支承于固定吊臂位于墙体内侧的端部的管壁上,且所述传动轴的轴线垂直于固定吊臂的轴线;In a preferred embodiment of the present invention, both ends of the transmission shaft are respectively rotatably supported on the pipe wall of the end of the fixed boom located inside the wall, and the axis of the transmission shaft is perpendicular to the axis of the fixed boom ;

所述动力结构包括在所述传动轴的向外穿出固定吊臂的管壁的一端且通过键或销同轴固定的蜗轮、与所述蜗轮啮合的蜗杆、一端与所述蜗杆一体同轴固接的蜗杆轴,以及与所述蜗杆轴的另一端固接的柄杆。The power structure includes a worm wheel at one end of the transmission shaft that protrudes out of the pipe wall of the fixed boom and is coaxially fixed by a key or pin, a worm that meshes with the worm wheel, and one end is coaxial with the worm. A fixed worm shaft, and a shank fixed with the other end of the worm shaft.

在本发明较佳的实施例中,所述活动吊臂通过第三定轴与固定吊臂铰接;所述第三滑轮转动地套设在所述第三定轴上;In a preferred embodiment of the present invention, the movable boom is hinged with the fixed boom through a third fixed shaft; the third pulley is rotatably sleeved on the third fixed shaft;

沿着所述第三滑轮的外圆柱面的周向开设有适于吊索缠绕的环形沟槽;以及An annular groove suitable for sling winding is provided along the circumference of the outer cylindrical surface of the third pulley; and

在所述活动吊臂远离固定吊臂的端部固设有第一定轴和第二定轴,且第一定轴的轴线和第二定轴的轴线互相平行,所述第一滑轮转动地套设在所述第一定轴上,所述第二滑轮转动地套设在所述第二定轴上;A first fixed shaft and a second fixed shaft are fixed at the end of the movable boom away from the fixed boom, and the axes of the first fixed shaft and the second fixed shaft are parallel to each other, and the first pulley rotates is sleeved on the first fixed shaft, and the second pulley is rotatably sleeved on the second fixed shaft;

沿着所述第一滑轮和第二滑轮的外圆柱面的周向分别开设有适于吊索缠绕的环形沟槽,以及An annular groove suitable for sling winding is respectively opened along the circumference of the outer cylindrical surface of the first pulley and the second pulley, and

所述第一滑轮与第二滑轮并排设置,使分别设于第一滑轮和第二滑轮上的环形沟槽相对并且对齐,以在第一滑轮和第二滑轮之间的最近位置处形成适于吊索穿过的孔隙。The first pulley and the second pulley are arranged side by side so that the annular grooves respectively provided on the first pulley and the second pulley are opposite and aligned to form a suitable The aperture through which the sling passes.

在本发明较佳的实施例中,所述空调室外机吊装装置还包括适于所述活动吊臂相对于固定吊臂摆动的吊臂摆动驱动机构;In a preferred embodiment of the present invention, the air conditioner outdoor unit hoisting device further comprises a boom swing driving mechanism suitable for the movable boom to swing relative to the fixed boom;

所述吊臂摆动驱动机构包括贯穿固定吊臂的位于墙体内侧一端的管壁且转动支承于固定吊臂的管壁上的转柄轴、与所述转柄轴位于固定吊臂的管孔外侧的端部固接的转柄、一端与所述转柄轴位于固定吊臂的管孔内侧的端部固接的曲柄,以及一端与所述曲柄的另一端通过第一铰轴铰接相连的连杆;其中The boom swinging drive mechanism includes a shank shaft that penetrates through the pipe wall of the fixed boom and is located at one end of the inner side of the wall and is rotatably supported on the pipe wall of the fixed boom; A turning handle with an outer end fixed, a crank with one end fixed with the end of the turning shaft shaft located inside the tube hole of the fixed boom, and a crank with one end hingedly connected to the other end of the crank through the first hinge shaft connecting rod; of which

所述连杆位于所述固定吊臂的管孔内,且所述连杆的另一端通过第二铰轴与所述活动吊臂铰接相连。The connecting rod is located in the pipe hole of the fixed boom, and the other end of the connecting rod is hingedly connected to the movable boom through a second hinge shaft.

在本发明较佳的实施例中,所述空调室外机吊装装置还包括位置调整机构;In a preferred embodiment of the present invention, the air conditioner outdoor unit hoisting device further includes a position adjustment mechanism;

所述位置调整机构包括在所述固定吊臂的外柱面设有的一段外齿圈、套设在所述固定吊臂上的且适于与所述外齿圈的轮齿镶嵌的固定板,以及开设于所述固定板上的螺栓孔;其中The position adjustment mechanism includes a section of external gear ring provided on the outer cylindrical surface of the fixed boom, a fixing plate sleeved on the fixed boom and suitable for inlaying with the gear teeth of the external gear ring , and the bolt holes opened on the fixing plate; wherein

所述外齿圈的轮齿沿固定吊臂的外柱面的周向阵列均布,且外齿圈的轮齿凸出于固定吊臂的外柱面设置;The gear teeth of the outer gear ring are evenly distributed along the circumferential array of the outer cylindrical surface of the fixed boom, and the gear teeth of the outer gear ring are arranged protruding from the outer cylindrical surface of the fixed boom;

所述固定板具有适于所述固定吊臂穿过的大孔,所述大孔的内圆柱面上设有适于与所述外齿圈镶嵌的内齿圈;The fixing plate has a large hole suitable for the fixed boom to pass through, and an inner gear ring suitable for being inlaid with the outer gear ring is arranged on the inner cylindrical surface of the large hole;

所述螺栓孔适于一固定螺栓穿过后插入墙体紧固。The bolt hole is suitable for a fixing bolt to be inserted into the wall for fastening after passing through.

在本发明较佳的实施例中,所述空调室外机吊装装置还包括适于锁紧固定吊臂的锁紧机构;In a preferred embodiment of the present invention, the air conditioner outdoor unit hoisting device further comprises a locking mechanism suitable for locking and fixing the hanging arm;

所述锁紧机构包括沿内齿圈的径向开设在固定板的内齿圈上的锁紧螺孔,以及旋合在锁紧螺孔内的锁紧螺钉;The locking mechanism comprises a locking screw hole opened on the inner gear ring of the fixing plate along the radial direction of the inner gear ring, and a locking screw screwed into the locking screw hole;

所述锁紧螺孔为通孔。The locking screw holes are through holes.

相对于公开号为CN208103802U的实用新型公开的一种空调吊装设备,本发明的空调室外机吊装装置可安装在墙体上的空调管线墙体穿孔中,且安装人员只须在室内就可完成该空调室外机吊装装置的安装及拆卸,安装及拆卸方便,可以有效降低空调室外机吊装的难度和危险性。Compared with the air conditioner hoisting device disclosed by the utility model with publication number CN208103802U, the air conditioner outdoor unit hoisting device of the present invention can be installed in the perforation of the air conditioner pipeline wall on the wall, and the installer only needs to be indoors to complete the installation. The installation and removal of the hoisting device of the outdoor unit of the air conditioner is convenient for installation and removal, which can effectively reduce the difficulty and danger of hoisting the outdoor unit of the air conditioner.

