CN110206136A - A kind of prefabricated buildings and its assembling assembly - Google Patents
A kind of prefabricated buildings and its assembling assembly Download PDFInfo
- Publication number
- CN110206136A CN110206136A CN201910459599.8A CN201910459599A CN110206136A CN 110206136 A CN110206136 A CN 110206136A CN 201910459599 A CN201910459599 A CN 201910459599A CN 110206136 A CN110206136 A CN 110206136A
- Authority
- CN
- China
- Prior art keywords
- cylinder
- guide post
- column
- assembling
- connection sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2481—Details of wall panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2484—Details of floor panels or slabs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
本发明提供一种装配式房屋及其装配组件,其中,装配式房屋包括墙体、楼板、梁和立柱;所述墙体由复数块墙板模块通过固定导柱连接而成,所述楼板由复数块楼板模块通过固定导柱连接而成,所述固定导柱的两端分别连接一所述梁上,所述梁的两端则连接在所述立柱上。本发明为装配式房屋提供整体解决方案,同时用于装配的预制件加工容易,组装操作简单,利于标准化生产。
The invention provides a prefabricated house and its assembly components, wherein the prefabricated house includes a wall, a floor, a beam and a column; the wall is formed by connecting a plurality of wall panel modules through fixed guide posts, and the floor is composed of A plurality of floor slab modules are connected by fixed guide columns, two ends of the fixed guide columns are respectively connected to one of the beams, and both ends of the beams are connected to the upright columns. The present invention provides an overall solution for prefabricated houses, and at the same time, the prefabricated parts used for assembly are easy to process, the assembly operation is simple, and the standardized production is facilitated.
Description
技术领域technical field
本发明涉及房屋建造技术领域,特别涉及一种装配式房屋及其装配组件。The invention relates to the technical field of house construction, in particular to a prefabricated house and its assembly components.
背景技术Background technique
装配式房屋是用工业化的生产方式来建造房屋,是将房屋的部分或全部构件在工厂预制完成,然后运输到施工现场,将构件通过可靠的连接方式组装而建成的房屋,也被称作产业化房屋或工业化房屋。随着现代工业技术的发展,建造房屋可以像机器生产那样,成批成套地制造。只要把预制好的房屋构件,运到工地装配起来就成了。近年来,随着国家政策的出台,装配式房屋得到大力发展。Prefabricated houses are built by industrialized production methods. Part or all of the components of the house are prefabricated in the factory, then transported to the construction site, and the components are assembled through reliable connections. It is also called industry. houses or industrial houses. With the development of modern industrial technology, building houses can be manufactured in batches like machine production. As long as the prefabricated building components are transported to the construction site and assembled. In recent years, with the introduction of national policies, prefabricated houses have been vigorously developed.
公开号为CN208009697U的中国实用新型公开了一种装配式建筑中的模块化墙体结构,包括墙体单元,多个墙体单元组成墙体,墙体单元是由底板和设置在底板顶面中线上的凸起段组成的条形结构,墙体单元的截面为为“凸”字形,所述的底板顶面在凸起段两侧的位置上设有预埋钢筋和钢套筒,预埋钢筋和钢套筒对称于凸起段设置;所述墙体单元上的预埋钢筋下半段预埋设置在底板内,预埋钢筋的上半段插入设置在相邻的墙体单元的钢套筒内。采用上述结构,通过将装配式墙体模块化,将更小更轻的墙体单元进行预制后连接,省去了在现场进行支模浇筑的麻烦,大大提高了施工效率,另外也解决了现有装配式墙体吊装困难的问题。由于其只提供了墙体结构,并没有提供整个房屋的解决方案,而且其是采用预埋钢筋和钢套筒的方式实现,可见墙体的重量无法实现轻便的效果。The Chinese utility model with publication number CN208009697U discloses a modular wall structure in a prefabricated building, including a wall unit, a plurality of wall units forming a wall, and the wall unit is composed of a bottom plate and a center line arranged on the top surface of the bottom plate. The strip structure is composed of raised sections on the upper part of the wall, the section of the wall unit is a "convex" shape, and the top surface of the bottom plate is provided with pre-embedded steel bars and steel sleeves on both sides of the raised section. Reinforcing bars and steel sleeves are arranged symmetrically to the raised sections; the lower half of the pre-embedded bars on the wall unit are pre-embedded in the bottom plate, and the upper half of the pre-embedded bars are inserted into the steel bars arranged in the adjacent wall units. inside the sleeve. Using the above structure, by modularizing the prefabricated wall, the smaller and lighter wall units are prefabricated and connected, which saves the trouble of supporting formwork on site, greatly improves the construction efficiency, and also solves the problem of existing problems. There is a problem of difficulty in hoisting the prefabricated wall. Since it only provides a wall structure and does not provide a solution for the entire house, and it is realized by pre-embedding steel bars and steel sleeves, it can be seen that the weight of the wall cannot achieve a light effect.
