CN110322147A - A kind of Project Supervision approaches to IM and system - Google Patents
A kind of Project Supervision approaches to IM and system Download PDFInfo
- Publication number
- CN110322147A CN110322147A CN201910596613.9A CN201910596613A CN110322147A CN 110322147 A CN110322147 A CN 110322147A CN 201910596613 A CN201910596613 A CN 201910596613A CN 110322147 A CN110322147 A CN 110322147A
- Authority
- CN
- China
- Prior art keywords
- project
- sub
- management
- information
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000013459 approach Methods 0.000 title claims abstract description 17
- 238000000034 method Methods 0.000 claims abstract description 8
- 238000004458 analytical method Methods 0.000 claims description 11
- 238000011156 evaluation Methods 0.000 claims description 8
- 230000010354 integration Effects 0.000 claims description 4
- 238000004891 communication Methods 0.000 claims description 3
- 238000012502 risk assessment Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 21
- 238000000354 decomposition reaction Methods 0.000 abstract description 5
- 238000007726 management method Methods 0.000 description 42
- 238000012544 monitoring process Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 238000002716 delivery method Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of Project Supervision approaches to IM and systems, the following steps are included: S1, engineering project to be resolved into multiple and different sub-projects, and management process, acceptance specification, working approaches of surveillance and measure are preset to every sub-project, and obtain file needed for every sub-project and carry out filing and form engineering record table;When S2, supervising engineer carry out management in every sub-project, judge the information actually obtained and presupposed information whether different from safe range, if information carries out early warning different from safe range, to the sub-project, and analyzes to adopt an effective measure after reason and be corrected;Conversely, thening follow the steps S3;S3, the information actually obtained and corresponding sub-project are stored, renewal project record sheet.Construction project is standardized decomposition according to project programme, and the documentation formed to every sub-project is filed in time and orderly management, improves the efficiency of management.
Description
Technical field
The present invention relates to project supervision technical fields, more particularly, to a kind of Project Supervision approaches to IM and are
System.
Background technique
Project supervision refers to engineering project of the supervisor with related qualification by the commission of Party A, according to state approval
File, the law in relation to engineering construction, regulation and engineering supervision contract and other construction contracts are built, Party A is represented
A kind of proficient service activity to the engineering construction implementing monitoring of Party B.Project supervision is a kind of paid engineering consulting clothes
Business;It is to be entrusted to carry out by Party A;The main foundation of management is law, regulation, technical standard, related contract and file;Management
Criterion be to abide by the law, is sincere, is just and scientific;Management purpose is to ensure that engineering construction quality and safety, improves engineering construction water
It is flat, give full play to returns of investment.
Project Supervision unit is entrusted by construction unit, according to laws and regulations, engineering construction standard, prospective design file
And contract, project delivery method, cost, progress are controlled in the construction stage, contract, information are managed, to engineering
The relationship of construction related side is coordinated, and fulfils the service activity of construction project production safety management statutory obligation.Management list
Position should requirement according to the scale, property, owner of construction project to management, appoint competent personnel to serve as Project Director science and engineering journey
Teacher, chief supervision engineer are the person in overalls of Project Supervision work, he is responsible for interior to supervisor, to export-oriented industry
It is main to be responsible for.The personnel component of Supervision Organization is the important content in management tender document, is that owner approves during the assessment of bids, always
Supervising engineer, should be according to the supervision commission contract content group of management outline content and signing when setting up Project Surveillance mechanism
It builds, and is timely adjusted in survey control measure and specific implementation plan execute.
Currently, the management of Project Supervision information, most of is all to fill in various tables manually, artificial progress information
Transmitting and management.It using this way to manage, can not accomplish standardized management, can not accomplish the integration of information and share entirely,
And the inefficiency of management, at high cost, poor safety performance.
Summary of the invention
The first object of the present invention is to provide a kind of Project Supervision approaches to IM, and engineering project is divided
It cuts, standardizes the conclusion of supervisory information more, improve the efficiency of management.
Foregoing invention purpose of the invention has the technical scheme that a kind of Project Supervision information
Management method, comprising the following steps:
S1, engineering project is resolved into multiple and different sub-projects, and management process, receiving gauge is preset to every sub-project
Model, working approaches of surveillance and measure, and obtain file needed for every sub-project carry out filing form engineering record table;
When S2, supervising engineer carry out management in every sub-project, judge that the information actually obtained and presupposed information are
It is no different from safe range, if information carries out early warning different from safe range, to the sub-project, and taken effectively after analyzing reason
Measure is corrected;Conversely, thening follow the steps S3;
S3, the information actually obtained and corresponding sub-project are stored, renewal project record sheet.