进一步的,通过设置位置调整机构,可调整活动吊臂用于起吊空调室外机的起吊端相对于墙体的水平方向的位置,以及起吊端相对于墙体外墙面的距离,这样,就可以调整被起吊的空调室外机相对于墙体的水平方向的位置以及相对于墙体外墙面的距离,从而实现能吊装偏离空调管线墙体穿孔正下方安装的空调室外机的效果。Further, by setting the position adjustment mechanism, the position of the hoisting end of the movable arm for hoisting the outdoor unit of the air conditioner relative to the horizontal direction of the wall, and the distance of the hoisting end relative to the outer wall of the wall can be adjusted. Adjust the horizontal position of the hoisted air conditioner outdoor unit relative to the wall and the distance relative to the outer wall of the wall, so as to achieve the effect of hoisting the air conditioner outdoor unit installed directly below the perforation of the air conditioner pipeline wall.

附图说明Description of drawings

下面对本说明书各附图所表达的内容及附图中的标记作简要说明:Below is a brief description of the content expressed in the drawings of this specification and the symbols in the drawings:

图1是本发明所述的空调室外机吊装装置的主视图;1 is a front view of the air conditioner outdoor unit hoisting device according to the present invention;

图2相对于图1,是俯视图,示出了空调室外机吊装装置的俯视结构,还示出了活动吊臂能相对于固定吊臂摆动;Fig. 2 is a plan view relative to Fig. 1, showing the plan structure of the air conditioner outdoor unit hoisting device, and also showing that the movable boom can swing relative to the fixed boom;

图3相对于图1,是左视图,示出了空调室外机吊装装置的左视结构,还示出了起吊端绕固定吊臂的轴线转动,可调整起吊端相对于墙体的水平方向的位置,即调整被起吊的空调室外机在墙体外墙面的水平方向的位置;Fig. 3 is a left side view relative to Fig. 1, showing the left view structure of the air conditioner outdoor unit hoisting device, and also shows that the hoisting end rotates around the axis of the fixed jib, and the horizontal direction of the hoisting end relative to the wall can be adjusted. Position, that is, adjust the horizontal position of the lifted air conditioner outdoor unit in the horizontal direction of the outer wall of the wall;

图4是图1的A向局部视图,示出了吊索卷拉单元的结构;FIG. 4 is a partial view of the direction A of FIG. 1, showing the structure of the sling winding and pulling unit;

图5是图1的B-B剖视图,示出了固定板设有内齿圈、内齿圈与固定吊臂上的外齿圈镶嵌的结构;还示出了锁紧固定吊臂的锁紧机构;Fig. 5 is the B-B sectional view of Fig. 1, shows the structure that the fixed plate is provided with the inner gear ring, the inner gear ring and the outer gear ring on the fixed boom; also shows the locking mechanism for locking the fixed boom;

图6是驱动活动吊臂相对于固定吊臂摆动的吊臂摆动驱动机构的主视图;6 is a front view of a boom swing driving mechanism that drives the movable boom to swing relative to the fixed boom;

图7是图6的俯视图。FIG. 7 is a plan view of FIG. 6 .

附图中的标记为:固定吊臂1、外柱面1-1、外齿圈1-2、活动吊臂2、起吊端2-1、第三定轴3、第三滑轮4、第一定轴5、第一滑轮6、第二定轴7、第二滑轮8、吊索9、卷索筒10、传动轴11、蜗轮12、蜗杆13、蜗杆轴13-1、柄杆14、手柄15、轴承座16、转柄轴17、转柄18、曲柄19、连杆20、第一铰轴21、第二铰轴22、固定板23、内齿圈23-1、固定螺栓24、墙体25、墙体穿孔25-1、空调室外机26、锁紧螺孔27、锁紧螺钉28。The symbols in the drawings are: fixed boom 1, outer cylindrical surface 1-1, outer gear 1-2, movable boom 2, lifting end 2-1, third fixed shaft 3, third pulley 4, first Fixed shaft 5, first pulley 6, second fixed shaft 7, second pulley 8, sling 9, reel 10, transmission shaft 11, worm gear 12, worm 13, worm shaft 13-1, handle 14, handle 15. Bearing seat 16, handle shaft 17, handle 18, crank 19, connecting rod 20, first hinge shaft 21, second hinge shaft 22, fixing plate 23, ring gear 23-1, fixing bolt 24, wall Body 25 , wall through hole 25 - 1 , air conditioner outdoor unit 26 , locking screw hole 27 , locking screw 28 .

具体实施方式Detailed ways

为使本发明实施方式的目的、技术方案和优点更加清楚,下面将结合本发明实施方式中的附图,对本发明实施方式中的技术方案进行清楚、完整地描述,显然,所描述的实施方式是本发明一部分实施方式,而不是全部的实施方式。因此,以下对在附图中提供的本发明的实施方式的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施方式。基于本发明中的实施方式,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施方式,都属于本发明保护的范围。In order to make the purposes, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments These are some embodiments of the present invention, but not all of them. Accordingly, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the invention as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

实施例1:Example 1:

请参阅图1、图2、图3,本实施例的空调室外机吊装装置,包括:支承吊臂单元、吊索单元和吊索卷拉单元。Please refer to FIG. 1 , FIG. 2 , and FIG. 3 , the hoisting device for the outdoor unit of the air conditioner in this embodiment includes: a supporting boom unit, a sling unit and a sling winding and pulling unit.

请参阅图1、图2、图3,支承吊臂单元包括适于穿过墙体穿孔25-1的固定吊臂1,以及与固定吊臂1适于穿过墙体穿孔25-1后伸出在墙体25外侧(墙体25外侧即指墙体25的室外侧)的端部铰接相连的活动吊臂2;固定吊臂1和活动吊臂2均为中空的管状体结构。吊索单元包括设于活动吊臂2的内腔中且位于固定吊臂1和活动吊臂2铰接处的第三滑轮4、设于活动吊臂2的内腔中且位于该活动吊臂2远离固定吊臂1的端部的第一滑轮6和第二滑轮8,以及适于同时绕设在第三滑轮4、第一滑轮6和第二滑轮8的外圆周面的吊索9。请参阅图1、图4,吊索卷拉单元包括设于固定吊臂1位于墙体25内侧(墙体25内侧即指墙体25的室内侧)部分的且适于缠绕吊索9的卷索筒10、与卷索筒10固连以驱动该卷索筒10转动的传动轴11,以及驱动传动轴11旋转的动力结构。Please refer to Fig. 1, Fig. 2, Fig. 3, the supporting boom unit includes a fixed boom 1 adapted to pass through the wall through hole 25-1, and the fixed boom 1 is adapted to pass through the wall through hole 25-1 to extend backward The movable boom 2 is hingedly connected to the ends outside the wall 25 (the outer side of the wall 25 refers to the outdoor side of the wall 25 ); the fixed boom 1 and the movable boom 2 are both hollow tubular structures. The sling unit includes a third pulley 4 arranged in the inner cavity of the movable jib 2 and located at the hinged joint of the fixed jib 1 and the movable jib 2, and arranged in the inner cavity of the movable jib 2 and located in the movable jib 2 The first pulley 6 and the second pulley 8 away from the end of the fixed boom 1 , and the sling 9 adapted to be wound around the outer circumferential surfaces of the third pulley 4 , the first pulley 6 and the second pulley 8 at the same time. Please refer to FIG. 1 and FIG. 4 , the sling winding and pulling unit includes a reel that is arranged on the part of the fixed boom 1 located inside the wall 25 (the inner side of the wall 25 refers to the indoor side of the wall 25 ) and is suitable for winding the sling 9 A cable drum 10 , a transmission shaft 11 fixedly connected with the cable drum 10 to drive the cable drum 10 to rotate, and a power structure for driving the transmission shaft 11 to rotate.