公开号为CN207048123U的本实用新型公开的一种装配式预制墙体用连接结构,包括连接立柱,所述连接立柱的两侧分别形成有一用于供相邻的两块预制墙体的侧边插入的第一、第二凹槽,在所述连接立柱的上、下端分别固定设置有上、下预埋板件,所述上、下预埋板件分别通过上、下紧固件与主体结构连接,所述连接立柱为超高性能混凝土立柱。其采用超高性能混凝土立柱代替轻钢龙骨,制备成本更低,适合对于层高较高的使用环境。由于其只提供了预制墙体用连接结构,并没有提供整个房屋的解决方案,而且立柱为超高性能混凝土立柱,同样很难实现轻便的效果。The utility model discloses a connection structure for a prefabricated wall with a publication number of CN207048123U, which includes a connecting column, and two sides of the connecting column are respectively formed with a side edge for inserting two adjacent prefabricated walls. The first and second grooves of the connecting column are respectively fixed with upper and lower embedded panels at the upper and lower ends of the connecting column, and the upper and lower embedded panels are connected to the main structure through the upper and lower fasteners respectively. The connecting column is an ultra-high performance concrete column. It uses ultra-high-performance concrete columns to replace light steel keels, and the preparation cost is lower, which is suitable for use environments with high storey heights. Since it only provides a connection structure for prefabricated walls, it does not provide a solution for the entire house, and the columns are ultra-high-performance concrete columns, so it is also difficult to achieve a lightweight effect.
发明内容SUMMARY OF THE INVENTION
本发明要解决的技术问题,在于提供一种装配式房屋及其装配组件,为装配式房屋提供整体解决方案,同时用于装配的预制件加工容易,组装操作简单,利于标准化生产。The technical problem to be solved by the present invention is to provide a prefabricated house and its assembly components, providing an overall solution for the prefabricated house, and at the same time, the prefabricated parts used for assembly are easy to process, and the assembly operation is simple, which is conducive to standardized production.
本发明的装配式房屋是这样实现的:一种装配式房屋,包括墙体、楼板、梁和立柱;所述墙体由复数块墙板模块通过固定导柱连接而成,所述楼板由复数块楼板模块通过固定导柱连接而成,所述固定导柱的两端分别连接一所述梁上,所述梁的两端则连接在所述立柱上;The prefabricated house of the present invention is realized as follows: a prefabricated house includes a wall, a floor, a beam and a column; the wall is formed by connecting a plurality of wall panel modules through fixed guide columns, and the floor is composed of a plurality of The slab modules are connected by fixed guide columns, two ends of the fixed guide columns are respectively connected to the beam, and both ends of the beam are connected to the upright column;
所述墙板模块为矩形板,两侧面均为第一装配面,该第一装配面上设置有平行于第一装配面的第一装配凹槽,两所述第一装配凹槽的开口对接后形成第一导柱孔;The wall panel module is a rectangular plate, and both sides are a first assembly surface, the first assembly surface is provided with a first assembly groove parallel to the first assembly surface, and the openings of the two first assembly grooves are butted. Then the first guide post hole is formed;
所述楼板模块为矩形板,至少一侧面为第二装配面,该第二装配面上设置有平行于第二装配面的第二装配凹槽,两所述第二装配凹槽的开口对接后形成第二导柱孔;The floor module is a rectangular plate, and at least one side is a second assembly surface. The second assembly surface is provided with a second assembly groove parallel to the second assembly surface. After the openings of the two second assembly grooves are butted together forming a second guide post hole;
所述立柱包括一第一柱体和两个连接头,两所述连接头固设于所述第一柱体的一端部,且所述连接头上设置有至少两个不同朝向的第一连接片;The upright column includes a first column body and two connecting heads, the two connecting heads are fixed on one end of the first column body, and the connecting heads are provided with at least two first connections with different orientations piece;
所述梁包括一第二柱体和两第二连接片,所述第二柱体的至少两侧面上开设有垂直于侧面的安装孔,两所述第二连接片分别固设于所述第二柱体两端部;The beam includes a second column body and two second connecting pieces, at least two sides of the second column body are provided with mounting holes perpendicular to the side surfaces, and the two second connecting pieces are respectively fixed on the first connecting pieces. Two ends of the cylinder;
每一所述第一导柱孔和第二导柱孔内均穿设有一所述固定导柱,且所述固定导柱的两端分别穿设于一所述安装孔内;所述第二连接片与第一连接片固定连接。Each of the first guide post hole and the second guide post hole is provided with a fixed guide post, and both ends of the fixed guide post are respectively penetrated in one of the installation holes; the second guide post The connecting piece is fixedly connected with the first connecting piece.
