CN110230730A - The construction method reinforced for pipeline - Google Patents
The construction method reinforced for pipeline Download PDFInfo
- Publication number
- CN110230730A CN110230730A CN201910418498.6A CN201910418498A CN110230730A CN 110230730 A CN110230730 A CN 110230730A CN 201910418498 A CN201910418498 A CN 201910418498A CN 110230730 A CN110230730 A CN 110230730A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- construction method
- overarm brace
- reinforced
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 238000009412 basement excavation Methods 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 239000002689 soil Substances 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims 1
- 238000005452 bending Methods 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 230000005484 gravity Effects 0.000 abstract description 2
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/16—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L57/00—Protection of pipes or objects of similar shape against external or internal damage or wear
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
This application provides a kind of construction methods reinforced for pipeline, belong to technical field of building construction.The construction method includes: the top mark of the earth excavation of corresponding position above pipeline to pipeline is high, formation operating pit;Overarm brace is set up on the operating pit overhead surface, and the both ends of the overarm brace are respectively supported on the ground of the opposite sides of the operating pit;Fixed device is set on the overarm brace, and through the fixed pipeline of the fixed device;Continue the digging operation that predetermined depth is carried out to the earthwork.Hanging pipeline is carried out to sling fixation after earth excavation by using overarm brace and fixed device, avoids the problem of bending damage occurs for the reason of pipeline is because of gravity.
Description
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of construction method reinforced for underground utilities.
Background technique
In some projects under construction such as municipal works, there are the underground utilities such as armored concrete pipeline, cable, in newly-built underground
When building, pipeline exist crosses newly-built underground structure phenomenon, pipeline can not be removed, to engineering construction bring it is many not
Just and perplex.If change moving to pipeline, more fund is needed, is taken time and effort, and the use of pipeline can impacted.
Summary of the invention
In view of this, having solved the purpose of the present invention is to provide a kind of construction method reinforced for pipeline newly-built
When underground structure, the problems such as construction can damage pipeline and pipeline is interfered to construction.
The present invention provides a kind of construction method reinforced for pipeline, the method is as follows:
The top mark of the earth excavation of corresponding position above pipeline to pipeline is high, form operating pit;
Overarm brace is set up on the operating pit overhead surface, and the both ends of the overarm brace are respectively supported at institute
On the ground for stating the opposite sides of operating pit;
Fixed device is set on the overarm brace, and through the fixed pipeline of the fixed device;
Continue the digging operation that predetermined depth is carried out to the earthwork.
Preferably, the erection method of the overarm brace is:
On the ground, the opposite sides of the earthwork piles up concrete foundation platform respectively;
Built-in fitting is set in the concrete foundation platform, the overarm brace is built and is put down in the concrete foundation
It is fixedly connected on platform and with the built-in fitting.
Preferably, the overarm brace is made using angle steel.
Preferably, the overarm brace includes:
Column, each built-in fitting are separately connected a column;
Header board, two header boards are arranged in parallel, and each header board is connect with each column respectively;
Truss, the truss are fixedly connected between two header boards, the structural strength for web beam plate.
Preferably, it is connected between the column and the built-in fitting using welding manner.
Preferably, it is all made of between the header board and the column and between the truss and the header board high-strength
Degree is bolted.
Preferably, the fixed device includes:
The side on the header board close to the pipeline is arranged in pulley, the pulley;
Guide chain, the guide chain are bypassed respectively below the pulley and the pipeline, and the pipeline hangs through the guide chain and holds in the palm
It rises.
Preferably, a neonychium is arranged in the position contacted below the pipeline with the guide chain, for avoiding the guide chain
The pipeline is damaged.
Preferably, the two sides perpendicular to its length direction on the overarm brace are respectively equipped with cable wind rope, the cable
Wind rope is connected to earth anchor.
Preferably, building enclosure is respectively set in the surrounding in the earthwork, for avoid the operating pit collapse with
And into the earthwork into soil.
The application has the advantages that
The construction method provided by the present application reinforced for pipeline, does not need change moving to pipeline to can be carried out applying
Work, by the way that pipeline is fixed, when can be avoided out cubic metre of earth, pipeline is not supported, the problem of damaging to pipeline.And it should
Construction method has many advantages, such as that simple, quick, device is detachable.
Detailed description of the invention
By referring to the drawings to the description of the embodiment of the present invention, above-mentioned and other purposes of the invention, feature and
Advantage will be apparent from.
Fig. 1 is the structure chart for pipeline bracing means provided according to embodiments of the present invention;
Fig. 2 is cross-section diagram at A-A in the Fig. 1 provided according to embodiments of the present invention.