详细来说,请参阅图1、图2、图3,以一种情况为例,固定吊臂1为横截面呈圆形的管状体,活动吊臂2为横截面呈矩形的管状体。固定吊臂1贯穿设置于开在墙体25上的空调管线墙体穿孔25-1中并使固定吊臂1的两端分别置于墙体25的室外侧与室内侧。活动吊臂2的一端部插入固定吊臂1的室外侧端的管口内并通过第三定轴3与固定吊臂1的室外侧端部铰接,使活动吊臂2能相对于固定吊臂1摆动,优选的,活动吊臂2相对于固定吊臂1摆动的角度以略大于90°为宜。请参阅图2、图3,在第三定轴3的中部转动设有第三滑轮4且第三滑轮4位于活动吊臂2的管内侧,沿第三滑轮4的外圆柱面的周向开有适于吊索9缠绕的环形沟槽(请参阅图3)。In detail, please refer to FIGS. 1 , 2 and 3 . Taking a situation as an example, the fixed boom 1 is a tubular body with a circular cross section, and the movable boom 2 is a tubular body with a rectangular cross section. The fixed boom 1 is inserted through the air-conditioning pipeline wall through hole 25 - 1 on the wall 25 , and the two ends of the fixed boom 1 are placed on the outdoor side and the indoor side of the wall 25 respectively. One end of the movable boom 2 is inserted into the nozzle of the outdoor side end of the fixed boom 1 and is hinged with the outdoor side end of the fixed boom 1 through the third fixed shaft 3, so that the movable boom 2 can swing relative to the fixed boom 1 , Preferably, the swing angle of the movable boom 2 relative to the fixed boom 1 is preferably slightly larger than 90°. Please refer to FIG. 2 and FIG. 3 , a third pulley 4 is rotated in the middle of the third fixed shaft 3 , and the third pulley 4 is located inside the tube of the movable boom 2 . The annular groove around which the sling 9 is wound (see Figure 3).

请参阅图1、图2、图3,活动吊臂2的远离固定吊臂1的端部为起吊端2-1,活动吊臂2的起吊端2-1固设有第一定轴5和第二定轴7,且第一定轴5的轴线和第二定轴7的轴线互相平行;通过第一定轴5转动设置有第一滑轮6,以及通过第二定轴7转动设置有第二滑轮8;第一滑轮6的转动轴线及第二滑轮8的转动轴线都垂直于第三定轴3的轴线。请参阅图1,沿第一滑轮6与第二滑轮8的外圆柱面的周向都开有适于吊索9缠绕的环形沟槽,并且,第一滑轮6与第二滑轮8并排设置,使分别设于第一滑轮6和第二滑轮8上的环形沟槽相对并且对齐,以在第一滑轮6和第二滑轮8之间的最近位置处形成适于吊索9穿过的孔隙(请参阅图1)。具体地说,假如用第一滑轮6的轴线和第二滑轮8的轴线所确定的平面去截第一滑轮6和第二滑轮8上的环形沟槽,在第一滑轮6和第二滑轮8之间的最近位置处会截出两个有凹陷弧形的截面(两个凹陷弧形的截面分别位于第一滑轮6和第二滑轮8上),两个有凹陷弧形的截面上的凹陷弧形恰好凹线对凹线并且对齐,从而拼合成近似圆形或者椭圆形的适于吊索9穿过的孔隙(请参阅图1)。此处需要说明的是,请参阅图1、图3,为了避免第一滑轮6和第二滑轮8在转动过程中相互影响,对于本实施例中的第一滑轮6和第二滑轮8的外圆周面之间是不直接接触的,而是存在间隙的,如此,也就是说第一滑轮6的环形沟槽的槽边沿与第二滑轮8的环形沟槽的槽边沿之间是存在间隙的,并且,此处的间隙小于吊索9的直径,以确保穿过分别位于第一滑轮6和第二滑轮8上的两个环形沟槽所形成的通槽的吊索9不会从第一滑轮6的环形沟槽的槽边沿与第二滑轮8的环形沟槽的槽边沿之间存在的间隙处滑出环形沟槽。请参阅图1、图2、图3,吊索9从活动吊臂2的起吊端2-1,穿过第一滑轮6的环形沟槽与第二滑轮8的环形沟槽的相对之处的孔隙进入活动吊臂2的管孔,再穿过活动吊臂2的管孔、绕过第三滑轮4,然后再穿过固定吊臂1的管孔并从固定吊臂1的室内侧端的管口穿出。请参阅图3,位于活动吊臂2的起吊端2-1外侧的吊索9,可用来捆绑空调室外机26;当给穿出于固定吊臂1的室内侧端管口的吊索9施以拉力时,活动吊臂2的起吊端2-1外侧的吊索9可将空调室外机26吊起。Please refer to Fig. 1, Fig. 2, Fig. 3, the end of the movable boom 2 away from the fixed boom 1 is a lifting end 2-1, and the lifting end 2-1 of the movable boom 2 is fixed with a first fixed shaft 5 and The second fixed shaft 7, and the axis of the first fixed shaft 5 and the axis of the second fixed shaft 7 are parallel to each other; the first pulley 6 is arranged through the rotation of the first fixed shaft 5, and the first pulley 6 is arranged through the rotation of the second fixed shaft 7. Two pulleys 8; the rotation axis of the first pulley 6 and the rotation axis of the second pulley 8 are both perpendicular to the axis of the third fixed shaft 3. Please refer to FIG. 1, along the circumference of the outer cylindrical surface of the first pulley 6 and the second pulley 8, there are annular grooves suitable for winding the sling 9, and the first pulley 6 and the second pulley 8 are arranged side by side, The annular grooves provided on the first pulley 6 and the second pulley 8, respectively, are opposed and aligned to form an aperture suitable for the passage of the sling 9 at the nearest position between the first pulley 6 and the second pulley 8 ( See Figure 1). Specifically, if the annular grooves on the first pulley 6 and the second pulley 8 are cut off by the planes defined by the axes of the first pulley 6 and the second pulley 8, the first pulley 6 and the second pulley 8 Two concave arc-shaped sections (the two concave arc-shaped sections are located on the first pulley 6 and the second pulley 8 respectively) will be cut at the nearest position between them, and the two concave arc-shaped sections have concave sections. The arcs are exactly concave-to-concave and aligned, so as to form an approximately circular or elliptical aperture suitable for the sling 9 to pass through (refer to FIG. 1 ). It should be noted here that, referring to FIG. 1 and FIG. 3 , in order to avoid the mutual influence of the first pulley 6 and the second pulley 8 during the rotation process, for the first pulley 6 and the second pulley 8 in this embodiment, the outer There is no direct contact between the circumferential surfaces, but there is a gap, so that there is a gap between the groove edge of the annular groove of the first pulley 6 and the groove edge of the annular groove of the second pulley 8 , and the gap here is smaller than the diameter of the sling 9 to ensure that the sling 9 passing through the through grooves formed by the two annular grooves on the first pulley 6 and the second pulley 8 respectively will not pass from the first pulley 6 and the second pulley 8. The annular groove is slid out of the gap between the groove edge of the annular groove of the pulley 6 and the groove edge of the annular groove of the second pulley 8 . Please refer to FIG. 1 , FIG. 2 , and FIG. 3 , from the lifting end 2 - 1 of the movable boom 2 , the sling 9 passes through the opposite place between the annular groove of the first pulley 6 and the annular groove of the second pulley 8 The hole enters the pipe hole of the movable boom 2, then passes through the pipe hole of the movable boom 2, bypasses the third pulley 4, and then passes through the pipe hole of the fixed boom 1 and from the pipe at the indoor side end of the fixed boom 1 Mouth pierced. Please refer to FIG. 3 , the sling 9 located on the outside of the hoisting end 2-1 of the movable boom 2 can be used to bind the outdoor unit 26 of the air conditioner; With pulling force, the sling 9 outside the hoisting end 2-1 of the movable jib 2 can hoist the outdoor unit 26 of the air conditioner.