根据本发明的实施例,所述墙板模块包括标准墙板模块、带门的非标墙板模块以及带窗户的非标墙板模块;所述梁和所述立柱均为金属所制;所述第一柱体的中段还设有至少一所述连接头。According to an embodiment of the present invention, the wall panel module includes a standard wall panel module, a non-standard wall panel module with a door, and a non-standard wall panel module with a window; the beam and the column are all made of metal; The middle section of the first cylinder is also provided with at least one of the connecting heads.
根据本发明的实施例,所述第一装配凹槽的横截面和第二装配凹槽的横截面的长宽尺寸分别相同;所述第一导柱孔和第二导柱孔均为大小相同的矩形孔,所述固定导柱为矩形柱体。According to an embodiment of the present invention, the length and width of the cross section of the first assembling groove and the cross section of the second assembling groove are respectively the same; the first guide post hole and the second guide post hole are both the same size The rectangular hole, the fixed guide post is a rectangular cylinder.
根据本发明的实施例,所述第一柱体四个侧面分别具有一凸棱,该凸棱的大小刚好与所述第一装配凹槽匹配。According to an embodiment of the present invention, each of the four sides of the first cylinder has a convex edge, and the size of the convex edge just matches the first assembling groove.
根据本发明的实施例,所述连接头具有按左右前后四个方向分布的第一连接片,每个所述第一连接片和所述第二连接片上均设有复数个对应的连接锁孔,并通过螺栓连接。According to an embodiment of the present invention, the connecting head has first connecting pieces distributed in four directions: left, right, front and rear, and each of the first connecting piece and the second connecting piece is provided with a plurality of corresponding connection locking holes , and connected by bolts.
本发明的装配式房屋的装配组件是这样实现的:一种装配式房屋的装配组件,包括墙板模块、楼板模块、梁、固定导柱以及立柱;The assembly assembly of the prefabricated house of the present invention is realized as follows: an assembly assembly of the prefabricated house includes a wall panel module, a floor slab module, a beam, a fixed guide column and a vertical column;
所述墙板模块为矩形板,两侧面均为第一装配面,该第一装配面上设置有平行于第一装配面的第一装配凹槽,两所述第一装配凹槽的开口对接后形成第一导柱孔;The wall panel module is a rectangular plate, and both sides are a first assembly surface, the first assembly surface is provided with a first assembly groove parallel to the first assembly surface, and the openings of the two first assembly grooves are butted. Then the first guide post hole is formed;
所述楼板模块为矩形板,至少一侧面为第二装配面,该第二装配面上设置有平行于第二装配面的第二装配凹槽,两所述第二装配凹槽的开口对接后形成第二导柱孔;The floor module is a rectangular plate, and at least one side is a second assembly surface. The second assembly surface is provided with a second assembly groove parallel to the second assembly surface. After the openings of the two second assembly grooves are butted together forming a second guide post hole;
所述立柱包括一第一柱体和两个连接头,两所述连接头固设于所述第一柱体的一端部,且所述连接头上设置有至少两个不同朝向的第一连接片;The upright column includes a first column body and two connecting heads, the two connecting heads are fixed on one end of the first column body, and the connecting heads are provided with at least two first connections with different orientations piece;
所述梁包括一第二柱体和两第二连接片,所述第二柱体的至少两侧面上开设有垂直于侧面的安装孔,两所述第二连接片分别固设于所述第二柱体两端部;The beam includes a second column body and two second connecting pieces, at least two sides of the second column body are provided with mounting holes perpendicular to the side surfaces, and the two second connecting pieces are respectively fixed on the first connecting pieces. Two ends of the cylinder;
每一所述第一导柱孔和第二导柱孔内均穿设有一所述固定导柱,且所述固定导柱的两端分别穿设于一所述安装孔内;所述第二连接片与第一连接片固定连接。Each of the first guide post hole and the second guide post hole is provided with a fixed guide post, and both ends of the fixed guide post are respectively penetrated in one of the installation holes; the second guide post The connecting piece is fixedly connected with the first connecting piece.