Wherein, 1- concrete foundation platform, 2- high-strength bolt, 3- truss, 4- header board, 5- built-in fitting, 6- go along with sb. to guard him knot
Structure, 7- pulley, 8- guide chain, 9- neonychium, 10- column, 11- pipeline, 12- overarm brace, 13- cable wind rope, 14- earth anchor, 15-
Face.
Specific embodiment
The various embodiments that the present invention will be described in more detail that hereinafter reference will be made to the drawings.In various figures, identical element
It is indicated using same or similar appended drawing reference.For the sake of clarity, the various pieces in attached drawing are not necessarily to scale.
In the prior art, it because of the requirement of engineering construction, can often be applied in the position with underground utilities (pipeline 11)
Work, pipeline 11 can interfere the excavation of the earthwork, meanwhile, if the earthwork area of excavation is larger, pipeline can be made hanging, if will
Pipeline change moving, and more economy can be lost, also take time and effort.It is moved if not changing, because gravity can cause brokenly pipeline
It is bad.For the above phenomenon, the present invention provides a kind of construction methods reinforced for pipeline.
The embodiment of the present invention is described in detail below with reference to attached drawing 1 and attached drawing 2.
The present invention provides a kind of construction method reinforced for pipeline, the method is as follows:
The top mark of the earth excavation of corresponding position above pipeline to pipeline 11 is high (i.e. under 11 horizontality of pipeline most
The side of top), form operating pit;Overarm brace 12, and the overarm brace are set up on the operating pit overhead surface
12 both ends are respectively supported on the ground of the opposite sides of the operating pit;Fixed dress is set on the overarm brace 12
It sets, and through the fixed pipeline 11 of the fixed device;Continue the digging operation that predetermined depth is carried out to the earthwork.
Overarm brace 12 is set up above the pipeline 11;It is arranged between the overarm brace 12 and the pipeline 11 solid
Device is determined, for fixing the pipeline 11;The excavation of predetermined depth is carried out to the earthwork.
In the present embodiment, it is to the principle of the reinforcing of pipeline: in the fooled erection simple beam structure (overarm brace of the earthwork
12) lifting reinforcing, is carried out to pipeline by simply supported beam, prevents from damaging the pipeline after hanging.
In the present embodiment, while one kind is provided for pipeline bracing means, as shown in Figure 1, being pipe shown in Fig. 1
The implementation principle figure that line is reinforced.Pipeline bracing means includes overarm brace 12, and the erection method of the overarm brace 12 is:
On ground 15, the opposite sides of the earthwork piles up concrete foundation platform 1 respectively;In the concrete foundation
Built-in fitting 5 is set in platform 1, by the overarm brace 12 build on the concrete foundation platform 1 and with the built-in fitting 5
It is fixedly connected.
Concrete foundation platform 1 is built-up by concrete, has preferable stability, can have enough to the cross
The support force of boom support 12.Built-in fitting 5 provides the connection of overarm brace 12 and concrete foundation platform, makes overarm brace 12 more
It is firm.
In the present embodiment, the overarm brace 12 is made using angle steel, is fabricated to 800mm and is multiplied 1000mm size
Standard knot can use high strength exploitation between each standard knot, increase the length of the overarm brace 12, be opened with meeting
The larger overarm brace 12 of the earthwork of digging has enough length.
In the present embodiment, the overarm brace 12 includes: column 10, and each built-in fitting 5 is separately connected described in one
Column 10;Header board 4, two header boards 4 are arranged in parallel, and each 4 plate of the header board respectively with each column
10 connections;Truss 3, the truss 3 are fixedly connected between two header boards 4, the structural strength for web beam plate.
It is understood that the stability in order to ensure bonding strength and overarm brace 12, connects on each concrete foundation platform 1
At least two pillars 10 are connected to, make overarm brace 12 that there is better stability;Header board can be set it is multiple, for example, four
A header board can be combined into the box-like structure of cuboid, and three header boards can be combined into triangular prism structure, in box-like structure
Or be filled in triangular prism structure with truss 3,3 lightweight construction of truss, and be capable of the bonding strength of web beam bracket 12,
Make overarm brace 12 that there is better bending strength.