为给吊索9施以起吊的拉力,在固定吊臂1的室内侧端设有吊索卷拉单元。请参阅图1、图2、图4,卷索筒10通过键或销同轴固定于传动轴11上,传动轴11转动支承于固定吊臂1的室内侧端,吊索9卷绕在卷索筒10上,优选的,卷索筒10固定于传动轴11的中部并设于固定吊臂1的室内侧端的管口内,传动轴11的两端分别转动支承于固定吊臂1的管壁上并使传动轴11的轴线垂直于固定吊臂1的轴线。动力结构包括在传动轴11的向外穿出固定吊臂1的管壁的一端且通过键或销同轴固定的蜗轮12、与蜗轮12啮合的蜗杆13、一端与蜗杆13一体同轴固接的蜗杆轴13-1,以及与蜗杆轴13-1的另一端固接的柄杆14。具体来说,蜗轮12与蜗杆13啮合,构成蜗轮蜗杆传动副,蜗杆13与蜗杆轴13-1一体同轴固接,蜗杆轴13-1通过轴承座16转动支承于固定吊臂1的外柱面1-1上,优选的,轴承座16通过焊接、螺纹连接、铆接等形式固定于固定吊臂1的外柱面1-1上,蜗杆轴13-1的一端与柄杆14的一端固接,柄杆14的另一端与手柄15铰接。In order to apply the hoisting force to the sling 9 , a sling winding and pulling unit is provided at the indoor side end of the fixed boom 1 . Please refer to Fig. 1, Fig. 2, Fig. 4, the cable reel 10 is coaxially fixed on the transmission shaft 11 through keys or pins, the transmission shaft 11 is rotatably supported on the indoor side end of the fixed boom 1, and the sling 9 is wound on the reel On the cable drum 10, preferably, the cable drum 10 is fixed in the middle of the transmission shaft 11 and arranged in the pipe opening of the indoor side end of the fixed boom 1, and the two ends of the transmission shaft 11 are respectively rotatably supported on the pipe wall of the fixed boom 1. Make the axis of the transmission shaft 11 perpendicular to the axis of the fixed boom 1 . The power structure includes a worm wheel 12 that penetrates the end of the transmission shaft 11 outwards from the pipe wall of the fixed boom 1 and is coaxially fixed by keys or pins, a worm 13 that meshes with the worm wheel 12, and one end is integrally and coaxially fixed to the worm 13. The worm shaft 13-1, and the handle 14 fixedly connected with the other end of the worm shaft 13-1. Specifically, the worm wheel 12 meshes with the worm 13 to form a worm gear and worm drive pair. The worm 13 and the worm shaft 13-1 are integrally and coaxially fixed, and the worm shaft 13-1 is rotatably supported on the outer column of the fixed boom 1 through the bearing seat 16. On the surface 1-1, preferably, the bearing seat 16 is fixed on the outer cylindrical surface 1-1 of the fixed boom 1 by welding, screw connection, riveting, etc., and one end of the worm shaft 13-1 is fixed to one end of the handle rod 14. The other end of the handle rod 14 is hinged with the handle 15.

为了驱动活动吊臂2相对于固定吊臂1的转动,空调室外机吊装装置还设有适于活动吊臂2相对于固定吊臂1摆动的吊臂摆动驱动机构。请参阅图1、图4、图6、图7,吊臂摆动驱动机构包括:贯穿固定吊臂1的位于墙体25内侧(墙体25内侧即指墙体25的室内侧)一端的管壁且转动支承于固定吊臂1的管壁上的转柄轴17、与转柄轴17位于固定吊臂1的管孔外侧的端部固接的转柄18、一端与转柄轴17位于固定吊臂1的管孔内侧的端部固接的曲柄19,以及一端与曲柄19的另一端通过第一铰轴21铰接相连的连杆20。其中连杆20位于固定吊臂1的管孔内,且连杆20的另一端通过第二铰轴22与活动吊臂2铰接相连。In order to drive the rotation of the movable boom 2 relative to the fixed boom 1 , the air conditioner outdoor unit hoisting device is further provided with a boom swing driving mechanism suitable for the movable boom 2 to swing relative to the fixed boom 1 . Please refer to Fig. 1, Fig. 4, Fig. 6, Fig. 7, the boom swing driving mechanism includes: a pipe wall penetrating the end of the fixed boom 1 at the inner side of the wall 25 (the inner side of the wall 25 refers to the indoor side of the wall 25) And the turning shaft 17 rotatably supported on the pipe wall of the fixed boom 1, the turning shaft 18 fixedly connected with the end of the turning shaft 17 located outside the pipe hole of the fixed hanging arm 1, one end and the turning shaft 17 are fixed. A crank 19 is fixedly connected to the inner end of the pipe hole of the boom 1 , and a connecting rod 20 is hingedly connected to the other end of the crank 19 through a first hinge shaft 21 . The connecting rod 20 is located in the pipe hole of the fixed boom 1 , and the other end of the connecting rod 20 is hingedly connected to the movable boom 2 through the second hinge shaft 22 .

吊臂摆动驱动机构的工作原理:请参阅图1、图4、图6、图7,曲柄19、连杆20、和活动吊臂2再加上固定吊臂1构成曲柄摇杆机构。当转动转柄18时,转柄18通过转柄轴17驱动曲柄19转动,曲柄19再通过连杆20带动活动吊臂2绕第三定轴3转动,从而实现活动吊臂2相对于固定吊臂1转动。The working principle of the boom swing drive mechanism: please refer to Figure 1, Figure 4, Figure 6, Figure 7, the crank 19, the connecting rod 20, and the movable boom 2 plus the fixed boom 1 constitute a crank-rocker mechanism. When the rotary handle 18 is rotated, the rotary handle 18 drives the crank 19 to rotate through the rotary handle shaft 17, and the crank 19 drives the movable boom 2 to rotate around the third fixed axis 3 through the connecting rod 20, thereby realizing that the movable boom 2 is relative to the fixed crane. Arm 1 turns.

实施例2:Example 2:

在实施例1的空调室外机吊装装置的基础上,本实施例提供的空调室外机吊装装置还包括适于调整活动吊臂2的起吊端2-1相对于墙体穿孔25-1位置的位置调整机构。On the basis of the air conditioner outdoor unit hoisting device in Embodiment 1, the air conditioner outdoor unit hoisting device provided in this embodiment further includes a position suitable for adjusting the position of the hoisting end 2-1 of the movable boom 2 relative to the position of the wall through-hole 25-1 Adjust the organization.