根据本发明的实施例,所述墙板模块包括标准墙板模块、带门的非标墙板模块以及带窗户的非标墙板模块;所述梁和所述立柱均为金属所制;所述第一柱体的中段还设有至少一所述连接头。According to an embodiment of the present invention, the wall panel module includes a standard wall panel module, a non-standard wall panel module with a door, and a non-standard wall panel module with a window; the beam and the column are all made of metal; The middle section of the first cylinder is also provided with at least one of the connecting heads.
根据本发明的实施例,所述第一装配凹槽的横截面和第二装配凹槽的横截面的长宽尺寸分别相同;所述第一导柱孔和第二导柱孔均为大小相同的矩形孔,所述固定导柱为矩形柱体。According to an embodiment of the present invention, the length and width of the cross section of the first assembling groove and the cross section of the second assembling groove are respectively the same; the first guide post hole and the second guide post hole are both the same size The rectangular hole, the fixed guide post is a rectangular cylinder.
根据本发明的实施例,所述第一柱体四个侧面分别具有一凸棱,该凸棱的大小刚好与所述第一装配凹槽匹配。According to an embodiment of the present invention, each of the four sides of the first cylinder has a convex edge, and the size of the convex edge just matches the first assembling groove.
根据本发明的实施例,所述连接头具有按左右前后四个方向分布的第一连接片,每个所述第一连接片和所述第二连接片上均设有复数个对应的连接锁孔,并通过螺栓连接。According to an embodiment of the present invention, the connecting head has first connecting pieces distributed in four directions: left, right, front and rear, and each of the first connecting piece and the second connecting piece is provided with a plurality of corresponding connection locking holes , and connected by bolts.
本发明具有如下优点:本发明为装配式房屋提供整体解决方案,同时用于装配的预制件加工容易,组装操作简单高效,利于标准化生产。The present invention has the following advantages: the present invention provides an overall solution for prefabricated houses, and at the same time, the prefabricated parts used for assembly are easy to process, the assembly operation is simple and efficient, and is conducive to standardized production.
附图说明Description of drawings
下面参照附图结合实施例对本发明作进一步的说明。The present invention will be further described below with reference to the accompanying drawings and embodiments.
图1为本发明装配式房屋的一实施例的立体结构示意图(拆除部分墙板模块和楼板模块)。FIG. 1 is a schematic three-dimensional structure diagram of an embodiment of a prefabricated house according to the present invention (part of the wall panel module and the floor panel module are removed).
图2为本发明的墙板模块的结构示意图。FIG. 2 is a schematic structural diagram of the wall panel module of the present invention.
图2a为本发明两块墙板模块抵紧状态的端示图。Fig. 2a is an end view of a state where two wallboard modules are pressed against each other according to the present invention.
图3为本发明的楼板模块的结构示意图。FIG. 3 is a schematic structural diagram of the floor module of the present invention.
图3a为本发明两块楼板模块抵紧状态的端示图。Fig. 3a is an end view of the abutting state of two floor slab modules of the present invention.
图4为本发明的固定导柱的结构示意图。FIG. 4 is a schematic structural diagram of the fixed guide post of the present invention.
图5为本发明的梁的结构示意图。FIG. 5 is a schematic structural diagram of the beam of the present invention.
图6为本发明的立柱的两种结构示意图。FIG. 6 is a schematic diagram of two structures of the column of the present invention.
图6a为本发明的立柱的连接头的结构示意图。FIG. 6a is a schematic structural diagram of the connector of the column according to the present invention.
图6b为本发明的立柱与梁连接结构示意图。FIG. 6b is a schematic diagram of the connection structure between the column and the beam according to the present invention.
图6c为本发明的立柱的截面结构示意图。FIG. 6c is a schematic cross-sectional structure diagram of a column of the present invention.
图6d为本发明的立柱与相邻墙板连接结构示意图。FIG. 6d is a schematic diagram of the connection structure of the column and the adjacent wall panel according to the present invention.
图7为本发明的梁与楼板模块连接节点的结构示意图。FIG. 7 is a schematic structural diagram of a connection node between a beam and a floor module of the present invention.