Preferably, it is connected between the column 10 and the built-in fitting 5 using welding manner, because in engineering construction,
The position of pipeline bracing means will not change again, ensure that the reliable of connection using welding between column 10 and built-in fitting 5
Property, loosening problem will not occur.It is understood that built-in fitting 5 can be welded to connect in advance with column 10, mixed
It, will be in the direct Transducers Embedded in Concrete basic platform 1 of built-in fitting 5 that be welded with column 10 when the building of solidifying earth foundation platform 1.Separately
Outside, it can be connected by screw bolts between column 10 and built-in fitting 5, be provided with threaded hole on built-in fitting 5, using bolt by column 10
It links together with built-in fitting 5, for example, being connected between column 10 and built-in fitting 5 using ring flange.
Institute in the present embodiment, state between header board 4 and the column 10 and the truss 3 and the header board 4 it
Between be all made of high-strength bolt 2 connection.The mode of being connected by screw bolts can assemble multiple header boards 4, and easy to disassemble.
In the present embodiment, it needs that pipeline is fixed, as shown in Figures 1 and 2, the fixed device includes:
The side on the header board close to the pipeline 11 is arranged in pulley 7, the pulley 7;It is arranged in crossbeam branch
The lower section of frame 12.
Guide chain 8, the guide chain 8 around the pulley 7 and 11 lower section of pipeline, hold up the pipeline for hanging respectively
11.Pipeline 11 is sling by guide chain 8, prevents pipeline 11 because bending damage vacantly occurs for lower section.Preferably, the pipeline 11
A neonychium 9 is arranged in the position that lower section is contacted with the guide chain 8, for avoiding the guide chain 8 from damaging the pipeline 11.
As it will be appreciated by those skilled in the art that, pipeline 11 has the position that connects of pipe, and guide chain 8 can be set
Pipe connects at position, can play better fixed effect.Neonychium 9 can use the rubber of U-shaped steel pipe and adequate thickness
Pad.Multiple guide chains 8 can be set, to meet the fixation to longer pipe line 11.In addition, fixed device may be arranged as a company
One end of extension bar and two " semicircular ring ", two " semicircular ring " are hinged and can be combined into an annulus, use two " semicircles
The hinged of ring " clamps pipeline 11, and then connecting rod and " semicircular ring " link together, i.e. realization consolidating to pipeline 11
It is fixed.
In the present embodiment, as shown in Fig. 2, it further includes cable wind rope 13 (cable wind rope 13 and crossbeam branch that pipeline, which reinforces rotary device,
Frame 12 can be connected with multiple angles, it is not limited to a kind of connection type, without display cable wind rope 13 and Fig. 2 in Fig. 1
Shown in be local cross-section diagram, there is no some other structures such as heatable adobe sleeping platform that display is excavated, as those skilled in the art
Member should understand that), the two sides perpendicular to its length direction on the overarm brace 12 are respectively equipped with cable wind rope 13, the cable
Wind rope 13 is fastened on the earth anchor 14 on ground 15.Enhance such as Fig. 2 middle cross beam bracket 12 or so two by setting cable wind rope 13
The stability of side.
As shown in Figure 1, building enclosure 6 is respectively set in the surrounding in the earthwork, for avoiding collapsing for the earthwork
And into the earthwork into soil.In engineering construction, the building enclosure of setting can protect facility and and construction in the earthwork
Personnel.
The construction method provided by the present application reinforced for pipeline, does not need change moving to pipeline to can be carried out applying
Work, by the way that pipeline is fixed, when can be avoided out cubic metre of earth, pipeline is not supported, the problem of damaging to pipeline.And it should
Construction method has many advantages, such as that simple, quick, device is detachable.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
Finally, it should be noted that obviously, the above embodiment is merely an example for clearly illustrating the present invention, and simultaneously
The non-restriction to embodiment.For those of ordinary skill in the art, it can also do on the basis of the above description
Other various forms of variations or variation out.There is no necessity and possibility to exhaust all the enbodiments.And thus drawn
The obvious changes or variations that Shen goes out are still in the protection scope of this invention.
Claims (10)
1. a kind of construction method reinforced for pipeline characterized by comprising
The top mark of the earth excavation of corresponding position above pipeline to pipeline is high, form operating pit;
Overarm brace is set up on the operating pit overhead surface, and the both ends of the overarm brace are respectively supported at the work
On the ground of the opposite sides in industry hole;
Fixed device is set on the overarm brace, and through the fixed pipeline of the fixed device;
Continue the digging operation that predetermined depth is carried out to the earthwork.
2. the construction method according to claim 1 reinforced for pipeline, which is characterized in that the erection of the overarm brace
Method is:
On the ground, the opposite sides of the earthwork piles up concrete foundation platform respectively;
Built-in fitting is set in the concrete foundation platform, the overarm brace is built on the concrete foundation platform
And it is fixedly connected with the built-in fitting.