详细来说,请参阅图1、图2、图5,位置调整机构包括在固定吊臂1的外柱面1-1设有的一段外齿圈1-2(请参阅图6、图7)、套设在固定吊臂1上的且适于与外齿圈1-2的轮齿镶嵌的固定板23,以及开设于固定板23上的螺栓孔;其中外齿圈1-2的轮齿沿固定吊臂1的外柱面1-1的周向阵列均布,且外齿圈1-2的轮齿凸出于固定吊臂1的外柱面1-1设置(请参阅图6、图7);固定板23具有适于固定吊臂1穿过的大孔,大孔的内圆柱面上设有适于与外齿圈1-2镶嵌的内齿圈23-1;螺栓孔适于一固定螺栓24穿过后插入墙体25紧固。In detail, please refer to FIG. 1 , FIG. 2 , and FIG. 5 , the position adjustment mechanism includes a section of external gear ring 1-2 provided on the outer cylindrical surface 1-1 of the fixed boom 1 (please refer to FIG. 6 , FIG. 7 ) , a fixed plate 23 sleeved on the fixed boom 1 and suitable for inlaying with the gear teeth of the outer gear ring 1-2, and the bolt holes opened on the fixed plate 23; wherein the gear teeth of the outer gear ring 1-2 It is evenly distributed along the circumferential array of the outer cylindrical surface 1-1 of the fixed boom 1, and the gear teeth of the outer gear 1-2 protrude from the outer cylindrical surface 1-1 of the fixed boom 1 (please refer to Fig. 6, Figure 7); the fixing plate 23 has a large hole suitable for fixing the boom 1 to pass through, and the inner cylindrical surface of the large hole is provided with an inner gear ring 23-1 suitable for inlaying with the outer gear ring 1-2; the bolt holes are suitable for After a fixing bolt 24 is passed through, it is inserted into the wall 25 for fastening.

内齿圈23-1与外齿圈1-2镶嵌的结构是这样的:请参阅图5,固定板23的内齿圈23-1的轮齿镶嵌在固定吊臂1的外齿圈1-2的对应的齿槽内。The inlaid structure of the inner gear 23-1 and the outer gear 1-2 is as follows: please refer to FIG. 2 in the corresponding tooth slot.

请参阅图5,内齿圈23-1的轮齿沿所述大孔的内圆柱面的周向阵列均布。固定板23套装在固定吊臂1上,固定板23上的内齿圈23-1与固定吊臂1上的外齿圈1-2镶嵌且固定吊臂1可沿固定板23的内齿圈23-1的轴线在内齿圈23-1中移动。所述螺栓孔的轴线与内齿圈23-1的轴线平行,固定螺栓24穿过固定板23上的螺栓孔并固定于墙体25,使固定板23固定于墙体25的内墙面。Referring to FIG. 5 , the gear teeth of the ring gear 23-1 are evenly distributed along the circumferential array of the inner cylindrical surface of the large hole. The fixed plate 23 is sleeved on the fixed boom 1, the inner gear 23-1 on the fixed plate 23 is inlaid with the outer gear 1-2 on the fixed boom 1, and the fixed boom 1 can follow the inner gear of the fixed plate 23. The axis of 23-1 moves in the ring gear 23-1. The axis of the bolt hole is parallel to the axis of the ring gear 23 - 1 , the fixing bolt 24 passes through the bolt hole on the fixing plate 23 and is fixed to the wall 25 , so that the fixing plate 23 is fixed to the inner wall of the wall 25 .

对于本发明的空调室外机吊装装置来说,本发明的空调室外机吊装装置可临时安装在墙体25上的空调管线墙体穿孔25-1中,安装方法如下:①请参阅图6、图7,转动转柄18,利用吊臂摆动驱动机构使活动吊臂2相对于固定吊臂1转动,使活动吊臂2的长度方向与固定吊臂1的长度方向一致(即活动吊臂2与固定吊臂1呈“一”字形);②将空调室外机吊装装置的活动吊臂2、固定吊臂1依次穿过空调管线墙体穿孔25-1;③请参阅图1、图5,固定螺栓24穿过固定板23上的螺栓孔并将固定螺栓24固定于墙体25,使套装在固定吊臂1上的固定板23固定于墙体25的内墙面(墙体25的内墙面即指墙体25的室内侧墙面)。此处需要说明,用打孔机在墙体25上打空调管线墙体穿孔25-1时,一般先需要在打孔位置的旁侧钻一个小直径的螺栓孔,该小直径的螺栓孔的用途是将打孔机固定于墙体25上,固定螺栓24可以插入该小直径的螺栓孔并固定于其内,使固定螺栓24固定于墙体25,即利用该小直径的螺栓孔使套装在固定吊臂1上的固定板23固定于墙体25的内墙面;④请参阅图1、图2、图6、图7,转动转柄18,利用吊臂摆动驱动机构使活动吊臂2相对于固定吊臂1转动,使活动吊臂2的长度方向与固定吊臂1的长度方向垂直(即活动吊臂2与固定吊臂1呈“L”形)。这样,空调室外机吊装装置就安装在墙体25上的空调管线墙体穿孔25-1中。For the air conditioner outdoor unit hoisting device of the present invention, the air conditioner outdoor unit hoisting device of the present invention can be temporarily installed in the air conditioning pipeline wall body perforation 25-1 on the wall body 25, and the installation method is as follows: ① Please refer to Fig. 6, Fig. 7. Rotate the handle 18, and use the boom swing drive mechanism to make the movable boom 2 rotate relative to the fixed boom 1, so that the length direction of the movable boom 2 is consistent with the length direction of the fixed boom 1 (that is, the movable boom 2 is the same as the fixed boom 1). The fixed boom 1 is in the shape of "one"); ② Pass the movable boom 2 and the fixed boom 1 of the air conditioner outdoor unit hoisting device through the air conditioning pipeline wall through hole 25-1 in turn; ③ Please refer to Figure 1 and Figure 5 to fix the The bolts 24 pass through the bolt holes on the fixing plate 23 and fix the fixing bolts 24 to the wall body 25, so that the fixing plate 23 sleeved on the fixed boom 1 is fixed to the inner wall surface of the wall body 25 (the inner wall of the wall body 25). The surface refers to the indoor side wall surface of the wall body 25). It needs to be explained here that when punching the air-conditioning pipeline wall perforation 25-1 on the wall 25 with a punching machine, it is generally necessary to drill a small-diameter bolt hole on the side of the punching position. The purpose is to fix the punching machine on the wall body 25, and the fixing bolt 24 can be inserted into the small diameter bolt hole and fixed in it, so that the fixing bolt 24 can be fixed on the wall body 25, that is, the small diameter bolt hole is used to make the set. The fixed plate 23 on the fixed boom 1 is fixed on the inner wall surface of the wall body 25; ④ Please refer to Figure 1, Figure 2, Figure 6, Figure 7, turn the handle 18, and use the boom swing drive mechanism to move the boom 2. Rotate relative to the fixed boom 1 so that the length direction of the movable boom 2 is perpendicular to the length direction of the fixed boom 1 (that is, the movable boom 2 and the fixed boom 1 are in an "L" shape). In this way, the air-conditioning outdoor unit hoisting device is installed in the air-conditioning pipeline wall through-hole 25-1 on the wall 25.