图8为本发明的梁与墙板模块板连接节点的结构示意图。FIG. 8 is a schematic structural diagram of a connection node between a beam and a wall panel module panel of the present invention.
具体实施方式Detailed ways
请参阅图1至图8,本发明的装配式房屋包括墙体、楼板、梁4和立柱5;所述墙体由复数块墙板模块1通过固定导柱3连接而成,所述楼板由复数块楼板模块2通过固定导柱3连接而成,所述固定导柱3的两端分别连接一所述梁4上,所述梁4的两端则连接在所述立柱5上。Please refer to FIGS. 1 to 8 , the prefabricated house of the present invention includes a wall, a floor, a beam 4 and a column 5; the wall is formed by connecting a plurality of wall panel modules 1 through a fixed guide column 3, and the floor is composed of A plurality of floor modules 2 are connected by a fixed guide column 3 , two ends of the fixed guide column 3 are respectively connected to a beam 4 , and two ends of the beam 4 are connected to the upright column 5 .
主要如图2所示,所述墙板模块1包括标准墙板模块11、带门的非标墙板模块12以及带窗户的非标墙板模块13;标准墙板模块11的高、宽、厚三个方向的尺寸均为固定尺寸,而带门的非标墙板模块12以及带窗户的非标墙板模块13仅高和厚的尺寸为固定尺寸,而宽度尺寸可作相应的调整,以满足设置门或窗户需求。但无论哪种墙板模块,均设计为矩形板,矩形板的两个侧面均为第一装配面13,该第一装配面上设置有平行于第一装配面13的第一装配凹槽14,两所述第一装配凹槽14的开口对接后形成第一导柱孔15,可供固定导柱3穿过;实际上,在较佳的实施例中,墙板模块1通过固定导柱3的连接并非独立的连接,即相互之间并没有锁定的关系,还需有梁4和立柱5的共同作用才可实现。Mainly as shown in FIG. 2 , the wall panel module 1 includes a standard wall panel module 11 , a non-standard wall panel module 12 with a door, and a non-standard wall panel module 13 with a window; The dimensions in the three directions of thickness are fixed dimensions, while the non-standard wall panel module 12 with door and the non-standard wall panel module 13 with windows are only fixed dimensions in terms of height and thickness, and the width dimension can be adjusted accordingly. To meet the needs of setting doors or windows. However, no matter what kind of wall panel module, it is designed as a rectangular panel, and the two sides of the rectangular panel are the first assembly surface 13 , and the first assembly surface is provided with a first assembly groove 14 parallel to the first assembly surface 13 . , the openings of the two first assembling grooves 14 are connected to form a first guide post hole 15 for the fixed guide post 3 to pass through; in fact, in a preferred embodiment, the wall panel module 1 passes through the fixed guide post The connection of 3 is not an independent connection, that is, there is no locking relationship between each other, and the joint action of the beam 4 and the column 5 can be realized.
主要如图3所示,所述楼板模块2为矩形板,至少一侧面为第二装配面21,如处于中间的楼板模块2必须有两个第二装配面21,而位于边缘处的楼板模块2有一抵靠于梁4的侧面无需设置为第二装配面21。该第二装配面21上设置有平行于第二装配面21的第二装配凹槽22,两所述第二装配凹槽22的开口对接后形成第二导柱孔23,可供固定导柱3穿过;实际上,在较佳的实施例中,楼板模块2通过固定导柱3的连接也并非独立的连接,同样还需有梁4和立柱5的共同作用才可实现。As shown in FIG. 3 , the floor module 2 is a rectangular plate, and at least one side is a second assembly surface 21 . For example, the floor module 2 in the middle must have two second assembly surfaces 21 , while the floor module at the edge must have two second assembly surfaces 21 . 2. A side abutting against the beam 4 does not need to be set as the second assembling surface 21. The second assembling surface 21 is provided with a second assembling groove 22 parallel to the second assembling surface 21 . The openings of the two second assembling grooves 22 are connected to form a second guide post hole 23 for fixing the guide post. 3 passes through; in fact, in the preferred embodiment, the connection of the floor module 2 through the fixed guide column 3 is not independent, and also requires the joint action of the beam 4 and the column 5 to be realized.