3. the construction method according to claim 2 reinforced for pipeline, which is characterized in that the overarm brace uses angle
Steel is made.
4. the construction method according to claim 1 or 2 or 3 reinforced for pipeline, which is characterized in that the overarm brace
Include:
Column, each built-in fitting are separately connected a column;
Header board, two header boards are arranged in parallel, and each header board is connect with each column respectively;
Truss, the truss are fixedly connected between two header boards, the structural strength for web beam plate.
5. it is according to claim 4 for pipeline reinforce construction method, which is characterized in that the column with it is described pre-buried
It is connected between part using welding manner.
6. the construction method according to claim 4 reinforced for pipeline, which is characterized in that the header board is stood with described
High strength exploitation is all made of between column and between the truss and the header board.
7. the construction method according to claim 1 reinforced for pipeline, which is characterized in that the fixed device includes:
The side on the header board close to the pipeline is arranged in pulley, the pulley;
Guide chain, the guide chain are bypassed respectively below the pulley and the pipeline, and for hanging the pipeline, the pipeline is through institute
Guide chain suspension is stated to hold up.
8. the construction method according to claim 7 reinforced for pipeline, which is characterized in that below the pipeline with it is described
A neonychium is arranged in the position of guide chain contact, for avoiding the guide chain from damaging the pipeline.
9. the construction method according to claim 1 reinforced for pipeline, which is characterized in that on the overarm brace
It is respectively equipped with cable wind rope perpendicular to the two sides of its length direction, the cable wind rope is connected to earth anchor.
10. the construction method according to claim 1 reinforced for pipeline, which is characterized in that the four of the operating pit
Building enclosure is respectively set in week, for avoiding the collapsing and into the earthwork into soil of the earthwork.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910418498.6A CN110230730A (en) | 2019-05-20 | 2019-05-20 | The construction method reinforced for pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910418498.6A CN110230730A (en) | 2019-05-20 | 2019-05-20 | The construction method reinforced for pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110230730A true CN110230730A (en) | 2019-09-13 |
Family
ID=67860790
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910418498.6A Pending CN110230730A (en) | 2019-05-20 | 2019-05-20 | The construction method reinforced for pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110230730A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112095619A (en) * | 2020-09-08 | 2020-12-18 | 中建一局集团第二建筑有限公司 | Protection device for underground original pipeline and construction method thereof |
CN116378055A (en) * | 2023-04-23 | 2023-07-04 | 安徽省交通建设股份有限公司 | Existing pipe culvert supporting and hanging type protection combined mechanism and construction method thereof |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2261376A1 (en) * | 1974-02-14 | 1975-09-12 | Adjiman Elie | Travelling machine constructing concrete culverts - inflated tube suspended from lateral rails within rigid coffer frame |
US4085876A (en) * | 1975-07-22 | 1978-04-25 | Raymond Albert Buckell | Hose fitting |
JPS6148691A (en) * | 1984-08-08 | 1986-03-10 | スタン・アンデユストリイ | Support apparatus for thin walled pipe |
US5522678A (en) * | 1994-04-18 | 1996-06-04 | Kelley Company, Inc. | Ground anchors |
CN101235649A (en) * | 2008-02-22 | 2008-08-06 | 上海市政工程设计研究总院 | Covered digging system for pit |
CN103233432A (en) * | 2013-04-26 | 2013-08-07 | 济南城建集团有限公司 | Bailey beam reverse lifting support system and construction method thereof |
CN103486403A (en) * | 2013-10-17 | 2014-01-01 | 中国建筑第六工程局有限公司 | In-situ protection construction method of pipeline above foundation pit |
CN204533963U (en) * | 2015-04-08 | 2015-08-05 | 中铁六局集团天津铁路建设有限公司 | A kind of foundation ditch built-in pipe overhead device |
CN105546278A (en) * | 2015-12-23 | 2016-05-04 | 国家电网公司 | Method for protecting underground pipeline during pipe ditch excavation |
CN105544603A (en) * | 2015-12-10 | 2016-05-04 | 中国二冶集团有限公司 | Construction method for underground pipeline reinforcement |
CN108060683A (en) * | 2017-12-18 | 2018-05-22 | 烟建集团有限公司 | A kind of middle weathering geology top-down construction method |