By using above-mentioned technical proposal, construction project is standardized by decomposition according to project programme, carefully
Change the work to every sub-project, and the documentation formed to every sub-project is filed in time and orderly management, realizes
It to the real time monitoring of engineering project, standardizes the conclusion of supervisory information more, improves the efficiency of management;Meanwhile to every sub-project
Supervisory information analyzed and determined, is had and is corrected using taking timely measure.
The present invention is further arranged to: in step S1, every sub-project is also preset with progress chart, and supervising engineer exists
Occur sub-project when management to fail to finish on schedule, then analyze reason, existing main problem and difficulty, and proposes how solution
Opinion.
By using above-mentioned technical proposal, the deadline and progress chart of every sub-project are compared, obtained
The performance of the sub-project, thus the progress situation of the entire engineering project of control, convenient for the work plan to later period sub-project
Carry out intelligent adjustment.
The present invention is further arranged to: in step S2, the information actually obtained includes file, video, image and sound.
The present invention is further arranged to: in step S2, supervising engineer should be in time by the various quality in engineering project
Situation is concluded and is analyzed in earnest, and is contrasted with related quality standard, is found out deviation and is corrected.
The second object of the present invention is to provide a kind of Project Supervision information management system, and engineering project is divided
It cuts, standardizes the conclusion of supervisory information more, improve the efficiency of management.
Foregoing invention purpose of the invention has the technical scheme that a kind of Project Supervision information
Management system, including server and management terminal;
The server for typing and store the management process of every sub-project, acceptance specification, working approaches of surveillance and
The real time data of measure and project progress simultaneously forms engineering record table;
The management terminal and the server communication understand, and is obtained by the supervising engineer of every sub-project by management is practical
Information and sub-project deadline typing engineering record table;
The server includes analysis module and risk evaluation module, and the analysis module is used to carry out the information of institute's typing big
Data Integration, analysis simultaneously form data analytical statement, and the risk evaluation module is used to carry out the exception and reason found
Automatic risk assessment, and early warning is issued automatically.
By using above-mentioned technical proposal, construction project is standardized by decomposition according to project programme, carefully
Change the work to every sub-project, and the documentation formed to every sub-project is filed in time and orderly management, realizes
To the real time monitoring of engineering project;Analysis module is integrated the deadline of each sub-project and quality, is analyzed, and engineering is found out
The exception and reason that construction occurs;Adjustment is carried out by deadline of the risk evaluation module to each sub-project, so that respectively
Sub-project is compact to be connected, to improve engineering efficiency.
The present invention is further arranged to: the server further includes reminding module, and the reminding module is used to remember when engineering
When recording table update, management terminal is sent by engineering record table and supervising engineer is reminded.
By using above-mentioned technical proposal, reminding module reminds the completion of each sub-project, is conducive to Supervision engineering
Teacher reaches construction site in time.
In conclusion advantageous effects of the invention are as follows: marked construction project according to project programme
Standardization is decomposed, and refine to the work of every sub-project, and the documentation formed to every sub-project is filed and had in time
Sequence management is realized to the real time monitoring of engineering project, standardizes the conclusion of supervisory information more, and the efficiency of management is improved;Meanwhile to every
The supervisory information of sub-project analyzed and determined, is had and is corrected using taking timely measure.
Detailed description of the invention
Fig. 1 is the system block diagram of the embodiment of the present invention.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of Project Supervision approaches to IM, as shown in Figure 1, comprising the following steps: S1, decompose engineering project
At multiple and different sub-projects, and management process, acceptance specification, working approaches of surveillance are preset to every sub-project and arranged
Apply, and obtain file needed for every sub-project carry out filing form engineering record table;S2, supervising engineer are in each subitem
When carrying out management in mesh, judge the information actually obtained and presupposed information whether different from safe range, if information different from
Safe range then carries out early warning to the sub-project, and analyzes to adopt an effective measure after reason and be corrected;Conversely, then executing step
Rapid S3;S3, the information actually obtained and corresponding sub-project are stored, renewal project record sheet.
Construction project is standardized decomposition according to project programme, refine to the work of every sub-project,
And the documentation formed to every sub-project is filed in time and orderly management, realizes the real time monitoring to engineering project,
It standardizes the conclusion of supervisory information more, improves the efficiency of management;Meanwhile the supervisory information of every sub-project is analyzed and determined,
Have and is corrected using taking timely measure.