主要如图6至图6d所示,所述立柱5最基本的实施例是包括一第一柱体51和两连接头52,所述连接头52固设于所述第一柱体51的端部,如图6的左图所示,以适应单层装配式房屋,但若装配式房屋有两层或多层时,第一柱体51根据层数设置在中段再设置相应个数的连接头,如图6的右图所示,适应两层装配式房屋时,第一柱体51的中段还需设置一连接头,用于连接中间楼板模块2,当要适应三层装配式房屋时,第一柱体51的中段还需设置两连接头,用于连接中间两层楼板模块2,以此类推。所述连接头52上设置有至少两个不同朝向的第一连接片53,以与不同方向的梁4连接;为了安装操作时省去辨认方向的麻烦,可以在所述连接头51在四个侧面,即按左右前后四个方向均设置一第一连接片53,根据本发明的实施例,为了使墙体边缘的固定也具有较好的稳定性,在所述第一柱体51相应侧面设置一凸棱512,该凸棱512的大小刚好与所述第一装配凹槽14匹配。为了操作的便利性,可以在第一柱体51的四个侧面分别设置一凸棱512,使立柱51的安装无需辨认方向。所述梁和所述立柱均为金属所制。As shown in FIG. 6 to FIG. 6d , the most basic embodiment of the column 5 includes a first column 51 and two connecting heads 52 , and the connecting heads 52 are fixed on the end of the first column 51 . As shown in the left figure of Figure 6, it is suitable for a single-storey prefabricated house, but if the prefabricated house has two or more layers, the first column 51 is arranged in the middle section according to the number of layers and then a corresponding number of connections are arranged As shown in the right figure of Figure 6, when adapting to a two-story prefabricated house, the middle section of the first column 51 also needs to be provided with a connector for connecting the middle floor module 2. When adapting to a three-story prefabricated house , the middle section of the first column body 51 also needs to be provided with two connecting heads for connecting the floor modules 2 of the middle two floors, and so on. The connecting head 52 is provided with at least two first connecting pieces 53 with different orientations to connect with the beams 4 in different directions; in order to save the trouble of identifying the direction during the installation operation, the connecting head 51 can be placed on four The side, that is, a first connecting piece 53 is arranged in the four directions of left, right, front and rear. According to the embodiment of the present invention, in order to make the fixing of the wall edge also have better stability, the corresponding side of the first column 51 A protruding edge 512 is provided, and the size of the protruding edge 512 just matches the first assembling groove 14 . For the convenience of operation, a convex edge 512 may be respectively provided on the four sides of the first column body 51, so that the installation of the upright column 51 does not need to identify the direction. Both the beam and the upright column are made of metal.
所述梁4包括一第二柱体41和两第二连接片42,所述第二柱体41的至少两侧面上开设有垂直于侧面的安装孔412,两所述第二连接片42分别固设于所述第二柱体41两端部;The beam 4 includes a second column body 41 and two second connecting pieces 42. At least two sides of the second column body 41 are provided with mounting holes 412 perpendicular to the side surfaces, and the two second connecting pieces 42 are respectively be fixed on both ends of the second cylinder 41;
每一所述第一导柱孔15和第二导柱孔23内均穿设有一所述固定导柱3,且所述固定导柱3的两端分别穿设于一所述安装孔412内;所述第二连接片42与第一连接片53固定连接,每个所述第一连接片53和所述第二连接片42上均设有复数个对应的连接锁孔532(422),并通过螺栓7连接。Each of the first guide post hole 15 and the second guide post hole 23 is provided with a fixed guide post 3 , and both ends of the fixed guide post 3 are respectively penetrated in one of the installation holes 412 ; The second connecting piece 42 is fixedly connected with the first connecting piece 53, and each of the first connecting piece 53 and the second connecting piece 42 is provided with a plurality of corresponding connection locking holes 532 (422), And connected by bolt 7.
由于固定导柱3穿设于第一导柱孔15和第二导柱孔23内,因此,实际上并没有真正固定墙板模块1或楼板模块2的作用,而是在固定导柱3的两端固定于梁4的安装孔412内,且梁的两端又通过第二连接片42与第一连接片53的连接而固定于立柱上时,整个房屋才形成稳定的固定结构。Since the fixed guide post 3 is penetrated in the first guide post hole 15 and the second guide post hole 23 , it does not actually fix the wall panel module 1 or the floor slab module 2 . When both ends of the beam are fixed in the mounting holes 412 of the beam 4 , and the two ends of the beam are fixed to the column through the connection of the second connecting piece 42 and the first connecting piece 53 , the entire house can form a stable fixed structure.