安装好的空调室外机吊装装置,还需要调整空调室外机吊装装置的起吊端2-1的位置,使起吊端2-1位于空调室外机26安装位置的正上方。起吊端2-1的位置调整机构的工作原理及有益效果如下:空调室外机吊装装置在起吊状态下,固定吊臂1的外齿圈1-2与固定板23的内齿圈23-1是镶嵌的(请参阅图1、图2、图5)。当需要调整起吊端2-1的位置时,请参阅图1、图2,沿固定板23的内齿圈23-1的轴线使固定吊臂1朝室外方向或朝室内方向移动,并使固定吊臂1的外齿圈1-2与固定板23的内齿圈23-1错开(此时,固定吊臂1的外柱面1-1位于固定板23的内齿圈23-1处),即固定吊臂1的外齿圈1-2与固定板23的内齿圈23-1脱离接触,这样就解除了外齿圈1-2与内齿圈23-1的镶嵌,在解除外齿圈1-2与内齿圈23-1镶嵌的状态下,可使固定吊臂1相对于固定板23绕其自身的轴线转动(即固定吊臂1绕固定板23的内齿圈23-1的轴线转动),并带动起吊端2-1绕固定吊臂1的轴线转动,从而调整起吊端2-1相对于墙体25的水平方向的位置。起吊端2-1相对于墙体25的水平方向的位置调整好后,再沿固定板23的内齿圈23-1的轴线移动固定吊臂1,重新使固定吊臂1的外齿圈1-2与固定板23的内齿圈23-1镶嵌,这样,固定吊臂1就不能相对于固定板23转动了。需要说明的是,外齿圈1-2的齿距越小,固定吊臂1相对于固定板23的最小转动角度就越小,故适当缩小外齿圈1-2的齿距,可以获得较小的固定吊臂1的最小转动角度。请参阅图1、图2,固定吊臂1沿固定板23的内齿圈23-1的轴线在内齿圈23-1中移动,还可调整固定吊臂1伸出于墙体25的外墙面的长度,从而调整起吊端2-1相对于墙体25外墙面的距离。此处需要说明的是,应在空调室外机吊装装置不吊挂重物的状态下,先调整好起吊端2-1在墙体25外墙面的水平方向的位置以及相对于墙体25外墙面的距离,使起吊端2-1位于空调室外机26安装位置的正上方,然后再起吊空调室外机26,将其吊装至安装位置。The installed air conditioner outdoor unit hoisting device also needs to adjust the position of the hoisting end 2-1 of the air conditioner outdoor unit hoisting device so that the hoisting end 2-1 is located directly above the installation position of the air conditioner outdoor unit 26 . The working principle and beneficial effects of the position adjustment mechanism of the hoisting end 2-1 are as follows: when the air conditioner outdoor unit hoisting device is in the hoisting state, the outer gear ring 1-2 of the fixed boom 1 and the inner gear ring 23-1 of the fixed plate 23 are Inlaid (see Figure 1, Figure 2, Figure 5). When it is necessary to adjust the position of the lifting end 2-1, please refer to Fig. 1 and Fig. 2, move the fixed boom 1 toward the outdoor direction or the indoor direction along the axis of the inner gear 23-1 of the fixed plate 23, and make the fixed boom 1 move toward the outdoor direction or the indoor direction. The outer gear 1-2 of the boom 1 is staggered from the inner gear 23-1 of the fixed plate 23 (at this time, the outer cylindrical surface 1-1 of the fixed boom 1 is located at the inner gear 23-1 of the fixed plate 23) , that is, the outer ring gear 1-2 of the fixed boom 1 is out of contact with the inner gear 23-1 of the fixed plate 23, so that the inlay of the outer gear 1-2 and the inner gear 23-1 is released, and the outer ring gear 1-2 is released. In the state where the ring gear 1-2 is inlaid with the inner gear 23-1, the fixed boom 1 can be rotated around its own axis relative to the fixed plate 23 (that is, the fixed boom 1 can be rotated around the inner gear 23 of the fixed plate 23- 1), and drives the hoisting end 2-1 to rotate around the axis of the fixed jib 1, thereby adjusting the position of the hoisting end 2-1 relative to the horizontal direction of the wall 25. After the position of the hoisting end 2-1 relative to the horizontal direction of the wall 25 is adjusted, move the fixed boom 1 along the axis of the inner gear 23-1 of the fixing plate 23, and reposition the outer gear 1 of the fixed boom 1 -2 is inlaid with the inner gear 23-1 of the fixed plate 23, so that the fixed boom 1 cannot rotate relative to the fixed plate 23. It should be noted that, the smaller the tooth pitch of the outer gear ring 1-2, the smaller the minimum rotation angle of the fixed boom 1 relative to the fixed plate 23. Therefore, by appropriately reducing the tooth pitch of the outer gear ring 1-2, a higher ratio can be obtained. The minimum rotation angle of the small fixed boom 1. Please refer to FIG. 1 and FIG. 2 , the fixed boom 1 moves in the inner gear 23-1 along the axis of the inner gear 23-1 of the fixed plate 23, and the fixed boom 1 can be adjusted to protrude from the outer wall of the wall 25. The length of the surface is adjusted, so as to adjust the distance of the lifting end 2-1 relative to the outer wall surface of the wall body 25. It should be noted here that the position of the hoisting end 2-1 in the horizontal direction of the outer wall surface of the wall body 25 and the position of the hoisting end 2-1 in the horizontal direction of the outer wall surface of the wall body 25 and relative to the outer surface of the wall body 25 should be adjusted in the state that the hoisting device of the outdoor unit of the air conditioner does not hang heavy objects. The distance from the wall is such that the hoisting end 2-1 is directly above the installation position of the air conditioner outdoor unit 26, and then the air conditioner outdoor unit 26 is hoisted to the installation position.

当空调室外机26吊装就位完成后,须将空调室外机吊装装置从墙体25上的空调管线墙体穿孔25-1中拆下,拆卸方法如下:①请参阅图6、图7,转动转柄18,使活动吊臂2的长度方向与固定吊臂1的长度方向一致(即活动吊臂2与固定吊臂1呈“一”字形);②请参阅图1、图5,从墙体25上拆下固定螺栓24,使套装在固定吊臂1上的固定板23与墙体25的内墙面(墙体25的内墙面即指墙体25的室内侧墙面)脱离;③将空调室外机吊装装置的固定吊臂1、活动吊臂2从空调管线墙体穿孔25-1中抽出。这样,就将空调室外机吊装装置从空调管线墙体穿孔25-1中拆下。墙体25上的空调管线墙体穿孔25-1就可以安装空调管线了。After the air-conditioning outdoor unit 26 is hoisted into place, the air-conditioning outdoor unit hoisting device must be removed from the air-conditioning pipeline wall perforation 25-1 on the wall 25. The removal method is as follows: ① Refer to Figure 6 and Figure 7, turn Turn the handle 18 so that the length direction of the movable boom 2 is consistent with that of the fixed boom 1 (that is, the movable boom 2 and the fixed boom 1 are in a "one" shape); Remove the fixing bolts 24 from the body 25, so that the fixing plate 23 sleeved on the fixed boom 1 is separated from the inner wall surface of the wall body 25 (the inner wall surface of the wall body 25 refers to the indoor side wall surface of the wall body 25); ③ Pull out the fixed boom 1 and movable boom 2 of the air-conditioning outdoor unit hoisting device from the air-conditioning pipeline wall through hole 25-1. In this way, the air-conditioning outdoor unit hoisting device is removed from the air-conditioning pipeline wall through hole 25-1. The air-conditioning pipeline on the wall 25 can be installed with the wall perforation 25-1.