In step S1, every sub-project is also preset with progress chart, and supervising engineer occurs sub-project in management not
It can finish on schedule, then analyze reason, existing main problem and difficulty, and propose how the opinion solved.To every sub-project
Deadline compared with progress chart, the performance of the sub-project is obtained, thus control entire engineering project
Progress situation carries out intelligent adjustment convenient for the work plan to later period sub-project.In step S2, the information actually obtained includes
File, video, image and sound;In step S2, supervising engineer should in time by the various quality conditions in engineering project into
Row is concluded and is analyzed in earnest, and is contrasted with related quality standard, is found out deviation and is corrected.
A kind of Project Supervision information management system, including server and management terminal;Server is for typing and deposits
The real time data of management process, acceptance specification, working approaches of surveillance and the measure and project progress of storing up every sub-project is simultaneously
Form engineering record table;Management terminal and the server communication understand, by the supervising engineer of every sub-project that management is real
The information and sub-project deadline typing engineering record table that border obtains;Server includes analysis module and risk evaluation module,
Analysis module is used to carry out big data integration, analysis to the information of institute's typing and forms data analytical statement, risk evaluation module
For carrying out automatic risk assessment to the exception and reason found, and early warning is issued automatically.
Construction project is standardized decomposition according to project programme, refine to the work of every sub-project,
And the documentation formed to every sub-project is filed in time and orderly management, realizes the real time monitoring to engineering project;
Analysis module is integrated the deadline of each sub-project and quality, is analyzed, and the exception and reason of engineering construction appearance are found out;
Adjustment is carried out by deadline of the risk evaluation module to each sub-project, is connected so that each sub-project is compact, from
And improve engineering efficiency.Server further includes reminding module, and reminding module is used for when engineering record table updates, by engineering record
Table is sent to management terminal and reminds supervising engineer;Reminding module reminds the completion of each sub-project, favorably
Construction site is reached in time in supervising engineer.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (6)
1. a kind of Project Supervision approaches to IM, which comprises the following steps:
S1, engineering project is resolved into multiple and different sub-projects, and management process, receiving gauge is preset to every sub-project
Model, working approaches of surveillance and measure, and obtain file needed for every sub-project carry out filing form engineering record table;
When S2, supervising engineer carry out management in every sub-project, judge that the information actually obtained and presupposed information are
It is no different from safe range, if information carries out early warning different from safe range, to the sub-project, and taken effectively after analyzing reason
Measure is corrected;Conversely, thening follow the steps S3;
S3, the information actually obtained and corresponding sub-project are stored, renewal project record sheet.
2. a kind of Project Supervision approaches to IM according to claim 1, which is characterized in that in step S1, often
Sub-project is also preset with progress chart, and supervising engineer occurs sub-project in management and fails to finish on schedule, then analyzes original
Because, existing for main problem and difficulty, and propose how solve opinion.
3. a kind of Project Supervision approaches to IM according to claim 1, which is characterized in that real in step S2
The information that border obtains includes file, video, image and sound.
4. a kind of Project Supervision approaches to IM according to claim 1, which is characterized in that in step S2, prison
Reason engineer should the various quality conditions in engineering project be concluded and be analyzed in earnest in time, and with related quality mark
Standard contrasts, and finds out deviation and is corrected.
5. a kind of Project Supervision information management system, which is characterized in that including server and management terminal;
The server for typing and store the management process of every sub-project, acceptance specification, working approaches of surveillance and
The real time data of measure and project progress simultaneously forms engineering record table;
The management terminal and the server communication understand, and is obtained by the supervising engineer of every sub-project by management is practical
Information and sub-project deadline typing engineering record table;
The server includes analysis module and risk evaluation module, and the analysis module is used to carry out the information of institute's typing big
Data Integration, analysis simultaneously form data analytical statement, and the risk evaluation module is used to carry out the exception and reason found
Automatic risk assessment, and early warning is issued automatically.