根据本发明的实施例,所述第一装配凹槽14的横截面和第二装配凹槽22的横截面的长宽尺寸分别相同;所述第一导柱孔15和第二导柱孔23均为大小相同的矩形孔,所述固定导柱3为矩形柱体,从而只需设置一种规格的固定导柱3即可,无需在操作时去辨认配合关系是否对应。According to the embodiment of the present invention, the length and width of the cross section of the first fitting groove 14 and the cross section of the second fitting groove 22 are respectively the same; the first guide post hole 15 and the second guide post hole 23 They are all rectangular holes of the same size, and the fixed guide post 3 is a rectangular cylinder, so that only one type of fixed guide post 3 is required, and there is no need to identify whether the matching relationship corresponds during operation.
本发明的操作过程是:The operation process of the present invention is:
1、先组成框架,将梁4的两端的第二连接片42和立柱5的连接头52上对应的第一连接片53用螺栓7连接好,如图7所示的状态,形成框架结构体。1. First form a frame, connect the second connecting pieces 42 at both ends of the beam 4 and the corresponding first connecting pieces 53 on the connecting head 52 of the column 5 with bolts 7, as shown in Figure 7, to form a frame structure .
2、然后安装楼板,为操作方便,先安装与梁相邻的楼板模块。将一楼板模块2的其中一侧抵设于一梁4,然后另一侧的第二装配凹槽22用固定导柱3挂设于另两个梁上,再用另一楼板模块2的其中一侧的第二装配凹槽22插设于固定导柱3上,依次进行,直到最后两块楼板模块2;此时需先安装最后一块楼板模块2和梁4一侧抵设,再安装倒数第二块楼板模块2插设于已有的固定导柱3,此时倒数第一块和第二块楼板模块2的相邻第二装配凹槽22形成第二导柱孔23,用固定导柱3挂设于另两个梁上。此时形成完整的平面结构。2. Then install the floor slab. For the convenience of operation, first install the floor slab module adjacent to the beam. One side of a floor module 2 is placed against a beam 4, and then the second assembly groove 22 on the other side is hung on the other two beams with the fixed guide post 3, and then the other floor module 2 is used for The second assembly groove 22 on one side is inserted on the fixed guide column 3, and the process is carried out in sequence until the last two floor modules 2; at this time, the last floor module 2 and the beam 4 need to be installed on one side, and then the countdown is installed. The second floor module 2 is inserted into the existing fixed guide column 3. At this time, the adjacent second assembling grooves 22 of the last floor module 2 and the second floor module 2 form a second guide column hole 23. The column 3 is hung on the other two beams. At this point a complete planar structure is formed.
3、最后安装墙体,与安装楼板2类似的,先安装与柱相邻的墙板模块1,将一楼板模块1的其中一侧的第一装配凹槽14插设于一柱5的凸棱512,然后另一侧的第一装配凹槽14用固定导柱3挂设于另两个梁上,依次进行安装,最后两块的安装顺序与楼板2安装相同,先安装最后一块,再安装倒数第二块。3. Finally, install the wall. Similar to installing the floor 2, first install the wall panel module 1 adjacent to the column, and insert the first assembly groove 14 on one side of the floor module 1 into the protrusion of a column 5. Edge 512, and then the first assembly groove 14 on the other side is hung on the other two beams with the fixed guide post 3, and the installation is performed in sequence. The installation sequence of the last two pieces is the same as that of the floor slab 2. Install the penultimate block.
当然安装过程不一定要按上述过程进行,可根据安装人员的习惯作适当的调整。Of course, the installation process does not necessarily have to be carried out according to the above process, and appropriate adjustments can be made according to the habits of the installer.