CN109056793A (en) * | 2018-08-15 | 2018-12-21 | 中国华冶科工集团有限公司 | Underground pipe gallery pre-reinforcement crossing pipeline construction method |
-
2019
- 2019-05-20 CN CN201910418498.6A patent/CN110230730A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2261376A1 (en) * | 1974-02-14 | 1975-09-12 | Adjiman Elie | Travelling machine constructing concrete culverts - inflated tube suspended from lateral rails within rigid coffer frame |
US4085876A (en) * | 1975-07-22 | 1978-04-25 | Raymond Albert Buckell | Hose fitting |
JPS6148691A (en) * | 1984-08-08 | 1986-03-10 | スタン・アンデユストリイ | Support apparatus for thin walled pipe |
US5522678A (en) * | 1994-04-18 | 1996-06-04 | Kelley Company, Inc. | Ground anchors |
CN101235649A (en) * | 2008-02-22 | 2008-08-06 | 上海市政工程设计研究总院 | Covered digging system for pit |
CN103233432A (en) * | 2013-04-26 | 2013-08-07 | 济南城建集团有限公司 | Bailey beam reverse lifting support system and construction method thereof |
CN103486403A (en) * | 2013-10-17 | 2014-01-01 | 中国建筑第六工程局有限公司 | In-situ protection construction method of pipeline above foundation pit |
CN204533963U (en) * | 2015-04-08 | 2015-08-05 | 中铁六局集团天津铁路建设有限公司 | A kind of foundation ditch built-in pipe overhead device |
CN105544603A (en) * | 2015-12-10 | 2016-05-04 | 中国二冶集团有限公司 | Construction method for underground pipeline reinforcement |
CN105546278A (en) * | 2015-12-23 | 2016-05-04 | 国家电网公司 | Method for protecting underground pipeline during pipe ditch excavation |
CN108060683A (en) * | 2017-12-18 | 2018-05-22 | 烟建集团有限公司 | A kind of middle weathering geology top-down construction method |
CN109056793A (en) * | 2018-08-15 | 2018-12-21 | 中国华冶科工集团有限公司 | Underground pipe gallery pre-reinforcement crossing pipeline construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112095619A (en) * | 2020-09-08 | 2020-12-18 | 中建一局集团第二建筑有限公司 | Protection device for underground original pipeline and construction method thereof |
CN116378055A (en) * | 2023-04-23 | 2023-07-04 | 安徽省交通建设股份有限公司 | Existing pipe culvert supporting and hanging type protection combined mechanism and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6200550B1 (en) | Temporary deadline method, temporary deadline structure | |
CN105887813A (en) | Large-diameter super-long pile construction method in karst area through full-casing pipe full rotating and rotary drilling | |
CN106014453B (en) | A kind of confined concrete arch supporting automated construction method suitable for subterranean tunnel | |
CN101871214B (en) | Foundation pit support and construction method for cement mixing pile inserted with Y type precast pile | |
JP6688263B2 (en) | Temporary cutoff method, temporary cutoff structure, support work, support work unit | |
CN110904867B (en) | Construction method for dismantling upper-span existing line arch bridge | |
CN110485429A (en) | A kind of prestressing force fashioned iron assembled combination inner support construction method | |
JP2016199929A (en) | Bridge construction method, column body and guide means used in bridge construction method | |
CN111119198A (en) | A reinforced structure that is used for SMW worker method stake to strut system | |
CN110023570B (en) | Portable mechanical combined ground fixing pile device | |
CN111173027A (en) | Construction method for reinforcing and protecting existing pipeline | |
CN110230730A (en) | The construction method reinforced for pipeline | |
CN106320349A (en) | Foundation Pit Reinforcement Support Device | |
JP2001115421A (en) | Construction method for temporary bridge and pier | |
CN108119165B (en) | Intelligent installation method of standardized prefabricated constrained concrete arch frame in underground engineering | |
CN104727324B (en) | Irregular basement construction method for supporting | |
CN103422486A (en) | Shipborne truss combined in-situ testing platform | |
JP6416474B2 (en) | Structure construction method and support device | |
CN107747314A (en) | A kind of construction method of combined beam type supporting pile pit supporting construction | |
CN106638326A (en) | Construction system for hoisting cable tower-free bridge cable and construction method | |
KR100819379B1 (en) | Concrete Structure Using Hydraulic System and Noise-Free Vibration Construction Method | |
CN111608700A (en) | A tunnel-free arch frame and its installation method | |
CN115899442B (en) | Protection device is sealed to new construction river course span oil gas pipeline | |
CN206753488U (en) | A kind of artificial digging pile reaming auxiliary equipment | |
CN217174727U (en) | Auxiliary vibrating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190913 |