实施例3:Example 3:

在实施例2的空调室外机吊装装置的基础上,本实施例提供的空调室外机吊装装置还包括锁紧固定吊臂1的锁紧机构。On the basis of the air conditioner outdoor unit hoisting device in Embodiment 2, the air conditioner outdoor unit hoisting device provided in this embodiment further includes a locking mechanism for locking and fixing the hanging arm 1 .

请参阅图5、图2,锁紧机构包括沿内齿圈23-1的径向开设在固定板23的内齿圈23-1上的锁紧螺孔27,以及旋合在锁紧螺孔27内的锁紧螺钉28;锁紧螺孔27为通孔。Please refer to FIG. 5 and FIG. 2 , the locking mechanism includes a locking screw hole 27 opened on the inner gear ring 23-1 of the fixing plate 23 along the radial direction of the inner gear ring 23-1, and a locking screw hole 27 screwed into the locking screw hole The locking screw 28 in 27; the locking screw hole 27 is a through hole.

旋紧锁紧螺钉28,锁紧螺钉28的端部紧紧压在固定吊臂1上,将固定吊臂1锁紧在固定板23的内齿圈23-1中,以防止空调室外机吊装装置在起吊状态下,固定吊臂1在固定板23的内齿圈23-1中朝室外方向或朝室内方向移动;旋松锁紧螺钉28,锁紧螺钉28的端部与固定吊臂1脱离,固定吊臂1就能在固定板23的内齿圈23-1中朝室外方向或朝室内方向移动,这样,就可以调整活动吊臂2的起吊端2-1相对于墙体穿孔25-1的位置。Tighten the locking screw 28, the end of the locking screw 28 is tightly pressed on the fixed boom 1, and the fixed boom 1 is locked in the inner gear ring 23-1 of the fixed plate 23 to prevent the outdoor unit of the air conditioner from being hoisted. When the device is in the hoisting state, the fixed boom 1 moves in the inner gear 23-1 of the fixed plate 23 toward the outdoor direction or toward the indoor direction; After disengagement, the fixed boom 1 can move toward the outdoor direction or the indoor direction in the inner gear 23-1 of the fixed plate 23, so that the lifting end 2-1 of the movable boom 2 can be adjusted relative to the wall through hole 25. -1 for the position.

以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。Taking the above ideal embodiments according to the present invention as inspiration, and through the above description, relevant personnel can make various changes and modifications without departing from the technical idea of the present invention. The technical scope of the present invention is not limited to the contents in the specification, and the technical scope must be determined according to the scope of the claims.

在本发明的描述中,需要理解的是,指示方位或位置关系的术语为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be understood that the terms indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying what is indicated. A device or element must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as limiting the invention.

在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the present invention, unless otherwise expressly specified and limited, the terms "installed", "connected", "connected", "fixed" and other terms should be understood in a broad sense, for example, it may be a fixed connection or a detachable connection , or into one; it can be directly connected or indirectly connected through an intermediary. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.

在本发明的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left",

“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该发明产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。The orientation or positional relationship indicated by "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or positional relationship shown in the attached drawings, or is usually placed when the product of the invention is used. The orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention. Furthermore, the terms "first", "second", "third", etc. are only used to differentiate the description and should not be construed as indicating or implying relative importance.

此外,术语“水平”、“竖直”、“悬垂”等术语并不表示要求部件绝对水平或悬垂,而是可以稍微倾斜。如“水平”仅仅是指其方向相对“竖直”而言更加水平,并不是表示该结构一定要完全水平,而是可以稍微倾斜。Furthermore, the terms "horizontal", "vertical", "overhanging" etc. do not imply that a component is required to be absolutely horizontal or overhang, but rather may be slightly inclined. For example, "horizontal" only means that its direction is more horizontal than "vertical", it does not mean that the structure must be completely horizontal, but can be slightly inclined.

在本发明中,除非另有明确的规定和限定,第一特征在第二特征之上或之下可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征之上、上方和上面包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征之下、下方和下面包括第一特征在第二特征正下方和斜下方,或仅仅表示第一特征水平高度小于第二特征。In the present invention, unless otherwise expressly specified and limited, the first feature above or below the second feature may include the first and second features in direct contact, or may include the first and second features that are not in direct contact with each other. through additional characteristic contact between them. Also, the first feature being above, above and above the second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is level higher than the second feature. The first feature is below, below and below the second feature includes the first feature is directly below and diagonally below the second feature, or simply means that the first feature level is smaller than the second feature.

Claims (6)