虽然以上描述了本发明的具体实施方式,但是熟悉本技术领域的技术人员应当理解,我们所描述的具体的实施例只是说明性的,而不是用于对本发明的范围的限定,熟悉本领域的技术人员在依照本发明的精神所作的等效的修饰以及变化,都应当涵盖在本发明的权利要求所保护的范围内。Although the specific embodiments of the present invention have been described above, those skilled in the art should understand that the specific embodiments we describe are only illustrative, rather than used to limit the scope of the present invention. Equivalent modifications and changes made by a skilled person in accordance with the spirit of the present invention should be included within the scope of protection of the claims of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910459599.8A CN110206136A (en) | 2019-05-29 | 2019-05-29 | A kind of prefabricated buildings and its assembling assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910459599.8A CN110206136A (en) | 2019-05-29 | 2019-05-29 | A kind of prefabricated buildings and its assembling assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110206136A true CN110206136A (en) | 2019-09-06 |
Family
ID=67789444
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910459599.8A Pending CN110206136A (en) | 2019-05-29 | 2019-05-29 | A kind of prefabricated buildings and its assembling assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110206136A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112538985A (en) * | 2020-10-30 | 2021-03-23 | 万华建筑科技有限公司 | Quickly-built house and dismounting and mounting method thereof |
CN115148084A (en) * | 2022-08-02 | 2022-10-04 | 河北工程大学 | Modularized large-space building fire safety experiment device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106320521A (en) * | 2016-11-08 | 2017-01-11 | 广州玮莱房屋建筑有限公司 | Pure part plate combined industrialized house assembling structure which can be rapidly erected |
CN106836502A (en) * | 2017-03-09 | 2017-06-13 | 陈阳 | Modularized house assembling structure |
CN108824635A (en) * | 2018-08-24 | 2018-11-16 | 四川省建筑科学研究院 | Support construction and its installation method for steel construction low-rise building |
CN208733860U (en) * | 2018-08-10 | 2019-04-12 | 湖北天欣木结构房制造有限公司 | Post and beam prefabricated wood wall and log cabin structure |
CN210104958U (en) * | 2019-05-29 | 2020-02-21 | 福州普斯普策信息科技有限公司 | Assembled house and assembly component thereof |
-
2019
- 2019-05-29 CN CN201910459599.8A patent/CN110206136A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106320521A (en) * | 2016-11-08 | 2017-01-11 | 广州玮莱房屋建筑有限公司 | Pure part plate combined industrialized house assembling structure which can be rapidly erected |
CN106836502A (en) * | 2017-03-09 | 2017-06-13 | 陈阳 | Modularized house assembling structure |
CN208733860U (en) * | 2018-08-10 | 2019-04-12 | 湖北天欣木结构房制造有限公司 | Post and beam prefabricated wood wall and log cabin structure |
CN108824635A (en) * | 2018-08-24 | 2018-11-16 | 四川省建筑科学研究院 | Support construction and its installation method for steel construction low-rise building |
CN210104958U (en) * | 2019-05-29 | 2020-02-21 | 福州普斯普策信息科技有限公司 | Assembled house and assembly component thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112538985A (en) * | 2020-10-30 | 2021-03-23 | 万华建筑科技有限公司 | Quickly-built house and dismounting and mounting method thereof |
CN115148084A (en) * | 2022-08-02 | 2022-10-04 | 河北工程大学 | Modularized large-space building fire safety experiment device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109642424B (en) | Connection system and method for prefabricated volumetric building modules | |
US7882665B2 (en) | Construction configurations and construction methods of steel houses | |
KR102154095B1 (en) | Modular prefabricated house using precast concrete segment and construction method thereof | |
CN212200877U (en) | Wall body component of assembled low-rise residence | |
CN201809858U (en) | Combined house | |
CN110206136A (en) | A kind of prefabricated buildings and its assembling assembly | |
CN211647105U (en) | Aluminum square tube wall structure | |
CN211849961U (en) | Wall formwork prefabricated unit and building structure with the wall formwork prefabricated unit | |
CN211898889U (en) | A prefabricated steel structure building | |
CN210104958U (en) | Assembled house and assembly component thereof | |
CN216713478U (en) | But quick assembly disassembly's prefabricated assembled indoor partition wall with finish coat | |
CN214090963U (en) | Loose-splicing early-dismantling building template system | |
CN213508886U (en) | Assembly type building with built-in truss mechanism | |
CN211775008U (en) | Ground keel frame structure | |
CN219343758U (en) | A kind of SP plate and plate end connector used in high intensity area | |
CN212866454U (en) | Assembled concrete stairwell outer wall structure | |
CN110984463A (en) | Net mould component of industrial low-rise assembled house | |
CN210238789U (en) | Steel house convenient to installation and dismantlement | |
CN216839889U (en) | Rapid Assembly type house | |
CN220704833U (en) | Assembled wall | |
CN113700148B (en) | Module system of multi-ribbed steel structure and construction method thereof | |
CN215670511U (en) | Assembled inner partition plate | |
CN222295292U (en) | Building structure for assembled house | |
CN119062031B (en) | Assembled energy-absorbing shear wall and construction method thereof | |
CN212866977U (en) | Earthquake-resistant reinforcing structure of reinforced concrete building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190906 |
|
WD01 | Invention patent application deemed withdrawn after publication |