6. a kind of Project Supervision information management system according to claim 5, which is characterized in that the server is also
Including reminding module, the reminding module is used to send management terminal simultaneously for engineering record table when engineering record table is updated
Supervising engineer is reminded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910596613.9A CN110322147A (en) | 2019-07-04 | 2019-07-04 | A kind of Project Supervision approaches to IM and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910596613.9A CN110322147A (en) | 2019-07-04 | 2019-07-04 | A kind of Project Supervision approaches to IM and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110322147A true CN110322147A (en) | 2019-10-11 |
Family
ID=68122498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910596613.9A Withdrawn CN110322147A (en) | 2019-07-04 | 2019-07-04 | A kind of Project Supervision approaches to IM and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110322147A (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110991990A (en) * | 2019-11-25 | 2020-04-10 | 四川华通建设工程造价管理有限责任公司 | Engineering project cost management system |
CN111210196A (en) * | 2019-12-27 | 2020-05-29 | 宁波国际投资咨询有限公司 | Intelligent engineering supervision information supervision method |
CN111476425A (en) * | 2020-04-15 | 2020-07-31 | 中道明华建设工程项目咨询有限责任公司 | Engineering project cost progress supervision system and method |
CN111738486A (en) * | 2020-05-09 | 2020-10-02 | 北京兴中海建工程造价咨询有限公司 | Comprehensive management method and system for construction project cost, bid inviting and consultation |
CN111861165A (en) * | 2020-07-06 | 2020-10-30 | 广东德尔智慧工厂科技有限公司 | Project management method, apparatus, computer equipment and storage medium |
CN111861166A (en) * | 2020-07-06 | 2020-10-30 | 广东德尔智慧工厂科技有限公司 | Asset health management method, apparatus, system, computer equipment and storage medium |
CN112446690A (en) * | 2020-12-15 | 2021-03-05 | 湖北省水利水电规划勘测设计院 | Hydraulic engineering building-up modularized management system and method |
CN112766645A (en) * | 2020-12-30 | 2021-05-07 | 苏州深鉴信息科技有限公司 | Supervision and management platform for whole process of information project |
CN113362033A (en) * | 2021-06-09 | 2021-09-07 | 四川省同瑞达建设工程有限公司 | Construction progress management method, system and storage medium for building project |
CN113919816A (en) * | 2021-10-22 | 2022-01-11 | 河北锦麟工程项目管理有限公司 | Real-time data intelligent association calculation method applied to project management system |
CN113988804A (en) * | 2021-10-28 | 2022-01-28 | 公诚管理咨询有限公司 | Digital management method, device, equipment and storage medium for whole engineering construction process |
CN114331190A (en) * | 2021-12-31 | 2022-04-12 | 惠州市建设集团工程建设监理有限公司 | Method and system for checking and actually measuring engineering supervision quality |
CN114386851A (en) * | 2022-01-13 | 2022-04-22 | 广东鸿厦工程管理咨询有限公司 | BIM-based municipal public works supervision method and system |
CN114493249A (en) * | 2022-01-24 | 2022-05-13 | 河南省宏力工程咨询有限公司 | Road construction full-period management method, system, terminal and storage medium for road engineering supervision |
CN114924535A (en) * | 2022-05-18 | 2022-08-19 | 北京天辰信科技有限公司 | Method and system for acquiring information from engineering data to perform safety production early warning |
CN115358721A (en) * | 2022-08-30 | 2022-11-18 | 中新华都国际工程咨询有限公司 | Engineering supervision information supervision system and method based on big data |
CN115409395A (en) * | 2022-09-06 | 2022-11-29 | 河南正海实业有限公司 | Quality acceptance inspection method and system for hydraulic construction engineering |
CN115719158A (en) * | 2022-11-28 | 2023-02-28 | 深圳市汇健智慧医疗有限公司 | Process management method for implementing event stream |
CN116186136A (en) * | 2023-01-06 | 2023-05-30 | 三峡高科信息技术有限责任公司 | Engineering construction implementation stage data processing method and system |
-
2019
- 2019-07-04 CN CN201910596613.9A patent/CN110322147A/en not_active Withdrawn
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110991990A (en) * | 2019-11-25 | 2020-04-10 | 四川华通建设工程造价管理有限责任公司 | Engineering project cost management system |
CN111210196A (en) * | 2019-12-27 | 2020-05-29 | 宁波国际投资咨询有限公司 | Intelligent engineering supervision information supervision method |
CN111476425A (en) * | 2020-04-15 | 2020-07-31 | 中道明华建设工程项目咨询有限责任公司 | Engineering project cost progress supervision system and method |
CN111738486A (en) * | 2020-05-09 | 2020-10-02 | 北京兴中海建工程造价咨询有限公司 | Comprehensive management method and system for construction project cost, bid inviting and consultation |
CN111738486B (en) * | 2020-05-09 | 2024-03-01 | 北京兴中海建工程造价咨询有限公司 | Comprehensive management method and system for construction project cost, bid-inviting and consultation |
CN111861165A (en) * | 2020-07-06 | 2020-10-30 | 广东德尔智慧工厂科技有限公司 | Project management method, apparatus, computer equipment and storage medium |
CN111861166A (en) * | 2020-07-06 | 2020-10-30 | 广东德尔智慧工厂科技有限公司 | Asset health management method, apparatus, system, computer equipment and storage medium |
CN112446690A (en) * | 2020-12-15 | 2021-03-05 | 湖北省水利水电规划勘测设计院 | Hydraulic engineering building-up modularized management system and method |
CN112766645A (en) * | 2020-12-30 | 2021-05-07 | 苏州深鉴信息科技有限公司 | Supervision and management platform for whole process of information project |
CN113362033A (en) * | 2021-06-09 | 2021-09-07 | 四川省同瑞达建设工程有限公司 | Construction progress management method, system and storage medium for building project |
CN113919816A (en) * | 2021-10-22 | 2022-01-11 | 河北锦麟工程项目管理有限公司 | Real-time data intelligent association calculation method applied to project management system |
CN113988804A (en) * | 2021-10-28 | 2022-01-28 | 公诚管理咨询有限公司 | Digital management method, device, equipment and storage medium for whole engineering construction process |
CN114331190A (en) * | 2021-12-31 | 2022-04-12 | 惠州市建设集团工程建设监理有限公司 | Method and system for checking and actually measuring engineering supervision quality |
CN114386851A (en) * | 2022-01-13 | 2022-04-22 | 广东鸿厦工程管理咨询有限公司 | BIM-based municipal public works supervision method and system |
CN114386851B (en) * | 2022-01-13 | 2023-01-17 | 广东鸿厦工程管理咨询有限公司 | BIM-based municipal public works supervision method and system |
CN114493249A (en) * | 2022-01-24 | 2022-05-13 | 河南省宏力工程咨询有限公司 | Road construction full-period management method, system, terminal and storage medium for road engineering supervision |
CN114924535A (en) * | 2022-05-18 | 2022-08-19 | 北京天辰信科技有限公司 | Method and system for acquiring information from engineering data to perform safety production early warning |
CN114924535B (en) * | 2022-05-18 | 2022-12-02 | 北京天辰信科技有限公司 | Method and system for acquiring information from engineering data to perform safety production early warning |
CN115358721A (en) * | 2022-08-30 | 2022-11-18 | 中新华都国际工程咨询有限公司 | Engineering supervision information supervision system and method based on big data |
CN115409395A (en) * | 2022-09-06 | 2022-11-29 | 河南正海实业有限公司 | Quality acceptance inspection method and system for hydraulic construction engineering |
CN115409395B (en) * | 2022-09-06 | 2023-08-08 | 河南正海实业有限公司 | Quality acceptance inspection method and system for hydraulic construction engineering |
CN115719158A (en) * | 2022-11-28 | 2023-02-28 | 深圳市汇健智慧医疗有限公司 | Process management method for implementing event stream |
CN116186136A (en) * | 2023-01-06 | 2023-05-30 | 三峡高科信息技术有限责任公司 | Engineering construction implementation stage data processing method and system |
CN116186136B (en) * | 2023-01-06 | 2024-03-12 | 三峡高科信息技术有限责任公司 | Engineering construction implementation stage data processing method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110322147A (en) | A kind of Project Supervision approaches to IM and system | |
CN107862450A (en) | Performance appraisal system and method | |
CN108564347A (en) | Overhaul whole process management system and lean inspection base | |
CN110298932A (en) | A kind of UAV Intelligent patrol inspection integral control platform | |
CN102117444A (en) | System for comprehensive arrangement and execution management of production equipment maintenance plan | |
CN109299851A (en) | A kind of intelligence progress kinetic-control system | |
CN111861799A (en) | Intelligent construction site management system and method | |
CN104573996A (en) | Automated quotation system for casting enterprises | |
CN109034404A (en) | A kind of thermal power plant's multi-person synergy examination and repair system based on AR glasses, method and a kind of AR glasses | |
CN111598411A (en) | Intelligent safety management and control system for substation operation site | |
CN110232504A (en) | A kind of quality manufacturing execution system platform and terminal | |
CN109146302A (en) | Overhaul of the equipments task processing method and system | |
CN111027874A (en) | Intelligent management system and method for substation tools | |
CN113379370A (en) | Segment production informatization management system | |
CN109636142A (en) | A kind of technique head detecting method and device based on MES | |
CN110738458A (en) | Engineering cost management system and method | |
CN113780841A (en) | Railway engineering multi-terminal collaborative interactive supervision system based on multi-information set | |
CN112184945A (en) | Mobile terminal inspection management method and system | |
CN106447157A (en) | Product testing and supervision method and monitoring system thereof | |
CN114677044A (en) | Management system and method for intelligent building supervision engineering project | |
CN112581304A (en) | Manufacturing workshop informatization management system and use method thereof | |
CN114066113A (en) | Production and manufacturing execution system for environment-friendly paper tableware industry | |
CN116224922A (en) | Information management system and method for intelligent factory | |
CN114677117A (en) | Building engineering management system and device | |
CN114492685A (en) | Intelligent system for point inspection of factory equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20191011 |