1. An air condensing units hoist device which characterized in that includes: a supporting suspension arm unit, a sling unit and a sling rolling and pulling unit;
the supporting boom unit comprises a fixed boom (1) which is suitable for passing through a wall perforation (25-1) and a movable boom (2) which is hinged with the end part of the fixed boom (1) which is suitable for passing through the wall perforation (25-1) and then extending out of the wall (25); the fixed suspension arm (1) and the movable suspension arm (2) are both hollow tubular structures;
the sling unit comprises a third pulley (4) which is arranged in the inner cavity of the movable suspension arm (2) and is positioned at the hinged part of the fixed suspension arm (1) and the movable suspension arm (2), a first pulley (6) and a second pulley (8) which are arranged in the inner cavity of the movable suspension arm (2) and are positioned at the end part of the movable suspension arm (2) far away from the fixed suspension arm (1), and a sling (9) which is suitable for being wound on the outer circumferential surfaces of the third pulley (4), the first pulley (6) and the second pulley (8) at the same time;
the sling rolling and pulling unit comprises a sling rolling cylinder (10) which is arranged at the inner part of the fixed suspension arm (1) on the wall body (25) and is suitable for winding a sling (9), a transmission shaft (11) which is fixedly connected with the sling rolling cylinder (10) to drive the sling rolling cylinder (10) to rotate, and a power structure which drives the transmission shaft (11) to rotate;
the air conditioner outdoor unit hoisting device further comprises a boom swing driving mechanism suitable for the movable boom (2) to swing relative to the fixed boom (1);
the boom swing driving mechanism comprises a rotating handle shaft (17) which penetrates through the pipe wall of the fixed boom (1) and is positioned at one end of the inner side of a wall body (25) and is rotatably supported on the pipe wall of the fixed boom (1), a rotating handle (18) fixedly connected with the end part, positioned at the outer side of the pipe hole of the fixed boom (1), of the rotating handle shaft (17), a crank (19) with one end fixedly connected with the end part, positioned at the inner side of the pipe hole of the fixed boom (1), of the rotating handle shaft (17), and a connecting rod (20) with one end hinged with the other end of the crank (19) through a first hinge shaft (21); wherein
The connecting rod (20) is positioned in the pipe hole of the fixed suspension arm (1), and the other end of the connecting rod (20) is hinged and connected with the movable suspension arm (2) through a second hinge shaft (22).
2. The outdoor unit lifting device of an air conditioner according to claim 1, characterized in that the fixed boom (1) is a tubular body with a circular cross section;
the movable suspension arm (2) is a tubular body with a rectangular cross section.
3. The outdoor unit lifting device of claim 1 or 2, wherein both ends of the transmission shaft (11) are rotatably supported on the pipe wall of the end of the fixed boom (1) inside the wall (25), and the axis of the transmission shaft (11) is perpendicular to the axis of the fixed boom (1);
the power structure comprises a worm wheel (12) which penetrates through one end of the pipe wall of the fixed suspension arm (1) outwards and is coaxially fixed through a key or a pin, a worm (13) meshed with the worm wheel (12), a worm shaft (13-1) with one end coaxially and fixedly connected with the worm (13) integrally, and a handle rod (14) fixedly connected with the other end of the worm shaft (13-1).
4. The outdoor unit lifting device of an air conditioner according to any one of claims 1 or 2, characterized in that the movable boom (2) is hinged with the fixed boom (1) through a third fixed shaft (3); the third pulley (4) is rotationally sleeved on the third fixed shaft (3);
an annular groove suitable for winding the sling (9) is formed in the circumferential direction of the outer cylindrical surface of the third pulley (4); and
a first fixed shaft (5) and a second fixed shaft (7) are fixedly arranged at the end part of the movable suspension arm (2) far away from the fixed suspension arm (1), the axis of the first fixed shaft (5) is parallel to the axis of the second fixed shaft (7), the first pulley (6) is rotatably sleeved on the first fixed shaft (5), and the second pulley (8) is rotatably sleeved on the second fixed shaft (7);
annular grooves suitable for winding the sling (9) are respectively arranged along the circumferential directions of the outer cylindrical surfaces of the first pulley (6) and the second pulley (8), and
the first pulley (6) and the second pulley (8) are arranged side by side with the annular grooves provided on the first pulley (6) and the second pulley (8), respectively, facing and aligned to form an aperture suitable for the passage of a sling (9) at the closest position between the first pulley (6) and the second pulley (8).
5. The outdoor unit lifting device of claim 1 or 2, further comprising a position adjusting mechanism;
the position adjusting mechanism comprises a section of outer gear ring (1-2) arranged on an outer cylindrical surface (1-1) of the fixed suspension arm (1), a fixing plate (23) which is sleeved on the fixed suspension arm (1) and is suitable for being embedded with gear teeth of the outer gear ring (1-2), and a bolt hole formed in the fixing plate (23); wherein
The gear teeth of the outer gear ring (1-2) are uniformly distributed along the circumferential array of the outer cylindrical surface (1-1) of the fixed suspension arm (1), and the gear teeth of the outer gear ring (1-2) are arranged to protrude out of the outer cylindrical surface (1-1) of the fixed suspension arm (1);
the fixing plate (23) is provided with a large hole for the fixed suspension arm (1) to pass through, and an inner gear ring (23-1) which is embedded with the outer gear ring (1-2) is arranged on the inner cylindrical surface of the large hole;
the bolt hole is suitable for a fixing bolt (24) to penetrate through the wall body (25) and be fastened.
6. The outdoor unit lifting device of claim 5, further comprising a locking mechanism adapted to lock the fixed boom (1);
the locking mechanism comprises a locking screw hole (27) formed in the inner gear ring (23-1) of the fixing plate (23) along the radial direction of the inner gear ring (23-1), and a locking screw (28) screwed in the locking screw hole (27);
the locking screw hole (27) is a through hole.
CN201910753856.9A 2019-08-15 2019-08-15 Air conditioner outdoor unit hoisting device Active CN110329924B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910753856.9A CN110329924B (en) 2019-08-15 2019-08-15 Air conditioner outdoor unit hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910753856.9A CN110329924B (en) 2019-08-15 2019-08-15 Air conditioner outdoor unit hoisting device

Publications (2)

Publication Number Publication Date
CN110329924A CN110329924A (en) 2019-10-15
CN110329924B true CN110329924B (en) 2020-02-18

Family

ID=68149674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910753856.9A Active CN110329924B (en) 2019-08-15 2019-08-15 Air conditioner outdoor unit hoisting device

Country Status (1)

Country Link
CN (1) CN110329924B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114572860A (en) * 2022-04-13 2022-06-03 王槐绪 Folding arm crane

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2516428A1 (en) * 1981-11-16 1983-05-20 Giros Sa H Pivoting hoist jib for workshop - uses pin joints with axles inclined to vertical and arm pivots back under its own
US5482169A (en) * 1992-05-15 1996-01-09 Commissariat A L'energie Atomique Cable lifting device for handling heavy loads within a tight shielded enclosure
CN201962000U (en) * 2011-02-17 2011-09-07 北京中新图锐科技有限公司 Crane boom for maintaining cranes of generator sets
CN206172873U (en) * 2016-11-11 2017-05-17 开化县普农家电有限公司 Multi -functional loop wheel machine of non -pressure
CN208103802U (en) * 2018-04-26 2018-11-16 徐涛 A kind of air conditioner hoisting equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2516428A1 (en) * 1981-11-16 1983-05-20 Giros Sa H Pivoting hoist jib for workshop - uses pin joints with axles inclined to vertical and arm pivots back under its own
US5482169A (en) * 1992-05-15 1996-01-09 Commissariat A L'energie Atomique Cable lifting device for handling heavy loads within a tight shielded enclosure
CN201962000U (en) * 2011-02-17 2011-09-07 北京中新图锐科技有限公司 Crane boom for maintaining cranes of generator sets
CN206172873U (en) * 2016-11-11 2017-05-17 开化县普农家电有限公司 Multi -functional loop wheel machine of non -pressure
CN208103802U (en) * 2018-04-26 2018-11-16 徐涛 A kind of air conditioner hoisting equipment

Also Published As

Publication number Publication date
CN110329924A (en) 2019-10-15

Similar Documents

Publication Publication Date Title
CN105731277B (en) A kind of portable transformer hanging apparatus
CN106115498B (en) A kind of adhesion type pole
CN106348185A (en) Adjustable lifting device of outdoor unit of air conditioner
CN107091008A (en) A kind of adhesion type is from lifting pole
CN110329924B (en) Air conditioner outdoor unit hoisting device
CN209906233U (en) Assembled building lifting device
CN212403160U (en) Assembled steel structure hoist device
CN205527438U (en) Portable transformer hoist device
CN112061898A (en) Column switch rotatable boom hoisting equipment
CN201284195Y (en) Miniature crane
CN205953369U (en) Adhere to formula and embrace pole
CN213738307U (en) Hoisting tool
CN111348566A (en) An intelligent control hoisting device for frequency converter
CN111362136A (en) But multi-functional cantilever crane of anchor clamps puts
CN206815946U (en) A kind of adhesion type is from lifting pole
CN216319599U (en) Climbing work safety rope suspension device
CN112010196B (en) Hoisting device for air conditioner external unit for high-rise building installation or disassembly
CN216235790U (en) A mechanical self-locking pulley for power maintenance
CN113184682B (en) Cable laying hanger convenient to install and use
CN211712491U (en) Intelligent control hoisting device for frequency converter
CN214399581U (en) Lifting device for electromechanical engineering
CN210505261U (en) Aluminum forging hoist and mount safety anchor clamps
CN113353813A (en) Building material hanging wire
CN112830352A (en) A cable pay-off device for easy clamping of cable reels
CN216336248U (en) A slewing arm for a crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant